Willis Street Assessment Form
Wil is Street Do Minimum
Wil is Street Option 1
Wil is Street Option 2
Wil is Street Option 3
Provide a description of 
Provide a description of 
Provide a description of 
Provide a description of 
Provide a description of 
Provide a description of 
how the the scoring may 
how the scoring may 
how the the scoring may 
how the scoring may 
how the the scoring may 
how the scoring may 
A
B C D
E
F
G
H
Provide an explanation 
change if loading bays 
change if taxi's and loading  A B C D
E
F
G
H
Provide an explanation 
change if loading bays 
change if taxi's and loading  A B C D
E
F
G
H
change if loading bays 
change if taxi's and loading  A B C D
E
F
G
H
Provide any commentary 
of the rational behind  were to be retained on the  bays were to be retained 
of the rational behind  were to be retained on the  bays were to be retained 
Provide an explanation of the  were to be retained on the  bays were to be retained 
Questions
Score
relevant to the do minimum.
Score
the score.
Golden Mile
on the Golden Mile
Score
the score.
Golden Mile
on the Golden Mile
Score
rational behind the score.
Golden Mile
on the Golden Mile
Loading bays adjacent to stops 
Removal of general traffic 
Loading bays adjacent to stops 
Slight decrease in JT, but significant  Loading bays adjacent to stops 
IO - Bus Travel time and reliability
What are bus travel times along each segment?
0
are a particualer issue on 
provides significant benefiits 
are a particualer issue on 
improvement in reliability due to 
are a particualer issue on 
0
0
0
0
0
0
0
0
1
Marginal improvements to 
n/a
0.25 0.15 0.35
0.1
0.2
0.2
0.2
0.21
2
n/a
0.5
0.3
0.7
0.2
0.4
0.4
0.4
0.42
2
n/a
0.5
0.3
0.7
0.2
0.4
0.4
0.4
0.42
What the variance of travel time / reliabilty of services along the 
travel time only.
Willis Street, due to the 
to reliability in particular. 
Willis Street, due to the 
removal of general traffic.  
Willis Street, due to the 
segment?
interaction with bus stops.
Score rounced up from 1.5
interaction with bus stops.
Rounded up from 1.5.
interaction with bus stops.
What is the bus volume throughput along the segment?
SB bus stop is to far away from 
Delay to bus customers much 
bus stop on Lambton Quay,  Loading bay adjenct to NB stop 
Loading bay adjenct to NB stop 
Stop location considered optimal of  Loading bay adjenct to NB stop 
IO - Bus passenger boarding and alighting 
reduced, however stop 
0
but marginal improvement in 
is a particular problem, 
is a particular problem, 
the three options, as well as 
is a particular problem, 
0
0
0
0
0
0
0
0
1
n/a
0.25 0.15
0.1
0.1
0.2
0.2
0.2
0.21
1
location (particularly SB) 
n/a
0.25 0.15
0.1
0.1
0.2
0.2
0.2
0.21
2
n/a
0.5
0.3
0.2
0.2
0.4
0.4
0.4
0.42
comfort and convenience
space provides maringal 
delaying buses access to the 
delaying buses access to the 
providng decreased wait time. 
delaying buses access to the 
degrades customer access and 
How many passengers may be cleared from bus stops?
improvements. Score rounded 
stop.
stop.
Rounded up from 1.75.
stop.
experience.
What is the wait time at buses?
up from 0.5.
How much bus stop crowding is there?
General traffic removed & 
Negative impact if within 
Subject to locations of loading  Subject to locations of taxi 
General traffic removed and 
Subject to locations of loading  Subject to locations of taxi 
IO -  Pedestrian safety
0
Subject to location of taxi 
Mercer St closed which 
0
0
0
0
0
0
0
0
1
Side roads closed reduces 
pedestrianised areas 
0.2
0.2
0.1
0.6
0.2
0.2
0.2
0.21
1
zones - potential slight 
ranks - potential slight 
0.2
0.2
0.1
0.6
0.2
0.2
0.2
0.21
1
Mercer Street closed which reduces 
zones - potential slight 
ranks - potential slight 
0.2
0.2
0.1
0.6
0.2
0.2
0.2
0.21
conflicts.
ranks.
removes ped v vehicle 
otherwise negligible change.
reduction in score
reduction in score
ped vs vehicle conflicts.
reduction in score
reduction in score
What is the potential for pedestrian accidents to be reduced?
conflicts
 Reduced signal timings will 
 Reduced signal timings will 
No changes to available 
No changes to available 
1982
How many pedestrian crossing are along the corridor?
