LOW COST/LOW RISK PROJECTS which were allocated funding in the 2015 Regional Land Transport Plan for the period 2018-2021 
Year 
Project Title 
Project Description 
YTD Budget 
Actual 
Comments 
Expenditure YTD 
2018/19 
Minor Improvement Projects 
Minor improvement projects for safety, walking & 
 $      70,150.00  
 $                     -    Not a project. Budget to balance overspend on Walking & Cycling 
cycling as well as small bridge renewals  
Projects, School Safety Projects and Minor Works.   
2018/19 
McIntosh Place 
Street light upgrades - install additional light to 
 $        5,000.00  
 $        8,017.00   Managed through the Street Light Maintenance Contract.  Upgrade 
correct spacing 
in McIntosh Pl & Vickery St complete. Overspend to balance with 
other Minor Improvement Projects. 
2018/19 
Vickery St 
Street light upgrades - install additional light to 
 $        5,000.00  
 $        4,348.00   Will be managed through Street light renewals contract 
correct spacing 
2018/19 
Tram Rd (at Woodfields Rd) 
Minor intersection improvements / upgrade for safety 
 $      14,285.71  
 $      16,274.00   Budget split between all intersection projects 
(Project did not proceed) 
2018/19 
Harewood Road (at Burnt Hill Rd) 
Speed Limit Threshold and line marking 
 $      14,285.71  
 $      16,274.00   Budget split between all intersection projects 
2018/19 
Broad Rd (at Upper Sefton Rd) 
Minor intersection improvements / upgrade for safety 
 $      14,285.71  
 $     16,274.00   Budget split between all intersection projects 
2018/19 
Oxford Rd (at Charles Upham Dr) 
Minor intersection improvements / upgrade for safety. 
 $      14,285.71  
 $     16,274.00   Budget split between all intersection projects 
Installation of pedestrian refuge island 
2018/19 
Lehmans Rd (at Oxford Rd) 
Minor intersection improvements / upgrade for safety. 
 $      14,285.71  
 $     16,274.00   Budget split between all intersection projects 
Widening and splitter island 
2018/19 
Southbrook / South Belt  
Carry over from previous year 
 $      14,285.71  
 $     16,274.00   Budget split between all intersection projects 
2018/19 
Poynts Road at Tram Road. Truck Layby 
Minor intersection improvements / upgrade for safety 
 $     14,285.71  
 $     16,274.23   Budget split between all intersection projects 
stabilising & sealing 
2018/19 
High St Pedestrian Maze 
Construction of a pedestrian maze on High Street at 
 $                    -    
 $     52,169.26   Work is fully subsidised by NZTA and is being carried out by 
level crossing. Completed by KiwiRail 
KiwiRail. No cost to Council. 
2018/19 
Mill Road Footpath - Whites to Bradleys 
Safety improvements associated with schools. 
 $     50,000.00  
 $     62,924.76   Mill Road Ohoka Path completed. Overspend to be balanced with 
Construction of unsealed footpath 
underspend in Walking & Cycling Projects. 
2018/19 
Gressons Rd Improvements 
Safety Improvement projects. Culvert widening 
 $     17,266.67  
 $     20,002.28   Budget split between all Safety Improvement Projects 
2018/19 
Courtenay Drive Entrance Threshold 
Safety Improvement projects. Landscaped entrance 
 $     17,266.67  
 $     20,002.28   Budget split between all Safety Improvement Projects 
threshold  
2018/19 
Active Stop Ahead Sign Trials (in conjunction with 
Safety Improvement projects. Johns Rd 
 $     17,266.67  
 $     20,002.28   Budget split between all Safety Improvement Projects 
ACC) 
2018/19 
Lineside Road K&C Channel Extension 
Safety Improvement projects. In conjunction with the 
 $     17,266.67  
 $     20,002.28   Budget split between all Safety Improvement Projects 
Passchendaele Memorial Path project 
2018/19 
Ashley Gorge Linemarking & Signage 
Improve signage & delineation at bridge 
 $     17,266.67  
 $     20,002.28   Budget split between all Safety Improvement Projects 
2018/19 
McHughs Road Water Race Culvert 
Install Culvert 
 $     17,266.67  
 $     20,002.28   Budget split between all Safety Improvement Projects 
2018/19 
Collin Street, Rangiora 
Footpath extension 
 $     16,666.67  
 $       5,358.42   Budget split between all footpath extension projects 
2018/19 
Ballarat Road 
Footpath extension 
 $     16,666.67  
 $       5,358.42   Budget split between all footpath extension projects 
2018/19 
Oxford / Acacia / Charles Upham 
Footpath extension 
 $     16,666.67  
 $       5,358.42   Budget split between all footpath extension projects 
 
