Appendix A to OIA2324-0296
Caveats for both Table 1&2:
• The statuses of the applications were collated on, and is accurate as of Wednesday, 8
November 2023.
• Table 1 contains data for the date the applications were received, Date started processing,
Date of outcome and their current status.
• Table 2 provides the applicant’s countries of birth for applications received in August 2023.
Counts of less than 5 have been masked with <5 to prevent identification of individuals. Line
and column totals have not been included as they could be used to determine masked
values.
• Country of birth is not confirmed until an application has been assessed by a LISO, therefore
unassigned applications may not have the correct country. This is often the case with people
entering New Zealand as the country of birth mistakenly.
• As the data is extracted from dynamic systems, there may be small variances when
compared with prior or future datasets.
Table 1. Citizen by Grant applications received in August 2023 by date
processing started, date outcome received and current status
Date started
Current
Date Received
processing
Date of Outcome
Status
01 August 2023
16 August 2023
28 August 2023
Approved
01 August 2023
16 August 2023
22 August 2023
Approved
01 August 2023
16 August 2023
28 August 2023
Approved
01 August 2023
16 August 2023
22 August 2023
Approved
01 August 2023
13 September 2023
20 September 2023
Approved
01 August 2023
13 September 2023
03 October 2023
Approved
01 August 2023
16 August 2023
20 August 2023
Approved
01 August 2023
13 September 2023
20 September 2023
Approved
01 August 2023
16 August 2023
22 August 2023
Approved
01 August 2023
13 September 2023
20 September 2023
Approved
01 August 2023
13 September 2023
06 October 2023
Approved
under the Official Information Act 1982
01 August 2023
16 August 2023
22 August 2023
Approved
01 August 2023
13 September 2023
20 September 2023
Approved
01 August 2023
16 August 2023
20 August 2023
Approved
01 August 2023
16 August 2023
22 August 2023
Approved
01 August 2023
16 August 2023
22 August 2023
Approved
01 August 2023
13 September 2023
20 September 2023
Approved
01 August 2023
17 August 2023
20 August 2023
Approved
01 August 2023
16 August 2023
28 August 2023
Approved
Released 01 August 2023 16 August 2023 20 August 2023 Approved
01 August 2023
16 August 2023
28 August 2023
Approved
01 August 2023
16 August 2023
22 August 2023
Approved
01 August 2023
16 August 2023
22 August 2023
Approved
01 August 2023
17 August 2023
20 August 2023
Approved
Page 1 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
01 August 2023
16 August 2023
22 August 2023
Approved
01 August 2023
13 September 2023
06 October 2023
Approved
01 August 2023
17 August 2023
20 August 2023
Approved
01 August 2023
16 August 2023
22 August 2023
Approved
01 August 2023
16 August 2023
28 August 2023
Approved
01 August 2023
16 August 2023
28 August 2023
Approved
1982
01 August 2023
16 August 2023
28 August 2023
Approved
01 August 2023
13 September 2023
20 September 2023
Approved
01 August 2023
13 September 2023
20 September 2023
Approved
Act
01 August 2023
16 August 2023
28 August 2023
Approved
01 August 2023
11 October 2023
Processing
01 August 2023
11 October 2023
Processing
01 August 2023
11 October 2023
Processing
01 August 2023
11 October 2023
Processing
01 August 2023
11 October 2023
Processing
01 August 2023
11 October 2023
Processing
01 August 2023
Unassigned
01 August 2023
Unassigned
Information
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
Official
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
the
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
under
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
Released 01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
Page 2 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
1982
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
Act
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
Information
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
Official
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
the
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
under
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
Released 01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
Page 3 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
1982
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
Act
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
Information
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
01 August 2023
Unassigned
Official
01 August 2023
Unassigned
02 August 2023
17 August 2023
28 August 2023
Approved
02 August 2023
17 August 2023
28 August 2023
Approved
the
02 August 2023
17 August 2023
30 August 2023
Approved
02 August 2023
20 September 2023
06 October 2023
Approved
02 August 2023
17 August 2023
20 August 2023
Approved
02 August 2023
13 September 2023
20 September 2023
Approved
02 August 2023
17 August 2023
23 August 2023
Approved
under
02 August 2023
13 September 2023
22 September 2023
Approved
02 August 2023
13 September 2023
20 September 2023
Approved
02 August 2023
17 August 2023
20 August 2023
Approved
02 August 2023
17 August 2023
20 August 2023
Approved
02 August 2023
13 September 2023
22 September 2023
Approved
02 August 2023
17 August 2023
20 August 2023
Approved
02 August 2023
17 August 2023
20 August 2023
Approved
Released 02 August 2023 13 September 2023 20 September 2023 Approved
02 August 2023
17 August 2023
20 August 2023
Approved
02 August 2023
17 August 2023
30 August 2023
Approved
02 August 2023
17 August 2023
30 August 2023
Approved
02 August 2023
17 August 2023
20 August 2023
Approved
Page 4 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
02 August 2023
17 August 2023
30 August 2023
Approved
02 August 2023
13 September 2023
20 September 2023
Approved
02 August 2023
17 August 2023
20 August 2023
Approved
02 August 2023
13 September 2023
22 September 2023
Approved
02 August 2023
17 August 2023
20 August 2023
Approved
02 August 2023
17 August 2023
23 August 2023
Approved
1982
02 August 2023
17 August 2023
20 August 2023
Approved
02 August 2023
13 September 2023
03 October 2023
Approved
02 August 2023
17 August 2023
28 August 2023
Approved
Act
02 August 2023
17 August 2023
23 August 2023
Approved
02 August 2023
17 August 2023
20 August 2023
Approved
02 August 2023
13 September 2023
03 October 2023
Approved
02 August 2023
30 August 2023
15 September 2023
Approved
02 August 2023
17 August 2023
30 August 2023
Approved
02 August 2023
17 August 2023
23 August 2023
Approved
02 August 2023
13 September 2023
20 September 2023
Approved
02 August 2023
17 August 2023
20 August 2023
Approved
02 August 2023
17 August 2023
28 August 2023
Approved
Information
02 August 2023
17 August 2023
20 August 2023
Approved
02 August 2023
17 August 2023
23 August 2023
Approved
02 August 2023
17 August 2023
20 August 2023
Approved
02 August 2023
17 August 2023
23 August 2023
Approved
02 August 2023
17 August 2023
23 August 2023
Approved
02 August 2023
13 September 2023
03 October 2023
Approved
Official
02 August 2023
17 August 2023
30 August 2023
Approved
02 August 2023
17 August 2023
20 August 2023
Approved
02 August 2023
17 August 2023
30 August 2023
Approved
the
02 August 2023
17 August 2023
28 August 2023
Approved
02 August 2023
17 August 2023
20 August 2023
Approved
02 August 2023
13 September 2023
20 September 2023
Approved
02 August 2023
13 September 2023
20 September 2023
Approved
02 August 2023
17 August 2023
23 August 2023
Approved
under
02 August 2023
17 August 2023
20 August 2023
Approved
02 August 2023
17 August 2023
30 August 2023
Approved
02 August 2023
13 October 2023
Processing
02 August 2023
11 October 2023
Processing
02 August 2023
11 October 2023
Processing
02 August 2023
11 October 2023
Processing
02 August 2023
11 October 2023
Processing
Released 02 August 2023 13 October 2023
Processing
02 August 2023
13 October 2023
Processing
02 August 2023
13 October 2023
Processing
02 August 2023
11 October 2023
Processing
02 August 2023
11 October 2023
Processing
Page 5 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
02 August 2023
11 October 2023
Processing
02 August 2023
13 October 2023
Processing
02 August 2023
11 October 2023
Processing
02 August 2023
13 October 2023
Processing
02 August 2023
Unassigned
02 August 2023
Unassigned
1982
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
Act
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
Information
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
Official
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
the
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
under
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
Released 02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
Page 6 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
1982
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
Act
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
Information
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
02 August 2023
Unassigned
03 August 2023
14 September 2023
22 September 2023
Approved
Official
03 August 2023
13 September 2023
20 September 2023
Approved
03 August 2023
13 September 2023
20 September 2023
Approved
03 August 2023
20 September 2023
06 October 2023
Approved
the
03 August 2023
17 August 2023
23 August 2023
Approved
03 August 2023
13 September 2023
25 October 2023
Approved
03 August 2023
17 August 2023
23 August 2023
Approved
03 August 2023
17 August 2023
23 August 2023
Approved
03 August 2023
14 September 2023
20 September 2023
Approved
under
03 August 2023
14 September 2023
20 September 2023
Approved
03 August 2023
17 August 2023
23 August 2023
Approved
03 August 2023
14 September 2023
22 September 2023
Approved
03 August 2023
13 September 2023
20 September 2023
Approved
03 August 2023
14 September 2023
20 September 2023
Approved
03 August 2023
13 September 2023
25 October 2023
Approved
03 August 2023
17 August 2023
23 August 2023
Approved
Released 03 August 2023 17 August 2023 23 August 2023 Approved
03 August 2023
17 August 2023
23 August 2023
Approved
03 August 2023
14 September 2023
20 September 2023
Approved
03 August 2023
13 September 2023
20 September 2023
Approved
03 August 2023
17 August 2023
23 August 2023
Approved
Page 7 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
03 August 2023
13 September 2023
20 September 2023
Approved
03 August 2023
17 August 2023
23 August 2023
Approved
03 August 2023
17 August 2023
23 August 2023
Approved
03 August 2023
14 September 2023
22 September 2023
Approved
03 August 2023
13 September 2023
20 September 2023
Approved
03 August 2023
17 August 2023
23 August 2023
Approved
1982
03 August 2023
17 August 2023
23 August 2023
Approved
03 August 2023
14 September 2023
22 September 2023
Approved
03 August 2023
14 September 2023
22 September 2023
Approved
Act
03 August 2023
17 August 2023
23 August 2023
Approved
03 August 2023
13 September 2023
20 September 2023
Approved
03 August 2023
13 September 2023
20 September 2023
Approved
03 August 2023
13 September 2023
20 September 2023
Approved
03 August 2023
17 August 2023
23 August 2023
Approved
03 August 2023
13 September 2023
20 September 2023
Approved
03 August 2023
14 September 2023
22 September 2023
Approved
03 August 2023
14 September 2023
20 September 2023
Approved
03 August 2023
14 September 2023
03 October 2023
Approved
Information
03 August 2023
17 August 2023
23 August 2023
Approved
03 August 2023
13 September 2023
20 September 2023
Approved
03 August 2023
17 August 2023
23 August 2023
Approved
03 August 2023
17 August 2023
30 August 2023
Approved
03 August 2023
17 August 2023
23 August 2023
Approved
03 August 2023
17 August 2023
30 August 2023
Approved
Official
03 August 2023
14 October 2023
Processing
03 August 2023
14 October 2023
Processing
03 August 2023
14 October 2023
Processing
the
03 August 2023
14 October 2023
Processing
03 August 2023
14 October 2023
Processing
03 August 2023
14 October 2023
Processing
03 August 2023
14 October 2023
Processing
03 August 2023
14 October 2023
Processing
under
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
Released 03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
Page 8 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
1982
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
Act
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
Information
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
Official
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
the
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
under
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
Released 03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
Page 9 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
1982
03 August 2023
Unassigned
03 August 2023
Unassigned
03 August 2023
Unassigned
Act
03 August 2023
Unassigned
03 August 2023
Unassigned
04 August 2023
18 August 2023
23 August 2023
Approved
04 August 2023
14 September 2023
22 September 2023
Approved
04 August 2023
18 August 2023
23 August 2023
Approved
04 August 2023
14 September 2023
22 September 2023
Approved
04 August 2023
18 August 2023
23 August 2023
Approved
04 August 2023
18 August 2023
23 August 2023
Approved
04 August 2023
14 September 2023
22 September 2023
Approved
Information
04 August 2023
14 September 2023
22 September 2023
Approved
04 August 2023
18 August 2023
23 August 2023
Approved
04 August 2023
18 August 2023
29 August 2023
Approved
04 August 2023
15 September 2023
22 September 2023
Approved
04 August 2023
14 September 2023
22 September 2023
Approved
04 August 2023
14 September 2023
22 September 2023
Approved
Official
04 August 2023
14 September 2023
22 September 2023
Approved
04 August 2023
18 August 2023
23 August 2023
Approved
04 August 2023
14 September 2023
03 October 2023
Approved
the
04 August 2023
14 September 2023
22 September 2023
Approved
04 August 2023
18 August 2023
23 August 2023
Approved
04 August 2023
14 September 2023
22 September 2023
Approved
04 August 2023
18 August 2023
23 August 2023
Approved
04 August 2023
18 August 2023
23 August 2023
Approved
under
04 August 2023
18 August 2023
23 August 2023
Approved
04 August 2023
18 August 2023
23 August 2023
Approved
04 August 2023
14 September 2023
22 September 2023
Approved
04 August 2023
18 August 2023
23 August 2023
Approved
04 August 2023
20 September 2023
06 October 2023
Approved
04 August 2023
16 October 2023
Processing
04 August 2023
14 October 2023
Processing
Released 04 August 2023 14 October 2023
Processing
04 August 2023
14 October 2023
Processing
04 August 2023
14 October 2023
Processing
04 August 2023
14 October 2023
Processing
04 August 2023
14 October 2023
Processing
Page 10 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
04 August 2023
14 October 2023
Processing
04 August 2023
16 October 2023
Processing
04 August 2023
14 October 2023
Processing
04 August 2023
14 October 2023
Processing
04 August 2023
Unassigned
04 August 2023
Unassigned
1982
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
Act
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
Information
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
Official
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
the
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
