Community Facilities: Build Maintain Renew Work Programme 2018/2019
Lead 
Further Decision 
Budget 
ID
LB Plan Outcome
Dept/Unit or 
Activity Name
Activity Description
Activity Benefits
Timeframe
FY18/19
Points for LB
Source
CCO
702
A treasured environment
CF: 
The Full Facilities 
With the maintenance contracts, local board assets are  With the maintenance contracts, 
No further decisions 
Q1; Q2; Q3;  ABS: Opex
 $  6,455,169 
Operations
maintenance contracts include  able to be maintained to the approved level of service. 
local board assets are able to be 
anticipated
Q4
all buildings, parks and open 
These contracts provide for required compliance tasks  maintained to the approved level of 
space assets, sports fields, 
and scheduled activities including planned preventative  service. These contracts provide for 
coastal management and 
maintenance to be completed, and for response to 
required compliance tasks and 
storm damage.
requests for maintenance. These contracts benefit all 
scheduled activities including 
members of the public as local board assets are able to  planned preventative maintenance 
be fully utilised if they are fit for the intended purpose, 
to be completed, and for response to 
and it offers better value to ratepayers if assets remain  requests for maintenance. These 
in service for their expected life.
contracts benefit all members of the 
public as local board assets are able 
to be fully utilised if they are fit for 
the intended purpose, and it offers 
better value to ratepayers if assets 
remain in service for their expected 
life.
703
A treasured environment
CF: 
The Arboriculture 
With the Arboriculture Contracts, trees in parks and 
With the Arboriculture Contracts, 
No further decisions 
Q1; Q2; Q3;  ABS: Opex
 $     514,637 
Operations
maintenance contracts include  reserves, and on streets, are able to be maintained to 
trees in parks and reserves, and on 
anticipated
Q4
tree management and 
the approved level of service. These contracts provide 
streets, are able to be maintained to 
maintenance.
for a programme of tree inspection and maintenance, 
the approved level of service. These 
and for response to requests for maintenance of trees 
contracts provide for a programme 
which have become damaged or are obstructions. 
of tree inspection and maintenance, 
These contracts benefit all members of the public as 
and for response to requests for 
trees which are properly maintained are more likely to 
maintenance of trees which have 
remain in good health, are less likely to become health  become damaged or are 
and safety issues, and offer greater visual amenity.
obstructions. These contracts 
benefit all members of the public as 
trees which are properly maintained 
are more likely to remain in good 
health, are less likely to become 
health and safety issues, and offer 
greater visual amenity.
704
A treasured environment
CF: 
Howick Ecological Restoration  The Ecological Restoration maintenance contracts 
With the maintenance contracts, 
No further decisions 
Q1; Q2; Q3;  ABS: Opex
 $     158,666 
Operations
Contracts
include pest plant and animal pest management within  local board assets are able to be 
anticipated
Q4
ecologically significant parks and reserves. 
maintained to the approved level of 
service. These contracts provide for 
a programme of restoration planting 
and pest animal and plant control for 
high value sites, and for response to 
requests for animal pests in parks. 
These contracts benefit all members 
of the public as they improve ensure 
ecologically significant sites on our 
local parks and reserves are pest 
free and offer ecological and wider 
benefits.
  
2325 Involved and connected 
CF: 
29 Granger Road, Howick 
Renew the rooms that have been assessed as having 
Maintain current service levels
Options to be 
Q1; Q2; Q3;  ABS: Capex -   $       20,000 
communities
Investigation  (Star of the Sea) - renew 
leaks and signs of mould.   Stage one - investigate, 
approved by local 
Q4
 Renewals
and Design
building
design and scope physical works.  Stage two - 
board
commence physical works.   This is a multi-year funded 
project to be initiated as part of the  2018/19 
programme.
