Thank you for your email of 9 August 2021 in which you asked 37 questions about the analysis 
outlined in the Golden Mile Alternatives and Options Report (Multi Criteria Analysis Report) under the 
Official Information Act 1982 (the Act). 
 
The  attached  document  schedule  details  the  documents  that  are  in  scope  of  your  request.  Some 
information has been withheld, as detailed in the document schedule. 
 
I have answered each of your requests in the table below: 
  
 Question 
Response 
1.   Can I please have a copy of the detailed calculations  This information is in Appendix O to the 
used to provide the amounts outlined in the Table 1:  MCA report. I am refusing this request 
Short List Report’s indicative benefits / disbenefits for  under section 18(d) of the Act as the 
the short-listed options (over a 40-year evaluation 
information is publicly available 
period) on page 20? 
2.   Can I please have a copy of the agenda, meeting 
As this was a workshop, all meeting 
minutes and all presentations to the MCA workshop 
notes and discussion points were 
would be held on Monday 30 November 2020 
captured in MCA scoring and summary.  
referred to on page 31? 
Please refer to documents 2-23.   
3.   Can I please have a copy of the names of those who  Please refer to document 23. Some 
took part in the MCA Workshop for the Golden Mile 
information has been withheld from this 
held on Monday 30 November 2020 referred to on 
under section 9(2)(a) of the Act, to 
page 31? 
protect the privacy of individuals 
4.   Can I please have a copy of the detailed calculations  This information is in Appendix O to the 
used to provide the amounts outlined in the “Cost, 
MCA report. I am refusing this request 
benefit, and value for money ranges” table on page 
under section 18(d) of the Act as the 
35? 
information is publicly available. 
 
5.   Can I please have a copy of the detailed calculations 
used to provide the amounts outlined in the 
“Individual benefit components” table on page 35? 
 
   

 
6.   Can I please have a copy of the “journey-time model  Please refer to document 24 
 
was developed to evaluate bus journeys along the 
corridor” referred to on page 36 and in Appendix D? 
7.   Can I please have a copy of the journey-time model 
bus travel times for the Do-Minimum Scenario and 
each of the three options referred to on page 36? 
8.   Can I please have a copy of the journey-time model 
bus reliability figures for the Do-Minimum Scenario 
and each of the three options referred to on page 
36? 
9.   Can I please have a copy of the bus stop model 
Please refer to document 25 
referred to on page 37 and in Appendix D? 
10.   Can I please have a copy of the detailed calculations  This information is included in the short 
used to provide the amounts outlined in the Table 
list options report available on the 
44: Cost estimate ranges on page 61? 
LGWM website. I am refusing your 
request under section 18(d) of the Act 
as the information is publicly available. 
11.   Can I please have a copy of the “MRCagney’s 
The model was developed and coded 
runtime model” used to assess Public transport 
by MRCagney and is MRCagney 
benefits referred to on page 62? 
Intellectual Property. I am withholding 
this information under sections 9(2)(b)(i) 
and 9(2)(ba)(i) of the Act.  
12.   Can I please have a copy of the detailed calculations  This information is in Appendix O to the 
used to provide the amounts outlined in the Table 
MCA report. I am refusing this request 
45: Updated net present value of the short-listed 
under section 18(d) of the Act as the 
options on page 62? 
information is publicly available 
 
13.   Can I please have a copy of the detailed calculations 
used to provide the amounts outlined in the Table 
46: Indicative BCR ranges on page 63? 
14.   Can I please have a copy of the detailed calculations  Weighting summaries are provided in 
used to provide the amounts outlined in the Table 
Appendix P of the MCA report, which is 
47: Evaluation of the weighted scenarios and 
publicly available. I am refusing this 
unweighted (i.e. raw) rankings on page 65? 
document under section 18(d) of the Act 
as the information is publicly available. 
MCA assessment sheet with scores, 
commentary, raw scores and weighted 
scores are provided in documents 14 to 
22. 
15.   Can I please have a copy of the “Correspondence 
Please refer to document 26 
with Alex Campbell – 2 October 2020” listed on page 
2 of Appendix B Project Assumption and Do-
Minimum Briefing Note 
16.   Can I please have a copy of the detailed calculations  This information is in the Let's Get 
used to provide the amounts outlined in Figure 2 - 
Wellington Moving RPI and Indicative 
Forecast Increase in Public Transport Passengers to  Package Modelling Report available on 
the CBD on page 8 of Appendix B Project 
the LGWM website. I am withholding 
Assumption and Do-Minimum Briefing Note 
this information under section 18(d) of 
17.   Can I please have a copy of the detailed calculations  the Act as the information is publicly 
used to provide the amounts outlined in Figure 2 - 
available. 
Forecast Increase in Public Transport Passengers to 
 