under
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
Released 04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
Page 11 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
1982
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
Act
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
04 August 2023
Unassigned
Information
04 August 2023
Unassigned
05 August 2023
19 August 2023
29 August 2023
Approved
05 August 2023
15 September 2023
06 October 2023
Approved
05 August 2023
15 September 2023
22 September 2023
Approved
05 August 2023
15 September 2023
22 September 2023
Approved
05 August 2023
19 August 2023
29 August 2023
Approved
Official
05 August 2023
19 August 2023
04 September 2023
Approved
05 August 2023
15 September 2023
22 September 2023
Approved
05 August 2023
19 August 2023
29 August 2023
Approved
the
05 August 2023
18 August 2023
23 August 2023
Approved
05 August 2023
18 August 2023
23 August 2023
Approved
05 August 2023
19 August 2023
04 September 2023
Approved
05 August 2023
19 August 2023
04 September 2023
Approved
05 August 2023
19 August 2023
29 August 2023
Approved
under
05 August 2023
15 September 2023
22 September 2023
Approved
05 August 2023
19 August 2023
29 August 2023
Approved
05 August 2023
15 September 2023
22 September 2023
Approved
05 August 2023
18 August 2023
23 August 2023
Approved
05 August 2023
19 August 2023
29 August 2023
Approved
05 August 2023
19 August 2023
04 September 2023
Approved
05 August 2023
18 August 2023
23 August 2023
Approved
Released 05 August 2023 19 August 2023 04 September 2023 Approved
05 August 2023
15 September 2023
22 September 2023
Approved
05 August 2023
19 August 2023
04 September 2023
Approved
05 August 2023
19 August 2023
29 August 2023
Approved
05 August 2023
18 August 2023
23 August 2023
Approved
Page 12 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
05 August 2023
19 August 2023
29 August 2023
Approved
05 August 2023
19 August 2023
29 August 2023
Approved
05 August 2023
16 October 2023
Processing
05 August 2023
17 October 2023
Processing
05 August 2023
Unassigned
05 August 2023
Unassigned
1982
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
Act
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
Information
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
Official
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
the
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
under
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
Released 05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
Page 13 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
05 August 2023
Unassigned
1982
06 August 2023
15 September 2023
22 September 2023
Approved
06 August 2023
19 August 2023
14 September 2023
Approved
06 August 2023
19 August 2023
04 September 2023
Approved
Act
06 August 2023
19 August 2023
04 September 2023
Approved
06 August 2023
15 September 2023
22 September 2023
Approved
06 August 2023
15 September 2023
22 September 2023
Approved
06 August 2023
19 August 2023
04 September 2023
Approved
06 August 2023
19 August 2023
04 September 2023
Approved
06 August 2023
19 August 2023
14 September 2023
Approved
06 August 2023
19 August 2023
04 September 2023
Approved
06 August 2023
19 August 2023
14 September 2023
Approved
06 August 2023
19 August 2023
14 September 2023
Approved
Information
06 August 2023
19 August 2023
04 September 2023
Approved
06 August 2023
15 September 2023
22 September 2023
Approved
06 August 2023
15 September 2023
22 September 2023
Approved
06 August 2023
19 August 2023
14 September 2023
Approved
06 August 2023
15 September 2023
22 September 2023
Approved
06 August 2023
19 August 2023
14 September 2023
Approved
Official
06 August 2023
19 August 2023
04 September 2023
Approved
06 August 2023
19 August 2023
04 September 2023
Approved
06 August 2023
19 August 2023
14 September 2023
Approved
the
06 August 2023
15 September 2023
22 September 2023
Approved
06 August 2023
19 August 2023
14 September 2023
Approved
06 August 2023
19 August 2023
04 September 2023
Approved
06 August 2023
15 September 2023
22 September 2023
Approved
06 August 2023
19 August 2023
04 September 2023
Approved
under
06 August 2023
15 September 2023
22 September 2023
Approved
06 August 2023
15 September 2023
22 September 2023
Approved
06 August 2023
15 September 2023
22 September 2023
Approved
06 August 2023
15 September 2023
22 September 2023
Approved
06 August 2023
15 September 2023
22 September 2023
Approved
06 August 2023
19 August 2023
04 September 2023
Approved
06 August 2023
15 September 2023
22 September 2023
Approved
Released 06 August 2023 19 August 2023 04 September 2023 Approved
06 August 2023
19 August 2023
04 September 2023
Approved
06 August 2023
19 August 2023
04 September 2023
Approved
06 August 2023
19 August 2023
04 September 2023
Approved
06 August 2023
19 August 2023
04 September 2023
Approved
Page 14 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
06 August 2023
19 August 2023
04 September 2023
Approved
06 August 2023
15 September 2023
22 September 2023
Approved
06 August 2023
15 September 2023
22 September 2023
Approved
06 August 2023
17 October 2023
Processing
06 August 2023
30 August 2023
Processing
06 August 2023
17 October 2023
Processing
1982
06 August 2023
Unassigned
06 August 2023
Unassigned
06 August 2023
Unassigned
Act
06 August 2023
Unassigned
06 August 2023
Unassigned
06 August 2023
Unassigned
06 August 2023
Unassigned
06 August 2023
Unassigned
06 August 2023
Unassigned
06 August 2023
Unassigned
06 August 2023
Unassigned
06 August 2023
Unassigned
Information
06 August 2023
Unassigned
06 August 2023
Unassigned
06 August 2023
Unassigned
06 August 2023
Unassigned
06 August 2023
Unassigned
06 August 2023
Unassigned
Official
06 August 2023
Unassigned
06 August 2023
Unassigned
06 August 2023
Unassigned
the
06 August 2023
Unassigned
06 August 2023
Unassigned
06 August 2023
Unassigned
06 August 2023
Unassigned
06 August 2023
Unassigned
under
06 August 2023
Unassigned
06 August 2023
Unassigned
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
19 August 2023
14 September 2023
Approved
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
15 September 2023
22 September 2023
Approved
Released 07 August 2023 19 August 2023 14 September 2023 Approved
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
18 September 2023
22 September 2023
Approved
07 August 2023
19 August 2023
30 August 2023
Approved
Page 15 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
07 August 2023
19 August 2023
14 September 2023
Approved
07 August 2023
19 September 2023
03 October 2023
Approved
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
15 September 2023
22 September 2023
Approved
07 August 2023
15 September 2023
03 October 2023
Approved
07 August 2023
19 September 2023
03 October 2023
Approved
1982
07 August 2023
15 September 2023
03 October 2023
Approved
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
15 September 2023
22 September 2023
Approved
Act
07 August 2023
19 August 2023
14 September 2023
Approved
07 August 2023
19 August 2023
14 September 2023
Approved
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
19 August 2023
14 September 2023
Approved
07 August 2023
19 August 2023
14 September 2023
Approved
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
19 August 2023
14 September 2023
Approved
07 August 2023
19 August 2023
14 September 2023
Approved
Information
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
15 September 2023
22 September 2023
Approved
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
15 September 2023
22 September 2023
Approved
07 August 2023
19 August 2023
30 August 2023
Approved
Official
07 August 2023
18 September 2023
22 September 2023
Approved
07 August 2023
18 September 2023
22 September 2023
Approved
07 August 2023
19 August 2023
30 August 2023
Approved
the
07 August 2023
19 August 2023
14 September 2023
Approved
07 August 2023
19 August 2023
29 August 2023
Approved
07 August 2023
18 September 2023
22 September 2023
Approved
07 August 2023
15 September 2023
22 September 2023
Approved
07 August 2023
15 September 2023
22 September 2023
Approved
under
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
19 August 2023
14 September 2023
Approved
07 August 2023
19 August 2023
29 August 2023
Approved
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
19 August 2023
29 August 2023
Approved
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
19 August 2023
14 September 2023
Approved
Released 07 August 2023 19 September 2023 03 October 2023 Approved
07 August 2023
19 August 2023
14 September 2023
Approved
07 August 2023
15 September 2023
22 September 2023
Approved
07 August 2023
15 September 2023
22 September 2023
Approved
07 August 2023
19 September 2023
06 October 2023
Approved
Page 16 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
07 August 2023
15 September 2023
22 September 2023
Approved
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
19 August 2023
14 September 2023
Approved
07 August 2023
19 August 2023
29 August 2023
Approved
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
18 September 2023
22 September 2023
Approved
1982
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
19 August 2023
30 August 2023
Approved
07 August 2023
19 September 2023
03 October 2023
Approved
Act
07 August 2023
19 August 2023
29 August 2023
Approved
07 August 2023
17 October 2023
Processing
07 August 2023
17 October 2023
Processing
07 August 2023
17 October 2023
Processing
07 August 2023
17 October 2023
Processing
07 August 2023
17 October 2023
Processing
07 August 2023
17 October 2023
Processing
07 August 2023
17 October 2023
Processing
07 August 2023
Unassigned
Information
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
Official
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
the
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
under
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
Released 07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
Page 17 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
1982
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
Act
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
Information
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
07 August 2023
Unassigned
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
Official
08 August 2023
18 September 2023
22 September 2023
Approved
08 August 2023
19 September 2023
03 October 2023
Approved
08 August 2023
19 August 2023
30 August 2023
Approved
the
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
18 September 2023
22 September 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
21 August 2023
30 August 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
under
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
18 September 2023
22 September 2023
Approved
08 August 2023
18 September 2023
22 September 2023
Approved
08 August 2023
19 August 2023
05 September 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
18 September 2023
22 September 2023
Approved
Released 08 August 2023 18 September 2023 03 October 2023 Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
18 September 2023
22 September 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
21 August 2023
30 August 2023
Approved
Page 18 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
08 August 2023
19 August 2023
31 August 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
19 August 2023
30 August 2023
Approved
08 August 2023
18 August 2023
23 August 2023
Approved
08 August 2023
21 August 2023
30 August 2023
Approved
1982
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
Act
08 August 2023
21 August 2023
30 August 2023
Approved
08 August 2023
19 August 2023
30 August 2023
Approved
08 August 2023
19 August 2023
31 August 2023
Approved
08 August 2023
19 August 2023
31 August 2023
Approved
08 August 2023
19 September 2023
03 October 2023
Approved
08 August 2023
18 September 2023
22 September 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
Information
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
18 September 2023
22 September 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
18 September 2023
22 September 2023
Approved
08 August 2023
18 September 2023
22 September 2023
Approved
Official
08 August 2023
18 September 2023
22 September 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
18 August 2023
23 August 2023
Approved
the
08 August 2023
18 September 2023
22 September 2023
Approved
08 August 2023
19 August 2023
31 August 2023
Approved
08 August 2023
18 September 2023
22 September 2023
Approved
08 August 2023
18 September 2023
22 September 2023
Approved
08 August 2023
21 August 2023
30 August 2023
Approved
under
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
21 August 2023
30 August 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
18 September 2023
22 September 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
18 September 2023
22 September 2023
Approved
Released 08 August 2023 19 August 2023 31 August 2023 Approved
08 August 2023
19 September 2023
03 October 2023
Approved
08 August 2023
19 August 2023
31 August 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
19 September 2023
03 October 2023
Approved
Page 19 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
08 August 2023
18 September 2023
22 September 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
18 September 2023
22 September 2023
Approved
08 August 2023
19 August 2023
31 August 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
1982
08 August 2023
19 August 2023
31 August 2023
Approved
08 August 2023
18 September 2023
22 September 2023
Approved
08 August 2023
18 September 2023
22 September 2023
Approved
Act
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
18 September 2023
22 September 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
21 August 2023
31 August 2023
Approved
08 August 2023
17 October 2023
Processing
08 August 2023
17 October 2023
Processing
08 August 2023
17 October 2023
Processing
08 August 2023
17 October 2023
Processing
08 August 2023
17 October 2023
Processing
Information
08 August 2023
17 October 2023
Processing
08 August 2023
17 October 2023
Processing
08 August 2023
17 October 2023
Processing
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
Official
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
the
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
under
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
Released 08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
Page 20 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
1982
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
Act
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
Information
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
Official
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
the
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
under
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
Released 08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
08 August 2023
Unassigned
Page 21 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
08 August 2023
Unassigned
08 August 2023
Unassigned
09 August 2023
19 September 2023
03 October 2023
Approved
09 August 2023
21 August 2023
