PrimaryKey,DateUpdated,ProcuringAgencyOrganisation,ProjectName,ProjectShortDescription,ParentProjectID,ProjectStatus,FundingStatus,ProcurementType,ProcurementMethod,ProjectRegion,ProjectCityTown,ProjectSuburb,ProjectSector,EstimatedProjectValueRange,EstimatedQuarterBusinessCaseStart,EstimatedQuarterBusinessCaseCompletion,EstimatedQuarterProcurementStart,EstimatedQuarterProcurementCompletion,EstimatedQuarterConstructionStart,EstimatedQuarterConstructionCompletion,EstimatedQuarterProjectRangeStart,EstimatedQuarterProjectRangeCompletion,ProjectInfoURL,EstimatedProjectValueNote,Contact,Latitude,Longitude
IP009598,19/03/2024,Ashburton District Council,Filtration and UV disinfection installation - Multiple Schemes.,Addition of UV and cartridge filtration equipment plus associated building modifications/new buildings.,,In planning,Fully funded,Open,Construct only,Canterbury,,,Water,5 - 25 million,,,,,2024-Q2,,2023-Q4,2025-Q2,,,,,
IP009601,19/03/2024,Ashburton District Council,Watermain renewals 2025/26.,Pipeline renewals typically around 100-150mm size. Mixture of urban and rural.,,In planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,5 - 25 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009602,5/12/2023,Ashburton District Council,Montalto treatment and reticulation upgrades.,Rural water supply. Upgraded treatment system and reticulation renewal.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009603,19/03/2024,Ashburton District Council,Ashburton WWTP aerator renewal.,Replacement of old surface aeration system with a new modern aeration system including control based on DO monitoring. Seeking increased effectiveness and reduced operating costs.,,In procurement,Fully funded,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,2024-Q3,2023-Q3,2024-Q3,,,,,
IP009605,5/12/2023,Ashburton District Council,Ashburton WWTP Fencing Replacement.,Upgrade of existing fencing around oxidation ponds to properly exclude access.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009607,5/12/2023,Ashburton District Council,Sewermain renewals 2025/26.,Pipeline renewals typically around 150-375mm size.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009871,19/03/2024,Ashburton District Council,Rakaia WWTP Sludge Drying Beds.,Installation of sludge drying beds and associated infrastructure.,,In planning,Funding source confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,2024-Q2,2024-Q2,2024-Q3,2024-Q3,2024-Q1,2024-Q4,,,,,
IP009872,19/03/2024,Ashburton District Council,Second Bridge Watermains.,Construction of ~DN300 watermain on Ashburton second bridge and extension along proposed new road connecting back to the existing network.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,,,,,,2025-Q3,2029-Q2,,,,,
IP009873,19/03/2024,Ashburton District Council,Methven WWTP Receiving Screen Renewal.,Renewal of old auger screen for WWTP.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009874,5/12/2023,Ashburton District Council,Rakaia WWTP UV Renewal.,Renewal of old inline UV disinfection system.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2026-Q3,2027-Q2,,,,,
IP009875,5/12/2023,Ashburton District Council,Grit Chamber to River Pipeline Renewal.,Renewal of 1.5km of DN800 trunk sewr.,,In planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP002807,20/12/2023,Auckland Transport,Seismic Strengthening Programme.,Replace/repair the seawall between Princess & Queens Wharves and strengthen Quay Street between Princes & Marsden Wharves against seismic failures.,,Under construction,Fully funded,Direct,Other,Auckland,,,Transport,5 - 25 million,,,,,2019-Q3,2031-Q2,2017-Q4,2031-Q2,
https://at.govt.nz/projects-roadworks/downtown-programme/,,,,
IP002812,20/12/2023,Auckland Transport,Glen Innes to Tamaki Drive Scheme C-Way Section 4a&b.,Provision of an off road Cycle highway from Glen Innes Rail Station to Tamaki Drive.,,In procurement,Fully funded,Selective,Other,Auckland,,,Transport,25 - 50 million,2019-Q2,2019-Q4,2021-Q1,2021-Q2,2021-Q2,2023-Q1,2011-Q4,2023-Q3,
https://at.govt.nz/projects-roadworks/glen-innes-to-tamaki-drive-shared-path/,,,,
IP002817,20/12/2023,Auckland Transport,Glen Innes C-Way - Package 1 - Links to Public Transport.,New infrastructure (including cycle parking) to integrate travel between active travel modes and public transport in Glen Innes.,,Under construction,Fully funded,Selective,Construct only,Auckland,,,Transport,5 - 25 million,,,,2022-Q3,2022-Q4,2023-Q3,2015-Q3,2023-Q4,
https://at.govt.nz/projects-roadworks/links-to-glen-innes-cycleways/,,,,
IP002818,20/12/2023,Auckland Transport,Glen Innes C-Way - Package 2 - Links to Public Transport.,New infrastructure (including cycle parking) to integrate travel between active travel modes and public transport in Glen Innes.,,In planning,Fully funded,Selective,Construct only,Auckland,,,Transport,5 - 25 million,,2022-Q3,2022-Q4,2023-Q1,2023-Q1,2023-Q3,2015-Q3,2023-Q4,
https://at.govt.nz/projects-roadworks/links-to-glen-innes-cycleways/,,,,
IP002820,20/12/2023,Auckland Transport,Pt Chevalier - Herne Bay C-Way.,This project address an infrastructure deficit and improve accessibility providing a basic network of cycle facility.,,In procurement,Fully funded,Selective,Construct only,Auckland,,,Transport,5 - 25 million,,2022-Q3,2022-Q4,2023-Q3,2023-Q3,2025-Q1,2015-Q3,2023-Q1,
https://at.govt.nz/projects-roadworks/pt-chevalier-to-westmere/,,,,
IP002822,20/12/2023,Auckland Transport,Matakana Link Road.,Connect Matakana Road and SH1. This alternative route bypass the SH1 / Hill Street intersection.,,Under construction,Fully funded,Selective,Construct only,Auckland,,,Transport,25 - 50 million,,,2019-Q3,2020-Q2,2020-Q2,2022-Q4,2018-Q3,2023-Q4,
https://at.govt.nz/projects-roadworks/matakana-link-road/,,,,
IP002824,20/12/2023,Auckland Transport,Tamaki Ngapipi Intersection Safety Imp.,To improve the pedestrian and cycle connection on Ngapipi Bridge adjacent to the Tāmaki Drive/ Ngapipi Road intersection.,,In planning,Fully funded,Selective,Construct only,Auckland,,,Transport,5 - 25 million,,,,,2022-Q4,2023-Q3,2019-Q3,2023-Q4,
https://at.govt.nz/projects-roadworks/tamaki-drive-improvements/tamaki-drive-and-ngapipi-road-intersection/,,,,
IP002825,20/12/2023,Auckland Transport,Kumeu-Huapai SHA - Access Road - Phase 1.,Upgrade of Access Road; Developer to upgrade level crossing at Access Road and install pedestrian overbridge between SHA and Matua Road shops.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Transport,5 - 25 million,,,2022-Q3,2022-Q3,2022-Q4,2023-Q3,2016-Q3,2023-Q3,
https://at.govt.nz/projects-roadworks/huapai-triangle-special-housing-area/,,,,
IP002826,20/12/2023,Auckland Transport,Kumeu-Huapai SHA - Station Road.,Upgrade of Access Road; Developer to upgrade level crossing at Access Road and install pedestrian overbridge between SHA and Matua Road shops.,,In procurement,Funding source confirmed,Selective,Construct only,Auckland,,,Transport,5 - 25 million,,2022-Q2,2022-Q2,2022-Q4,2023-Q1,2023-Q4,2016-Q3,2023-Q4,
https://at.govt.nz/projects-roadworks/huapai-triangle-special-housing-area/,,,,
IP002830,20/12/2023,Auckland Transport,Short-term Airport Access.,Localised Bus Priorties from New Lynn Onehunga Botany and Sylvia Park to the Airport.,,Under construction,Fully funded,Selective,Construct only,Auckland,,,Transport,5 - 25 million,,,2020-Q2,2020-Q4,2020-Q4,2024-Q2,2019-Q2,2022-Q4,
https://at.govt.nz/projects-roadworks/airport-to-botany-rapid-transit/,,,,
IP008203,20/12/2023,Auckland Transport,Rosedale and Constellation Bus Stations.,A new Rosedale bus station and improvements to the existing Constellation bus station associated with the extension of the Northern Busway to Albany.,,Under construction,Fully funded,To be determined,Construct only,Auckland,,,Transport,50 - 100 million,,,,,2020-Q1,2025-Q2,2018-Q3,2025-Q2,,,,,
IP008205,20/12/2023,Auckland Transport,Midtown Bus Improvements.,Delivery of bus infrastructure in the CBD including bus priority along Wellesley Street a new learning Quarter bus interchange.,,In planning,Fully funded,To be determined,Construct only,Auckland,,,Transport,100 - 250 million,2021-Q3,2022-Q4,2023-Q1,2023-Q2,2024-Q1,2024-Q2,2021-Q3,2031-Q2,,,,,
IP008206,20/12/2023,Auckland Transport,Northwest Bus Improvements.,Bus Station at Westgate and bus stops at Lincoln Road and Te Atatu motorway interchanges. This will be delivered with part-funding from the COVID Response and Recovery Fund.,,Under construction,Fully funded,To be determined,Construct only,Auckland,,,Transport,50 - 100 million,2021-Q3,2022-Q4,2021-Q3,2023-Q2,2021-Q3,2026-Q2,2021-Q3,2031-Q2,,,,,
IP008208,20/12/2023,Auckland Transport,Carrington Road Improvements.,Provision of intersection improvements bus lanes and new bus facilities to support the UNITEC precinct redevelopment in Mt Albert.,,In planning,Funding source confirmed,To be determined,Construct only,Auckland,,,Transport,50 - 100 million,2022-Q3,2023-Q2,2027-Q1,2027-Q2,2027-Q3,2029-Q2,2026-Q3,2029-Q2,,,,,
IP008210,20/12/2023,Auckland Transport,Albert and Vincent Street Bus Priority Improvements.,Bus priority measures on Albert and Vincent Streets to improve journey time and reliability between Karangahape Road and Britomart.,,In procurement,Fully funded,To be determined,Construct only,Auckland,,,Transport,5 - 25 million,2024-Q1,,,,2024-Q3,2025-Q1,2028-Q3,2025-Q2,,,,,
IP008215,20/12/2023,Auckland Transport,Ormiston Town Centre Link.,A new road link to provide shorter access towards the emerging Ormiston Town Centre. This includes walking and cycling facilities.,,Under construction,Fully funded,To be determined,Construct only,Auckland,,,Transport,5 - 25 million,,,,,2021-Q3,2023-Q2,2021-Q3,2030-Q2,,,,,
IP008219,20/12/2023,Auckland Transport,Hill Street Intersection Improvement.,Upgrade and reconfiguration of two intersections on State Highway 1 and Sandspit Road in Warkworth to improve movement for all modes.,,In planning,Funding source to be confirmed,To be determined,Construct only,Auckland,,,Transport,5 - 25 million,2021-Q4,2023-Q1,,,,,2021-Q3,2025-Q2,,,,,
IP008220,20/12/2023,Auckland Transport,Eastern Busway Stages 2 to 3.,Completion of the Rapid Transit Busway including the Reeves Road flyover new bus interchanges at Pakuranga and Botany and associated safety and cycling works which will create faster more reliable transport options for communities in East and South Auckland.,,Under construction,Fully funded,To be determined,Alliance,Auckland,,,Transport,500 million - 1 billion,,,,,2022-Q3,2029-Q2,2021-Q3,2029-Q2,,,,,
IP009904,20/12/2023,Auckland Transport,Flood/Storm Recovery.,Asset renewals and maintenance in response to adverse weather events.,,Under construction,Fully funded,To be determined,Construct only,Auckland,,,Transport,250 - 500 million,,,,,2023-Q1,2027-Q4,2023-Q1,2027-Q4,,,,,
IP010698,14/03/2025,Auckland Zoo,Masterplan Stage 3 (MP3).,Masterplan Stage 3 is focused on renewing and improving the visitor experience and the interface with our communities. The programme is split into three projects: Project 1: Takutai/NZ Coast Nature Play & Savannah III Project 2: Africa Safari Connection Project 3: Arrival and Community Experience.,,In planning,Part funded,To be determined,Early contractor involvement,Auckland,,,Other not specified,50 - 100 million,,,,,,,2023-Q3,2030-Q3,,,,,
IP004840,14/03/2024,Bay of Plenty Regional Council,Whakatane River flood protection - Urban. Project Future Proof.,Community consultation. Upgrade of existing stopbanks and floodwalls in accordance with the Rivers and Drainage Asset Management Plan.,,Under construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Water,5 - 25 million,2020-Q4,2021-Q2,,,2023-Q3,2027-Q2,2020-Q4,2027-Q2,,,,,
IP004841,14/03/2024,Bay of Plenty Regional Council,Ngongotaha Flood Mitigation Works.,Flood risk management work. Where appropriate upgrade of existing and establishment of new flood protection structures in the lower Ngongataha catchment - Rotorua.,,In planning,Fully funded,To be determined,To be determined,Bay of Plenty,,,Water,5 - 25 million,2020-Q4,2021-Q2,,,2024-Q3,2027-Q2,2019-Q3,2027-Q2,,,,,
IP006663,14/03/2024,Bay of Plenty Regional Council,Ford Road Pump Station Replacement.,Remove existing pump station and build a new pump station adjacent to the Diagonal Drain pump station.,,Under construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Water,5 - 25 million,2020-Q4,2021-Q2,,,2023-Q3,2025-Q2,2021-Q3,2025-Q2,,,,,
IP006664,14/03/2024,Bay of Plenty Regional Council,Te Puke Storm Water.,Implement storm water mitigation solutions to account for increased run-off into scheme drainage system.,,Under construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Water,1 - 5 million,2020-Q4,2021-Q2,,,2023-Q3,2024-Q2,2022-Q3,2024-Q2,,,,,
IP006666,14/03/2024,Bay of Plenty Regional Council,Lake Rotorua (upper Kaituna) streams flood defence upgrades.,Flood risk management work. Where appropriate upgrade of existing and establishment of new flood protection structures in the Utuhina catchment - Rotorua in accordance with Rivers and Drainage AMP.,,In planning,Fully funded,To be determined,To be determined,Bay of Plenty,,,Water,1 - 5 million,2020-Q4,2021-Q2,,,2024-Q3,2027-Q2,2019-Q3,2027-Q2,,,,,
IP010695,14/03/2024,Bay of Plenty Regional Council,Lower Kaituna stopbank upgrades.,Stopbanks in the lower Kaituna River area will be upgraded to meet levels of service.,,In planning,Fully funded,To be determined,To be determined,Bay of Plenty,,,Water,1 - 5 million,2023-Q4,2024-Q2,,,2025-Q3,2027-Q2,2023-Q4,2027-Q2,,,,,
IP010696,14/03/2024,Bay of Plenty Regional Council,Ohineangaanga erosion repairs and reinstate drop structure.,Install structures in the Ohineangaanga Stream (Te Puke) to protect infrastructure.,,In planning,Fully funded,To be determined,To be determined,Bay of Plenty,,,Water,1 - 5 million,2023-Q4,2024-Q2,,,2024-Q3,2025-Q2,2023-Q4,2025-Q2,,,,,
IP006667,14/03/2024,Bay of Plenty Regional Council,Waioeka-Otara Stopbank Construction.,Upgrade existing stopbank in accordance with Rivers and Drainage asset management plan.,,In procurement,Fully funded,To be determined,To be determined,Bay of Plenty,,,Water,1 - 5 million,2020-Q4,2021-Q2,,,2024-Q3,2025-Q2,2020-Q4,2025-Q2,,,,,
IP006669,14/03/2024,Bay of Plenty Regional Council,Rangitāiki Stopbank Construction.,Upgrade work to existing stopbank on true left of Rangitāiki River downstream of Thornton Rd in accordance with Rivers and Draianage asset management plan.,,Under construction,Fully funded,Open,Construct only,Bay of Plenty,,,Water,1 - 5 million,2020-Q4,2021-Q2,,,2023-Q3,2024-Q2,2019-Q3,2024-Q2,,,,,
IP006670,14/03/2024,Bay of Plenty Regional Council,Tarawera Stopbank Construction.,Upgrade of existing stopbanks in the lower Tarawera River catchment in accordance with Rivers and Drainage asset management plan.,,Under construction,Fully funded,Open,Construct only,Bay of Plenty,,,Water,1 - 5 million,2020-Q4,2021-Q2,,,2024-Q1,2024-Q2,2020-Q3,2025-Q2,,,,,
IP006673,14/03/2024,Bay of Plenty Regional Council,Culvert replacements - Rangitāiki Drainage Scheme.,replace culverts that have reached the end of their expected lives.,,In planning,Fully funded,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,2020-Q4,2021-Q2,,,2022-Q3,2027-Q2,2020-Q4,2027-Q2,,,,,
IP006674,14/03/2024,Bay of Plenty Regional Council,Eastern Drain Construction.,Upgrade existing stopbank in accordance with Rivers and Drainage asset management plan.,,In planning,Fully funded,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,2020-Q4,2021-Q2,,,2024-Q3,2025-Q2,2020-Q4,2025-Q2,,,,,
IP008136,14/03/2024,Bay of Plenty Regional Council,Whakatāne-Tauranga scheme canal stopbanks.,Upgrade exisiting canal stopbanks in accordance with the Rivers and Drainage Asset Management Plan.,,In planning,Fully funded,To be determined,To be determined,Bay of Plenty,,,Water,1 - 5 million,2020-Q4,2021-Q2,,,2025-Q3,2026-Q2,2020-Q4,2026-Q2,,,,,
IP010697,14/03/2024,Bay of Plenty Regional Council,Rangitāiki-Tarawera scheme canal stopbanks.,Upgrade exisiting canal stopbanks in accordance with the Rivers and Drainage Asset Management Plan.,,In planning,Fully funded,To be determined,To be determined,Bay of Plenty,,,Water,1 - 5 million,2023-Q4,2024-Q3,,,2025-Q3,2026-Q2,2023-Q4,2026-Q2,,,,,
IP008137,14/03/2024,Bay of Plenty Regional Council,Trident stopbank upgrade.,Upgrade existing stopbank in accordance with Rivers and Drainage asset management plan.,,In planning,Fully funded,Open,Design and construct,Bay of Plenty,,,Water,1 - 5 million,2020-Q4,2021-Q2,,,2025-Q3,2026-Q2,2020-Q4,2026-Q2,,,,,
IP008138,14/03/2024,Bay of Plenty Regional Council,Rangitāiki Spillway.,A weir type control structure that will release floodwaters into the Rangitāiki Floodway.,,Under construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Water,1 - 5 million,2020-Q4,2021-Q2,,,2023-Q3,2024-Q2,2013-Q3,2024-Q2,,,,,
IP009806,14/03/2024,Bay of Plenty Regional Council,Safeguarding Our Stopbanks.,Remove structures in stopbanks un urban areas across the Bay of Plenty.,,Under construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Water,1 - 5 million,2023-Q1,2023-Q2,,,2023-Q3,2027-Q2,2023-Q3,2027-Q2,,,,,
CCC_235,20/03/2024,Christchurch City Council,Belfast & Marshland Intersection Safety Improvement.,Improve the Belfast/Marshland Intersection to increase capacity improve safety align the intersection with surrounding projects and address the needs of all road users particularly recognising the strong cycle movement along Marshland Road.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2012-Q2,,,2023-Q4,2024-Q2,2012-Q2,2024-Q2,,,,-43.458683,172.657967
CCC_243,20/03/2024,Christchurch City Council,Greers Northcote & Sawyers Arms Intersection Safety Improvement.,Intersection upgrade to alter the configuration of the Greers / Northcote / Sawyers Arms intersection.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2012-Q3,,,2026-Q4,2026-Q2,2012-Q3,2026-Q2,,,,-43.484282,172.599697
CCC_357,20/03/2024,Christchurch City Council,Te Nukutai o Tapoa - Naval Point Development Plan.,Produce a development plan and undertake subsequent works for the reserve areas adjacent to Naval Point. This includes planning for the renewal replacement or removal of existing assets including the marina.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,25 - 50 million,,2018-Q2,,,2021-Q1,2031-Q3,2018-Q2,2031-Q3,,,,-43.60556,172.713566
CCC_596,20/03/2024,Christchurch City Council,WW Akaroa Reclaimed Water Treatment & Reuse Scheme.,The purpose of this project is to provide alternative and improved treatment and disposal of wastewater at Akaroa to meet cultural considerations and meet long term resource consent conditions.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,50 - 100 million,,2012-Q2,,,2026-Q3,2029-Q3,2012-Q2,2029-Q3,,,,-43.81263,172.955034
CCC_862,20/03/2024,Christchurch City Council,Matatiki Hornby Centre.,Construction of an integrated library service centre and swimming pool complex on Kyle Park including associated parking.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,25 - 50 million,,2019-Q4,,,2021-Q4,2024-Q2,2019-Q4,2024-Q2,,,,-43.539171,172.524878
CCC_874,20/03/2024,Christchurch City Council,WW Riccarton Trunk Main.,Reduce wet weather sewage overflows to the Avon River to meet resource consent requirements. To provide additional capacity for future growth.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2014-Q4,,,2016-Q3,2021-Q2,2014-Q4,2021-Q2,,,,-43.529011,172.607746
CCC_885,20/03/2024,Christchurch City Council,CWTP Reuse (C3 & C4 Water).,Construct facility to supply non-potable water for process purposes.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2029-Q3,,,,2032-Q2,2029-Q3,2032-Q2,,,,,
CCC_888,20/03/2024,Christchurch City Council,WS Lyttelton Rail Tunnel Pipeline Renewals.,The renewal and replacement of the water supply pipeline location in the rail tunnel to Lyttleton.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2019-Q1,,,2025-Q3,2027-Q2,2019-Q1,2027-Q2,,,,-43.603108,172.717701
CCC_890,20/03/2024,Christchurch City Council,WW Lyttelton Harbour Wastewater Scheme.,This project is to remove all routine wastewater discharges from the harbour and to redirect them to the waste water treatment plant at Bromley by construction of buried submarine pipelines from the Governors Bay and Diamond Harbour treatment plants to a new pump station by the Lyttleton road tunnel portal.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,50 - 100 million,,2014-Q2,,,2018-Q1,2023-Q2,2014-Q2,2023-Q2,,,,-43.607221,172.721856
CCC_899,20/03/2024,Christchurch City Council,CWTP Step Screen Renewal.,To ensure that wastewater infrastructure is maintained and renewed to achieve the required level of service to meet resource consent conditions.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2018-Q1,,,2021-Q2,2023-Q3,2018-Q1,2023-Q3,,,,-43.524943,172.700776
CCC_913,20/03/2024,Christchurch City Council,Marshland Road Bridge Renewal.,This project is for the strengthening of the bridge and addressing any capacity and safety issues. The provision of facilities for cyclists and pedestrians on the bridge is also included in the project scope.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2013-Q3,,,2020-Q4,2022-Q1,2013-Q3,2022-Q1,,,,-43.462411,172.658233
CCC_914,20/03/2024,Christchurch City Council,Core Public Transport Corridor & Facilities - South (Colombo St).,Bus priority measures and facilities along Colombo St south of the Central City (Moorhouse Avenue to Princess Margaret Hospital).,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2019-Q3,,,,2022-Q2,2019-Q3,2022-Q2,,,,-43.543906,172.636689
CCC_915,20/03/2024,Christchurch City Council,Northcote Road Corridor Improvement.,Four laning of Northcote Road and intersection upgrade.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2012-Q3,,,,2031-Q2,2012-Q3,2031-Q2,,,,-43.484118,172.608343
CCC_917,20/03/2024,Christchurch City Council,Lincoln Road Passenger Transport Improvements (Curletts to Wrights).,Road assets renewals and improvements of the section of Lincoln Road (Curletts to Wrights) to accommodate the core south-west public transport route on this corridor.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2016-Q3,,,2024-Q3,2025-Q3,2016-Q3,2025-Q3,,,,-43.552644,172.596526
CCC_924,20/03/2024,Christchurch City Council,Halswell Junction Road Extension.,This project is for an extension of Halswell Junction Road from Foremans Road to Waterloo Business Park installing a new level crossing at Waterloo Road. The existing level crossing and intersection of Halswell Junction Road with Waterloo Road will be closed off with a cul-de-sac. The project team are working closely with KiwiRail who are undertaking the design for the new level crossing and related rail signal changes required.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,25 - 50 million,,2014-Q3,,,2021-Q3,2024-Q4,2014-Q3,2024-Q4,,,,-43.543563,172.507132
CCC_1024,20/03/2024,Christchurch City Council,Town Hall Rebuild.,Major community facility rebuild project to repair the existing Town Hall building to 100% of the new building standard.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,100 - 250 million,,2012-Q4,,,2015-Q2,2019-Q3,2012-Q4,2019-Q3,,,,-43.526958,172.635577
CCC_1026,20/03/2024,Christchurch City Council,Te Kaha Canterbury Multi Use Arena (CMUA).,A major community facility as an anchor project under the Central Christchurch Recovery Plan. The arena is a replacement for the previous stadium at Lancaster Park destroyed in the earthquake. It will have a seating capacity of 30 000 for sports events and will hold a minimum 36 000 spectators for large music events. Note: The budget of $671.1m excludes site decontamination and project governance allocations. The total approved project budget is $683.2m.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,500 million - 1 billion,,2020-Q2,,,2022-Q3,2026-Q2,2020-Q2,2026-Q2,,,,-43.533769,172.644224
CCC_1341,20/03/2024,Christchurch City Council,Major Cycleway - Nor'West Arc Route - Annex Birmingham & Wrights Corridor Improvement.,Project to upgrade the road network for cyclists and vehicles on Annex Road Birmingham Drive and Wrights Road. Project delivery in conjunction with other transport projects.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2013-Q3,,,2021-Q1,2029-Q4,2013-Q3,2029-Q4,,,,-43.544493,172.591616
CCC_1347,20/03/2024,Christchurch City Council,Pūharakekenui Ki Tai - Lower Styx & Marshland Intersection Improvement.,Improve capacity and safety at the Hawkins/Lower Styx/Marshland intersection in response to urban and road network growth.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2013-Q3,,,2020-Q4,2022-Q1,2013-Q3,2022-Q1,,,,-43.462994,172.658264
CCC_1436,20/03/2024,Christchurch City Council,Takapūneke Reserve Development.,The vegetation management of this reserve has been required for some time as the green assets are in need of capital intervention.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2015-Q4,,,2021-Q4,2025-Q2,2015-Q4,2025-Q2,,,,-43.817141,172.950338
CCC_1969,20/03/2024,Christchurch City Council,Central City Projects - Wayfinding.,This project will deliver signs intelligent traffic and mapping systems and provide information to the public on travel options within and around the Central City.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2016-Q3,,,2017-Q2,2026-Q2,2016-Q3,2026-Q2,,,,-43.534214,172.63753
CCC_2025,20/03/2024,Christchurch City Council,Prestons Corridor Improvements.,Hawkins/ Hills/ Prestons intersection improvement includes upgrade of intersection to a roundabout. Project ensures continuity between developments and existing transport network.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2025-Q3,,,,2026-Q2,2025-Q3,2026-Q2,,,,-43.474824,172.642338
CCC_2027,20/03/2024,Christchurch City Council,Hawkins Corridor Improvements.,Hawkins/Radcliffe intersection improvement includes carriageway widening to provide a median. Project ensures continuity between developments and existing transport network.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2028-Q3,,,,2031-Q2,2028-Q3,2031-Q2,,,,-43.466116,172.650964
CCC_2034,20/03/2024,Christchurch City Council,Burwood & Mairehau Intersection Improvement.,General safety improvement at the intersection of Burwood and Mairehau Roads.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2013-Q3,,,,2024-Q2,2013-Q3,2024-Q2,,,,-43.482703,172.68116
CCC_2174,20/03/2024,Christchurch City Council,Ngā Puna Wai Sports Hub.,The Sports Hub will be an effective and efficient way of providing sport and recreation facilities for the community and provide a venue capable of hosting national and international events.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,50 - 100 million,,2015-Q4,,,2017-Q3,2019-Q3,2015-Q4,2019-Q3,,,,-43.558875,172.57463
CCC_2214,20/03/2024,Christchurch City Council,WW Duvauchelle Treatment and Disposal Renewal.,Upgrade of wastewater treatment and disposal at Duvauchelle.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2019-Q3,,,2026-Q4,2028-Q3,2019-Q3,2028-Q3,,,,-43.75069,172.931821
CCC_2356,20/03/2024,Christchurch City Council,Akaroa Wharf Renewal.,The iconic Akaroa Wharf originally built in 1887 is being replaced as it is nearing the end of its usable life. The new wharf will not be a replica of the existing one but be its own structure – using the best materials available for the conditions which complement the local environment and take into consideration the longer-term maintenance costs. Working with commercial operators regarding temporary access and operation during the construction period is also part of the scope of works.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,2019-Q3,,,2025-Q1,2026-Q4,2019-Q3,2026-Q4,,,,-43.808858,172.959237
CCC_2598,20/03/2024,Christchurch City Council,Burwood Gas Treatment Plant Renewals.,To ensure gas supplies are available to support energy strategy at Burwood.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Waste management,1 - 5 million,,2013-Q4,,,2015-Q2,2024-Q2,2013-Q4,2024-Q2,,,,-43.463968,172.707721
CCC_2679,20/03/2024,Christchurch City Council,SW Prestons & Clare Park.,Development of stormwater detention and treatment facilities related to the growth and development of residential subdivisions in the catchment area of Snellings drain.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2013-Q3,,,2015-Q2,2026-Q2,2013-Q3,2026-Q2,,,,-43.487793,172.680822
CCC_3174,20/03/2024,Christchurch City Council,Roydvale Wairakei & Wooldridge Intersection Safety Improvement.,Upgrade of existing roundabout at Roydvale/Wairaki/Woolridge Intersection to signals. This will mitigate the effects of nearby developments and increase capacity by managing conflicting movements more efficiently.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2014-Q3,,,,2027-Q2,2014-Q3,2027-Q2,,,,-43.489074,172.566036
CCC_3349,20/03/2024,Christchurch City Council,Chokebore Lodge.,Significant repair and strengthening while maintaining as much original fabric as possible.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2014-Q1,,,2020-Q1,2024-Q2,2014-Q1,2024-Q2,,,,-43.531132,172.550974
CCC_3373,20/03/2024,Christchurch City Council,Old Municipal Chambers.,Old Municipal Chambers (Our City Ōtautahi) is of national significance as the first Queen Anne styled building in New Zealand and was severely damaged in the 2010-2012 Canterbury earthquake sequence.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,2015-Q4,,,2021-Q3,2024-Q3,2015-Q4,2024-Q3,,,,-43.530769,172.63357
CCC_9146,20/03/2024,Christchurch City Council,Coastal Pathway.,To provide a 6.5km long coastal pathway that is a multi-functional pathway incorporating walking cycling recreation and amenity facilities.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2013-Q3,,,2015-Q3,2023-Q1,2013-Q3,2023-Q1,,,,-43.564009,172.751088
CCC_9982,20/03/2024,Christchurch City Council,Sumner Road Risk Mitigation (Zone 3A) (HI CSA funded).,The purpose of this project is to mitigate rockfall hazards to pre-quake status enabling the road to then be repaired.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2015-Q3,,,2017-Q3,2019-Q1,2015-Q3,2019-Q1,,,,-43.603287,172.733378
CCC_11382,20/03/2024,Christchurch City Council,Waikākāriki - Horseshoe Lake Reserve Boardwalks & Track Repairs (Stage 2).,Replacement old earthquake damaged assets in Horseshoe Lake Reserve. This project is for the car park replacement with track upgrades connecting the car park and toilet and removal of a damaged foot bridge.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2019-Q1,,,2025-Q1,2026-Q2,2019-Q1,2026-Q2,,,,-43.501386,172.668655
CCC_12692,20/03/2024,Christchurch City Council,Belfast Park Cycle & Pedestrian Rail Crossing.,Construction of a safe cycle and pedestrian crossing facility across the rail corridor to allow access from adjacent residential developments to the existing residential shopping and commercial areas.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2016-Q3,,,2026-Q1,2026-Q3,2016-Q3,2026-Q3,,,,-43.458466,172.628232
CCC_14700,20/03/2024,Christchurch City Council,Sumner Road Rockfall Mitigation (Zone 3B) (HI CSA funded).,The purpose of this project is to mitigate rockfall hazards to pre-quake status enabling the road to then be repaired.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2014-Q1,,,2016-Q3,2018-Q2,2014-Q1,2018-Q2,,,,-43.599756,172.743444
CCC_14701,20/03/2024,Christchurch City Council,Sumner Roading (Zone 3B) (HI CSA funded).,The purpose of this project is to mitigate rockfall hazards to pre-quake status enabling the road to then be repaired.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2015-Q3,,,2018-Q3,2019-Q1,2015-Q3,2019-Q1,,,,-43.598035,172.745757
CCC_14866,20/03/2024,Christchurch City Council,WS Ben Rarere Pump Station Bexley Earthquake Replacement.,To replace the capacity of the earthquake damaged Bexley Pump Station.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2015-Q3,,,2021-Q2,2022-Q3,2015-Q3,2022-Q3,,,,-43.511349,172.697401
CCC_15704,20/03/2024,Christchurch City Council,Tsunami Warning System.,To install an effective tsunami early alerting system where a series of sirens and/or public address speakers can alert those on coastal Christchurch areas.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2022-Q2,,,2024-Q2,2024-Q4,2022-Q2,2024-Q4,,,,,
CCC_16130,20/03/2024,Christchurch City Council,Citizens' War Memorial Earthquake Repair.,Relocation of the war memorial from cathedral square to a new location.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2014-Q3,,,2021-Q4,2023-Q2,2014-Q3,2023-Q2,,,,-43.530603,172.636898
CCC_16133,20/03/2024,Christchurch City Council,Lancaster Park War Memorial Entrance Gates (Capex).,The War Memorial Entrance Gates at AMI Stadium were damaged in the earthquake. The project to repair the memorial will be undertaken in coordination with the Stadium Demolition Project.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2014-Q3,,,2021-Q4,2023-Q4,2014-Q3,2023-Q4,,,,-43.542367,172.653769
CCC_17043,20/03/2024,Christchurch City Council,Main North Road Corridor Improvement.,Medium to long term improvements to Main North Road corridor to improve travel movements along the corridor.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2024-Q3,,,,2031-Q2,2024-Q3,2031-Q2,,,,-43.497289,172.60814
CCC_17044,20/03/2024,Christchurch City Council,McLeans Island Road Corridor Improvement.,This project is aimed at improving the safety and condition of the Pound Road and McLeans Island Road corridor.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2021-Q4,,,2023-Q1,2024-Q2,2021-Q4,2024-Q2,,,,-43.476618,172.51903
CCC_17051,20/03/2024,Christchurch City Council,Shands Road Improvements.,Shands Rd from SH76 to Sir James Wattie Dr is being upgraded to provide for pedestrian and cyclists as part of an industrial development with works to include: carriageway widening kerbs and paths. The project will ensure continuity between developments and existing transport network.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2021-Q4,,,2022-Q1,2023-Q2,2021-Q4,2023-Q2,,,,-43.551165,172.516601
CCC_17057,20/03/2024,Christchurch City Council,Cycle Connections - Rapanui - Shag Rock.,Package of local cycleway improvements and destination links to Rapanui-Shag Rock Major Cycleway Route.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2024-Q3,,,,2031-Q2,2024-Q3,2031-Q2,,,,-43.536682,172.677695
CCC_17059,20/03/2024,Christchurch City Council,Cycle Connections - Little River Link.,Package of local cycleway improvements and destination links to Little River Link Major Cycleway Route.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2024-Q3,,,,2030-Q2,2024-Q3,2030-Q2,,,,-43.562126,172.566217
CCC_17082,20/03/2024,Christchurch City Council,Main South to South-West Hornby New Link.,Link from Main South Road to new Industrial subdivision South West of Hornby as well as re-assessment of surrounding network requirements to better reflect adjacent land use.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2027-Q3,,,,2029-Q2,2027-Q3,2029-Q2,,,,-43.545937,172.501359
CCC_17112,20/03/2024,Christchurch City Council,Barrington Lincoln & Whiteleigh Intersection Improvement.,Project to upgrade the intersection of Barrington/Lincoln/Whiteleigh in order to improve safety.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2015-Q3,,,2022-Q1,2023-Q1,2015-Q3,2023-Q1,,,,-43.545409,172.609
CCC_17144,20/03/2024,Christchurch City Council,Ilam Middleton & Riccarton Intersection Improvement.,Project to upgrade the intersection of Ilam Middleton & Riccarton in order to improve safety.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2016-Q1,,,2021-Q1,2022-Q1,2016-Q1,2022-Q1,,,,-43.531059,172.580155
