This is an HTML version of an attachment to the Official Information request 'Resource consents for combustion discharges'.
 
28 September 2018 
PO Box 645 Nelson 7040  
 
Phone: 03 546 0200 
Fax: 03 546 0239 
South Pine (Nelson) Limited 
 
C/- Tony Wilkinson 
 
South Pine 
Resource Consent Number: 085308V5 
Contact: Mark Buckley
PO Box 554 
 
DD:03 265 6227 
Nelson 7040 
Email: [email address] 
 
www.nelson.govt.nz 
Dear Mr Wilkinson 
 
RM085308V5 DECISION ON NON-NOTIFIED RESOURCE CONSENT   

Pursuant to Section 114 of the Resource Management Act 1991 (“the Act”), please find 
enclosed  a  copy  of  the  Council’s  decision  on  your  application  for  resource  consent 
referred to above. 
Section  120  of  the  Act  provides  you  with  the  right  to  lodge  an  appeal  with  the 
Environment Court in respect of this decision and/or any associated conditions.  Section 
121 of the Act requires that any such appeal must be made in the prescribed form, must 
state  the  reasons  for  the  appeals,  the  relief  sought,  state  any  matters  required  by 
regulations and must be lodged with both the environment Court and the Council within 
15 working days of receiving this letter. 
You  may  commence  your  activity  immediately  unless  you  lodge  an  appeal  to  this 
decision.    However,  it  is  important  that  you  check  the  conditions  of  your  consent 
carefully  as  some  of  them  may  require  you  to  provide  information  and/or  plans  to  the 
Council  before  you  may  commence  your  activity.  In  addition,  in  some  cases  you  may 
also  require  other  permits  or  building  consents  for  your  activity  and  these  must  be 
obtained before you can commence your activity. 
Invoicing: Once the final processing costs are determined an invoice will be sent out or 
you will be contacted if there is a refund of any fees.  
Please  feel  free  to  contact  me  if  you  have  any  questions  regarding  any  aspect  of  your 
consent or its conditions. My contact details are listed at the top of this letter. 
Yours faithfully 
Mark Buckley 
Principal Planner 
RM085308V5 
Notice of Decision  
Page 1 of 17 
 
 


DECISION ON APPLICATION TO CHANGE CONSENT CONDITIONS 
Resource Consent number: RM085308V5 
Pursuant to Sections 104B and 127 of the Resource Management Act 1991 (“the Act”), the 
Nelson  City  Council  (“the  Council”)  hereby  grants  the  application  to  change  conditions  of 
resource consent to the Consent Holder being: 
  South Pine (Nelson) Limited 
The activity to which this decision relates: 
Change  of  condition  4  of  Resource  Consent  RM085308  (as  varied  by  RM085308V1, 
RM085308V2,  RM085308V3  and  RM085308V4)  to  defer  meeting  Phase  2  (PM10  and 
SO2  emission  reduction  requirements)  for  a  further  four  months  from  30  September 
2018 to 31 January 2019. 
Location details: 
 
Address of property:  67 Quarantine Road, Nelson 
Legal description: 
Lot 10 DP 13460 
Certificate of title: 
8B/439 8B/440 
Location co-ordinates: 2529949E, 5989914N (NZ Transverse Mercator)  
 
CONDITIONS 
The  application  to  change  condition  4  (i)  of  RM085308  (as  varied  by  RM085308V1, 
RM085308V2, RM085308V3 and RM085308V4) is granted as follows: 
Condition 4 is changed from: 
4. 

Phase 2 Emission Reductions 
The Vekos Boiler shall be either retained or replaced with a combustion plant having a gross 
heat  output  not  exceeding  8.3  MW.  Prior  to  the  design  being  finalised  relevant  technical 
information  shall  be  provided  to  the  Consent  Authority,  together  with  a  report  from  an  air 
quality consultant showing: 
(i) 
That  the  proposed  PM10  and  SO2  emission  reductions  will  be  achieved  by  30 
September 2018; 
(ii) 
That the design of the particulate matter collection equipment to be installed is such 
as to achieve the guaranteed performance provided in the original application, AEE 
and Section 92 response; and 
(iii) 
That  the  adverse  effects  of  contaminants  discharged  from  the  combustion  plant 
stacks  and  the  Timber  Drying  Kilns  will  be  no  greater  than  those  indicated  by 
modelling provided in the original application, AEE and Section 92 response. 
(iv) 
The  Consent  Holder  shall  at  all  times  during  the  duration  of  the  consent,  retain  a 
copy of the Application, AEE and Section 92 response in either hard copy or CD form.  
 
RM085308V5 
Notice of Decision  
Page 2 of 17 
 
 


Advice Note
The  design  of  the  upgraded  particulate  collection  equipment  is  required  to  achieve  a 
guaranteed  emission  concentration  for  TSP  not  exceeding  100  milligrams  per  cubic  metre, 
adjusted to 0 degrees Celsius, 8.5% oxygen and 101.3 kilopascals, on a dry gas basis.  The 
air quality consultant will need to confirm that appropriate safety factors have been used to 
accommodate the required long term operating performance. 
To: 
4. 