31 August 2023
Approved
09 August 2023
21 August 2023
31 August 2023
Approved
09 August 2023
21 August 2023
31 August 2023
Approved
1982
09 August 2023
21 August 2023
31 August 2023
Approved
09 August 2023
21 August 2023
01 September 2023
Approved
09 August 2023
21 August 2023
31 August 2023
Approved
Act
09 August 2023
21 August 2023
31 August 2023
Approved
09 August 2023
19 September 2023
03 October 2023
Approved
09 August 2023
19 September 2023
03 October 2023
Approved
09 August 2023
19 September 2023
03 October 2023
Approved
09 August 2023
21 August 2023
31 August 2023
Approved
09 August 2023
19 September 2023
03 October 2023
Approved
09 August 2023
21 August 2023
31 August 2023
Approved
09 August 2023
21 August 2023
31 August 2023
Approved
09 August 2023
21 August 2023
01 September 2023
Approved
Information
09 August 2023
21 August 2023
01 September 2023
Approved
09 August 2023
21 August 2023
31 August 2023
Approved
09 August 2023
18 September 2023
03 October 2023
Approved
09 August 2023
21 August 2023
31 August 2023
Approved
09 August 2023
18 September 2023
03 October 2023
Approved
09 August 2023
19 September 2023
03 October 2023
Approved
Official
09 August 2023
18 September 2023
03 October 2023
Approved
09 August 2023
21 August 2023
31 August 2023
Approved
09 August 2023
18 September 2023
03 October 2023
Approved
the
09 August 2023
19 September 2023
03 October 2023
Approved
09 August 2023
19 September 2023
25 October 2023
Approved
09 August 2023
19 September 2023
03 October 2023
Approved
09 August 2023
19 September 2023
25 October 2023
Approved
09 August 2023
19 September 2023
03 October 2023
Approved
under
09 August 2023
21 August 2023
31 August 2023
Approved
09 August 2023
21 August 2023
01 September 2023
Approved
09 August 2023
21 August 2023
31 August 2023
Approved
09 August 2023
19 September 2023
03 October 2023
Approved
09 August 2023
11 October 2023
Processing
09 August 2023
17 October 2023
Processing
09 August 2023
17 October 2023
Processing
Released 09 August 2023 19 September 2023
Processing
09 August 2023
17 October 2023
Processing
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
Page 22 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
1982
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
Act
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
Information
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
Official
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
the
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
under
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
Released 09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
Page 23 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
1982
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
Act
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
Information
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
Unassigned
09 August 2023
15 September 2023
Withdrawn
Official
10 August 2023
22 August 2023
31 August 2023
Approved
10 August 2023
22 August 2023
30 August 2023
Approved
10 August 2023
22 August 2023
30 August 2023
Approved
the
10 August 2023
22 August 2023
30 August 2023
Approved
10 August 2023
19 September 2023
03 October 2023
Approved
10 August 2023
22 August 2023
01 September 2023
Approved
10 August 2023
22 August 2023
30 August 2023
Approved
10 August 2023
22 August 2023
30 August 2023
Approved
under
10 August 2023
22 August 2023
30 August 2023
Approved
10 August 2023
19 September 2023
03 October 2023
Approved
10 August 2023
22 August 2023
30 August 2023
Approved
10 August 2023
19 September 2023
25 October 2023
Approved
10 August 2023
22 August 2023
31 August 2023
Approved
10 August 2023
22 August 2023
30 August 2023
Approved
10 August 2023
20 September 2023
03 October 2023
Approved
Released 10 August 2023 19 September 2023 06 October 2023 Approved
10 August 2023
22 August 2023
30 August 2023
Approved
10 August 2023
19 September 2023
25 October 2023
Approved
10 August 2023
22 August 2023
30 August 2023
Approved
10 August 2023
19 September 2023
25 October 2023
Approved
Page 24 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
10 August 2023
20 September 2023
03 October 2023
Approved
10 August 2023
22 August 2023
31 August 2023
Approved
10 August 2023
21 August 2023
07 September 2023
Approved
10 August 2023
21 August 2023
03 September 2023
Approved
10 August 2023
21 August 2023
07 September 2023
Approved
10 August 2023
19 September 2023
06 October 2023
Approved
1982
10 August 2023
19 September 2023
03 October 2023
Approved
10 August 2023
19 September 2023
06 October 2023
Approved
10 August 2023
22 August 2023
30 August 2023
Approved
Act
10 August 2023
19 September 2023
25 October 2023
Approved
10 August 2023
19 September 2023
25 October 2023
Approved
10 August 2023
21 August 2023
07 September 2023
Approved
10 August 2023
21 August 2023
07 September 2023
Approved
10 August 2023
22 August 2023
30 August 2023
Approved
10 August 2023
21 August 2023
07 September 2023
Approved
10 August 2023
22 August 2023
01 September 2023
Approved
10 August 2023
21 August 2023
07 September 2023
Approved
10 August 2023
22 August 2023
30 August 2023
Approved
Information
10 August 2023
22 August 2023
30 August 2023
Approved
10 August 2023
19 September 2023
03 October 2023
Approved
10 August 2023
22 August 2023
30 August 2023
Approved
10 August 2023
17 October 2023
01 November 2023
Approved
10 August 2023
19 September 2023
25 October 2023
Approved
10 August 2023
16 October 2023
Processing
Official
10 August 2023
17 October 2023
Processing
10 August 2023
11 October 2023
Processing
10 August 2023
17 October 2023
Processing
the
10 August 2023
11 October 2023
Processing
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
under
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
Released 10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
Page 25 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
1982
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
Act
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
Information
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
Official
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
the
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
under
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
Released 10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
Page 26 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
1982
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
Act
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
10 August 2023
Unassigned
Information
10 August 2023
Unassigned
10 August 2023
Unassigned
11 August 2023
20 September 2023
06 October 2023
Approved
11 August 2023
22 August 2023
01 September 2023
Approved
11 August 2023
20 September 2023
06 October 2023
Approved
11 August 2023
22 August 2023
01 September 2023
Approved
Official
11 August 2023
22 August 2023
01 September 2023
Approved
11 August 2023
22 August 2023
01 September 2023
Approved
11 August 2023
20 September 2023
03 October 2023
Approved
the
11 August 2023
20 September 2023
03 October 2023
Approved
11 August 2023
22 August 2023
01 September 2023
Approved
11 August 2023
20 September 2023
06 October 2023
Approved
11 August 2023
22 August 2023
01 September 2023
Approved
11 August 2023
22 August 2023
01 September 2023
Approved
under
11 August 2023
20 September 2023
06 October 2023
Approved
11 August 2023
20 September 2023
03 October 2023
Approved
11 August 2023
20 September 2023
22 September 2023
Approved
11 August 2023
20 September 2023
06 October 2023
Approved
11 August 2023
22 August 2023
01 September 2023
Approved
11 August 2023
22 August 2023
01 September 2023
Approved
11 August 2023
22 August 2023
01 September 2023
Approved
Released 11 August 2023 22 August 2023 01 September 2023 Approved
11 August 2023
22 August 2023
01 September 2023
Approved
11 August 2023
22 August 2023
01 September 2023
Approved
11 August 2023
22 August 2023
01 September 2023
Approved
11 August 2023
22 August 2023
01 September 2023
Approved
Page 27 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
11 August 2023
22 August 2023
01 September 2023
Approved
11 August 2023
20 September 2023
06 October 2023
Approved
11 August 2023
22 August 2023
01 September 2023
Approved
11 August 2023
22 August 2023
01 September 2023
Approved
11 August 2023
22 August 2023
01 September 2023
Approved
11 August 2023
22 August 2023
01 September 2023
Approved
1982
11 August 2023
22 August 2023
01 September 2023
Approved
11 August 2023
25 October 2023
Processing
11 August 2023
25 October 2023
Processing
Act
11 August 2023
25 October 2023
Processing
11 August 2023
25 October 2023
Processing
11 August 2023
25 October 2023
Processing
11 August 2023
25 October 2023
Processing
11 August 2023
25 October 2023
Processing
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
Information
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
Official
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
the
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
under
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
Released 11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
Page 28 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
1982
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
Act
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
Information
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
Official
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
the
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
under
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
11 August 2023
Unassigned
Released 11 August 2023
Unassigned
11 August 2023
Unassigned
12 August 2023
23 August 2023
31 August 2023
Approved
12 August 2023
23 August 2023
31 August 2023
Approved
12 August 2023
22 August 2023
01 September 2023
Approved
Page 29 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
12 August 2023
22 August 2023
07 September 2023
Approved
12 August 2023
22 August 2023
01 September 2023
Approved
12 August 2023
22 August 2023
01 September 2023
Approved
12 August 2023
22 August 2023
31 August 2023
Approved
12 August 2023
23 August 2023
31 August 2023
Approved
12 August 2023
23 August 2023
05 September 2023
Approved
1982
12 August 2023
23 August 2023
31 August 2023
Approved
12 August 2023
22 August 2023
25 August 2023
Approved
12 August 2023
23 August 2023
05 September 2023
Approved
Act
12 August 2023
22 August 2023
31 August 2023
Approved
12 August 2023
23 August 2023
05 September 2023
Approved
12 August 2023
22 August 2023
31 August 2023
Approved
12 August 2023
23 August 2023
31 August 2023
Approved
12 August 2023
20 September 2023
03 October 2023
Approved
12 August 2023
22 August 2023
01 September 2023
Approved
12 August 2023
23 August 2023
08 September 2023
Approved
12 August 2023
22 August 2023
01 September 2023
Approved
12 August 2023
22 August 2023
07 September 2023
Approved
Information
12 August 2023
20 September 2023
03 October 2023
Approved
12 August 2023
22 August 2023
01 September 2023
Approved
12 August 2023
23 August 2023
31 August 2023
Approved
12 August 2023
20 September 2023
03 October 2023
Approved
12 August 2023
20 September 2023
22 September 2023
Approved
12 August 2023
20 September 2023
22 September 2023
Approved
Official
12 August 2023
23 August 2023
31 August 2023
Approved
12 August 2023
22 August 2023
31 August 2023
Approved
12 August 2023
23 August 2023
31 August 2023
Approved
the
12 August 2023
20 September 2023
03 October 2023
Approved
12 August 2023
22 August 2023
07 September 2023
Approved
12 August 2023
20 September 2023
03 October 2023
Approved
12 August 2023
23 August 2023
31 August 2023
Approved
12 August 2023
20 September 2023
06 October 2023
Approved
under
12 August 2023
23 August 2023
31 August 2023
Approved
12 August 2023
23 August 2023
31 August 2023
Approved
12 August 2023
22 August 2023
31 August 2023
Approved
12 August 2023
22 August 2023
31 August 2023
Approved
12 August 2023
22 August 2023
01 September 2023
Approved
12 August 2023
23 August 2023
31 August 2023
Approved
12 August 2023
23 August 2023
31 August 2023
Approved
Released 12 August 2023 23 August 2023 31 August 2023 Approved
12 August 2023
22 August 2023
01 September 2023
Approved
12 August 2023
23 August 2023
31 August 2023
Approved
12 August 2023
23 August 2023
05 September 2023
Approved
12 August 2023
20 September 2023
22 September 2023
Approved
Page 30 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
12 August 2023
23 August 2023
31 August 2023
Approved
12 August 2023
22 August 2023
01 September 2023
Approved
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
1982
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
Act
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
Information
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
Official
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
the
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
under
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
12 August 2023
Unassigned
Released 12 August 2023 23 August 2023
Withdrawn
13 August 2023
23 August 2023
31 August 2023
Approved
13 August 2023
20 September 2023
03 October 2023
Approved
13 August 2023
23 August 2023
31 August 2023
Approved
13 August 2023
20 September 2023
03 October 2023
Approved
Page 31 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
13 August 2023
23 August 2023
04 September 2023
Approved
13 August 2023
23 August 2023
04 September 2023
Approved
13 August 2023
23 August 2023
31 August 2023
Approved
13 August 2023
21 September 2023
03 October 2023
Approved
13 August 2023
23 August 2023
05 September 2023
Approved
13 August 2023
23 August 2023
05 September 2023
Approved
1982
13 August 2023
20 September 2023
06 October 2023
Approved
13 August 2023
23 August 2023
05 September 2023
Approved
13 August 2023
23 August 2023
04 September 2023
Approved
Act
13 August 2023
23 August 2023
05 September 2023
Approved
13 August 2023
23 August 2023
04 September 2023
Approved
13 August 2023
23 August 2023
31 August 2023
Approved
13 August 2023
23 August 2023
05 September 2023
Approved
13 August 2023
23 August 2023
05 September 2023
Approved
13 August 2023
23 August 2023
31 August 2023
Approved
13 August 2023
23 August 2023
31 August 2023
Approved
13 August 2023
23 August 2023
05 September 2023
Approved
13 August 2023
23 August 2023
05 September 2023
Approved
Information
13 August 2023
20 September 2023
03 October 2023
Approved
13 August 2023
23 August 2023
05 September 2023
Approved
13 August 2023
23 August 2023
31 August 2023
Approved
13 August 2023
20 September 2023
06 October 2023
Approved
13 August 2023
23 August 2023
31 August 2023
Approved
13 August 2023
23 August 2023
31 August 2023
Approved
Official
13 August 2023
23 August 2023
04 September 2023
Approved
13 August 2023
23 August 2023
05 September 2023
Approved
13 August 2023
23 August 2023
05 September 2023
Approved
the
13 August 2023
20 September 2023
06 October 2023
Approved
13 August 2023
20 September 2023
03 October 2023
Approved
13 August 2023
23 August 2023
05 September 2023
Approved
13 August 2023
20 September 2023
06 October 2023
Approved
13 August 2023
23 August 2023
04 September 2023
Approved
under
13 August 2023
23 August 2023
05 September 2023
Approved
13 August 2023