 


 
the CBD on page 8 of Appendix B Project 
Assumption and Do-Minimum Briefing Note 
18.   Can I please have a copy of the detailed calculations  There are no amounts specified in this 
used to provide the amounts outlined in the Table 3 -  table. I am therefore refusing your 
Summary of Golden Mile Section Relationships on 
request for this information under 
page 7 of Appendix D Bus Travel Time, Reliability, 
section 18(e) of the Act, as the 
Comfort and Convenience Report? 
information does not exist.  
19.   Can I please have a copy of the detailed calculations  Please refer to document 24 
used to provide the amounts outlined in the Figure 2 
- Lambton Quay AM Peak Northbound and 
Southbound on page 8 of Appendix D Bus Travel 
Time, Reliability, Comfort and Convenience Report? 
20.   Can I please have a copy of the detailed calculations 
used to provide the amounts outlined in the Figure 3 
- Lambton Quay PM Peak Northbound and 
Southbound on page 8 of Appendix D Bus Travel 
Time, Reliability, Comfort and Convenience Report? 
21.   Can I please have a copy of the detailed calculations 
used to provide the amounts outlined in the Figure 4 
-Willis Street AM Peak Northbound and Southbound 
on page 9 of Appendix D Bus Travel Time, 
Reliability, Comfort and Convenience Report? 
22.   Can I please have a copy of the detailed calculations 
used to provide the amounts outlined in the Figure 5 
- Willis Street PM peak Northbound and Southbound 
on page 9 of Appendix D Bus Travel Time, 
Reliability, Comfort and Convenience Report? 
23.   Can I please have a copy of the detailed calculations 
used to provide the amounts outlined in the Figure 6 
- Manners Street AM Peak Northbound and 
Southbound on page 10 of Appendix D Bus Travel 
Time, Reliability, Comfort and Convenience Report? 
24.   Can I please have a copy of the detailed calculations 
used to provide the amounts outlined in the Figure 7 
- Manners Street PM Peak Northbound and 
Southbound on page 10 of Appendix D Bus Travel 
Time, Reliability, Comfort and Convenience Report? 
25.   Can I please have a copy of the detailed calculations 
used to provide the amounts outlined in the Figure 8 
- Courtenay Place AM Peak Northbound and 
Southbound on page 11 of Appendix D Bus Travel 
Time, Reliability, Comfort and Convenience Report? 
26.   Can I please have a copy of the detailed calculations 
used to provide the amounts outlined in the Figure 9 
- Courtenay Place PM Peak Northbound and 
Southbound on page 11 of Appendix D Bus Travel 
Time, Reliability, Comfort and Convenience Report? 
 
 


 
27.   Can I please have a copy of the modelled normal 
Please refer to document 25 
 
bus dwell time and the double decker buses dwell 
time referred to on page 13 of of Appendix D Bus 
Travel Time, Reliability, Comfort and Convenience 
Report? 
28.   Can I please have a copy of the detailed calculations 
used to provide the amounts outlined in the Figure 
10 - Lambton Quay Stop Assessment (PM Peak) on 
page 14 of Appendix D Bus Travel Time, Reliability, 
Comfort and Convenience Report? 
29.   Can I please have a copy of the detailed calculations 
used to provide the amounts outlined in the Figure 
11 - Willis Street Stop Assessment (Pm Peak) on 
page 15 of Appendix D Bus Travel Time, Reliability, 
Comfort and Convenience Report? 
30.   Can I please have a copy of the detailed calculations 
used to provide the amounts outlined in the Figure 
12 - Courtenay Place Stop Assessment on page 16 
of Appendix D Bus Travel Time, Reliability, Comfort 
and Convenience Report? 
31.   Can I please have a copy of the detailed calculations  Please refer to Sheet 1 of document 1 
used to provide the amounts outlined in the Table 1: 
Present value of economic costs and benefits on 
page 6 of Appendix O Economics Report? 
32.   Can I please have a copy of MRCagney’s runtime 
The model was developed and coded 
model referred to on pages 13 and 14 of Appendix O  by MRCagney and is MRCagney 
Economics Report? 
Intellectual Property. I am withholding 
33.   Can I please have a copy of the detailed calculations  this information under sections 9(2)(b)(i) 
used to provide the amounts outlined in the Table 5:  and 9(2)(ba)(i) of the Act. Document 24 
Range of median to upper limit travel times in the PM  provides the outputs of this model. 
 