No changes to available 
No changes to available 
No changes to available 
No changes to available 
 Reduced signal timings will reduce 
IO - Pedestrian capacity
reduce pedestrian delays and 
reduce pedestrian delays and 
footpath width or signal times  footpath width or signal times 
What is the pedestrian delay per crossing?
0
No changes to available footpath width 
0
0
0
0
0
0
0
0
1
footpath width or signal times  footpath width or signal times  0.2 0.2 0.35 0.1
0.2
0.2
0.2
0.18
1
footpath width or signal times  footpath width or signal times  0.2 0.2 0.35 0.1
0.2
0.2
0.2
0.18
2
pedestrian delays coupled with 
0.4
0.4
0.7
0.2
0.4
0.4
0.4
0.36
How many pedestrian crossings are across the corridor?
or pedstrian crossings 
no change to available foot 
no change to available foot 
assumed. Therefore score 
assumed. Therefore score 
assumed
assumed
assumed
assumed
some improved bus stop capacity
What is the pedestrian delay per crossing?
path
path
would change to 1
would change to 1
What is the level of footpath pedestrian density
What is the level of bus stop overspill?
Level of pedestrian amenity (using VURT)
primarily relates to Mercer St  change (probably not enough  change (probably not enough 
primarily relates to Mercer St  change (probably not enough  change (probably not enough 
change (probably not enough  change (probably not enough 
primarily relates to Mercer St being 
IO - Improve Place quality
Composition and relationship of buildings and space
0
being able to be used as 
to reduce by 1 point)  if street  to reduce by 1 point)  if street 
being able to be used as 
to reduce by 1 point)  if street  to reduce by 1 point)  if street 
to reduce by 1 point)  if street  to reduce by 1 point)  if street 
0
0
0
0
0
0
0
0
1
0.1
0.3
0.1
0.1
0.2
0.2
0.2
0.19
1
0.1
0.3
0.1
0.1
0.2
0.2
0.2
0.19
1
able to be used as connection to 
0.1
0.3
0.1
0.1
0.2
0.2
0.2
0.19
How connected does the place feel?
connection to civic sq and 
widths remain without 
widths remain without 
connection to civic sq and 
widths remain without 
widths remain without 
widths remain without 
widths remain without 
civic sq and along Willis
What is the level of activity promoted
along Willis
footpath widening
footpath widening
along Willis
footpath widening 
footpath widening 
footpath widening 
footpath widening 
Act 
How comfortable does the place feel?
0
0
0
0
0
0
0
0
0
1
0.12 0.12 0.12 0.08
0.04
0.12
0.04
0.16
1.2
0.15 0.14 0.16 0.09 0.048
0.144
0.048
0.1936
1.6
0.2
0.18 0.22 0.16 0.192
0.192
0.192
0.192
PT & AT as more viable modes for 
E - Social 
0
all, greater ease of movement, 
0
0
0
0
0
0
0
0
1
greater PT efficiency, little 
minimal change
minimal change
0.17 0.17 0.17
0.1
0.1
0.1667
0.25
0.19
1
greater PT efficiency, little 
minimal change
minimal change
0.17 0.17 0.17
0.1
0.1
0.1667
0.25
0.19
3
minimal change
minimal change
0.5
0.5
0.5
0.3
0.3
0.5001
0.75
0.57
change in public space
change in public space
more space for social 
What is the range of relevant stakeholder and community feedback
opportunititues 
E - Retail Impact Assessment
What is the likely impact/opportunity to retailers and businesses?