Phase 2 Emission Reductions 
The Vekos Boiler shall be either retained or replaced with a combustion plant having a gross 
heat  output  not  exceeding  8.3  MW.  Prior  to  the  design  being  finalised  relevant  technical 
information  shall  be  provided  to  the  Consent  Authority,  together  with  a  report  from  an  air 
quality consultant showing: 
(i) 
that  the  proposed  PM10  and  SO2  emission  reductions  will  be  achieved  by  30 
September 2018 31 January 2019; 
(ii) 
that the design of the particulate matter collection equipment to be installed is such 
as to achieve the guaranteed performance provided in the original application, AEE 
and Section 92 response; and 
(iii) 
that  the  adverse  effects  of  contaminants  discharged  from  the  combustion  plant 
stacks  and  the  Timber  Drying  Kilns  will  be  no  greater  than  those  indicated  by 
modelling provided in the original application, AEE and Section 92 response. 
(iv) 
The  Consent  Holder  shall  at  all  times  during  the  duration  of  the  consent,  retain  a 
copy of the Application, AEE and Section 92 response in either hard copy or CD form.  
Advice Note
The  design  of  the  upgraded  particulate  collection  equipment  is  required  to  achieve  a 
guaranteed  emission  concentration  for  TSP  not  exceeding  100  milligrams  per  cubic  metre, 
adjusted to 0 degrees Celsius, 8.5% oxygen and 101.3 kilopascals, on a dry gas basis.  The 
air quality consultant will need to confirm that appropriate safety factors have been used to 
accommodate the required long term operating performance. 
 
A  full  updated  copy  of  the  resource  consent  conditions  are  attached  to  this  decision  as 
APPENDIX A 

 
ADVICE NOTES 
1.  This  is  not  a  building  consent,  and  the  Consent  Holder  shall  meet  the  requirements  of 
Council with regard to all Building and Health Bylaws, Regulations and Acts. 
2.  This  resource  consent  authorises  only  the  activity  described  above.  Any  matters  or 
activities not referred to in this consent or covered by the conditions above must either: 
(a) comply  with  all  the  criteria  of  a  relevant  permitted  activity  in  the  Nelson  Resource 
Management Plan (NRMP); or 
RM085308V5 
Notice of Decision  
Page 3 of 17 
 
 


(b) be allowed by the Resource Management Act 1991; or 
(c) be authorised by a separate resource consent. 
3.  Monitoring: A monitoring charge of $150 has been included in your invoice, as conditions 
of  consent  requiring  monitoring  have  been  imposed.  This  charge  covers  the  costs 
involved  in  the  first  hour  of  monitoring  compliance  with  the  consent  conditions.  Where 
additional  monitoring  costs  are  required  to  determine  that  conditions  have  been  met, 
these will be charged as per the Council’s Fees and Charges policy in force at the time. 
Please  email  the  Council’s  Monitoring  Officer,  [email address]  ,  when  work 
commences  on  this  consent,  so  that  monitoring  can  be  carried  out.  Please  quote  the 
consent number, RM085308V5. 
4.  The  consent  holder  is  advised  that  the  council  is  proposing  to  apply  environmental 
monitoring  charges  to  resource  consent  holders  to  recover  annual  environmental 
monitoring  and  science  costs.  For  further  information  please  contact  Council’s 
Environmental Programmes Adviser [email address] 
 
BACKGROUND AND PROPOSAL 
South Pine currently kiln dries up to 75,000m³ per annum of timber, the heat for which is 
generated in a thermal energy (combustion) plant. The combustion plant includes one 6 MW 
gross  Scots  Combustor  and  one  4.5  MW  gross  Vekos  Boiler,  both  of  which  discharge 
contaminants into air from their respective stacks. 
South  Pine  has  an  existing  discharge  permit  to  discharge  contaminants  to  air  from  the 
combustion  plants,  for  which  a  discharge  permit  was  originally  granted  in  2009.    This 
consent has subsequently been varied in 2012, 2015, 2016 and 2018.  The consent provides 
for a two stage reduction in emissions from the combustion plant, and notably provides at 
the  end  of  Phase  2  emissions  reductions  for  an  increase  in  the  installed  capacity  of  the 
thermal  plants  (from  8.3  MW  total  to  14.3  MW),  with  a  commensurate  increase  in  the 
volume of timber that can be kiln dried.   
The  Phase  1  reduction  requirements  were  completed  ahead  of  schedule  in  January  2010. 
This  has  reduced  the  total  suspended  particulate  (TSP)  emissions  to  below  the  standard 
required at the end of Phase 1.  
South Pine installed a new 50,000m³ capacity kiln in 2015 and retired one of the batch kilns. 
They also undertook investigations to look at different options for increasing its kiln capacity 
and  at  the  same  time  considering  the  combustion  plant  needed  to  heat  the  expanded  kiln 
capacity, while still achieving the required net reduction in particle (and SO2) emissions. In 
April 2018 a variation to the consent was sought to defer the Phase 2 Emissions reduction 
date  from  April  to  September  2018  to  allow  it  to  complete  its  investigations,  select  the 
appropriate plant and install it. Due to confusion around the design inputs, the cyclones are 
unable  to  meet  the  required  reduction  limits  and  they  are  now  looking  at  installing  a  wet 
scrubber  between  the  cyclones  and  the  stack.  Delays  in  manufacturing  mean  the  wet 
scrubber  will  not  be  able  for  installation  by  30  September  2018.  The  proposed  time 
extension for this variation is to allow for the delivery and installation of the wet scrubber. 
The installation will be undertaken during the January 2019 shutdown. 
SECTION 127 RMA  
Section  127  of  the  Act  allows  a  consent  holder  to  apply  for  a  change  to  or  cancellation  of 
consent  conditions.    Section  127(3)  states  that  in  assessing  such  a  s127  application, 
sections  88  to  121  apply,  with  all  necessary  modifications,  as  if  the  application  were  an 
application for resource consent for a discretionary activity, and the references to a resource 
consent and to the activity were references only to the change or cancellation of a conditions 
and  the  effects  of  the  change  or  cancellation  respectively.    The  assessment  of  this 
RM085308V5 
Notice of Decision  
Page 4 of 17 
 
 


application  has  therefore  addressed  only  the  actual  and  potential  effects  of  the  proposed 
change to the conditions.  
THE PROPOSAL  
The  Consent  Holder  has  now  sought  a  further  variation  to  allow  a  further  4  months  to 
complete the installation of equipment to meet the Phase 2 limits.  The original application 
requested a variation to December, this was subsequently  amended in an email dated 19th 
September  2019  for  an  additional  month.  The  Consent  Holder  has  noted  that  the  further 
delay is due to a delay in manufacturing by plant’s suppliers, meaning that the completion 
date of 30 September can no longer be met, and the additional time requested is required to 
modify  emission  control  equipment  that  was  installed  between  late  December  2018  and 
early January 2019 so that the Phase 2 emission levels can be met.  
 
