FILE: 005490 
Resource Consent 
(01 to 03) 
Replacement (01 and 02) 
New (03)  
Document Date: 14.03.2023  
 
 
Pursuant to the Resource Management Act 1991, the Northland Regional Council 
does hereby grant a Resource Consent to: 
FAR NORTH DISTRICT COUNCIL 
To undertake the following activities in Mill Bay, Mangonui Harbour at or about location co-ordinates 
1648209E 6128330N: 
Note:  All location co-ordinates in this document refer to Geodetic Datum 2000, New Zealand 
Transverse Mercator Projection. 
AUT.005490.01.02 
Use and occupy space in the coastal marine area with a jetty facility 
(inclusive of jetty, gangway, pontoon and piles). 
AUT.005490.02.02 
Occupy space in the coastal marine area to the exclusion of others. 
AUT.005490.03.01 
Reconstruct, alter and extend a jetty facility in the coastal marine area. 
Subject to the fol owing conditions: 

These  consents  apply  only to the jetty facility identified on the  attached  Shorewise 
Engineering Consultants drawing referenced  as  Northland Regional Council Plan Number 
3407A (and any authorised reconstruction, alterations or extensions to the jetty facility), and 
to the Occupation Area identified on the attached Northland Regional Council Plan Number 
4095A
 

The Consent Holder must, on becoming aware of any discharge associated with the Consent 
Holder’s operations that is not authorised by these consents: 
(a)  Immediately take such action, or execute such work as may be necessary, to stop and/or 
contain the discharge; and 
(b)  Immediately notify the council by telephone of the discharge; and 
(c)  Take all reasonable steps to remedy or mitigate any adverse effects on the environment 
resulting from the discharge; and 
(d)  Report to the Northland Regional Council’s Compliance Manager in writing within one 
week on the cause of the discharge and the steps taken, or being taken, to effectively 
control or prevent the discharge. 
For telephone notification during the  Northland Regional Council’s opening hours, the 
Northland Regional Council’s assigned monitoring officer for these consents must  be 
contacted.  If that person cannot be spoken to directly, or it is outside of the Northland 
Regional Council’s opening hours, then the Environmental Hotline must be contacted. 
RC AUGUST 2022 (REVISION 17) 

 
Advice Note: 
The Environmental Hotline is a 24 hour, seven day a week, service that is free 
to cal  on 0800 504 639. 

The Northland Regional Council may, in accordance with Section 128 of the Resource 
Management Act 1991, serve notice on the Consent Holder of its intention to review the 
conditions annual y during the month of July to deal with any adverse effects on the 
environment that may arise from the exercise of the consents and which it is appropriate to 
deal with at a later stage.  The Consent Holder must meet all reasonable costs of any such 
review. 
AUT.005490.01 - Jetty Facility: 

The jetty facility must  be marked with the number 5490  in black lettering on a white 
background, with the number positioned on the jetty facility so that it is clearly displayed in 
such a manner as to be visible from the sea at all times. 

The jetty facility must be available for recreational public use, free of charge, for embarking 
and/or disembarking and for emergencies, except when the facilities are required for the 
particular use by the Consent Holder or for reasons of safety. 
Advice Note: 
For the avoidance of doubt, there is no restriction on general public access to 
and within the area of the structures. 

The jetty facility must not be used for the permanent mooring of vessels.  Vessels using the 
jetty facility must not be moored for periods longer than would be reasonably necessary to 
pick up or unload passengers or goods.  Dinghies and other vessels must not be stored on the 
jetty facility. 

The jetty facility authorised by this consent must be maintained in good order and repair. 

The jetty facility must be inspected at least once every six years by a Chartered Professional 
(Structural) Engineer to ensure its structural integrity.  The first inspection must be undertaken 
prior to 31 August 2023 and then again prior to 31 August in 2029 and 2035, with a final 
inspection being undertaken prior to 30 September 2042, being six months before the expiry 
date of this consent.  An inspection report from the Chartered Professional Engineer must be 
provided to the council’s assigned monitoring officer within two weeks of completion of the 
inspection, on each occasion.  The inspection report must identify any maintenance that is 
required, the timeframe within which this maintenance is required to be carried out and must 
confirm, or otherwise, the ongoing structural integrity and security of the structures. 

The Consent Holder must carry out all maintenance required by the inspection report provided 
in accordance with Condition 8 within the prescribed timeframes.  The Consent Holder must 
notify the Northland Regional Council’s assigned monitoring officer, in writing, as soon as the 
maintenance works have been completed on each occasion.  This notice must be accompanied 
by a statement from a Chartered Professional (Structural) Engineer confirming that any 
identified maintenance works have been undertaken as prescribed in the inspection report. 
10 
In the event of failure or loss of structural integrity of any part of the jetty facility, the Consent 
Holder must immediately: 
(a)  Retrieve all affected elements and debris that might escape from the jetty facility and 
dispose of these on land where they cannot escape to the coastal marine area; and 
(b)  Advise the Regional Harbourmaster for Northland and the Northland Regional Council’s 
Compliance Manager of the event and the steps being taken to retrieve and dispose of 
the affected jetty facility elements and debris. 

