This is an HTML version of an attachment to the Official Information request 'LGWM Golden Mile Alternatives and Options Report Supporting Analysis'.


DELIVERY
MAINTENANCE AND OPERATIONS
COSTS
TIMEFRAME FOR DELIVERY
Presentation by Sam Thornton
30 November 2020
under the Official Information Act 1982
Released 



Delivery - methodology 
Qualitative assessment of the following sub-criteria:
• Pedestrian impacts during construction
• Bus impacts during construction
• Retail impacts during construction
• Building servicing impacts during construction
• Traffic impacts during construction
under the Official Information Act 1982
Released 



Delivery - key assumptions 
The following construction time-frames have been assumed, these timeframes are 
based on assuming the work is not staged, and could be shorter or longer depending 
on several factors:
• Available resources; (both at an industry level and from the Contractor, e.g. number 
of crews);
• Available working hours (restrictions around bus / business and noise disruption);
• Wider network and programme coordination; and
• Level of project staging needed
Section
Option 1
Option 2
Option 3
• Desire for trials or proof of concept Lambton Quay 6-9 months
9-15 months
12-18 months
Willis Street
< 3 months
< 3 months
3-6 months
under the Official Information Act 1982
Manners Street
< 3 months
< 3 months
3-6 months
Courtenay Place 3-6 months
3-6 months
6-12 months
Released 



Delivery - key assumptions 
• Impacts on utilities have not been considered in detail. In general, it is expected that 
the impacts on existing utilities will be minimal except in areas where new drainage 
provision is required (strip drains, sumps and lateral connectors). Limited areas of 
new road pavement are expected and therefore significant levels of excavation are 
not expected. There is currently insufficient detail to determine the potential impact 
of the options on specific utilities.
under the Official Information Act 1982
Released 



Delivery - evaluation outcomes 
Section
Option 1
Option 2
Option 3
Comments
Lambton Quay
-1
-1
-2
Step change in impact on 
pedestrians, buses and retail 
Wil is Street
-1
-1
-2
during delivery of option 3.
No significant differentiators for 
Manners Street
-1
Manners Street.
Courtenay Place
-1
-1
-2
under the Official Information Act 1982
Released 



Delivery - comments
Aspect
Comment
Loading bay retention
Reduces construction impacts for Options 1 and 2 if remain in same 
location – construction effort for Option 3 would remain the same –
no change in score expected
Loading bay and taxi bay retention
Reduces construction impacts for Options 1 and 2 if remain in same 
location – construction effort for Option 3 would remain the same –
no change in score expected
Tory Street through movement
Potential minor reduction in construction impacts if cul-de-sac 
treatments not required (Option 3) – no change in score expected
under the Official Information Act 1982
Released 



Maintenance and Operations - methodology 
Qualitative assessment of the following sub-criteria:
• Maintenance costs
• Maintenance access
• Utilities access
• Bus ability to pass broken down vehicle
• Bus diversion routes
• Public events
• Emergency services
For the maintenance scores the full range of scores (0 to -3) has been used to differentiate between the 
options. However, the options that score that -3 are not necessarily significantly negative.
under the Official Information Act 1982
Released 



Maintenance and Operations - key assumptions 
• No significant impact on the current bus diversion routes
• Taranaki to / from Whitmore via Quays
• Willis / Victoria to / from Basin via SH1, Taranaki and 
Ghuznee
• None of the options are expected to allow PT services to remain on the Golden Mile 
during public events (parades, protests, party zone, very Welly Christmas) 
• Footpath areas are costlier to maintain than road carriageway and footpaths (paved) 
also have a shorter asset life*
* Alternative footpath area surfacing could have an impact on the scoring, however, current costings 
do not allow for a full route replacement.
under the Official Information Act 1982
Released 



Maintenance and Operations - evaluation outcomes 
Section
Option 1
Option 2
Option 3
Comments
Lambton Quay
-1
-2
-3
Maintenance costs and 
maintenance access worsen 
from option 1 to 3.
Wil is Street
-1
-1
-2
Step change in impact on 
utilities access, buses ability to 
pass and emergency services 
for option 3 (negligible impact 
Manners Street
-1
for options 1 and 2).
No significant differentiators for 
Courtenay Place
-1
-2
-3
Manners Street.
under the Official Information Act 1982
Released 



Maintenance and Operations - comments
Aspect
Comment
Loading bay retention
Minor improvement for maintenance access (as provides a parking 
location – no change in score expected).
Enforcement chal enges with access. 
Loading bay and taxi bay retention
Minor improvement for maintenance access (as provides a parking 
location – no change in score expected).
Enforcement chal enges with access. 
Tory Street through movement
Minor improvement for number of sub-aspects (as provides 
improved access – no change in score expected).
under the Official Information Act 1982
Released 



Costs - methodology 
The estimate has been built up from the following type of items / proportions:
• Linear items;
• Area items;
• Intermittent items;
• Proportion for services relocation;
• Proportion for temporary traffic management;
• Proportion for preliminary and general; 
• Proportion for other costs (professional services and client costs); and
• Proportions for risk and contingency.
under the Official Information Act 1982
Released 




Costs - key assumptions 
Following costs have been excluded:
• Operational and maintenance costs
• Costs associated with wider network improvements to address traffic redistribution
• Quantities based on sketches provided in cost memo e.g. 
under the Official Information Act 1982
Released 




Costs - evaluation outcomes 
$80,000,000
$70,000,000
$60,000,000
$50,000,000
$40M Budget (indicative)
st
o $40,000,000
C
$30,000,000
$20,000,000
$10,000,000
$0
Option 1
Option 2
Option 3
under the Official Information Act 1982
Released 



Costs - comments
Aspect
Comment
Loading bay retention
Potential minor cost savings for Option 1 and 2 if remain in same 
location 
Loading bay and taxi bay retention
Potential minor cost savings for Option 1 and 2 if remain in same 
location 
Tory Street through movement
Cost saving if cul-de-sac treatments not required
under the Official Information Act 1982
Released 



Timeframe for delivery - methodology 
Qualitative assessment of the following sub-criteria:
• ability to demonstrate tangible improvements (outputs) within the 2018-21 / 2021-
24 period
• ability to demonstrate tangible improvements (benefits) within the 2018-21 / 2021-
24 period 
under the Official Information Act 1982
Released 



Timeframe for delivery - key assumptions 
• SSBC complete July 2021
• Detailed design complete / construction begins July 2022
• Construction complete by July 2024
• Construction time-frames are not a significant differentiator between options 
under the Official Information Act 1982
Released 



Timeframe for delivery - evaluation outcomes 
Section
Option 1
Option 2
Option 3
Comments
Lambton Quay
2
Wil is Street
2
Complete within desired time-
period
No significant differentiators 
Manners Street
2
between options
Courtenay Place
2
under the Official Information Act 1982
Released 



Timeframe for delivery - comments
Aspect
Comment
Loading bay retention
No change in score expected
Loading bay and taxi bay retention
No change in score expected
Tory Street through movement
No change in score expected