The information you have requested – CAS-456062-V8C4X9
I refer to your request for information dated 15 October 2021 regarding the Tamaki Drive Cycle Route
project.
The budget to date for Tamaki Drive Cycle Route is $25.8M, this includes investigation, design and
construction costs between Plumber St to Ngapipi Bridge plus the cost for raising the road between
Outboard Boating Club and Ngapipi Bridge.
The funding for this project was allocated as 50% Waka Kotahi (NZ Transport Agency) and 50% AT.
The public consultation period ran from 22 May to 18 June 2017, and we received 644 submissions on this
proposal. In September 2017 we had a joint public consultation with the Glen Innes Tamaki Drive Shared
Path and Ngapipi Bridge Widening.
You can download the public feedback report, including an analysis of feedback and Auckland Transport
responses,
here.
No climate impact assessment was undertaken by AT for this project.
You can view the detailed design plans on the AT website project page. We have provided copies of the
construction plans for this project.
We have provided the plans for the Solent Street/Tamaki Drive intersection.
Some sections of the provided documentation have been withheld under:
− Section 7(2)(a) of the Act, as withholding the information is necessary to protect the privacy of natural
persons, including that of deceased natural persons.
Please click on this
link to download the information that we hold in relation to you request.
Should you believe that we have not dealt with your request appropriately, you are able to make a complaint
to the Office of the Ombudsman and seek an investigation and review in regard to this matter.
Kind regards
David Nelson
Portfolio Delivery Director (Projects)
Integrated Networks