DPMC: Value for Money and Right Sizing the Budget
14 August 2012
Dr Murray Horn
Purpose
This report was commissioned by the Department as part of a suite of work to provide the incoming 1982
Chief Executive with the information necessary to identify what needed to be done to better
position DPMC for the future. It responds to the specific issues raised in Terms of Reference
attached as Schedule 1. While the immediate request was to identify what it would take to “right
Act
size the budget”, the brief is to consider this issue in terms of what the Department should be doing
to deliver more value for money.
Executive Summary
A May 2011 Strategic Review of DPMC concluded that “. . under the present structure DPMC is
doomed to struggle. The department is too small and fragmented to offer the flexibility and
capability that should be provided to support the Prime Ministers .. (with) much of the work
routine”. I agree with that conclusion.
Information
DPMC also faces significant short-term financial pressures that cannot be met solely from savings
without a significant degradation in support for the Prime Minister and Cabinet. Some additional
funding will be required. That imposes an obligation on the Department to add more value.
However, addressing these immediate financial pressures will not in itself address the fundamental
viability issues facing the Department. The 2011 Review’s recommended merger with SSC would
Official
solve the problem but has been discounted because of the implications for the Commissioners
position. However, creating a “virtual corporate centre” with Treasury and SSC inside a single budget
the
envelop is possible (similar to that established for the Justice sector). That would help ensure the
Department’s longer-term financial viability at the same time as it created the extra value necessary
to justify additional funding. It would require changes in the way DPMC is managed, although these
could be delivered without too much difficulty.
under
Output Classes: How can DPMC deliver more value for money?
DPMC exists to support the Prime Minister as head of the administration and the Governor General
as representative of the Crown. The Department has three output classes that group the activities of
almost the entire Department: Policy advice to the Prime Minister; Support to the Governor
General; and Intelligence Coordination and National Security Priorities. There is an additional very
small output for the Chief Science Advisor.
Released
a. DPMC can and should not try and compensate for weaknesses elsewhere
None of these on-going functions are designed to try and compensate for deficiencies elsewhere in
the state services, with the possible exception of the Chief Science Advisor. However, from time to
time the Department does form specific groups to tackle cross-agency issues of particular concern to
1
the Prime Minister: e.g., positive aging; Y2K; employment taskforce; Crime Prevention Unit; Climate
Change; Better Public Services. The Department is also currently leading projects on youth mental
health and controlling “P” and is about to establish the National Cyber Policy Office.
Some of these tasks do fit neatly with the core role of the Department. However, others are more
likely to have ended up being run out of DPMC because of the relative difficultly in the past of
creating effective sector groupings of independent agencies and their Ministers to tackle these sorts
of cross-agency issues. This should become a lot easier in future as agencies learn to work effectively
together to deliver this Government’s BPS goals and as the corporate centre develops and is able to 1982
provide greater assurance to the Prime Minister that important cross-agency issues will be
effectively addressed at the sector level.
Act
This is one test of an effective corporate centre: can it provide the necessary assurance to the Prime
Minister that a particular cross agency result that he or she wants to see delivered can be
successfully delegated to the relevant departmental sector grouping? If so, then the extent to which
DPMC needs to lead a particular project – or incubate a new state sector capability – should be
relatively rare. That should allow for more predictability in the Department’s costs over the four year
planning cycle as well as allowing a greater focus on those areas where DPMC can make a distinctive
contribution.
b. DPMC needs to be managed in a more unified way Information
My findings also reinforce the conclusion of last year’s Strategic Review that the effectiveness of
DPMC could be enhanced by operating in a less fragmented way.
DPMC is currently managed as seven almost completely separate units reporting directly to the CE,
with the budget managed central y. This fragmentation exacerbates the problems caused by the
Departments small size (average of about 120 FTE).
Official
While the smal size and diverse nature of the Department’s business creates viability issues, some
of the negative impact of size and scope could be ameliorated if the senior managers acted as a
the
team in setting a clear purpose and vision for the Department; setting departmental priorities (and
reallocating resources among units where possible to better support those priorities); and agreeing
each units operational plans. It would then be possible to delegate each unit manager more
authority to deliver against those plans within their budget (i.e., to manage their people and their
under
budget to deliver the best possible result).
c. Effectively supporting the Governor General has some distinctive aspects
While this more unified approach applies to support for the Governor General and maintenance of
the residences, this is an output that has two distinctive features. Clearly, it is the Governor General
who needs to set the objectives for that role and agree the operational plan required to deliver
those objectives. This is also the only output class with significant physical assets and it is necessary
Released
to ensure that the right asset maintenance schedule is identified and agreed and funding clearly
earmarked for this purpose.
