Activity name
Location /site description
Brief scope description /
Type of intervention
2018/19
2019/20
2020/21
2021/22
Total
proposed treatment
activity cost
Safety Footpath Pointbush Point Bush Waimate Creek To Garlands
Safety Footpath
Walking improvements (incl.
65,489 20,354
85,843
Road
Road
pedestrian, pram or Kea
crossings; pedestrian refuges;
mid-block crossing; new
footpaths)
Glenavy Safety Footpath
SH1 Glenavy township (between White St Construct footpath in conjunction Walking improvements (incl.
7,977 7,129
15,106
and Pyke St)
with NZTA K&C construction
pedestrian, pram or Kea
crossings; pedestrian refuges;
mid-block crossing; new
footpaths)
Safety Footpath SH 82
RP 10.3 - 11.07
Construct walkway
Walking improvements (incl.
52,264 55,000
107,264
pedestrian, pram or Kea
crossings; pedestrian refuges;
mid-block crossing; new
footpaths)