1982
Act
Information
Official
the
Independent
under
Reference Group
4th November 2020
Released
TABLE OF CONTENTS1982
Act
Introductions
Review of filter reporting
Introductions to new members
04 Overview of how previous
01
methods of reporting to the IRG
and proposed changes
Information
Overview of the implementation
05 Digital Safety Structure
Overview of the new Digital
Overview of the filter, procurement
02
Official
Safety team structure
process and the new provider
the
Review of filter governance
Overview of governance required
03 under
including code of practice and
agreements
Released
1982
Act
1.
Information
Introdu
TBCctions
TBC
Official
the
under
Released
Introductions
1982
Jared Mullen – Director Digital Safety
Kathleen L
Act
ogan –Children’s Commission
Lisa Wilkin-Krug - Manager Digital
Messaging & System
David Shanks – Classification Office
Information
John Michael (JP) – Deputy Director
Digital Safety
Geoff Thorn – NZ Telecommunications Forum
Official
Tim Houston–Manager Digital Child
the
Exploitation
Leela Gantman – SPARK
under
Josh Mitchell
Mark Harris
– Operational Policy Analyst
– Technology Research & Consulting
David Stone – Telecommunications Specialist
Released
1982
Act
2. Overview of the
TBC
i
Information
mplementation
TBC
Official
the
under
Released
The Digital Child Exploitation Filter
1982
Act
About the filter
• The DCEF is made up of websites that are known to
Information
contain child exploitation material.
• These websites are identified through complaints
Official and investigations by DIA
the
• Websites found to be hosting child sexual abuse
under
material are placed on the filter block list once they
are assessed.
Released
Our Timeline
1982
Comms to IRG
Notification from NetClean
Act
29 June 2020
Technical
28 Feb 2020
Public Tender
Notification of
Implementation
NetClean advise DIA they
22 May 2020
Procurement of new DCEF
July 2020
are suspending the service
The public tender was
Provider
The new filter is
as of 30 April 2020
advertised
implemented
Information
IRG
Further
21 Nov
Implementation
2019
Aug – Sept 2020
Official
Last IRG
Arising issues
Meeting
were resolved
the
held
Quotes Received
under
Contract with Allot Signed
NetClean Extension
Comms to IRG & the
8 June 2020
30 June 2020
Date 25 May 2020
media
4 Providers
Contract signed for an
DIA secure extension from
5 Aug 2020
responded to us
initial period of 3yrs, with
NetClean until 31 July 2020
DIA announce Al ot
quotes
up to two extensions, each
Ltd. as new provider
for 2yrs (7yrs total)
Released
1982
Act
Allot Ltd
Provide a range of services to
international teleco’s including filter
Information ing,
security and traffic management. They
have a positive international reputation
Official
with branches in locations such as NZ,
the
Aus, India & across Europe
under
Released
Why Allot Ltd.
1982
Each supplier had to meet the following pre-conditions for their bid to be considered:
Act
1. The system can be hosted in New Zealand
2. The system supports Border Gateway Protocol filtering
3. The system enables DIA to manage the block list.
Information
Evaluation Criteria:
Proposed
Protect from Official
Service
Price
Service Quality
Experience
Solution
Harm
Continuity
the
• Undertook price
• Understood
• Proposal was
• Provided
• Allot have the
• Offer robust
sensitivity
DIA’s needs &
thought out, well
confidence that
ability to
support including
analysis
requirements
prepared and
their solution
manage
a NZ based
under
• Allot was ranked
• Understood how
comprehensive
was fit for
volumes and
account
the best public
the Border
• Established and
purpose
scale up
manager
value
Gateway
work with other
• System was
• Global
• System is a ‘turn
Protocol solution
Teleco’s
demonstrated as
organisation with
key’ out of the
would work
stable
locations in
box solution
multiple
Released
countries
Operation of the DCEF1982
Act
How the filter works:
• All internet traffic is passed by ISPs to the filter.
Information
• The filter compares the URL address requested to
the list of known child exploitation sites.
Official
• The requested site is not on the filter →
user is passed to requested website.
the
• If the requested site is on the filter list →under
the user is passed to the DIA landing page
Released
1982
Act
3. Review of filter
Information
governance
TBC
Official
the
under
Released
Filter Governance 1982
Act
We now need to focus on reviewing the governance around the filter
including:
Information
▪ Code of Practice
▪ Frequency of IRG meetings
Official
▪ Review IRG membership
the
▪ ISP/ DIA filter agreements
under
▪ Process to review URLs
▪ Review previous IRG meeting actions
Released
1982
Act
4. Review of
Information
filter reporting
TBC
Official
the
under
Released
Reporting
1982
Previous Reporting
Proposed Reporting
Act
For our report going forward, some of the
improvements we’d like to make are:
• Automating the reporting – it’s quite manual
Information
at the moment
• Peak times of users trying to access sites
Official
• Each month/period
• Number of sites removed
the
• Number of sites added
under
Released
1982
Act
5. Digital Safety
s
Information
tructure
TBC
Official
the
under
Released
Structure of Digital Safety
1982
Act
Information
Official
the
under
Released
1982
Act
THANK YOU!
Information
Does anyone have any questions?
Official
the
under
Released