CCC_17208,20/03/2024,Christchurch City Council,Dyers Pass Corridor Guardrails Installation.,Installation of guardrails on Dyers Pass Road to improve safety.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2016-Q1,,,2020-Q4,2022-Q4,2016-Q1,2022-Q4,,,,-43.577101,172.630347
CCC_17211,20/03/2024,Christchurch City Council,Dyers Pass Road Pedestrian & Cycle Safety Improvements.,Installation of safety measures on Dyers Pass Road to improve safety for cyclists pedestrians and motorcyclists.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2015-Q4,,,2020-Q4,2022-Q4,2015-Q4,2022-Q4,,,,-43.577101,172.630347
CCC_17214,20/03/2024,Christchurch City Council,Local Cycleway - Northern Arterial Link Cranford to Rutland Reserve.,New cycle link between Cranford Street and Rutland Street north.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2019-Q1,,,2020-Q3,2021-Q2,2019-Q1,2021-Q2,,,,-43.49897,172.623146
CCC_17875,20/03/2024,Christchurch City Council,WW Cranford Street Pump Station Renewal (PS0058).,Extend the existing wet well to include the dry well replacement of existing dry mount pumps with submersible pumps and associated upgrades.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q4,,,2025-Q1,2026-Q1,2022-Q4,2026-Q1,,,,-43.489871,172.620939
CCC_17876,20/03/2024,Christchurch City Council,WW Locarno Street Pump Station Renewal (PS0020).,Pump station building wet well and pressure main renewal. Assets at end of useful life and in poor condition.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,50 - 100 million,,2024-Q3,,,,2038-Q2,2024-Q3,2038-Q2,,,,-43.552598,172.658835
CCC_17885,20/03/2024,Christchurch City Council,WS Eastern Terrace Trunk Main Renewal.,Replacement of the critical water supply trunk main located along Eastern Tce due to the very poor pipe joint condition.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2016-Q3,,,2021-Q4,2023-Q4,2016-Q3,2023-Q4,,,,-43.569042,172.645023
CCC_17924,20/03/2024,Christchurch City Council,WS Averill Street Pump Station Renewal (PS1005).,Replacement of Averill Water Supply Pump Station and associated wells 2 3 and 4 due to age.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2022-Q2,,,2027-Q1,2028-Q3,2022-Q2,2028-Q3,,,,-43.512749,172.660345
CCC_18336,20/03/2024,Christchurch City Council,Central City Projects - Colombo Street (Bealey to Kilmore).,Road user improvements along part of Colombo Street between Kilmore and Bealey to connect cycle and bus routes from the central city to the north.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2018-Q4,,,2022-Q1,2022-Q2,2018-Q4,2022-Q2,,,,-43.523766,172.636601
CCC_18338,20/03/2024,Christchurch City Council,Central City Projects - Colombo Street (St Asaph to Moorhouse).,Road user improvements on Colombo Street between St Asaph and Moorhouse to connect cycle and bus routes from the central city to the south.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2024-Q3,,,,2029-Q2,2024-Q3,2029-Q2,,,,-43.537921,172.636607
CCC_18341,20/03/2024,Christchurch City Council,Central City Projects - Ferry Road (St Asaph to Fitzgerald).,Road user improvements on Ferry Road between St Asaph and Fitzgerald to connect cycle and bus routes from the central city to the south-east.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2016-Q3,,,2027-Q2,2028-Q1,2016-Q3,2028-Q1,,,,-43.537604,172.648023
CCC_18342,20/03/2024,Christchurch City Council,Central City Projects - High Street (Cashel to Tuam).,Road user improvements on High Street between Cashel and Tuam to connect walking and cycling routes in the central city.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2018-Q1,,,2021-Q3,2022-Q2,2018-Q1,2022-Q2,,,,-43.534787,172.640482
CCC_18343,20/03/2024,Christchurch City Council,Central City Projects - High Street (Tuam to St Asaph).,Upgrade of the roadway and footpaths of High Street to the same standard as other inner city streets including public realm improvements.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2019-Q1,,,2024-Q1,2024-Q3,2019-Q1,2024-Q3,,,,-43.532884,172.637928
CCC_18361,20/03/2024,Christchurch City Council,Central City Projects - Rolleston Avenue (Hereford to Armagh).,Road user improvements on Rolleston Ave between Hereford and Armagh to connect walking cycling and PT routes from the central city to the North-West.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2024-Q3,,,,2028-Q2,2024-Q3,2028-Q2,,,,-43.530999,172.627596
CCC_18370,20/03/2024,Christchurch City Council,Central City Projects - Gloucester Street (Madras to Manchester).,Road user improvements on Gloucester Street between Madras and Manchester to support vehicular and Public Transport access to the central city from the East.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2025-Q3,,,,2030-Q2,2025-Q3,2030-Q2,,,,-43.529816,172.641008
CCC_18371,20/03/2024,Christchurch City Council,Central City Projects - Gloucester Street (Manchester to Colombo).,Road user improvements on Gloucester Street between Manchester and Colombo to support vehicular and Public Transport access to the central city convention centre and parking from the East.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2022-Q1,,,2026-Q1,2026-Q3,2022-Q1,2026-Q3,,,,-43.529855,172.637988
CCC_18372,20/03/2024,Christchurch City Council,Central City Projects - Gloucester Street (Oxford to Montreal).,Road user improvements on Gloucester Street between Oxford and Montreal to support multi-modal access within the central city.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2025-Q3,,,,2028-Q2,2025-Q3,2028-Q2,,,,-43.529833,172.63242
CCC_18374,20/03/2024,Christchurch City Council,Central City Projects - Cambridge Terrace (Montreal to Rolleston).,Road user improvements on Cambridge Terrace between Montreal and Rolleston to support multi-modal access within the central city.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2027-Q3,,,,2028-Q2,2027-Q3,2028-Q2,,,,-43.534203,172.629185
CCC_18384,20/03/2024,Christchurch City Council,Central City Projects - Montreal Street (Tuam to St Asaph).,Road user improvements on Montreal Street between Tuam and St Asaph to support multi-modal access within the central city.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2027-Q3,,,,2029-Q2,2027-Q3,2029-Q2,,,,-43.535778,172.630613
CCC_18390,20/03/2024,Christchurch City Council,Central City Projects - Cashel Street (Cambridge to Montreal).,Road user improvements on Cashel Street between Cambridge and Montreal to support multi-modal access within the central city.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2024-Q3,,,,2027-Q2,2024-Q3,2027-Q2,,,,-43.533109,172.631608
CCC_18395,20/03/2024,Christchurch City Council,Central City Projects - Bealey Avenue.,Road user improvements on Bealey Ave to support multi-modal access within and around the central city.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2029-Q3,,,,2041-Q2,2029-Q3,2041-Q2,,,,-43.520932,172.637
CCC_18396,20/03/2024,Christchurch City Council,Te Kaha Surrounding Streets.,This project is for a suite of upgrades to the streets surrounding Te Kaha in preparation for increased activity once the arena opens. Upgrades include widening of footpaths slower speed limits landscaping pedestrian crossings parking changes and changing the travel direction of some streets. The project includes significant upgrades to Lichfield St between Manchester St and Madras St to provide safe pedestrian connectivity to the bus interchange and central city activation of the area and support with traffic management during larger events.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2021-Q4,,,2024-Q3,2026-Q1,2021-Q4,2026-Q1,,,,-43.533757,172.642642
CCC_19847,20/03/2024,Christchurch City Council,Central City Projects - Hereford Street (Manchester to Cambridge).,Road amenity and transport facilities improvements on Hereford Street between Manchester and Cambridge to support vehicular and public transport access to the central city and interchange from the East.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2016-Q3,,,2019-Q4,2020-Q4,2016-Q3,2020-Q4,,,,-43.53202,172.637369
CCC_20053,20/03/2024,Christchurch City Council,Shirley Community Centre.,To rebuild a community facility in the Shirley region develop a robust business case and work with the community board to identify suitable locations.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2020-Q2,,,,2031-Q2,2020-Q2,2031-Q2,,,,-43.508236,172.653731
CCC_20836,20/03/2024,Christchurch City Council,Ōmōkihi (South Library & Service Centre Rebuild).,The South Library and Service Centre building was badly damaged in the 2010/2011 earthquakes. Temporary strengthening has made the facility safe to occupy but a rebuild is planned to future-proof the facility. The new building will remain on the same site and have approximately the same floor area as the existing building. The concept design focuses on reconnecting the building with the landscape and improves how the space can be used providing greater flexibility for the future.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,2023-Q1,,,2025-Q1,2027-Q1,2023-Q1,2027-Q1,,,,-43.561405,172.638141
CCC_21129,20/03/2024,Christchurch City Council,Te Pou Toetoe Linwood Pool.,Provision of a new aquatic recreation centre in the Woolston/Linwood area. The Linwood Central Heathcote Community Board has promoted the Linwood - Woolston Pool as a means of strengthening community cohesion and increasing participation in aquatics.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,2018-Q2,,,2020-Q3,2021-Q4,2018-Q2,2021-Q4,,,,-43.537103,172.676881
CCC_22167,20/03/2024,Christchurch City Council,Canterbury Provincial Chambers.,To begin the restoration of Canterbury Provincial Chambers to a condition appropriate for its local national and international heritage status as the sole remaining complex of buildings remaining from the Provincial Government system in New Zealand.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,100 - 250 million,,2015-Q4,,,2024-Q3,2028-Q2,2015-Q4,2028-Q2,,,,-43.529097,172.633935
CCC_23080,20/03/2024,Christchurch City Council,Major Cycleway - Rapanui - Shag Rock Route (Section 3) Dyers to Ferry Road Bridge.,Major Cycleway Route project linking Dyers Road and the Coastal Pathway at Ferrymead Bridge.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2016-Q3,,,2022-Q1,2022-Q4,2016-Q3,2022-Q4,,,,-43.546552,172.695253
CCC_23098,20/03/2024,Christchurch City Council,Major Cycleway - Northern Line Route(Section 1) Blenheim to Kilmarnock & Harewood Crossing & Restell.,Major Cycleway Route project linking (a) Blenheim Road and Kilmarnock Street (b) Harewood Road at rail crossing & Restell.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2016-Q1,,,2025-Q1,2025-Q3,2016-Q1,2025-Q3,,,,-43.536442,172.609663
CCC_23100,20/03/2024,Christchurch City Council,Major Cycleway - Heathcote Expressway Route (Section 2) Tannery to Martindales.,Major Cycleway Route project linking Garlands Road and Heathcote valley.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2016-Q2,,,2022-Q3,2023-Q4,2016-Q2,2023-Q4,,,,-43.560678,172.686426
CCC_23101,20/03/2024,Christchurch City Council,Major Cycleway - Nor'West Arc Route (Section 3) University to Harewood.,This Major Cycleway Route connects Papanui to Cashmere via an orbital route.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2016-Q4,,,2023-Q3,2025-Q2,2016-Q4,2025-Q2,,,,-43.517196,172.578036
CCC_23102,20/03/2024,Christchurch City Council,Major Cycleway - Nor'West Arc Route (Section 1a) Cashmere to Sparks.,Major Cycleway Route project linking Cashmere Road and Sparks Road.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2016-Q1,,,2020-Q3,2020-Q4,2016-Q1,2020-Q4,,,,-43.561278,
CCC_23103,20/03/2024,Christchurch City Council,Major Cycleway - Nor'West Arc Route (Section 2) Annex & Wigram Road to University.,Major Cycleway Route project linking Wigram Road and University at Ilam Road.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2019-Q2,,,2020-Q3,2023-Q3,2019-Q2,2023-Q3,,,,-43.540994,172.578432
CCC_24778,20/03/2024,Christchurch City Council,Central City Projects - St Asaph Street (Ferry to Antigua).,Road user improvements on St Asaph Street between Ferry and Antigua to support vehicular and cycle access to the central city from the South East.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2015-Q3,,,2016-Q2,2026-Q2,2015-Q3,2026-Q2,,,,-43.536389,172.64047
CCC_25648,20/03/2024,Christchurch City Council,SW Worsleys Spur stormwater pipe and drain system.,To alleviate runoff issues on Worsleys Spur.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2015-Q3,,,2018-Q2,2019-Q2,2015-Q3,2019-Q2,,,,-43.590988,172.60774
CCC_26599,20/03/2024,Christchurch City Council,SW Cashmere Worsleys Flood Storage (LDRP 500).,Construction of storm water detention in the Upper Heathcote area. This will reduce the risk of storm water flooding post-earthquake for those affected by flooding from the Heathcote River in the upper and mid reaches.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,25 - 50 million,,2015-Q4,,,2018-Q3,2024-Q2,2015-Q4,2024-Q2,,,,-43.582106,172.621928
CCC_26601,20/03/2024,Christchurch City Council,Major Cycleway - Ōtākaro Avon Route (Section 1) Fitzgerald to Swanns Road Bridge (OARC).,Major Cycleway Route along Ōtākaro/Avon River from Fitzgerald Ave to Swanns Road Bridge.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2015-Q4,,,2026-Q4,2028-Q2,2015-Q4,2028-Q2,,,,-43.525039,172.658868
CCC_26604,20/03/2024,Christchurch City Council,Major Cycleway - Ōpāwaho River Route (Section 1) Princess Margaret Hospital to Corson Avenue.,Major Cycleway Route along Ōpāwaho/Heathcote River from Princess Margaret to Corson Ave.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2020-Q2,,,,2029-Q2,2020-Q2,2029-Q2,,,,-43.561145,172.636919
CCC_26605,20/03/2024,Christchurch City Council,Major Cycleway - Ōpāwaho River Route (Section 3) Waltham to Ferrymead Bridge.,Major Cycleway Route along Ōpāwaho/Heathcote River from Waltham to Ferrymead Bridge.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,25 - 50 million,,2024-Q3,,,2026-Q1,2029-Q2,2024-Q3,2029-Q2,,,,-43.553313,172.667468
CCC_26606,20/03/2024,Christchurch City Council,Major Cycleway - Ōpāwaho River Route (Section 2) Corson to Waltham.,Major Cycleway Route along Ōpāwaho/Heathcote River from Corson Ave to Waltham.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2024-Q3,,,,2028-Q2,2024-Q3,2028-Q2,,,,-43.557936,172.647186
CCC_26607,20/03/2024,Christchurch City Council,Major Cycleway - Southern Lights Route (Section 1) Strickland to Tennyson.,Major Cycleway Route project linking Strickland Street and Tennyson Street.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,,,,2027-Q2,2027-Q2,2027-Q2,2027-Q2,,,,-43.557956,172.636978
CCC_26608,20/03/2024,Christchurch City Council,Major Cycleway - South Express Route (Section 1) Hei Hei to Jones.,Major Cycleway Route project linking Templeton township and Hei Hei/Hornby.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2016-Q2,,,2024-Q2,2025-Q1,2025-Q1,2025-Q1,,,,-43.550377,172.483825
CCC_26610,20/03/2024,Christchurch City Council,Major Cycleway - South Express Route (Section 3) Curletts to Old Blenheim.,Major Cycleway Route project linking Curletts Road and Mandeville Street at Blenheim Road.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2019-Q1,,,2020-Q4,2021-Q4,2025-Q3,2021-Q4,,,,-43.534761,172.590165
CCC_26611,20/03/2024,Christchurch City Council,Major Cycleway - Wheels to Wings Route (Section 1) Harewood to Greers.,The project is to deliver the Wheels to Wings Major Cycle Route which is a 4.5 kilometre cycleway down Harewood Road from the Papanui Parallel cycleway on Papanui Road to the existing cycle and pedestrian underpass at Johns Road near the airport. There are three sections to this route with a budget of $22.7m.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2017-Q3,,,2024-Q3,2026-Q2,2026-Q4,2026-Q2,,,,-43.493182,172.600256
CCC_26612,20/03/2024,Christchurch City Council,Major Cycleway - Wheels to Wings Route (Section 2) Greers to Wooldridge.,Major Cycleway Route - Wheels to Wings - from Greers Road to Wooldridge Road.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2023-Q2,,,2025-Q2,2027-Q2,2023-Q2,2027-Q2,,,,-43.488315,172.588704
CCC_26613,20/03/2024,Christchurch City Council,Major Cycleway - Wheels to Wings Route (Section 3) Wooldridge to Johns Road Underpass.,Major Cycleway Route - Wheels to Wings - from Wooldridge Road to SH1 underpass.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2023-Q3,,,2025-Q2,2028-Q2,2023-Q3,2028-Q2,,,,-43.479514,172.561182
CCC_26623,20/03/2024,Christchurch City Council,Edgeware Village Masterplan (A1).,Streetscape improvements in Edgware Village to respond to community aspirations for improved safety accessibility and use of the streets.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2017-Q3,,,2027-Q2,2028-Q2,2017-Q3,2028-Q2,,,,-43.513413,172.636566
CCC_27273,20/03/2024,Christchurch City Council,Pages Road Bridge Renewal (OARC).,To construct a resilient replacement of the Pages Road bridge in New Brighton including improvements to the approach roads. The design is being developed with an awareness of its potential as an important emergency evacuation route.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2018-Q3,,,2025-Q4,2027-Q4,2018-Q3,2027-Q4,,,,-43.509203,172.721378
CCC_28744,20/03/2024,Christchurch City Council,SW Sumner Stream & Richmond Hil (LDRP 505).,To restore the Sumer and Richmond Hill land drainage to pre-earthquake conditions/performance.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2017-Q3,,,2032-Q4,2033-Q4,2017-Q3,2033-Q4,,,,-43.570092,172.75831
CCC_28802,20/03/2024,Christchurch City Council,Burwood & North Shirley Roading Repairs & Renewals (ex SCIRT 11091).,Road assets renewals in conjunction with road user improvements.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2019-Q3,,,2020-Q3,2021-Q1,2019-Q3,2021-Q1,,,,-43.503509,172.708763
CCC_29076,20/03/2024,Christchurch City Council,SW Charlesworth Drain (LDRP 531).,Repair earthquake damage to Linwood Canal and Cuthberts Drain South. Reinstate the pre-earthquake flood risk to the Linwood Canal and Cuthberts Drain South Catchments.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2015-Q4,,,2024-Q3,2025-Q3,2015-Q4,2025-Q3,,,,-43.53545,172.699491
CCC_29100,20/03/2024,Christchurch City Council,Nicholls Street Renewal.,Road assets renewals on Nicholls Street in conjunction with road user improvements.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2016-Q1,,,2023-Q4,2025-Q1,2016-Q1,2025-Q1,,,,-43.515397,172.654622
CCC_30172,20/03/2024,Christchurch City Council,WW Riccarton Interceptor (Upper Riccarton).,To increase capacity in the Riccarton area to reduce overflows to the environment and provide for growth in the upper catchment.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2017-Q2,,,2024-Q3,2026-Q3,2017-Q2,2026-Q3,,,,-43.516823,172.572098
CCC_30173,20/03/2024,Christchurch City Council,WW Avonhead Road Main Renewal.,To provide additional capacity to accommodate growth in Dakota Business Park Memorial Avenue Investments Ltd and the Hawthornden Residential New Neighbourhood area.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2016-Q4,,,2021-Q3,2023-Q1,2016-Q4,2023-Q1,,,,-43.50334,172.559685
CCC_32243,20/03/2024,Christchurch City Council,SW Eastman Sutherland and Hoon Hay Wetlands.,Provision of stormwater treatment basins to manage stormwater from 190 hectares of greenfield land proposed for residential development. The wider project includes the naturalisation of 1km of Cashmere Stream and the provision of public pathways for walking and biking.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,25 - 50 million,,2016-Q1,,,2018-Q1,2025-Q2,2016-Q1,2025-Q2,,,,-43.588554,172.588044
CCC_33259,20/03/2024,Christchurch City Council,SW Wairarapa Wai-iti & Tributaries (LDRP 510).,Design and construction of land drainage works to repair earthquake damage and reinstate pre-earthquake flood risk to the Wairarapa and Wai-iti Catchments.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2017-Q3,,,2025-Q1,2027-Q2,2017-Q3,2027-Q2,,,,-43.51061,172.586562
CCC_33813,20/03/2024,Christchurch City Council,WS Jeffreys Road Pump Station Upgrade (PS1076).,To demolish the damaged buffer tank at the pump station and to construct a new one.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2016-Q2,,,2022-Q2,2023-Q4,2016-Q2,2023-Q4,,,,-43.514139,172.59043
CCC_33828,20/03/2024,Christchurch City Council,SW Timber Lining Renewal - Marshland Road Canal Reserve Drain (Stage 1).,Renewal is required due to the lining being in poor condition and failure of the lining could increase flood risk and damage the adjacent road. .,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2018-Q2,,,2023-Q2,2024-Q4,2018-Q2,2024-Q4,,,,-43.468506,172.6589
CCC_33836,20/03/2024,Christchurch City Council,WW Highfield Connection to Northcote Collector.,Provides wastewater capacity to accommodate greenfield development in Highfield.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2016-Q3,,,2018-Q2,2020-Q2,2016-Q3,2020-Q2,,,,-43.474663,172.634052
CCC_34094,20/03/2024,Christchurch City Council,Transport Choices 2022 - Linwood Village Streetscape Enhancements (S1).,This project is part of the adopted Linwood Village master plan and involves streetscape enhancements focusing on the Worcester St/Stanmore Road intersection and road corridor adjacent to the shopping strip.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2017-Q1,,,2024-Q1,2024-Q2,2017-Q1,2024-Q2,,,,-43.530925,172.657061
CCC_34266,20/03/2024,Christchurch City Council,Sumner Shared Space & Viewing Platform (Burgess Street) (P1.3.1 & P1.3.2).,"Part of the Sumner Masterplan: Burgess Street will be changed into a ""shared space"" through changing kerbs road surface markings paving and landscaping and the creation of a viewing platform.",,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2030-Q3,,,,2032-Q1,2030-Q3,2032-Q1,,,,-43.567838,172.759798
CCC_34418,20/03/2024,Christchurch City Council,Delivery Package - Paving Central City City Mall & High Street.,Road and footpath asset renewals in the central city.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2016-Q3,,,2016-Q4,2022-Q3,2016-Q3,2022-Q3,,,,-43.532314,172.63697
CCC_34774,20/03/2024,Christchurch City Council,Heathcote & Oak Streetscape Improvements (WL2).,Part of the Ferry Road Masterplan: Implement the streetscape proposals for the Woolston commercial centre section of Ferry Road as developed in the suburban centre Masterplan.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2016-Q4,,,2032-Q2,2033-Q2,2016-Q4,2033-Q2,,,,-43.549017,172.680258
CCC_35140,20/03/2024,Christchurch City Council,SW Mid Ōpāwaho Heathcote Bank Stabilisation (LDRP 518).,Repair earthquake damage and stabilise the banks of the Heathcote River/ Opawaho River for prioritised sites.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2016-Q2,,,2018-Q1,2019-Q2,2016-Q2,2019-Q2,,,,-43.563854,172.639582
CCC_35900,20/03/2024,Christchurch City Council,SW Pump Station Earthquake Repairs (LDRP 513) (PS205).,Repair earthquake damage to the storm water pump station and adjacent area to reinstate pre-earthquake flood risk for this catchment area.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2016-Q4,,,2020-Q4,2023-Q1,2016-Q4,2023-Q1,,,,-43.502646,172.679596
CCC_36063,20/03/2024,Christchurch City Council,SW Coxs - Quaifes Facility.,Construction of a stormwater facility consisting of first flush sedimentation basins stormwater wetland and detention basin.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2016-Q3,,,2020-Q1,2022-Q4,2016-Q3,2022-Q4,,,,-43.588047,172.55438
CCC_37343,20/03/2024,Christchurch City Council,SW Highsted Land Purchase & Construction of Waterways Basins & Wetlands.,Purchase of land construction of first flush basin and enhancement of Styx Drain including bunding and pumping to provide temporary flood protection and stormwater service for Cavendish Road.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2018-Q3,,,2020-Q2,2022-Q3,2018-Q3,2022-Q3,,,,-43.472498,172.60346
CCC_37858,20/03/2024,Christchurch City Council,Ferry Road & Estuary Edge Intersection Improvements (FM3) (Coastal Pathway).,Tidal View improvements to support Coastal Pathway MCR project.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2018-Q1,,,2022-Q1,2022-Q4,2018-Q1,2022-Q4,,,,-43.558346,172.708639
CCC_38022,20/03/2024,Christchurch City Council,SW Blakes Road Stormwater Facility (Works 1).,Land and design works to construct first flush basin and wetland for stormwater treatment and flood protection at 59 Blakes Road in accordance with Styx Stormwater Management Plan.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2018-Q3,,,2021-Q1,2023-Q3,2018-Q3,2023-Q3,,,,-43.449846,172.640693
CCC_38088,20/03/2024,Christchurch City Council,SW Gardiners Stormwater Facility.,Land purchase and construction of first storm water basin and wetland at 233 Gardiners Road or other acceptable land.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2019-Q1,,,2023-Q1,2024-Q2,2019-Q1,2024-Q2,,,,-43.470201,172.589292
CCC_38090,20/03/2024,Christchurch City Council,SW Greens Stormwater Facility.,Land purchases and construction of storm water first filter basins detention basins and wetland. Project includes Green Stream and Glovers Drain enhancement.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2020-Q1,,,2024-Q3,2025-Q3,2020-Q1,2025-Q3,,,,-43.598,172.568835
CCC_38091,20/03/2024,Christchurch City Council,SW Otukaikino Stormwater Facility.,Land purchase and construction of first flush basin and storm water wetland to provide storm water treatment and flood mitigation at 940-1000 Main North Road.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2022-Q1,,,2026-Q4,2028-Q2,2022-Q1,2028-Q2,,,,-43.434309,172.646901
CCC_38572,20/03/2024,Christchurch City Council,Core Public Transport Route & Facilities - South-West Lincoln Road (Phase 1).,Bus facilities improvements in Lincoln Road (Moorhouse to Wrights) to enhance the facilities on the core south-west public transport route on this corridor.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2016-Q3,,,2022-Q2,2023-Q1,2016-Q3,2023-Q1,,,,-43.544073,172.611001
CCC_39121,20/03/2024,Christchurch City Council,The Esplanade Streetscape Enhancements (Sumner) (P1.2.1).,The project will explore increased traffic calming measures changes to the kerb-line/footpath widths new paving and stormwater treatments increased landscaping and new street furniture (e.g. directional signage public seating rubbish bins cycle stands drinking fountains bollards etc) a review of on-street parking arrangements (time restrictions and number of spaces) and lighting improvements.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2030-Q3,,,,2033-Q2,2030-Q3,2033-Q2,,,,-43.570999,172.763869
CCC_39122,20/03/2024,Christchurch City Council,Marriner Streetscape Enhancements (Sumner) (P1.4.1).,Review Marriner Street road markings and remove the kerb and channel to design a street share space environment. Also to consider measures to calm vehicle speeds and investigate low impact design technologies for stormwater drainage. In addition to new paving new landscape plantings and street furniture are necessary and the lighting may also be upgraded as well as parking arrangements.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2030-Q3,,,,2033-Q2,2030-Q3,2033-Q2,,,,-43.567726,172.75811
CCC_40237,20/03/2024,Christchurch City Council,SW Wigram East Retention Basin (LDRP 520).,This project will reduce flooding in the lower Heathcote provide a better experience for park users by improving pathways and also improve the native habitat and separation between bird breeding and dog walking.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2016-Q4,,,2017-Q2,2024-Q4,2016-Q4,2024-Q4,,,,-43.557074,172.573196
CCC_41638,20/03/2024,Christchurch City Council,SW Upper Ōtākaro Avon (LDRP 511).,Design and construction of land drainage works to repair earthquake damage and reinstate pre-earthquake flood risk to the Upper Avon area (including the Upper Avon Okeover Stream and Ilam Stream).,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q2,,,,2027-Q2,2023-Q2,2027-Q2,,,,-43.522882,172.609247
CCC_41686,20/03/2024,Christchurch City Council,Moorhouse & Stewart Intersection Improvements.,An intersection improvement project Moorhouse Ave/Stewart St forming part of the CCC Transport System Programme Business Case. This will improve access to and reduce delays caused by the new sports facility (Parakiore).,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2022-Q4,,,,2025-Q2,2022-Q4,2025-Q2,,,,-43.539852,172.624595
CCC_41752,20/03/2024,Christchurch City Council,Pound & Ryans Intersection Safety Improvement.,Improvement to the intersection of Pound Rd and Ryans Rd in response to the increase in traffic particularly heavies on this rural road.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2021-Q3,,,2024-Q1,2024-Q2,2021-Q3,2024-Q2,,,,-43.504722,172.513402
CCC_41844,20/03/2024,Christchurch City Council,Cycle Connections - Heathcote Expressway.,Package of local cycleway links to the Heathcote Expressway Major Cycleway Route.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2027-Q3,,,,2031-Q2,2027-Q3,2031-Q2,,,,,
CCC_41847,20/03/2024,Christchurch City Council,Cycle Connections - Nor'West Arc.,Package of local cycleway links to the Nor'West Arc Major Cycleway Route.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,,,,2025-Q1,2038-Q2,2025-Q1,2038-Q2,,,,,
CCC_41852,20/03/2024,Christchurch City Council,Cycle Connections - Ōtākaro-Avon Route.,Package of local cycleway links to the Ōtākaro-Avon Route Major Cycleway Route.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2026-Q3,,,,2028-Q2,2026-Q3,2028-Q2,,,,,
CCC_41901,20/03/2024,Christchurch City Council,SW Blencathra Basins.,Stormwater treatment for 3.6 hectares of greenfields residential development and approximately 22 hectares of existing Residential Hill development at Westmorland within Council land at 482A Cashmere Road.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q2,,,2023-Q4,2026-Q2,2022-Q2,2026-Q2,,,,-43.580848,172.594687
CCC_41930,20/03/2024,Christchurch City Council,Whakatā – Christchurch Cemetery Development (Templeton).,Design and build new cemetery in west of city as per Cemeteries Master Plan.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,2020-Q3,,,,2031-Q2,2020-Q3,2031-Q2,,,,-43.552197,172.458278
CCC_41975,20/03/2024,Christchurch City Council,Innes Road Corridor Improvement.,Innes Road Corridor Improvement is improved secondary connections from the Northern Arterial.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2029-Q3,,,,2031-Q2,2029-Q3,2031-Q2,,,,-43.502169,172.633565
CCC_41987,20/03/2024,Christchurch City Council,SW Addington Brook & Riccarton Drain Filtration Devices.,Design and construction of storm water filtration devices including filters civil works associated pumping and ancillary equipment.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,25 - 50 million,,2019-Q2,,,2025-Q2,2027-Q2,2019-Q2,2027-Q2,,,,-43.535456,172.61788
CCC_42010,20/03/2024,Christchurch City Council,Mairehau Road Corridor Improvement (Burwood to Marshland).,Mairehau Rd route improvements from Marshland Rd to Burwood Rd includes: carriageway widening kerbs and paths. Projects ensure continuity between developments and the existing transport network.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2019-Q4,,,2023-Q4,2025-Q2,2019-Q4,2025-Q2,,,,-43.4862,172.6656
CCC_42013,20/03/2024,Christchurch City Council,Cranford Street New Signalised Intersection.,Cranford Street new collector road so requires a new signalised intersection.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,,,,2025-Q3,2026-Q2,2025-Q3,2026-Q2,,,,,
CCC_42022,20/03/2024,Christchurch City Council,Quaifes Road Corridor Improvement.,Quaifes Rd route improvements includes: carriageway widening kerbs and paths. Projects ensure continuity between developments and existing transport network.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2022-Q2,,,2023-Q2,2025-Q2,2022-Q2,2025-Q2,,,,-43.582977,172.547604
CCC_42027,20/03/2024,Christchurch City Council,Wigram & Hayton Intersection Improvement.,Wigram Road / Hayton Road intersection improvement project to mitigate road network traffic changes due to new residential and commercial developments.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2019-Q3,,,2024-Q3,2024-Q4,2019-Q3,2024-Q4,,,,-43.5526,172.5686
CCC_42030,20/03/2024,Christchurch City Council,Wigram Road Realignment.,New road connection on Carrs Reserve to accommodate travel demands associate with Awatea residential neighbourhood.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2023-Q3,,,2024-Q4,2025-Q2,2023-Q3,2025-Q2,,,,-43.565025,172.546973
CCC_42154,20/03/2024,Christchurch City Council,WW Selwyn Pump Station (PS0152) Pressure Main and Sewer Upgrades.,To reduce wastewater overflows to the Heathcote River so that compliance with the wet weather overflow consent can be achieved.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,25 - 50 million,,2023-Q1,,,2025-Q3,2028-Q1,2023-Q1,2028-Q1,,,,-43.554149,172.627142
CCC_42193,20/03/2024,Christchurch City Council,WW Halswell Pump Station (Stage 2) (PS60).,To maximise flows without requiring upgrades to the existing pressure mains.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2019-Q3,,,2022-Q3,2024-Q3,2019-Q3,2024-Q3,,,,-43.574702,172.568932
CCC_42333,20/03/2024,Christchurch City Council,Parakiore Recreation and Sports Centre Equipment (formally Metro Sports Facility).,To purchase specific equipment to operate the Parakiore (Metro) Sports Facility.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2020-Q4,,,2024-Q3,2025-Q3,2020-Q4,2025-Q3,,,,-43.537552,172.62664
CCC_42407,20/03/2024,Christchurch City Council,Central City Projects - Fitzgerald Ave Twin Bridge Renewal (OARC) (R109).,Replacement of the Fitzgerald Ave Twin Bridges in Central Christchurch to construct a resilient replacement following the earthquake damage that the existing structure experienced.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,25 - 50 million,,2027-Q3,,,,2030-Q2,2027-Q3,2030-Q2,,,,-43.525882,172.650645
CCC_42603,20/03/2024,Christchurch City Council,WW Vacuum System Monitoring Equipment.,Monitoring equipment for wastewater vacuum sewer systems in Prestons Aranui and Shirley to enable monitoring of every vacuum collection chamber for fault finding and planning purposes.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2017-Q3,,,2019-Q1,2023-Q4,2017-Q3,2023-Q4,,,,-43.513842,172.710536
CCC_43214,20/03/2024,Christchurch City Council,CWTP Treatment Plant Channel Improvements.,Additional channel to increase wet weather flow capacity and operational flexibility between the existing inlet screens and the primary sedimentation tanks.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2030-Q3,,,,2033-Q2,2030-Q3,2033-Q2,,,,,
CCC_43216,20/03/2024,Christchurch City Council,WW Tyrone Street Pump Station Capacity Renewal (Stage 2) (PS62).,To increase wastewater capacity to accommodate growth in the Belfast area including residential industrial and commercial greenfield areas by installing an additional pump and additional air valves and/or pressure suge vessels.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2026-Q3,,,,2030-Q2,2026-Q3,2030-Q2,,,,-43.443146,172.638385