 

 
Advice Note:  The principle purpose of this condition is to avoid navigation safety being 
compromised by floating debris and avoid contamination of the coastal 
marine area by debris arising as a result of loss of structural integrity of the 
structure. 
11 
The discharge of water, or a contaminant into water or onto or into land where it may enter 
water, arising from the use or maintenance of the structures or any vessel berthed at the jetty 
facility are permitted, unless the discharge: 
(a)  Contains a hazardous substance; or 
(b)  Causes scouring of the bed of the coastal marine area at the point of discharge; or 
(c)  Causes the production of any conspicuous oil or grease film, scums or foams, floatable 
or suspended materials, conspicuous change in colour or visual clarity, or an emission 
of objectionable odour in the receiving waters, as measured at any point 10 metres 
from the point of the discharge into the coastal marine area. 
12 
The coastal marine area must be kept free of debris resulting from the activities authorised by 
this consent. 
13 
Prior to the expiry or cancellation of this consent the Consent Holder must  remove the 
structures and other materials and refuse associated with this consent from the consent area 
and must restore the consent area to the satisfaction of the Northland Regional Council, unless 
an application for a replacement consent has been properly made beforehand or the structure 
becomes permitted by a rule in the Regional Plan. 
AUT.005490.02 - Occupy Space in the coastal marine area to the exclusion of others: 
14 
The Consent Holder must  not unreasonably exclude the recreational public from the 
Occupation Area for the purpose of public access to and along the coastal marine area.  The 
Occupation Area must be available for recreational public access and use, free of charge, at all 
times, other than times when it is necessary to limit public access for reasons of safety or 
where facility or vessel operations are such that it is necessary to limit public access.  The 
Consent Holder may restrict access to, and use of, the jetty facility by commercial vessels for 
commercial purposes including loading and unloading of goods and cargo. 
AUT.005490.03 – Reconstruct, Alter and Extend a Jetty Facility: 
15 
The Consent Holder must notify the council’s assigned monitoring officer in writing of the date 
works associated with this consent are intended to commence at least two weeks beforehand. 
The Consent Holder must arrange for a site meeting between the Consent Holder’s contractor 
and the Northland Regional Council’s assigned monitoring officer.  No works must commence 
until the Northland Regional Council’s assigned monitoring officer has completed the site 
meeting. 
 Advice Note:  Notification of the commencement of works may be made by email to 
[email address]. 
 
16 
As part of the written notification required by Condition 15, the Northland Regional Council’s 
assigned monitoring officer must be provided written certification from a suitably qualified 
and experienced person that all plant and equipment entering the coastal marine area 
associated with the exercise of this consent are free from unwanted or risk marine species. 
 

 

 
17 
The jetty facility must be reconstructed alter and extended in general accordance with the 
attached  Shorewise Engineering Consultants drawings referenced as Northland Regional 
Council Plan Numbers 5199/15199/25199/3, 5199/5, 5199/5. 5199/6 and 5199/7
 
18 
Works associated with this consent must only be carried out between 7.00 a.m. and sunset or 
8.00 p.m., whichever occurs earlier, and only on days other than Sundays and public holidays. 
 
19 
Noise levels associated with the exercise of this consent must not exceed those set out in 
Schedule 1, attached
 
20 
A copy of this consent must be provided to the person who is to carry out the works associated 
with this consent.  A copy of this consent must be held on site, and available for inspection by 
the public, during construction activities. 
 
21 
The exercise of this consent must not result in any conspicuous oil or grease film, scums or 
foams, floatable or suspended materials, or emissions of objectionable odour in the coastal 
water area, as measured at any point 10 metres from the active construction area. 
 
22 
All vehicles or equipment entering the coastal marine area associated with the exercise of this 
consent must be in a good state of repair and free of any leaks e.g. oil, diesel etc. 
 
23 
Fuel ing and maintenance of plant and equipment used during the exercise of this consent 
must not be carried out: 
 (a)  In the coastal marine area unless refuelling or maintenance involving oil or other liquids 
are undertaken within a fully bunded area on a work barge/vessel; or 
(b)  In any location at or near the site where fuel or oil could enter the coastal marine area; 
or 
(c)  In such a way that soil or water near the site is contaminated.   
 
Where an accidental spillage to land occurs, all contaminated soil must  be col ected and 
removed to a disposal site that is authorised to take such material. 
 
24 
An oil spill kit, appropriate to the plant and equipment being used, must be provided and 
maintained on site during works authorised by this consent. 
 
25 
The Consent Holder must notify the council’s assigned monitoring officer in writing as soon as 
the reconstruction, alteration and extension works have been completed. 
 
26 
Immediately upon completion of the jetty reconstruction, alteration and extension works, the 
Consent Holder must notify the following organisations in writing of the completion of the 
structure.   
 
Hydrographic Surveyor 
Maritime New Zealand 
Land Information New Zealand 
P O Box 27006 
Private Box 5501 
Marion Square 
Wellington 6145 
Wellington 6141 
  
A scale plan of the completed works must be included with the notification. 
 
 
 

 


 
27 
This consent shal  lapse on the 31 March 2033, unless before this date the consent has been 
given effect to. 
Advice Note:  An application can be made to the council in accordance with Section 125 of 
the  Resource Management Act  1991  to extend the date after which the 
consent lapses.  Such an application must be made before the consent lapses. 
 
EXPIRY DATE: 
31 MARCH 2043 
 
These consents are granted this Fourteenth day of April 2023 under delegated authority from the 
council by: 
 
 
   
Paul Maxwell 
 
Coastal and Works Consents Manager 
 
 
 
Note:  The plans attached to this consent are reduced copies and therefore may not be to scale and 
may be difficult to read.  In the event that compliance and/or enforcement action is to be based 
on compliance with the attached plans, it is important that the original plans, are sighted and 
used.  Originals of the plans referred to are available for viewing at the council’s Whangārei 
office. 

 


 

 


 

 


 
 

 


 
 

 


 
 