2
d. Working closely with SSC and Treasury to create an effective corporate centre is likely to add
greatest value and, if successful, be increasingly critical to effective Government
By far the most important set of changes needed to deliver more value for money are those that
create the opportunity for the Prime Minister to more effectively leverage his or her unique position
to support better collective outcomes. There are two areas where this is likely to be particularly
important. First, better integrated policy and delivery across what are still largely independent
agencies working to their own Ministers with their own portfolio priorities (this was a theme of the
Better Public Service Advisory Group). Second, more attention to building institutional capacity to 1982
support more effective and efficient delivery of the governments “core business” (a system
weakness identified in the Performance Improvement Framework reports). Improvements in both
areas are needed to deliver the BPS targets the Government has set itself.
Act
DPMC does not have the capacity or capability on its own to support the Prime Minister in this task:
i.e., to help Government set the agenda; provide the Prime Minister with the necessary assurance
that government has the policies in place and the capability and capacity to deliver on its priorities
and improve core business; or point out what needs to be done to be able to provide that assurance.
Neither does it have the necessary understanding of – or reach into – agencies to anticipate and
address the problems that could cast doubt on the competency of the government to deliver.
What DPMC does have that is unique is its proximity to the Prime Minister and Cabinet. This gives
Information
the Department an intimate understanding of the government’s col ective ambitions, preferences
and priorities. It also gives the Department the authority to reflect that understanding back to
officials and to engage the Prime Minister to identify and resolve tensions that may arise between
individual portfolio priorities and these collective priorities.
However, DPMC lacks the powers and processes necessary to ensure that understanding is properly
Official
reflected in way agencies are funded or their performance is defined, managed and assessed. Nor
does it have the capacity or reach to develop insights into the strengths and weakness of the
individual agencies that must deliver the results the government is seeking; effectively monitor
the
performance; and take remedial action if these agencies go off track. Treasury and SSC have these
levers and DPMC needs to work “as one” with its central agencies colleagues to provide a full range
of corporate centre capability and capacity in order to provide the Prime Minister and the Cabinet
with the advice and assurance they need. This is particularly important in delivering the
Government’s BPS target results.
under
In short, success requires a much more effective combination of:
• the advantages DPMC derives from its proximity to the Prime Minister and to Cabinet with
• the capacity and reach that the SSC and the Treasury have into the rest of the bureaucracy
through the budget and performance management processes.
Adding value wil require changes in the Policy Advisory Group and Cabinet Office
Released
Creating a value adding corporate centre wil require changes to the way the Policy Advisory Group
(PAG) works and the way it works with the Cabinet Office. Much of what PAG does is routine and
reactive. There is also considerable scope for the Cabinet Office doing more of what the PAG is
currently doing (and departments doing more of what the Cabinet Office is currently doing). For
3
example, departments - working with their Minister’s Office if necessary - should be required to
provide the first draft of the note that covers each Cabinet or Cabinet Committee paper. Cabinet
Office could then refine that if necessary and brief the Prime Minister on upcoming Cabinet and
Cabinet Committee meetings. Cabinet Office could also brief the Prime Minister on the outcome of
the Cabinet Committees that he or she could or does not attend (with less need for two Cabinet
Office people plus a PAG member to attend each meeting). This could relive the PAG of much work
that is reactive and routine.
PAG should be focussed on working with the other two central agencies to advise the Prime Minister 1982
on the priorities that should be set for each portfolio – or portfolio groupings – and then provide the
Prime Minister with assurance that the priorities that the Prime Minister and Cabinet have set for
the administration wil be delivered and indentifying when and how the Prime Minister can be most
Act
personally effective in ensuring that priority results are achieved.
If the corporate centre is working well it should be able to anticipate and address those areas where
capacity and capability issues – or poor risk management – within the state services are likely to
create problems that would otherwise have required a reaction from the PAG and, ultimately, the
Prime Minister. Providing the necessary assurance also means more time spent with Treasury and
SSC making sure the systemic aspects of effectively delivery are firmly in place; that milestones are
established and performance well monitored; and that these agencies are actively engaged to assist
if delivery is going off track.