CCC_43219,20/03/2024,Christchurch City Council,WW Belfast Northern Wastewater Pump Station (Stage 1).,A new pump station and pressure main to convey wastewater from growth areas from Belfast including residential industrial and commercial greenfield areas.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,25 - 50 million,,2029-Q3,,,2031-Q3,2034-Q2,2029-Q3,2034-Q2,,,,,
CCC_43662,20/03/2024,Christchurch City Council,Bays Skate and Scooter Park.,Install a skate and scooter facility in the Bays Area (Ferrymead to Sumner). This project is to work with the community to develop a skate and scooter facility. This project will also consider other associated recreation activities to complement the skate and scooter park.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2018-Q3,,,2024-Q2,2025-Q2,2018-Q3,2025-Q2,,,,-43.569318,172.758383
CCC_43946,20/03/2024,Christchurch City Council,WW Tilford Street Pump Station & Pressure Main Capacity Renewal (PS13).,To reduce wastewater overflows to the Heathcote River so that compliance with the wet weather overflow consent can be achieved.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2018-Q3,,,2024-Q2,2025-Q2,2018-Q3,2025-Q2,,,,-43.544058,172.677162
CCC_44056,20/03/2024,Christchurch City Council,SW Knights Drain Ponds (LDRP 509).,Design and Construction of land drainage works to repair earthquake damage to the Knights Drain Ponds reinstate the pre-earthquake flood risk to the Knights Drain Catchment and improve water quality discharging into the Avon River.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2017-Q3,,,2022-Q4,2024-Q1,2017-Q3,2024-Q1,,,,-43.511034,172.715103
CCC_44410,20/03/2024,Christchurch City Council,WW Mains Renewal Tuam St Reticulation Renewal (Brick Barrel) (Livingstone to Mathesons).,Renew or line the critical wastewater trunk main and install a new collector main due to very poor pipe condition on a critical wastewater trunk main.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2017-Q3,,,2019-Q2,2021-Q2,2017-Q3,2021-Q2,,,,-43.535458,172.654014
CCC_44421,20/03/2024,Christchurch City Council,SW Kainga Basins.,Land and works to construct a wetland for stormwater treatment and a detention basin for flood protection.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2022-Q1,,,2025-Q3,2027-Q2,2022-Q1,2027-Q2,,,,-43.416151,172.655018
CCC_44577,20/03/2024,Christchurch City Council,SW Highsted Styx Mill Reserve Wetland.,Construction of a 4 hectare wetland on CCC reserve at 12 Styx Mill Road to provide secondary treatment for storm water.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2021-Q2,,,2025-Q3,2027-Q4,2021-Q2,2027-Q4,,,,-43.465352,172.608217
CCC_44585,20/03/2024,Christchurch City Council,SW Highsted Wetland Highams Basin & Pūharakekenui - Styx Stream.,Complete construction of the Highsted stormwater management system including wetlands first flush basins and waterway enhancements in accordance with the Styx Stormwater Management Plan.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2021-Q3,,,2025-Q3,2026-Q2,2021-Q3,2026-Q2,,,,-43.472065,172.602827
CCC_44696,20/03/2024,Christchurch City Council,Local Cycle Network - North West Outer Orbital.,Package of local cycleways along the north-west section of the Outer Orbital including Racecourse Rd Yaldhurst Rd Withells Rd Avonhead Rd Roydvale Ave and Wooldridge Rd. Includes a link between the South Express and Wheels to Wings.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2029-Q3,,,,2031-Q2,2029-Q3,2031-Q2,,,,,
CCC_44703,20/03/2024,Christchurch City Council,Local Cycle Network - Northwood.,Package of local cycleways within and around Northwood linking the Northern Line and the Northern Arterial Pathway via the Northwood Key Activity Centre. Includes Belfast Rd Blakes Rd Thompsons Rd and Radcliffe Rd.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2028-Q3,,,,2031-Q2,2028-Q3,2031-Q2,,,,,
CCC_44706,20/03/2024,Christchurch City Council,Local Cycle Network - Avonside & Wainoni.,Package of local cycleways within Avonside and Wainoni. Includes Avonside Dr Woodham Rd Gloucester St Gayhurst Rd England St Breezes Rd Avondale Rd Kerrs Rd and Pages Rd.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2025-Q3,,,,2028-Q2,2025-Q3,2028-Q2,,,,,
CCC_44709,20/03/2024,Christchurch City Council,Local Cycle Network - Greers Rd.,Package of local cycleways along Greers Rd connecting Burnside High School to Wheels to Wings and Bishopdale.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2025-Q3,,,,2029-Q2,2025-Q3,2029-Q2,,,,,
CCC_44710,20/03/2024,Christchurch City Council,Local Cycle Network - Halswell to Hornby.,Package of local cycleways connecting Hornby to Halswell crossing the Little River Link. Includes Aymes rd Springs Rd Awatea Rd Dunbars Rd Shands Rd and Halswell Rd.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2026-Q3,,,,2028-Q2,2026-Q3,2028-Q2,,,,,
CCC_44715,20/03/2024,Christchurch City Council,Local Cycle Network - Ferrymead.,Package of local cycleways within Ferrymead. Includes Port Hills Rd Bridle Path Rd and Martindales Rd from Tunnel Rd to Main Rd.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2029-Q3,,,,2031-Q2,2029-Q3,2031-Q2,,,,,
CCC_45202,20/03/2024,Christchurch City Council,WS Wrights Road Suction Tank & Pump Station Building (PS1080).,Stage 2 of the Wrights waster supply pump station upgrade which includes a new suction tank and pump station building. This project is in addition to Stage 1 which involves drilling two new wells on a new site.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2024-Q3,,,,2028-Q2,2024-Q3,2028-Q2,,,,,
CCC_45280,20/03/2024,Christchurch City Council,WW Highfield Wastewater Servicing - Stage 2.,Stage 2 of the wastewater scheme to service the Highfield Outline Development Plan area. The area will be developed as a smart pressure sewer network.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q1,,,2024-Q3,2026-Q2,2023-Q1,2026-Q2,,,,-43.478408,172.638865
CCC_45281,20/03/2024,Christchurch City Council,WS Highfield Water Supply Mains - Stage 2.,Stage 2 of the water supply scheme to service the Highfield Outline Development Plan area. This stage will complete the backbone of the water supply network with pipelines along Hills Road and Hawkins Road.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q1,,,2024-Q3,2026-Q2,2023-Q1,2026-Q2,,,,-43.478276,172.638887
CCC_45318,20/03/2024,Christchurch City Council,Central City Projects - High Street Tram Extension.,Extending the tram tracks south from Manchester Street and Poplar Street to enable the tram to make a loop return journey northbound along High Street.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2018-Q1,,,2021-Q3,2022-Q2,2018-Q1,2022-Q2,,,,-43.535221,172.641119
CCC_47023,20/03/2024,Christchurch City Council,Major Cycleway - Northern Line Route (Section 2) Tuckers to Barnes & Main North Road.,Major Cycleway Route – Northern Line – From Tuckers Road to Barnes Road & Main North Road.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2021-Q1,,,2022-Q3,2024-Q3,2021-Q1,2024-Q3,,,,-43.474102,172.616963
CCC_47024,20/03/2024,Christchurch City Council,Major Cycleway Northern Line Route (Section 3a) Styx Mill Overbridge to Northwood Boulevard.,Major Cycleway Route - Northern Line - from Styx Mill Overbridge to Northwood Boulevard.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2021-Q1,,,2021-Q3,2022-Q4,2021-Q1,2022-Q4,,,,-43.466845,172.61795
CCC_47027,20/03/2024,Christchurch City Council,Major Cycleway Nor'West Arc Route (Section 1b) Sparks to Lincoln & Halswell Intersection.,Major Cycleway Route project linking Sparks Road and Lincoln Road.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2019-Q3,,,2020-Q3,2021-Q1,2019-Q3,2021-Q1,,,,-43.558223,172.606519
CCC_47028,20/03/2024,Christchurch City Council,Major Cycleway Nor'West Arc Route (Section 1c) Lincoln Halswell Rd to Annex Sthn Mway Underpass.,This Major Cycleway Route connects Papanui to Cashmere via an orbital route.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2019-Q3,,,2020-Q3,2020-Q4,2019-Q3,2020-Q4,,,,-43.554823,172.592703
CCC_47031,20/03/2024,Christchurch City Council,Major Cycleway - South Express Route (Section 2) Craven to Buchanans.,Major Cycleway Route project linking the upper Riccarton Library and Curletts Road.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2019-Q1,,,2021-Q3,2024-Q2,2019-Q1,2024-Q2,,,,-43.533221,172.565339
CCC_47123,20/03/2024,Christchurch City Council,CWTP Biogas Storage Upgrade.,Improve bio-gas storage to reduce amount of bio-gas flared to waste and improve ability to match electrical generation with demand thereby reducing peak demand electricity charges.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2018-Q4,,,2024-Q3,2026-Q2,2018-Q4,2026-Q2,,,,-43.525153,172.699606
CCC_47124,20/03/2024,Christchurch City Council,CWTP Biogas Engine Upgrade (Generator 1).,Upgrade of biogas engine.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2026-Q3,,,2029-Q3,2030-Q3,2026-Q3,2030-Q3,,,,-43.525073,172.700605
CCC_48081,20/03/2024,Christchurch City Council,WS Mains Renewal - Halswell Junction Rd Roading Extension.,Water renewal works will be constructed in conjunction with roading upgrade works in the area.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2018-Q3,,,2021-Q2,2023-Q4,2018-Q3,2023-Q4,,,,-43.542838,172.507638
CCC_48083,20/03/2024,Christchurch City Council,WW St Asaph St Odour Treatment.,Install a treatment system to mitigate odour corrosion risk and customer complaints.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2018-Q4,,,2021-Q4,2024-Q3,2018-Q4,2024-Q3,,,,-43.536287,172.624105
CCC_48551,20/03/2024,Christchurch City Council,SW Manchester Street Drain Reticulation Renewal (Brick Barrels) (Purchas Street to Bealey Ave).,Renewal of damaged poor condition major stormwater pipeline.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2018-Q3,,,2024-Q1,2026-Q2,2018-Q3,2026-Q2,,,,-43.519559,172.638804
CCC_48891,20/03/2024,Christchurch City Council,WS Mains Renewal of Colombo to Moorhouse Utility Tunnel.,Replacement and renewal of water supply mains.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2018-Q3,,,2023-Q2,2024-Q1,2018-Q3,2024-Q1,,,,-43.539932,172.636661
CCC_48900,20/03/2024,Christchurch City Council,WW Pump & Storage Equipment Renewals 2021 (MEICA).,The purpose of this project is to proactively replace critical assets that are the end of their useful life and those that are not meeting current CCC standards.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2019-Q2,,,2020-Q4,2022-Q3,2019-Q2,2022-Q3,,,,,
CCC_48901,20/03/2024,Christchurch City Council,WS Pump & Storage Equipment Renewals 2020 (MEICA).,The purpose of this project is to proactively replace critical assets that are the end of their useful life and those that are not meeting current CCC standards.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2018-Q4,,,2021-Q3,2024-Q1,2018-Q4,2024-Q1,,,,,
CCC_48902,20/03/2024,Christchurch City Council,WS Pump & Storage Equipment Renewals (MEICA) & Transient Mitigation.,The purpose of this project is to proactively replace critical assets that are the end of their useful life and those that are not meeting current CCC standards.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2019-Q2,,,2024-Q4,2026-Q1,2019-Q2,2026-Q1,,,,,
CCC_48918,20/03/2024,Christchurch City Council,SW Upper Heathcote Storage Optimisation (LDRP 530).,This project to minimise flood risk in the Heathcote flood plain by establishing a control system between the four storm water basins in the upper Heathcote.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2019-Q1,,,2021-Q4,2023-Q1,2019-Q1,2023-Q1,,,,-43.587603,172.627398
CCC_49093,20/03/2024,Christchurch City Council,SW Corsair Bay Pipeline Renewal (From Park Terrace Inlet to Coastal Outfall).,Renew approximately 265m of pipeline from an inlet structure upstream of Park Terrace to a beach outfall in Corsiar Bay Lyttelton Harbour.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q4,,,2025-Q2,2025-Q3,2020-Q4,2025-Q3,,,,-43.606727,172.70029
CCC_49716,20/03/2024,Christchurch City Council,SW Mairehau Drain Timber Lining Renewal (Westminister to Crosby).,Replacement of timber lining that has reached the end of its useful life.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2018-Q4,,,2022-Q2,2023-Q4,2018-Q4,2023-Q4,,,,-43.483796,172.677358
CCC_50154,20/03/2024,Christchurch City Council,Te Papa Kura Redcliffs Park Development.,This project is to redevelop the former Redcliffs School Site into a park to replace the community asset at Redcliffs Park which is the site of the new school.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2018-Q3,,,2020-Q3,2025-Q2,2018-Q3,2025-Q2,,,,-43.559302,172.734919
CCC_50182,20/03/2024,Christchurch City Council,Pages Road Depot Buildings Repair.,Repair of earthquake damage strengthen building structure to 67% of new building code and install a new fire protection system.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2021-Q2,,,2020-Q3,2024-Q1,2021-Q2,2024-Q1,,,,-43.524044,172.700968
CCC_50341,20/03/2024,Christchurch City Council,WS Mays Well Renewal (3).,Replacement of Well 3 with a deep well. .,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2018-Q3,,,2020-Q3,2023-Q2,2018-Q3,2023-Q2,,,,-43.502144,172.621716
CCC_50449,20/03/2024,Christchurch City Council,WS Sydenham Suction Tank Replacement.,The pump station suction tank was destroyed in the earthquake and had temporary tanks installed to reinstate the site during the earthquake recovery period. This project is to remove the old tank and build a permanent replacement tank.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2018-Q4,,,2022-Q3,2023-Q4,2018-Q4,2023-Q4,,,,-43.561903,172.638113
CCC_50580,20/03/2024,Christchurch City Council,WW Ensors Fifield & Louisson Mains Renewal.,Replacement and renewal of wastewater mains.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2018-Q3,,,2020-Q2,2023-Q2,2018-Q3,2023-Q2,,,,-43.552417,172.657709
CCC_50797,20/03/2024,Christchurch City Council,Coronation Hall Repairs.,The Coronation Hall is a listed Heritage building in the District Plan but has been damaged by fire. This project is to carry out works to repair and upgrade to allow for leasing and occupancy by a suitable community group.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2021-Q1,,,2023-Q2,2023-Q4,2021-Q1,2023-Q4,,,,-43.555009,172.599564
CCC_52095,20/03/2024,Christchurch City Council,WS Prestons - Additional Well Development & Well Head Construction.,Design and construction to convert well head to a secure above ground well head.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2018-Q4,,,2019-Q1,2021-Q1,2018-Q4,2021-Q1,,,,-43.473442,172.665072
CCC_52902,20/03/2024,Christchurch City Council,WS Okains Bay New Water Supply.,To provide drinking water to the residents and visitors of Okains Bay To meet the New Zealand Drinking Water Standards.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2019-Q3,,,2024-Q3,2025-Q2,2019-Q3,2025-Q2,,,,-43.694165,173.061358
CCC_54020,20/03/2024,Christchurch City Council,Central City Projects - Hereford Street Bridge Surface Replacement.,Replacement of the existing road and footpath surfaces including changes to the kerbs.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2019-Q2,,,2019-Q4,2020-Q4,2019-Q2,2020-Q4,,,,-43.532023,172.633528
CCC_54276,20/03/2024,Christchurch City Council,Diamond Harbour Wharf Renewal.,Ensure the wharf facilities meet current and future demand.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2019-Q4,,,2022-Q3,2023-Q4,2019-Q4,2023-Q4,,,,-43.623113,172.73678
CCC_55592,20/03/2024,Christchurch City Council,SW Halswell Modelling (LDRP 533).,Develop a Halswell hydraulic model in line with the City Wide Model specification.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2019-Q4,,,2020-Q1,2024-Q4,2019-Q4,2024-Q4,,,,,
CCC_55781,20/03/2024,Christchurch City Council,WS Libeau & Chemin Du Nache Mains Renewal.,New water supply pumping main and hydrant in Akaroa.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2019-Q4,,,2022-Q1,2023-Q2,2019-Q4,2023-Q2,,,,-43.801533,172.972139
CCC_55783,20/03/2024,Christchurch City Council,WS Scruttons Road Pump Station to Lyttelton Road Tunnel & St Andrews Hill Road Mains Renewal.,Renew and upsize critical pumping water supply main from Scruttons Pump Station to the Lyttelton Road Tunnel and also to renew the water supply main from 45 St Andrews Hill Rd to 57 St Andrews Hill Rd.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2019-Q4,,,2022-Q1,2024-Q3,2019-Q4,2024-Q3,,,,-43.576881,172.707408
CCC_55784,20/03/2024,Christchurch City Council,WS Hackthorne & Dyers Pass Road to Takahē Pump Station Mains Renewal.,Renew water supply mains from the Hackthorne Reservoir (104C Hackthorne Rd) to PS1032 Takahe Pump Station (164 Dyers Pass Rd).,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2019-Q3,,,2021-Q3,2022-Q4,2019-Q3,2022-Q4,,,,-43.577932,172.627607
CCC_55785,20/03/2024,Christchurch City Council,WS Rocking Horse Heron Plover Mermaid & Pukeko Mains Renewal.,Replacement and renewal of water supply mains.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q1,,,2021-Q1,2023-Q2,2020-Q1,2023-Q2,,,,-43.552142,172.748559
CCC_55788,20/03/2024,Christchurch City Council,WS Fenchurch Grosvenor Paddington Ealing Camden Uxbridge & Aldgate Mains Renewal.,Replacement and renewal of water supply mains.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q1,,,2021-Q2,2022-Q2,2020-Q1,2022-Q2,,,,-43.480631,172.613974
CCC_55789,20/03/2024,Christchurch City Council,WS Grahams Hounslow & Rembrandt Mains Renewal.,Replacement and renewal of water supply mains.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q1,,,2021-Q3,2022-Q2,2020-Q1,2022-Q2,,,,-43.509719,172.56681
CCC_55790,20/03/2024,Christchurch City Council,WS Puriri Kilmarnock Wharenui Ilam Maidstone Wainui George Division Deans & Waimairi Mains Renewal.,Replacement and renewal of water supply mains.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2020-Q1,,,2021-Q2,2022-Q4,2020-Q1,2022-Q4,,,,-43.5259,172.591159
CCC_55796,20/03/2024,Christchurch City Council,WS Port Hills Road Mains Renewal.,Replacement and renewal of water supply mains.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q1,,,2022-Q4,2023-Q3,2020-Q1,2023-Q3,,,,-43.563595,172.709084
CCC_55797,20/03/2024,Christchurch City Council,WS Park Governors Bay Cressy Pages Buxtons & Gladstone Quay Mains Renewal.,Replacement and renewal of water supply mains.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q1,,,2021-Q3,2024-Q2,2020-Q1,2024-Q2,,,,-43.607204,172.701141
CCC_55798,20/03/2024,Christchurch City Council,WS Conway Hollis Centaurus Palatine Herbs & Eastern Terrace Mains Renewal.,Replacement and renewal of water supply mains.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q1,,,2021-Q2,2022-Q4,2020-Q1,2022-Q4,,,,-43.563795,172.61844
CCC_55894,20/03/2024,Christchurch City Council,Evans Pass Road & Reserve Terrace Remedial Works.,Installation of guardrails renewal of retaining walls and assessment and renewal of road drainage to meet route safety requirements along Evans Pass and Reserve Terrace.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2019-Q3,,,2023-Q1,2029-Q2,2019-Q3,2029-Q2,,,,-43.589373,172.750813
CCC_56060,20/03/2024,Christchurch City Council,WS Update Model Base Data.,Update the Council water supply hydraulic models.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2019-Q1,,,2023-Q1,2031-Q2,2019-Q1,2031-Q2,,,,,
CCC_56163,20/03/2024,Christchurch City Council,WW Riccarton Mains Renewal (Hansons Lane to Euston Street).,Renew the waste water mains within the following street sections: Riccarton Road from Hansons Lane to Euston Street.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2019-Q4,,,2021-Q2,2022-Q2,2019-Q4,2022-Q2,,,,-43.531181,172.581581
CCC_56165,20/03/2024,Christchurch City Council,WW Upper Totara Puriri Balgay Milnebank Karamu Field Wharenui Weka Tui Leinster Bristol Main Renewal.,Renewal of waste water sewer mains.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2019-Q4,,,2021-Q2,2023-Q2,2019-Q4,2023-Q2,,,,-43.527188,172.59332
CCC_56166,20/03/2024,Christchurch City Council,SW Ōtākaro Avon River Corridor Waikākāriki - Horseshoe Lake Stormwater Treatment (OARC) Stage 1.,This facility will provide stormwater treatment for approximately 480 hectares of existing development discharging via Dudley Creek Diversion using a first flush basin and stormwater wetland.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2020-Q1,,,2026-Q1,2028-Q3,2020-Q1,2028-Q3,,,,-43.49755,172.672546
CCC_56177,20/03/2024,Christchurch City Council,WW Ascot Randwick Flemington Beach & Bower Mains Renewal.,Replacement of wastewater pipes in poor condition.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q1,,,2021-Q4,2023-Q2,2020-Q1,2023-Q2,,,,-43.488745,172.708243
CCC_56180,20/03/2024,Christchurch City Council,WW Tome Rutlan Scotsto Norfol Benne May Tavendal Chapte Lingar Mathia Paparo & Claremo Ma.,Replacement of wastewater pipes in poor condition.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2020-Q1,,,2021-Q2,2023-Q2,2020-Q1,2023-Q2,,,,-43.503207,172.615972
CCC_56181,20/03/2024,Christchurch City Council,WW W Edmonds Randolph Marcroft Manning Wildberry Hopkins Ferry & Okeover Mains Renewal.,Replacement of wastewater pipes in poor condition.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q1,,,2021-Q3,2023-Q3,2020-Q1,2023-Q3,,,,-43.54153,172.668514
CCC_56183,20/03/2024,Christchurch City Council,WW Allard Edward Geraldine & Cleveland Mains Renewal.,Replacement of wastewater pipes in poor condition.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q1,,,2021-Q3,2023-Q2,2020-Q1,2023-Q2,,,,-43.511044,172.644252
CCC_56186,20/03/2024,Christchurch City Council,Warden Street Renewals (Warden to Shirley).,Street assets renewals in Warden Street between property #102 and Shirley Road.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2019-Q3,,,2022-Q2,2022-Q4,2019-Q3,2022-Q4,,,,-43.509231,172.659948
CCC_56187,20/03/2024,Christchurch City Council,Petrie Street Renewals (North Avon to Randall).,Condition-based renewal of street assets in Petrie Street between North Avon Road and Randall Street.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2019-Q3,,,2022-Q2,2022-Q4,2019-Q3,2022-Q4,,,,-43.51648,172.657365
CCC_56188,20/03/2024,Christchurch City Council,Chrystal Street Renewals (North Avon to Randall).,Street assets renewals in Chrystal Street (North Avon Road - Randall Street).,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2019-Q3,,,2022-Q2,2022-Q4,2019-Q3,2022-Q4,,,,-43.516372,172.658598
CCC_56189,20/03/2024,Christchurch City Council,Dudley Street Renewals (Slater to Stapletons).,Street assets renewals in Dudley Street (Slater Street to Stapletons Road).,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2019-Q3,,,2023-Q4,2025-Q1,2019-Q3,2025-Q1,,,,-43.514326,172.654663
CCC_56190,20/03/2024,Christchurch City Council,Stapletons Road Renewals (Warden to Shirley).,Condition-based renewal of street assets in Stapletons Road between Warden Street and Shirley Road.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2019-Q4,,,2023-Q4,2024-Q3,2019-Q4,2024-Q3,,,,-43.509475,172.655942
CCC_56318,20/03/2024,Christchurch City Council,SW Cashmere Stream Enhancement (Cashmere Road).,We’re enhancing a two-kilometre section of Cashmere Stream between Sutherlands Road and Dunbars Stream to improve the health of the stream and enhance and provide new and diverse habitat for native plants and animals to live. This project has been granted funding from the Ministry for the Environment Freshwater Improvement Fund over three years. The entire project is due for completion in 2024.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2021-Q1,,,2021-Q4,2025-Q2,2021-Q1,2025-Q2,,,,-43.585275,172.59261
CCC_56343,20/03/2024,Christchurch City Council,SW Quarry Road Drain Conveyance Improvements & Sutherlands Road Culverts.,Quarry Road Drain capacity improvements and installation of three culverts under Sutherlands Road to provide conveyance of stormwater into Sutherlands Basins.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2019-Q4,,,2024-Q4,2025-Q2,2019-Q4,2025-Q2,,,,-43.591077,172.581209
CCC_56802,20/03/2024,Christchurch City Council,Multicultural Recreation and Community Centre.,Identify and secure a community partnership to provide a multicultural community and recreation centre in central Christchurch.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2019-Q3,,,2022-Q1,2027-Q2,2019-Q3,2027-Q2,,,,,
CCC_56899,20/03/2024,Christchurch City Council,QEII Park Master Plan Sports Field Repositioning & Stormwater Development.,Delivery of the realignment of the sports field including mounding and light repositioning and storm water basin as per the master plan.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,2019-Q3,,,2023-Q3,2028-Q2,2019-Q3,2028-Q2,,,,-43.492839,172.702895
CCC_56950,20/03/2024,Christchurch City Council,SW South New Brighton Set-Back Bund (Bridge Street to Jetty).,Some upgrading the walkway/cycleway through to New Brighton and some repair of the estuary edge in South New Brighton Park. Construction of a bund on the Estuary side of the camping ground.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2019-Q3,,,2019-Q4,2021-Q4,2019-Q3,2021-Q4,,,,-43.524206,172.728162
CCC_57643,20/03/2024,Christchurch City Council,WW Hayton Road Main Renewal.,Provide additional wastewater capacity in conjunction with other development work in the area.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2019-Q4,,,2021-Q3,2023-Q1,2019-Q4,2023-Q1,,,,-43.541199,172.553532
CCC_57717,20/03/2024,Christchurch City Council,Oxford Terrace Bollards at Hereford Street.,Install bollards to restrict traffic movements into Oxford Terrace.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2019-Q3,,,2021-Q3,2021-Q4,2019-Q3,2021-Q4,,,,-43.532053,172.633816
CCC_57718,20/03/2024,Christchurch City Council,SW Ōtākaro Avon River Corridor Waikākāriki - Horseshoe Lake Stromwater Treatment (OARC) (Stage 2).,Design and construction of an extension to the first flush basin and stormwater treatment wetland.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2022-Q1,,,,2030-Q2,2022-Q1,2030-Q2,,,,-43.49755,172.672546
CCC_57800,20/03/2024,Christchurch City Council,WS Moorhouse Avenue Pump Station.,Construction of a water supply pump station adjacent to the proposed Metro Sports Facility. This water supply pump station will supply water to the Central Water Supply Zone to cater for future growth.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2022-Q1,,,2024-Q4,2028-Q2,2022-Q1,2028-Q2,,,,-43.536538,172.626138
CCC_57801,20/03/2024,Christchurch City Council,WS Redwood Pump Station Well 1 & Well 2 Renewal (PS1077).,Replacement of two wells at Redwood pump station with deep wells and secure above ground well heads.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q2,,,2021-Q2,2023-Q4,2020-Q2,2023-Q4,,,,-43.474148,172.623636
CCC_57808,20/03/2024,Christchurch City Council,WS Duvauchelle Membrane Filtration.,Upgrade Duvauchelle water treatment to a membrane filtration plant.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2021-Q2,,,2024-Q3,2025-Q2,2021-Q2,2025-Q2,,,,-43.756274,172.953524
CCC_58135,20/03/2024,Christchurch City Council,WS Ashgrove Macmillan Cashmere Dyers Pass Victoria Barry Hogan & Hackthorne Mains Renewals.,Planned renewal of water supply pipelines.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2019-Q4,,,2021-Q3,2023-Q3,2019-Q4,2023-Q3,,,,-43.56728,172.627086
CCC_58140,20/03/2024,Christchurch City Council,WS Rezoning Linwood & Woolston Subzones.,Creation of the Linwood and Woolston pressure management sub-zones.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q1,,,,2026-Q2,2023-Q1,2026-Q2,,,,-43.540564,172.684295
CCC_58177,20/03/2024,Christchurch City Council,WS Pump Station Resilience Renewal.,Implementation of works identified in Pump Station Security Assessments.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q4,,,2021-Q2,2024-Q1,2020-Q4,2024-Q1,,,,,
CCC_58178,20/03/2024,Christchurch City Council,WS Hackthorne Reservoir Renewal.,Complete renewal and refurbishment of the Hackthorne water supply reservoir to ensure it meets a demonstrably safe and secure level and meets the requirements of the NZ Drinking Water Standards.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q3,,,2025-Q3,2026-Q2,2020-Q3,2026-Q2,,,,-43.601821,172.575637
CCC_58434,20/03/2024,Christchurch City Council,WW Smart Overflow Reduction.,To develop and deploy a smart overflow surcharger in Pump Station 53 catchment which will be fully monitored in order to measure the impact of wet weather overflows at the Grassmere overflow site.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2019-Q4,,,2021-Q2,2024-Q2,2019-Q4,2024-Q2,,,,-43.487691,172.626561
CCC_58672,20/03/2024,Christchurch City Council,Ōtākaro-Avon River Corridor - Bridges and Landing (OARC).,Development of the Avon River Corridor including Christchurch Earthquake Appeal Trust (CEAT) funded Projects (3 bridges and 1 landing in Dallington) and the Capital Regeneration Acceleration Funding from the Crown.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,2020-Q2,,,2021-Q1,2022-Q2,2020-Q2,2022-Q2,,,,,
CCC_58910,20/03/2024,Christchurch City Council,WS Quarry Reservoir Renewal.,Address unacceptable risks to potable water quality. Return Reservoir to a watertight status. Enable chlorination of water supply to be stopped.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q3,,,2021-Q3,2023-Q2,2020-Q3,2023-Q2,,,,-43.592604,172.72266
CCC_58911,20/03/2024,Christchurch City Council,QEII Park Master Plan Sports Pavilion.,Build a changing block to service existing and proposed sports fields. Incorporate public toilets into the sport change facility.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2020-Q1,,,,2026-Q2,2020-Q1,2026-Q2,,,,-43.490223,172.706932
CCC_59076,20/03/2024,Christchurch City Council,CWTP Wastewater Treatment Plant Building Three Renewal.,Replacement building for three waters controls infrastructure.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2022-Q3,,,2026-Q1,2027-Q1,2022-Q3,2027-Q1,,,,-43.52466,172.70116
CCC_59181,20/03/2024,Christchurch City Council,Central City Projects - Antigua Street Cycle Network (Tuam-Moorhouse).,Complete the connection of the Quarryman's Trail MCR between Moorhouse Ave and the central city cycle networks after construction of the adjacent Metrosports facility.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2020-Q2,,,2024-Q2,2025-Q1,2020-Q2,2025-Q1,,,,-43.538834,172.627818
CCC_59849,20/03/2024,Christchurch City Council,Performing Arts Precinct Public Realm.,Develop the public realm of the Performing Arts Precinct site funded through the Crown Global Settlement Agreement.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2022-Q2,,,,2025-Q4,2022-Q2,2025-Q4,,,,-43.529307,172.637637
CCC_59935,20/03/2024,Christchurch City Council,Bexley Landfill Remediation.,Stop landfill material from dispersing or discharging into the estuary during a storm event using rock containment.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Waste management,1 - 5 million,,2020-Q3,,,2021-Q3,2025-Q3,2020-Q3,2025-Q3,,,,-43.528686,172.724205
CCC_59938,20/03/2024,Christchurch City Council,WS Metro Pump Station to Antigua Street Link Main.,Replacement and renewal of water supply mains.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q4,,,2024-Q2,2024-Q4,2020-Q4,2024-Q4,,,,-43.538397,172.625417
CCC_60007,20/03/2024,Christchurch City Council,WS Lyttelton Harbour Water Supply Security.,To provide new and upgraded water supply infrastructure to secure the water supply to Lyttelton Harbour in the event that the renewal of the rail tunnel water supply pipes is not achievable. This may include the strengthening of the road tunnel infrastructure by upgrading the mains on either side of the tunnel upgrading of the Scruttons pump station and provision of additional storage in Lyttelton.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,25 - 50 million,,2026-Q3,,,,2031-Q2,2026-Q3,2031-Q2,,,,-43.592587,172.722612
CCC_60069,20/03/2024,Christchurch City Council,Cowles Stadium Renewals & Replacements.,To ensure Cowles Stadium is operating correctly and avoid any unscheduled breakdown and downtime.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2020-Q2,,,2022-Q1,2024-Q2,2020-Q2,2024-Q2,,,,-43.521546,172.695579
CCC_60096,20/03/2024,Christchurch City Council,WS Blighs Road Pump Station Well 3 Renewal (PS1007).,Replacement of this water supply well as the current unit cannot be converted to an above ground well head (required for water safety reasons) due to its location.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q3,,,2021-Q3,2024-Q2,2020-Q3,2024-Q2,,,,-43.505707,172.599094
CCC_60097,20/03/2024,Christchurch City Council,Marshlands Road Corridor Improvement (Prestons Road to Old Waimakariri Bridge).,Marshlands Road from Prestons Road to Old Waimakariri Bridge has been identified as a high-risk corridor. This project aims to improve safety and reduce death and serious injury crashes on this corridor and includes widening the centreline and shoulder widening at high-risk locations.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2020-Q1,,,2025-Q2,2027-Q2,2020-Q1,2027-Q2,,,,-43.452234,172.65765
CCC_60101,20/03/2024,Christchurch City Council,Taiora QEII Renewals & Replacements.,To ensure Taiora QEII is operating correctly and avoid any unscheduled breakdown and downtime. Delivery Package of asset renewals at end of life required to meet levels of service.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2021-Q3,,,2023-Q1,2025-Q2,2021-Q3,2025-Q2,,,,-43.491184,172.708014
CCC_60102,20/03/2024,Christchurch City Council,Dickeys & Main North Road Intersection Safety Improvement.,Dickeys Road / Main North Road intersection has been identified as a medium-high risk intersection. This project aims to improve safety and reduce death and serious injury crashes at this intersection by converting it to a rural roundabout.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2025-Q3,,,,2028-Q2,2025-Q3,2028-Q2,,,,-43.437177,172.63774
CCC_60104,20/03/2024,Christchurch City Council,Prestons & Grimseys Intersection Improvement.,Intersection improvement to accommodate increased traffic demand generated by Highfield Park development.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,,,,2025-Q1,2026-Q2,2025-Q1,2026-Q2,,,,-43.474134,172.627357
CCC_60107,20/03/2024,Christchurch City Council,Pioneer Renewals & Replacements.,To ensure Pioneer is operating effectively efficiently and avoid any unscheduled breakdown and downtime.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2020-Q2,,,2023-Q1,2024-Q2,2020-Q2,2024-Q2,,,,-43.566144,172.614085
CCC_60110,20/03/2024,Christchurch City Council,Graham Condon Cycle Shutdown.,Delivery Package of asset renewals at end of life required to meet levels of service so as to ensure Graham Condon is operating effectively efficiently and avoid any unscheduled breakdown and downtime.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,2020-Q2,,,2023-Q4,2024-Q2,2020-Q2,2024-Q2,,,,-43.491555,172.608848
CCC_60115,20/03/2024,Christchurch City Council,Radcliffe Road Corridor Improvement.,Radcliffe Rd route improvements between railway and Hawkins Rd including carriageway widening and level crossing upgrade.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2025-Q3,,,2024-Q4,2026-Q2,2025-Q3,2026-Q2,,,,-43.463852,172.640571
