Asbestos Management Survey Report 
 
             

 
                              
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 

BOILER ROOM 
 
 
 
 
 
 
 
 
 


                                                                  
 
Repo
       
r
       t P
        r  oduc
         
tio
        n
                                                         
 
 
 
 
 
 
 
Survey Conducted by:  

Haretini Wakefield 
Date of Survey: 
 
16th of March 2018 
Position in Company:   
Operations Project Manager 
Assessor Number: 
 
AA18020017 
Expiry Date:    
 
9 February 2023 
Signature: 
 
 
H. Wakefield 
 
 
 
Survey Prepared by:    

Ali Lind 
Date Survey Prepared: 
26th of March 2018 
Position in Company:   
Operations Project Manager 
Assessor Number: 
 
 AA17090140 
Expiry Date:    
 
5 September 2022 
Signature: 
 
 
 
 
 
 
Survey Prepared by:    

Bruce Wakefield 
Date Survey Prepared: 
02nd of April 2018 
Position in Company:   
Managing Director 
Assessor Number: 
 
AA16090111 
Expiry Date:    
 
5 September 2021 
Signature: 
 
 
B. Wakefield 
 
 

 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 

 

                                                                  
 
Repo
       
r
       t P
        r  oduc
         
tio
        n
                                                         
 
 
 
 
 
 
 

 

 
Contents Page 
 
Section 1 
 

•  Report Details 
 
•  Introduction 
 
•  Survey Methodology 
 
•  General Recommendations for Asbestos Cement Products 
 
•  General Recommendation for Asbestos Insulation, Coatings 
or Insulating Board (AIB) 
 
•  Survey Summary & Recommendations 
 
•  Risk Assessment Methods 
 
Section 2 
 

•  Identification & Photographic Register Sheets 
 
•  Survey Recommendations 
 
•  Survey Record Sheets 
 
•  Laboratory Certificate of Analysis 
 
•  Management Inspection Record 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 

 

 
 
 
 
Introduction 
Further to an invitation from Mr. Grant Hood  
(WDHB – Whanganui District Health Board.) 
AISL - Asbestos Inspection Services Limited was requested to carry out a 
Management Survey at - 
 

Taihape Hospital, Boiler House. 
 
There are 2 designated categories of Asbestos surveys currently available. 
These are listed below: 
 
 
Management Survey 
 

Standard sampling, identification and assessment survey (Sampling Survey), 
the purpose of which is to locate as far as reasonably Practicable the presence 
and extent of any suspect asbestos containing materials in the building and 
their condition. This is done by the collection and analysis of samples of 
suspect asbestos containing materials. 
 
Refurbishment / Demolition Survey 
 

Full access sampling and identification survey (Pre-demolition/Major 
Refurbishment Survey). This type of survey is used to locate and describe as far 
as reasonably practicable, all asbestos containing materials in the building and 
may involve destructive inspection as necessary to gain access to all areas, 
including those that may be difficult to reach. A full sampling programme is 
undertaken to identify possible asbestos containing materials and estimates of 
the volume and surface areas of asbestos containing materials made. 
 
Access arrangements were made with aid of Mr. Grant Hood (Whanganui District 
Health Board) to ensure all accessible areas were surveyed during the project. 
 
The survey was carried out on 16/03/2018 and completed 10 days thereafter. 
 
The survey was to include for visual inspection within the above premises. 
 
The survey was undertaken and completed by members of the AISL – Asbestos 
Inspection Services Limited survey team. 
 
During the survey the building remained un-occupied. 
 
 
 
 
 

 
 

 

 
 
 
Disclaimer 
 
Every effort has been made to identify all asbestos materials so far as was 
reasonably practicable to do so within the scope of the survey and 
the attached report. Methods used to carry out the survey were agreed with the 
client prior to any works being commenced. 
 
Survey techniques used involves trained and experienced surveyors using the 
combined approach about visual examination. and bulk sample collections 
where required.  
It is always possible after a survey that asbestos based materials may remain 
in the property or area covered by that survey, this could be due to several 
reasons: 
 

•  Asbestos materials existing outside the scope of the survey. 
 