The  new  cyclone  equipment  does  not  provide  sufficient  emission  control.    A  subsequent 
modelling  showed  this  to  be  the  case,  with  the  estimated  TSP  level  being  320mg/m3  from 
the new stack when the intended output was to be under 100mg/m3.   
The Consent Holder has noted that subsequent reviews of the design and planning process 
by  their  technical  consultant  identified  that  they  had  used  an  incorrect  particulate 
concentration  level.    In  order  to  address  this  the  installation  of  a  pre-separator  cyclone 
before  the  high-efficiency  cyclone  system  was  recommended.    However,  subsequent 
assessment  found  that  this  would  not  achieve  the  required  Phase  2  limit  and  that  a  wet 
scrubber would be required to meet the TSP Phase 2 limits.  
ASSESSMENT OF EFFECTS  
These changes are outlined in detail in the application and supporting information prepared 
by  South  Pine  (Nelson)  Ltd  (dated  28  August  2018).  A  previous  assessment  of  the 
environmental effects associated with the delay was undertaken by Environet Ltd (Council’s 
peer review). The assessment concluded ‘that the delay of the installation of the equipment 
is unlikely to pose a significant risk to compliance with the NES for PM10.  While it will result 
in the delaying of the health benefits associated with the emissions reductions for a further 
spring and while this is not ideal, 2017 data suggests the community is still benefiting from 
improved winter time air quality’.   
The emissions from South Pine improved last year with the Total Mass Emission limit (kg/hr) 
meeting  the  Phase  2  level,  although  the  Vekos  emissions,  while  being  below  the  Phase  1 
were still well above the Phase 2 limits. TSP emissions from the Vekos since the granting of 
the original consent have decreased from 400 mg/Sm3 in 2010 to 326 mg/Sm3 in 2017.  
The  environmental  effects  from  the  proposed  variation  are  considered  to  be  no  more  than 
minor due to the following reasons: 
  The climatic conditions during the proposed extension period comprise stronger winds 
averaging  over  14km/hr,  with  gusts  of  over  40km/hr  common  in  during  the  day. 
Greater  average  wind  speeds  will  result  on  more  mixing  of  any  particulate  matter 
within the discharge from the South Pine site,  resulting in an overall lower average 
concentration beyond the property boundary.   
  During  the  term  of  the  consent  there  has  been  continual  reduction  in  the 
concentration of emissions from the South Pine site.  The total mass emissions from 
the site has reduced from 3.7 in 2013 to 2.1 in 2017.  
  The  applicant  has  made  a  significant  investment  in  emission  control  infrastructure 
since the granting of the consent. They have demonstrated a desire to comply with 
the  discharge  limits  and  have  not  been  able  to  meet  timeframes  due  to  technical 
constraints outside of their control. 
RM085308V5 
Notice of Decision  
Page 5 of 17 
 
 


  As a result of improvements in air quality there has been a reduction in the number 
of complaints associated with smoke from South Pine. The last complaint associated 
with  South  Pine  was  in  February  this  year,  prior  to  that  the  last  one  was  in  2009. 
None  of  the  submitters  who  opposed  the  original  consent  application  in  2009  have 
complained about smoke or odour from the operation since the consent was granted. 
  The  use  of  a  wet  scrubber  will  also  reduce  the  pressure  of  the  steam/smoke 
emission,  resulting  in  less  steam  being  emitted  from  the  stack.  This  will  however 
mean that South Pine will have a greater amount of liquid and solid waste generated 
at the site which will need to be discharged into the tradewaste system or disposed of 
to landfill and greater operation and maintenance costs. 
  Discussions with Air Quality experts at the Council has revealed that recent breaches 
with the national air quality standard were attributed to dust from other sites and not 
smoke particulates from the applicant’s operation.  
The  proposed  variation  to  delay  compliance  with  the  Phase  2  compliance  requirement  will 
result in less than minor environmental effects. 
PLAN RULES AFFECTED 
According  to  the  Nelson  Resource  Management  Plan,  the  following  apply  to  the  subject 
property: 
Zoning: 
Industrial 
Overlays: 
None relevant 
Airshed: 
B1 
Status: 
The proposed change of conditions is deemed to be a Discretionary Activity in 
accordance with Section 127(3)(a) of the Act. 
STATUTORY CONSIDERATIONS  
Policy Statements and Plans  
The  proposed  extension  to  the  implementation  of  the  Phase  2  targets  are  minor  and  any 
effects will be temporary.  Pursuant to section 127(3) of the Act, consideration of the effects 
of  the  proposed  change  in  conditions  is  limited  to  the  effects  of  the  change  sought.    The 
provisions  of  the  relevant  statutory  documents  were  considered  in  full  when  the  existing 
consent  was  determined.    The  proposed  changes  sought  are  consistent  with  the  existing 
consent and continue to be consistent with the relevant provisions of the statutory plans.  
Part 2 RMA Matters  
The effects of the proposed change are considered to be less than minor, and the proposal is 
considered to be consistent with the purpose and principles of the Act. There are no section 
6  matters  affected  by  the  proposed  variation,  and  the  development  and  proposed 
amendments  continue  to  represent  the  efficient  use,  development  and  management  of 
natural  and  physical  resources  required  by  section  7(b),  and  the  proposal  will  not  detract 
from the quality of the environment (section 7(f)).  
 