0
Increased pedestrian congestion from 
0
0
0
0
0
0
0
0
1
Increased foot traffic and 
Willis Street has 3 large 
NA as no taxi stands on Willis  0.17 0.17 0.17 0.1
0.1
0.1667
0.25
0.2
1
In addition to Option 1, two  Assuming loading bays on the  NA as no taxi stands on Willis  0.17 0.17 0.17 0.1
0.1
0.1667
0.25
0.2
2
Signigicantly increasing amenity 
Assuming loading bays on the  NA as no taxi stands on Willis  0.33 0.33 0.33 0.2
0.2
0.3334
0.5
0.4
population growth, but CBD will always 
pedestrian activity from 30% 
loading bays that are well 
Street.
bus lanes in each direction 
GM can be accessed while all 
Street.
with 75% more footpath space and  GM can be accessed while all 
Street.
attract people and patronage, not deter 
more footpath space, however  utlilised. Larger businesses 
would improve transport 
else remains constant, 
provisions for bikes and scooters 
else remains constant, 
especially for Willis Street which is the 
loss of efficiency/higher goods 
such as New World have 
networks, but no general 
retailers would benefit as 
outweigh the same magnitude of 
retailers would benefit as 
main 'high end' retail precinct along 
damage/theft risk for 
loading bays on Boulcott 
traffic would limit access. 
there are 3 large loading bays 
negative impacts from Options 1  there are 3 large loading bays 
with LQ. Hence, in the event of 'do 
businesses from relocation of  Street. Score could increase.
However, very little private 
that are currently well 
and 2. Modal shift allowances 
that are well utlilised. Hence, 
minimum', it would be expected to see 
loading bays. No parking 
transit and no parking as is, 
utlilised. Hence, the score 
create medium to long term 
the score could increase.
growing levels of patronage as this is 
spaces anyways in do 
hence limiting access would 
could increase.
benefits. Hence the higher score. 
Wellington's premier retail precinct.
minimum so this would not be 
not be a significant issue.
But questions around the reduced 
impacted and very little/no 
buslane causing bus stacking, hence 
private transit.
decreasing transit amenity.
Still no cycle provision for 
southbound cyclists. Northbound 
Still no cycle provision for 
Minimal change as 
Minimal change as 
Minimal change as 
Minimal change as 
cyclists continue to use general 
Minimal change as 
Minimal change as 
Still no cycle provision for 
No cycle provision for southbound 
southbound cyclists. 
northbound cyclists generally  northbound cyclists generally 
northbound cyclists generally  northbound cyclists generally 
traffic lane. Removal of indented  northbound cyclists generally  northbound cyclists generally 
southbound cyclists. 
E - Cycling Level of Service 
0
cyclists. Northbound cyclists mix with 
Northbound cyclists continue 
take the lane already. Door 
take the lane already. Door 
take the lane already. Door 
take the lane already. Door 
bus stops and marking of in-lane 
take the lane already. Door 
take the lane already. Door 
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Northbound cyclists to use bus 
0
0
0
0
0
0
0
0
-1
-0.17 -0.17 -0.17 -0.1
-0.1
-0.167
-0.1
-0.16
general traffic in a low speed 
to use general traffic lane. See 
zone is not a particular 
zone is not a particular 
zone is not a particular 
zone is not a particular 
bus stops means people on bikes 
zone is not a particular 
zone is not a particular 
lane. See further comments in 
environment.
further comments in "Fit with 
concern for this section of 
concern for this section of 
concern for this section of 
concern for this section of 
have limited space to pass 
concern for this section of 
concern for this section of 
"Fit with LGWM Programme"
LGWM Programme"
Golden Mile.
Golden Mile.
Golden Mile.
Golden Mile.
stationary buses. See further 
Golden Mile.
Golden Mile.
What is the effect to cycling level of service?
What is the effect on perceived safety and comfort of cycling on the 
comments in "Fit with LGWM 
segment?
Programme"
General traffic removed and 
Reduction in score due to 
Reduction in score due to 
Reduction in score due to 
Information 
E - General Safety 
0
Reduction in score due to 
Reduction in score due to 
Mercer Street closed which reduces 
Reduction in score due to 
0
0
0
0
0
0
0
0
1
RT conflicts at Mercer St 
manouevring of service 
0.17 0.17 0.17
0.5
0.1
0.1667
0.1
0.19
1
General traffic removed & 
manouevring of service 
0.17 0.17 0.17
0.5
0.1
0.1667
0.1
0.19
1
manouevring of service 
0.17 0.17 0.17
0.5
0.1
0.1667
0.1
0.19
What is the general effect to road safety on the segment?
removed.
manouevring of taxis.