Information
If the PAG is effective in this more systematic and proactive “assurance” role, it will economise on
the need for direct Prime Ministerial authority and effort to be expended in ensuring that priority
results are delivered. A more proactive approach with Treasury and SSC should also mean that fewer
problems arise that casts doubt on the competency of Government. These are also useful tests of an
effective corporate centre.
Official
Security, risk management and crisis response are central to an effective corporate centre
the
While these considerations will have the greatest implications for the management and operation of
the Policy Advisory Group and the Cabinet Office, the Department’s role in “intel igence
coordination and national security priorities” are important components of an effective corporate
centre and add value to what DPMC can bring to the table.
under
It is only the Prime Minister who has the authority to bring the government together to respond to
immediate threats or crisis in a timely way. The nature of that response often defines an
administration. It is inevitable that Prime Ministers will look to their own Department to help
coordinate crisis response. That, in turn, requires the Department to be proactive in identifying the
risks that need to be managed and ensuring that the various agencies of State are managing those
risks appropriately, especially security threats. While crisis response relies heavily on the authority of
the Prime Minister, effective risk management requires the sort of capacity and reach that SSC and
Treasury can bring to the table.
Released
National security is one of the first responsibilities of government and often requires redefining the
boundary between the individual and the State. It is not surprising, therefore, that Prime Ministers
typically take responsibility for the two security agencies and look to their Department to ensure
4
that the security effort is well prioritised and coordinated and that intelligence product is
independently assessed (although that does not imply that DPMC need be responsible for producing
that assessment).
Right Sizing the Budget
DPMC faces a significant immediate fiscal challenge as well as more fundamental questions about its
ongoing financial viability. Addressing the immediate challenge will require some difficult savings
and funding decisions to be made. Addressing the viability issue requires the Government to
consider a different funding model.
1982
a. The Impact of the Central Agency Shared Service (CASS)
Act
The CASS budget is the sum of running costs (personal and direct operating of about $11m), a
“managed fund” (depreciation, capital charge, recruitment and training of about $4m) and an
improvement program (of about $0.9m to start next year, if agreed).
The impact of CASS on DPMC across each dimension is as follows:
a. Based on activity weightings, about 19% of the running costs have been allocated to DPMC:
i.e., about $2.1m of the $11m total for 2012/13. This is an increase of $685k for DPMC (with
about $450k of DPMC’s costs for 2011/12 actual y funded by Treasury and SSC).
Information
b. About 16% of the “managed fund” has been al ocated to DPMC: i.e., about $665k of the $4m
total for 2012/13. This is an increase of $319k for DPMC (almost all for “learning and
development” and “depreciation”).
c. About 20% of a one-off CASS development cost for 2012/13 (i.e., $185k) which is anticipated
to reduce the on-going CASS costs in each out-year by an equivalent amount.
Official
In short, CASS will increase DPMCs costs for 2012/13 by about $1.19m, with an on-going impact of
about $820 per annum. The impact of CASS on the costs of the three central agencies varies
significantly, with DPMC’s costs increasing and Treasury and SSC declining, albeit with an overall
the
reduction in the combined running cost to central agencies of about $560k.
While any cost al ocation mechanism is subject to judgement, the approach applied to the CASS
expenses is sound (and slightly lower than the al ocation based on cruder measures, like FTE or
“active users”). under
CASS is costing DPMC more because it is providing a better and more robust set of IT, Finance,
Information Management and Human resources services than it was able to provide as a stand-alone
department (with about $200k for additional depreciation). It would be surprising if the Department
as small as DPMC could offer a like-for-like service at a lower cost. Moreover, given the similarities in
the operations of the three departments it is likely that DPMC would have eventual y converged
with the service standards of the other two departments (especially to improve managerial decision
making and support improved staff efficiency). Indeed, the cost of the stand alone service was the
Released
fastest growing cost centre in DPMC over the last nine years.
5
b. Options for savings in baseline, changes in priorities and adequacy of funding
The size of the financial challenge facing DPMC is daunting. The Terms of Reference acknowledge
that DPMC has found itself under increasing resourcing and funding pressures that have obliged it to
look to other agencies for assistance. That assistance now stands at some $700k for 2011/12,
excluding the fact that the Department’s contribution to CASS has been subsidised by the other two
central agencies to the tune of $620k. When the impact of the 3% efficiency dividend (about $0.5m)
is added for 2012/13, DPMC faces an “all up” challenge of about $2.5m for 2012/13 ($1.8m cash
shortfall plus the $700k on-going subsidy from other departments) falling to about $2m in the out- 1982
years as CASS efficiencies kick in. This is a little over 13% of the 2012/13 budget. Even then, more
work needs to be done to identify the amount it needs to earmark to maintain the two Governor
General residences in their current condition (albeit that is unlikely to be a large sum in the short
Act
term).