 
 
RM085308V5 
Notice of Decision  
Page 6 of 17 
 
 


REASONS FOR THE DECISION 
1.  The  activity  remains  broadly  consistent  with  the  National  Environmental  Standards 
(NES) for Air Quality and the Nelson Air Quality Plan (AQP) (including the policies and 
objectives contained in section 5). As an example, Objective A5-1 ‘Air Quality’ of the 
Nelson AQP seeks to avoid adverse effects on the environment of localised discharges 
to air. It is considered that this activity will achieve this objective, particularly as the 
assessment  of  the  effects  is  related  to  the  4  month  extension  of  the  Phase  2 
deadline. 
2.  Policy  A5-1.4A  ‘Existing  large-scale  fuel  burning  activities’  states  that  when 
considering applications for resource consent for existing discharges to air from large 
scale fuel burning appliances in Airsheds that breach the NES for Air Quality for fine 
particles (PM10), particular regard will be had to the social and economic benefits of 
allowing the activity to continue and the level of existing investment in it, providing 
that granting consent is consistent with the NES and improvements to the discharge 
will occur which support achievement of the NES and Air Quality Plan targets.  It is 
noted  that  South  Pine  is  a  large  industry  and  being  unable  to  operate  would  have 
significant  social  and  economic  effects.    As  identified  above,  the  assessment  of 
effects  related  to  this  variation is limited  to  the  effect  of  the  extension  sought,  and 
these effects have been determined to be less than minor.  The proposal is therefore 
considered to be consistent with this Policy.  
3.  The Council considers that the adverse effects of the activity on the environment will 
be no more than minor and there are no persons adversely affected by this proposal. 
4.  The  activity  is  considered  to  be  consistent  with  the  relevant  objectives  and  policies 
contained  in  the  Nelson  Resource  Management  Plan  and  the  Nelson  Regional  Policy 
Statement.  In  particular  objective  IN2  and  policy  IN2.2  nuisances  beyond  the 
boundary  of  the  site.  The  applicant  is  proposing  to  install  a  wet  scrubber  to  meet 
compliance  requirements  to  ensure  that  there  is  no  to  limited  impact  beyond  the 
boundary  of  the  site.  The  use  of  a  wet  scrubber  will  also  reduce  steam  emissions 
from the South Pine site due to a decreased in pressure of the emission. 
5.  The  Council  has  taken  into  account  the  relevant  principles  outlined  in  sections  6,  7 
and 8 of the Act and it is considered that granting this resource consent achieves the 
purpose of the Act as set out in section 5. 
 
This  application  to  change  conditions  is  granted  on  28  September  2018  under  delegated 
authority from Nelson City Council by: 
 
 
 
Jennifer Lancashire 
Team Leader Resource Consents 
RM085308V5 
Notice of Decision  
Page 7 of 17 
 
 


APPENDIX A 
Full and Updated Conditions for Resource Consent RM085308 dated 2 July 2010 as 
varied by RM085308V1 dated 10 September 2012, RM085308V2 dated 8 July 2015, 
RM085308V3 dated 2 August 2016, RM085308V4 dated 15 April 2018 and 
RM085308V5 dated 28 September 2018: 

1. 
Definition of Allowed Discharges 
Until completion of the Phase 1 Emission Reductions (condition 3) 
Discharges of contaminants to air shall only be from the operation of: 
(a) 
one Scotts Combustor (having a gross heat output of not more than 6 MW); 
(b) 
one Sawdust Drier; 
(c) 
one Vekos Boiler (having a gross rated heat output of not more than 4.5 MW); and 
(d) 
seven  Timber  Drying  Kilns  with  a  nominal  timber  capacity  of  around  400  cubic 
metres, 
as  described  in  the  application  (Nelson  City  Council  number  RM085308)  at  a  site  legally 
described as Lots 9-16 DP 13460, Lot 1 DP 7279, Pt Lot 2 DP 11840, Lot 2 Pt Lot 1 DP 4905, 
Pt Lot 1 DP 5375, Lot 1 DP 5981, Lot 1 DP 9013, Lot 3 DP 307039 and Sec 1 SO 327063), 
situated  on  Quarantine  Road  and  Pascoe  Street,  Tahunanui,  Nelson,  at  or  about  Map 
Reference NZMG 2529949E, 5989914N.    
From completion of the Phase 1 Emission Reductions until completion of Phase 2 
As above, except conditions 1(a) and 1(b) shall be replaced by: 
(a) 
one  Scotts  Combustor  (having  a  gross  heat  output  of  not  more  than  6  MW)  and 
associated Sawdust Drier; 
(b) 
[deleted
From completion of the Phase 2 Emission Reductions (condition 4) 
As above, except conditions 1(c) and 1(d) shall be replaced by: 
(c) 
one Scotts Combustor (having a gross heat output of not more than 8.3 MW); and 
(d) 
up to nine Timber Drying Kilns with a nominal timber capacity of up to 520 cubic 
metres. 
2. 
Consent Duration 
This consent shall expire on 30 April 2026. 
3. 
Phase 1 Emission Reductions 
The  particulate  matter  emission  control  equipment  at  the  Scotts  Combustor  shall  be 
upgraded, and the Scotts Combustor and the Sawdust Drier shall be integrated, as described 
in  the  Application  documentation  (application,  Assessment  of  Environmental  Effects  and 
Section  92  response).    Prior  to  the  design  being  finalised,  relevant  technical  information 
shall  be  provided  to  the  Consent  Authority,  together  with  a  report  from  an  air  quality 
consultant showing: 
RM085308V5 
Notice of Decision  
Page 8 of 17 
 
 


(i) 
that the proposed PM10 emission reductions will be achieved by 1 May 2010; 
(ii) 
that the design of the upgraded particulate matter collection equipment is such as to 
achieve  the  guaranteed  performance  provided  in  the  original  application,  AEE  and 
Section 92 response; and 
(iii) 
that  the  dispersion  of  contaminants  from  the  upgraded  Scotts  Combustor  and 
Sawdust Drier stack will be no worse than from the existing two stack configuration. 
 