1/6
Howick Local Board

Community Facilities: Build Maintain Renew Work Programme 2018/2019
Lead 
Further Decision 
Budget 
ID
LB Plan Outcome
Dept/Unit or 
Activity Name
Activity Description
Activity Benefits
Timeframe
FY18/19
Points for LB
Source
CCO
2326 Involved and connected 
CF: 
90R Wellington Street, Howick  Renew condition 4 and 5 assets for the following: 
Maintaining current service levels
Options to be 
Q1; Q2; Q3;  ABS: Capex -   $       25,000 
communities
Investigation  - Howick Domain Building - 
Howick Brass Band, Howick Tennis Club and Howick 
approved by local 
Q4
 Renewals
and Design
renew condition 4 and 5 assets Athletics Club.     Stage one - investigate, design and 
board
scope the physical works.  Stage two  - commence 
physical works.  This is a multi-year funded project to 
be initiated as part of the 2018/19 programme.
2327 Involved and connected 
CF: 
Bucklands & Eastern Beach 
Renew and refurbish condition 4 and 5 assets at the 
Maintaining current service levels
No further decisions 
Q1; Q2; Q3;  ABS: Capex -   $       45,000 
communities
Investigation  War Memorial Hall - refurbish  facility, in line with the recent condition assessment 
anticipated
Q4
 Renewals
and Design
facility
undertaken by the asset team.  Works to include 
painting, renewal of the floor, carpet replacement  and 
replacement of the internal doors.  Stage one -  
investigate, design and scope  physical works 
(including options to propose to the local board for 
assets that may benefit from an increased level of 
service).  Stage two -   physical works commence.  
This project is a multi-year funded project to be initiated 
as part of the 2018/19 programme.
2328 A treasured environment
CF: 
Cockle Bay - renew and 
Extend and renew the seawall at Cockle Bay as 
Maintaining current service levels
No further decisions 
Q1; Q2; Q3;  ABS: Capex -   $     350,000 
Investigation  extend seawall
recommended by the Coastal Management Team to 
anticipated
Q4
 Renewals; 
and Design
ensure the assets remains fit for purpose. Stage one -  
LDI: Capex
investigate, design and scope physical works (including 
options to propose to the local board for assets that 
may benefit from an increased level of service).  Stage 
two - physical works commence.  This project is a multi-
year funded project to be initiated as part of the 
2018/19 programme.
2329 Involved and connected 
CF: 
Cockle Bay Reserve - renew 
Renew play assets, fence and seating.  Year one - 
Continued use of facility/park/asset
No further decisions 
Q1; Q2; Q3
ABS: Capex -   $       15,000 
communities
Investigation  play assets and fence
investigation (including options for sites that would 
anticipated
 Renewals
and Design
benefit from an increase level of service to propose to 
the local board), scoping and physical works, year 2+ - 
physical works.
2330 Involved and connected 
CF: 
Howick  - renew park furniture  Renew park furniture and fixtures. Details to be Renew  Maintaining current service levels
Options to be 
Q1; Q2; Q3;  ABS: Capex -   $       10,000 
communities
Investigation  and fixtures FY19+
park fencing. Stage one includes the investigation, 
approved by local 
Q4
 Renewals
and Design
design and scope of the physical works (including 
board
options for assets that may benefit from an increased 
level of service subject to local board approval).  Stage 
two will include the physical works.  This project is a 
multi-year funded project to be initiated in the 
2018/2019 programme.
2331 Involved and connected 
CF: 
Howick - LDI minor capex 
Funding to deliver minor capex projects throughout the  Increase current service levels
Options to be 
Q1; Q2; Q3;  LDI: Capex
 $       50,000 
communities
Investigation  fund 2018/19
financial year as approved in the monthly local board 
approved by local 
Q4
and Design
workshops.
board
2332 Involved and connected 
CF: 
Howick - renew  park fencing 
Renew park fencing. Stage one includes the 
Maintaining current service levels
No further decisions 
Q1; Q2; Q3;  ABS: Capex -   $       10,000 
communities
Investigation  FY19+
investigation, design and scope of the physical works 
anticipated
Q4
 Renewals
and Design
(including options for assets that may benefit from an 
increased level of service subject to local board 
approval).  Stage two will include the physical works.  
This project is a multi-year funded project to be initiated 
in the 2018/2019 programme.