CCC_60117,20/03/2024,Christchurch City Council,Gardiners Road Corridor Improvement.,Gardiners Rd route improvements north of Claridges includes new kerb and path. Project ensures continuity between developments and existing transport network.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2025-Q3,,,,2028-Q2,2025-Q3,2028-Q2,,,,-43.469641,172.589577
CCC_60152,20/03/2024,Christchurch City Council,WS Kerrs Road Pump Station Renewal (PS1022).,Whole station renewal at a new site location.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2022-Q1,,,2026-Q1,2028-Q2,2022-Q1,2028-Q2,,,,-43.524824,172.681718
CCC_60153,20/03/2024,Christchurch City Council,WS Tara Street Replacement Building Electrics & Controls (PS1089).,Replace building taken over by waste pumping station. This has led to conflicts with regard towards water safety and access monitoring.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2024-Q1,,,,2044-Q2,2024-Q1,2044-Q2,,,,-43.53179,172.589652
CCC_60154,20/03/2024,Christchurch City Council,WS Grampian Street Suction Tank Renewal (PS1074).,Replacement of below ground suction tank.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2022-Q2,,,2027-Q1,2029-Q2,2022-Q2,2029-Q2,,,,-43.477389,172.60547
CCC_60155,20/03/2024,Christchurch City Council,WS Auburn Avenue Pump Station Renewal (PS1068).,This station is one of two in the city with an underground suction tank that poses a significant risk to the water safety of the city. As this site also is now down to one well that is up for replacement and the station land does not support any further development the station has been marked for full replacement.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q2,,,2025-Q1,2029-Q2,2023-Q2,2029-Q2,,,,-43.533482,172.576265
CCC_60158,20/03/2024,Christchurch City Council,WS Pump & Storage MEICA Renewals for FY2023.,The purpose of this project is to proactively replace critical assets that are the end of their useful life and those that are not meeting current CCC standards.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q1,,,2024-Q2,2025-Q2,2022-Q1,2025-Q2,,,,,
CCC_60159,20/03/2024,Christchurch City Council,WS Burnside & Farrington Generator Replacement.,The purpose of this project is to proactively replace critical assets that are the end of their useful life and those that are not meeting current CCC standards in terms of operability. Replacement of generators at Burnside and Farrington Pump Stations.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q3,,,2024-Q2,2024-Q4,2022-Q3,2024-Q4,,,,,
CCC_60163,20/03/2024,Christchurch City Council,WS Scarborough 1 Pump Station Relocation out of Rock Fall Zone (PS1060).,Scarborough 1 booster station is currently located in a known rock fall location.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2024-Q3,,,,2028-Q2,2024-Q3,2028-Q2,,,,,
CCC_60171,20/03/2024,Christchurch City Council,Radio Communications Upgrade (4RF).,Water Supply control software upgrade.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q1,,,2025-Q1,2025-Q2,2023-Q1,2025-Q2,,,,-43.58126,172.65616
CCC_60173,20/03/2024,Christchurch City Council,WW Pages Road Pump Station Pump Replacements (PS0001).,Replacement of wastewater pumps at Pages Road wastewater pump station.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q3,,,2025-Q3,2026-Q2,2022-Q3,2026-Q2,,,,-43.52541,172.683072
CCC_60174,20/03/2024,Christchurch City Council,WW Alport Pump Station Pump Renewals (PS0015).,The objectives of this project is to reduce known risks and costs associated with aged pumps in poor condition.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2021-Q1,,,2024-Q2,2026-Q2,2021-Q1,2026-Q2,,,,-43.551334,172.690295
CCC_60175,20/03/2024,Christchurch City Council,WW Pump Station 11 Randolph MEICA Renewals.,The purpose of this project is to proactively replace critical assets that are the end of their useful life and those that are not meeting current CCC standards.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q1,,,2024-Q3,2026-Q1,2022-Q1,2026-Q1,,,,-43.540298,172.66903
CCC_60176,20/03/2024,Christchurch City Council,WW Pump & Storage MEICA Renewals for FY2024.,The purpose of this project is to proactively replace critical assets that are the end of their useful life and those that are not meeting current CCC standards in terms of operability.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q2,,,2024-Q3,2025-Q1,2022-Q2,2025-Q1,,,,,
CCC_60177,20/03/2024,Christchurch City Council,WW Harrison Street Pump Station Renewal (PS0006).,Renewal of wastewater pump station components to meet current standards.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q3,,,2025-Q1,2025-Q4,2023-Q3,2025-Q4,,,,-43.507309,172.647671
CCC_60178,20/03/2024,Christchurch City Council,WW Stapletons Road Pump Station Renewal (PS0007).,Renewal of wastewater pump station components to meet current standards.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2024-Q3,,,,2028-Q2,2024-Q3,2028-Q2,,,,,
CCC_60179,20/03/2024,Christchurch City Council,WW Chelsea Street Pump Station Renewal (PS0009).,Renewal of wastewater pump station components to meet current standards.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2026-Q3,,,,2029-Q2,2026-Q3,2029-Q2,,,,,
CCC_60180,20/03/2024,Christchurch City Council,WW Smith Street Pump Station Renewal (PS0012).,Renewal of wastewater pump station components to meet current standards.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2028-Q3,,,,2031-Q2,2028-Q3,2031-Q2,,,,,
CCC_60181,20/03/2024,Christchurch City Council,WW Tilford Street Pump Station Renewal (PS0013).,Renewal of wastewater pump station components to meet current standards.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2030-Q3,,,,2033-Q2,2030-Q3,2033-Q2,,,,,
CCC_60183,20/03/2024,Christchurch City Council,SW Hempleman Drive Asset Improvements (Akaroa).,Improvement works to existing infrastructure in Onuku Road and Hempleman Drive Akaroa to mitigate the effects of inlet capacity issues.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q1,,,2025-Q4,2026-Q2,2023-Q1,2026-Q2,,,,-43.815186,172.954643
CCC_60186,20/03/2024,Christchurch City Council,WW McCormacks Bay Road Pump Station Renewal (PS0057).,Renewal of wastewater pump station components to meet current standards.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q1,,,2025-Q2,2027-Q3,2022-Q1,2027-Q3,,,,-43.5593,172.72521
CCC_60200,20/03/2024,Christchurch City Council,WS Woolston Well 3 Renewal (PS1065).,Replacement of well.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q2,,,2024-Q2,2025-Q2,2022-Q2,2025-Q2,,,,-43.548542,172.683578
CCC_60209,20/03/2024,Christchurch City Council,SW Stevensons Steep Network Renewals (Lyttelton).,Undertake inlet improvements secondary flow improvements and pipe renewals.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q1,,,2025-Q4,2026-Q2,2023-Q1,2026-Q2,,,,-43.603463,172.72532
CCC_60215,20/03/2024,Christchurch City Council,SW Jacksons Creek Lower Water Course Renewals.,Renewal of concrete invert and bank linings.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q1,,,2025-Q1,2026-Q2,2022-Q1,2026-Q2,,,,-43.549539,172.658939
CCC_60217,20/03/2024,Christchurch City Council,SW Dudley Creek Timber Lining Renewals (Ranger Street).,Renewal of timber lining.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q3,,,2025-Q1,2025-Q2,2020-Q3,2025-Q2,,,,-43.497263,172.636676
CCC_60231,20/03/2024,Christchurch City Council,SW No 2 Drain Rural Renewal.,The renewal of 1650m of failing timber lining of No 2 drain crossing through rural farm land adjacent to Marshland Road commencing at 382 Marshland Road through to Mairehau Road and then onto QE II Drive.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q3,,,2024-Q3,2025-Q3,2020-Q3,2025-Q3,,,,-43.484016,172.665934
CCC_60235,20/03/2024,Christchurch City Council,SW Bishopdale Flood Management.,Reduction of flood risk in a residential area.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2024-Q3,,,,2029-Q2,2024-Q3,2029-Q2,,,,,
CCC_60236,20/03/2024,Christchurch City Council,Central City Projects - Worcester Street (Fitzgerald Ave to Madras Street).,Cycleway / slow street connection between city - wide Major Cycle Routes (MCR) Network (in this case Rapanui Shag Rock Route) with Central City slow core.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2022-Q3,,,,2028-Q2,2022-Q3,2028-Q2,,,,-43.53093,172.646536
CCC_60240,20/03/2024,Christchurch City Council,Central City Projects - Cathedral Square & Colombo (Hereford to Armagh Street).,"Enabling further street works / public realm enhancements (beyond currently programmed works) for full reinstatement of Cathedral Square and delivering key streetscape features of Regenerate Christchurch's Cathedral Square ""Vision"" to be realised. Objectives are to produce a safe inviting environment that priorities activation of Square and needs of pedestrians and cyclists in a broadly low speed / shared space environment while maintaining reasonable access for servicing vehicles and immediate access to hotels and premises. Works likely to focus on removal of through extraneous traffic from Colombo Street between Armagh and Hereford Streets.",,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2024-Q3,,,,2031-Q2,2024-Q3,2031-Q2,,,,-43.530676,172.637485
CCC_60242,20/03/2024,Christchurch City Council,SW Riccarton Main Drain Flood Management.,Reduction of flood risk in a residential area.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,25 - 50 million,,2036-Q3,,,,2043-Q2,2036-Q3,2043-Q2,,,,,
CCC_60244,20/03/2024,Christchurch City Council,Central City Projects - Central City Transport Interchange Extension.,Project investigation and land purchase for a future Christchurch Transport Interchange extension.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2021-Q2,,,,2024-Q2,2021-Q2,2024-Q2,,,,-43.534668,172.637395
CCC_60251,20/03/2024,Christchurch City Council,SW Hillsborough Flood Management.,Reduction of flood risk in a residential area.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2028-Q3,,,,2034-Q2,2028-Q3,2034-Q2,,,,,
CCC_60252,20/03/2024,Christchurch City Council,SW Marion Street Flood Management.,Reduction of flood risk in a residential area.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2029-Q3,,,,2034-Q2,2029-Q3,2034-Q2,,,,,
CCC_60257,20/03/2024,Christchurch City Council,WS Spreydon Well 2 & Well 3 Renewal (PS1030).,Water supply well renewal.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2021-Q1,,,2022-Q2,2024-Q2,2021-Q1,2024-Q2,,,,-43.564594,172.614457
CCC_60260,20/03/2024,Christchurch City Council,CWTP Biosolids Holding Tank.,Convert digester 2 into a sludge storage facility.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2022-Q3,,,2028-Q1,2029-Q2,2022-Q3,2029-Q2,,,,-43.532021,172.630559
CCC_60261,20/03/2024,Christchurch City Council,WS Montreal Street Well 2 Renewal (PS1027).,Replacement of Well 2.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q2,,,2024-Q2,2024-Q4,2022-Q2,2024-Q4,,,,-43.534888,172.63058
CCC_60265,20/03/2024,Christchurch City Council,SW Quaifes Murphys Extended Detention Basin.,Construction of a dry detention basin on CCC land at 145 and 155 Quaifes Road for Huritini - Halswell River flood protection.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q4,,,2025-Q4,2027-Q2,2023-Q4,2027-Q2,,,,-43.582699,172.545461
CCC_60268,20/03/2024,Christchurch City Council,Bishopdale Village Mall Revitalisation - Car Parking Reconfiguration & Intersection Safety.,Reconfiguration of North-eastern carpark area and safety improvements to vehicle access and thoroughfares in the mall.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2030-Q3,,,,2033-Q2,2030-Q3,2033-Q2,,,,-43.48958,172.586771
CCC_60269,20/03/2024,Christchurch City Council,Kāinga Ora Regeneration Projects.,Council support for Kāinga Ora housing focused regeneration projects.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2030-Q3,,,,2033-Q2,2030-Q3,2033-Q2,,,,,
CCC_60271,20/03/2024,Christchurch City Council,Cashel Mall Upgrade.,Cashel Mall public realm upgrade to improve amenity respond to changes in adjoining land uses and support central city momentum.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2030-Q3,,,,2034-Q2,2030-Q3,2034-Q2,,,,-43.533117,172.636347
CCC_60272,20/03/2024,Christchurch City Council,Cathedral Square Improvements - Northern Side.,Public realm improvements to the northern side of Cathedral Square to address condition and support longer term vision and changes in adjoining land-use.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2028-Q3,,,,2030-Q2,2028-Q3,2030-Q2,,,,-43.53041,172.636618
CCC_60273,20/03/2024,Christchurch City Council,Cathedral Square Improvements - Worcester Boulevard East & West.,Renewal of existing assets in Worcester Boulevard from Cathedral Square West to the Terrace and East to Manchester Street.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2028-Q3,,,2024-Q1,2031-Q2,2028-Q3,2031-Q2,,,,-43.530935,172.635413
CCC_60291,20/03/2024,Christchurch City Council,Delivery Package - SW Waimairi & Fendalton Stream Lining & Enhancement.,Design and construct the renewal of 310m of existing and failing drain linings on Fendalton and Waimairi Streams within the same geographical location.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q4,,,2022-Q4,2021-Q4,2020-Q4,2021-Q4,,,,-43.520859,172.60553
CCC_60301,20/03/2024,Christchurch City Council,CWTP Landfill Gas Compressor Renewal.,Replacement of landfill gas compressors to ensure levels of service of energy and maintain discharge requirements for Methane gas.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2024-Q3,,,,2026-Q2,2024-Q3,2026-Q2,,,,,
CCC_60304,20/03/2024,Christchurch City Council,WW Fyfe Road Pump Station Renewal (PS0101).,Modification of pump stations.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q2,,,2024-Q1,2024-Q3,2023-Q2,2024-Q3,,,,-43.551949,172.547867
CCC_60309,20/03/2024,Christchurch City Council,CWTP Wastewater Clarifier Mechanical Renewals (Clarifier 4 only).,Renewal of mechanical clarifier arms.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2024-Q1,,,2025-Q4,2026-Q2,2024-Q1,2026-Q2,,,,-43.526829,172.700405
CCC_60310,20/03/2024,Christchurch City Council,CWTP Wastewater Digester 1-4 Roof Renewal.,Renewal of digester roof.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2027-Q3,,,,2030-Q2,2027-Q3,2030-Q2,,,,,
CCC_60313,20/03/2024,Christchurch City Council,CWTP Wastewater Secondary Contact Tanks Renewal Pipework.,Replacement of pipework for secondary contact tanks.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q1,,,,2029-Q2,2023-Q1,2029-Q2,,,,-43.524894,172.700605
CCC_60314,20/03/2024,Christchurch City Council,CWTP Wastewater Influent Structure Renewal (upstream of screens).,Full replacement of wastewater treatment plant influent structure.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2028-Q3,,,,2031-Q2,2028-Q3,2031-Q2,,,,,
CCC_60315,20/03/2024,Christchurch City Council,CWTP Wastewater Sludge Screen.,Replacement of wastewater treatment plant sludge screen.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2024-Q3,,,,2029-Q2,2024-Q3,2029-Q2,,,,,
CCC_60316,20/03/2024,Christchurch City Council,CWTP Wastewater Pump Station A & B Pump Renewal.,Replacement of wastewater treatment plant pumps in Pump Station A and Pump Station B.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2028-Q3,,,,2030-Q2,2028-Q3,2030-Q2,,,,,
CCC_60317,20/03/2024,Christchurch City Council,CWTP Wastewater Odour Control Renewal & Enhancements.,Replacement of CWTP odour control system as well as improvements to reduce smells emanating from plant.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2026-Q3,,,2027-Q1,2029-Q2,2026-Q3,2029-Q2,,,,-43.525325,172.700426
CCC_60320,20/03/2024,Christchurch City Council,CWTP Wastewater Ocean Outfall Diffuser Renewal.,Ocean outfall pipeline diffuser replacement.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2029-Q3,,,,2031-Q2,2029-Q3,2031-Q2,,,,,
CCC_60321,20/03/2024,Christchurch City Council,CWTP Wastewater Toe Drain Reprofiling.,Oxidation Pond toe drain reprofiling to assist in discharge capture and disposal.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q1,,,2026-Q3,2027-Q2,2023-Q1,2027-Q2,,,,-43.525129,172.700655
CCC_60322,20/03/2024,Christchurch City Council,CWTP Wastewater Sludge Dryer 1 & 2 Renewal.,Sludge drier 1 and 2 facility major upgrade and renewal to maintain levels of service and operational efficiency.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2024-Q3,,,,2027-Q2,2024-Q3,2027-Q2,,,,,
CCC_60323,20/03/2024,Christchurch City Council,CWTP Wastewater Solids Contact Tanks Air Distribution Pipe Renewal.,Solid contact tank air distribution pipe replacement.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2025-Q3,,,,2027-Q2,2025-Q3,2027-Q2,,,,,
CCC_60337,20/03/2024,Christchurch City Council,SW Jardines Drain Renewal (Nuttall to Ōpāwaho Heathcote River).,The renewal of 800m of failing lining of Jardines Drain crossing through industrial land from Nuttall Drive through to the Heathcote River.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q1,,,2025-Q1,2025-Q2,2022-Q1,2025-Q2,,,,-43.562446,172.680449
CCC_60338,20/03/2024,Christchurch City Council,SW Faulls Drain Lining Renewal (Hills to Walters Marshland).,The renewal of 690m of failing concrete lining of Faulls Drain crossing through rural farm land between Hills Road and Walters Road Marshland.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q1,,,2024-Q4,2025-Q1,2022-Q1,2025-Q1,,,,-43.481519,172.645063
CCC_60339,20/03/2024,Christchurch City Council,SW Addington Brook to Hagley Park South Timber Lining Renewal.,Renewal of failing and missing timber lining to Addington Brook within Hagley Park South.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2022-Q1,,,2024-Q1,2027-Q2,2022-Q1,2027-Q2,,,,-43.53712,172.618903
CCC_60375,20/03/2024,Christchurch City Council,WS Mains Renewal - Multi-Use Arena - Barbadoes Madras Lichfield.,Renewal of the following mains in which bound the location of the new Multi-Use Arena: 1) Madras St-Hereford St to St. Asaph St; and 2) Barbadoes St-Gloucester St to Ferry Rd.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2021-Q3,,,2024-Q3,2025-Q2,2021-Q3,2025-Q2,,,,-43.534173,172.645673
CCC_60385,20/03/2024,Christchurch City Council,WW Mains Renewal - Multi-Use Arena - Barbadoes Madras Lichfield Tuam.,Replacement of wastewater pipes in poor condition.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q1,,,2024-Q3,2025-Q2,2022-Q1,2025-Q2,,,,-43.532806,172.64418
CCC_60421,20/03/2024,Christchurch City Council,Pound & Ryans Road Corridor Improvements.,Addressing the Pound Road and Ryan Road corridors acknowledging their role as a key heavy vehicle route and addressing specific crash locations road widths and improving pavement resilience.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2022-Q2,,,2026-Q2,2030-Q2,2022-Q2,2030-Q2,,,,-43.508076,172.511476
CCC_60430,20/03/2024,Christchurch City Council,Transfer Station Redevelopment - Barrys Bay.,Barrys Bay site re development.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Waste management,1 - 5 million,,2022-Q4,,,2026-Q2,2026-Q4,2022-Q4,2026-Q4,,,,-43.75872,172.92465
CCC_60431,20/03/2024,Christchurch City Council,Organics Processing Plant Development.,The Organics Processing Plant is a Council-owned composting facility in Bromley operated by Living Earth. The plant receives all the food and green waste collected in the kerbside green bins. The Council has agreed in principle to relocate the organics processing operation to an alternative site. There is currently no preferred site for a new organics processing plant. We will be working through procurement processes to produce a shortlist including options for location partnerships joint ventures and commercial opportunities for the future processing of organics.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Waste management,25 - 50 million,,2021-Q1,,,,2027-Q3,2021-Q1,2027-Q3,,,,-43.539188,172.707916
CCC_60455,20/03/2024,Christchurch City Council,SW WE St Albans Creek Naturalisation.,Improvements to the ecology and water quality of St Albans Creek. Restoration of degraded aquatic habitat and planting riparian corridors.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2024-Q3,,,,2037-Q2,2024-Q3,2037-Q2,,,,-43.513019,172.65212
CCC_60456,20/03/2024,Christchurch City Council,SW WE Upper Dudley Creek Naturalisation.,Improvements the ecology and water quality of Upper Dudley Creek. Restoration of degraded aquatic habitat and planting riparian corridors. Works will look to replace timber lined drains / engineered drains with naturalised banks and bed.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2025-Q3,,,,2045-Q2,2025-Q3,2045-Q2,,,,,
CCC_60457,20/03/2024,Christchurch City Council,SW WE Jacksons Creek Naturalisation.,Improvements to the ecology and water quality of Jacksons Creek. Restoration of degraded aquatic habitat and planting riparian corridors. Works will look to replace timber lined drains / engineered drains with naturalised banks and bed.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2026-Q3,,,,2037-Q2,2026-Q3,2037-Q2,,,,,
CCC_60458,20/03/2024,Christchurch City Council,SW WE Brittans Drain Naturalisation.,Improvements to the ecology and water quality of Brittans Drain. Restoration of degraded aquatic habitat and planting riparian corridors. Works will look to renew timber lined drains / engineered drains with naturalised banks and bed.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2028-Q3,,,,2041-Q2,2028-Q3,2041-Q2,,,,,
CCC_60460,20/03/2024,Christchurch City Council,SW Pūharakekenui Styx Tributaries Naturalisation.,Improvements to the ecology and water quality of waterways. Restoration of degraded aquatic habitat and planting riparian corridors. Works will look to replace timber lined drains / engineered drains with naturalised banks and bed.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2024-Q3,,,,2033-Q2,2024-Q3,2033-Q2,,,,,
CCC_61531,20/03/2024,Christchurch City Council,Ngā Puna Wai Car Park and Access Improvements.,To create a new entranceway from Wigram Road to the Ngā Puna Wai Sports complex and additional shared carparking spaces.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,2021-Q3,,,2022-Q3,2024-Q2,2021-Q3,2024-Q2,,,,-43.5584,172.57423
CCC_61615,20/03/2024,Christchurch City Council,SW South New Brighton & Southshore Estuary Edge Flood Mitigation.,This project addresses two separate but geographically connected issues in South New Brighton and on the Southshore peninsula: 1) estuary edge erosion issues and; 2) construction of a new bund to tackle local inundation.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2021-Q3,,,2024-Q1,2026-Q2,2021-Q3,2026-Q2,,,,-43.545344,172.74344
CCC_61702,20/03/2024,Christchurch City Council,Botanic Gardens - Gondwana Land and Childrens Garden Development Project.,This project includes provision for a children’s playground and children’s garden as included in the Master Plan for this area.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2022-Q1,,,2026-Q2,2028-Q2,2022-Q1,2028-Q2,,,,-43.528701,172.618661
CCC_61769,20/03/2024,Christchurch City Council,Belfast Cemetery Extension Development.,To develop the infrastructure requirements for the extension to Belfast cemetery to meet future growth needs.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2023-Q1,,,2024-Q3,2026-Q2,2023-Q1,2026-Q2,,,,-43.45271,172.64348
CCC_61789,20/03/2024,Christchurch City Council,Carrs Reserve Club Relocation.,Relocate the kart club and the greyhounds activity from Carrs Reserve to a new site. .,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2024-Q3,,,,2036-Q2,2024-Q3,2036-Q2,,,,,
CCC_61801,20/03/2024,Christchurch City Council,Lancaster Park Redevelopment.,To create sports park and community park facilities at the Lancaster park site.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,2021-Q3,,,2023-Q3,2024-Q4,2021-Q3,2024-Q4,,,,-43.54213,172.65444
CCC_61821,20/03/2024,Christchurch City Council,Cuningham House Building Renewals (Heritage).,Refurbish the building and glasshouses so it is fit for purpose. Enhance visitor experience to fulfil Botanic Gardens primary goal to help visitors appreciate and understand the plant world such as the different biomes locally and worldwide that can be practicably created.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,2022-Q3,,,2024-Q3,2026-Q2,2022-Q3,2026-Q2,,,,-43.53,172.62
CCC_61843,20/03/2024,Christchurch City Council,Coastal Pathway & Moncks Bay - Shovel Ready Funded.,Deliver a shared cycle/pedestrian pathway in Moncks Bay.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2020-Q3,,,2021-Q4,2024-Q1,2020-Q3,2024-Q1,,,,-43.566304,172.745378
CCC_62147,20/03/2024,Christchurch City Council,Linwood Park - Village Remediation.,This project is to undertake the removal of the existing site services remediate the existing site back to the Council standard for a public park.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2020-Q4,,,2022-Q4,2024-Q2,2020-Q4,2024-Q2,,,,-43.536205,172.67298
CCC_62329,20/03/2024,Christchurch City Council,Road Safety Priorities Delivery Package (CRAF).,The Road Safety Priorities component of the Christchurch Regeneration Acceleration Facility (CRAF) aims to address critical road safety constraints and challenges by progressing targeted road safety initiatives across the Christchurch transport network.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2020-Q4,,,2023-Q1,2024-Q2,2020-Q4,2024-Q2,,,,,
CCC_62351,20/03/2024,Christchurch City Council,WW Duvauchelle Inflow and Infiltration Renewals.,Undertake a temperature sensing survey of the wastewater network in Duvauchelle so that sources of stormwater inflow and groundwater infiltration can be pinpointed (on both the public and private parts of the network). Undertake repairs as required.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q4,,,2022-Q4,2023-Q4,2020-Q4,2023-Q4,,,,-43.752087,172.939312
CCC_62549,20/03/2024,Christchurch City Council,Southshore and South New Brighton Estuary Edge Erosion Management (Red Zone Regeneration).,This project addresses two separate but geographically connected issues in South New Brighton and on the Southshore peninsula: 1) estuary edge erosion issues and; 2) construction of a new bund to tackle local inundation.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,2021-Q2,,,2025-Q1,2026-Q2,2021-Q2,2026-Q2,,,,-43.541265,172.742424
CCC_62924,20/03/2024,Christchurch City Council,SW Ōtākaro Avon River Corridor Flood Management Avon River Flood Modelling (OARC).,Flood model development and assessment work to support the land drainage recovery programme (LDRP).,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q4,,,,2024-Q3,2020-Q4,2024-Q3,,,,,
CCC_62925,20/03/2024,Christchurch City Council,SW Ōtākaro Avon River Corridor Waitaki Street Stopbank (OARC).,Construct new stopbank stormwater facility and tidal wetland.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2020-Q4,,,2022-Q1,2030-Q2,2020-Q4,2030-Q2,,,,-43.509111,172.71777
CCC_63039,20/03/2024,Christchurch City Council,WS Mains Renewal - Lincoln Rd and Hazeldean Rd.,Renewal of underground waste water reticulation assets in Lincoln Road (Moorhouse Ave to Whiteleigh Ave) and Hazeldean Road (Lincoln Rd to Grove Rd).,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2020-Q4,,,2022-Q2,2023-Q2,2020-Q4,2023-Q2,,,,-43.541309,172.615644
CCC_63360,20/03/2024,Christchurch City Council,Brighton Mall Upgrade (A4).,Renewal of existing assets and creation of new assets on connecting roads around New Brighton Mall.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2023-Q3,,,2026-Q1,2028-Q2,2023-Q3,2028-Q2,,,,-43.507143,172.72996
CCC_63671,20/03/2024,Christchurch City Council,Hoon Hay Basin Outlet and Cashmere Stream Control Structure (Eastman Sutherlands).,To construct outlet and high flow diversion from the Hoon Hay basin into the Eastman wetland.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2021-Q1,,,2021-Q1,2024-Q4,2021-Q1,2024-Q4,,,,-43.578373,172.616206
CCC_64048,20/03/2024,Christchurch City Council,Te Whare Tapere Performing Arts Precinct.,The Performing Arts Precinct is the city's outlet for creative performance offering first-rate facilities for music drama dance and other performing arts. One of the anchor projects in the Christchurch Central Recovery Plan the Performing Arts Precinct is being built in the block bounded by Armagh Gloucester Colombo and New Regent streets.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,50 - 100 million,,2019-Q1,,,2023-Q1,2025-Q1,2019-Q1,2025-Q1,,,,-43.529307,172.637637
CCC_64331,20/03/2024,Christchurch City Council,WS Sefton Pascoe Webb Walnut Hutcheson Bradford Walsall Hammond Willis & Dobs Mains Renewals.,Replacement and renewal of water supply mains.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2021-Q2,,,2023-Q1,2023-Q4,2021-Q2,2023-Q4,,,,-43.555942,172.616805
CCC_64671,20/03/2024,Christchurch City Council,Major Cycleway - Northern Line Route (Section 1) Railway Crossings.,This project covers the cycleway rail crossings at Kilmarnock Riccarton Rd Harewood Rd Langdons and Sawyers.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2021-Q2,,,2024-Q3,2024-Q4,2021-Q2,2024-Q4,,,,-43.52687,172.608319
CCC_64986,20/03/2024,Christchurch City Council,WS Akaroa L'Aube Hill Reservoir Replacement.,Replace the decommissioned L'Aube Hill Reservoir with two permanent reservoirs.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2022-Q1,,,2024-Q1,2025-Q2,2022-Q1,2025-Q2,,,,-43.819066,172.966135
CCC_65019,20/03/2024,Christchurch City Council,CWTP Waste Water Equipment Renewals 2022 (EICA).,Replacement and renewal of assets as they come to the end of their useful life for the Christchurch Wastewater Treatment Plant.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q1,,,2024-Q3,2026-Q1,2022-Q1,2026-Q1,,,,-43.525065,172.701729
CCC_65020,20/03/2024,Christchurch City Council,CWTP Waste Water Equipment Renewals 2023 (EICA).,Planned renewal of Christchurch Wastewater Treatment Plant equipment.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q1,,,2024-Q3,2026-Q1,2022-Q1,2026-Q1,,,,-43.524764,172.702944
CCC_65021,20/03/2024,Christchurch City Council,CWTP Waste Water Equipment Renewals MLC-E HV System Platform (EICA).,Planned renewal of Christchurch Wastewater Treatment Plant equipment.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q1,,,2025-Q2,2026-Q2,2022-Q1,2026-Q2,,,,-43.524972,172.70327
CCC_65100,20/03/2024,Christchurch City Council,WS Tilford Frensham Jura Islay Staffa Gow Bute & Alport Submains Renewal.,Renewal of water supply submains with greatest risk and impact of failure.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2021-Q3,,,2023-Q1,2024-Q1,2021-Q3,2024-Q1,,,,-43.542294,172.678099
CCC_65111,20/03/2024,Christchurch City Council,WS Bridle Path Ticehurst Hawkhurst Coleridge Dublin Selwyn Brittan Charlotte J Mains Renewals.,Replacement and renewal of water supply mains.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2021-Q3,,,2023-Q1,2024-Q1,2021-Q3,2024-Q1,,,,-43.580063,172.709429
CCC_65112,20/03/2024,Christchurch City Council,WS Grahams Powell Pulford Sunningvale Bainton Rolfe Gregan Farrington Hillsbo Mains Renewals.,Replacement and renewal of water supply mains.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2021-Q3,,,2023-Q1,2024-Q1,2021-Q3,2024-Q1,,,,-43.502111,172.576332
CCC_65113,20/03/2024,Christchurch City Council,WS Mt Pleasant Moorhouse Struthers Troup Oxford Kevin Dalkeith Cedars & Wyn Mains Renewals.,Water supply mains renewals across a number of urban streets.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2021-Q3,,,2024-Q1,2024-Q2,2021-Q3,2024-Q2,,,,-43.571485,172.721641
CCC_65129,20/03/2024,Christchurch City Council,WW Bradford Norwood Hunter Malcolm Young Woodbridge Penrith Cardiff et al Mains Renewals.,Waste water mains renewals across a number of urban streets.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q3,,,2023-Q2,2024-Q2,2022-Q3,2024-Q2,,,,-43.558442,172.640997
CCC_65133,20/03/2024,Christchurch City Council,WW Picton Nelson Elizabeth Lyndon Mandeville Kipax Kyle Peverel Burdale Seto Mains Renewals.,Underground waste water mains renewal.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2022-Q3,,,2022-Q4,2024-Q1,2022-Q3,2024-Q1,,,,-43.53372,172.605005
CCC_65134,20/03/2024,Christchurch City Council,WW Gloucester Worcester Hereford Trent Nursery Dearsley & Raglan Mains Renewals.,Renewal of wastewater mains laterals and manholes.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2022-Q3,,,2023-Q2,2025-Q1,2022-Q3,2025-Q1,,,,-43.530825,172.65695
CCC_65145,20/03/2024,Christchurch City Council,SW Jacksons Creek (Upper) Lining Renewals.,Renewal of drain lining.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q1,,,2025-Q1,2026-Q2,2022-Q1,2026-Q2,,,,-43.547239,172.621565
CCC_65147,20/03/2024,Christchurch City Council,SW McSaveneys Road Drain Timber Lining Renewal.,Design and construct the renewal of 690m of existing timber lining along the northern boundary of the road corridor of McSaveneys Road Marshlands.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q1,,,2024-Q1,2024-Q2,2022-Q1,2024-Q2,,,,-43.485011,172.65742
CCC_65241,20/03/2024,Christchurch City Council,Roto Kohatu Development.,Park access and road development swimming beach and facility development and other prioritised works from the development plan.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2021-Q3,,,2024-Q2,2031-Q2,2021-Q3,2031-Q2,,,,-43.46533,172.57444
CCC_65439,20/03/2024,Christchurch City Council,Linwood Park Pavilion & Toilet Renewal.,Renewal of pavilion near Linwood Ave is highest priority with H&S concerns around electrical issues usability and relationship to new Linwood Pool being constructed in FY20. Replacement pavilion is to be relocated in the park. Renewal needs to be co-ordinated with Linwood Keas plans for a club building and integrated with provision of a public toilet to ensure fit for purpose facilities that meet user needs. Plans for renewal of second pavilion also need to be taken into account and possibly integrated.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2022-Q3,,,2024-Q2,2024-Q2,2022-Q3,2024-Q2,,,,-43.53705,172.67588
CCC_65468,20/03/2024,Christchurch City Council,Pine Avenue Asset Renewal.,Renewal of dish channel due to poor condition and associated impacts to carriageway and footpath.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2021-Q4,,,2022-Q4,2023-Q2,2021-Q4,2023-Q2,,,,-43.536742,172.741034
CCC_65521,20/03/2024,Christchurch City Council,Sheldon Park Hard Surfaces Renewal.,Renewal and replacement of hard surfaces at Sheldon Park - north & south driveways/carparks and the tennis/netball courts.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2023-Q3,,,2022-Q2,2027-Q2,2023-Q3,2027-Q2,,,,-43.4547,172.62908
CCC_65530,20/03/2024,Christchurch City Council,Onuku Bay Landfill Remediation.,Renewal of landfill capping at Onuku Bay to include; clearing site vegetation recontour slopes and remedy slumping and reinstate consistent cap across site.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Waste management,1 - 5 million,,2021-Q3,,,2022-Q4,2024-Q1,2021-Q3,2024-Q1,,,,-43.81852,172.947518
CCC_65537,20/03/2024,Christchurch City Council,SW Ferry Road Renewal (Brick Barrel).,Carry out the rehabilitation of a manhole in the intersection of Ferry/Ensors Roads construct two new manholes on the brick barrel to provide access and carry out the lining of two lengths of pipeline to mitigate observed damage to prevent failure.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2021-Q4,,,2023-Q4,2025-Q2,2021-Q4,2025-Q2,,,,-43.542741,172.665613
