Activity name
Location /site description
Brief scope description / 
Type of intervention
2018/19
2019/20
2020/21
2021/22
Total 
proposed treatment
activity cost
Safety Footpath Pointbush  Point Bush Waimate Creek To Garlands 
Safety Footpath
Walking improvements (incl. 
      65,489        20,354 
          85,843 
Road
Road
pedestrian, pram or Kea 
crossings; pedestrian refuges; 
mid-block crossing; new 
footpaths)
Glenavy Safety Footpath
SH1 Glenavy township (between White St  Construct footpath in conjunction  Walking improvements (incl. 
        7,977          7,129 
          15,106 
and Pyke St)
with NZTA K&C construction 
pedestrian, pram or Kea 
crossings; pedestrian refuges; 
mid-block crossing; new 
footpaths)
Safety Footpath SH 82
RP 10.3 - 11.07
Construct walkway 
Walking improvements (incl. 
             52,264        55,000 
        107,264 
pedestrian, pram or Kea 
crossings; pedestrian refuges; 
mid-block crossing; new 
footpaths)