2018/19 
Upper Sefton Road - Tombstone Headwall 
Cut off headwalls on existing culvert 
 $     20,000.00  
 $       4,061.25  
Removal 
 
2018/19 
Ashley Gorge Road Guardrail 
Installation of guardrail for the protection of roadside 
 $   100,000.00  
 $   146,341.98  
hazards. 
 
 
 
 
   
2019/20 
Minor Improvements 
Minor Improvement Projects 
 $     13,750.04  
 $                   -    Not a project. Budget to be reallocated 
2019/20 
Roadside Hazard Removal 
Minor Safety Removal of Roadside Hazards 
 $     30,000.00  
 $    10,639.00   Not a project. Budget split between road side hazard removal 
projects 
2019/20 
Roadside Hazard Removal 
Ashley Gorge Guard Rail 
 $     30,000.00  
 $    44,500.00   Budget split between roadside hazard projects.  
2019/20 
Roadside Hazard Removal 
Upper Sefton Road Culvert Widening 
 $     30,000.00  
 $    87,000.00   Budget split between roadside hazard projects.  
2019/20 
Roadside Hazard Removal 
Fawcetts Road Handrail 
 $     30,000.00  
 $                   -    Budget split between roadside hazard projects. Did not proceed at 
this time 
 
2019/20 
Walking and Cycling Projects 
Minor Safety Walking & Cycling Projects 
 $     75,000.00  
 $    62,183.34    
2019/20 
Minor Lighting Upgrades 
Upgrade of lighting in East Belt & Wales St in 
 $     40,000.00  
 $    38,885.28  
conjunction with overhead lines removal 
 
2019/20 
Intersection improvements 
Minor Safety Intersection Upgrades 
 $                    -    
 $    15,481.92  

Year 
Project Title 
Project Description 
YTD Budget 
Actual 
Comments 
Expenditure YTD   
2019/20 
Intersection improvement King St / George St 
King Street / George Street Splitter islands 
 $     25,000.00  
 $    10,705.24  
2019/20 
Intersection improvement Swannanoa Rd / Johns 
Swannanoa / Johns - electronic warning signage 
 $        20,000.00  
 $                  -    Did not proceed at this time 
Rd 
2019/20 
Intersection improvement Lehmans Rd (at Oxford 
Lehmans / Oxford - widening and splitter islands 
 $        25,000.00  
 $     2,751.91   Late costs from previous years project 
Rd) 
 
2019/20 
Intersection improvement Pegasus Main St / 
Pegasus Main Street / Infinity Drive - mark cycle 
 $        20,000.00  
 $   12,866.32  
Infinity Dr 
lanes through intersections 
 
2019/20 
Intersection improvement Oxford Rd / Starvation 
seal widening and culvert extension 
 $        30,000.00  
 $   57,311.04  
Hill Rd 
2019/20 
Intersection improvement Main North Rd at 
Main North Road / Hellers - central median, bus stop 
 $        35,000.00  
 $                 -    Did not proceed at this time 
Hellers 
improvements, splitter island 
 
2019/20 
Intersection improvement King St/Johns Rd 
King Street / Johns Road - upgrade roundabout 
 $        50,000.00  
 $  57,124.51  
Intersection 
central island 
 
2019/20 
School Safety Projects 
Cust & Fernside Schools - electronic signage and 
 $        50,000.00  
 $  62,956.31  
line marking 
2019/20 
Minor Works 
Tuahiwi Safety Improvements - traffic calming 
 $        60,000.00  
 $                 -    Did not proceed at this time 
 