CCC_65633,20/03/2024,Christchurch City Council,Central City Projects - Salisbury & Kilmore (Stage 2).,Transport network improvement project including passenger transport routes on Kilmore Street and one block on Salisbury Street.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2027-Q3,,,2028-Q1,2029-Q1,2027-Q3,2029-Q1,,,,-43.524398,172.635026
CCC_66000,20/03/2024,Christchurch City Council,SW Ōtākaro Avon River Corridor ANZAC to Waitaki Stopbank (OARC).,The project aims to design and construct a stopbank between Wainoni Bridge and Waitaki Street Stopbank Realignment Project. Priority has been given to the replacement of the temporary stopbank with a new long-term stopbank.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2021-Q3,,,2024-Q4,2027-Q2,2021-Q3,2027-Q2,,,,-43.505112,172.709806
CCC_66183,20/03/2024,Christchurch City Council,SW Dudley Creek Waterway lining Renewal (Paparoa Street to PS219) Stage 2.,To investigate the reach of Dudley Creek and carry out renewal works to the damaged timber lined waterway.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2025-Q3,,,,2028-Q2,2025-Q3,2028-Q2,,,,,
CCC_66258,20/03/2024,Christchurch City Council,Road Lighting LED Install - Non-Subsidy.,Renewal or installation of pathway lighting and control systems citywide off the road network (and therefore not eligible for Waka Kotahi subsidies). This aims to improve control and reduce power requirements leading to lower costs and reduced environmental impact.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2021-Q3,,,2022-Q3,2024-Q2,2021-Q3,2024-Q2,,,,,
CCC_66288,20/03/2024,Christchurch City Council,Public Transport CRAF - Bus Priority Scheme Design Riccarton Road (Matipo Street to Waimairi Road).,Bus priority improvements on Riccarton Rd from Matipo St to Waimairi Rd. Objectives are to: Improve journey time and reliability of PT services relative to private vehicle; Remove barriers to uptake of PT.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2022-Q1,,,2025-Q1,2025-Q2,2022-Q1,2025-Q2,,,,-43.53072,172.587714
CCC_66294,20/03/2024,Christchurch City Council,Public Transport CRAF - Bus Priority Lincoln Road (Whiteleigh Avenue to Wrights Road).,Bus priority improvements on Lincoln Rd from Whitleigh Ave to Wrights Rd. Objectives are to: Improve journey time and reliability of PT services relative to private vehicles; Remove barriers to uptake of PT.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2022-Q1,,,2024-Q3,2025-Q2,2022-Q1,2025-Q2,,,,-43.547293,172.605449
CCC_66373,20/03/2024,Christchurch City Council,Lyttelton Sports Field Upgrades.,Renew/upgrade the sports field to provide good quality all year round playing surface.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2021-Q4,,,2023-Q4,2025-Q2,2021-Q4,2025-Q2,,,,-43.60947,172.70835
CCC_66469,20/03/2024,Christchurch City Council,WW Heathcote Valley New Pipeline.,Construction of a new pipeline between northern Lyttleton Tunnel portal and the already complete pipeline to Woolston (100m).,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2021-Q3,,,2021-Q3,2022-Q2,2021-Q3,2022-Q2,,,,-43.585983,172.707353
CCC_67248,20/03/2024,Christchurch City Council,Pioneer Renewals & Replacements.,Renewal and replacement of assets to ensure Pioneer is operating effectively efficiently and avoid any unscheduled breakdown and downtime.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2022-Q1,,,2023-Q2,2025-Q1,2022-Q1,2025-Q1,,,,-43.566144,172.614085
CCC_67250,20/03/2024,Christchurch City Council,Jellie Park Earthquake Renewals and Cycle Shutdown.,Scheduled capital renewal work and EQ repair at Jellie Park to ensure that components within the facility are renewed and operating efficiently avoiding unscheduled breakdown and meeting LoS. .,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,2022-Q1,,,2026-Q1,2025-Q3,2022-Q1,2025-Q3,,,,-43.509542,172.582578
CCC_67421,20/03/2024,Christchurch City Council,SW Ōtākaro Avon River Corridor Stopbank from Pages Road to Bridge Street (OARC).,The project aims to design and construct sections of stopbank and stormwater facility in the area between Pages Road and Bridge Street.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2022-Q1,,,2024-Q4,2027-Q2,2022-Q1,2027-Q2,,,,-43.512278,172.726197
CCC_67456,20/03/2024,Christchurch City Council,WS Koukourārata Drinking Water Scheme.,To provide a safe and reliable water supply system to service the Koukourārata marae and the surrounding housing at Port Levy both now and into the future.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2022-Q3,,,2025-Q2,2028-Q2,2022-Q3,2028-Q2,,,,-43.648314,172.836867
CCC_67458,20/03/2024,Christchurch City Council,WW SCADA Server Infrastructure Upgrades.,This project is to replace the aging server and networking infrastructure that runs the 3W supervisor control data acquisition systems and Bromley IT server.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q2,,,2023-Q3,2023-Q3,2023-Q2,2023-Q3,,,,,
CCC_67806,20/03/2024,Christchurch City Council,CWTP Renewals & Replacements.,Replacements at Christchurch Wastewater Treatment Plant.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2023-Q4,,,,2031-Q3,2023-Q4,2031-Q3,,,,-43.525703,172.702439
CCC_67987,20/03/2024,Christchurch City Council,Greers Langdons Traffic Lights.,Installation of new traffic signals on the Intersection of Greers Road and Langdons Road.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2022-Q3,,,2024-Q2,2024-Q4,2022-Q3,2024-Q4,,,,-43.48831,172.595542
CCC_68173,20/03/2024,Christchurch City Council,Ōtākaro-Avon River Corridor City to Sea Pathway (OARC).,Development of the City to Sea Pathway an 11km path connecting New Brighton and adjacent communities with the city and providing recreational opportunities for walking and cycling.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,25 - 50 million,,2023-Q1,,,2024-Q3,2027-Q2,2023-Q1,2027-Q2,,,,-43.526376,172.650113
CCC_68174,20/03/2024,Christchurch City Council,Ōtākaro-Avon River Corridor Cultural and Secondary Trails (OARC).,Development within the Otakaro Avon River Corridor.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,2026-Q3,,,,2031-Q2,2026-Q3,2031-Q2,,,,,
CCC_68175,20/03/2024,Christchurch City Council,Ōtākaro-Avon River Corridor Community Spaces incl. Landings (OARC).,Delivery of community spaces along the OtakarioAvon River Corridor. Sub projects within this includes:- Kerrs Reach Off-water- Kerrs Reach - On-water- Avon Park Development- Wainoni Landing- Otakaro Avon River Corridor Furniture.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,25 - 50 million,,2023-Q1,,,,2031-Q2,2023-Q1,2031-Q2,,,,,
CCC_68389,20/03/2024,Christchurch City Council,Condell Ave Street Renewals.,Street Renewals Kerbing and Surfacing in Condell Ave Aorangi Road and Matsons Ave. This is primarily as upgrades driven by condition and adjacent land use changes but will also support the change in speed and usage patterns caused by Nor'West Arc Major Cycleway Route.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2022-Q1,,,2025-Q4,2026-Q2,2022-Q1,2026-Q2,,,,-43.49963,172.599885
CCC_68390,20/03/2024,Christchurch City Council,WS - Main Pumps UV Reactor System Rehabilitation.,Modification of existing pipework and pumps to allow the easier maintenance and cleaning of the UV reactors.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q4,,,2025-Q1,2026-Q2,2023-Q4,2026-Q2,,,,-43.562121,172.638376
CCC_68434,20/03/2024,Christchurch City Council,Godley Quay Carriageway Drainage and Footpath.,Installation of footpath and improvements to road drainage. This will improve pedestrian access between Te Ana Marina and Lyttelton Recreation Ground and needs to be delivered in 2022 to support the planned Sail GP event.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2022-Q1,,,2022-Q4,2023-Q4,2022-Q1,2023-Q4,,,,-43.606222,172.709573
CCC_68838,20/03/2024,Christchurch City Council,WS Little River Sparks Springs Various Lyttelton & Akaroa Mains Renewals.,Renewal of mains in geospatial clusters in Lyttelton and Akaroa containing high break rates high vulnerability and are difficult to repair.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2022-Q3,,,2024-Q1,2025-Q2,2022-Q3,2025-Q2,,,,-43.767382,172.792672
CCC_68843,20/03/2024,Christchurch City Council,WS Ayr Darvel Mona Vale Mathias Chapter Jacksons Peverel Dallas Tintern & Balrudry Mains Renewals.,Renewal of the following mains: 1) Ayr St-Mona Vale Ave to Deans Ave; 2) Darvel St-Riccarton Rd to Matai St East; 3) Mona Vale Ave-Riccarton Rd to Matai St East; 4) Mathia St / Chapter St-Mays Rd to Rutland St; 5) Chapter St-Mathias St to Bretts Rd; 6) Jacksons Rd-Fendalton Rd to Wroxton Tce; 7) Peverel St-Matipo St to Picton Ave; 8) Dallas St-Wainui St to Matipo St; 9) Tintern Ave-Stravely St to End; and 10) Balrudry St-Stavely St to End.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q3,,,2023-Q3,2025-Q1,2022-Q3,2025-Q1,,,,-43.527855,172.610596
CCC_68844,20/03/2024,Christchurch City Council,WS Mains Memorial Hampton Frith Grangewood Kyburn & Braco Renewals.,Renewal of the following mains: 1) Memorial Ave-Ilam Rd to Roydvale Ave; 2) Hampton Pl-Memorial Ave to End; 3) Frith Pl-Memorial Ave to End; 4) Grangewood Ln / Witbrock Reserve-Memorial Ave to End; 5) Kyeburn Pl-Avonhead Rd to End; and 6) Braco Pl-Westburn Tce to End.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2022-Q3,,,2024-Q1,2024-Q2,2022-Q3,2024-Q2,,,,-43.50733,172.572309
CCC_68898,20/03/2024,Christchurch City Council,WS Domain Cobham Kaiwara Diamond King Frankleigh HoonHay Clouston Huxley Fisher Submains Renewal.,Renewal of water supply submains and crossovers.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q3,,,2024-Q2,2024-Q4,2022-Q3,2024-Q4,,,,-43.555486,172.601073
CCC_69132,20/03/2024,Christchurch City Council,WS Mt Pleasant Major Hornbrook Muritai Soleares Toledo & Santa Maria Submains Renewal.,Renewal of water supply submains and crossovers.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q3,,,2024-Q2,2024-Q4,2022-Q3,2024-Q4,,,,-43.570942,172.722216
CCC_69133,20/03/2024,Christchurch City Council,WS Webb Queens St James Shearer Bordesley McLean & Ryan Submains Renewal.,Renewal of water supply submains and crossovers.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q3,,,2023-Q2,2024-Q2,2022-Q3,2024-Q2,,,,-43.514547,172.627174
CCC_69218,20/03/2024,Christchurch City Council,SW Port Hills Revegetation and Sediment Control Stage 1.,The purpose of this project is to reduce the amount of sediment being eroded from the Port Hills within the Stage 1 area that is currently washed into the Heathcote River and Ihutai-Estuary. It is anticipated that this will be effected mostly by planting native trees through a range of methods.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2021-Q1,,,2024-Q2,2027-Q3,2021-Q1,2027-Q3,,,,-43.590913,172.616958
CCC_69267,20/03/2024,Christchurch City Council,SW Nottingham Stream.,Capital improvements in Nottingham stream catchment.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,,,,2025-Q1,2025-Q2,2025-Q1,2025-Q2,,,,-43.59173,172.5666
CCC_69275,20/03/2024,Christchurch City Council,Phillipstown Community Centre.,To design and build a new Community Centre for the Phillipstown community.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2029-Q3,,,,2031-Q2,2029-Q3,2031-Q2,,,,,
CCC_69323,20/03/2024,Christchurch City Council,Whaka Terrace Retaining Wall Renewal.,Renewal of the Retaining Wall holding up Whaka Terrace above Enticott Place plus associated works to bring Whaka Terrace back into 2 way vehicular traffic reinstatement of the pedestrian walkway and fencing and works to the property below. The existing retaining wall failed in a storm in August 21 causing a slip onto a property in Enticott Place and rendering Whaka Terrace one-way.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2022-Q2,,,2024-Q2,2024-Q3,2022-Q2,2024-Q3,,,,-43.569841,172.647237
CCC_69465,20/03/2024,Christchurch City Council,WW Sandy Ave reticulation renewal.,Replacement of approximately 810m of existing 150mm 1954 concrete pipes and 13 manholes.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q4,,,2024-Q2,2024-Q4,2022-Q4,2024-Q4,,,,-43.497816,172.708753
CCC_69533,20/03/2024,Christchurch City Council,WW Langdons Rd Mains Renewal.,The renewal and up-sizing of existing waste water assests as they have reached end of life.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2023-Q2,,,2024-Q3,2025-Q2,2023-Q2,2025-Q2,,,,-43.491193,172.602061
CCC_69983,20/03/2024,Christchurch City Council,WS Dedicated Water Take/Filling Sites.,To provide safe and secure water abstraction points for contractors (who normally hire standpipes) and registered water carriers.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q1,,,,2025-Q2,2023-Q1,2025-Q2,,,,,
CCC_70580,20/03/2024,Christchurch City Council,WW Pacific Road Mains Renewal.,Replacement of Wastewater mains in Pacific Road.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q4,,,2023-Q2,2024-Q1,2022-Q4,2024-Q1,,,,-43.493627,172.724189
CCC_70633,20/03/2024,Christchurch City Council,WW Fitzgerald Ave Brick Barrel Mains Renewal.,Renewal of the brick barrel at the corner of Tuam Street and Fitzgerald Avenue.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2023-Q1,,,2025-Q1,2027-Q2,2023-Q1,2027-Q2,,,,-43.532416,172.650503
CCC_70659,20/03/2024,Christchurch City Council,WS Innes Condell & Matsons Mains Renewal.,Renew the following mains prior to or in conjunction with the transport road renewal projects: 1) Innes Rd-Jameson Ave to Philpotts Rd; 2) Condell Ave-Aorangi Rd to Blighs Rd; and 3) Matsons Ave-Harewood Rd to Kemp Ln.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q3,,,2023-Q2,2024-Q2,2022-Q3,2024-Q2,,,,-43.499054,172.639962
CCC_70742,20/03/2024,Christchurch City Council,Innes Road Street Renewal (Mersey to Philpotts).,The investigation design and reconstruction of the pavement and associated assets between Mersey Street and Philpotts Road to remove issues with vibrations and road surface condition.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2022-Q3,,,2024-Q3,2025-Q2,2022-Q3,2025-Q2,,,,-43.500775,172.636467
CCC_70743,20/03/2024,Christchurch City Council,WS Mains Tuckers Renewals.,Renewal of water supply mains and submains along Tuckers Rd between Cavendish Rd and Main North Rd .,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q3,,,2023-Q2,2024-Q2,2022-Q3,2024-Q2,,,,-43.4794,172.611214
CCC_70853,20/03/2024,Christchurch City Council,WW Buchanans Road Mains Renewal.,Design and renewal 13 pipe lengths totaling 886m 15 manholes all associated laterals and side street connections. Project also includes pavement restoration.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2023-Q1,,,2025-Q1,2025-Q4,2023-Q1,2025-Q4,,,,-43.531275,172.531364
CCC_70894,20/03/2024,Christchurch City Council,WS Mains Burwood Stanford & Newhaven Renewals.,Renewal of water supply mains and submains along Burwood Stanford and Newhaven Roads.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q4,,,2024-Q2,2025-Q1,2022-Q4,2025-Q1,,,,-43.486515,172.682562
CCC_71128,20/03/2024,Christchurch City Council,WW Brougham Street Mains Renewals (NZTA).,Replacing and upsizing the waste water line and laterals before work starts on the Simeon Street overbridge.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2023-Q1,,,2025-Q2,2026-Q2,2023-Q1,2026-Q2,,,,-43.547519,172.638704
CCC_71129,20/03/2024,Christchurch City Council,WW Lyttelton Package Mains Renewals.,Replace existing waste water infrastructure that has reached its end of life causing operational issues or concerns or are located in areas where access and ongoing maintenance is becoming problematic.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q1,,,2025-Q3,2026-Q2,2023-Q1,2026-Q2,,,,-43.602824,172.717734
CCC_71278,20/03/2024,Christchurch City Council,WW Land for Somerfield Pump Station.,Secure and prepare the land for the new Waster Water Somerfield Pump Station targeted to divert wet weather flow from the Selwyn Street trunk sewers downstream of Milton Street to the Southern Relief in order to reduce wet weather overflows in the Heathcote River catchment.,,Post implementation,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q3,,,,2024-Q2,2022-Q3,2024-Q2,,,,-43.55444,172.6278
CCC_71281,20/03/2024,Christchurch City Council,WW Meadows Street Mains Renewal.,This project will increase the wastewater capacity by replacing all the pipes and the non PVC laterals as well as reversing the flow to discharge into the Northcote Collector.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q4,,,2024-Q2,2025-Q1,2022-Q4,2025-Q1,,,,-43.490086,172.616906
CCC_71295,20/03/2024,Christchurch City Council,Aorangi Rd and Matsons Ave Kerb Renewals.,Kerbing and Surfacing in Aorangi Road and Matsons Ave.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2023-Q1,,,2024-Q4,2025-Q4,2023-Q1,2025-Q4,,,,-43.49963,172.599885
CCC_71306,20/03/2024,Christchurch City Council,Coastal Pathway & Moncks Bay - Council Funded.,To deliver a shared cycle/pedestrian pathway in Moncks Bay. Note: Shovel Ready budget of $15.8m for the Coastal Pathway & Moncks Bay has been largely expended with the remaining ~$300k expected to be expended in the next few months. The remaining works on this project are Council funded (project ID 71306).,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,2022-Q3,,,2021-Q4,2024-Q2,2022-Q3,2024-Q2,,,,-43.566304,172.745378
CCC_71379,20/03/2024,Christchurch City Council,SW Ōtākaro Avon River Corridor Services & Utilities Preliminary Design (OARC).,Each of the Otakaro Avon River Corridor projects will need to understand the vertical and horizontal alignment of services infrastructure to avoid network clashes. It is inefficient to map these on an individual project basis so this project is to locate and map them on an Otakaro Avon River Corridor -wide basis. This will then be used by the designer of each reach.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q4,,,,2027-Q2,2022-Q4,2027-Q2,,,,-43.511544,172.725416
CCC_71381,20/03/2024,Christchurch City Council,SW Ōtākaro Avon River Corridor Geotechnical & Contaminated Land Assessment (OARC).,The goal of the project is to improve Council's understanding of the nature of ground conditions and land contamination in the Otakaro Avon River Corridor to a sufficient level to support design of stopbanks and treatment facilities.,,In procurement,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q4,,,2024-Q3,2026-Q2,2022-Q4,2026-Q2,,,,-43.511544,172.725416
CCC_71495,20/03/2024,Christchurch City Council,Richmond CRAF - Intersection upgrades.,The Richmond CRAF intersection upgrade project includes improvements to six intersections in the Richmond area.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2022-Q3,,,2025-Q1,2025-Q2,2022-Q3,2025-Q2,,,,-43.513068,172.65734
CCC_71497,20/03/2024,Christchurch City Council,Richmond CRAF - Slater Street renewal.,This project includes the reconstruction of the road carriageway and widening the footpath upgrades to the intersections of Slater and Warren Slater and Guild and Slater and Shirley.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2022-Q3,,,2025-Q1,2025-Q2,2022-Q3,2025-Q2,,,,-43.511309,172.653111
CCC_71599,20/03/2024,Christchurch City Council,Streets for People - Gloucester Street Shared Space.,Part of the Streets for People Programme this project aims to improve the streetscape adjoining the Performing Arts Precinct.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2022-Q3,,,2023-Q4,2024-Q2,2022-Q3,2024-Q2,,,,-43.529855,172.637988
CCC_71600,20/03/2024,Christchurch City Council,Streets for People - Aranui.,Part of the Streets for People Programme this project aims to improve local connections and public transport for students travelling to and from Haeata Campus and surrounding areas.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2022-Q4,,,2024-Q2,2024-Q2,2022-Q4,2024-Q2,,,,-43.514426,172.698481
CCC_71640,20/03/2024,Christchurch City Council,Linwood Woolston CRAF - Wyon Street and Hulbert Street Renewal.,A street renewal of the whole length of Wyon Street from Worcester Street to Buckleys Road and Hulbert Street.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2023-Q1,,,2025-Q1,2025-Q2,2023-Q1,2025-Q2,,,,-43.528757,172.676366
CCC_71748,20/03/2024,Christchurch City Council,SW Ōtākaro Avon River Corridor Avondale to ANZAC (OARC).,This project is to design consent and construct the stormwater assets between Avondale Road and ANZAC Drive (along Hulverstone Drive) as outlined in the Regeneration Plan. This is Stage 1 and includes detailed design and the stopbank construction.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2022-Q4,,,,2031-Q2,2022-Q4,2031-Q2,,,,-43.502255,172.693774
CCC_71937,20/03/2024,Christchurch City Council,WS Harewood Mains Renewal.,Renewal of water supply pipes along Harewood Road. This will take place alongside the Wheels to Wings Cycleway project.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q1,,,2024-Q4,2026-Q2,2023-Q1,2026-Q2,,,,-43.487352,172.58652
CCC_71995,20/03/2024,Christchurch City Council,WS Grassmere to Mays Link Main.,This project is for the construction of a water main between Grassmere Street and the intersection of Rutland Street and Mays Street to link the Grassmere and Mays pump stations. It supports the development of the East Papanui ODP area (Grassmere Development).,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q3,,,2025-Q1,2026-Q2,2023-Q3,2026-Q2,,,,-43.49731,172.620311
CCC_71996,20/03/2024,Christchurch City Council,WW Grassmere Wet Weather Storage Facility.,Construction of a storage tank pump station and pressure main to reduce wet weather sewage overflows and provide capacity for new development.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,25 - 50 million,,2023-Q3,,,2026-Q1,2027-Q4,2023-Q3,2027-Q4,,,,-43.49565,172.618851
CCC_72038,20/03/2024,Christchurch City Council,WW - Matsons Aorangi Pipe Renewal.,Renewal of wastewater mains and associated assets along the majority of Matsons Ave between Harewood Road and Condell Ave and along Aorangi Road between Truman Road and Wallace Street.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q2,,,2024-Q2,2025-Q1,2023-Q2,2025-Q1,,,,-43.49698,172.602478
CCC_72242,20/03/2024,Christchurch City Council,New Brighton CRAF - Marine Parade (Hawke to Bowhill) Street Renewal.,The Marine Parade street renewal project includes Hawke Street to 187 Marine Parade. Removing the road surface and replacing with new assessing footpath condition. Lonsdale Street to 142 Marine Parade replace gutters and assess footpath condition.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2023-Q1,,,2025-Q1,2025-Q2,2023-Q1,2025-Q2,,,,-43.498127,172.72755
CCC_72584,20/03/2024,Christchurch City Council,SW - Winters Road Drain Renewals (Winters Road).,To replace the timber lining that is failing due to age along a section of Winters Road Drain and carry out the reinforcement and stabilisation of the eroding/collapsing true left bank of Winters Road Drain.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q1,,,2024-Q3,2027-Q1,2022-Q1,2027-Q1,,,,-43.488038,172.630517
CCC_72586,20/03/2024,Christchurch City Council,SW Popes Drain Renewal (278 Centaurus Road to 42 Vernon Terrace).,Carry out the renewal of approximately 265m of failing timber lined waterway of Centaurus Drain.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q1,,,2026-Q1,2026-Q2,2023-Q1,2026-Q2,,,,-43.564951,172.661108
CCC_72587,20/03/2024,Christchurch City Council,SW Ballintines Drain Renewal (Kevin Street to Sparks Road).,Project to carry out the renewal of approximately 625m of failing timber lined waterway of Ballintines Drain.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q1,,,2025-Q1,2026-Q1,2023-Q1,2026-Q1,,,,-43.565838,172.599386
CCC_72588,20/03/2024,Christchurch City Council,SW Truscotts Drain Renewal (Ferrymead).,Project to carry out the renewal of approximately one kilometre of failing lined waterway of Truscotts Drain adjacent to Ferrymead Park Drive.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2024-Q1,,,,2029-Q2,2024-Q1,2029-Q2,,,,,
CCC_72589,20/03/2024,Christchurch City Council,SW Linwood Canal Bank Renewals.,Carry out the renewal of approximately 1200m of eroding waterway bank of Linwood Canal between St Johns Street and the estuary. The objective is prevention of damage to transport assets and provides an enhancement to the waterway.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q1,,,2025-Q1,2025-Q3,2023-Q1,2025-Q3,,,,-43.546246,172.695016
CCC_72599,20/03/2024,Christchurch City Council,SW Duvauchelle Waterway Renewals.,The renewal of three flood damaged waterways in Duvauchelle - Pawsons Drain and Duvauchelle Showground Drain within the Akaroa Golf Course and Pipers Stream between the state highway and Seafield Road.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q1,,,2024-Q4,2025-Q3,2022-Q1,2025-Q3,,,,,
CCC_72755,20/03/2024,Christchurch City Council,Transport Choices 2022 - Te Aratai College Cycle Connection.,The project seeks to implement safe cycle facilities that provide access to Te Aratai College as well as a continuous cycle connection between the Rapanui-Shag Rock and the Heathcote Expressway.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2023-Q2,,,2025-Q3,2026-Q2,2023-Q2,2026-Q2,,,,-43.538414,172.668642
CCC_72759,20/03/2024,Christchurch City Council,Transport Choices 2022 - Westmorland Cycle Connection.,The project seeks to improve cycle connectivity between Westmorland and existing Major Cycle Routes schools and areas of recent residential development.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2023-Q2,,,,2024-Q1,2023-Q2,2024-Q1,,,,-43.57462,172.609973
CCC_72760,20/03/2024,Christchurch City Council,Transport Choices 2022 - Little River Link Cycle Connections (incl Simeon Street).,The project seeks to provide more cycle connectivity with the communities and destinations through the south and west of Christchurch in proximity to the Little River Link Major Cycle Route.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2023-Q2,,,2023-Q3,2024-Q1,2023-Q2,2024-Q1,,,,-43.5516,172.618087
CCC_72776,20/03/2024,Christchurch City Council,Transport Choices 2022 - Slow Speed Neighbourhoods Linwood.,This project is part of the city-wide Slow Speed Neighbourhoods programme. It is intended to support the delivery of slow speed neighbourhoods through the implementation of speed limit changes speed signage and other traffic calming devices in Linwood.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2023-Q2,,,2024-Q1,2024-Q2,2023-Q2,2024-Q2,,,,,
CCC_72779,20/03/2024,Christchurch City Council,Transport Choices 2022 - Linwood Bus Stop Improvements.,This project is part of the city-wide Bus Stop Improvement programme. It is intended to upgrade bus stop infrastructure in an effort to improve bus journey time reliability compared with private vehicles and remove barriers to the uptake of public transport. This project focusses on Linwood and surrounding eastern suburbs.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2023-Q2,,,2024-Q1,2024-Q2,2023-Q2,2024-Q2,,,,,
CCC_73097,20/03/2024,Christchurch City Council,Urban Forest Implementation - Phase 1.,The growth of our urban forest requires an increase in tree planting across the city. We have set targets to increase canopy cover throughout the district across all land use types. If we meet these targets we would have a city-wide canopy cover of >20% by 2070.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,,,,2024-Q3,2026-Q2,2024-Q3,2026-Q2,,,,,
CCC_73356,20/03/2024,Christchurch City Council,WS Mains Silvester Corso Desmo Finla Whiteh Fernbr Idri Bradn Inglewo Lamor Portn Kowh Wattl Renewal.,Renewal of water supply mains and / or submains.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2024-Q3,,,2024-Q3,2025-Q2,2024-Q3,2025-Q2,,,,,
CCC_73441,20/03/2024,Christchurch City Council,WW Pressure Main Realignment - Pages Road (PM37).,Replacing and realigning the wastewater pressure main as part of the replacement of the Pages Road bridge.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q3,,,2025-Q1,2026-Q3,2023-Q3,2026-Q3,,,,-43.510627,172.724766
CCC_73544,20/03/2024,Christchurch City Council,WS Mains Halswell Hendersons Cardinal Warren & Kinnaird Renewals.,Renewal of water supply pipes along Halswell Rd between Augustine Dr and Curletts Rd and side streets.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q2,,,2024-Q1,2024-Q2,2023-Q2,2024-Q2,,,,,
CCC_73572,20/03/2024,Christchurch City Council,Riccarton CRAF - Bradshaw Terrace Street Renewal.,This project is a street renewal of the length of Bradshaw Terrace which includes the replacement of the existing kerb and dish channel widening footpaths where possible and investigating if a reconstruction of the carriageway and footpaths is required.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2023-Q2,,,2024-Q1,2025-Q2,2023-Q2,2025-Q2,,,,-43.528166,172.601206
CCC_73575,20/03/2024,Christchurch City Council,Pioneer Earthquake Renewals and Cycle Shutdown.,Scheduled renewals at Pioneer Recreation and Sport Centre.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2023-Q3,,,2025-Q1,2025-Q2,2023-Q3,2025-Q2,,,,-43.56563,172.61461
CCC_73576,20/03/2024,Christchurch City Council,Spencer Beach Holiday Park Amenity Block Rebuild.,Reinstatement of the amenity block at Spencer Park camp ground after it was destroyed in a fire.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2024-Q1,,,2025-Q1,2025-Q4,2024-Q1,2025-Q4,,,,-43.430125,172.706207
CCC_73818,20/03/2024,Christchurch City Council,Spreydon Somerfield Waltham Beckenham CRAF - Colombo St Somerfield St Selwyn St improvements.,The Colombo Street Somerfield Street and Selwyn Street project focuses on improving access to the public transport network upgrading cycle infrastructure providing safer crossing opportunities - including around schools - and reducing speed. The targeted roading and transport improvements were identified through a review of the streets in the area by transportation engineers and by asking the local community what improvements they wanted to see in their area.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2023-Q2,,,2024-Q4,2024-Q4,2023-Q2,2024-Q4,,,,,
CCC_73852,20/03/2024,Christchurch City Council,East Papanui Outline Development Plan (ODP) Upsize Carriageway Widening.,To upgrade the developer provided local road to collector road standard to be delivered by the developer.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,,,,2024-Q4,2026-Q2,2024-Q4,2026-Q2,,,,-43.49306,172.619744
CCC_73886,20/03/2024,Christchurch City Council,WS Ferrymead WSZ Capacity Upgrade.,New pump station and groundwater abstraction wells and water main connection to increase capacity provide resilience and meet future demand.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2024-Q3,,,,2030-Q2,2024-Q3,2030-Q2,,,,,
CCC_73924,20/03/2024,Christchurch City Council,WS Mains Brougham Jerrold Selwyn Somerset Colombo Waltham Renewals.,Renewal and decommissioning of water supply reticulation assets along Brougham St / Jerrold St North between Spencer St and Ensors Rd.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2023-Q4,,,2025-Q2,2026-Q2,2023-Q4,2026-Q2,,,,-43.547475,172.63829
CCC_73937,20/03/2024,Christchurch City Council,WS Banks Peninsula surface water intakes renewals.,Renewal of Banks Peninsula raw water intakes to reinstate their service life and increase their resilience against flood events.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q2,,,2024-Q3,2025-Q3,2023-Q2,2025-Q3,,,,,
CCC_73967,20/03/2024,Christchurch City Council,WS Rezoning Stage 1 Implementation.,Pump station and pipe upgrades to maintain levels of service security of supply and fire flow compliance.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,2024-Q2,,,2025-Q1,2026-Q2,2024-Q2,2026-Q2,,,,,
CCC_73993,20/03/2024,Christchurch City Council,WW Beckenham PS (PS0153) and Pressure Main.,Construction of a new Wet Weather Flow wastewater pump station at Beckenham Park with associated pressure main and gravity pipe upsizing in order to reduce overflows to the Heathcote River.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q3,,,2025-Q1,2026-Q4,2023-Q3,2026-Q4,,,,-43.561054,172.647889
CCC_74022,20/03/2024,Christchurch City Council,Hoon Hay Sports Pavilion and Toilets.,Removal of existing earthquake prone Pavilion and replace with new Pavilion and toilets.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,,,,2024-Q2,2027-Q2,2024-Q2,2027-Q2,,,,-43.56185,172.59351
CCC_74207,20/03/2024,Christchurch City Council,WW Network SCADA System Platform Software Upgrade.,Replace electrical equipment and software that is no longer supported by manufacturers and to bring equipment up to the latest CCC standards.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2024-Q3,,,,2029-Q2,2024-Q3,2029-Q2,,,,,
CCC_74214,20/03/2024,Christchurch City Council,CWTP MLC-H 11kV RMU Renewal Pond Radio's Upgrade.,Replace electrical equipment that is no longer supported by manufacturers and to bring equipment up to the latest CCC standards.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2024-Q3,,,,2029-Q2,2024-Q3,2029-Q2,,,,-43.524764,172.702944
CCC_74352,20/03/2024,Christchurch City Council,WW Lincoln Road Mains Renewal.,Renewal of wastewater mains along Lincoln Road and part of associated side streets between Curletts Road and Wrights Road.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q3,,,2024-Q4,2025-Q3,2023-Q3,2025-Q3,,,,-43.550983,172.599251
CCC_74437,20/03/2024,Christchurch City Council,WS Ashgrove and others MEICA renewals.,Renewal of software and electrical equipment at nine Potable Water Pump Stations to meet the latest CCC standards.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2024-Q3,,,,2029-Q2,2024-Q3,2029-Q2,,,,,
CCC_74469,20/03/2024,Christchurch City Council,Transport Choices 2022 - Improving Bromley's Roads.,The Bromley Area Traffic Plan integrated into the Linwood-Central-Heathcote Community Board Action Plan 2020 aims to address community concerns including safety speed accessibility pedestrian issues parking challenges and the presence of large vehicles through a collaborative approach and effective engagement strategies.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2023-Q2,,,,2025-Q2,2023-Q2,2025-Q2,,,,-43.543325,172.699137
CCC_74584,20/03/2024,Christchurch City Council,WW Anzac Drive Renewal.,Renewal of 122 metres of wastewater pipe.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q2,,,2024-Q2,2027-Q2,2023-Q2,2027-Q2,,,,-43.507361,172.713423
CCC_74786,20/03/2024,Christchurch City Council,Botanic Gardens Paddling Pool Renewal.,Upgrade of the Botanic Gardens Paddling Pool and surrounding facilities.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2025-Q3,,,,2028-Q2,2025-Q3,2028-Q2,,,,-43.528753,172.61955
CCC_75397,20/03/2024,Christchurch City Council,WS Main Pumps Well 4 5 & 6 Services Renewal (PS1024).,Relocation works of the existing electricals controls panel and piping system of the wells before the demolition works of the South Library in early 2025.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q4,,,2024-Q3,2025-Q3,2023-Q4,2025-Q3,,,,-43.562119,172.638336
CCC_75713,20/03/2024,Christchurch City Council,WW Springs Road Pressure Main Renewal PM67.,Replacement of approximately 725 metres of wastewater main in Springs Road.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q4,,,2024-Q4,2026-Q2,2023-Q4,2026-Q2,,,,-43.561605,172.528873