(iv) 
The  Consent  Holder  shall  at  all  times  during  the  duration  of  the  consent,  retain  a 
copy  of  the  Application,  AEE  and  Section  92  response  in  either  hard  copy  or  CD 
form.  
Advice Note
The design of the upgraded particulate matter collection equipment is required to achieve a 
guaranteed emission concentration for total suspended particulate (TSP) not exceeding 100 
milligrams  per  cubic  metre,  adjusted  to  0  degrees  Celsius,  8.5%  oxygen  and  101.3 
kilopascals,  on  a  dry  gas  basis.    The  air  quality  consultant  will  need  to  confirm  that 
appropriate safety factors have been used to accommodate the required long term operating 
performance. 
4. 
Phase 2 Emission Reductions 
The Vekos Boiler shall be either retained or replaced with a combustion plant having a gross 
heat  output  not  exceeding  8.3  MW.  Prior  to  the  design  being  finalised  relevant  technical 
information  shall  be  provided  to  the  Consent  Authority,  together  with  a  report  from  an  air 
quality consultant showing: 
(i) 
that the proposed PM10 and SO2 emission reductions will be achieved by  31 January 
2019; 
(ii) 
that the design of the particulate matter collection equipment to be installed is such 
as to achieve the guaranteed performance provided in the original application, AEE 
and Section 92 response; and 
(iii) 
that  the  adverse  effects  of  contaminants  discharged  from  the  combustion  plant 
stacks  and  the  Timber  Drying  Kilns  will  be  no  greater  than  those  indicated  by 
modelling provided in the original application, AEE and Section 92 response. 
(iv) 
The  Consent  Holder  shall  at  all  times  during  the  duration  of  the  consent,  retain  a 
copy of the Application, AEE and Section 92 response in either hard copy or CD form.  
Advice Note
The  design  of  the  upgraded  particulate  collection  equipment  is  required  to  achieve  a 
guaranteed  emission  concentration  for  TSP  not  exceeding  100  milligrams  per  cubic  metre, 
adjusted to 0 degrees Celsius, 8.5% oxygen and 101.3 kilopascals, on a dry gas basis.  The 
air quality consultant will need to confirm that appropriate safety factors have been used to 
accommodate the required long term operating performance. 
 
RM085308V5 
Notice of Decision  
Page 9 of 17 
 
 


 
5. 

Combustion Plant Stack Heights 
Until completion of the Phase 1 Emission Reductions (condition 3) 
(a) 
The discharge to air from the Scotts Combustor shall occur via a stack at a height of 
at least 16 metres above ground level. 
(b) 
The discharge to air from the Sawdust Drier shall occur via a stack at a height of at 
least 14.4 metres above ground level. 
(c) 
The  discharge  to  air  from  the  Vekos  Boiler  shall  occur  via  a  stack  at  a  height  of  at 
least 15 metres above ground level. 
(d) 
The  discharges  from  combustion  sources  detailed  in  conditions  5(a),  5(b)  and  5(c) 
shall be directed vertically into air and shall not be impeded by any obstruction above 
the stack that decreases the vertical efflux velocity below that which would occur in 
the absence of such obstruction. 
From completion of the Phase 1 Emission Reductions until completion of Phase 2 
As above, except conditions 5(a) and 5(b) shall be replaced by: 
(a) 
The discharge to air from the Scotts Combustor and Sawdust Drier shall occur via the 
drier cyclone stack at a height of at least 20 metres above ground level. 
(b) 
[deleted
Advice Note
The reason for the replacement condition 5(a) referring to the drier cyclone stack is to make 
it clear that the redundant stacks are not to be used to discharge contaminants to air. 
From completion of the Phase 2 Emission Reductions (condition 4) 
As above, except condition 5(c) shall be replaced by: 
(c) 
The discharge to air from the Vekos Boiler or from the replacement combustion plant 
shall occur via a stack at a height of at least 20 metres above ground level. 
6. 
Type of Fuel to be Burned 
Until completion of the Phase 2 Emission Reductions (condition 4) 
(a) 
Only  wood  which  has  not  been  treated  with  any  chemicals  shall  be  burned  in  the 
Scotts Combustor and Vekos Boiler, except that containing antisapstain residues, the 
burning of which shall be kept to a minimum and shall not exceed 50 kilograms per 
hour. 
Advice Note
Because the use of antisapstain is likely to be periodic or seasonal a short-term quantity of 
treated  residues  is  specified.    The  basis  of  the  calculation  was  an  annual  quantity  of  125 
tonnes per annum. 
RM085308V5 
Notice of Decision  
Page 10 of 17 
 
 


