This is an HTML version of an attachment to the Official Information request 'Victoria Street Footpath Reinstatement'.




CONTRACTOR TO VERIFY DIMENSIONS ON SITE BEFORE CONSTRUCTION 
30mm chamfer at 45 degrees
2 927.7
 metre Maximum
30
100
150
M10 Bolt
150
100mm galv jolt head nails
750
125
Skew nail as shown
150
128
150
175
(Mowing Strip Optional)
Concrete Footing
17 mPa at 21 days
500
Construction Notes:
-  150 x 50 H4 Rough Sawn Pine to create Posts
-  150 x 50 H4 Rough Sawn Pine for Rails
75
-  M10 Galv Round Head Bolts to hold rails; counter sink nut and washer end
-  Mowing strip may be required in grassed areas
 
 
 
ISSUE
DATE
REVISION
PROJECT
PROJECT #
Mt Victoria
Mt
WCC
 Lookout
 Victoria
 Parks Two Rail Fence
14/0011 
CLIENT
DATE #
DATE
Date
14-8-14 DWG #
Parks Sports
Parks
 &
 Sports  Recreation
SCALE @
SCALE
 A3
 @
1:100
1:10 M296-01
DWG
DRAWN
DWG
Details
C Gordon
Details
C
Details
CHKD
C Gordon
C
REVISION
   
Wellington 
Wellington  City
 
 Council
 City
 Architects
 Council
 
 Architects  - Landscape
 -
 Architects
 Landscape
 - Urban Design

Document Outline