•  Materials may be concealed or hidden by other items or covered surfaces 
i.e. paint, over boarding, concealing etc. Where this is the case then 
its discovery will be limited. 

 
•  Asbestos may well be hidden as part of the structure to a building and 
not visible until the structure is demolished later. 
 
•  Fragments from previous asbestos removal projects may well be 
present in various areas; general asbestos fragments do not form 
part of this survey however all good intentions are made for its 
discovery. 

 
Where an area has been formerly stripped of asbestos i.e. plant rooms, 
ducts etc. and new coverings added, it must be pointed out that 
asbestos removal techniques have improved steadily over the years since its 
initial introduction. Most particularly would be the Health and Safety at Work 
(Asbestos) Regulations 2016, that outline enforceable strategies. Asbestos 
removal prior to this regulation would not be of today’s standard and 
therefore fragments may be present beneath new coverings. 
 
This survey will detail areas accessed and all samples taken, where an area is not 
covered by this survey it will be due to No Access for one reason or other i.e. 
working technicians, delicate location or just simply no admittance. It may have 
been necessary for the restrictions of the surveyor’s specialist to 
be confirmed prior to the survey. 
 
Admittance for the survey may be restricted for many reasons outside our 
control such as height, deadlines to others, steady complications 
or confined space. Where electrical equipment is present and presumed in the 
way of the survey no access will be attempted until proof of its safe state is 
given. Our operatives have a duty of care under the Health and Safety at Work 
Act (2016) for both themselves and others. 
 
 

 
 
 
 

 

 
Disclaimer 
 
In the structure where asbestos has been located and not all zones have been 
examined, any material that is found to be suspicious and not detailed as part of 
the survey should be treated with caution and sampled accordingly. 
 
Certain materials contain asbestos to variable grades and some may be 
less densely contaminated at certain locations (Artex for example). Where this is 
the case the sample taken may not be representative of the whole 
product throughout, therefore composite sampling is therefore encouraged. 
 
Where a survey is carried out under the guidance of the owner of the property or 
his representative, then the survey will be as per his/her instructions and 
supervision at that time. 
 
Asbestos Inspection Services Limited cannot accept any liability for loss, 
injury, damage or penalty issues due to errors or oversights contained within 
this report. 
 
Asbestos Inspection Services Limited cannot be held responsible for any 
damage caused as part of this survey carried out on your behalf. Due to the 
landscape and stipulation of sampling for asbestos some danger is inevitable 
and will be limited to just that necessary for the taking of the sample. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

 
 
 
 
General Recommendations for Asbestos Cement Products. 
 
Work with cement products containing asbestos is covered by the Management and 
Removal of Asbestos (November 2016) Approved Code of Practice. 
 
An assessment of all proposed works which may disturb any asbestos should be 
carried out to launch the risk existing, the appropriate precautions must be adopted 
to control any exposure. This should combine the succeeding over-all principles: 
 

•  Where work on asbestos cement is inevitable, keep the materials wet 
during work and avoid breakage wherever possible. Acceptable PPE 
must be worn always. 

 
•  Avoid using power tools. If deemed necessary to use power tools set at the 
lowest possible speed, exhaust ventilation such as cowls must be fitted to 
power tool and utilising the “investigation technique” with high efficiency H 
type vacuum units. 

 
•  Organise the work in a single controlled location where practicable, to 
streamline control and supervision. Isolate working areas using warning 
signs and tape barriers, or in case of significant fibre levels by means of a 
sealed polythene work enclosure and negative pressure equipment. Air 
tests must also be carried out by an independent asbestos assessor. 

 
•  Signify respirator zones where the Control Limit is likely to be exceeded 
and ensure that all persons entering the zones wear appropriate RPE/PPE 
are trained in its use. 

 
•  Ensure that those persons employed in working on asbestos cement are 
suitably trained in the correct working practices, control methods and 
anticipation of risks. 

 
•  Keep the work area clean during the work and use methods that abate dust 
creation, avoid sweeping and brushing, which will make dust airborne. 
 
•  Dispose of asbestos cement waste safely as Asbestos Waste under the 
statutory consignment note procedures in accordance with the Health 
and Safety at Work (Asbestos) Regulations 2016. 