(b) 
Only coal with a sulphur content of less than  0.7 % by weight and a gross calorific 
value of greater than 26 MJ/kg shall be burned in the Vekos Boiler. 
From completion of the Phase 2 Emission Reductions (condition 4) 
As above, except conditions 6(a) and 6(b) shall be replaced by: 
(a) 
Only  wood  which  has  not  been  treated  with  any  chemicals  shall  be  burned  in  the 
combustion plant, except that containing antisapstain residues, the burning of which 
shall be kept to a minimum and shall not exceed 50 kilograms per hour. 
(b) 
Only coal with a  sulphur content of less than  1.0 % by weight and a  gross calorific 
value of greater than around 26 MJ/kg shall be burned in the combustion plant. 
Advice Note: 
When burning coal the addition of alkali to the scrubber liquor may be necessary to ensure 
pH is kept alkaline.  
7. 
Amount of Fuel to be Burned 
Until completion of the Phase 2 Emission Reductions (condition 4) 
(a) 
The  maximum  burning  rate  of  wood  in  the  6  MW  gross  Scotts  Combustor  shall  not 
exceed 2,200 kg/hr. 
(b) 
The maximum burning rate of wood in the Vekos Boiler shall not exceed 930 kg/hr. 
(c) 
The maximum burning rate of coal in the Vekos Boiler shall not exceed 610 kg/hr. 
(d) 
A  record  shall  be  kept  of  the  type  and  quantity  of  fuel  burned  in  both  combustion 
units each day.  This record shall be provided to the Consent Authority at least once 
every 12 months, or as requested by the Consent Authority. 
From completion of the Phase 2 Emission Reductions (condition 4) 
As above, except conditions 7(b) and 7(c) shall be replaced by: 
(b) 
The maximum burning rate of wood in the Vekos Boiler shall not exceed 930 kg/hr. 
The  maximum  burning  rate  of  wood  in  any  combustion  plant  replacing  the  Vekos 
Boiler shall not exceed 3,000 kg/hr. 
(c) 
The  maximum  burning  rate  of  coal  in  the  combustion  plant  collectively  shall  not 
exceed 300 kg/hr in total at any time, except if planer mill or feeding system failure 
occurs when up to 600 kg/hour for a period not exceeding 48 hours may be burned.  
8. 
Concentrations of PM10 and TSP in Exhaust Gases 
Until completion of the Phase 1 Emission Reductions (condition 3) 
(a) 
The concentration of PM10 in the discharge from the Scotts Combustor stack shall not 
exceed 250 milligrams per cubic metre, adjusted to 0 degrees Celsius, 8.5% oxygen 
and 101.3 kilopascals, on a dry gas basis. 
RM085308V5 
Notice of Decision  
Page 11 of 17 
 
 


(b) 
The  concentration  of  PM10  in  the  discharge  from  the  Sawdust  Drier  stack  shall  not 
exceed 250 milligrams per cubic metre, adjusted to 0 degrees Celsius, 8.5% oxygen 
and 101.3 kilopascals, on a dry gas basis. 
(c) 
The concentration of PM10 in the discharge from the Vekos Boiler shall not exceed 400 
milligrams per cubic metre, adjusted to 0 degrees Celsius,  8.5%  oxygen and 101.3 
kilopascals, on a dry gas basis. 
Advice Note
The  purpose  of  these  concentration  emission  limits  is  to  demonstrate  satisfactory 
performance  of  the  particulate  emission  control  equipment.    They  also  form  individual 
assessment  criteria  for  the  source  emission  testing  required  by  condition  11.  
Notwithstanding that, the primary criteria for  assessment  of  satisfactory  emissions are the 
total mass emission rate limits in condition 9. 
From completion of the Phase 1 Emission Reductions until completion of Phase 2 
As above, except conditions 8(a) and 8(b) replaced by: 
(a) 
The  concentration  of  TSP  in  the  discharge  from  the  6  MW  gross  Scotts  Combustor 
and Sawdust Drier stack shall not exceed 100 milligrams per cubic metre adjusted to 
0 degrees Celsius, 8.5% oxygen and 101.3 kilopascals, on a dry gas basis.  
(b) 
[deleted
From completion of the Phase 2 Emission Reductions (condition 4) 
As above, except condition 8(c) replaced by: 
(c) 
The  concentration  of  TSP  in  the  discharge  from  the  Vekos  Boiler  stack  or  from  the 
stack or the replacement combustion plant shall not exceed 100 milligrams per cubic 
metre  adjusted  to  0  degrees  Celsius,  8.5%  oxygen  and  101.3  kilopascals,  on  a  dry 
gas basis. 
And, a new condition 8(d) is added: 
(d) 
All  combustion  gases  and  drier  gases  from  the  combustion  plant,  excluding  minor 
fugitive emissions, shall be directed to their respective water scrubbers. 
9. 
Mass Emission Rates of PM10 and TSP 
Until completion of the Phase 1 Emission Reductions (condition 3) 
The  total  mass  emission  rate  of  PM10  from  the  Scotts  Combustor  stack,  the  Sawdust  Drier 
stack and the Vekos Boiler stack, when measured in accordance with condition 11, shall not 
exceed 3.4 kilograms per hour. 
Advice Note
For  emission inventory  purposes a longer term emission limit is required.  When averaged 
over 24 hours, the total mass emission rate of PM10 from the Scotts  Combustor stack, the 
RM085308V5 
Notice of Decision  
Page 12 of 17 
 
 