peak on page 16 of Appendix O Economics Report? 
34.   Can I please have a copy of the detailed calculations 
used to provide the amounts outlined in the Figure 1: 
Public transport travel time estimates along Golden 
Mile on page 17 of Appendix O Economics Report? 
35.   Can I please have a copy of the detailed calculations  Please refer to sheet 2 of document 1 
used to provide the amounts outlined in the Table 6: 
Annual public transport benefit, 2025 on page 17 of 
Appendix O Economics Report? 
36.   Can I please have a copy of the detailed calculations  Please refer to sheet 3 of document 1 
used to provide the amounts outlined in the Table 7: 
Present value of public transport benefits on page 17 
of Appendix O Economics Report? 
37.   Can I please have a copy of the report that provided  These dwell times were estimated from 
the existing dwell times at stops along the Golden 
analysis of Snapper data and were not 
Mile as provided to MRCagney referred to page 32 
provided in a report. I am refusing this 
of Appendix O Economics Report? 
request under section 18(e) of the Act 
as the information requested does not 
exist. 
 
 
 



 
Requests 6-8, 11, 19, 20-26 and 32-34 are related to models developed and coded by MRCagney which 
are MRCagney intellectual property. I am withholding these models under the following sections of the 
Act:  
•  9(2)(b)(i), to protect information where the making available of the information would disclose a 
trade secret  
•  9(2)(ba)(i) of the Act, and protect information which is subject to an obligation of confidence or 
which  any  person  has  been  or  could  be  compelled  to  provide  under  the  authority  of  any 
enactment, where the making available of the information would be likely to prejudice the supply 
of similar information, or information from the same source, and it is in the public interest that 
such information should continue to be supplied.  
 
While  we  are  withholding  these  models,  we  have  provided  you  with  their  outputs  relevant  to  your 
requests in document 24.  
 
With respect to the information that has been withheld, I do not consider there are any other factors 
which would render it desirable, in the public interest, to make the information available. 
 
Under section 28 of the Act, you have the right to ask the Ombudsman to review my decision to 
withhold some information and refuse some portions this request. The contact details for the 
Ombudsman can be located at www.ombudsman.parliament.nz. 
 
If you would like to discuss this reply with Let’s Get Wellington Moving, please contact Willy Trolove, 
Interim Communications and Engagement Manager, by email to [email address]. 
 
 
Yours sincerely 
 
 
David Dunlop  
Interim Programme Director 
 
 
 


 
OIA-8625 Document Schedule  
 
Ref 
Document 
Comment 
1. 
 Economics Spreadsheet 
Released in full. 
2. 
 Delivery Maintenance and Operations Costs 
GM MCA presentation 
3. 
 Economics GM MCA Presentation 
4. 
 JT and Bus GM MCA presentation 
5. 
 LGWM Programme fit GM MCA presentation 
6. 
 Pedestrian and General Safety GM MCA 
presentation 
7. 
 Pedestrian Capability GM MCA presentation 
8. 
 Retail Impacts Assessment GM MCA 
presentation 
9. 
 Social Effects GM MCA presentation 
10. 
 Sustainability GM MCA presentation 
11. 
 Urban Amenity GM MCA presentation 
12. 
 Workshop Introduction 
13. 
 Cycling Leve of Service GM MCA  
14. 
 GM Raw score summary 
15. 
 GM Score Framework 
16. 
 GM Score Summary 
17. 
 GM Weighting Scenarios 
18. 
 GM Economics 
19. 
 GM Willis Street Assessment 
20. 
 GM Courtenay Place Assessment 
21. 
 GM Lambton Quay Assessment 
22. 
 GM Manners Street Assessment 
23. 
 Appendix C to the MCA report 
Some information 
withheld under section 
9(2)(a) of the Act. 
24. 
 GM MRC run time model outputs 
Released in full. 
25. 
 LGWM Golden Mile Clearance Rates 
26. 
 RE: GM Do minimum - future bus provision 
Some information 
withheld under section 
9(2)(a) of the Act.