2333 Involved and connected 
CF: 
Howick - renew park lighting 
Renew park lighting. Stage one - investigate, design 
Maintaining current service levels
Options to be 
Q1; Q4; Q3;  ABS: Capex -   $         8,000 
communities
Investigation  FY19
and scope physical works (including options to propose 
approved by local 
Q2
 Renewals
and Design
to the local board for assets that may benefit from an 
board
increased level of service).  Stage two - physical works 
commence.  This project is a multi-year funded project 
to be initiated in the 2018/2019 programme.
2/6
Howick Local Board

Community Facilities: Build Maintain Renew Work Programme 2018/2019
Lead 
Further Decision 
Budget 
ID
LB Plan Outcome
Dept/Unit or 
Activity Name
Activity Description
Activity Benefits
Timeframe
FY18/19
Points for LB
Source
CCO
2334 Involved and connected 
CF: 
Howick - renew sports fields
Renew sports fields at various sites. Year one - 
Continued use of facility/park/asset
No further decisions 
Not 
ABS: Capex -   $       20,000 
communities
Investigation 
investigation (including options for sites that would 
anticipated
scheduled
 Renewals
and Design
benefit from an increase level of service to propose to 
the local board) and scoping.  Year two - physical 
works.
2335 Involved and connected 
CF: 
Howick - renew park play 
Renew play equipment at various sites including 
Continued use of facility/park/asset
No further decisions 
Not 
ABS: Capex -   $       30,000 
communities
Investigation  spaces FY19+
playgrounds, skate parks and half courts. Year one - 
anticipated
scheduled
 Renewals
and Design
investigation (including options for sites that would 
benefit from an increase level of service to propose to 
the local board) and scoping.  Year two - physical 
works.
2336 Involved and connected 
CF: 
Howick Library - 
Comprehensive building refit including FF&E and air 
Maintaining current service levels
No further decisions 
Q1; Q2; Q3;  ABS: Capex -   $     185,000 
communities
Investigation  comprehensive renewal and 
conditioning.   Stage one - investigate, design and 
anticipated
Q4
 Renewals
and Design
renew air conditioning
scope physical works (including options to propose to 
the local board for assets that may benefit from an 
increased level of service).  Stage two - physical works 
commence. This project is a multi-year funded project 
and is a continuation from the 2016/2017 programme 
(previous ID 2534).
2337 Involved and connected 
CF: Project 
Howick Library - replace 
Replace CCTV system, cameras and monitor, as 
Improved security measures at the 
No further decisions 
Q1; Q2
ABS: Capex -   $       14,000 
communities
Delivery
CCTV system
equipment is at the end of its useful life
facility.
anticipated
 Renewals
2338 Involved and connected 
CF: Project 
Howick Recreation Centre - 
Comprehensive Upgrade.  This project is a 
Continued use of facility/park/asset
Options to be 
Not 
ABS: Capex -   $     200,000 
communities
Delivery
comprehensive renewal
continuation of the 2017/2018 programme (previous 
approved by local 
scheduled
 Renewals
SP18 ID 2540).
board
2339 Involved and connected 
CF: Project 
Lloyd Elsmore Park Leisure 
Upgrade of Hiwall air-conditioning in group fitness 
Continued use of facility/park/asset
No further decisions 
Not 
ABS: Capex -   $     720,000 
communities
Delivery
Centre - comprehensive 
studio; upgrade of poolside men`s, woman`s and family 
anticipated
scheduled
 Renewals
renewal
changing rooms; LED upgrade replacing many of the 
lights throughout the facility; complete tiling of steam 
room; renew spa inlet jet pipework; renew splash pool 
leak; replace skylights in the main pool hall; repaint 
bleachers; replace three variable speed drives units; 
replace diatomaceous earth socks; replace gym 
carpets; refit gym changing rooms; renew membrane 
roof on main pool hall; back up plant room pumps and 
renew spin studio carpet.  This project is a continuation 
from the 2016/2017 programme (previous ID 207).
2340 Involved and connected 
CF: 
Mangemangeroa and Pt View   Due to recent slips walkway and car park must be 
Continued use of the 
No further decisions 
Not 
ABS: Capex -   $       80,000 
communities
Investigation  - renew walkway and car park
renewed.  This project is a continuation of the 
park/facility/asset
anticipated
scheduled
 Renewals
and Design
2017/2018 programme (previous SP18 ID 2545).
