This is an HTML version of an attachment to the Official Information request 'National numbers of sealed road network'.
   
44 Bowen Street 
Private Bag 6995 
 
Wellington 6141 
New Zealand 
 
T 64 4 894 5400 
 
F 64 4 894 6100 
 
www.nzta.govt.nz 
 
 
 
 
 
 
 
31 January 2024 
 
 
 
  
Cyclist Fan 
[FYI request #25359 email] 
REF: OIA-14410 
 
Dear Cyclist Fan 
 
Request made under the Official Information Act 1982 
 
Thank you for your email of 9 January 2024 requesting the following information under the Official 
Information Act 1982 (the Act): 
 
What is the total km of sealed road network in Aotearoa?  
How many km of road are being replaced per year?  
What is the funding gap between current expenditure by the Government (including National's 
$500 mil ion funding promise), and actual budget required to sustainable replace al  roads in 
NZ over the lifespan of 25 and 40 years of the road. 

 
I wil  respond to each of your questions in turn.  
 
What is the total km of sealed road network in Aotearoa?  
 
As at 2022/23, and noting that the network grows each year, there were 65,633.3km of sealed roads, 
of which 11,072.3km are a state highway. Further information on the length of urban and rural, sealed 
and unsealed roads is publicly available at www.nzta.govt.nz/planning-and-investment/learning-and-
resources/transport-data/data-and-tools/.
  2022/23 is the most up to date information we have. This 
information is updated annually for financial years ended 30 June.  
 
How many km of road are being replaced per year?  
 
Please see Attachment A which shows the length of roads being built, reconstructed or seal extended 
across New Zealand.  
 
Further information on the length of roads being built, reconstructed or seal is publicly available at 
www.nzta.govt.nz/planning-and-investment/learning-and-resources/transport-data/data-and-tools/. 
 
What is the funding gap between current expenditure by the Government (including National's $500 
mil ion funding promise), and actual budget required to sustainable replace all roads in NZ over the 
lifespan of 25 and 40 years of the road. 
 
 
  


NZ Transport Agency Waka Kotahi (NZTA) does not hold this information in the form you have 
requested it. NZTA provided advice to the Minister of Transport on 30 November 2023 on asset 
condition and maintenance. Sections of this briefing would be relevant to your request with respect to 
state highways only. This advice is being withheld in ful  under section 9(2)(f)(iv) which al ows for the 
withholding of information to maintain the constitutional conventions for the time being which protect 
the confidentiality of advice tendered by Ministers of the Crown and officials. 
 
In September 2023, NZTA also published a State highway investment proposal 2024-34 available at: 
https://www.nzta.govt.nz/resources/state-highway-investment-proposal-2024-34/ 
 
While the above proposal covers investment in maintenance and renewal of state highways over the 
next 10 years, it is likely to be revised as a new Government Policy Statement (GPS) is being 
developed to reflect Government investment priorities. Each local Roading Control Authority (RCA) wil  
also have a maintenance and renewal investment plan for their region once a new GPS comes into 
effect. 
 
With respect to the information that has been withheld from your request, I do not consider there are 
any other factors which would render it desirable, in the public interest, to make the information 
available. 
 
Under section 28 of the Act, you have the right to ask the Ombudsman to review my decision to 
withhold this information. The contact details for the Ombudsman can be located at 
www.ombudsman.parliament.nz. 
 
If you would like to discuss this reply with Waka Kotahi, please contact Ministerial Services by email to 
[email address]  
 
 
Yours sincerely 
 
 
 
 
 
Andrew Clark 
National Manager – Maintenance and Operations 
 
 
 
 
 
 


Attachment A: Length of roads built, reconstructed or ‘seal extended’ measured in lane kilometres – New Zealand 
 
State highway/ 
Work Undertaken 
2011/ 
2012/ 
2013/201
2014/ 
2015/ 
2016/20
2017/ 
2018/ 
2019/2
2020/ 
2021/ 
2022/ 
Region 
local road 
(see Key) 
2012 
2013 

2015 
2016 
17 
2018 
2019 
020 
2021 
2022 
2023 
National 
Local road 
New roads 
46.0* 
77.9 
19.0 
20.1 
16.7 
48.1 
39.9 
86.0 
63.2 
52.4 
69.3 
84.1 
Pavement 
National 
Local road 
rehabilitation 
734.0 
566.0 
1384.9 
630.3 
453.4 
443.0 
436.7 
338.5 
296.1 
324.1 
252.4 
237.6 
National 
Local road 
Resurfacing 
6081.0 
5860.5 
5863.5 
6301.6 
6067.1 
6186.1 
5578.8 
5588.1 
5364.3 
6003.7 
5537.3 
4845.2 
Road 
National 
Local road 
reconstruction 
70.0 
58.4 
32.0 
28.3 
35.617 
234.3 
116.0 
70.4 
108.4 
155.0 
25.1 
40.2 
National 
Local road 
Seal extension 
117.0 
14.2 
32.1 
19.6 
26.8 
33.7 
73.1 
88.2 
53.9 
85.2 
12.7 
30.2 
 
National 
State highway 
New roads 
12.0 
18.0 
68.2 
5.1 
15.6 
96.5 

5.0 
226.9 

16.8 
158.9 
Pavement 
National 
State highway 
rehabilitation 
285.0 
231.1 
274.0 
182.0 
118.5 
72.3 
115.3 
154.0 
138.3 
114.5 
120.1 
100.8 
National 
State highway 
Resurfacing 
2053.0 
2402.9 
2185.0 
1592.0 
1071.5 
1167.3 
1596.5 
2141.6 
1975.6 
1733.3 
2118.5 
1988.1 
Road 
-
National 
State highway 
reconstruction 
21.0 

38.0 
2.7 
2.8 

73.4 
177.0 
38.1 

42.6 
14.3 
National 
State highway 
Seal extension 
4.0 
 
 
 
 
 
 
 
1.0 
 
 
 
 
* Figures have been rounded to 1 decimal point 
Key 
Works 
Details 
New roads 
The construction of a new road or road link that is additional to the existing road network, including any associated 
new road structures. 
Road reconstruction 
Improvements to or upgrading of existing roads 
Seal extension 
The sealing of existing unsealed roads. 
Resurfacing 
Renewals based on Resurfacing of Reseals 
Unsealed road metalling  Renewals based on Unsealed road metalling 
Rehabilitation 
Renewals based on Rehabilitation (Pavement rehabilitation, Area wide pavement treatment, Pavement smoothing) 
 
Source: Number and length of roads built, reconstructed or seal extended