CCC_75900,20/03/2024,Christchurch City Council,Te Nukutai o Tapoa - Naval Point New Multi-Purpose Facility (Stage 3).,Design and build a new multi-purpose sports / change facility at Te Nukutai o Tapoa – Naval Point to support marine and recreational activities and local community needs. The new facility will replace a number of individual buildings and structures that have been developed over time at Naval Point.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,2023-Q4,,,2024-Q4,2025-Q2,2023-Q4,2025-Q2,,,,-43.611613,172.706795
CCC_75969,20/03/2024,Christchurch City Council,SW Patchetts Drain Renewal (Landsdowne Terrace to Gunns Crescent).,Carry out the renewal of approximate 190m of lined waterway of Patchetts Drain through the backs of properties between 21 Gunns Crescent (upstream) and Sibleys Drain within 35 Landsdown Terrace that are failing.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2024-Q1,,,2025-Q2,2026-Q2,2024-Q1,2026-Q2,,,,-43.572758,172.640165
CCC_76042,20/03/2024,Christchurch City Council,WW Colombo St Ferry Rd Linwood Ave Waltham Rd Renewals.,Renewal of 771 metres of wastewater pipes as well as upgrading pipes to take a higher volume.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q4,,,2024-Q3,2026-Q1,2023-Q4,2026-Q1,,,,-43.536078,172.636672
CCC_76073,20/03/2024,Christchurch City Council,WW Shirley Local Pressure Sewer System.,Installation of a new local pressure system to serve the area of Shirley surrounding the commercial core area and some of the residential medium density zone west of the commercial zone. This area lies in and around The Palms Mall on Golf Links Road Marshland Road and New Brighton Road.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,,,,2025-Q2,2026-Q2,2025-Q2,2026-Q2,,,,-43.508034,172.662861
CCC_76081,20/03/2024,Christchurch City Council,WS Tanner PS1095 Treatment Equipment & Controls.,Provide UV treatment and chlorination equipment and controls at the Tanner pump station.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q4,,,2025-Q1,2025-Q3,2023-Q4,2025-Q3,,,,-43.557863,172.678904
CCC_76206,20/03/2024,Christchurch City Council,WW Hawthorne Lansbury Walnut Renewals.,Renewal of wastewater mains and associated laterals in Hawthorne Street Lansbury Avenue and Walnut Avenue.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2024-Q1,,,2027-Q3,2028-Q2,2024-Q1,2028-Q2,,,,-43.504149,172.608495
CCC_76389,20/03/2024,Christchurch City Council,WS Parklands Rezoning.,Pipe links and configuration changes to rezone the Rawhiti North district metered area to support the decommissioning of redundant and non-compliant pump stations Burwood and Mairehau.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q4,,,2024-Q4,2025-Q2,2023-Q4,2025-Q2,,,,-43.480073,172.701024
CCC_76593,20/03/2024,Christchurch City Council,CWTP Combined Heat and Power Engine Renewal (CHP2 CHP3).,Complete planned mechanical overhaul of Combined Heat and Power (CHP) engines CHP 2 and CHP 3.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2023-Q4,,,2024-Q1,2025-Q2,2023-Q4,2025-Q2,,,,-43.525073,172.700605
CCC_76770,20/03/2024,Christchurch City Council,WW Wainui Peverel Matipo George Renewals.,"""The purpose of this project is to renew wastewater reticulation assets that are due for repairs/renewal based on the Asset Assessment Intervention Framework (AAIF) programme. If necessary upsize assets that are deemed inadequate based on current flow profiles or as required by future demand.",,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2024-Q1,,,2027-Q3,2028-Q2,2024-Q1,2028-Q2,,,,-43.533548,172.593471
CCC_77013,20/03/2024,Christchurch City Council,SW Stilwells Drain Renewal (Hoon Hay).,Renewal of failing timber waterway lining of Stilwells Drain with piped asset along a new alignment that works with future development.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2024-Q1,,,2025-Q1,2025-Q2,2024-Q1,2025-Q2,,,,-43.569767,172.606786
CCC_72764,1/12/2023,Christchurch City Council,Transport Choices 2022 - Linwood and Woolston Roading and Transport Improvements.,This project seeks to deliver safety improvements on corridors and intersections within Linwood and Woolston.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,2023-Q2,,,2024-Q1,2024-Q2,2023-Q2,2024-Q2,,,,,
CCC_71974,1/12/2023,Christchurch City Council,SW Horseshoe Lake (Waikakariki) Outlet Renewal (New Brighton Road).,Heathcote Domain Play Space Renewal.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,2022-Q4,,,2024-Q1,2024-Q2,2022-Q4,2024-Q3,,,,-43.502867,172.682802
IP010460,18/03/2024,Christchurch International Airport Limited,Property Development.,Property Development.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Commercial,25 - 50 million,,,,,,,2024-Q1,2024-Q4,,,,,
IP002502,20/03/2024,City Rail Link Limited,City Rail Link.,The CRL is a 3.45km twin-tunnel underground rail link up to 42 metres below the city centre transforming the downtown Britomart Transport Centre into a two-way through-station that better connects the Auckland rail network.,,Under construction,Fully funded,Limited,Alliance,Auckland,,,Transport,1 billion +,,,,,2017-Q3,2025-Q2,2017-Q3,2025-Q4,
https://www.cityraillink.co.nz/,,Patrick Brockie,,
IP009715,22/03/2024,Connexa Limited,Mobile Tower Build Programme.,Minimum of 750 new mobile tower sites to be built over the next decade. This project will underpin the growth of our digital economy and enable businesses in Aotearoa to innovate and grow.,,Under construction,Fully funded,Selective,Design and construct,Nationwide,,,Communications,100 - 250 million,,,,,,,2022-Q2,2033-Q2,www.connexa.co.nz,,,,
IP004923,19/12/2023,Contact Energy Limited,Tauhara Power Station.,The Tauhara Power Station is a new geothermal power station in the Central North Island. With a capacity of 174MW it is expected to produce annual generation of over 1400GWh. It will consist of a single shaft steam turbine driven by geothermal fluid from.,,Under construction,Fully funded,Limited,Design and construct,Waikato,,,Energy,500 million - 1 billion,,,,2020-Q2,2021-Q1,2024-Q3,2020-Q2,2024-Q3,
https://contact.co.nz/aboutus/our-story/our-projects,,,-38.623976,176.2807933
IP006655,31/12/2023,Auckland Council,Building Auckland’s Resource Recovery.,A series of eight recycling centres across Auckland. This project will fast track the effectiveness of the Resource Recovery Network through developing fit for purpose infrastructure to support resource recovery activity.,,Under construction,Fully funded,To be determined,To be determined,Auckland,,,Environmental,5 - 25 million,,,,,2021-Q1,2024-Q2,2021-Q1,2024-Q2,,,,,
IP008946,31/12/2023,Auckland Council,Te Whau Pathway.,The Te Whau Pathway will be extended through New Lynn from Olympic Park to Ken Maunder Park and through Te Atatū South from Laurieston Park to the North Western Cycleway. This will give these communities an easy and safe way to get around.,,Under construction,Fully funded,To be determined,To be determined,Auckland,,,Transport,25 - 50 million,,,,,2020-Q4,2026-Q4,2020-Q4,2026-Q4,,,,,
IP004001,31/12/2023,Auckland Transport,Northwestern Busway.,It involves a range of short-term works (early deliverables ahead of a full busway or light rail) which includes new bus interchanges at Te Atatu Rd Lincoln Rd and Westgate local bus stop improvements and bus priority at motorway interchanges and along motorway shoulders. This project involves $100 million worth of improvements to the North Western Motorway to allow faster and more frequent bus services.,,Under construction,Fully funded,To be determined,To be determined,Auckland,,,Transport,100 - 250 million,,,,,2021-Q3,2026-Q2,2021-Q3,2026-Q2,,,,,
IP008075,31/12/2023,Auckland Transport,Tamaki Makaurau Auckland Electric Ferries.,To pilot electric ferry and one hydrogen-ready hybrid ferry in Auckland and one electric ferry in Tauranga.,,Under construction,Fully funded,To be determined,To be determined,Auckland,,,Transport,25 - 50 million,,,,,2022-Q3,2025-Q2,2022-Q3,2025-Q2,,,,,
IP008109,31/12/2023,Aukaha (1997) Ltd,Energy Hardship Alleviation - Substitute.,Home energy retrofit pilot project.,,Under construction,Fully funded,To be determined,To be determined,Otago,,,Community facilities,1 - 5 million,,,,,2022-Q2,2024-Q2,2022-Q2,2024-Q2,,,,,
IP004012,31/12/2023,Bone Marrow Cancer Trust,Medi Hotel – “ Ranui Apartments”.,The Bone Marrow Cancer Trust is developing a Medi-Hotel offering 42 fully self-contained apartments for patients and their families undergoing cancer treatment.,,Under construction,Fully funded,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,,,,2021-Q2,2024-Q3,2021-Q2,2024-Q3,,,,,
IP004069,31/12/2023,Buller District Council,Port Package - Grey Port.,The ports package (strategy and summary attached) seeks central government funding to enable the ongoing private investment from four companies (letters of support attached). By spending $7.0m to revitalise the 'port and river systems' for sustainable shipping and operations the fishing and bulk trades will grow on the West Coast creating substantial long term jobs in both sectors. Without this underlying infrastructure investment private investment is likely to be constrained due the risk of the assets not supporting long term operations.,,Under construction,Fully funded,To be determined,To be determined,West Coast,,,Transport,5 - 25 million,,,,,2021-Q2,2024-Q2,2021-Q2,2024-Q2,,,,,
IP004890,31/12/2023,Cancer Society Of New Zealand Canterbury-West Coast Division Incorporated,Cancer Society – Christchurch Building Project.,To design consent and construct an integrated Cancer Society Community Centre for the Canterbury region.,,Under construction,Fully funded,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,,,,2021-Q2,2024-Q1,2021-Q2,2024-Q1,,,,,
IP004078,31/12/2023,Chatham Islands Airport Limited,Chatham Islands Airport.,Construction of a 490m extension to the existing runway to extend the overall length to 1 850m as well as ancillary works to enable the airport to accommodate Code 4C aircraft (jet aircraft). Project has been split into two phases with an initial design phase to establish a firm cost for the project prior to committing funding for the construction of the runway (initial phase government funding is $700 000). 5.5m paid by Waka Kothai for transmission gully delay.,,Under construction,Fully funded,To be determined,To be determined,Canterbury,,,Transport,50 - 100 million,,,,,2021-Q3,2024-Q2,2021-Q3,2024-Q2,,,,,
IP008951,31/12/2023,Christchurch City Council,Major Cycleway Routes.,The overall scope of the Major Cycleway Routes (MCR) programme is building cycle routes across Christchurch city and is key to providing residents with mode choice and mode shift from vehicles to active transport modes. The MCR network are high quality separated cycleways that provide significant safety improvements for cyclists.,,Under construction,Fully funded,To be determined,To be determined,Canterbury,,,Transport,100 - 250 million,,,,,2020-Q3,2025-Q2,2020-Q3,2025-Q2,,,,,
IP006652,31/12/2023,Crown Infrastructure Partners Limited,Digital package.,To address rural connectivity issues that arose during Covid-19 inlcuding increased broadband capacity to areas that experienced congestion and further funds to connect boradband to more Marae that can provide a rural digital hub. $2.5m from Round 1 borrowed to pay some of IRG stuff inlcuded in co-fund of 3 886 653.,,Under construction,Fully funded,To be determined,To be determined,Nationwide,,,Communications,50 - 100 million,,,,,2021-Q4,2024-Q1,2021-Q4,2024-Q1,,,,,
IP006656,31/12/2023,Energy Efficiency and Conservation Authority,Minimum Viable Hydrogen Refuelling Network.,There are two contracts involved in the project: One with Hiringa Refuelling New Zealand limited – contract signed 23 August 2021 and Another with TR Group Limited – contracted signed 17 September 2021.,,Under construction,Fully funded,To be determined,To be determined,Waikato,,,Environmental,25 - 50 million,,,,,2022-Q2,2024-Q4,2022-Q2,2024-Q4,,,,,
IP008087,31/12/2023,Energy Efficiency and Conservation Authority,Thermal Drying Facility Replacement.,Construct a new sludge dryer at NPDC's wastewater treatment plant to dry sludge for beneficial reuse primarily fuelled by natural gas with provision to enable supplementary use of hydrogen. Also construct a new building to house the wastewater treatment plant’s laboratory facilities.,,Under construction,Fully funded,To be determined,To be determined,Taranaki,,,Environmental,50 - 100 million,,,,,2021-Q4,2025-Q2,2021-Q4,2025-Q2,,,,,
IP004895,31/12/2023,Environment Canterbury,Region Wide River Berm Planting Programme.,This project is an extensive planting programme across various river berms from Kaikoura to Waitaki. It includes removing exotic non-beneficial invasive plant species and strengthening waterway edges to improve flood resilience. 05/07/2022 Funds added from P610 - Halswell/Hurutinin weed barrage.,,Under construction,Fully funded,To be determined,To be determined,Canterbury,,,Environmental,5 - 25 million,,,,,2021-Q3,2024-Q2,2021-Q3,2024-Q2,,,,,
IP004912,31/12/2023,Environment Southland,Gore Town S/B Upgrade.,This project comprises urgently required stopbank upgrades which will raise stopbank heights to design levels based on climate change modelling along the Mataura River.,,Under construction,Fully funded,To be determined,To be determined,Southland,,,Environmental,5 - 25 million,,,,,2021-Q3,2024-Q2,2021-Q3,2024-Q2,,,,,
IP004916,31/12/2023,Environment Southland,Wyndham Stopbank Upgrade.,This project is a flood management programme which will increase stopbank heights to climate change design levels.,,Under construction,Fully funded,To be determined,To be determined,Southland,,,Environmental,1 - 5 million,,,,,2021-Q3,2024-Q2,2021-Q3,2024-Q2,,,,,
IP004918,31/12/2023,Environment Southland,Invercargill Stopbank Upgrade.,The project will raise the height and strengthening of Otepuni Stop Banks. This project is part of a broader flood management programme protecting Invercargill City. The effectiveness of this programme requires all projects of the flood management programme to be put in place 13/12/2022 Otepuni Stop Banks Upgrade (P290) merged with Waihopai Stop Bank (P289) into Invercargill Stopbank Upgrade (P290).,,Under construction,Fully funded,To be determined,To be determined,Southland,,,Environmental,1 - 5 million,,,,,2022-Q1,2024-Q1,2022-Q1,2024-Q1,,,,,
IP004919,31/12/2023,Environment Southland,Stead Street Pump Station.,This project will replace existing drainage pump and associated pipework and upgrade the pump station structures and building. This project is part of a broader flood management programme protecting Invercargill City.,,Under construction,Fully funded,To be determined,To be determined,Southland,,,Environmental,5 - 25 million,,,,,2021-Q3,2024-Q2,2021-Q3,2024-Q2,,,,,
IP004803,31/12/2023,Far North Holdings Ltd,FNDC jetties - Pukenui Unahi Rangitane.,The project involves: Pukenui & Unahi jetties – demolish existing concrete wharf and construct new heavy-vehicle concrete wharf with fender piles floating pontoon service deck and other works. Rangitane jetties - construct a new reclamation with space for 20 trailers and 12 car parks. Construct a double width boat ramp with a launching pontoon in the centre to make it safer to launch and retrieve vessels. A new jetty and pontoon will be installed to replace the existing one which is unsafe.,,Under construction,Fully funded,To be determined,To be determined,Northland,,,Transport,5 - 25 million,,,,,2021-Q2,2024-Q4,2021-Q2,2024-Q4,,,,,
IP004020,31/12/2023,Gisborne District Council,Gisborne Olympic Pool.,A redevelopment of Gisborne’s Olympic Pool complex with three phases: Demolition of current pool & building Indoor pool & hall and Outdoor pool & landscaping.,,Under construction,Fully funded,To be determined,To be determined,Gisborne,,,Community facilities,25 - 50 million,,,,,2021-Q3,2024-Q2,2021-Q3,2024-Q2,,,,,
IP004846,31/12/2023,Gisborne District Council,Waipaoa River Flood Control Scheme.,This project is a flood management programme that will upgrade 15km of critical area stop banks and associated structure along with associated access and remedial works.,,Under construction,Fully funded,To be determined,To be determined,Gisborne,,,Environmental,5 - 25 million,,,,,2020-Q4,2024-Q1,2020-Q4,2024-Q1,,,,,
IP005980,31/12/2023,Green School Properties Limited and Green School Farm Limited,Green School New Zealand.,Constructing phases two and three of Green School New Zealand which will expand the school’s capacity from 120 students to 250 students. Securing this extra capacity is key to ensuring the long term feasibility of the school.,,Under construction,Fully funded,To be determined,To be determined,Taranaki,,,Environmental,5 - 25 million,,,,,2020-Q4,2025-Q1,2020-Q4,2025-Q1,,,,,
IP004022,31/12/2023,Hastings District Council,Flaxmere and Iona Urban Developments.,The project involves the delivery of Bulk Housing Infrastructure required to enable land to be developed for social affordable and market housing in Hastings. The project supports approximately 350 market houses and 175 social and affordable houses.,,Under construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,5 - 25 million,,,,,2021-Q1,2025-Q3,2021-Q1,2025-Q3,,,,,
IP004860,31/12/2023,Hawke's Bay Regional Council,Heretaunga Plains Flood Control Protection.,This project is a flood management programme will construct new or strengthen existing stop banks on the Tutaekuri Ngaruroro and Clive Rivers areas within the Heretaunga Plains Flood Control Scheme.,,Under construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Environmental,5 - 25 million,,,,,2021-Q4,2024-Q1,2021-Q4,2024-Q1,,,,,
IP008948,31/12/2023,Hawke's Bay Regional Council,Upper Tukituki Flood Control Scheme.,This project is a flood management programme involving the removal and stockpile of 800 000m3 of gravel from the Upper Tukituki Flood protection Scheme.,,Under construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Environmental,5 - 25 million,,,,,2021-Q3,2024-Q1,2021-Q3,2024-Q1,,,,,
IP006659,31/12/2023,Heritage NZ,Hokitika Government Building.,To purchase and upgrade the historic Seddon House property Hokitika for use as Department of Conservation offices.,,Under construction,Fully funded,To be determined,To be determined,West Coast,,,Community facilities,5 - 25 million,,,,,2022-Q2,2025-Q2,2022-Q2,2025-Q2,,,,,
IP005977,31/12/2023,Hihiaua Cultural Centre,Hihiaua Cultural Centre.,Construct an architecturally iconic 800 seat performing arts and conference venue. Stage 2 of the Hihiaua Cultural Centre project. This is part of Whangarei ‘Rejuvenation Package’.,,Under construction,Fully funded,To be determined,To be determined,Northland,,,Community facilities,5 - 25 million,,,,,2022-Q4,2025-Q4,2022-Q4,2025-Q4,,,,,
IP004849,31/12/2023,Horizons Regional Council,Rangitikei River Enhancement.,This project is a flood management programme that will develop a river park to enhance access to the Rangitikei River close to State Highway 1 near Bulls. The projects includes: extensive landscaping and planting of native plants to manage river edge erosion and locating and constructing stable walkways to manage foot cycle and recreational horse riding activities away from unstable ground.,,Under construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Environmental,5 - 25 million,,,,,2020-Q4,2025-Q2,2020-Q4,2025-Q2,,,,,
IP004850,31/12/2023,Horizons Regional Council,Palmerston North Flood Protection.,This project is a flood management programme which involves rebuilding stopbanks and strengthening associated structures involving major earth works drainage work and reinstatement of land.,,Under construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Environmental,5 - 25 million,,,,,2020-Q4,2025-Q2,2020-Q4,2025-Q2,,,,,
IP004852,31/12/2023,Horizons Regional Council,Foxton Flood Mitigation.,This project is a flood management programme which includes : Upgrading sections of the existing stop bank to meet higher engineering standards constructing surface water drainage system in the eastern catchment area of Foxton and diversion of water to the existing Whirokino drainage scheme.,,Under construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Environmental,5 - 25 million,,,,,2021-Q3,2025-Q2,2021-Q3,2025-Q2,,,,,
IP004855,31/12/2023,Horizons Regional Council,Lower Manawatu Flood Protection Resilience.,The project will upgrade 25 km of stop banks by raising the heights and civil engineering modifications improve performance of existing stop banks. This project is part of a long term programme of works being undertaken to upgrade flood resilience across the Lower Manawatu River flood Plain area.,,Under construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Environmental,5 - 25 million,,,,,2021-Q3,2025-Q2,2021-Q3,2025-Q2,,,,,
IP004853,31/12/2023,Horowhenua District Council,Tara-Ika Growth Area.,Connecting three waters roading & parks infrastructure required to enable the greenfield development of ~2 500 houses.,,Under construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Housing,25 - 50 million,,,,,2021-Q1,2024-Q4,2021-Q1,2024-Q4,,,,,
IP004018,31/12/2023,Hurunui District Council,Conical Hill flyline at Hanmer Springs.,Build a new tourist attraction at Hanmer Springs. A fly to be constructed on a walkway that attracts 80 000 visitors per year.,,Under construction,Fully funded,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,,,,2021-Q3,2024-Q2,2021-Q3,2024-Q2,,,,,
IP004061,31/12/2023,Hutt City Council,Naenae Pool + Fitness New Build.,The demolition of the current earthquake prone Naenae Pool + Fitness building in Everest Avenue Naenae Lower Hutt and construction of a new Aquatic and Fitness facility – funding dependent on Council LTP approval for June 2021.,,Under construction,Fully funded,To be determined,To be determined,Wellington,,,Community facilities,50 - 100 million,,,,,2021-Q3,2024-Q3,2021-Q3,2024-Q3,,,,,
IP004041,31/12/2023,Kaikohe & Districts Sportsville Incorporated,Mid-North Sports Package: Lindvart Park.,This project includes upgrading and constructing new facilities for 25 different sports across the Far North. The work includes upgrading court facilities roading and carparking improvements and safer access to Lindvart Park in Kaikohe. A new pavilion capable of providing two full sized competition indoor courts and supporting facilities is planned. A recent sport strategy plan for the region has identified the need for this project. A detailed project plan will be drafted through the deisgn and consenting stage.,,Under construction,Fully funded,To be determined,To be determined,Northland,,,Community facilities,5 - 25 million,,,,,2022-Q2,2024-Q1,2022-Q2,2024-Q1,,,,,
IP006374,31/12/2023,Kaipara District Council,Kaipara Stopbank Enhancement.,Funding will support: Raupo Internal Stopbank ($2.5M) - installation of flood gates will aloow stormwater to be attenuarted and used to address animal welfare issues over the dry season and help to raise the groundwater levels duringthe drier period Mitigating the instrusion of salt water. the floodgates will also reduce the need to raise over 30km of internal stopbanks in Raupo Drainage District. Dargaville to Te Kopuru Stopbank ($3.5m) - works wil linclude standard maintenance on stopbanks that will support the first phase of land productivity change associated iwth the Provincial Growth Fund funded Tai Tokerau Water Stoargae project and Kapara Kai.,,In planning,Fully funded,To be determined,To be determined,Northland,,,Environmental,5 - 25 million,,,,,2023-Q2,2024-Q2,2023-Q2,2024-Q2,,,,,
IP004874,31/12/2023,Marlborough District Council,Wairau River Flood protection Scheme.,The project comprises strengthening and protection construction work on the Southern Valley/Upper Conders area of Wairau River and associated pump station infrastructure construction installation and maintenance work. The project integral to the overall Wairau River flood protection scheme.,,Under construction,Fully funded,To be determined,To be determined,Marlborough,,,Environmental,5 - 25 million,,,,,2021-Q1,2024-Q2,2021-Q1,2024-Q2,,,,,
IP004058,31/12/2023,Marlborough Kaikoura Trail Trust,The Whale Trail.,The Marlborough Kaikōura Trail Trust (the Trust) was formed in December 2017 to develop promote and construct the trail. Since then the Trust has completed a technical study identifying the route and detailed project costs and a business case that identified the project would deliver significant public benefit. The trail will connect the communities of Picton Blenheim Seddon Ward Kekerengu Clarence and Kaikōura. Building the trail would also complete a key part of the NZ’s cycling infrastructure with a vital link to Picton and the Cook Strait ferries which carry over a million passengers per year.,,Under construction,Fully funded,To be determined,To be determined,South Island,,,Transport,25 - 50 million,,,,,2020-Q4,2025-Q2,2020-Q4,2025-Q2,,,,,
IP004068,31/12/2023,Masterton District Council,Hood Aerodrome Infrastructure Upgrade.,Upgrade the runway by resurfacing and widening airfield fixtures terminal precinct and services and engineering precinct. (Stage 1: $3.3m) acquire land and proceed with work on runway approaches and an extension of the runway alignment of Manaia Road work on drainage and runway engineering and upgrade airfield management. (Stage 2: $6.7m). Stage 2 would require securing additional consents and co-funding to deliver the larger project. This project will transform the Hood Aerodrome into a modern functional airport and centre for aviation activity.,,Under construction,Fully funded,To be determined,To be determined,Wellington,,,Transport,5 - 25 million,,,,,2020-Q4,2025-Q4,2020-Q4,2025-Q4,,,,,
IP008609,31/12/2023,Merlin Labs NZ Ltd,Apollo Aviation.,$1m convertible loan to Merlin Labs NZ Limited for the Commercialisation and Certification of Autonomous Aircraft. Establish a commercially operating freight business using certified NZ planes fitted with Merlin Labs Inc US technology and seek Civil Aviation Authority.,,Under construction,Fully funded,To be determined,To be determined,Nationwide,,,Transport,5 - 25 million,,,,,2021-Q4,2025-Q1,2021-Q4,2025-Q1,,,,,
IP005971,31/12/2023,Ministry of Housing and Urban Development,Unitec Housing Development.,Horizontal infrastructure to support residential development of up to 4 000 homes on up to 36 hectares of land within the former Unitec campus (a subset of the Wairaka Precinct in the Auckland Unitary Plan) including three waters roading and community infrastructure. This investment will bring forward residential construction on the Site.,,Under construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,50 - 100 million,,,,,2021-Q2,2024-Q4,2021-Q2,2024-Q4,,,,,
IP008950,31/12/2023,Nelson City Council,AIMEX: Nelson Port Slipway.,Upgrade existing small vessel slipway facilities which are used for building and repairing boats at Port Nelson.,,In planning,Fully funded,To be determined,To be determined,Nelson,,,Transport,5 - 25 million,,,,,2023-Q2,2024-Q4,2023-Q2,2024-Q4,,,,,
IP004028,31/12/2023,New Zealand Police,New Whanganui Hub (NZ Police).,Construction of new Police Hub building and custody facility as part of a new justice and social agency hub in Whanganui.,,Under construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Community facilities,25 - 50 million,,,,,2022-Q4,2025-Q3,2022-Q4,2025-Q3,,,,,
IP004801,31/12/2023,Northland Regional Council,Awanui River Flood Protection Scheme - Kaitaia.,This project is a flood protection programme which targets protection for two Townships in Northland. Flood protection for Kaitaia Township and Flood protection for Moewera Township.,,Under construction,Fully funded,To be determined,To be determined,Northland,,,Environmental,5 - 25 million,,,,,2020-Q1,2024-Q3,2020-Q1,2024-Q3,,,,,
IP004904,31/12/2023,Otago Regional Council,West Taieri Contour Channel Upgrade.,This project is a flood management programme that will renew aging infrastructure built in 1950’s – contour channel upgrade 2 820m (Stages 5 7 8 9 and 10) and a bridge replacement.,,Under construction,Fully funded,To be determined,To be determined,Otago,,,Environmental,5 - 25 million,,,,,2021-Q3,2025-Q2,2021-Q3,2025-Q2,,,,,
IP008947,31/12/2023,Otorohanga Kiwi House Charitable Trust,Otorohanga Kiwi house.,The Otorohanga Kiwi House Redevelopment is a capital works project that involves building a new Visitors and Department of Conservation Information Centre retail area and ticketing area; a new Nocturnal House facility displaying Kiwi Tuatara and other species including an augmented reality interactive space showcasing Moa and Kiwi several large free flight aviaries to enable flying displays and bird shows full refurbishment of existing enclosures and rebuilding the existing brown kiwi breed for release facility and pre-release conditioning facility.,,Under construction,Fully funded,To be determined,To be determined,Waikato,,,Community facilities,5 - 25 million,,,,,2020-Q3,2024-Q4,2020-Q3,2024-Q4,,,,,
IP004811,31/12/2023,Paparoa Community Charitable Trust,Paparoa Housing.,The project is to complete the development of a 29 lot subdivision including civil works and subdivision services with 14 lots purposely designed for retirement living. The remaining 15 lots are being sold on the open market as suitable for family dwellings. The project is already well advanced.,,Under construction,Funding source confirmed,To be determined,To be determined,Northland,,,Housing,1 - 5 million,,,,,2021-Q1,2024-Q1,2021-Q1,2024-Q1,,,,,
IP005984,31/12/2023,Poverty Bay Rugby Football Union,Rugby Park grandstand rebuild.,Demolish an existing grandstand at Rugby Park in Tairawhiti and replace it with a fit for purpose facility for rugby other sports entertainment and cultural / family events.,,Under construction,Fully funded,To be determined,To be determined,Gisborne,,,Community facilities,5 - 25 million,,,,,2021-Q4,2024-Q4,2021-Q4,2024-Q4,,,,,
IP004900,31/12/2023,Queenstown-Lakes District Council,Queenstown Arterials Stage 1.,This project involves a combination of upgrading some existing road corridors and development of a completely new roading link from Henry Street to the intersection of Melbourne Street and Beetham Street in Queenstown.,,Under construction,Fully funded,To be determined,To be determined,Otago,,,Transport,50 - 100 million,,,,,2021-Q3,2025-Q2,2021-Q3,2025-Q2,,,,,
IP004901,31/12/2023,Queenstown-Lakes District Council,Queenstown Town Centre.,This project includes the proposed upgrades of the existing road reserve of Brecon Street Rees Street Beach Street and Park Street. The upgrades will include new three water services renewals paving street furniture planting and lighting.,,Under construction,Fully funded,To be determined,To be determined,Otago,,,Transport,50 - 100 million,,,,,2020-Q3,2024-Q1,2020-Q3,2024-Q1,,,,,
IP004848,31/12/2023,Rangitikei District Council,Marton Rail Hub.,The Rangitikei District Council (RDC) is looking to facilitate the development of the Marton Rail Hub (MRH). The project will involve purchasing land developing the log yard rail sidings de-barker and access road as well as operationalising the development. The rail hub will be key for the region particularly the forestry sector as a central point where the significant volumes of harvested wood will be transferred to rail and freighted to markets. KiwiRail has been involved with this project since inception with contracts being negotiated for works. NZTA are involved providing initial road layouts and design however contracts will not be completed until a contractor has been agreed to complete the road construction.,,In planning,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Transport,5 - 25 million,,,,,2024-Q1,2026-Q4,2024-Q1,2026-Q4,,,,,
IP005972,31/12/2023,Research & Innovation Queenstown Limited,Research and Innovation Queenstown.,The RIQ project constructs world class research and innovation facilities in Queenstown. It leverages Queenstown as an international destination to bring together world leading people projects and presence from such global innovation players as Singularity University’s Artificial Intelligence and Robotics track; NZ Centres of Research Excellence such as the Dodd-Walls Centre of Photonic and Quantum Technologies (the combined best from NZ universities and research entities); NASA’s Jet Propulsion Laboratory; and Cambridge University’s Innovation Network - amongst others - who have already expressed strong support for the proposition. Collectively this cluster will generate unparalleled research and innovation benefits across the entire NZ economy and landscape and champion New Zealand’s global brand as a place for the world’s best and brightest to do their most advanced and frontier facing work.,,Under construction,Fully funded,To be determined,To be determined,Otago,,,Science and research,25 - 50 million,,,,,2021-Q2,2024-Q2,2021-Q2,2024-Q2,,,,,
IP004006,31/12/2023,Rotorua Lakes Council,Rotorua: Wheranui Road Unlocking urban land.,The Project involves building roading and storm water infrastructure to enable housing and industrial development in Rotorua (particularly for land owned by Ngāti Whakaue Tribal Lands (NWTL) that is unlikely to be fully developed without intervention). This Project is supported by upgrades to SH30 submitted as a separate project (due to these works being undertaken by NZTA) to the Ministers for approval for shovel ready funding. This was submitted as part of tranche 2 on 19 August 2020.,,Under construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,5 - 25 million,,,,,2021-Q1,2024-Q2,2021-Q1,2024-Q2,,,,,
IP004818,31/12/2023,Ruakaka Recreation Centre Incorporated,Ruakaka Recreation Centre.,This project will provide funding to complete Stage One of a three-stage project to build a new recreation centre at Ruakaka on land owned by Whangarei District Council. Stage One comprises the construction of a building containing a gymnasium and attached meeting rooms. This building will provide much needed space for activities in the community. The recipient expects that confirmation of government funding and the completion of Stage One will act as “seed funding” for the management committee of the Centre to attract other funding to complete the development of stages two and three.,,Under construction,Fully funded,To be determined,To be determined,Northland,,,Community facilities,1 - 5 million,,,,,2021-Q4,2024-Q1,2021-Q4,2024-Q1,,,,,
IP004863,31/12/2023,South Taranaki District Council,Library Arts and Culture Centre (Te Ramanui o Ruaputahanga).,The project will create Aa new 1605m2 civic facility which will be built in Hāwera combining a number of facilities onto one site. These will include a bigger library meeting rooms public toilets a community art gallery i-SITE visitor centre and café. The development includes car-parking landscaping and exterior public civic spaces.,,Under construction,Fully funded,To be determined,To be determined,Taranaki,,,Community facilities,5 - 25 million,,,,,2021-Q2,2024-Q2,2021-Q2,2024-Q2,,,,,
IP008949,31/12/2023,South Taranaki District Council,Nukumaru Station Road construction.,The Nukumaru Station Road Extension Project aims to provide the Waiinu Beach community and local commercial parties including Silver Fern Farms Limited and the local metal quarry with a safe and flood resilient access road south of the Lime Works Bridge.,,Under construction,Fully funded,To be determined,To be determined,Taranaki,,,Transport,5 - 25 million,,,,,2021-Q3,2024-Q2,2021-Q3,2024-Q2,,,,,
