Authorised Fire Protection System Isolations – University Accommodation Halls of Residences
January 2020 to 18 May 2023 Period.
Hall of Residence
Date and Duration
Fire Protection Isolated
TPV
8.00am 13-12-21 to 4.00pm 20-12-21
Both Fire alarm and Sprinkler Systems
Edge building (Contractors)
Level 1 – 11, stairwells only
TPV
8.00am 10-01-22 to 4.00pm 04-02-22
Both Fire alarm and Sprinkler Systems
Edge and Tower buildings
Level 7 only
Weir House and James Hutchinson
7.30am 26-04-22 to 5.00pm 27-04-22
Fire alarm system
Weir House
8.00am 26-01-23 to 4.00pm 14 -02-23
Fire alarm System
Please Note:
1. These are building fire protection isolation requests received and authorised by University’s Safety, Risk and Assurance team.
2. Requests are sent to us by Fire Technicians engaged by Contractors undertaking the work.
3. The Safety, Risk and Assurance team may not be advised of any fire protection isolations carried out by the landlord in buildings leased by the
University.