23 August 2023
05 September 2023
Approved
13 August 2023
23 August 2023
05 September 2023
Approved
13 August 2023
21 September 2023
03 October 2023
Approved
13 August 2023
21 September 2023
03 October 2023
Approved
13 August 2023
20 September 2023
03 October 2023
Approved
13 August 2023
23 August 2023
31 August 2023
Approved
Released 13 August 2023 23 August 2023 05 September 2023 Approved
13 August 2023
21 August 2023
27 September 2023
Approved
13 August 2023
23 August 2023
05 September 2023
Approved
13 August 2023
Unassigned
13 August 2023
Unassigned
Page 32 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
1982
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
Act
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
Information
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
Official
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
the
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
under
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
Released 13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
13 August 2023
Unassigned
14 August 2023
23 August 2023
05 September 2023
Approved
Page 33 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
14 August 2023
21 September 2023
03 October 2023
Approved
14 August 2023
25 September 2023
25 October 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
21 September 2023
03 October 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
1982
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
21 September 2023
03 October 2023
Approved
14 August 2023
21 September 2023
03 October 2023
Approved
Act
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
21 September 2023
03 October 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
21 September 2023
03 October 2023
Approved
Information
14 August 2023
25 September 2023
25 October 2023
Approved
14 August 2023
21 September 2023
03 October 2023
Approved
14 August 2023
21 September 2023
03 October 2023
Approved
14 August 2023
22 September 2023
03 October 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
21 September 2023
03 October 2023
Approved
Official
14 August 2023
21 September 2023
03 October 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
the
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
22 September 2023
03 October 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
27 September 2023
03 October 2023
Approved
under
14 August 2023
25 September 2023
25 October 2023
Approved
14 August 2023
23 August 2023
12 September 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
21 September 2023
06 October 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
25 September 2023
25 October 2023
Approved
Released 14 August 2023 23 August 2023 05 September 2023 Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
Page 34 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
26 September 2023
03 October 2023
Approved
14 August 2023
26 September 2023
06 October 2023
Approved
1982
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
Act
14 August 2023
22 September 2023
03 October 2023
Approved
14 August 2023
22 September 2023
03 October 2023
Approved
14 August 2023
23 August 2023
05 September 2023
Approved
14 August 2023
17 October 2023
Processing
14 August 2023
17 October 2023
Processing
14 August 2023
17 October 2023
Processing
14 August 2023
17 October 2023
Processing
14 August 2023
17 October 2023
Processing
14 August 2023
17 October 2023
Processing
Information
14 August 2023
17 October 2023
Processing
14 August 2023
17 October 2023
Processing
14 August 2023
17 October 2023
Processing
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
Official
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
the
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
under
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
Released 14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
Page 35 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
1982
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
Act
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
Information
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
Official
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
the
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
under
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
Released 14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
14 August 2023
Unassigned
15 August 2023
23 August 2023
07 September 2023
Approved
Page 36 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
15 August 2023
02 October 2023
25 October 2023
Approved
15 August 2023
23 August 2023
07 September 2023
Approved
15 August 2023
23 August 2023
07 September 2023
Approved
15 August 2023
23 August 2023
05 September 2023
Approved
15 August 2023
23 August 2023
07 September 2023
Approved
15 August 2023
23 August 2023
05 September 2023
Approved
1982
15 August 2023
23 August 2023
06 September 2023
Approved
15 August 2023
27 September 2023
06 October 2023
Approved
15 August 2023
23 August 2023
05 September 2023
Approved
Act
15 August 2023
23 August 2023
07 September 2023
Approved
15 August 2023
23 August 2023
05 September 2023
Approved
15 August 2023
23 August 2023
05 September 2023
Approved
15 August 2023
23 August 2023
06 September 2023
Approved
15 August 2023
02 October 2023
25 October 2023
Approved
15 August 2023
23 August 2023
05 September 2023
Approved
15 August 2023
23 August 2023
07 September 2023
Approved
15 August 2023
23 August 2023
05 September 2023
Approved
15 August 2023
23 August 2023
05 September 2023
Approved
Information
15 August 2023
02 October 2023
25 October 2023
Approved
15 August 2023
23 August 2023
05 September 2023
Approved
15 August 2023
23 August 2023
05 September 2023
Approved
15 August 2023
23 August 2023
07 September 2023
Approved
15 August 2023
23 August 2023
05 September 2023
Approved
15 August 2023
28 September 2023
06 October 2023
Approved
Official
15 August 2023
28 September 2023
06 October 2023
Approved
15 August 2023
23 August 2023
07 September 2023
Approved
15 August 2023
23 August 2023
07 September 2023
Approved
the
15 August 2023
23 August 2023
05 September 2023
Approved
15 August 2023
23 August 2023
07 September 2023
Approved
15 August 2023
29 September 2023
25 October 2023
Approved
15 August 2023
23 August 2023
05 September 2023
Approved
15 August 2023
02 October 2023
25 October 2023
Approved
under
15 August 2023
23 August 2023
05 September 2023
Approved
15 August 2023
23 August 2023
07 September 2023
Approved
15 August 2023
23 August 2023
07 September 2023
Approved
15 August 2023
23 August 2023
05 September 2023
Approved
15 August 2023
06 October 2023
17 October 2023
Approved
15 August 2023
23 August 2023
06 September 2023
Approved
15 August 2023
27 September 2023
03 October 2023
Approved
Released 15 August 2023 23 August 2023 07 September 2023 Approved
15 August 2023
23 August 2023
07 September 2023
Approved
15 August 2023
23 August 2023
05 September 2023
Approved
15 August 2023
23 August 2023
07 September 2023
Approved
15 August 2023
23 August 2023
07 September 2023
Approved
Page 37 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
15 August 2023
27 September 2023
06 October 2023
Approved
15 August 2023
28 September 2023
06 October 2023
Approved
15 August 2023
23 August 2023
05 September 2023
Approved
15 August 2023
02 October 2023
25 October 2023
Approved
15 August 2023
23 August 2023
06 September 2023
Approved
15 August 2023
23 August 2023
07 September 2023
Approved
1982
15 August 2023
23 August 2023
07 September 2023
Approved
15 August 2023
06 October 2023
17 October 2023
Approved
15 August 2023
27 September 2023
03 October 2023
Approved
Act
15 August 2023
23 August 2023
05 September 2023
Approved
15 August 2023
17 October 2023
Processing
15 August 2023
25 October 2023
Processing
15 August 2023
17 October 2023
Processing
15 August 2023
17 October 2023
Processing
15 August 2023
17 October 2023
Processing
15 August 2023
25 October 2023
Processing
15 August 2023
17 October 2023
Processing
15 August 2023
02 October 2023
Processing
Information
15 August 2023
25 October 2023
Processing
15 August 2023
25 October 2023
Processing
15 August 2023
17 October 2023
Processing
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
Official
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
the
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
under
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
Released 15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
Page 38 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
1982
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
Act
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
Information
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
Official
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
the
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
under
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
Released 15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
Page 39 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
15 August 2023
Unassigned
1982
15 August 2023
30 September 2023
Withdrawn
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
05 October 2023
25 October 2023
Approved
Act
16 August 2023
09 October 2023
25 October 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
03 October 2023
25 October 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
Information
16 August 2023
04 October 2023
25 October 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
Official
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
10 October 2023
25 October 2023
Approved
the
16 August 2023
09 October 2023
25 October 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
03 October 2023
25 October 2023
Approved
under
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
05 October 2023
25 October 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
09 October 2023
25 October 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
Released 16 August 2023 23 August 2023 07 September 2023 Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
05 October 2023
25 October 2023
Approved
Page 40 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
1982
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
Act
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
10 October 2023
25 October 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
Information
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
23 August 2023
07 September 2023
Approved
16 August 2023
10 October 2023
Processing
16 August 2023
25 October 2023
Processing
16 August 2023
04 October 2023
Processing
16 August 2023
10 October 2023
Processing
Official
16 August 2023
25 October 2023
Processing
16 August 2023
10 October 2023
Processing
16 August 2023
09 October 2023
Processing
the
16 August 2023
30 August 2023
Processing
16 August 2023
25 October 2023
Processing
16 August 2023
25 October 2023
Processing
16 August 2023
25 October 2023
Processing
16 August 2023
10 October 2023
Processing
under
16 August 2023
25 October 2023
Processing
16 August 2023
10 October 2023
Processing
16 August 2023
25 October 2023
Processing
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
Released 16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
Page 41 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
1982
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
Act
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
Information
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
Official
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
the
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
under
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
Released 16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
Page 42 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
1982
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
Act
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
Information
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
16 August 2023
Unassigned
Official
17 August 2023
24 August 2023
08 September 2023
Approved
17 August 2023
23 August 2023
08 September 2023
Approved
17 August 2023
20 October 2023
27 October 2023
Approved
the
17 August 2023
24 August 2023
07 September 2023
Approved
17 August 2023
20 October 2023
27 October 2023
Approved
17 August 2023
11 October 2023
27 October 2023
Approved
17 August 2023
17 October 2023
27 October 2023
Approved
17 August 2023
24 August 2023
07 September 2023
Approved
under
17 August 2023
24 August 2023
07 September 2023
Approved
17 August 2023
23 August 2023
08 September 2023
Approved
17 August 2023
24 August 2023
08 September 2023
Approved
17 August 2023
11 October 2023
27 October 2023
Approved
17 August 2023
24 August 2023
07 September 2023
Approved
17 August 2023
20 October 2023
27 October 2023
Approved
17 August 2023
24 August 2023
08 September 2023
Approved
Released 17 August 2023 17 October 2023 27 October 2023 Approved
17 August 2023
24 August 2023
07 September 2023
Approved
17 August 2023
18 October 2023
27 October 2023
Approved
17 August 2023
19 October 2023
27 October 2023
Approved
17 August 2023
30 August 2023
13 September 2023
Approved
Page 43 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
17 August 2023
18 October 2023
27 October 2023
Approved
17 August 2023
23 August 2023
08 September 2023
Approved
17 August 2023
24 August 2023
07 September 2023
Approved
17 August 2023
12 October 2023
27 October 2023
Approved
17 August 2023
11 October 2023
25 October 2023
Approved
17 August 2023
23 August 2023
08 September 2023
Approved
1982
17 August 2023
23 August 2023
08 September 2023
Approved
17 August 2023
24 August 2023
07 September 2023
Approved
17 August 2023
11 October 2023
27 October 2023
Approved
Act
17 August 2023
11 October 2023
27 October 2023
Approved
17 August 2023
24 August 2023
07 September 2023
Approved
17 August 2023
24 August 2023
07 September 2023
Approved
17 August 2023
23 August 2023
08 September 2023
Approved
17 August 2023
23 August 2023
08 September 2023
Approved
17 August 2023
24 August 2023
08 September 2023
Approved
17 August 2023
17 October 2023
27 October 2023
Approved
17 August 2023
24 August 2023
07 September 2023
Approved
17 August 2023
17 October 2023
27 October 2023
Approved
Information
17 August 2023
23 August 2023
08 September 2023
Approved
17 August 2023
23 August 2023
08 September 2023
Approved
17 August 2023
24 August 2023
07 September 2023
Approved
17 August 2023
19 October 2023
27 October 2023
Approved
17 August 2023
18 October 2023
27 October 2023
Approved
17 August 2023
24 August 2023
07 September 2023
Approved
Official
17 August 2023
24 August 2023
07 September 2023
Approved
17 August 2023
23 August 2023
07 September 2023
Approved
17 August 2023
23 August 2023
08 September 2023
Approved
the
17 August 2023
23 August 2023
08 September 2023
Approved
17 August 2023
24 August 2023
07 September 2023
Approved
17 August 2023
24 August 2023
07 September 2023
Approved
17 August 2023
23 August 2023
08 September 2023
Approved
17 August 2023
23 August 2023
08 September 2023
Approved
under
17 August 2023
24 August 2023
07 September 2023
Approved
17 August 2023
24 August 2023
08 September 2023
Approved
17 August 2023
24 August 2023
07 September 2023
Approved
17 August 2023