 
•  Avoid further disturbance of asbestos cement products wherever possible 
by relocating or re-routing facilities. 
 
•  Clearly identify and label any asbestos cement products. 
 
 
 
 

 

 

 
 
 
 
General Recommendations for Asbestos Insulation, 
Coatings or Insulating Board (AIB) 
 
Where the materials are in safe condition and the risk of disturbance is small, they 
can be maintained on site. They should be identified with adequate warning signs 
and routinely inspected for damages. All asbestos materials should not be drilled, 
abraded or disturbed in any way. 
 
All asbestos containing materials should be removed prior to any planned 
refurbishment or demolition works, where damage is likely to be sustained during 
the occupant’s activities or where future decline is likely. 
 
Work on any of these items may only be carried out by a specialist contractor 
licensed under the Health & Safety at Work Act 2016. The selected contractor is 
required to notify the WSNZ at least 5 days prior to commencement of the works, 
and to provide a written Method Statement as follows: 
 

•  Full explanation of the works to be carried out and its duration. 
 
•  Type, quantity and location of asbestos to be removed. 
 
•  Anticipated exposure levels and persons affected. 
 
•  Enclosure construction details, layout and location, signage and 
ventilation. 
 
•  Protections to be adopted to minimize exposure to lowest possible level 
and to control release of asbestos fibre beyond the work area. 
 
•  Validation for any withdrawal from preferred methods, e.g. where wet 
stripping cannot be used. 
 
•  Type, use and decontamination of RPE/PPE 
 
•  Waste removal and disposal procedures 
 
•  Training and instruction of employees 
 
•  Emergency procedures on site
 

 

 
 
10 
 

 
Material Assessment Methods 
total risk score of between 0 and 12 is calculated using four categories 
that are evaluated by the surveyor against given values. The criteria 
and the respective values are as follows: 

 
Product Type 
 

Asbestos reinforced composites such as plastics, resins, mastic, 
roofing felt, vinyl tiles, paints and decorative finishes, asbestos 
cement products. 

 

Asbestos insulation board, mill boards, other low-density insulation 
boards, asbestos textiles, gaskets, ropes and woven textiles, 
asbestos paper and felt. 

 

Thermal insulation (e.g. pipe and boiler lagging), sprayed asbestos, 
loose asbestos, asbestos mattresses and packing. 

 
Condition/Extent of Damage 
 

Good condition, no visible damage. 
 

Low damage, a few scratches or surface marks, broken edges on 
boards, tiles etc. 

 

Medium damage, significant breakage of materials or several small 
areas where material has been damaged, revealing loose asbestos 
fibres. 

 

High damage or delamination of materials, sprays and thermal 
insulation. Visible asbestos debris. 

 
Surface Treatment 
 

Composite materials containing asbestos, such as reinforced 
plastics, resins, vinyl tiles. 

 

Enclosed sprays and lagging, asbestos insulation board with exposed 
surface painted or encapsulated, asbestos cement products. 

 

Unsealed asbestos insulation board or encapsulated lagging and 
sprays. 

 

Unsealed lagging and sprays. 
 
 
11 
 

 
Material Assessment Methods 
 
Asbestos Type 
 

Chrysotile (white) asbestos. 
 

Amosite (brown) asbestos. 
 

Crocidolite (blue) asbestos. 
 
 
The algorithms shown against each situation are added together to give a total material 
risk score, for conciseness, the register we have prepared contains only the total risk 
score rather than the component scores. 
 
The total score for each situation can be broadly classified using the following bands: 
 
 

Material Risk Score 
 
 

0 - 3  Very Low Risk 
 
 

4 - 6  Low Risk 
 
 

7 – 9 Medium Risk 
 
10 – 12 High Risk 
 
 
It is likely that high risk items will be highlighted in the report text and that some 
immediate action will be required.  
Other items may also be measured for consideration where the decision of the 
surveyor recommends this would be beneficial. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
12 
 

 
Priority Assessment Formula 
 
A priority risk score of between 0 and 12 is calculated using four categories that 
are evaluated by the duty holder. 
 