 
 
 
   
 
2020/21  
Minor Improvements 
Minor Improvements (all sites) 
 $      104,750.00  
 $ 480,037.61    
2020/21  
Minor Lighting Upgrades 
New lighting in Denches Rd, and additional light in 
 $        30,000.00  
 $   32,196.69  
Eders Rd to correct spacing 
 
2020/21  
School Safety Projects 
Late line marking costs for Fernside School 
 $                       -    
 $   10,050.69    
2020/21  
West Rangiora Route Improvement 
TRIP 
 $                       -    
 $        100.00    
2020/21  
Intersection improvement Swannanoa Rd / Johns 
Swannanoa / Johns - electronic warning signage and 
 $        23,000.00  
 $   39,009.78  
Rd 
associated signage and markings 
 
2020/21  
Intersection improvement Main North Rd at 
Main North Road / Hellers - central median, bus stop 
 $        35,000.00  
 $   35,000.00  
Hellers 
improvements, splitter island 
 
2020/21  
Minor Improvements - Blackett Street / Ayers 
Pedestrian refuge island, also Blackett / White St 
 $        16,000.00  
 $   20,106.57  
Street 
 
2020/21  
Minor Improvements - Solander Road / Whakatipu  Splitter Islands 
 $                       -    
 $   17,213.29  
Street 
 
2020/21  
Minor Improvements - Fuller Street Pedestrian 
Splitter Island 
 $        10,000.00  
 $   12,025.03  
Refuge 
 
2020/21  
Minor Improvements - North Eyre Rd / McHugh 
Install kerb quadrants, gate signage 
 $        30,000.00  
 $   46,413.37  
Rd / No. 10 Rd 
 
2020/21  
Minor Improvements - Boundary Rd / Fawcetts Rd  Seal widening outside school, splitter island 
 $        15,000.00  
 $   17,477.41    
2020/21  
Minor Improvements - Ashley School Safety 
Seal widening outside school, splitter island 
 $        15,000.00  
 $   13,650.00  
Improvements 
 
2020/21  
Minor Improvements - Swannanoa School Safety 
New footpath 
 $        23,000.00  
 $   20,542.73  
Improvements 
 
2020/21  
Minor Improvements - Tuahiwi Improvements 
Tuahiwi Safety Improvements - traffic calming 
 $      195,000.00  
 $ 212,655.53    
2020/21  
Minor Improvements - Woodend Threshold (West 
New threshold signage & widening 
 $        24,000.00  
 $   23,723.50  
of Ravenswood) 
 
2020/21  
Minor Improvements - Tram Rd Path Extension 
Extend footpath 
 $        35,000.00  
 $   35,000.00    
2020/21  
Minor Improvements - Upper Sefton Rd Guard 
Replace timber sight rails with guard rails 
 $      108,000.00  
 $ 108,941.50  
Rail 
2020/21  
Minor Improvements - Ashley Gorge Route 
Next stage of signage and delineation improvements 
 $        15,000.00  
 $                  -    Did  not proceed at this time 
Improvements 
 
2020/21  
Peraki St Cycleway (physical works) 
Kaiapoi town cycleway (Peraki St and Vickery St, as 
 $      750,000.00  
 $ 729,213.95  
well as Raven Quay works) 
 
2020/21  
Williams St Cycleway (Main North Rd to Vickery) 
Kaiapoi town cycleway (Williams St, north of Kaikanui 
 $      121,000.00  
 $ 118,741.94  
Stream) 
 
2020/21  
Rangiora Woodend Rd (at Chinnerys Rd) 
Kerb separators on Rangiora to Woodend cycleway 
 $        10,000.00  
 $   10,122.41    
2020/21  
Lineside Rd Share Path 
eastern side, from Passchendaele Memorial Path to 
 $        75,000.00  
 $   78,072.90  
Railway Rd 

Year 
Project Title 
Project Description 
YTD Budget 
Actual 
Comments 
Expenditure YTD 
2020/21  
Cycle Network Plan Development 
Cycleway Programme (all sites) 
 $        45,000.00  
 $   57,752.47   Professional fees