Sawdust Drier stack and the Vekos Boiler stack shall not exceed 50 kilograms per day.  The 
basis of this calculation is a plant operating factor of 70%. 
From completion of the Phase 1 Emission Reductions until completion of Phase 2 
The  total  mass  emission  rate  of  PM10  from  the  Scotts  Combustor  and  Sawdust  Drier  stack 
and  the  Vekos  Boiler  stack,  when  measured  in  accordance  with  condition  11,  shall  not 
exceed 2.6 kilograms per hour.  If stack conditions do not allow measurement of PM10, then 
the  mass  emission  limit  shall  be  3.9  kilograms  per  hour  of  TSP,  and  from  2  August  2016 
until completion of the Phase 2 Emissions Reductions, 2.9 kilograms per hour of TSP. 
Advice Note
For emission inventory purposes longer term emission limits are required.  When averaged 
over 24 hours, the total mass emission rate of PM10 from the Scotts Combustor and Sawdust 
Drier stack and the Vekos Boiler stack shall not exceed 37 kilograms per day, and for TSP 
shall not exceed 65 kilograms per day.  The basis of these calculations is a plant operating 
factor of 70%. 
From completion of the Phase 2 Emission Reductions (condition 4) 
The total mass emission rate of PM10 from the combustion plant collectively, when measured 
in accordance with condition 11, shall not exceed 2.0 kilograms per hour.  If stack conditions 
do not allow measurement of PM10, then the mass emission limit shall be 2.4 kilograms per 
hour of TSP. 
Advice Note
For  emission  inventory  purpose  longer  term  emission  limits  are  required.    When  averaged 
over 24 hours, the total mass emission rate of PM10 from the combustion plant collectively 
shall not exceed 34 kilograms per day, and for TSP shall not exceed 40 kilograms per day.  
The basis of these calculations is a plant operating factor of 70%. 
10. 
Mass Emission Rates of SO2 
Until completion of the Phase 2 Emission Reductions (condition 4) 
The  Consent  Holder  shall  keep  records  of  the  coal  blend  burned  in  the  Vekos  Boiler, 
including  the  gross  calorific  value  and  sulphur  content  by  weight,  and  the  calculated 
maximum sulphur dioxide emission rate based on that information.  These records shall  be 
provided to the Consent Authority at least once every 12 months.  The rate of discharge of 
sulphur  dioxide,  as  calculated  from  the  maximum  burning  rate  of  the  coal  blend  used  and 
the  sulphur  content  of  that  coal  blend,  allowing  for  sulphur  retention  in  the  ash  from  the 
Boiler.  The rate of discharge of sulphur dioxide, as measured in accordance with condition 
11, shall not exceed 8.1 kilograms per hour. 
From completion of the Phase 2 Emission Reductions (condition 4) 
The  Consent  Holder  shall  keep  records  of  the  coal  blend  burned  in  the  combustion  plant, 
including  the  gross  calorific  value  and  sulphur  content  by  weight,  and  the  calculated 
maximum sulphur dioxide emission rate based on that information.  These records shall be 
RM085308V5 
Notice of Decision  
Page 13 of 17 
 
 


provided to the Consent Authority at least once every 12 months.  The rate of discharge of 
sulphur  dioxide,  as  calculated  from  the  maximum  burning  rate  of  the  coal  blend  used  and 
the sulphur content of  that coal blend,  can allow for  sulphur retention in the ash from the 
Combustors.    The  rate  of  discharge  of  sulphur  dioxide,  as  measured  in  accordance  with 
condition 11, shall not exceed 4.0 kilograms per hour. 
 
Advice Note: 
When burning coal the addition of alkali to the scrubber liquor may be necessary to ensure 
pH is kept alkaline.  
11. 
Emission Test Frequency and Method 
Until completion of the Phase 1 Emission Reductions (condition 3) 
(a) 
The  concentration  of  PM10  discharged  from  the  three  stacks  referred  in  condition  5, 
and SO2 discharged  from the Vekos Boiler while burning coal, shall be measured at 
least once every 12 months. 
(b) 
Test sampling shall occur when each combustion unit is operated at greater than 50 
percent of maximum capacity.  The method of sampling and analysis for particulate 
matter  shall  be  USEPA  Method  201A,  or  an  equivalent  method.    The  method  of 
sampling and analysis for sulphur dioxide shall be USEPA Method 6, or an equivalent 
method. 
(c) 
Sampling  results  shall  be  adjusted  to  0  degrees  Celsius,  8.5%  oxygen  and  101.3 
kilopascals, on a dry gas basis, and as a mass emission expressed as kilograms per 
hour. The results shall include a description of the method used, the combustion unit 
output during testing and any assumptions made. 
(d) 
The  organisation  performing  the  test  shall  at  that  time  be  accredited  under  ISO 
17025 to the method used to do the testing, or accredited to that method by another 
quality control organisation acceptable to the Consent Authority.  
(e) 
A copy of the test results shall be retained and provided to the Consent Authority on 
request. 
From completion of the Phase 1 Emission Reductions until completion of Phase 2 
As above, except conditions 11(a) and (b) replaced by: 
(a) 
The concentration of PM10 discharged from the two stacks referred in condition 5, or 
TSP  if  stack  conditions  do  not  allow  measurement  of  PM10  emitted  from  the  Scott 
Combustor stack, and SO2 discharged from the Vekos Boiler while burning coal, shall 
be measured at least once every 12 months. 
(b) 
Test sampling shall occur when each combustion unit is operated at greater than 50 
percent of maximum capacity. The method of sampling and analysis for PM10 shall be 
USEPA  Method  201A,  or  an  equivalent  method.  If  stack  conditions  do  not  allow 
measurement  of  PM10,  then  the  method  of  sampling  and  analysis  for  TSP  shall  be 
methods ISO9096: 2003 or USEPA Method 5, or equivalent methods. The method of 
RM085308V5 
Notice of Decision  
Page 14 of 17 
 
 


sampling and analysis for sulphur dioxide shall be USEPA Method 6, or an equivalent 
method. 
 