2341 Involved and connected 
CF: 
Ostrich Farm - sand slits, 
Sand slits, drainage, irrigation and lights.  Year one - 
Continued use of the 
No further decisions 
Not 
ABS: Capex -   $     200,000 
communities
Investigation  drainage and irrigation - 
investigation (including options for sites that would 
park/facility/asset
anticipated
scheduled
 Development
and Design
design and consent
benefit from an increase level of service to propose to 
the local board), scoping and physical works, year 2+ - 
physical works.  This project is a continuation of the 
2017/2018 programme (previous SP18 ID 2550).
2342 Involved and connected 
CF: Project 
Pakuranga Recreation & 
Security cameras to capture main car park area
Continued use of the 
No further decisions 
Not 
ABS: Capex -   $       24,000 
communities
Delivery
Youth Centre - renew carpark 
park/facility/asset
anticipated
scheduled
 Renewals
security cameras
3/6
Howick Local Board

Community Facilities: Build Maintain Renew Work Programme 2018/2019
Lead 
Further Decision 
Budget 
ID
LB Plan Outcome
Dept/Unit or 
Activity Name
Activity Description
Activity Benefits
Timeframe
FY18/19
Points for LB
Source
CCO
2343 Involved and connected 
CF: 
Pakuranga Sailing Club ramp  Renew Bramley Drive Reserve boat ramp, fence, 
Maintaining current service levels
Options to be 
Not 
ABS: Capex -   $     690,000 
communities
Investigation  and structures - renewal
fitness station, bridge, seawall and step renewal.   
approved by local 
scheduled
 Renewals
and Design
Stage one is investigation and design including the 
board
condition assessment and conceptual drawings which 
will provide a clear understanding of the recommended 
options.  These options will be presented to the Local 
Board for consideration and approval.  A design 
solution will be then be developed.  Stage two will 
include the physical works.   This is a multi-year funded 
project  and is a continuation of the 2017/2018 
programme (previous SP18 ID 2552).
2344 Involved and connected 
CF: 
Pohutukawa Avenue 
Install stairs as a health and safety measure following a  Maintaining current service levels
Options to be 
Q1; Q2; Q3;  LDI: Capex
 $     150,000 
communities
Investigation  Esplanade Reserve - improve  land slip. This work is required to ensure fit for purpose 
approved by local 
Q4
and Design
access
and allow for maintenance access.  Project started 
board
under urgency.  Further work is required that cannot be 
funded through renewals,  as new assets provide the 
best solution. LDI Capex  funding is being sought. 
Stage one includes the investigation, design and scope 
of the physical works (including options for assets that 
may benefit from an increased level of service subject 
to local board approval).  Stage two will include the 
physical works.  This is a multi-year funded project and 
is a continuation of the 2017/2018 work programme 
(previous SP ID 3563).
2345 Involved and connected 
CF: 
Point View Reserve - replace 
Renew the retaining wall (supporting the western end 
maintain current service levels
Options to be 
Q1; Q2; Q3;  ABS: Capex -   $     100,000 
communities
Investigation  retaining wall
of the gateway) which is in poor condition and is the 
approved by local 
Q4
 Renewals
and Design
cause of road damage. Consideration will be given for 
board
other options for pedestrian access to the site around 
the eastern side as opposed to the western side.  
Stage one includes the investigation, design and scope 
of the physical works (including options for assets that 
may benefit from an increased level of service subject 
to local board approval).  Stage two will include the 
physical works.  This project is a multi-year funded 
project and a continuation of the 2017/2018 
programme (previous SP ID 3566).
