31 January 2022 
 
 
Mr Tim Adriaansen 
 
Via Email: [FYI request #17606 email]   
 
 
Dear Mr Adriaansen 
 
OFFICIAL INFORMATION REQUEST 
 
I refer to your official information received by way of Transfer from Environment Canterbury on 
14 December 2021. 
 
The information you have requested is enclosed. 
 
‘Please provide a breakdown of all Low Cost Low Risk projects which were allocated funding under 
the Low Cost/Low Risk category, for the period 2018-2021, in the 2015 RLTP (updated 2018). This 
information can be restricted to those items which appear in TABLE 1: PRIORITY 1 EXPENDITURE on 
pages 42 and 43 of the Canterbury Regional Land Transport Plan 2015 - 2025. In particular, I am 
seeking information on which projects included improved pedestrian or cycling facilities, what the 
locations of the improvements were and what their budget allocation was. Please include projects 
which were funded in this period but may have had construction delayed into the current funding 
period. 
 
A review of the projects identified in the 2015-25 Canterbury Regional Land Transport Plan 2015 – 
2025 has been undertaken. 
  RLTP 
Identified in the RLTP  Other projects are included in this 
Low Cost Low Risk 
as 
allocation (mostly intersection upgrades) 
projects which were 
Local road 
allocated funding 
improvements Low 
under the Low 
cost / low risk 
Cost/Low 
improvements 2018-
Risk category, for the  21 $3,727,000 
period 2018-2021, in 
the 2015 RLTP 
(updated 2018). 
 
_______________________________________________________________________________
______ 
 
2 Norman Kirk Drive, Rolleston   |  PO Box 90, Rolleston 7643  |  P: 03 347 2800  |  F: 03 347 2799 
E: [email address]   |   W: www.selwyn.govt.nz   |   Facebook.com/selwyndistrictcouncil 



 
Please note the RLTP total does not separate walking and cycling from Low Cost Low Risk Projects 
so additional detail has been provided.  Items are listed below. 
  Selwyn District 
Low Cost Low Risk – 
Springs Rd Upgrade Prebbleton - CSM2 
Council funding 
one project  
2020/21   $500,000  
application to NZTA 
(Springs Rd Upgrade 
Widen shoulders, incorporate improved 
and LTP 
Prebbleton - CSM2 
cycle facilities, merge to new overbridge. 
Note this separates 
$500,000) 
Consider Project P11 Springs/Marshs Rd 
Walking and Cycling 
Roundabout and WC11 Cycleway 
projects from Low 
Walking and Cycling: 
Lincoln to Tai Tapu Cycle Connection 
Cost Low Risk 
two projects 
2019/20    $100,000 
Projects. 
(Lincoln to Tai Tapu 
Short off road pathway section Ellesmere 
Cycle Connection 
Rd to Perymans Rd. 
$100,000 Rolleston to  Minor improvements to Perymans Rd to 
Templeton Cycleway 
facilitate on road cycling to Tai Tapu. 
$400,000) 
Rolleston to Templeton Cycleway 
2020/21   $400,000 
2.5km off road cycleway from Curraghs Rd 
to Templeton. Extend from that provided by 
CSM2 and coordinate and link with CCC 
South Express Cycleway to Templeton. 
Project from Walking and Cycling Strategy 
Walking and Cycling – 
2018/19   $250,000 
 
Foot path extensions as  2019/20   $550,000 
per Walking and Cycling  2020/21   $400,00 
Strategy 
Carried over from 2015- Delayed to align with 
Doyleston to Leeston Cycleway 
18 period 
other works 
2019/20   $795,000 
 
If you have any questions relating to the above, please contact Mr Murray Washington, Group 
Manager Infrastructure on (03) 3472 800. 
 
 
Yours sincerely 
 
David Ward 
CHIEF EXECUTIVE OFFICER