From completion of the Phase 2 Emission Reductions (condition 4) 

As above, except condition 11(a) and (b) replaced by: 
(a) 
The  concentration  and  mass  emission  of  PM10  discharged  from  the  two  stacks 
referred in condition 5, or TSP if stack conditions do not allow measurement of PM10, 
and  SO2  discharged  from  one  of  the  combustion  units  while  burning  coal,  shall  be 
measured at least once every 12 months. 
(b) 
Test sampling shall occur when each combustion unit is operated at greater than 50 
percent of maximum capacity. The method of sampling and analysis for PM10 shall be 
USEPA  Method  201A,  or  an  equivalent  method.  If  stack  conditions  do  not  allow 
measurement  of  PM10,  then  the  method  of  sampling  and  analysis  for  TSP  shall  be 
methods ISO9096: 2003 or USEPA Method 5, or equivalent methods. The method of 
sampling and analysis for sulphur dioxide shall be USEPA Method 6, or an equivalent 
method. 
12. 
Plant Maintenance  
The  combustion  units  and  the  driers  shall  be  maintained  at  least  once  every  year,  by  a 
person  competent  in  the  servicing  of  such  plant.    This  maintenance  shall  include  for  the 
combustion units adjustment (if necessary) of the fuel to air ratio and testing of the ratio of 
combustion  gases  discharged  (i.e.  carbon  monoxide,  carbon  dioxide  and  oxygen)  using 
suitably calibrated instruments.  Service reports shall be prepared and retained, and copies 
shall be provided to the Consent Authority on request. 
13. 
Plume Opacity 
The  opacity  of  the  stack  emissions,  excluding  wet  steam,  shall  not  be  darker  than 
Ringelmann Shade 1 as described in New Zealand Standard 5201:1973 except: 
(a) 
in the case of a cold start, for a period not exceeding 30 minutes in the first hour 
of operation; and 
(b) 
for  a  period  not  exceeding  a  total  of  four  minutes  in  each  succeeding  hour  of 
operation. 
14. 
Operation of Kilns – volume of wood processed 
Until completion of the Phase 2 Emission Reductions (condition 4) 
(a) 
The total volume of green timber being dried in the kilns shall not exceed 400 m3 at 
any one time. 
(b) 
The  total  volume  of  timber  dried  in  the  kilns  shall  not  exceed  75,000  m3  in  any 
calendar year. 
RM085308V5 
Notice of Decision  
Page 15 of 17 
 
 


(c) 
The total volume of treated timber being re-dried in the kilns shall not exceed 160 m3 
at any one time. 
(d) 
The total volume of treated timber re-dried in the kilns shall not exceed 14,000 m3 in 
any calendar year. 
(e) 
The Consent Holder shall monitor and record the volume of timber dried in each kiln 
to determine compliance with condition 14(a), 14(b) 14(c) and 14(d). 
(f) 
Records  shall  be  retained  for  a  period  of  at  least  12  months  and  also  be  made 
available to the Consent Authority within two working days on request. 
From completion of the Phase 2 Emission Reductions (condition 4) 
As above, except condition 14(b) replaced by: 
(b) 
The  total  volume  of  timber  dried  in  the  kilns  shall  not  exceed  100,000  m3  in  any 
calendar year. 
15. 
Operation of Kilns – temperature regime 
Until completion of the Phase 2 Emission Reductions (condition 4) 
(a) 
The kilns shall be operated at temperatures not exceeding 110°C (dry bulb). 
(b) 
The  Consent  Holder  shall  monitor  and  record  the  temperature  in  each  kiln  to 
determine compliance with condition 15(a). 
(c) 
Records  shall  be  retained  for  a  period  of  at  least  12  months  and  also  be  made 
available to the Consent Authority within two working days of request by the consent 
authority. 
From completion of the Phase 2 Emission Reductions (condition 4) 
As above, except condition 15(a) replaced by: 
(a) 
The kilns shall be operated at as low a temperature as commercially practicable and, 
in any case, the medium temperature kiln temperatures shall not exceed 110°C (dry 
bulb)  and  the  ‘soft’  high  temperature  kiln  temperature  shall  not  exceed  130oC  (dry 
bulb). 
16. 
Odour, Deposited Particulate and Visible Plume Effects 
Discharges from the operation of the combustion units or timber drying kilns shall not cause 
odour,  deposited  particulate  material  or  visible  plumes  (including  blue  haze),  which  is 
objectionable  or  offensive  beyond  the  boundary  of  the  property  on  which  the  consent  is 
exercised. 
17. 
Complaints Records 
A record of all complaints relating to odour or particulate matter caused by a discharge from 
the Consent Holder’s operations shall be maintained, and shall include: 
(a) 
the location where the odour or particulate matter was detected by the complainant; 
(b) 
the date and time when the odour or particulate matter was detected; 
RM085308V5 
Notice of Decision  
Page 16 of 17 
 
 


(c) 
a  description  of  the  wind  speed  and  wind  direction  when  the  odour  or  particulate 
matter was detected; 
(d) 
the most likely cause of the odour or particulate matter detected; 
(e) 
any corrective action undertaken by the consent holder to avoid, remedy or mitigate 
the odour or particulate matter; and 
(f) 
this record shall be provided to the Consent Authority on request. 
 
18. 
Annual Consent Review 
The Consent Authority may, once per year, until 2016 on any of the five last working days of 
November each year, and from 2017 on any of the five last working days in February each 
year, serve notice of its intention to review the conditions of this consent for the purposes 
of: 
(a) 
dealing  with  any  adverse  effect  on  the  environment  which  may  arise  from  the 
exercise of the consent and which is appropriate to deal with at a later stage; or 
(b) 
requiring the adoption of the best practicable option to remove or reduce any adverse 
effect on the environment; and 
(c) 
to  consider  consistency  of  the  conditions  of  this  consent  with  progress  toward 
achieving the air quality targets in the Nelson Air Quality Plan. 
Advice Note
If,  following  the  annual  reviews,  reductions  in  emissions  are  deemed  to  be  necessary  the 
work shall be carried out until 2016 during the Christmas shutdown, and from 2017 during 
the Easter shutdown.  The implementation date for any revised conditions of consent shall 
be  from  the  1  May  following.    As  part  of  the  annual  review  in  February  2026  the  Consent 
Authority may evaluate how it intends processing any application for a new consent (that is, 
whether to notify or not, etc). 
 
 
 
 
RM085308V5 
Notice of Decision  
Page 17 of 17