19 October 2023
27 October 2023
Approved
17 August 2023
25 October 2023
Processing
17 August 2023
12 October 2023
Processing
17 August 2023
25 October 2023
Processing
Released 17 August 2023 20 October 2023
Processing
17 August 2023
18 October 2023
Processing
17 August 2023
25 October 2023
Processing
17 August 2023
18 October 2023
Processing
17 August 2023
07 November 2023
Processing
Page 44 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
17 August 2023
18 October 2023
Processing
17 August 2023
12 October 2023
Processing
17 August 2023
17 October 2023
Processing
17 August 2023
12 October 2023
Processing
17 August 2023
18 October 2023
Processing
17 August 2023
25 October 2023
Processing
1982
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
Act
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
Information
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
Official
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
the
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
under
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
Released 17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
Page 45 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
17 August 2023
Unassigned
17 August 2023
Unassigned
17 August 2023
Unassigned
18 August 2023
24 August 2023
08 September 2023
Approved
18 August 2023
24 October 2023
27 October 2023
Approved
18 August 2023
24 October 2023
31 October 2023
Approved
1982
18 August 2023
24 August 2023
08 September 2023
Approved
18 August 2023
20 October 2023
27 October 2023
Approved
18 August 2023
24 August 2023
08 September 2023
Approved
Act
18 August 2023
24 August 2023
08 September 2023
Approved
18 August 2023
24 August 2023
08 September 2023
Approved
18 August 2023
24 August 2023
08 September 2023
Approved
18 August 2023
24 August 2023
08 September 2023
Approved
18 August 2023
24 August 2023
08 September 2023
Approved
18 August 2023
24 August 2023
08 September 2023
Approved
18 August 2023
24 August 2023
08 September 2023
Approved
18 August 2023
24 August 2023
08 September 2023
Approved
18 August 2023
24 August 2023
08 September 2023
Approved
Information
18 August 2023
24 October 2023
27 October 2023
Approved
18 August 2023
24 October 2023
31 October 2023
Approved
18 August 2023
24 August 2023
07 September 2023
Approved
18 August 2023
24 August 2023
07 September 2023
Approved
18 August 2023
24 August 2023
07 September 2023
Approved
18 August 2023
24 August 2023
08 September 2023
Approved
Official
18 August 2023
24 August 2023
08 September 2023
Approved
18 August 2023
24 August 2023
08 September 2023
Approved
18 August 2023
20 October 2023
27 October 2023
Approved
the
18 August 2023
24 August 2023
08 September 2023
Approved
18 August 2023
24 October 2023
31 October 2023
Approved
18 August 2023
24 August 2023
08 September 2023
Approved
18 August 2023
24 October 2023
27 October 2023
Approved
18 August 2023
24 August 2023
08 September 2023
Approved
under
18 August 2023
24 August 2023
08 September 2023
Approved
18 August 2023
24 August 2023
08 September 2023
Approved
18 August 2023
24 October 2023
27 October 2023
Approved
18 August 2023
25 October 2023
Processing
18 August 2023
24 October 2023
Processing
18 August 2023
24 October 2023
Processing
18 August 2023
24 October 2023
Processing
Released 18 August 2023 24 October 2023
Processing
18 August 2023
25 October 2023
Processing
18 August 2023
24 October 2023
Processing
18 August 2023
24 October 2023
Processing
18 August 2023
30 October 2023
Processing
Page 46 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
18 August 2023
25 October 2023
Processing
18 August 2023
24 October 2023
Processing
18 August 2023
24 October 2023
Processing
18 August 2023
30 October 2023
Processing
18 August 2023
30 October 2023
Processing
18 August 2023
24 October 2023
Processing
1982
18 August 2023
24 October 2023
Processing
18 August 2023
30 October 2023
Processing
18 August 2023
25 October 2023
Processing
Act
18 August 2023
21 October 2023
Processing
18 August 2023
24 October 2023
Processing
18 August 2023
25 October 2023
Processing
18 August 2023
25 October 2023
Processing
18 August 2023
24 October 2023
Processing
18 August 2023
30 October 2023
Processing
18 August 2023
21 October 2023
Processing
18 August 2023
30 October 2023
Processing
18 August 2023
24 October 2023
Processing
Information
18 August 2023
30 October 2023
Processing
18 August 2023
24 October 2023
Processing
18 August 2023
24 October 2023
Processing
18 August 2023
25 October 2023
Processing
18 August 2023
24 October 2023
Processing
18 August 2023
Unassigned
Official
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
the
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
under
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
Released 18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
Page 47 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
1982
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
Act
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
Information
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
Official
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
the
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
18 August 2023
Unassigned
under
18 August 2023
Unassigned
18 August 2023
Unassigned
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 October 2023
31 October 2023
Approved
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 August 2023
08 September 2023
Approved
Released 19 August 2023 24 August 2023 08 September 2023 Approved
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 October 2023
31 October 2023
Approved
19 August 2023
24 August 2023
08 September 2023
Approved
Page 48 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 October 2023
31 October 2023
Approved
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 August 2023
08 September 2023
Approved
1982
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 October 2023
27 October 2023
Approved
Act
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 October 2023
27 October 2023
Approved
19 August 2023
24 August 2023
08 September 2023
Approved
Information
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 October 2023
31 October 2023
Approved
19 August 2023
24 October 2023
27 October 2023
Approved
19 August 2023
24 October 2023
31 October 2023
Approved
19 August 2023
24 October 2023
31 October 2023
Approved
Official
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 August 2023
08 September 2023
Approved
19 August 2023
24 October 2023
Processing
the
19 August 2023
24 October 2023
Processing
19 August 2023
24 October 2023
Processing
19 August 2023
30 October 2023
Processing
19 August 2023
24 October 2023
Processing
19 August 2023
24 October 2023
Processing
under
19 August 2023
24 October 2023
Processing
19 August 2023
24 October 2023
Processing
19 August 2023
24 October 2023
Processing
19 August 2023
30 October 2023
Processing
19 August 2023
24 October 2023
Processing
19 August 2023
24 October 2023
Processing
19 August 2023
24 October 2023
Processing
Released 19 August 2023 24 October 2023
Processing
19 August 2023
24 October 2023
Processing
19 August 2023
24 October 2023
Processing
19 August 2023
24 October 2023
Processing
19 August 2023
24 October 2023
Processing
Page 49 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
19 August 2023
30 October 2023
Processing
19 August 2023
24 October 2023
Processing
19 August 2023
24 October 2023
Processing
19 August 2023
Unassigned
19 August 2023
Unassigned
19 August 2023
Unassigned
1982
19 August 2023
Unassigned
19 August 2023
Unassigned
19 August 2023
Unassigned
Act
19 August 2023
Unassigned
19 August 2023
Unassigned
19 August 2023
Unassigned
19 August 2023
Unassigned
19 August 2023
Unassigned
19 August 2023
Unassigned
19 August 2023
Unassigned
19 August 2023
Unassigned
19 August 2023
Unassigned
Information
19 August 2023
Unassigned
19 August 2023
Unassigned
19 August 2023
Unassigned
19 August 2023
Unassigned
19 August 2023
Unassigned
19 August 2023
Unassigned
Official
19 August 2023
Unassigned
19 August 2023
Unassigned
19 August 2023
Unassigned
the
19 August 2023
Unassigned
20 August 2023
24 August 2023
10 September 2023
Approved
20 August 2023
24 October 2023
31 October 2023
Approved
20 August 2023
24 October 2023
31 October 2023
Approved
20 August 2023
04 September 2023
10 October 2023
Approved
under
20 August 2023
24 August 2023
10 September 2023
Approved
20 August 2023
24 August 2023
10 September 2023
Approved
20 August 2023
24 October 2023
27 October 2023
Approved
20 August 2023
24 October 2023
31 October 2023
Approved
20 August 2023
24 October 2023
31 October 2023
Approved
20 August 2023
24 October 2023
31 October 2023
Approved
20 August 2023
24 August 2023
08 September 2023
Approved
Released 20 August 2023 24 August 2023 10 September 2023 Approved
20 August 2023
24 August 2023
08 September 2023
Approved
20 August 2023
24 October 2023
01 November 2023
Approved
20 August 2023
24 October 2023
01 November 2023
Approved
20 August 2023
24 October 2023
31 October 2023
Approved
Page 50 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
20 August 2023
24 August 2023
10 September 2023
Approved
20 August 2023
24 August 2023
08 September 2023
Approved
20 August 2023
24 August 2023
08 September 2023
Approved
20 August 2023
24 October 2023
31 October 2023
Approved
20 August 2023
24 August 2023
08 September 2023
Approved
20 August 2023
24 August 2023
28 September 2023
Approved
1982
20 August 2023
24 August 2023
10 September 2023
Approved
20 August 2023
24 August 2023
08 September 2023
Approved
20 August 2023
24 August 2023
08 September 2023
Approved
Act
20 August 2023
24 October 2023
31 October 2023
Approved
20 August 2023
24 August 2023
08 September 2023
Approved
20 August 2023
24 October 2023
31 October 2023
Approved
20 August 2023
24 August 2023
10 September 2023
Approved
20 August 2023
24 August 2023
08 September 2023
Approved
20 August 2023
24 August 2023
08 September 2023
Approved
20 August 2023
24 August 2023
10 September 2023
Approved
20 August 2023
24 August 2023
08 September 2023
Approved
20 August 2023
24 October 2023
31 October 2023
Approved
Information
20 August 2023
24 August 2023
10 September 2023
Approved
20 August 2023
24 August 2023
08 September 2023
Approved
20 August 2023
24 October 2023
31 October 2023
Approved
20 August 2023
24 October 2023
31 October 2023
Approved
20 August 2023
24 October 2023
27 October 2023
Approved
20 August 2023
24 October 2023
27 October 2023
Approved
Official
20 August 2023
24 August 2023
08 September 2023
Approved
20 August 2023
24 August 2023
28 September 2023
Approved
20 August 2023
24 October 2023
31 October 2023
Approved
the
20 August 2023
24 August 2023
08 September 2023
Approved
20 August 2023
24 August 2023
08 September 2023
Approved
20 August 2023
24 August 2023
10 September 2023
Approved
20 August 2023
24 October 2023
31 October 2023
Approved
20 August 2023
24 October 2023
Processing
under
20 August 2023
24 October 2023
Processing
20 August 2023
24 October 2023
Processing
20 August 2023
24 October 2023
Processing
20 August 2023
24 October 2023
Processing
20 August 2023
24 October 2023
Processing
20 August 2023
24 October 2023
Processing
20 August 2023
30 October 2023
Processing
Released 20 August 2023 24 August 2023
Processing
20 August 2023
24 October 2023
Processing
20 August 2023
24 October 2023
Processing
20 August 2023
24 October 2023
Processing
20 August 2023
24 October 2023
Processing
Page 51 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
20 August 2023
02 November 2023
Processing
20 August 2023
24 October 2023
Processing
20 August 2023
24 October 2023
Processing
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
1982
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
Act
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
Information
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
Official
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
the
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
under
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
20 August 2023
Unassigned
Released 20 August 2023
Unassigned
20 August 2023
Unassigned
21 August 2023
21 September 2023
09 October 2023
Approved
21 August 2023
24 August 2023
18 October 2023
Approved
21 August 2023
21 September 2023
09 October 2023
Approved
Page 52 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
21 August 2023
06 September 2023
18 September 2023
Approved
21 August 2023
24 August 2023
18 October 2023
Approved
21 August 2023
24 October 2023
27 October 2023
Approved
21 August 2023
21 September 2023
09 October 2023
Approved
21 August 2023
24 October 2023
31 October 2023
Approved
21 August 2023
05 September 2023
18 September 2023
Approved
1982
21 August 2023
21 September 2023
04 October 2023
Approved
21 August 2023
21 September 2023
04 October 2023
Approved
21 August 2023
24 October 2023
31 October 2023
Approved
Act
21 August 2023
21 September 2023
04 October 2023
Approved
21 August 2023
21 September 2023
04 October 2023
Approved
21 August 2023
15 September 2023
09 October 2023
Approved
21 August 2023
24 October 2023
31 October 2023
Approved
21 August 2023
24 October 2023
27 October 2023
Approved
21 August 2023
15 September 2023
09 October 2023
Approved
21 August 2023
24 October 2023
31 October 2023
Approved
21 August 2023
24 October 2023
31 October 2023
Approved
21 August 2023
15 September 2023
09 October 2023
Approved
Information
21 August 2023
15 September 2023
09 October 2023
Approved
21 August 2023
15 September 2023
09 October 2023
Approved
21 August 2023
21 September 2023
09 October 2023
Approved
21 August 2023
21 September 2023
04 October 2023
Approved
21 August 2023
21 September 2023
09 October 2023
Approved
21 August 2023
24 October 2023
27 October 2023
Approved
Official
21 August 2023
15 September 2023
09 October 2023
Approved
21 August 2023
24 October 2023
31 October 2023
Approved
21 August 2023
15 September 2023
09 October 2023
Approved
the
21 August 2023
15 September 2023
06 October 2023
Approved
21 August 2023
21 September 2023
04 October 2023
Approved
21 August 2023
21 September 2023
04 October 2023
Approved
21 August 2023
24 October 2023
27 October 2023
Approved
21 August 2023
21 September 2023
04 October 2023
Approved
under
21 August 2023
06 September 2023
18 September 2023
Approved
21 August 2023
24 August 2023
18 October 2023
Approved
21 August 2023
24 October 2023
31 October 2023
Approved
21 August 2023
24 August 2023
18 October 2023
Approved
21 August 2023
21 September 2023
04 October 2023
Approved
21 August 2023
24 October 2023
31 October 2023
Approved
21 August 2023
24 August 2023
18 October 2023
Approved
Released 21 August 2023 21 September 2023 09 October 2023 Approved
21 August 2023
24 October 2023
27 October 2023
Approved
21 August 2023
24 October 2023
31 October 2023
Approved
21 August 2023
24 October 2023
27 October 2023
Approved
21 August 2023
21 September 2023
09 October 2023
Approved
Page 53 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
21 August 2023
21 September 2023
04 October 2023
Approved
21 August 2023
21 September 2023
04 October 2023
Approved
21 August 2023
15 September 2023
09 October 2023
Approved
21 August 2023
15 September 2023
06 October 2023
Approved
21 August 2023