IP008111.1,31/12/2023,Southland Regional Development Agency Limited,Invercargill Decarbonisation Contestable Fund.,Funding be repurposed to fulfil the original objectives of decorbonising fossil fuelled heating systems at regional scare by way of a contestable fund managed by Great South and supported by a robust eligibility criteria principles and assessment cirteria.,,Under construction,Fully funded,To be determined,To be determined,Southland,,,Environmental,5 - 25 million,,,,,2022-Q3,2024-Q1,2022-Q3,2024-Q1,,,,,
IP004851,31/12/2023,Tararua District Council,Route 52 Improvements (Central Hawkes Bay to Weber).,This project will upgrade a section of Route 52 between Weber (just east of Dannevirke) and the boundary of Central Hawkes Bay to enable safe ongoing use by heavy vehicles and local tourist traffic. Specifically the project entails: Upgrading all bridges along the route so they can support HPMVs geotechnical improvements to improve resilience of the route (Design/Construct to align future maintenance costs with the network average) and safety improvements of High-risk sections of the road. (bring in line with ONRC category).,,Under construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Transport,5 - 25 million,,,,,2021-Q1,2024-Q4,2021-Q1,2024-Q4,,,,,
IP004870,31/12/2023,Tasman District Council,Lower Motueka River Flood-Bank Improvement.,This project includes construction of new stop banks and strengthening existing stop banks along the Motueka River. This project is part of an existing flood management programme for the Motueka River flood protection scheme.,,Under construction,Fully funded,To be determined,To be determined,Tasman,,,Environmental,5 - 25 million,,,,,2021-Q1,2024-Q2,2021-Q1,2024-Q2,,,,,
IP004060,31/12/2023,Tauhara Management Limited,Taupo EUL Block.,The Project is a $180m residential retirement commercial and community development in a strategic location that is the gateway to Taupo’s future urban growth corridor. The development will be progressively completed over the next seven years. The Government Funding is being specifically applied to fund the acceleration of various works with broader public benefit beyond the development. This includes a reserve walking and cycling infrastructure roading infrastructure and a community pavilion. Given the long-term nature of the development the works have been split into phases and CIP has focused on Stage One of the development which is estimated to be completed by 30 June 2022. Stage One includes the completion of 61 residential sections construction of 15 houses 2 350sqm GFA of retail space the public good works and the community pavilion.,,Under construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,100 - 250 million,,,,,2021-Q1,2024-Q2,2021-Q1,2024-Q2,,,,,
IP005981,31/12/2023,Taupo District Council,Shared Paths.,Turangi Kerb and Channel: Improving accessibility and addressing identified accessibility barriers along with kerb and channel (road gutter) replacements. Turangi has up to 30km of kerb and channel which was constructed around 1960 and is now starting to fail. Taupo Walking Cycling and Accessibility Improvements: Taupō district has identified several gaps in its walking and cycling networks. Priority areas include connections between residential areas and local shops schools and kindergartens local playgrounds and recreational areas and Lake Taupō.,,Under construction,Fully funded,To be determined,To be determined,Waikato,,,Transport,5 - 25 million,,,,,2020-Q4,2024-Q2,2020-Q4,2024-Q2,,,,,
IP004011,31/12/2023,Tauranga City Council,Te Papa Spatial Plan (Cameron Road).,The project involves multi modal upgrades to Cameron Road in Tauranga City between Harrington Street and 17th Avenue / the Hospital. At a later date the bus clearways will become full-time bus lanes although this stage does not form part of the project.,,Under construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Transport,50 - 100 million,,,,,2021-Q3,2024-Q1,2021-Q3,2024-Q1,,,,,
IP008062,31/12/2023,Te Pai Roa Tika,Housing Energy Retrofit Pilot - Northland.,Housing energy retrofit pilot project in Northland to be delivered by Te Pai Roa Tika in partnership with CBEC Tindall Foundation and Foundation North.,,Under construction,Fully funded,To be determined,To be determined,Northland,,,Housing,1 - 5 million,,,,,2022-Q2,2024-Q1,2022-Q2,2024-Q1,,,,,
IP004056,31/12/2023,Te Rere o Kapuni Limited,Dawson Falls Lodge Development.,Brief description: Renovation upgrade of Iwi owned Dawson Falls lodge and Enable lodge to be positioned as an exceptional cultural tourism destination in Egmont National Park.,,Under construction,Fully funded,To be determined,To be determined,Taranaki,,,Housing,5 - 25 million,,,,,2021-Q3,2024-Q3,2021-Q3,2024-Q3,,,,,
IP004823,31/12/2023,Thames-Coromandel District Council,Kōpū Marine Precinct.,This is a stand-alone project to build essential marine servicing infrastructure at the Kōpū Industrial area (7km from Thames township). This will support the existing Hauraki Gulf mussel industry with an indirect economic return of $58.5M over the next 30 years including 12 FTE’s over the next 30 days and long-term sustainable employment of 181 subsequent FTE’s.,,Under construction,Fully funded,To be determined,To be determined,Waikato,,,Transport,5 - 25 million,,,,,2022-Q4,2024-Q2,2022-Q4,2024-Q2,,,,,
IP004065,31/12/2023,The Roman Catholic Archdiocese Of Wellington,Sacred Heart Cathedral Restoration.,Seismic strengthening of the roof base isolation and then exterior and interior refurbishment (and restoration of organ) of the Sacred Heart Cathedral in Wellington.,,Under construction,Fully funded,To be determined,To be determined,Wellington,,,Community facilities,5 - 25 million,,,,,2020-Q4,2024-Q4,2020-Q4,2024-Q4,,,,,
IP004077,31/12/2023,The Wellington City Mission (Anglican) Trust Board,Wellington Mission - Whakamaru.,The building will include a community café social supermarket for people in need and 35 supported housing units providing transitional accommodation for up to 12 months. The building will also contain a training kitchen conference facilities for the community rooms for health professionals a chapel available to the public external access 24/7 public toilets and showers a commercial laundry and office space for the Wellington City Mission. There will be an extensive food distribution warehouse The Project involves extensive redevelopment work on an existing three storey building to reconfigure it to form a five-storey building providing a dynamic community facility. The total floor area of the new building is 4 700 square metres including the basement.,,Under construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,25 - 50 million,,,,,2021-Q4,2024-Q3,2021-Q4,2024-Q3,,,,,
IP004014,31/12/2023,The Young Mens Christian Association,YMCA Christchurch Central City Development.,YMCA Accommodation building strengthening and refurbishment (stage 1) YMCA community building construction (stage 2).,,Under construction,Fully funded,To be determined,To be determined,Canterbury,,,Community facilities,50 - 100 million,,,,,2020-Q4,2024-Q3,2020-Q4,2024-Q3,,,,,
IP006376,31/12/2023,The Youth Hub Trust Te Hurihanga O Rangatahi,Youth Hub Christchurch.,the project comprises a purpose built facility to help Canterbury's young people (aged between 10 and 25) to reach their full potential. The project is made up of housing support in the form of transitional housing (for up to 30 young people at a time) and a collective of co-located services and facilities providing mental helath medical health care education and employemetn and training and social enterpreneurship. The funding will be used for phase on f hte project consisting of an accomadation block and administration block. Further phases will be funded solely by the Trust.,,Under construction,Fully funded,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,,,,2022-Q2,2024-Q3,2022-Q2,2024-Q3,,,,,
IP005974,31/12/2023,Timaru District Council,The Theatre Royal.,The Theatre Royal Upgrade and Heritage Facility Project will upgrade the existing Timaru Theatre Royal together with the design and construction of a new connected Heritage Facility (museum exhibition space) on 1 700m2 of Council owned land. Extra 20m cofunding added 20m of co-funding and larger wrok programme has pushed out the end date.,,Under construction,Fully funded,To be determined,To be determined,Canterbury,,,Community facilities,50 - 100 million,,,,,2021-Q3,2025-Q2,2021-Q3,2025-Q2,,,,,
IP004826,31/12/2023,Waikato Regional Council,Fish passage pumps critical flood protection.,This project is a flood management programme which includes upgrading: critical infrastructure to the ongoing flood protection of approximately 3 000 ha of farmland in the Lower Waikato and Hauraki flood pumps do not enable the safe passage of native fish particularly eels (tuna) for which mortality very high during migration and infrastructure in 5 priority catchments for tuna.,,Under construction,Fully funded,To be determined,To be determined,Waikato,,,Environmental,5 - 25 million,,,,,2020-Q4,2024-Q2,2020-Q4,2024-Q2,,,,,
IP004832,31/12/2023,Waikato Regional Council,Foreshore East & West Stopbank.,This project is a flood management programme comprising of: restorative and strengthening work of existing stopbanks along the east and west foreshore designed to protect all of the Hauraki Plains and drainage restoration and improvement and fencing along waterways.,,Under construction,Fully funded,To be determined,To be determined,Waikato,,,Environmental,1 - 5 million,,,,,2021-Q3,2024-Q2,2021-Q3,2024-Q2,,,,,
IP004834,31/12/2023,Waikato Regional Council,Piako Scheme Right Stopbanks.,This project is a flood management programme comprising of: provision for future proofing existing pump station foundation and upgrade access to the pump station relocation and upgrading of 3 underperforming floodgates to alternative locations identified as providing greater flood resilience and rationalisation of aging privately developed and Waikato Regional Council (WRC) owned stopbanks.,,Under construction,Fully funded,To be determined,To be determined,Waikato,,,Environmental,1 - 5 million,,,,,2021-Q1,2024-Q2,2021-Q1,2024-Q2,,,,,
IP006377,31/12/2023,Waikato Regional Council,Replacement Barge Construction Project.,this project is to construct a new replacement barge for use along Waikato River system which is a critical infrastrucutre asset required for effective river management activities.,,Under construction,Fully funded,To be determined,To be determined,Waikato,,,Environmental,5 - 25 million,,,,,2023-Q2,2024-Q4,2023-Q2,2024-Q4,,,,,
IP004878,31/12/2023,West Coast Regional Council,Grey Floodwall Upgrade (Stage Two).,This project will complete Stage Two of the upgrade of the Greymouth Floodwall to a 1:150 year AEP from1:50 year level currently. The first stage of the project was completed in 2009 but Stage Two was deferred due to cost.,,Under construction,Fully funded,To be determined,To be determined,West Coast,,,Environmental,1 - 5 million,,,,,2021-Q4,2024-Q3,2021-Q4,2024-Q3,,,,,
IP004879,31/12/2023,West Coast Regional Council,Hokitika Beach Coastal Protection Project.,This project is a flood management programme that involves constructing a 1.4km rock revetment seawall.,,Under construction,Fully funded,To be determined,To be determined,West Coast,,,Environmental,5 - 25 million,,,,,2021-Q3,2024-Q2,2021-Q3,2024-Q2,,,,,
IP006378,31/12/2023,West Coast Regional Council,Franz Josef (Waiho River Stopbank Protection).,This first phase of the project ($12.5M) involves building and upgrading existing stopbanks along the northern side of the Waiho River for flood protection and resilience to protect Franz Joseph Township.,,Under construction,Fully funded,To be determined,To be determined,West Coast,,,Environmental,5 - 25 million,,,,,2021-Q3,2024-Q2,2021-Q3,2024-Q2,,,,,
IP004005,31/12/2023,Western Bay of Plenty District Council,Omokoroa Road Safety.,This project consists of several packages of works focused on the urbanisation of existing roads and building new roads within the Omokoroa peninsula. This supports planned land use development for residential industrial commercial development.,,Under construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,25 - 50 million,,,,,2020-Q4,2024-Q4,2020-Q4,2024-Q4,,,,,
IP004073,31/12/2023,Westland District Council,Hokitika Swimming Pool Renovation.,The Hokitika Swimming Pool Renovation involves a complete overhaul of the existing changing rooms and the creation of a new reception and entranceway to the facility. The works also include a significant amount of work to the infrastructure of the pool itself including dividing the pool to include a learners area lining both pools and replacement of the core pipe infrastructure. The pool building is to have a new ceiling installed and a significant heating and ventilation system installed.,,Under construction,Fully funded,To be determined,To be determined,West Coast,,,Community facilities,1 - 5 million,,,,,2021-Q3,2024-Q1,2021-Q3,2024-Q1,,,,,
IP004847,31/12/2023,Whanganui District Council,Sarjeant Gallery.,The revitalization of the Sarjeant Gallery in Whanganui including construction of a major new wing and upgrades to the existing building.,,Under construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Community facilities,50 - 100 million,,,,,2020-Q2,2024-Q1,2020-Q2,2024-Q1,,,,,
IP000163,29/11/2023,Department of Corrections,Waikeria Prison Build.,This project is for a new prison build. This will result in an additional 500 beds plus 100 mental health beds at Waikeria Prison.,,Under construction,Fully funded,Open,Public private partnership,Waikato,,,Justice,500 million - 1 billion,2016-Q2,2016-Q4,2017-Q1,2018-Q3,2018-Q3,2023-Q3,2016-Q1,2024-Q2,
https://www.corrections.govt.nz,,,,
IP002723,29/11/2023,Department of Corrections,3 Waters Remediation - Tranche 2a.,To bring the underground infrastructure to meet current and future needs and legislation.,,In procurement,Fully funded,Direct,Other,Nationwide,,,Water,50 - 100 million,2022-Q3,2023-Q3,2023-Q4,2024-Q2,2024-Q3,2027-Q2,2022-Q3,2027-Q4,
https://www.corrections.govt.nz,,,,
IP005891,29/11/2023,Department of Corrections,Sally Ports.,This project will provide improved cover for staff operating in poor weather enabling them to undertake more consistent vehicle searches. This in turn will improve safety for people in our care with decreased risk of contraband entering each site.,,On hold,Fully funded,Open,Design and construct,Nationwide,,,Justice,< 1 million,2021-Q3,2023-Q2,2022-Q1,2022-Q3,,,2021-Q4,2024-Q3,,,,,
IP005894,6/03/2024,Department of Corrections,CCS Programme - New Sites & Refresh (Tranche 1).,Opex seed funding will be used to undertake feasibility work at each of the identified six CCS locations to determine the work required to improve the sites ensuring that they are fit for purpose and meet the current CCS design and security standards.,,In planning,Funding source confirmed,To be determined,Other,Nationwide,,,Justice,5 - 25 million,2021-Q3,,,,,,2021-Q3,2028-Q2,,,,,
IP008111,29/11/2023,Department of Corrections,Whanganui Stormwater (Is now under Waters Infrastructure Programme (Tranche 1).,Installation of stormwater filtration untits and bio retention to meet stormwater discharge consent conditions.,,Early planning,Fully funded,Open,Construct only,Manawatū - Whanganui,,,Water,1 - 5 million,2022-Q3,2022-Q3,2022-Q3,2022-Q4,2022-Q4,2023-Q2,2022-Q4,2026-Q1,,,,,
IP008112,29/11/2023,Department of Corrections,Touratanga Phase 4.,Provide additional transitional residential accommodation consisting of an additional four beds (4x 1 bedroom units). Includes remediation to the sewer line serving the Community Hub / Staff base as well as the infrastructure required to support the addit.,,On hold,Fully funded,Open,Design and construct,Canterbury,,,Housing,1 - 5 million,2020-Q3,2021-Q3,2021-Q4,2022-Q4,2022-Q4,2023-Q2,2021-Q3,2023-Q3,,,,,
IP008114,29/11/2023,Department of Corrections,Invercargill Boiler.,Replacement of the boilers at Invercargill Prison/ Removal of asbestos cladded building that houses boliers.,,On hold,Funding source to be confirmed,Direct,Design and construct,Southland,,,Justice,1 - 5 million,2021-Q2,2021-Q2,2021-Q2,2023-Q1,2023-Q1,2023-Q4,2021-Q2,2025-Q3,,,,,
IP008115,18/03/2024,Department of Corrections,Intervention and Support Unit (ISU) Improvements - Televisions.,This project aims to create a more therapeutic environment for the ISUs and align with industry best-rpactice and aligning with Hokai Rangi model's outcomes humanising and healing for both staff and people in our care.,,In procurement,Funding source confirmed,Open,Other,Nationwide,,,Health,1 - 5 million,2021-Q4,2023-Q1,2022-Q3,2023-Q4,2024-Q1,2024-Q4,2022-Q3,2024-Q4,,,,,
IP008117,13/03/2024,Department of Corrections,Community Corrections Sites (CCS) Site Safety Improvements (Stage 2 Tranche 2).,Tranche 2 works will ensure that 107 of the Department’s 162 CCS sites where possible align with the CCS Four Lines of Security Model. The main objective of Stage 2 Tranche 2 is to reduce the risk of harm to staff people we manage in the community and visitors using those CCS sites.,,Under construction,Funding source confirmed,Open,Design and construct,Nationwide,,,Justice,1 - 5 million,2022-Q2,2022-Q2,2021-Q4,2022-Q1,2022-Q4,2023-Q3,2021-Q3,2024-Q2,,,,,
IP008120,29/11/2023,Department of Corrections,Auckland Potable Water Separation (3W).,The Auckland Prison Potable Water Separation Project is required to complete separation works comprising of: Connecting spare pipe to the reservoir and extending the pipe from where it currently terminates at the community centre on Paremoremo Road to the Village and School.,,In planning,Fully funded,Open,Construct only,Auckland,,,Water,< 1 million,,,,,,,2022-Q3,2025-Q1,,,,,
IP008121,29/11/2023,Department of Corrections,Auckland Housing Village - Healthy Homes Upgrade.,To ensure all houses at the AHV will be compliant with the requirements of the 2019 Healthy Homes Standards providing safe and improved housing for all tenants.,,In procurement,Fully funded,Direct,Alliance,Auckland,,,Housing,1 - 5 million,2021-Q3,2021-Q4,2021-Q1,2022-Q1,,,2021-Q4,2024-Q2,,,,,
IP008122,29/11/2023,Department of Corrections,Yards & Enhancements - ARWCF Phase 1 Priority Items: Stage 1.,To create a lasting solution for Auckland Women's Regional Correctional Facility (AWRCF) which will increase the safety and security of both wāhine in our care and staff and enablethe Department to provide the required minimum entitlements to High Security wāhine as determined as part of the Corrections Act 2004.,,In procurement,Fully funded,Open,Design and construct,Auckland,,,Justice,5 - 25 million,2021-Q3,2023-Q1,2023-Q1,2023-Q3,2023-Q4,2025-Q4,2022-Q1,2025-Q4,,,,,
IP008123,19/03/2024,Department of Corrections,Whanganui Wastewater.,Installation of a new wastewater pump station Construction of a new pumped pipeline and Divestment of the Pump Station and transfer pipeline to Whanganui District Council.,,In procurement,Funding source confirmed,Open,Construct only,Manawatū - Whanganui,,,Water,5 - 25 million,2019-Q4,2022-Q3,2022-Q3,2022-Q4,2023-Q1,2024-Q2,2022-Q3,2026-Q2,,,,,
IP008124,18/03/2024,Department of Corrections,Prisoner Escort Vehicle (PEV) Waste Disposal Project (wash bays).,Provision of PEV wash bays across the estate to support maintenance and upkeep of these critical assets. Safe and compliant discharge of wastewater contaminated with human waste from washing down the interior of PEVs and wastewater from external vehicle.,,In procurement,Fully funded,Open,Design and construct,Nationwide,,,Transport,5 - 25 million,2021-Q3,2023-Q1,2023-Q1,,,,2023-Q3,2024-Q1,,,,,
IP008125,18/03/2024,Department of Corrections,Housing on Corrections Land - RIMP Te Korowai.,Provision of housing on prison land (Rimutaka) for clients not yet ready or not able to source accommodation in the general populace.,,In procurement,Funding source confirmed,Open,Construct only,Wellington,,,Housing,5 - 25 million,2021-Q4,2023-Q4,2023-Q4,2024-Q4,2024-Q4,2026-Q2,2022-Q3,2026-Q4,,,,,
IP008201,29/11/2023,Department of Corrections,Women's Prisons Full Body Scanning Project (Arohata body scanner).,Currently the only way of identifying internally concealed contraband items is either to take a person in our care to perform a strip / body search or to hospital for an x-ray with associated risks.The process of a strip / full body search is intrusive to.,,In planning,Fully funded,Open,Design and construct,North Island,,,Justice,1 - 5 million,2022-Q1,2022-Q2,2022-Q1,2022-Q3,2024-Q2,2025-Q1,2022-Q1,2025-Q2,,,,,
IP008640,29/11/2023,Department of Corrections,Health Services - Intervention Support Units.,Feasibility work for the ISU sites identified as priority sites by the Mental Health & Addictions team for refurbishments creating more therapeutic environments within the exisiting units.,,In planning,Funding source confirmed,Direct,Construct only,Nationwide,,,Health,5 - 25 million,2022-Q3,2023-Q3,2022-Q2,2024-Q3,2024-Q4,2028-Q2,2021-Q3,2028-Q1,,,,,
IP008641,18/03/2024,Department of Corrections,Spring Hill Correctional Facility Management Units Yards.,The current secure exercise yard for the Management Unit (MU) at Spring Hill Corrections Facility (SHCF) cannot always be used for people in our care with differing needs and requirements at the same time. The increased yard capacity will provide prisoners with minimum entitlments.,,Under construction,Fully funded,Direct,Design and construct,Auckland,,,Justice,5 - 25 million,2022-Q3,2022-Q4,2022-Q3,2022-Q4,2023-Q2,2024-Q2,2023-Q1,2024-Q2,,,,,
IP008642,29/11/2023,Department of Corrections,Housing on Corrections Land - Additional Capacity.,Feasibility works to determine if additional housing and associated facilities can be placed on Corrections land at five nominated sites. Note: Because this is feasbility works there will not be a Business Case for this project.,,In planning,Funding source confirmed,Direct,To be determined,Nationwide,,,Housing,5 - 25 million,,,,,,,2022-Q3,2029-Q1,,,,,
IP008643,18/03/2024,Department of Corrections,AUCP Psych Unit - Staff Facilities.,The current facilities at Auckland Men’s Prison that accommodate the Psychological Services and Special Treatment Unit (STU) teams are no longer fit-for-purpose. The teams are currently located in different parts of the prison which impacts the ability to work collaboratively. The seed funding will be used undertake feasibility work to determine the work required to create a suitable space for the Auckland Men’s Prison Psychology Team and STU staff ensuring that it is fit-for-purpose and will meet the operational requirements for the site and people in our care.,,In planning,Funding source confirmed,Open,To be determined,North Island,,,Justice,5 - 25 million,2023-Q3,2023-Q4,,,,,2022-Q3,2026-Q2,,,,,
IP008644,18/03/2024,Department of Corrections,Auckland Womens Regional Corrections Facility - Intervention & Support Team (ISPT) Unit.,The seed funding will be used undertake feasibility work to determine the work required to create a suitable space for the ARWCF ISPT staff ensuring that it is fit-for-purpose and will meet the operational requirements for the site and wāhine in our care.,,In planning,Funding source to be confirmed,Open,To be determined,Auckland,,,Justice,1 - 5 million,2023-Q4,2024-Q1,,,,,2022-Q3,2026-Q2,,,,,
IP008645,18/03/2024,Department of Corrections,Arohata Prison - Upgrade Staff Facilities.,Physical works required to improve the existing staff facilities building at Arohata Prison as it has identified as being no longer fit-for-purpose due to their existing condition and are inadequate for current demand.,,On hold,Funding source to be confirmed,Open,To be determined,Wellington,,,Justice,1 - 5 million,2023-Q3,2023-Q2,,,,,2022-Q3,2026-Q3,,,,,
IP008648,29/11/2023,Department of Corrections,Anti-Ligature and Cell Hardening FY22/23.,This programme of works aims to reduce ligature risks and opportunities for intentional damage across Corrections custodial estate. This involves a prioritised approach to remove ligature points and install TV cabinets that are resilient to intentional da.,,Under construction,Funding source confirmed,Direct,Construct only,Nationwide,,,Justice,1 - 5 million,2022-Q3,2022-Q4,,,,,2022-Q3,2032-Q3,,,,,
IP008720,18/03/2024,Department of Corrections,ARWCF Gatehouse Upgrade.,The current gatehouse is poorly designed and cramped. When there are more than a few visitors to becomes difficult to process people and keep people seperated. An expansion and improved design of the gate-house layout such as locations of key equipment is required.,,In planning,Funding source to be confirmed,Open,To be determined,Auckland,,,Justice,5 - 25 million,2023-Q1,2024-Q1,,,,,2022-Q3,2026-Q3,,,,,
IP008721,18/03/2024,Department of Corrections,HBRP New Access.,Hawkes Bay Regional Prison has been operating with a small relocatbale entry building for about 10 years - for a high security prison this is no longer fit for purpose. The project will replace the existing relocatble building woth a purpose built facilities.,,In planning,Funding source confirmed,Open,To be determined,Hawke's Bay,,,Justice,25 - 50 million,2023-Q1,2024-Q1,,,,,2022-Q3,2025-Q3,,,,,
IP009309,29/11/2023,Department of Corrections,OCF Ancillary Works.,The OCF High Security Ancillary Works includes hardening work in Unit 35 addition of a Health consultation room and strengthening of the ISU interview room to provide privacy to those being interviewed and align to best practice.,,In procurement,Funding source confirmed,Direct,Design and construct,Otago,,,Justice,1 - 5 million,2022-Q3,2023-Q1,2023-Q1,2023-Q2,2023-Q2,2024-Q2,2022-Q4,2024-Q1,,,,,
IP009830,18/03/2024,Department of Corrections,Temperature Control and Ventilation Programme.,The temperature control and ventilation programme is a multi-year programme to address temperature and ventilation requirements across the prison estate.,,In procurement,Funding source confirmed,Open,Construct only,Nationwide,,,Justice,5 - 25 million,,,,,,,2023-Q3,2033-Q2,,,,,
IP009831,18/03/2024,Department of Corrections,Visitor Centre Improvements.,In support of Hōkai Rangi action 3.3 a project has been set up to improve the decor fittings furniture acoustics and generally improve the visiting environment at each prison.,,On hold,Funding source to be confirmed,Open,Construct only,Nationwide,,,Justice,5 - 25 million,,,,,,,2023-Q4,2027-Q4,,,,,
IP009832,18/03/2024,Department of Corrections,Whanganui Prison Laundry and Kitchen Freezer Upgrade.,There will be upgrades to both Whanganui Prison laundry and kitchen freezer in order to meet opeational standards.,,Early planning,Funding source to be confirmed,Open,Construct only,Manawatū - Whanganui,,,Justice,5 - 25 million,,,,,,,2023-Q3,2024-Q3,,,,,
IP009833,18/03/2024,Department of Corrections,Privacy Screens/Features.,Approximately 400 cells across have been identified as requiring privacy screening . In discussion with the Mental Health & Addiction team a need was identified for bespoke solutions for some cells to ensure appropriate observation of our most at-risk people in our care while still providing an acceptable level of privacy. A range of privacy features have been requested to be investigated such as removable and soft panels and curtains (all anti-ligature).,,In planning,Funding source confirmed,Open,Design and construct,Nationwide,,,Justice,1 - 5 million,,,,,,,2022-Q4,2027-Q2,,,,,
IP009834,18/03/2024,Department of Corrections,Auckland Region Womens' Correction Facility Special Treatment Unit.,This project endeavours to provide better targeted and faster access to services and more effective programmes for Māori and support in an improved whānau connection.,,On hold,Funding source confirmed,Open,Construct only,Auckland,,,Justice,1 - 5 million,,,,,,,2023-Q3,2025-Q4,,,,,
IP010745,18/03/2024,Department of Corrections,ISU Improvements - Refurbishments.,This project aims to create a more therapeutic environment for the ISUs and align with industry best-rpactice and aligning with Hokai Rangi model's outcomes humanising and healing for both staff and people in our care.,,Under construction,Funding source confirmed,Open,Construct only,Nationwide,,,Justice,5 - 25 million,,,,,,,2021-Q3,2028-Q1,,,,,
IP008129,20/03/2023,Department of Internal Affairs,Heke Rua Archives (HRA) Tāhuhu Programme.,A new purpose-built archives facility in Wellington will house and protect our memory of government and taonga and provide specialist facilities for conservation and digitisation. The building will be connected to the National Library by a link bridge.,,Under construction,Fully funded,Selective,Other,Wellington,,,Community facilities,250 - 500 million,,,,,2022-Q1,2025-Q2,2020-Q2,2026-Q1,
https://www.archives.govt.nz/tahuhu-programme,,[email address],,
IP008610,20/03/2023,Department of Internal Affairs,Heke Puna Library (HPL) Bridge Enabling Structure Tāhuhu Programme.,A structure to connect the National Library to the link bridge of the Heke Rua Archives building which enables the transfers between buildings sharing of specialist facilities and better collaboration.,,Under construction,Fully funded,Selective,Early contractor involvement,Wellington,,,Community facilities,5 - 25 million,,,,,2023-Q2,2024-Q4,2022-Q2,2024-Q4,
https://www.archives.govt.nz/tahuhu-programme,,[email address],,
IP002777,15/03/2024,Dunedin City Council,Waterfront Bridge.,Build a bridge between the Chinese Gardens & Waterfront for cycling and walking purposes.,,On hold,Funding source confirmed,To be determined,To be determined,Otago,,,Transport,5 - 25 million,2019-Q4,2020-Q2,2019-Q4,2024-Q4,2025-Q2,2026-Q4,2019-Q1,2028-Q3,
https://www.dunedin.govt.nz/council/council-projects/waterfront,,Josh von Pein,-45.880307,170.504785
IP002779,15/03/2024,Dunedin City Council,Tunnels Trails.,Active network from South Dunedin to Mosgiel.,,In planning,Funding source confirmed,Open,To be determined,Otago,,,Transport,25 - 50 million,2020-Q3,2022-Q1,2019-Q2,2026-Q1,2024-Q1,2027-Q4,2019-Q1,2029-Q3,
http://www.dttt.org.nz/,,Josh von Pein,-45.886269,170.3880444
IP002781,15/03/2024,Dunedin City Council,Section 1 Peninsula Connection Project.,Reconfiguration work to existing road and shared path.,,On hold,Funding source to be confirmed,Open,To be determined,Otago,,,Transport,< 1 million,2018-Q1,2018-Q2,,,2028-Q1,2028-Q2,2014-Q4,2031-Q3,
https://www.dunedin.govt.nz/services/roads-and-footpaths/projects/peninsula-connection,,Josh von Pein,-45.839477,170.652047
IP002782,15/03/2024,Dunedin City Council,Section 3 Peninsula Connection Project.,Reconfiguration work to existing road and shared path.,,On hold,Funding source to be confirmed,Open,To be determined,Otago,,,Transport,< 1 million,2018-Q1,2018-Q2,,,2028-Q2,2028-Q3,2014-Q4,2031-Q3,
https://www.dunedin.govt.nz/services/roads-and-footpaths/projects/peninsula-connection,,Josh von Pein,-45.839477,170.652047
IP002783,15/03/2024,Dunedin City Council,Section 10 Peninsula Connection Project.,Reconfiguration work to existing road and shared path.,,On hold,Funding source to be confirmed,Open,To be determined,Otago,,,Transport,< 1 million,2018-Q1,2018-Q2,,,2028-Q3,2028-Q4,2014-Q4,2031-Q3,
https://www.dunedin.govt.nz/services/roads-and-footpaths/projects/peninsula-connection,,Josh von Pein,-45.839477,170.652047
IP002784,15/03/2024,Dunedin City Council,Section 12 Peninsula Connection Project.,Reconfiguration work to existing road and shared path.,,In planning,Funding source to be confirmed,Open,To be determined,Otago,,,Transport,< 1 million,2018-Q1,2018-Q2,,,2028-Q3,2028-Q4,2014-Q4,2031-Q3,
https://www.dunedin.govt.nz/services/roads-and-footpaths/projects/peninsula-connection,,Josh von Pein,-45.839477,170.652047
IP002785,15/03/2024,Dunedin City Council,Section 13 Peninsula Connection Project.,Widening road and shared path.,,On hold,Funding source to be confirmed,Open,To be determined,Otago,,,Transport,1 - 5 million,2018-Q1,2018-Q2,,,2029-Q3,2030-Q2,2014-Q4,2031-Q3,
https://www.dunedin.govt.nz/services/roads-and-footpaths/projects/peninsula-connection,,Josh von Pein,-45.839477,170.652047
IP002786,15/03/2024,Dunedin City Council,Section 15 Peninsula Connection Project.,Reconfiguration work to existing road and shared path.,,On hold,Funding source to be confirmed,Open,To be determined,Otago,,,Transport,< 1 million,2018-Q1,2018-Q2,,,2028-Q4,2029-Q1,2014-Q4,2031-Q3,
https://www.dunedin.govt.nz/services/roads-and-footpaths/projects/peninsula-connection,,Josh von Pein,-45.839477,170.652047
IP002787,15/03/2024,Dunedin City Council,Section 14 Peninsula Connection Project.,Widening road and shared path.,,On hold,Funding source to be confirmed,Open,To be determined,Otago,,,Transport,1 - 5 million,2018-Q1,2018-Q2,,,2028-Q3,2029-Q4,2014-Q4,2031-Q3,
https://www.dunedin.govt.nz/services/roads-and-footpaths/projects/peninsula-connection,,Josh von Pein,-45.839477,170.652047
IP002788,15/03/2024,Dunedin City Council,Section 5 Peninsula Connection Project.,Widening road and shared path.,,Post implementation ,Funding source confirmed,Open,To be determined,Otago,,,Transport,1 - 5 million,2018-Q1,2018-Q2,2020-Q3,2022-Q1,2022-Q2,2023-Q4,2014-Q4,2031-Q3,
https://www.dunedin.govt.nz/services/roads-and-footpaths/projects/peninsula-connection,,Josh von Pein,-45.839477,170.652047
IP002790,15/03/2024,Dunedin City Council,Retail Quarter George Street.,3W assets renewals and street scaping.,,Under construction,Funding source confirmed,Open,Other,Otago,,,Transport,100 - 250 million,2021-Q1,2022-Q1,2019-Q1,2023-Q3,2021-Q4,2024-Q2,2017-Q4,2026-Q2,
https://www.dunedin.govt.nz/council/policies-plans-and-strategies/plans/central-city-plan/retail-quarter,,Josh von Pein,,
IP002792,15/03/2024,Dunedin City Council,Harbour Link.,Link SH88 cycleway to central city upgrade St Andrew's St Carpark upgrade St Andrew's St rail crossing relocate Wanaka Siding.,,Under construction,Funding source confirmed,Open,Construct only,Otago,,,Transport,5 - 25 million,2020-Q2,2020-Q2,2020-Q4,2021-Q2,2020-Q3,2024-Q1,2017-Q1,2025-Q1,
https://www.dunedin.govt.nz/services/roads-and-footpaths/projects/dunedin-urban-cycleways,,Josh von Pein,,
IP002793,15/03/2024,Dunedin City Council,South Dunedin Library & Community Complex building.,Construction of new South Dunedin Library.,,Under construction,Funding source confirmed,Open,Construct only,Otago,,,Community facilities,5 - 25 million,2020-Q3,2021-Q1,2021-Q3,2022-Q2,2024-Q1,2025-Q3,2019-Q1,2026-Q2,
https://www.dunedin.govt.nz/council/council-projects/south-dunedin-library-and-community-complex,,Josh von Pein,,
IP005437,15/03/2024,Dunedin City Council,Creative Quarter Princess Street.,3W assets renewals and street scaping.,,In planning,Funding source to be confirmed,To be determined,Other,Otago,,,Transport,25 - 50 million,,,,,,,2025-Q3,2028-Q3,,,Josh von Pein,,
IP005438,15/03/2024,Dunedin City Council,Cultural and Entertainment Quarter Octagon.,3W assets renewals and street scaping.,,In planning,Funding source to be confirmed,To be determined,Other,Otago,,,Transport,25 - 50 million,,,,,,,2028-Q3,2030-Q3,,,Josh von Pein,,
IP005439,15/03/2024,Dunedin City Council,Waste Services.,Resourse Recovery Park Precint.,,Under construction,Funding source confirmed,Open,Other,Otago,,,Waste management,25 - 50 million,,,2021-Q3,2022-Q1,2023-Q3,2024-Q3,2021-Q3,2024-Q3,,,Serge Kolman,,
IP005441,15/03/2024,Dunedin City Council,Moana Pool Revelopment.,Upgrade of Moana Pool facilities.,,Under construction,Funding source confirmed,Open,Construct only,Otago,,,Community facilities,25 - 50 million,2020-Q4,2021-Q1,2021-Q2,2023-Q4,2022-Q3,2026-Q3,2020-Q3,2027-Q3,,,Josh von Pein,,