DPMC can meet some of the immediate cash shortfall through better management of existing
functions. In particular, it should be able to make further savings in what is now the CE’s office as the
CASS arrangements bed in as well as some economies in the new Cyber office and possibly even in
the National Assessment Bureau (e.g., as more assessment product is generated elsewhere and if it
was amalgamated with the new Coordination Group).
However, the immediate savings here and elsewhere are unlikely to be large enough to meet the
Information
cash shortfall for 2012/13 without significant changes in capability:
• The focus for the PAG and Cabinet Office should be to reorient what they do – rather than
be looking to make savings - in order to help deliver the value uplift possible from the
corporate centre.
• Support for the Governor General appears to me to be about right, with the issue here
Official
largely around ensuring the right level of asset maintenance within the current budget.
• The cost of the Chief Science Advisor is relatively fixed and the big question is whether this
role needs to be in DPMC or would be better embedded in MoBIE where the Advisor would
the
have more operational leverage (as, for example, the Chief Medical Officer is embedded in
the Ministry of Health).
The Intelligence and Security area has been recently reviewed and the changes made appear to be a
significant improvement (esp., the way the various agencies are working together and the role of the
under
new Intel igence Coordinator Group).
While NAB is not really core business for DPMC, locating this function elsewhere is more likely to
result in cost shifting rather than cost reduction and may well reduce the effectiveness of the
function. The assessment function is, to a large degree, a shared service provided to a large number
of end-users of the intelligence community. It is possible to conceive of this function being provided
by another large Ministry (MFAT, for example). Housing the assessment function in a larger agency
Released
might also help make NAB a more attractive place to work because it would be able to offer its staff
a wider set of career options.
However, reallocating NAB is more likely to shift cost rather than improve value for money. Indeed,
the risk is that the reduced status and the greater distance from the rest of the Intelligence
6
Community could reduce value for money from the assessment function (especially so quickly after a
major review). Unless NAB was shifted largely intact, the bigger risk is that its role would resurface in
less efficient and effective forms elsewhere. Keeping NAB in DPMC also helps round out the
contribution that the Department can make to the emerging corporate centre.
In summary, DPMC is unlikely to be able to meet its entire cash shortfall for 2012/13 without what is
effectively cost shifting that impact negatively on value. Current levels of capacity and investment
are also being maintained by the generosity of other departments that is unlikely to outlive the
current projects (at least not at a $700k level). Moreover, DPMC’s small size and relatively broad
1982
scope constrains its ability to reprioritise and to absorb negative financial shocks or take on
additional activity. If Government wants the DPMC budget to “stand alone” within a four year
baseline then the Department wil need that baseline increased by at least $1m.
Act
c. Enhancing DPMCs long-term viability
DPMC is a very small and fragmented department – with an average of 120FTE spread across 7
different units – which leaves each unit relatively thinly stretched and the Department poorly placed
to respond to shifting priorities or adverse financial shocks. While this could be better managed, it
will remain a fundamental problem.
DPMC is “doomed to struggle” under the current arrangements and has only be able to delay the
inevitable by the generosity of other departments. It needs to be part of a much larger budget entity
Information
in order to ensure its long-term financial viability and provide the desirable financial flexibility. The
Government should only consider extra funding if the Department is likely to be able to generate
extra value as part of this larger entity.
Al of these conditions could be met by taking the idea of a more unified corporate centre and
setting a budget envelop for the three central agencies to manage within (i.e., a budget arrangement
Official
that is similar to that being developed for the Justice Sector agencies). The discussion above
illustrated how the creation of a more cohesive corporate centre would help all three central
the
agencies add more value and why DPMC’s active engagement was both essential and brings real
value to the collective table (albeit with some changes to the way DPMC is managed).
More work is required before the Government could be confident that the opportunities created by
a more cohesive corporate centre could be realised. However, if this can be done then it would be
under
reasonable to re-set the col ective budget envelop and associated 4 year budget plans to capture
those benefits.