15 September 2023
06 October 2023
Approved
21 August 2023
24 October 2023
31 October 2023
Approved
1982
21 August 2023
24 October 2023
31 October 2023
Approved
21 August 2023
24 August 2023
18 October 2023
Approved
21 August 2023
24 October 2023
31 October 2023
Approved
Act
21 August 2023
21 September 2023
04 October 2023
Approved
21 August 2023
24 October 2023
27 October 2023
Approved
21 August 2023
24 October 2023
31 October 2023
Approved
21 August 2023
24 August 2023
18 October 2023
Approved
21 August 2023
24 August 2023
18 October 2023
Approved
21 August 2023
24 October 2023
31 October 2023
Approved
21 August 2023
21 September 2023
04 October 2023
Approved
21 August 2023
24 October 2023
31 October 2023
Approved
21 August 2023
24 August 2023
18 October 2023
Approved
Information
21 August 2023
21 September 2023
09 October 2023
Approved
21 August 2023
24 August 2023
18 October 2023
Approved
21 August 2023
24 August 2023
18 October 2023
Approved
21 August 2023
24 October 2023
Processing
21 August 2023
24 October 2023
Processing
21 August 2023
24 October 2023
Processing
Official
21 August 2023
24 October 2023
Processing
21 August 2023
24 October 2023
Processing
21 August 2023
02 November 2023
Processing
the
21 August 2023
24 October 2023
Processing
21 August 2023
24 October 2023
Processing
21 August 2023
18 September 2023
Processing
21 August 2023
24 October 2023
Processing
21 August 2023
24 October 2023
Processing
under
21 August 2023
24 October 2023
Processing
21 August 2023
24 October 2023
Processing
21 August 2023
02 November 2023
Processing
21 August 2023
24 October 2023
Processing
21 August 2023
02 November 2023
Processing
21 August 2023
24 October 2023
Processing
21 August 2023
24 October 2023
Processing
Released 21 August 2023 24 October 2023
Processing
21 August 2023
24 October 2023
Processing
21 August 2023
24 October 2023
Processing
21 August 2023
24 October 2023
Processing
21 August 2023
02 November 2023
Processing
Page 54 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
21 August 2023
24 October 2023
Processing
21 August 2023
24 October 2023
Processing
21 August 2023
24 October 2023
Processing
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
1982
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
Act
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
Information
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
Official
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
the
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
under
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
Released 21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
Page 55 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
1982
21 August 2023
Unassigned
21 August 2023
Unassigned
21 August 2023
Unassigned
Act
21 August 2023
Unassigned
21 August 2023
Unassigned
22 August 2023
25 October 2023
27 October 2023
Approved
22 August 2023
21 September 2023
06 October 2023
Approved
22 August 2023
21 September 2023
05 October 2023
Approved
22 August 2023
24 October 2023
01 November 2023
Approved
22 August 2023
25 October 2023
27 October 2023
Approved
22 August 2023
21 September 2023
06 October 2023
Approved
22 August 2023
21 September 2023
05 October 2023
Approved
Information
22 August 2023
25 October 2023
27 October 2023
Approved
22 August 2023
21 September 2023
05 October 2023
Approved
22 August 2023
24 October 2023
01 November 2023
Approved
22 August 2023
21 September 2023
04 October 2023
Approved
22 August 2023
21 September 2023
04 October 2023
Approved
22 August 2023
21 September 2023
06 October 2023
Approved
Official
22 August 2023
21 September 2023
05 October 2023
Approved
22 August 2023
21 September 2023
09 October 2023
Approved
22 August 2023
25 October 2023
01 November 2023
Approved
the
22 August 2023
25 October 2023
01 November 2023
Approved
22 August 2023
21 September 2023
04 October 2023
Approved
22 August 2023
24 October 2023
01 November 2023
Approved
22 August 2023
21 September 2023
06 October 2023
Approved
22 August 2023
25 October 2023
06 November 2023
Approved
under
22 August 2023
25 October 2023
01 November 2023
Approved
22 August 2023
21 September 2023
04 October 2023
Approved
22 August 2023
21 September 2023
05 October 2023
Approved
22 August 2023
25 October 2023
01 November 2023
Approved
22 August 2023
24 October 2023
31 October 2023
Approved
22 August 2023
21 September 2023
05 October 2023
Approved
22 August 2023
21 September 2023
04 October 2023
Approved
Released 22 August 2023 24 October 2023 01 November 2023 Approved
22 August 2023
21 September 2023
04 October 2023
Approved
22 August 2023
25 October 2023
01 November 2023
Approved
22 August 2023
24 October 2023
01 November 2023
Approved
22 August 2023
21 September 2023
05 October 2023
Approved
Page 56 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
22 August 2023
25 October 2023
01 November 2023
Approved
22 August 2023
25 October 2023
27 October 2023
Approved
22 August 2023
21 September 2023
09 October 2023
Approved
22 August 2023
24 October 2023
31 October 2023
Approved
22 August 2023
21 September 2023
06 October 2023
Approved
22 August 2023
24 October 2023
27 October 2023
Approved
1982
22 August 2023
21 September 2023
06 October 2023
Approved
22 August 2023
25 October 2023
06 November 2023
Approved
22 August 2023
21 September 2023
09 October 2023
Approved
Act
22 August 2023
24 October 2023
06 November 2023
Approved
22 August 2023
25 October 2023
01 November 2023
Approved
22 August 2023
24 October 2023
Processing
22 August 2023
02 November 2023
Processing
22 August 2023
25 October 2023
Processing
22 August 2023
02 November 2023
Processing
22 August 2023
24 October 2023
Processing
22 August 2023
25 October 2023
Processing
22 August 2023
02 November 2023
Processing
Information
22 August 2023
02 November 2023
Processing
22 August 2023
24 October 2023
Processing
22 August 2023
25 October 2023
Processing
22 August 2023
25 October 2023
Processing
22 August 2023
03 November 2023
Processing
22 August 2023
02 November 2023
Processing
Official
22 August 2023
02 November 2023
Processing
22 August 2023
25 October 2023
Processing
22 August 2023
25 October 2023
Processing
the
22 August 2023
02 November 2023
Processing
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
under
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
Released 22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
Page 57 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
1982
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
Act
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
Information
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
Official
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
the
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
under
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
Released 22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
Page 58 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
1982
22 August 2023
Unassigned
22 August 2023
Unassigned
22 August 2023
Unassigned
Act
22 August 2023
Unassigned
22 August 2023
Unassigned
23 August 2023
21 September 2023
27 October 2023
Approved
23 August 2023
21 September 2023
09 October 2023
Approved
23 August 2023
21 September 2023
27 October 2023
Approved
23 August 2023
21 September 2023
09 October 2023
Approved
23 August 2023
21 September 2023
09 October 2023
Approved
23 August 2023
25 October 2023
06 November 2023
Approved
23 August 2023
21 September 2023
09 October 2023
Approved
Information
23 August 2023
21 September 2023
27 October 2023
Approved
23 August 2023
25 October 2023
01 November 2023
Approved
23 August 2023
25 October 2023
01 November 2023
Approved
23 August 2023
25 October 2023
01 November 2023
Approved
23 August 2023
25 October 2023
01 November 2023
Approved
23 August 2023
25 October 2023
01 November 2023
Approved
Official
23 August 2023
21 September 2023
09 October 2023
Approved
23 August 2023
21 September 2023
27 October 2023
Approved
23 August 2023
22 September 2023
27 October 2023
Approved
the
23 August 2023
21 September 2023
27 October 2023
Approved
23 August 2023
21 September 2023
27 October 2023
Approved
23 August 2023
25 October 2023
01 November 2023
Approved
23 August 2023
25 October 2023
01 November 2023
Approved
23 August 2023
22 September 2023
27 October 2023
Approved
under
23 August 2023
21 September 2023
27 October 2023
Approved
23 August 2023
25 October 2023
01 November 2023
Approved
23 August 2023
25 October 2023
01 November 2023
Approved
23 August 2023
25 October 2023
01 November 2023
Approved
23 August 2023
21 September 2023
09 October 2023
Approved
23 August 2023
21 September 2023
27 October 2023
Approved
23 August 2023
21 September 2023
27 October 2023
Approved
Released 23 August 2023 21 September 2023 27 October 2023 Approved
23 August 2023
21 September 2023
09 October 2023
Approved
23 August 2023
21 September 2023
09 October 2023
Approved
23 August 2023
22 September 2023
09 October 2023
Approved
23 August 2023
25 October 2023
01 November 2023
Approved
Page 59 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
23 August 2023
25 October 2023
06 November 2023
Approved
23 August 2023
25 October 2023
01 November 2023
Approved
23 August 2023
21 September 2023
09 October 2023
Approved
23 August 2023
21 September 2023
27 October 2023
Approved
23 August 2023
25 October 2023
01 November 2023
Approved
23 August 2023
21 September 2023
09 October 2023
Approved
1982
23 August 2023
25 October 2023
01 November 2023
Approved
23 August 2023
25 October 2023
01 November 2023
Approved
23 August 2023
21 September 2023
09 October 2023
Approved
Act
23 August 2023
21 September 2023
09 October 2023
Approved
23 August 2023
25 October 2023
01 November 2023
Approved
23 August 2023
21 September 2023
27 October 2023
Approved
23 August 2023
21 September 2023
09 October 2023
Approved
23 August 2023
21 September 2023
27 October 2023
Approved
23 August 2023
21 September 2023
27 October 2023
Approved
23 August 2023
21 September 2023
27 October 2023
Approved
23 August 2023
21 September 2023
27 October 2023
Approved
23 August 2023
25 October 2023
03 November 2023
Approved
Information
23 August 2023
21 September 2023
27 October 2023
Approved
23 August 2023
25 October 2023
27 October 2023
Approved
23 August 2023
21 September 2023
09 October 2023
Approved
23 August 2023
21 September 2023
09 October 2023
Approved
23 August 2023
25 October 2023
Processing
23 August 2023
25 October 2023
Processing
Official
23 August 2023
03 November 2023
Processing
23 August 2023
25 October 2023
Processing
23 August 2023
03 November 2023
Processing
the
23 August 2023
25 October 2023
Processing
23 August 2023
03 November 2023
Processing
23 August 2023
03 November 2023
Processing
23 August 2023
25 October 2023
Processing
23 August 2023
03 November 2023
Processing
under
23 August 2023
03 November 2023
Processing
23 August 2023
03 November 2023
Processing
23 August 2023
03 November 2023
Processing
23 August 2023
25 October 2023
Processing
23 August 2023
25 October 2023
Processing
23 August 2023
25 October 2023
Processing
23 August 2023
25 October 2023
Processing
Released 23 August 2023 25 October 2023
Processing
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
Page 60 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
1982
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
Act
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
Information
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
Official
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
the
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
under
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
Released 23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
Page 61 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
1982
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
Act
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
23 August 2023
Unassigned
24 August 2023
22 September 2023
17 October 2023
Approved
24 August 2023
22 September 2023
09 October 2023
Approved
24 August 2023
22 September 2023
09 October 2023
Approved
24 August 2023
04 October 2023
25 October 2023
Approved
Information
24 August 2023
22 September 2023
09 October 2023
Approved
24 August 2023
22 September 2023
09 October 2023
Approved
24 August 2023
25 October 2023
06 November 2023
Approved
24 August 2023
26 October 2023
01 November 2023
Approved
24 August 2023
22 September 2023
09 October 2023
Approved
24 August 2023
22 September 2023
09 October 2023
Approved
Official
24 August 2023
22 September 2023
09 October 2023
Approved
24 August 2023
22 September 2023
09 October 2023
Approved
24 August 2023
22 September 2023
09 October 2023
Approved
the
24 August 2023
22 September 2023
09 October 2023
Approved
24 August 2023
22 September 2023
09 October 2023
Approved
24 August 2023
25 October 2023
06 November 2023
Approved
24 August 2023
22 September 2023
09 October 2023
Approved
24 August 2023
22 September 2023
09 October 2023
Approved
under
24 August 2023
22 September 2023
09 October 2023
Approved
24 August 2023
25 October 2023
06 November 2023
Approved
24 August 2023
25 October 2023
06 November 2023
Approved
24 August 2023
22 September 2023
09 October 2023
Approved
24 August 2023
25 October 2023
01 November 2023
Approved
24 August 2023
22 September 2023
09 October 2023
Approved
24 August 2023
25 October 2023
01 November 2023
Approved
Released 24 August 2023 25 October 2023 01 November 2023 Approved
24 August 2023
25 October 2023
01 November 2023
Approved
24 August 2023
22 September 2023
09 October 2023
Approved
24 August 2023
22 September 2023
09 October 2023
Approved
24 August 2023
25 October 2023
03 November 2023
Approved
Page 62 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
24 August 2023
22 September 2023
09 October 2023
Approved
24 August 2023
22 September 2023
09 October 2023
Approved
24 August 2023
26 October 2023
06 November 2023
Approved
24 August 2023
03 November 2023
Processing
24 August 2023
26 October 2023
Processing
24 August 2023
25 October 2023
Processing
1982
24 August 2023
26 October 2023
Processing
24 August 2023
25 October 2023
Processing
24 August 2023
25 October 2023
Processing
Act
24 August 2023
25 October 2023
Processing
24 August 2023
03 November 2023
Processing
24 August 2023
26 October 2023
Processing
24 August 2023
25 October 2023
Processing
24 August 2023
25 October 2023
Processing
24 August 2023
22 September 2023
Processing
24 August 2023
25 October 2023
Processing
24 August 2023
26 October 2023
Processing
24 August 2023
03 November 2023
Processing
Information
24 August 2023
07 November 2023
Processing
24 August 2023
25 October 2023
Processing
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
Official
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
the
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
under
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
Released 24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
Page 63 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
1982
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
Act
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
24 August 2023
Unassigned
25 August 2023
22 September 2023
09 October 2023
Approved
Information
25 August 2023
26 October 2023
01 November 2023