2346 Involved and connected 
CF: 
Raphoe Park - renew 
Renew playground
Continued use of the 
Design to be approved  Not 
ABS: Capex -   $     150,000 
communities
Investigation  playground
park/facility/asset
by local board
scheduled
 Renewals
and Design
2347 Involved and connected 
CF: 
Rogers Park - renew 
Renew failing play space
Continued use of the 
Design to be approved  Not 
ABS: Capex -   $       20,000 
communities
Investigation  playground
park/facility/asset
by local board
scheduled
 Renewals
and Design
2348 Involved and connected 
CF: 
Shelly Park - stabilise cliff with  Stabilise clifftop with soil nails
Continued use of the 
Options to be 
Not 
ABS: Capex -   $     300,000 
communities
Investigation  soil nails (Shelly Park Cruising 
park/facility/asset
approved by local 
scheduled
 Renewals
and Design
Club)
board
2349 Involved and connected 
CF: 
Stockade Hill, Howick - renew  Renew sign
Replacement of asset
Options to be 
Not 
ABS: Capex -   $         5,000 
communities
Investigation  sign
approved by local 
scheduled
 Renewals
and Design
board
2350 Involved and connected 
CF: 
Tamaki Estuary Walkway - 
Create a 10-15 kilometre network of shared paths 
As per the Tamaki Inlet 
Design to be approved  Not 
ABS: Capex -   $     200,000 
communities
Investigation  develop walkway - stage 2
along the edge of the Tamaki Inlet which once 
Development plan
by local board
scheduled
 Growth
and Design
complete will link to the Rotary Walkway.
2351 Involved and connected 
CF: 
Ti Rakau Park - renew 
Ti Rakau Park whole playground renewal.  This project  Continued use of asset
Design to be approved  Not 
ABS: Capex -   $     140,000 
communities
Investigation  playground
is a continuation of the 2017/2018 programme 
by local board
scheduled
 Renewals
and Design
(previous SP18 ID 2556).
4/6
Howick Local Board

Community Facilities: Build Maintain Renew Work Programme 2018/2019
Lead 
Further Decision 
Budget 
ID
LB Plan Outcome
Dept/Unit or 
Activity Name
Activity Description
Activity Benefits
Timeframe
FY18/19
Points for LB
Source
CCO
2742 Involved and connected 
CF: Project 
Barry Curtis Park - implement  Delivery of Barry Curtis Park Master Plan. Completing 
Improved open spaces for our 
Options to be 
Q1; Q2; Q3;  ABS: Capex -   $     600,000 
communities
Delivery
Master Plan
southern building toilet and changing rooms.  Construct  community to enjoy
approved by local 
Q4
 Development
a promenade along chapel road.  Install lights on field 5 
board
and 6 and construct new carpark along Flat Bush 
School Road. This project is a continuation of the 
2017/2018 programme (previous SP18 ID 2825).
2745 Our future growth is 
CF: Project 
Cascade Walkway renewals
Renew walkways for the following proposed sites: 
Improved connections in our local 
No further decisions 
Q1; Q2; Q3;  ABS: Capex -   $       90,500 
managed effectively
Delivery
Cascade Walkway No. 3 (Gosford), Cascade Walkway  area
anticipated
Q4
 Renewals
No. 7 (Orinda Cr) and Cascade Walkway No. 4 
(Kookaburra).  Works to include replacement and 
repair of handrails, bridge cleaning and segmental 
replacement of concrete pavements and foundation.  
This is a multi-year funded project and is a continuation 
of the 2017/18 programme (previous SP18 ID 2528).
2749 Our future growth is 
CF: 
Blundell Park - demolish toilet
Demolish the toilet block at Blundell Park as a health 
Improved open spaces for our 
No further decisions 
Q1; Q2; Q3;  Regional
 $       45,000 
managed effectively
Investigation 
and safety measure to ensure a safe and secure 
community to enjoy
anticipated
Q4
and Design
environment.
2751 Involved and connected 
CF: 
Flat Bush - develop multi-
Design and construct new library and multi-use 
Design and construction of new 
No further decisions 
Q1; Q2; Q3;  ABS: Capex -   $       50,000 
communities
Investigation  purpose facility
community facility.   investigation (including options for 
facility
anticipated
Q4
 Development
and Design
sites that would benefit from an increase level of 
service to propose to the local board), scoping and 
physical works, year 2+ - physical works.  This project 
is a continuation of the 2017/2018 programme 
(previous SP18 ID 2532).