Mercer St closed
manouevring of taxis.
ped vs vehicle and vehicle v vehicle 
manouevring of taxis.
vehicles.
vehicles.
vehicles.
What is the general effect to road safety on adjacent streets?
conflicts.
Potentially significant 
E - Sustainability
To what extent does the option deliver against sustainabiltiy issues 
0
Continued PMV preference, growth, and 
0
0
0
0
0
0
0
0
1
Minor improvement on key 
mimimal change 
minimal change
0.17 0.17 0.17
0.1
0.1
0.1667
0.1
0.16
1
Minor improvement on key 
mimimal change 
minimal change
0.17 0.17 0.17
0.1
0.1
0.1667
0.1
0.16
3
improvement on key sustinability 
mimimal change 
minimal change
0.5
0.5
0.5
0.3
0.3
0.5001
0.3
0.48
bus congenstion  
sustinability criteria
sustinability criteria
and aspects relevant and important to Wellington and Aotearoa?
criteria
minimal opportunity to 
challenging to accommodate 
challenging to accommodate 
provide a safe and convenient 
E - Fit with LGWM Programme
What is the alignment with linked projects such as MRT or central 
improvements for people on 
improvements for people on bikes 
city cycling network?
0
0
0
0
0
0
0
0
0
-1
cycling movement between 
mimimal change 
minimal change
-0.17 -0.17 -0.17 -0.1
-0.5
-0.167
-0.1
-0.1
-1
mimimal change 
minimal change
-0.17 -0.17 -0.17 -0.1
-0.5
-0.167
-0.1
-0.1
-1
mimimal change 
minimal change
-0.17 -0.17 -0.17 -0.1
-0.5
-0.167
-0.1
-0.1
bikes or buses on these north-
or buses on these north-south 
How much flexibility is there to integrate with linked projects?
Willis Street northbound and 
south corridors. 
corridors. 
Mercer Street 
0
0
0
0
0
0
0
0
0
0.5
0.02 0.02 0.02 0.05 -0.007 0.0167
0.06
0.0107
0.5
0.02 0.02 0.02 0.05 -0.007 0.0167
0.06
0.0107 1.1667
0.04 0.04 0.04 0.04
0.01
0.0389 0.0483
0.046
DM&O - Delivery
0
0
0
0
0
0
0
0
0
-1
No change in score
No change in score
-0.33 -0.33 -0.33 -0.3
-0.4
-0.333 -0.333
-0.4
-1
No change in score
No change in score
-0.33 -0.33 -0.33 -0.3
-0.4
-0.333 -0.333
-0.4
-2
No change in score
No change in score
-0.67 -0.67 -0.67 -0.7
-0.8
-0.666 -0.666
-0.8
DM&O - Operations and Maintenance
0
0
0
0
0
0
0
0
0
-1
No change in score
No change in score
-0.33 -0.33 -0.33 -0.3
-0.2
-0.333 -0.333
-0.55
-2
No change in score
No change in score
-0.67 -0.67 -0.67 -0.7
-0.4
-0.666 -0.666
-1.1
-3
No change in score
No change in score
-1
-1
-1
-1
-0.6
-0.999 -0.999
-1.65
DM&O - Timeframe for Delivery
0
0
0
0
0
0
0
0
2
No change in score
No change in score
0.67 0.67 0.67 0.67
0.8
0.666
0.666
0.1
2
No change in score
No change in score
0.67 0.67 0.67 0.67
0.8
0.666
0.666
0.1
2
No change in score
No change in score
0.67 0.67 0.67 0.67
0.8
0.666
0.666
0.1
Official 
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.0267
0
0
-0.0283 -0.333
-0.02 -0.02 -0.02
-0
0
-0.022 -0.022 -0.0467
-1
-0.07 -0.07 -0.07 -0.1
-0.04
-0.067 -0.067 -0.1567
0
0
0
0
0
0
0
0
0
1.5
0.1 0.1 0.1 0 0.06 0.14 0.1 0.14 1.3667
0.1 0.1 0.2 0 0.04 0.14 0.09 0.16 1.7667
0.2 0.2 0.2 0 0.16 0.16 0.17 0.08