Approved
25 August 2023
22 September 2023
09 October 2023
Approved
25 August 2023
26 October 2023
01 November 2023
Approved
25 August 2023
22 September 2023
09 October 2023
Approved
25 August 2023
22 September 2023
09 October 2023
Approved
25 August 2023
26 October 2023
01 November 2023
Approved
Official
25 August 2023
26 October 2023
01 November 2023
Approved
25 August 2023
22 September 2023
09 October 2023
Approved
25 August 2023
22 September 2023
09 October 2023
Approved
the
25 August 2023
26 October 2023
01 November 2023
Approved
25 August 2023
26 October 2023
01 November 2023
Approved
25 August 2023
22 September 2023
09 October 2023
Approved
25 August 2023
26 October 2023
01 November 2023
Approved
25 August 2023
22 September 2023
09 October 2023
Approved
under
25 August 2023
22 September 2023
09 October 2023
Approved
25 August 2023
26 October 2023
01 November 2023
Approved
25 August 2023
22 September 2023
09 October 2023
Approved
25 August 2023
22 September 2023
09 October 2023
Approved
25 August 2023
22 September 2023
09 October 2023
Approved
25 August 2023
26 October 2023
01 November 2023
Approved
25 August 2023
26 October 2023
01 November 2023
Approved
Released 25 August 2023 22 September 2023 09 October 2023 Approved
25 August 2023
22 September 2023
09 October 2023
Approved
25 August 2023
26 October 2023
01 November 2023
Approved
25 August 2023
22 September 2023
09 October 2023
Approved
25 August 2023
22 September 2023
09 October 2023
Approved
Page 64 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
25 August 2023
22 September 2023
09 October 2023
Approved
25 August 2023
22 September 2023
09 October 2023
Approved
25 August 2023
26 October 2023
03 November 2023
Approved
25 August 2023
22 September 2023
09 October 2023
Approved
25 August 2023
26 October 2023
Processing
25 August 2023
26 October 2023
Processing
1982
25 August 2023
07 November 2023
Processing
25 August 2023
26 October 2023
Processing
25 August 2023
26 October 2023
Processing
Act
25 August 2023
26 October 2023
Processing
25 August 2023
22 September 2023
Processing
25 August 2023
07 November 2023
Processing
25 August 2023
26 October 2023
Processing
25 August 2023
07 November 2023
Processing
25 August 2023
07 November 2023
Processing
25 August 2023
07 November 2023
Processing
25 August 2023
07 November 2023
Processing
25 August 2023
26 October 2023
Processing
Information
25 August 2023
26 October 2023
Processing
25 August 2023
26 October 2023
Processing
25 August 2023
26 October 2023
Processing
25 August 2023
26 October 2023
Processing
25 August 2023
26 October 2023
Processing
25 August 2023
Unassigned
Official
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
the
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
under
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
Released 25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
Page 65 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
1982
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
Act
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
Information
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
Official
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
the
25 August 2023
Unassigned
25 August 2023
Unassigned
25 August 2023
Unassigned
26 August 2023
22 September 2023
09 October 2023
Approved
26 August 2023
22 September 2023
09 October 2023
Approved
under
26 August 2023
26 October 2023
01 November 2023
Approved
26 August 2023
22 September 2023
09 October 2023
Approved
26 August 2023
22 September 2023
09 October 2023
Approved
26 August 2023
22 September 2023
09 October 2023
Approved
26 August 2023
26 October 2023
01 November 2023
Approved
26 August 2023
22 September 2023
09 October 2023
Approved
26 August 2023
26 October 2023
01 November 2023
Approved
Released 26 August 2023 22 September 2023 09 October 2023 Approved
26 August 2023
26 October 2023
01 November 2023
Approved
26 August 2023
22 September 2023
09 October 2023
Approved
26 August 2023
22 September 2023
09 October 2023
Approved
26 August 2023
26 October 2023
01 November 2023
Approved
Page 66 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
26 August 2023
26 October 2023
01 November 2023
Approved
26 August 2023
22 September 2023
09 October 2023
Approved
26 August 2023
22 September 2023
09 October 2023
Approved
26 August 2023
22 September 2023
09 October 2023
Approved
26 August 2023
22 September 2023
09 October 2023
Approved
26 August 2023
26 October 2023
01 November 2023
Approved
1982
26 August 2023
26 October 2023
01 November 2023
Approved
26 August 2023
22 September 2023
09 October 2023
Approved
26 August 2023
26 October 2023
01 November 2023
Approved
Act
26 August 2023
26 October 2023
01 November 2023
Approved
26 August 2023
26 October 2023
01 November 2023
Approved
26 August 2023
22 September 2023
09 October 2023
Approved
26 August 2023
22 September 2023
09 October 2023
Approved
26 August 2023
22 September 2023
09 October 2023
Approved
26 August 2023
22 September 2023
09 October 2023
Approved
26 August 2023
22 September 2023
09 October 2023
Approved
26 August 2023
22 September 2023
09 October 2023
Approved
26 August 2023
26 October 2023
01 November 2023
Approved
Information
26 August 2023
26 October 2023
01 November 2023
Approved
26 August 2023
26 October 2023
01 November 2023
Approved
26 August 2023
22 September 2023
09 October 2023
Approved
26 August 2023
26 October 2023
Processing
26 August 2023
07 November 2023
Processing
26 August 2023
07 November 2023
Processing
Official
26 August 2023
22 September 2023
Processing
26 August 2023
22 September 2023
Processing
26 August 2023
26 October 2023
Processing
the
26 August 2023
26 October 2023
Processing
26 August 2023
22 September 2023
Processing
26 August 2023
26 October 2023
Processing
26 August 2023
07 November 2023
Processing
26 August 2023
22 September 2023
Processing
under
26 August 2023
26 October 2023
Processing
26 August 2023
26 October 2023
Processing
26 August 2023
26 October 2023
Processing
26 August 2023
26 October 2023
Processing
26 August 2023
07 November 2023
Processing
26 August 2023
26 October 2023
Processing
26 August 2023
26 October 2023
Processing
Released 26 August 2023 26 October 2023
Processing
26 August 2023
26 October 2023
Processing
26 August 2023
22 September 2023
Processing
26 August 2023
22 September 2023
Processing
26 August 2023
26 October 2023
Processing
Page 67 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
26 August 2023
Unassigned
26 August 2023
Unassigned
26 August 2023
Unassigned
26 August 2023
Unassigned
26 August 2023
Unassigned
26 August 2023
Unassigned
1982
26 August 2023
Unassigned
26 August 2023
Unassigned
26 August 2023
Unassigned
Act
26 August 2023
Unassigned
26 August 2023
Unassigned
26 August 2023
Unassigned
26 August 2023
Unassigned
27 August 2023
22 September 2023
16 October 2023
Approved
27 August 2023
22 September 2023
11 October 2023
Approved
27 August 2023
22 September 2023
11 October 2023
Approved
27 August 2023
22 September 2023
11 October 2023
Approved
27 August 2023
26 October 2023
03 November 2023
Approved
Information
27 August 2023
22 September 2023
11 October 2023
Approved
27 August 2023
22 September 2023
11 October 2023
Approved
27 August 2023
27 October 2023
03 November 2023
Approved
27 August 2023
22 September 2023
11 October 2023
Approved
27 August 2023
22 September 2023
11 October 2023
Approved
27 August 2023
22 September 2023
11 October 2023
Approved
Official
27 August 2023
22 September 2023
11 October 2023
Approved
27 August 2023
26 October 2023
01 November 2023
Approved
27 August 2023
26 October 2023
01 November 2023
Approved
the
27 August 2023
26 October 2023
01 November 2023
Approved
27 August 2023
26 October 2023
01 November 2023
Approved
27 August 2023
26 October 2023
01 November 2023
Approved
27 August 2023
22 September 2023
16 October 2023
Approved
27 August 2023
22 September 2023
11 October 2023
Approved
under
27 August 2023
26 October 2023
03 November 2023
Approved
27 August 2023
26 October 2023
01 November 2023
Approved
27 August 2023
22 September 2023
11 October 2023
Approved
27 August 2023
22 September 2023
09 October 2023
Approved
27 August 2023
26 October 2023
01 November 2023
Approved
27 August 2023
22 September 2023
11 October 2023
Approved
27 August 2023
22 September 2023
16 October 2023
Approved
Released 27 August 2023 27 October 2023 01 November 2023 Approved
27 August 2023
26 October 2023
01 November 2023
Approved
27 August 2023
27 October 2023
01 November 2023
Approved
27 August 2023
27 October 2023
01 November 2023
Approved
27 August 2023
22 September 2023
16 October 2023
Approved
Page 68 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
27 August 2023
22 September 2023
11 October 2023
Approved
27 August 2023
22 September 2023
11 October 2023
Approved
27 August 2023
22 September 2023
11 October 2023
Approved
27 August 2023
22 September 2023
11 October 2023
Approved
27 August 2023
26 October 2023
01 November 2023
Approved
27 August 2023
22 September 2023
17 October 2023
Approved
1982
27 August 2023
27 October 2023
03 November 2023
Approved
27 August 2023
26 October 2023
01 November 2023
Approved
27 August 2023
22 September 2023
11 October 2023
Approved
Act
27 August 2023
22 September 2023
17 October 2023
Approved
27 August 2023
22 September 2023
16 October 2023
Approved
27 August 2023
22 September 2023
11 October 2023
Approved
27 August 2023
22 September 2023
16 October 2023
Approved
27 August 2023
27 October 2023
Processing
27 August 2023
07 November 2023
Processing
27 August 2023
07 November 2023
Processing
27 August 2023
26 October 2023
Processing
27 August 2023
26 October 2023
Processing
Information
27 August 2023
27 October 2023
Processing
27 August 2023
27 October 2023
Processing
27 August 2023
26 October 2023
Processing
27 August 2023
26 October 2023
Processing
27 August 2023
27 October 2023
Processing
27 August 2023
07 November 2023
Processing
Official
27 August 2023
07 November 2023
Processing
27 August 2023
26 October 2023
Processing
27 August 2023
07 November 2023
Processing
the
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
under
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
Released 27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
Page 69 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
1982
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
Act
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
Information
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
Official
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
the
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
under
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
27 August 2023
Unassigned
Released 27 August 2023
Unassigned
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
25 September 2023
16 October 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
25 September 2023
16 October 2023
Approved
Page 70 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
28 August 2023
28 October 2023
03 November 2023
Approved
28 August 2023
25 September 2023
16 October 2023
Approved
28 August 2023
28 October 2023
03 November 2023
Approved
28 August 2023
25 September 2023
16 October 2023
Approved
28 August 2023
27 October 2023
03 November 2023
Approved
28 August 2023
28 October 2023
03 November 2023
Approved
1982
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
25 September 2023
16 October 2023
Approved
28 August 2023
27 October 2023
03 November 2023
Approved
Act
28 August 2023
27 October 2023
03 November 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
28 October 2023
03 November 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
25 September 2023
16 October 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
25 September 2023
16 October 2023
Approved
28 August 2023
28 October 2023
03 November 2023
Approved
Information
28 August 2023
25 September 2023
16 October 2023
Approved
28 August 2023
28 October 2023
03 November 2023
Approved
28 August 2023
28 October 2023
03 November 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
Official
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
25 September 2023
16 October 2023
Approved
the
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
27 October 2023
03 November 2023
Approved
28 August 2023
25 September 2023
16 October 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
under
28 August 2023
28 October 2023
03 November 2023
Approved
28 August 2023
25 September 2023
16 October 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
25 September 2023
16 October 2023
Approved
28 August 2023
27 October 2023
03 November 2023
Approved
28 August 2023
25 September 2023
16 October 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
Released 28 August 2023 22 September 2023 16 October 2023 Approved
28 August 2023
25 September 2023
16 October 2023
Approved
28 August 2023
27 October 2023
03 November 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
Page 71 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
25 September 2023
16 October 2023
Approved
28 August 2023
25 September 2023
16 October 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
25 September 2023
16 October 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
1982
28 August 2023
27 October 2023
03 November 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
Act
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
27 October 2023
03 November 2023
Approved
28 August 2023
28 October 2023
03 November 2023
Approved
28 August 2023
27 October 2023
03 November 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
22 September 2023
16 October 2023
Approved
28 August 2023
27 October 2023
Processing
28 August 2023
27 October 2023
Processing
28 August 2023
27 October 2023
Processing
Information
28 August 2023
28 October 2023
Processing
28 August 2023
28 October 2023
Processing
28 August 2023
27 October 2023
Processing
28 August 2023
27 October 2023
Processing
28 August 2023
27 October 2023
Processing
28 August 2023
27 October 2023
Processing
Official
28 August 2023
27 October 2023
Processing
28 August 2023
27 October 2023
Processing
28 August 2023
28 October 2023
Processing
the
28 August 2023
27 October 2023
Processing
28 August 2023
27 October 2023
Processing
28 August 2023
27 October 2023
Processing
28 August 2023
27 October 2023
Processing
28 August 2023
27 October 2023
Processing
under
28 August 2023
27 October 2023
Processing
28 August 2023
27 October 2023
Processing
28 August 2023
27 October 2023
Processing
28 August 2023
27 October 2023
Processing
28 August 2023
27 October 2023
Processing
28 August 2023
28 October 2023
Processing
28 August 2023
27 October 2023
Processing
Released 28 August 2023 27 October 2023
Processing
28 August 2023
27 October 2023
Processing
28 August 2023
27 October 2023
Processing
28 August 2023
27 October 2023
Processing
28 August 2023
Unassigned
Page 72 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
1982
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
Act
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
Information
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
Official
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
the
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
under
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