2752 Involved and connected 
CF: 
Highland Park Library - renew  Replace the CCTV system including cameras and 
Improved security measures at the 
No further decisions 
Q1; Q2
ABS: Capex -   $       20,000 
communities
Investigation  CCTV system
monitor, as the current equipment is at the end of its 
facility.
anticipated
 Renewals
and Design
useful life.  This project has been requested by the 
Auckland Council Security Manager.
2753 Involved and connected 
CF: Project 
Howick  - renew park paths 
Renew and restore pathway network in McLean's Park  Continued use of access ways
No further decisions 
Q1; Q2; Q3;  ABS: Capex -   $     100,000 
communities
Delivery
and culverts - McLean's Park
to address severe degradation of the tracks due to 
anticipated
Q4
 Renewals
weather events.  Paths to be realigned to improve 
drainage, culverts to be expanded and vegetation to be 
trimmed and/or removed.  This is a multi-year funded 
project and is a continuation of the 2017/2018 
programme (previous SP18 ID 2535).
2754 Involved and connected 
CF: 
Howick  - renew park 
Renew walkways and paths at various parks. Stage 
Maintaining current service levels
Options to be 
Q1; Q2; Q3;  ABS: Capex -   $       10,000 
communities
Investigation  walkways and pathways 
one -  investigate, design and scope physical works 
approved by local 
Q4
 Renewals
and Design
FY19+
(including options to propose to the local board for 
board
assets that may benefit from an increased level of 
service).  Stage two - physical works commence.  This 
is a multi-year funded project and is a continuation of 
the 2017/2018 programme.
2755 Involved and connected 
CF: Project 
Barry Curtis Park - develop 
Construct new carpark along Flat Bush School Road. 
Improved open spaces for our 
Options to be 
Q1; Q2; Q3;  ABS: Capex -   $  1,400,000 
communities
Delivery
Flat Bush School Rd Carpark
Original project is a continuation from the 2016/2017 
community to enjoy
approved by local 
Q4
 Development
programme (previous ID 2776), replacing items 
board
2523,2525 and 2526.
2757 Involved and connected 
CF: Project 
Barry Curtis Park - develop 
Install lighting for sports fields, Park Road and main 
Improved open spaces for our 
Options to be 
Q1; Q2; Q3;  ABS: Capex -   $  1,250,000 
communities
Delivery
lighting (southern sector)
walkways.  Original project is a continuation from the 
community to enjoy
approved by local 
Q4
 Development
2016/2017 programme (previous ID 2776) replacing 
board
items 2523, 2525, and 2526.
2758 Involved and connected 
CF: Project 
Barry Curtis Park - develop 
Construct carpark along culture lawn chapel road.  
Improved open spaces for our 
Options to be 
Q1; Q2; Q3;  ABS: Capex -   $  1,500,000 
communities
Delivery
existing Culture Lawn Chapel 
Original project is a continuation from the 2016/2017 
community to enjoy
approved by local 
Q4
 Development
Rd metal carpark
programme (previous ID 2776) replacing items 2523, 
board
2525, and 2526.
5/6
Howick Local Board

Community Facilities: Build Maintain Renew Work Programme 2018/2019
Lead 
Further Decision 
Budget 
ID
LB Plan Outcome
Dept/Unit or 
Activity Name
Activity Description
Activity Benefits
Timeframe
FY18/19
Points for LB
Source
CCO
2771 Our future growth is 
CF: Project 
Programme Development and  Development and delivery contractor professional fees. Improved initiative delivery in the 
Q1; Q2; Q3;  LDI: Opex
 $     150,000 
managed effectively
Delivery
Delivery - Local Initiatives
Howick area
Q4
2773 Our future growth is 
CF: 
Greenmount Development - 
Greenmount development project. Stage one -  
Improved accessibility to 
Design to be approved  Not 
ABS: Capex -   $       50,000 
managed effectively
Investigation  develop public access
investigate, design and scope physical works (including  recreational sites for local enjoyment by the local board
scheduled
 Development
and Design
options to propose to the local board for assets that 
may benefit from an increased level of service).  Stage 
two - physical works commence.  This project is a multi-
year funded project  is a continuation of the 2017/2018 
programme (previous SP18 ID 2529).