Although a surveyor may have some of the information which will contribute to 
the risk assessment and may be part of an assessment team, the duty holder is 
required to make a risk assessment based on the survey findings and their 
detailed knowledge of the activities carried out within the premises. The criteria 
and the respective values are as follows: 
 
 

Normal occupant activity 
 
Assessment 
Score 
Examples of score variables 
factor 
 
Main type of 

Rare disturbance activity (e.g. little used store room) 
activity in area 

Low disturbance activities (e.g. office type activity) 
 

Periodic disturbance (e.g. industrial or vehicular 
 
 
activity which may contact ACMs) 
 

High levels of disturbance, (e.g. fire door with 
 
 
asbestos insulating board) 
Secondary 
 
activities for 
As above 
area 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
13 
 

 
Priority Assessment Formula 
 
Likelihood of disturbance 
 
Assessment 
Score 
Examples of score variables 
factor 
 
Location 
0  Outdoors 
1  Large rooms or well-ventilated areas 
2  Rooms up to 100 m2 
3  Confined spaces 

 
 
Accessibility 
0  Usually inaccessible or unlikely to be disturbed 
1  Occasionally likely to be disturbed 
2  Easily disturbed 
3  Routinely disturbed 

 
 
Extent/amount 
0  Small amounts or items (e.g. strings, gaskets) 
1  <10 m2 or <10 m 
2  10 m2 to 50 m2 or 10 m to 50 m 
3  >50 m2 or >50 m 

 
 
 

Human exposure potential 
 
Assessment 
Score 
Examples of score variables 
factor 
 
 
Number of 

None 
occupants 

1 to 3 
 

4 to 10 
 

>10 
Frequency of 

Infrequent 
use of area 

Monthly 
 

Weekly 
 

Daily 
Average time 

<1 hour 
area is in use 

1 to 3 hours 
 

3 to 6 hours 
 

>6 hours 
 
 
 
 

 
14 
 

 
Priority Assessment Formula 
 
Maintenance activity 
 
Assessment 
Score 
Examples of score variables 
factor 
 
Type of 

Minor disturbance (e.g. possibility of contact 
maintenance 
when gaining access) 
activity 

Low disturbance (e.g. changing light bulbs in 
 
asbestos insulating board ceiling) 
 

Medium disturbance (e.g. lifting one or two 
 
asbestos insulating board ceiling tiles to access 
 
a valve) 
 

High levels of disturbance (e.g. removing many 
 
asbestos insulating board ceiling tiles to replace 
 
a valve or for re-cabling) 
 
 
Frequency of 

ACM unlikely to be disturbed for maintenance 
maintenance 

<1 per year 
activity 

>1 per year 

>1 per month 
 
 
 
The score for each variable is determined by calculating the average score of the 
appropriate factors. 
 
The algorithms shown against each section are added together to give a total priority 
risk score, for conciseness, the register we have prepared contains only the overall 
risk score rather than the component scores. 
 
 

Priority Risk Score 
 
 

 
0 - 3  Very Low Risk 
 
 

 
4 - 6  Low Risk 
 
 

 
7 – 9  Medium Risk 
 
10 – 12 High Risk 
 
 
 
 
 
 
 
 

 
15 
 










 
Overal  Hazard Risk Assessment Formulae 
 
The material and priority assessment scores provide an overall hazard risk score for 
each situation which can be broadly classified using the following table: 
 
 
 

 
 
 

Material Assessment 
 
 
 
 

 
 
10-12 
7-9 
5-6 
1-4 
 
 
 
 

 
 
 

 
 
 

10-12 
 
 
 
 


 
en
7-9 
 
 

sm
 
 

ses
s

 
 
 

rity A
4-6 
 
rio
 
P
 
 

0-3 
 
 
 
 
 
 
 
 

Key 
 
 
High Risk 
Total score = 19-24 
 
Medium Risk 
Total score = 13-18 
 
Low Risk 
Total score = 7-12 
 
Very Low Risk 
Total score = 1-6 
 
 
 
 
16 
 







 
 
 

 
Specific Locations that may contain asbestos based material’s or 
Presumed to Contain Asbestos Containing material’s.   
 