Central agencies have already agreed to form an executive board to set priorities across the set of
“corporate centre” functions, although the idea of a combined budget envelop is controversial and
has not (yet) been agreed.
Released
7
Conclusion
The Government has a clear choice between:
EITHER:
a. Maintaining existing arrangements and addressing the near term financial problem with
some combination of baseline increase and expenditure reduction, although if this were the
chosen path and the Government wanted to hold a four year budget baseline, then it is
realistically looking to add at least $1m to the DPMC baseline;
1982
OR
b. Addressing the fundamental size and scope problem by accelerating the development of a
corporate centre; making the changes inside DPMC needed to make its contribution more
Act
valuable; placing the three central agencies inside a col ective budget envelop (albeit
maintaining each Vote); and asking this larger budget entity to provide an assurance product
of sufficient quality to justify retaining the collective CASS savings (which may require
increasing the collective baseline by this amount if, as seems likely, these savings have
already been earmarked for other uses).
Information
Official
the
under
Released
8
Schedule 1
Terms of Reference: Value for Money and Right-Sizing DPMC’s Budgetary
Requirements
Context
A review of the current state of DPMC’s finances has been proposed. This will ensure that there is a 1982
good understanding of the value-for-money of current DPMC service provision, and also of the extent
of resourcing required for DPMC to deliver the services required by its Minister, to an appropriate
Act
extent and standard and what is required to get DPMC to run more effectively
DPMC’s role,
inter alia, is to support the effective conduct of executive government, and to lead and
coordinate a range of government policy initiatives. In meeting these expectations DPMC has in recent
times found itself under increasing resource and funding pressures. It has been required to look to
other agencies for assistance with additional short-term staffing support, and financial input, in order
to carry out a number of particular tasks that have been requested.
The recent transition to the new Central Agencies Shared Services (CASS) has also presented budget
challenges for DPMC. The delivery of IT, IM, HR and Finance functions that were formerly delivered by
Information
DPMC from a very modest budget are now being provided by a more expensive CASS, but to an
enhanced degree. CASS offers a more resilient, comprehensive and robust delivery of these functions
for DPMC.
The relative cost levels of CASS, DPMC, Treasury and SSC are evident from the BASS surveys for
Official
2009/10 and 2010/11. The higher costs that have been al ocated to DPMC as a result of the
establishment of CASS are not able to be borne by the existing DPMC budget. For the remainder of
2011/12 this issue has been managed by the SSC and Treasury providing – very welcome - additional
the
funding to DPMC. In addition, the Government has applied a 3% efficiency savings on baselines form
2012/13. This reduction in baselines will place additional pressure on DPMC to make cost savings
across all of its activities. These cost savings will need to be made in an environment where there is a
growing demand for services from Ministers and increasing costs for remuneration and other
inflationary pressures.
under
In Budget 2012 a capability bid of approximately $1m (the value of the efficiency savings) was
submitted but was not approved.
The review wil be undertaken by a person external to the three Central Agencies.
Alongside the upcoming staff climate survey, and the Performance Improvement Framework Self-
Review, this financial review will form part of the brief for the incoming Chief Executive, and provide
Released
a sound basis for s/he to embark on her/his new role.
Purpose
The purpose of the review to is ensure that
9
1. DPMC’s output classes are delivering effective and timely advice, and efficient and effective
support and value for money to the Prime Minister, the Governor-General and the taxpayer;
2. DPMC’s allocated costs for CASS are reasonable, justified and efficient;
3. Develop options for savings (if any)which can be made within DPMC’s baseline with identified
impacts of any reduced or discontinued services on the government’s objectives;
4. DPMC’s priorities and internal budget allocations are appropriately set up to achieve the
government’s objectives;
5. DPMC’s funding (operating and capital) is adequate to meet future requirements including
those of CASS;
6. DPMC’s long term viability is enhanced, so that it remains fit-for-purpose and is right-sized to 1982
meet future expectations.
Scope
Act
The review should include an evaluation of current financial information including forecasts such as
the Four Year Budget Plan, and examine the transition to CASS and its costs implications for DPMC.
The reviewer should consult key external stakeholders including the Prime Minister, Deputy Prime
Minister, Governor-General, and the central Agencies CEs, and make recommendations on how DPMC
management and Central Agencies CEs might assess future funding requirements.
It is expected that the review be completed within a six week timeframe. The completed review wil
be reported to the Chief Executive of DPMC.