Released 28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
28 August 2023
Unassigned
Page 73 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
28 August 2023
Unassigned
29 August 2023
25 September 2023
16 October 2023
Approved
29 August 2023
30 October 2023
03 November 2023
Approved
29 August 2023
25 September 2023
16 October 2023
Approved
29 August 2023
30 October 2023
03 November 2023
Approved
29 August 2023
30 October 2023
03 November 2023
Approved
1982
29 August 2023
25 September 2023
16 October 2023
Approved
29 August 2023
25 September 2023
16 October 2023
Approved
29 August 2023
25 September 2023
16 October 2023
Approved
Act
29 August 2023
25 September 2023
16 October 2023
Approved
29 August 2023
30 October 2023
03 November 2023
Approved
29 August 2023
30 October 2023
03 November 2023
Approved
29 August 2023
25 September 2023
16 October 2023
Approved
29 August 2023
30 October 2023
03 November 2023
Approved
29 August 2023
30 October 2023
03 November 2023
Approved
29 August 2023
30 October 2023
03 November 2023
Approved
29 August 2023
26 September 2023
16 October 2023
Approved
29 August 2023
25 September 2023
16 October 2023
Approved
Information
29 August 2023
25 September 2023
16 October 2023
Approved
29 August 2023
30 October 2023
03 November 2023
Approved
29 August 2023
25 September 2023
16 October 2023
Approved
29 August 2023
30 October 2023
03 November 2023
Approved
29 August 2023
25 September 2023
16 October 2023
Approved
29 August 2023
25 September 2023
16 October 2023
Approved
Official
29 August 2023
25 September 2023
16 October 2023
Approved
29 August 2023
25 September 2023
16 October 2023
Approved
29 August 2023
25 September 2023
16 October 2023
Approved
the
29 August 2023
25 September 2023
16 October 2023
Approved
29 August 2023
30 October 2023
03 November 2023
Approved
29 August 2023
25 September 2023
16 October 2023
Approved
29 August 2023
25 September 2023
16 October 2023
Approved
29 August 2023
25 September 2023
16 October 2023
Approved
under
29 August 2023
25 September 2023
16 October 2023
Approved
29 August 2023
25 September 2023
16 October 2023
Approved
29 August 2023
26 September 2023
16 October 2023
Approved
29 August 2023
25 September 2023
16 October 2023
Approved
29 August 2023
26 September 2023
16 October 2023
Approved
29 August 2023
30 October 2023
03 November 2023
Approved
29 August 2023
25 September 2023
16 October 2023
Approved
Released 29 August 2023 26 September 2023 16 October 2023 Approved
29 August 2023
25 September 2023
Processing
29 August 2023
25 September 2023
Processing
29 August 2023
30 October 2023
Processing
29 August 2023
25 September 2023
Processing
Page 74 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
29 August 2023
25 September 2023
Processing
29 August 2023
30 October 2023
Processing
29 August 2023
25 September 2023
Processing
29 August 2023
25 September 2023
Processing
29 August 2023
30 October 2023
Processing
29 August 2023
30 October 2023
Processing
1982
29 August 2023
25 September 2023
Processing
29 August 2023
30 October 2023
Processing
29 August 2023
25 September 2023
Processing
Act
29 August 2023
25 September 2023
Processing
29 August 2023
30 October 2023
Processing
29 August 2023
30 October 2023
Processing
29 August 2023
30 October 2023
Processing
29 August 2023
25 September 2023
Processing
29 August 2023
25 September 2023
Processing
29 August 2023
30 October 2023
Processing
29 August 2023
30 October 2023
Processing
29 August 2023
30 October 2023
Processing
Information
29 August 2023
30 October 2023
Processing
29 August 2023
30 October 2023
Processing
29 August 2023
30 October 2023
Processing
29 August 2023
25 September 2023
Processing
29 August 2023
25 September 2023
Processing
29 August 2023
30 October 2023
Processing
Official
29 August 2023
25 September 2023
Processing
29 August 2023
25 September 2023
Processing
29 August 2023
30 October 2023
Processing
the
29 August 2023
25 September 2023
Processing
29 August 2023
30 October 2023
Processing
29 August 2023
30 October 2023
Processing
29 August 2023
Unassigned
29 August 2023
Unassigned
under
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
Released 29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
Page 75 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
1982
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
Act
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
Information
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
Official
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
the
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
under
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
Released 29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
Page 76 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
1982
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
Act
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
29 August 2023
Unassigned
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
30 October 2023
03 November 2023
Approved
30 August 2023
26 September 2023
16 October 2023
Approved
Information
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
30 October 2023
03 November 2023
Approved
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
26 September 2023
16 October 2023
Approved
Official
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
26 September 2023
16 October 2023
Approved
the
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
30 October 2023
03 November 2023
Approved
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
30 October 2023
03 November 2023
Approved
30 August 2023
26 September 2023
16 October 2023
Approved
under
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
30 October 2023
03 November 2023
Approved
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
30 October 2023
03 November 2023
Approved
Released 30 August 2023 26 September 2023 16 October 2023 Approved
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
30 October 2023
03 November 2023
Approved
30 August 2023
30 October 2023
03 November 2023
Approved
Page 77 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
30 August 2023
30 October 2023
03 November 2023
Approved
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
30 October 2023
03 November 2023
Approved
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
30 October 2023
03 November 2023
Approved
30 August 2023
26 September 2023
16 October 2023
Approved
1982
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
26 September 2023
16 October 2023
Approved
Act
30 August 2023
26 September 2023
16 October 2023
Approved
30 August 2023
30 October 2023
03 November 2023
Approved
30 August 2023
30 October 2023
03 November 2023
Approved
30 August 2023
30 October 2023
Processing
30 August 2023
30 October 2023
Processing
30 August 2023
30 October 2023
Processing
30 August 2023
30 October 2023
Processing
30 August 2023
30 October 2023
Processing
30 August 2023
30 October 2023
Processing
Information
30 August 2023
30 October 2023
Processing
30 August 2023
30 October 2023
Processing
30 August 2023
30 October 2023
Processing
30 August 2023
30 October 2023
Processing
30 August 2023
30 October 2023
Processing
30 August 2023
30 October 2023
Processing
Official
30 August 2023
30 October 2023
Processing
30 August 2023
30 October 2023
Processing
30 August 2023
Unassigned
the
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
under
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
Released 30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
Page 78 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
1982
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
Act
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
Information
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
Official
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
the
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
under
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
Released 30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
Page 79 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
1982
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
Act
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
Information
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
Official
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
the
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
30 August 2023
Unassigned
under
30 August 2023
Unassigned
30 August 2023
Unassigned
31 August 2023
26 September 2023
16 October 2023
Approved
31 August 2023
26 September 2023
16 October 2023
Approved
31 August 2023
31 October 2023
03 November 2023
Approved
31 August 2023
31 October 2023
03 November 2023
Approved
31 August 2023
30 October 2023
03 November 2023
Approved
Released 31 August 2023 31 October 2023 03 November 2023 Approved
31 August 2023
31 October 2023
06 November 2023
Approved
31 August 2023
26 September 2023
16 October 2023
Approved
31 August 2023
26 September 2023
16 October 2023
Approved
31 August 2023
31 October 2023
03 November 2023
Approved
Page 80 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
31 August 2023
26 September 2023
16 October 2023
Approved
31 August 2023
26 September 2023
16 October 2023
Approved
31 August 2023
26 September 2023
16 October 2023
Approved
31 August 2023
26 September 2023
16 October 2023
Approved
31 August 2023
26 September 2023
16 October 2023
Approved
31 August 2023
26 September 2023
16 October 2023
Approved
1982
31 August 2023
26 September 2023
16 October 2023
Approved
31 August 2023
26 September 2023
16 October 2023
Approved
31 August 2023
26 September 2023
16 October 2023
Approved
Act
31 August 2023
11 September 2023
20 September 2023
Approved
31 August 2023
31 October 2023
03 November 2023
Approved
31 August 2023
31 October 2023
03 November 2023
Approved
31 August 2023
26 September 2023
16 October 2023
Approved
31 August 2023
26 September 2023
16 October 2023
Approved
31 August 2023
30 October 2023
03 November 2023
Approved
31 August 2023
30 October 2023
03 November 2023
Approved
31 August 2023
26 September 2023
16 October 2023
Approved
31 August 2023
31 October 2023
03 November 2023
Approved
Information
31 August 2023
26 September 2023
16 October 2023
Approved
31 August 2023
26 September 2023
16 October 2023
Approved
31 August 2023
26 September 2023
16 October 2023
Approved
31 August 2023
26 September 2023
16 October 2023
Approved
31 August 2023
26 September 2023
16 October 2023
Approved
31 August 2023
26 September 2023
16 October 2023
Approved
Official
31 August 2023
31 October 2023
06 November 2023
Approved
31 August 2023
31 October 2023
06 November 2023
Approved
31 August 2023
26 September 2023
16 October 2023
Approved
the
31 August 2023
31 October 2023
03 November 2023
Approved
31 August 2023
31 October 2023
Processing
31 August 2023
30 October 2023
Processing
31 August 2023
31 October 2023
Processing
31 August 2023
31 October 2023
Processing
under
31 August 2023
31 October 2023
Processing
31 August 2023
31 October 2023
Processing
31 August 2023
31 October 2023
Processing
31 August 2023
31 October 2023
Processing
31 August 2023
31 October 2023
Processing
31 August 2023
31 October 2023
Processing
31 August 2023
31 October 2023
Processing
Released 31 August 2023 31 October 2023
Processing
31 August 2023
31 October 2023
Processing
31 August 2023
31 October 2023
Processing
31 August 2023
30 October 2023
Processing
31 August 2023
Unassigned
Page 81 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
1982
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
Act
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
Information
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
Official
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
the
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
under
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
Released 31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
Page 82 of 86
Date started
Current
Date Received
processing
Date of Outcome
Status
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
1982
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
Act
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
Unassigned
31 August 2023
06 November 2023
Withdrawn
Table 2: Current status of citizenship by grant applications for August 2023
by country of birth Information
Country of Birth
Approved Processing Unassigned Withdrawn
Afghanistan
<5
.
43
.
American Samoa
.
<5
.
.
Argentina
24
<5
<5
.
Australia
<5
<5
30
.
Official
Bangladesh
<5
<5
<5
.
Bechuanaland
.
.
<5
.
Belarus
.
.
<5
.
the
Belgium
<5
.
<5
.
Bosnia and Herzegovina
.
.
<5
.
Botswana
<5
.
.
.
Brazil
27
5
19
.
Cambodia
.
.
11
.
under
Cameroon
.
.
<5
.
Canada
11
<5
8
.
Central African Republic
.
.
.
<5
Chile
9
<5
11
.
China
81
31
116
.
Colombia
10
<5
18
.
Congo, the Democratic Republic of the
.
.
<5
.
Released
Croatia
<5
.
.
.
Cuba
<5
.
.
.
Cyprus
.
.
<5
.
Czech Republic
6
.
.
.
Denmark
.
.
<5
.
Page 83 of 86
Country of Birth
Approved Processing Unassigned Withdrawn
Dominican Republic
.
<5
.
.
Ecuador
.
.
<5
.
Egypt
<5
.
8
.
El Salvador
.
<5
.
.
Estonia
<5
<5
.
.
Ethiopia
.
.
6
.
Fiji
68
11
99
.
1982
Finland
<5
.
<5
.
France
15
<5
<5
.
Germany
19
.
13
.
Act
Germany, Federal Republic of
.
.
<5
.
Ghana
.
<5
.
.
Greece
<5
.
.
.
Hong Kong (SAR)
.
<5
21
.
Hungary
<5
.
6
.
India
245
43
191
.
Indonesia
8
<5
8
.
Iran (Islamic Republic of)
11
<5
18
.
Iraq
5
.
14
.
Information
Ireland
10
.
14
.
Israel
<5
.
6
.
Italy
7
<5
<5
.
Japan
<5
<5
<5
.
Jordan
<5
.
8
.
Kazakhstan
<5
.
5
.
Official
Kenya
<5
<5
<5
.
Kiribati
<5
<5
9
.
the
Kyrgyzstan
.
.
<5
.
Lebanon
<5
<5
5
.
Lesotho
.
.
<5
.
Libya
<5
.
<5
.
Lithuania
<5
.
.
.
Macedonia, the former Yugoslav
under
Republic of
.
.
<5
.
Malaysia
13
<5
34
.
Malta
<5
.
.
.
Mauritius
.
<5
.
.
Mexico
8
<5
5
.
Monaco
.
.
<5
.
Morocco
.
.
<5
.
Released
Myanmar
.
.
23
.
Namibia
<5
.
.
.
Nauru
.
.
5
.
Nepal
<5
<5
10
.
Netherlands
<5
<5
5
.
Page 84 of 86
Country of Birth
Approved Processing Unassigned Withdrawn
New Caledonia
<5
<5
.
.
New Zealand
13
23
150
.
Nicaragua
.
.
<5
.
Nigeria
<5
<5
<5
.
Norway
<5
.
<5
.
Oman
<5
.
.
.
Pakistan
6
<5
20
.
1982
Papua New Guinea
<5
.
<5
.
Peru
<5
.
.
.
Philippines
153
8
115
.
Act
Pitcairn
<5
.
.
.
Poland
<5
.
.
.
Qatar
.
.
<5
.
Rhodesia
.
.
<5
.
Romania
<5
<5
<5
.
Russia
<5
.
5
.
Russian Federation
<5
.
.
.
Russian Soviet Federative Socialist
Republic
.
.
<5
.
Information
Samoa
<5
150
32
.
Serbia
<5
.
<5
.
Singapore
9
.
<5
.
Slovakia
.
.
<5
.
Slovenia
<5
.
.
.
Solomon Islands
.
.
<5
.
Official
South Africa
209
19
156
<5
South Africa, Union of
.
.
<5
.
South Korea
8
<5
30
.
the
South Sudan
.
.
<5
.
Spain
<5
<5
9
.
Sri Lanka
35
<5
38
.
Sudan
.
.
<5
.
Sweden
<5
.
.
.
under
Switzerland
<5
<5
.
.
Syria
<5
5
8
.
Syrian Arab Republic
.
.
8
.
Taiwan
9
6
9
.
Tanganyika
.
.
<5
.
Thailand
14
<5
19
.
Tonga
20
7
40
.
Released
Turkey
5
<5
<5
.
Tuvalu
<5
<5
11
.
Ukraine
.
<5
7
.
Union of Soviet Socialist Republics
<5
.
.
.
United Arab Emirates
<5
<5
<5
.
Page 85 of 86
Country of Birth
Approved Processing Unassigned Withdrawn
United Kingdom
200
25
192
<5
United States of America
41
6
38
.
Unknown Country ID
.
<5
18
.
Uzbekistan
<5
.
.
.
Vanuatu
.
.
<5
.
Venezuela, Bolivarian Republic of
<5
.
<5
.
Vietnam
14
5
15
.
1982
Zambia
<5
.
<5
.
Zimbabwe
7
<5
16
.
Act