Structural engineers processing checklist
Address:
Consent No:
Processed by:
Date:
Description of
work:
Code clauses
reviewed
☐ B1
☐ B2
Brief description of the work reviewed
☐ Acceptable Solution
(describe) ☐ Verification Method
(describe)
☐ Alternative Solution
(describe) ☐ Full review
(refer SESOC Practice Guideline – SESOC Journal Volume 23, N0: 2 September 2010) (describe) ☐ Partial review
(describe) ☐ Structural Systems (refer SESOC Interim Design Guidance – Design of Conventional Structural Systems following the
Canterbury Earthquakes)
(describe)
Decision
Structural documentation supplied
Reasons for decision / comments
Yes
RFI
N/A
Design features report
☐
☐
☐
Structural calculations
☐ Clear
☐
☐
☐
☐ Complete
Structural specifications
☐
☐
☐
Structural drawings
☐
☐
☐
Design / detailing of structural elements for durability
Acceptable Solutions
☐ NZS 3604
☐ NZS 3101
☐ Other
(describe)
Alternative Solutions
☐ AS/NZS 2312
☐ NZS 3404:Part 1:2009
☐ Other
(describe)
Page 1 of 5
January 2023
AC0810 (v.7)
Decision
Section 112.1 the BCA is satisfied that after the alteration the building wil :
N/A ☐
Yes
No
1(b) Continue to comply with the provisions of the Code that relate to structural performance, to at least the same
extent as before the alteration
☐
☐
Decision
Section 115
N/A ☐
Yes
No
Complies as near as is reasonably practicable with the provisions of the Building Code that relate to structural
performance
☐
☐
Decision
Items checked
Reasons for decision / comments
Yes
RFI
N/A
Design loadings
☐ Dead
☐ Live
☐
☐
☐
☐ Wind
☐ Seismic
☐ Other specific loadings
GIS special land features
☐
☐
☐
Geotechnical / soil report
☐ Completeness of geotechncial report
☐
☐
☐
☐ Slope stability
☐ Expansive soils
Site subsoil class (NZS 1170.5)
☐
☐
☐
Excavation and construction near boundary
☐ Excavation procedure
☐
☐
☐
☐ Surcharge loads
☐ Retaining wall design (strength & stiffness)
Landscape retaining walls
☐ Surcharge (driveway, buildings, backslope)
☐
☐
☐
☐ Height >1.5m
Basement retaining walls
☐ Type
☐ Surcharge (driveway, buildings, backslope)
☐
☐
☐
☐ Retained height
☐ Design and detailing
Drain bridging details
☐
☐
☐
Strip footings and pads
☐ Size
☐
☐
☐
☐ Depth
☐ Reinforcing
Bored piles
☐ Pile size
☐
☐
☐
☐ Pile depth
Page 2 of 5
January 2023
AC0810 (v.7)
Decision
Items checked
Reasons for decision / comments
Yes
RFI
N/A
Concrete
☐ Strength
☐
☐
☐
☐ Specifications
Driven piles
☐ Calculations
☐ Hammer drop
☐ Hammer weight
☐
☐
☐
☐ Pile set
☐ Pile size
☐ Pile depth
Screw piles
☐ Eccentricity check
☐
☐
☐
☐ Adequate specification
Block walls ☐ A ☐ B ☐ C
☐ Height
☐
☐
☐
☐ Shear wal s
☐ Reinforcing
Slabs
☐ Raft
☐
☐
☐
☐ On-grade
☐ Suspended
Slab
☐ Thickness
☐
☐
☐
☐ Reinforcement
☐ Construction joints
Floor design loads
☐ Recorded on plans
☐ Line loads
☐
☐
☐
☐ Point loads
☐ Vibration check
Proprietary floor system
☐ Manufacturer’s information
☐
☐
☐
☐ Support details
Columns and posts
☐ Calculations
☐ Combined action
☐
☐
☐
☐ Detailing (size, connections)
☐ Concrete columns detailed for ductility
Concrete moment resisting frames
☐ Ductility
☐
☐
☐
☐ Calculations
☐ Detailing (reinforcing, beam/column joints)
Steel moment resisting frames
☐ Ductility
☐ Calculations
☐
☐
☐
☐ Restraint points
☐ Detailing (size, connections)
Timber wall framing outside scope of NZS3604
☐ Calculations
☐ Height
☐
☐
☐
☐ Loadings
☐ Openings
Page 3 of 5
January 2023
AC0810 (v.7)
Decision
Items checked
Reasons for decision / comments
Yes
RFI
N/A
Steel braced frames
☐ Ductility
☐
☐
☐
☐ Type
Rafters, beams and lintels outside scope of
NZS3604
☐ Calculations
☐
☐
☐
☐ Point loads
☐ Lateral restraint
Purlins and girts
☐ Size
☐ Spacing in relation to cladding
☐
☐
☐
☐ Local wind press. effects at knee, ridge & end
☐ Lateral restraints
☐ Number of braces per bay
Trusses
☐ Member sizes
☐
☐
☐
☐ Connections
☐ Support details
Bracing
☐ Roof
☐ Wall
☐
☐
☐
☐ Mezzanine
☐ Lateral load paths to bracing elements
Firewall
☐ Stability
☐
☐
☐
☐ Connections (NZS 3101 cl 4.8)
Precast panels
☐ Development length of starters
☐ No wire mesh as primary reinforcement
☐
☐
☐
☐ Thickness and reinforcement
☐ Embedded anchors
Welded connections ☐ Grade G ☐ Grade S
☐ Weld type/size
☐ Fatigue considerations
☐
☐
☐
☐ Adequately specified and detailed
☐ Inspection requirements
Bolted connections
☐ Shear and tension
☐ Fatigue considerations
☐
☐
☐
☐ Adequately specified and detailed
☐ Edge and end distances
Vertical load paths to foundations
☐
☐
☐
Building lateral deflection under ULS wind or
earthquake loading vs. boundary separation
☐
☐
☐
Serviceability deflections (under gravity and / or
wind loadings)
☐
☐
☐
Wind pressures mapped for cladding / glazing
design
☐
☐
☐
Page 4 of 5
January 2023
AC0810 (v.7)
Decision
Items checked
Reasons for decision / comments
Yes
RFI
N/A
Note on drawings that manufacturer to provide
shop drawings for design engineer’s approval
☐
☐
☐
before construction
Balustrades (refer AC2223 Timber barriers and
MBIE guidance document on Barriers)
☐ Design loading
☐ Height
☐
☐
☐
☐ Connections
☐ Infil
Pallet racking (refer AC2246 Pallet racking)
☐
☐
☐
Heritage buildings (refer AC2248)
☐
☐
☐
Structural steel
☐ Imported structural steel. Has compliance with
NZS3404 been demonstrated?
☐
☐
☐
☐ How was this achieved?
Decision
Requests for further information
Date requested
Date resolved
Yes
N/A
Information requested
☐
☐
Information requested
☐
☐
Information requested
☐
☐
Information requested
☐
☐
Decision
Decision
Final check / sign off
Final check / sign off
Yes
N/A
Yes
N/A
PIM issues resolved
☐
☐
Conditions completed
☐
☐
Agreement to provide PS4 required
☐
☐
Computer tasks completed
☐
☐
Specialist inspections identified
☐
☐
☐
☐
Superseded plans separated / retained
☐
☐
☐
☐
Final sign off (signature)
Yes
No
The structural engineering specialist input on this building consent has been completed and I am satisfied resolves any
items identified
☐
☐
Engineers name:
Date:
Notes / comments/ RFI summary
Page 5 of 5
January 2023
AC0810 (v.7)