    ID: CARD NO:001 
Photograph No. 
DSCN0333 
 
Location/Area 
South Wall: Spouting System 
Sample No. 
Presumed the presence of ACM. 
Laboratory Analysis Findings 
Sample not taken. 
Quantity 
5.0m2 
 
 
    ID: CARD NO:002 
Photograph No. 
DSCN0334 
 
Location/Area 
Lower Roof: Air Vents 
Sample No. 
Presumed the presence of ACM. 
Laboratory Analysis Findings 
Sample not taken. 
Quantity 
16.0m2 
 
 
    ID: CARD NO:003 
Photograph No. 
DSCN0335 
 
Location/Area 
Lower Roof: Chimney 2 
Sample No. 
Presumed the presence of ACM. 
Laboratory Analysis Findings 
Sample not taken. 
Quantity 
40.0m2 
  
 
    ID: CARD NO:004 
Photograph No. 
DSCN0336 
 
Location/Area 
Lower Roof: Chimney 1 
Sample No. 
Presumed the presence of ACM. 
Laboratory Analysis Findings 
Sample not taken. 
Quantity 
6.0m2 
 
 
    ID: CARD NO:005 
Photograph No. 
DSCN0337 
 
Location/Area 
East Wall: Spouting System 
Sample No. 
Presumed the presence of ACM. 
Laboratory Analysis Findings 
Sample not taken. 
Quantity 
15.0m2 
 
 
 
 
 

 
17 
 







 
 
    ID:
 CARD NO:006 
Photograph No. 
DSCN0338 
 
Location/Area 
West Wall: Spouting System 
Sample No. 
Presumed the presence of ACM. 
Laboratory Analysis Findings 
Sample not taken. 
Quantity 
8.0m2 
 
 
    ID: CARD NO:007 
Photograph No. 
DSCN0339 
 
Location/Area 
Furnace Room: Cement Sheeting 
(Ceiling) 
Sample No. 
Presumed the presence of ACM. 
Laboratory Analysis Findings 
Sample not taken. 
Quantity 
12.0m2 
 
  
    ID:
 CARD NO:008 
Photograph No. 
DSCN0340 
 
Location/Area 
Main Boiler: Valve Gaskets 
Sample No. 
Presumed the presence of ACM. 
Laboratory Analysis Findings 
Sample not taken. 
Quantity 
34x100 Dia 
 
 
    ID: CARD NO:009 
Photograph No. 
DSCN0341 
 
Location/Area 
Work Room: Toilet (Vinyl Floor) 
Sample No. 
Presumed the presence of ACM. 
Laboratory Analysis Findings 
Sample not taken. 
Quantity 
5.0m2 
 
 
    ID: CARD NO:010 
Photograph No. 
DSCN0342 
 
Location/Area 
Ash Storage Shed: Building Paper 
Sample No. 
Presumed the presence of ACM. 
Laboratory Analysis Findings 
Sample not taken. 
Quantity 
56.0m2 
 
 
    ID: CARD NO:011 
Photograph No. 
DSCN0343 
 
Location/Area 
Ash Storage Shed: Soil/Ash 
Sample No. 
Presumed the presence of ACM. 
Laboratory Analysis Findings 
Sample not taken. 
Quantity 
30.0m2 
 
 
 
 
 
18 
 


 
 
 
 
 
 

Inspection Personnel 
 
 
 
Taihape Hospital, Boiler House 
 
 
 
 
 

Date 
Name 
Company Name 
Competency Attained  License No  Expiry Date 
Phone Number Email Address 
16th March 2018  Haretini Wakefield  Asbestos Inspection Services Limited  Licensed Asbestos Assessor   
09th of February  
+24 22 3234534 
[email address] 
AA18020017 
2023 
16th March 2018  Ali  
Asbestos Inspection Services Limited  Licensed Asbestos Assessor   
05th of September 
+24 27 8565624 
[email address] 
Lind 
AA17090140 
2022 
16th March 2018  Bruce Wakefield 
Asbestos Inspection Services Limited  Licensed Asbestos Assessor  AA16090111  05th of September 
+64 27 7655123 
[email address] 
2021 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
19 
 


 
Survey Record Sheet 
 
 
 

 
 Ref:  WDHB 
Site Address: 
Boiler Room, Taihape Hospital  
 Date: 16/03/2018 
 
 Survey Type: 
 Management Survey 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 

 
 
 re
 ity
 
 
 re
 re
 
 
 
 
 
 
 
 e 
 e
 t 
 
p
 c o
 n
 re
 c tiv
 
 c o
 
 
 
 
 
 
 
e
tm
 y 
 a
A
 c o

T
 
 k S
 p
 
 s u
 
 
 
 
 
 
 
 f  
y p 
 
 o
n
 k S
re 
 s 
 is
 o
 
 c e
 c e 
 n
 is
 
 
 
 
 
 
 
T
to
 c c u
 d
 x p
 l R
 
 n
 l 
 a
 is k S
 
c t T
itio 
 l O
 o
 a
 E
 n
 
 
a
 
 

 e 
 s 
 ity  o
 n
 tia
 ll R
 
 u 
 e
 ri
 a
 rb
 lih
 a
 n
 te
ty R
 ra
ID Card 
Photo No 
 
Sample Ref   
Product 
Asbestos 

ri
 rfac
b
 te
 rm
 e
 tu
 m
 te
 in
o
 
rod
 o 
u
 s 
 a
 c tiv
 is
 u
 o
 a
ri
 v e
No 
Location/Area Description 
 ik
/Presumed  Quantity 
Description 
Type 
P
C
S
A
M
No
 A L
D
H
P
M
P
O
Action 
001 
DSCN0333 
South Wall: Spouting 
Presumed  5.0m2 
Suspect ACM 
Spouting 
1  0  0  1  0 



0  0  Very low risk 
Complete a Risk Assessment.  
System 
material 
Lining 
002 
DSCN0334 
Lower Roof: Air Vents 
Presumed  16.0m2 
Suspect ACM 
ACM 
1  0  0  1  0 



0  0  Very low risk 
Complete a Risk Assessment.  
 
material 
material 
003 
DSCN0335 
Lower Roof: Chimney 2 
Presumed  40.0m2 
Suspect ACM 
ACM 
1  0  0  1  0 



0  0  Very low risk 
Complete a Risk Assessment.  
material 
material 
004 
DSCN0336 
Lower Roof: Chimney 1 
Presumed  6.0m2 
Suspect ACM 
ACM 
1  0  0  1  0 



0  0  Very low risk 
Complete a Risk Assessment.  
material 
material 
005 
DSCN0337 
East Wall: Spouting System  Presumed  15.0m2 
Suspect ACM 
Spouting 
1  0  0  1  0 



0  0  Very low risk 
Complete a Risk Assessment.  
material 
System 
006 
DSCN0338 
West Wall: Spouting System  Presumed  8.0m2 
Suspect ACM 
Spouting 
1  0  0  1  0 



0  0  Very low risk 
Complete a Risk Assessment.  
material 
lining 
007 
DSCN0339 
Furnace Room: Cement 
Presumed  12.0m2 
Suspect ACM 
Compressed  1  0  0  1  0  0 


0  0  Very low risk 
Complete a Risk Assessment.  
Sheeting (Ceiling) 
material 
Board 
008 
DSCN0340 
Boiler Room: Gasket Valves  Presumed  34x100 
Suspect ACM 
ACM gasket  1  0  0  1  0  0 


0  0  Very low risk 
Complete a Risk Assessment.  
diameter   material 
material 
009 
DSCN0341 
Work Room: Toilet (Floor) 
Presumed  5.0m2 
Suspect vinyl or  Vinyl resin 
1  0  0  1  0 



0  0  Very low risk 
Complete a Risk Assessment.  
backing 
010 
DSCN0342 
Ash Storage Shed 
Presumed  56.0m2 
Suspect ACM 
ACM 
1  0  0  1  0 



0  0  Very low risk 
Complete a Risk Assessment.  
building paper 
material 
011 
DSCN0343 
Ash Storage Shed (Floor) 
Presumed  30.0m2 
Suspect ACM 
Soil 
1  5  0  1  5/6  9 

6  6/7  6  Medium risk 
Complete a Risk Assessment.  
Soil 
Contamination 
 
20 
 