IP005442,15/03/2024,Dunedin City Council,Musselbrough to Tahuna Pipeline.,Construction of new waste water pipelines.,,Under construction,Funding source confirmed,Open,Design and construct,Otago,,,Water,25 - 50 million,,,2021-Q3,2023-Q4,2023-Q1,2024-Q2,2021-Q3,2025-Q2,,,Serge Kolman,,
IP008899,15/03/2024,Dunedin City Council,Section 9b Peninsula Connection Project.,Widening road and shared path.,,On hold,Funding source to be confirmed,Open,To be determined,Otago,,,Transport,1 - 5 million,2018-Q1,2018-Q2,2020-Q4,2022-Q1,2028-Q1,2028-Q4,2014-Q4,2031-Q3,
https://www.dunedin.govt.nz/services/roads-and-footpaths/projects/peninsula-connection,,Josh von Pein,-45.839477,170.652047
IP010598,7/03/2024,Environment Canterbury,Ashburton Hinds Drainage.,Map and renew Donga drop structures near the coast.,,Early planning,Funding source to be confirmed,Procurement not required,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2031-Q2,2035-Q1,,,,,
IP010599,7/03/2024,Environment Canterbury,Ashburton Rivers / Hakatere.,North Branch Ashburton River - Restore design flood capacity in North Branch plus adequate freeboard. Investigate Design Implement stopbank changes and bed level management throughBlands Reach.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2030-Q2,2040-Q1,,,,,
IP010600,7/03/2024,Environment Canterbury,Ashley / Rakahuri.,Primary stopbank upgrades to reduce steep slopes.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2028-Q2,2035-Q1,,,,,
IP010601,7/03/2024,Environment Canterbury,Halswell / Hurutini.,Investigation of flood storage basin options to attenuate flows from the Port Hills catchments.,,Early planning,Funding source to be confirmed,Procurement not required,Other,Canterbury,,,Water,< 1 million,,,,,,,2024-Q2,2025-Q1,,,,,
IP010602,7/03/2024,Environment Canterbury,Kaikōrua Rivers.,Rock Quarry Investigation to replace mining from Hapuku and Kowhai Rivers.,,Early planning,Funding source to be confirmed,Procurement not required,Other,Canterbury,,,Water,< 1 million,,,,,,,2024-Q2,2028-Q1,,,,,
IP010603,7/03/2024,Environment Canterbury,Te Waihora / Lake Ellesmere.,Investigation of future lake opening feasibility under a climate changed scenario.,,Early planning,Funding source to be confirmed,Procurement not required,Other,Canterbury,,,Water,< 1 million,,,,,,,2024-Q2,2027-Q1,,,,,
IP010604,7/03/2024,Environment Canterbury,Lower Hinds - Capacity review.,Investigation and design work to determine scheme capacity upgrade requirements.,,Early planning,Funding source to be confirmed,Procurement not required,Other,Canterbury,,,Water,< 1 million,,,,,,,2025-Q2,2028-Q1,,,,,
IP010605,7/03/2024,Environment Canterbury,Lower Hinds - stopbank renewal.,Stopbank renewal programme to be informed by capacity review / scheme review.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2033-Q2,2034-Q1,,,,,
IP010606,7/03/2024,Environment Canterbury,Ōmārama Stream.,Stopbank repairs. Willow removal and enhancement.,,In planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2031-Q2,2034-Q1,,,,,
IP010607,7/03/2024,Environment Canterbury,Ōpihi.,River berm regeneration including weed clearance and planting.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2025-Q2,2028-Q1,,,,,
IP010608,7/03/2024,Environment Canterbury,Ōrāri Waihi Temuka - Ōpihi River near Milford/Waipopo.,Ōpihi River near Milford/Waipopo - Replace existing concrete floodwall. Retreat stopbank where possible (1.5km). Design investigation and repair of existing assets phase.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2027-Q2,2028-Q1,,,,,
IP010609,7/03/2024,Environment Canterbury,Ōrāri Waihi Temuka - Ōrāri River (Repair).,Ōrāri River - Repair damaged North stopbank between SH1 & railway line.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2025-Q2,2026-Q1,,,,,
IP010610,7/03/2024,Environment Canterbury,Ōrāri Waihi Temuka - Ōrāri River (Tree removal).,Ōrāri River - Tree removal in zone within 5m of stopbank toe.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2024-Q2,2035-Q1,,,,,
IP010611,7/03/2024,Environment Canterbury,Ōrāri Waihi Temuka -Ōrāri River (Stopbank rebuild).,Ōrāri River - Stopbank rebuild / re-batter in places.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2024-Q2,2025-Q1,,,,,
IP010612,7/03/2024,Environment Canterbury,Pareora River.,Stopbank repair programme to be informed by capacity review / scheme review.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2031-Q2,2035-Q1,,,,,
IP010613,7/03/2024,Environment Canterbury,Rakaia Double Hill.,Resume operations at the quarry requires initial investment to develop a safe worksite.,,In procurement,Funding source confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2027-Q2,2028-Q1,,,,,
IP010614,7/03/2024,Environment Canterbury,Rangitata -Investigate additional flood resilience measures Arundel township.,Investigate additional flood resilience measures Arundel township.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2024-Q2,2025-Q1,,,,,
IP010615,7/03/2024,Environment Canterbury,Seadown Drainage - Investigation and Design.,Coastal stopbank retreat drain and pipe upgrade. 7km of stopbank relocation. Stage 1 - Investigation and Design.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2027-Q2,2028-Q1,,,,,
IP010616,7/03/2024,Environment Canterbury,Selwyn / Waikirikiri - Berm vegetation enhancement.,Berm vegetation enhancement investigation and gradual implementation.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Environmental,< 1 million,,,,,,,2028-Q2,2035-Q1,,,,,
IP010617,7/03/2024,Environment Canterbury,Selwyn / Waikirikiri - suppliments scheme review.,Investigation fund for design and investigation of scheme upgrades (supplements scheme review).,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2024-Q2,2027-Q1,,,,,
IP010618,7/03/2024,Environment Canterbury,Selwyn / Waikirikiri - Stopbank removal.,Remove a section of stopbank 2km from mouth to allow flood flows directly to Te Waihora / Lake Ellesmere.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2026-Q2,2027-Q1,,,,,
IP010619,7/03/2024,Environment Canterbury,Twizel River.,Stopbank repairs invasive tree removal and enhancement of surrounding land.,,In planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Environmental,< 1 million,,,,,,,2024-Q2,2028-Q1,,,,,
IP010620,7/03/2024,Environment Canterbury,Waimakariri Eyre Cust - Cam River Floodgate.,Cam River Floodgate - Structure upgrade consisting of paint new flood gate new bearings.,,In planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2026-Q2,2027-Q1,,,,,
IP010621,7/03/2024,Environment Canterbury,Waimakariri Eyre Cust - Courtney Floodgates Kaiapoi River.,Courtney Floodgates Kaiapoi River - Complete Structure Rebuild.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2024-Q2,2025-Q1,,,,,
IP010622,7/03/2024,Environment Canterbury,Waimakariri Eyre Cust - Cust River vegetated berms.,Cust River vegetated berms - major willow tree maintenance removal replanting. Swannanoa Rd to Bradleys Rd.,,In planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Environmental,< 1 million,,,,,,,2024-Q2,2028-Q1,,,,,
IP010623,7/03/2024,Environment Canterbury,Waimakariri Eyre Cust - Kaiapoi River stopbank.,Kaiapoi River stopbank - Full rebuild to remove stumps / roots.,,In planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2024-Q2,2028-Q1,,,,,
IP010624,7/03/2024,Environment Canterbury,Waimakariri Eyre Cust - Ōtūkaikino willow clearance.,Ōtūkaikino willow clearance near Clearwater.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Environmental,1 - 5 million,,,,,,,2028-Q2,2035-Q1,,,,,
IP010625,7/03/2024,Environment Canterbury,Waimakariri Eyre Cust - Rock Quarry Investigation.,Rock Quarry Investigation Review of View Hill rock resource for future requirements.,,Early planning,Funding source to be confirmed,Open,Other,Canterbury,,,Water,< 1 million,,,,,,,2026-Q2,2030-Q1,,,,,
IP010626,7/03/2024,Environment Canterbury,Waimakariri Eyre Cust - Cam River.,Cam River - Tree clearance and stopbank upgrade.,,In planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2024-Q2,2028-Q1,,,,,
IP010627,7/03/2024,Environment Canterbury,Kahutara River - Long term maintanence for stopbank.,Kahutara River - Formalise long term maintenance responsibilities for a de facto stopbank that protects Peketa Kiwirail and Waka Kotahi assets.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2031-Q2,2035-Q1,,,,,
IP010628,7/03/2024,Environment Canterbury,Kahutara River - fairway clearance.,Kahutara River - Investigate and implement fairway clearance weed management pest control and planting in braided sections of river and tributaries upstream of stopbank.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2031-Q2,2035-Q1,,,,,
IP010629,7/03/2024,Environment Canterbury,Selwyn District whole of catchment works.,Selwyn District whole of catchment works. Initial focus is removal of tree congestion. Additional flood and erosion control works to be considered in future years.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Environmental,1 - 5 million,,,,,,,2024-Q2,2035-Q1,,,,,
IP010630,7/03/2024,Environment Canterbury,Region wide work programme for works outside of the dedicated 58 schemes.,Region wide work programme for works outside of the dedicated 58 schemes.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,5 - 25 million,,,,,,,2024-Q2,2035-Q1,,,,,
IP010631,7/03/2024,Environment Canterbury,Investigate flood protection upgrades for Hororata Springfield Coalgate.,Investigate flood protection upgrades for Hororata Springfield Coalgate.,,Early planning,Funding source to be confirmed,Open,Other,Canterbury,,,Water,< 1 million,,,,,,,2026-Q2,2027-Q1,,,,,
IP010632,7/03/2024,Environment Canterbury,Carters & Lagmhors Creeks upstream of Tinwald (investigate).,Carters & Lagmhors Creeks upstream of Tinwald. Investigate possible diversion of flood flows to Ashburton River. Possible upstream storage / wetland to aid with water quality. Bankimprovement (battering / planting) through township.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2027-Q2,2030-Q1,,,,,
IP010633,7/03/2024,Environment Canterbury,Ashburton / Hakatere - North Branch Ashburton River/Hakatere.,Restore design flood capacity in North Branch plus adequate freeboard. Investigate Design Implement stopbank changes and bed level management through Blands Reach.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2025-Q2,2031-Q1,,,,,
IP010634,7/03/2024,Environment Canterbury,Ashburton / Hakatere - North Branch Ashburton River/Hakatere at Walkhams Rd.,North Branch Ashburton River/Hakatere at Walkhams Rd - Stopbank realignment (2km).,,In planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2024-Q2,2025-Q1,,,,,
IP010635,7/03/2024,Environment Canterbury,Ashley/Rakahuri - Secondary stopbank scheme.,Investigate Design Implement a secondary stopbank scheme on the South side of the Ashley Riverfrom Mt Thomas Rd / Priors Rd area to Rangiora plus other secondary banks downstream.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,5 - 25 million,,,,,,,2024-Q2,2033-Q1,,,,,
IP010636,7/03/2024,Environment Canterbury,Kowai Leithfield.,Stopbank investigation Design and build.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2025-Q2,2026-Q1,,,,,
IP010637,7/03/2024,Environment Canterbury,Ōmārama Stream - Stopbank upgrades.,Stopbank upgrades including flood modelling.,,Early planning,Funding source to be confirmed,Open,Other,Canterbury,,,Water,< 1 million,,,,,,,2032-Q2,2035-Q1,,,,,
IP010638,7/03/2024,Environment Canterbury,Ōpihi - river regeneration Nursery development for future supply of tree stock.,Nursery development for future supply of tree stock.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Environmental,< 1 million,,,,,,,2025-Q2,2029-Q1,,,,,
IP010639,7/03/2024,Environment Canterbury,Ōrāri Waihi Temuka -Ōpihi River near Milford/Waipopo (Capital works phase).,Ōpihi River near Milford/Waipopo - Replace existing concrete floodwall. Retreat stopbank wherepossible (1.5km). Capital Works phase.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2026-Q2,2027-Q1,,,,,
IP010640,7/03/2024,Environment Canterbury,Ōrāri River - new stopbanks / return banks in Silverton area.,Ōrāri River - new stopbanks / return banks in Silverton area.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2026-Q2,2030-Q1,,,,,
IP010641,7/03/2024,Environment Canterbury,Ōrāri River - Retreat South stopbank between SH1 & railway line.,Ōrāri River - Retreat South stopbank between SH1 & railway line.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2024-Q2,2025-Q1,,,,,
IP010642,7/03/2024,Environment Canterbury,Ōrāri River - Stopbank fencing and upgrades.,Ōrāri River - Stopbank fencing and upgrades.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2024-Q2,2035-Q1,,,,,
IP010643,7/03/2024,Environment Canterbury,Pareora River:Stopbank upgrade programme (Capital works).,Stopbank upgrade programme to be informed by capacity review / scheme review.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2028-Q2,2032-Q1,,,,,
IP010644,7/03/2024,Environment Canterbury,Rakaia Double Hill:Extend Rock Groynes.,Extend Rock Groynes from existing bank end to Double Hill.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2031-Q2,2032-Q1,,,,,
IP010645,7/03/2024,Environment Canterbury,Rangitata - Design Implement additional flood resilience measures Arundel township.,Design Implement additional flood resilience measures Arundel township.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2025-Q2,2028-Q1,,,,,
IP010646,7/03/2024,Environment Canterbury,Seadown Drainage - Implimentation.,Coastal stopbank retreat drain and pipe upgrade. 7km of stopbank relocation. Stage 2 -Implementation.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2028-Q2,2031-Q1,,,,,
IP010647,7/03/2024,Environment Canterbury,Waimakariri Eyre Cust - Beach Road Floodgate.,Beach Road Floodgate - Design / Investigation and New Structure (new location likely).,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2024-Q2,2027-Q1,,,,,
IP010648,7/03/2024,Environment Canterbury,Waihao Wainono.,Repair of Waihao Box removal of gravel from Morven Drain and Waihao Arm.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2025-Q2,2032-Q1,,,,,
IP010649,7/03/2024,Environment Canterbury,Design Implement flood protection upgrades for Hororata Springfield Coalgate.,Design Implement flood protection upgrades for Hororata Springfield Coalgate.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2027-Q2,2031-Q1,,,,,
IP010650,7/03/2024,Environment Canterbury,Carters & Lagmhors Creeks upstream of Tinwald. Design and Implement.,Carters & Lagmhors Creeks upstream of Tinwald. Design and Implement possible diversion of floodflows to Ashburton River. Possible upstream storage / wetland to aid with water quality. Bankimprovement (battering / planting) through township.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2028-Q2,2031-Q1,,,,,
IP010914,13/02/2024,Far North District Council,Russell Cemetery Development.,Expansion and development of the Russell Cemetery.,,In planning,Funding source confirmed,Limited,Construct only,Northland,,,Community facilities,< 1 million,,,,,,,2023-Q4,2024-Q2,,,,,
IP010915,13/02/2024,Far North District Council,Wastewater treatment system Kaitaia Resource Centre.,Wastewater treatment system.,,In planning,Funding source confirmed,Limited,Construct only,Northland,,,Community facilities,< 1 million,,,,,,,2024-Q2,2024-Q4,,,,,
IP010916,13/02/2024,Far North District Council,HFTE Kaitāia Oxford.,Renewal and LOS upgrades 23 Units.,,Under construction,Fully funded,Limited,Construct only,Northland,,,Community facilities,< 1 million,,,,,,,2024-Q1,2024-Q2,,,,,
IP010917,26/03/2024,Far North District Council,HFTE Kawakawa.,Renewal and LOS upgrades 6 Units.,,In planning,Funding source confirmed,To be determined,Construct only,Northland,,,Community facilities,< 1 million,,,,,,,2023-Q4,2024-Q4,,,,,
IP010918,26/03/2024,Far North District Council,HFTE Kaitāia Puckey.,Renewal and LOS upgrades 22 Units.,,Under construction,Fully funded,Direct,Construct only,Northland,,,Community facilities,< 1 million,,,,,,,2024-Q1,2024-Q2,,,,,
IP010919,26/03/2024,Far North District Council,Opito Bay Toilet Renewal.,Replacement of existing toilet block and septic holding tanks with 2 pan accessible unit.,,Under construction,Fully funded,Direct,Construct only,Northland,,,Community facilities,< 1 million,,,,,,,2023-Q4,2024-Q2,,,,,
IP010920,26/03/2024,Far North District Council,Paihia Memorial Hall Renewal.,Replacement of all existing window and door joinery with Aluminium Double Glazed Joinery.,,Under construction,Fully funded,Direct,Construct only,Northland,,,Community facilities,< 1 million,,,,,,,2024-Q2,2024-Q2,,,,,
IP010921,26/03/2024,Far North District Council,Okaihau Hall Renewals.,Interior Renewals.,,In planning,Funding source confirmed,Open,Construct only,Northland,,,Community facilities,< 1 million,,,,,,,2024-Q3,2024-Q4,,,,,
IP010922,26/03/2024,Far North District Council,Kerikeri Squash Courts.,Construction of 4 Court facility attached to the existing Sports Complex.,,Under construction,Fully funded,Direct,Construct only,Northland,,,Community facilities,1 - 5 million,,,,,,,2022-Q4,2024-Q2,,,,,
IP010923,26/03/2024,Far North District Council,Shade Sails District WideStage 2.,Shade sails over playgrounds – 6 sites per year for 2 years.,,Under construction,Fully funded,Direct,Design and construct,Northland,,,Community facilities,< 1 million,,,,,,,2022-Q1,2024-Q2,,,,,
IP010924,26/03/2024,Far North District Council,Rawene Hall Renewals.,Interior Renewals.,,Under construction,Fully funded,Open,Construct only,Northland,,,Community facilities,< 1 million,,,,,,,2024-Q1,2024-Q2,,,,,
IP010925,26/03/2024,Far North District Council,Objects and Statues.,Health and Safety structural repairsHone Heke Memorial KaikoheJohnson Park Arch Kawakawa.,,Under construction,Fully funded,Direct,Construct only,Northland,,,Community facilities,< 1 million,,,,,,,2024-Q1,2024-Q2,,,,,
IP010926,26/03/2024,Far North District Council,Kohukohu Cemetery Renewals.,Kohukohu Cemetery Fencing.,,Under construction,Fully funded,Direct,Construct only,Northland,,,Community facilities,< 1 million,,,,,,,2024-Q1,2024-Q2,,,,,
IP010927,27/03/2024,Far North District Council,Opua-Paihia Coastal Walkway.,Opua-Paihia Coastal Walkway.,,Under construction,Fully funded,Open,Construct only,Northland,,,Community facilities,< 1 million,,,,,,,2022-Q3,2024-Q1,,,,,
IP010928,27/03/2024,Far North District Council,Pukenui Coastal Walkway.,Pukenui Coastal Walkway.,,Under construction,Fully funded,Direct,Construct only,Northland,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q1,,,,,
IP010929,27/03/2024,Far North District Council,Waipapa Sports Hub.,Temporary Changing RoomsSports Field ConstructionWastewater Treatment PlantCarpark Construction.,,Under construction,Fully funded,Selective,Construct only,Northland,,,Community facilities,5 - 25 million,,,,,,,2023-Q4,2024-Q1,,,,,
IP010930,27/03/2024,Far North District Council,Te Hiku Revitalisation Project.,Kaitaia Town Centre Development.,,Under construction,Fully funded,Selective,Construct only,Northland,,,Community facilities,< 1 million,,,,,,,2023-Q4,2024-Q1,,,,,
IP010931,27/03/2024,Far North District Council,Russell Boat Ramp Carprk upgrade.,Car park upgrade.,,Under construction,Fully funded,Direct,Design and construct,Northland,,,Community facilities,< 1 million,,,,,,,2024-Q2,2024-Q2,,,,,
IP004149,21/03/2024,First Gas Limited,Pipeline inline inspections.,Pipeline pigging operations undertaken on piggable lines.,,Under construction,Funding source confirmed,Limited,Design and construct,North Island,,,Energy,5 - 25 million,,,,,,,2021-Q4,2030-Q3,
https://www.firstgas.co.nz/,,,,
IP004150,21/03/2024,First Gas Limited,SCADA and communications.,Upgrade and replacement of SCADA master server.,,Under construction,Funding source confirmed,Limited,To be determined,Taranaki,,,Energy,5 - 25 million,,,,,,,2022-Q4,2025-Q3,
https://www.firstgas.co.nz/,,,,
IP004152,21/03/2024,First Gas Limited,Asset relocations.,Allocation to allow for Movement of Infrastructure.,,Under construction,Funding source confirmed,Limited,To be determined,North Island,,,Energy,5 - 25 million,,,,,,,2020-Q4,2030-Q3,
https://www.firstgas.co.nz/,,,,
IP004153,21/03/2024,First Gas Limited,Transmission - Customer connections.,Allocation to allow for Connecting New Customers.,,Under construction,Funding source confirmed,Limited,Other,North Island,,,Energy,5 - 25 million,,,,,,,2021-Q4,2030-Q3,
https://www.firstgas.co.nz/,,,,
IP004154,21/03/2024,First Gas Limited,Geohazards Risk remediation projects.,Risk remediation projects resulting from geotechnical hazards.,,Under construction,Funding source confirmed,Limited,To be determined,North Island,,,Energy,50 - 100 million,,,,,,,2022-Q4,2031-Q3,
https://www.firstgas.co.nz/,,,,
IP004159,21/03/2024,First Gas Limited,Waitotara Pipeline River Crossing.,Geohazard Risk remediation due to stream erosion.,,In procurement,Funding source confirmed,Limited,To be determined,Manawatū - Whanganui,,,Energy,< 1 million,,,,,,,2021-Q4,2025-Q2,
https://www.firstgas.co.nz/,,,,
IP004161,21/03/2024,First Gas Limited,System growth.,Allocation to meet increase pipeline or station demand.,,Under construction,Funding source confirmed,Limited,To be determined,North Island,,,Energy,5 - 25 million,,,,,,,2021-Q4,2030-Q3,
https://www.firstgas.co.nz/,,,,
IP004165,21/03/2024,First Gas Limited,Pre-85 Polyethylene Pipeline replacement (Long term).,Replacement of Distribution pipelines.,,Under construction,Funding source confirmed,Limited,Other,North Island,,,Energy,25 - 50 million,,,,,,,2021-Q4,2031-Q3,
https://www.firstgas.co.nz/,,,,
IP004166,21/03/2024,First Gas Limited,Pre-85 Polythelene Pipeline replacement (Annually).,Replacement of Distribution pipelines.,,Under construction,Funding source confirmed,Limited,Other,Waikato,,,Energy,1 - 5 million,,,,,,,2022-Q4,2023-Q3,
https://www.firstgas.co.nz/,,,,
IP004167,21/03/2024,First Gas Limited,Mains Pipeline Extensions (Long term).,Extensions to existing Mains Pipework to facilitate future customer connections.,,Under construction,Funding source confirmed,Limited,To be determined,North Island,,,Energy,25 - 50 million,,,,,,,2021-Q4,2031-Q3,
https://www.firstgas.co.nz/,,,,
IP004169,21/03/2024,First Gas Limited,Distribution - Consumer Connections (Long term).,Works to enable new consumers to connect to the network.,,Under construction,Funding source confirmed,Limited,To be determined,North Island,,,Energy,50 - 100 million,,,,,,,2021-Q4,2031-Q3,
https://www.firstgas.co.nz/,,,,
IP006339,21/03/2024,First Gas Limited,Gas Compressor Replacement Strategy: Kaitoke Compressor Station.,Expenditure to upgrade ageing fleet and standardise.,,Under construction,Funding source confirmed,Limited,To be determined,Manawatū - Whanganui,,,Energy,5 - 25 million,,,,,,,2021-Q4,2025-Q4,
https://www.firstgas.co.nz/,,,,
IP006341,21/03/2024,First Gas Limited,Biogas processing facillity construction.,Expenditure to construct biogas processing facility.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Energy,5 - 25 million,,,,,,,2021-Q4,2024-Q4,
https://www.firstgas.co.nz/,,,,
IP008131,21/03/2024,First Gas Limited,200 Line Kiwirail Drury realignment.,Pipeline realignment.,,In procurement,Funding source confirmed,Limited,Design and construct,Auckland,,,Energy,1 - 5 million,,,,,,,2022-Q4,2025-Q4,
https://www.firstgas.co.nz/,,,,
IP010794,22/03/2024,First Gas Limited,Hydrogen trials.,Trialing a hydrogen blend gas to a small number of monitored homes.,,Under construction,Funding source confirmed,Limited,Design and construct,Manawatū - Whanganui,,,Energy,1 - 5 million,,,,,,,2023-Q1,2025-Q2,
https://www.firstgas.co.nz/,,,,
IP010795,23/03/2024,First Gas Limited,800 & 805 Line Washout.,Pipelines exposed in riverbank post Cyclone Hale January 2023.,,Under construction,Funding source confirmed,Limited,Design and construct,Bay of Plenty,,,Energy,1 - 5 million,,,,,,,2023-Q1,2024-Q4,
https://www.firstgas.co.nz/,,,,
IP000612,6/03/2024,Hamilton City Council,Peacocke River Bridge and Northern Arterials Construction - Hamilton.,Construction of a new major arterial roading connection into the Hamilton greenfield growth area of Peacocke - including a bridge across the Waikato River.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Transport,100 - 250 million,2017-Q3,2018-Q2,2019-Q4,2020-Q3,2020-Q4,2024-Q2,2020-Q3,2025-Q2,
https://www.hamilton.govt.nz/our-city/city-development/peacocke/Pages/default.aspx,,[email address],-37.804261,175.31161
IP000614,12/03/2024,Hamilton City Council,Peacocke Strategic Wastewater Storage and Pump Station - Hamilton.,This project is the construction of a new major pump station and associated storage.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Water,25 - 50 million,2017-Q3,2018-Q2,2021-Q1,2020-Q3,2022-Q1,2024-Q2,2021-Q4,2025-Q2,
https://www.hamilton.govt.nz/our-city/city-development/peacocke/Pages/default.aspx,,[email address],-37.812843,175.307904
IP000615,6/03/2024,Hamilton City Council,Peacocke East/West Roading Arterial Construction - Hamilton.,This project is the construction of a new major arterial roading connection into the Hamilton greenfield growth area of Peacocke - including some significant gully crossings. (Whatukooruru).,,Under construction,Fully funded,Open,Construct only,Waikato,,,Transport,50 - 100 million,2017-Q3,2018-Q2,2022-Q1,2022-Q3,2022-Q4,2025-Q4,2022-Q4,2026-Q4,
https://www.hamilton.govt.nz/our-city/city-development/peacocke/Pages/default.aspx,,[email address],-37.823021,175.309287
IP000618,6/03/2024,Hamilton City Council,Hamilton Water Treatment Plant Capacity Upgrade.,The project is to upgrade existing water treatment plant with additional sedimentation and filtration capacity. Membrane supply contract in-place civil/structural contract in-place. Project scheduled completion date of August 2024.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Water,25 - 50 million,2016-Q3,2019-Q4,2020-Q4,2021-Q1,2022-Q2,2024-Q2,2022-Q4,2024-Q3,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.808472,175.306994
IP000626,12/03/2024,Hamilton City Council,Hamilton Transport Network Renewals and Maintenance.,This project is a collaborative working agreement to deliver planned maintenance and renewals across the Hamilton Transportation networks.,,Under construction,Fully funded,Open,Alliance,Waikato,,,Transport,100 - 250 million,,,,,,,2023-Q3,2028-Q2,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.786061,175.281503
IP000627,6/03/2024,Hamilton City Council,Low Cost Low Risk Programme.,This project is the delivery of a programme of transport network safety improvements. intersection upgrades and cycling connectivity projects.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Transport,5 - 25 million,,,2022-Q2,2023-Q3,2023-Q3,2024-Q2,2023-Q3,2024-Q2,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.786061,175.281503
IP000633,6/03/2024,Hamilton City Council,Hamilton Borman road to Horsham Downs Road connection 2022-2025.,This project is an extension of an arterial road to complete network connectivity. This includes associated urban upgrades and a new intersection at Horsham Downs Road.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Transport,5 - 25 million,2019-Q4,2020-Q2,2022-Q2,2022-Q3,2022-Q4,2025-Q1,2022-Q4,2025-Q1,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.720495,175.276097
IP000635,12/03/2024,Hamilton City Council,Hamilton two waters network renewals.,Delivery of programme of planned renewals and minor improvements to the wastewater and stormwater reticulation network from 2022 to 2026.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Water,25 - 50 million,,,,,,,2022-Q3,2026-Q2,
https://hamilton.govt.nz/strategies-plans-and-projects/projects/,,[email address],-37.786061,175.281503
IP000636,12/03/2024,Hamilton City Council,Hamilton Drinking Water Reticulation Network Renewals - 2022 to 2026.,Delivery of programme of planned renewals and minor improvements to the water reticulation network from 2022 to 2026.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Water,5 - 25 million,,,,,,,2022-Q3,2026-Q2,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.786061,175.281503
IP000637,6/03/2024,Hamilton City Council,Hamilton Eastern Pathways Cycling and Public Transport Network Improvements.,This project is the significant upgrade of primary cycling and public transport corridors on the eastern side of the city including the School Link City Centre to University Link and other key connections.,,In planning,Funding source to be confirmed,Open,To be determined,Waikato,,,Transport,25 - 50 million,,2021-Q4,,,,,2021-Q3,2029-Q2,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.772494,175.293245
IP005483,12/03/2024,Hamilton City Council,Hamilton Water and Wastewater Treatment Plant Renewals and Minor Improvements - 2021 to 2031.,Delivery of programme of planned renewals and minor improvements to the citys water and wastewater treatment plants from 2022 to 2031.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Water,5 - 25 million,,,2021-Q3,2021-Q4,2022-Q1,,2021-Q3,2029-Q2,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.786061,175.281503
IP005489,6/03/2024,Hamilton City Council,Ruakura Eastern Transport Corridor - Hamilton.,Extend the major arterial road network in Rukaura from the inland port /superhub in the south to Webb Drive in the north including connection to Fifth Ave cross city connector arterial.,,In planning,Funding source to be confirmed,To be determined,To be determined,Waikato,,,Transport,50 - 100 million,2021-Q3,2024-Q2,2028-Q2,2028-Q3,2028-Q4,2032-Q1,2022-Q1,2032-Q1,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.768204,175.315025
IP005494,11/03/2024,Hamilton City Council,Hamilton City Council Building/Facility Renewals and Upgrade programme- 2023 to 2031.,To deliver programme of works across Hamilton City Councils buildings and facilities from mid 2023 to mid 2031.,,Under construction,Fully funded,Open,Design and construct,Waikato,,,Community facilities,50 - 100 million,,,,,,,2023-Q3,2029-Q2,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.786062,175.281504
IP005495,6/03/2024,Hamilton City Council,Gordonton Road Intersection Upgrades.,Construction of roundabouts at the Gordonton/Darjon & Gordonton Puketaha Intersections.,,Post implementation ,Fully funded,Open,Construct only,Waikato,,,Transport,5 - 25 million,2018-Q4,2020-Q3,2022-Q2,2023-Q3,2023-Q2,2023-Q4,2020-Q4,2024-Q1,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.739227,175.289163
IP005496,6/03/2024,Hamilton City Council,Hamilton Transport Centre Upgrade.,Upgrade and refurbishment of the existing Hamilton Transport Centre.,,In procurement,Funding source confirmed,Direct,Construct only,Waikato,,,Transport,5 - 25 million,,2021-Q3,2024-Q1,2024-Q1,2024-Q2,2024-Q3,2023-Q3,2024-Q4,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.786352,175.277881
IP005497,6/03/2024,Hamilton City Council,Hamilton Wastewater Treatment Plant - Aeration Basin Retrofits.,Upgrade of existing aeration basins 1-4 over a 3 year period.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Water,1 - 5 million,2020-Q1,2020-Q2,2023-Q1,2023-Q4,2023-Q3,2026-Q2,2022-Q1,2026-Q3,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.730776,175.229162
IP005498,6/03/2024,Hamilton City Council,Hamilton Wastewater Treatment Plant - Inlet Upgrade.,Upgrade of existing plant inlet screening facility and odour control system.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Water,5 - 25 million,2020-Q1,2020-Q2,2023-Q4,2024-Q2,2024-Q2,2026-Q1,2023-Q1,2026-Q1,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.730776,175.229162
IP005499,6/03/2024,Hamilton City Council,Hamilton Wastewater Bulk Storage.,Programme of major wastewater network bulk wet weather storage sites across the city. Concept design and preferred option development from 2021 to 2023 - with staged implementation from 2023 onwards.,,In planning,Funding source confirmed,Open,To be determined,Waikato,,,Water,50 - 100 million,2021-Q3,2023-Q1,2023-Q2,2023-Q4,2024-Q1,2029-Q4,2022-Q1,2029-Q2,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.786062,175.281504
IP005501,6/03/2024,Hamilton City Council,Hamilton Biking Network Programme.,Significant upgrade of strategic biking and micro-mobility networks across the city (in addition to seprarately identified Eastern Pathways project).,,In planning,Funding source to be confirmed,Open,Construct only,Waikato,,,Transport,50 - 100 million,2019-Q2,2022-Q3,2023-Q4,,,,2021-Q3,2029-Q4,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.786064,175.281506
IP005502,11/03/2024,Hamilton City Council,IAF Hamilton City Active Modes River Crossing.,New ped/cycle bridge across the river - indicatively between Memorial Park and the new Waikato Regional Theatre site Hamilton City.,,In procurement,Funding source confirmed,Open,Early contractor involvement,Waikato,,,Transport,25 - 50 million,,,2023-Q4,2024-Q3,2025-Q2,2027-Q4,2023-Q1,2027-Q4,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.788989,175.287714
IP005503,6/03/2024,Hamilton City Council,Gully Network Erosion Control & Rehabilitation.,Erosion Control programme ($16m+) plus Nature in the City Gully Restoration ($15m+) - combination of landscaping supply & installation and civil works from 2021 to 2031.,,Under construction,Fully funded,Selective,To be determined,Waikato,,,Water,25 - 50 million,2020-Q2,,2021-Q3,2031-Q2,2021-Q3,2031-Q2,2021-Q3,2029-Q4,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.786064,175.281506
IP005504,12/03/2024,Hamilton City Council,Hamilton Gardens Development- visitor entry precinct.,Programme of upgrades and development at the Hamilton Gardens from 2021 to 2031- with current live project of the Visitor entry precinct.,,Under construction,Fully funded,Open,Early contractor involvement,Waikato,,,Community facilities,5 - 25 million,,,2022-Q1,2023-Q2,2023-Q2,2024-Q3,2021-Q3,2029-Q4,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.806342,175.302857
IP005505,12/03/2024,Hamilton City Council,Boyes Park Redevelopment.,Redevelopment of the existing Founders Theatre site in the Hamilton west town belt.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Community facilities,1 - 5 million,,,2023-Q2,2023-Q4,2023-Q4,2024-Q2,2022-Q3,2024-Q2,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.785097,175.273576
IP005507,6/03/2024,Hamilton City Council,Boundary/Heaphy Intersection Upgrade.,Major upgrade to existing intersection - likely to traffic signals.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Waikato,,,Transport,5 - 25 million,,,,,,,2024-Q3,2027-Q2,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.774751,175.284704
IP005509,12/03/2024,Hamilton City Council,Peacocke North-South Wastewater Pipeline.,New strategic wastewater pipe along alignment of the north/south arterial corridor through the Peacocke growth area and incorporation of walking and cycling facilities.,,Under construction,Fully funded,Direct,Early contractor involvement,Waikato,,,Water,5 - 25 million,2017-Q3,2018-Q2,2023-Q3,2023-Q1,2023-Q1,2025-Q2,2022-Q3,2026-Q2,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.819819,175.31786
IP005510,6/03/2024,Hamilton City Council,Rotokauri Arterial Roading Corridors (designation phase).,New strategic transport corridors enabling further development in the Rotokauri growth area on Hamiltons north-west. Implementation planned between 2028 and 2031.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,25 - 50 million,2020-Q1,2022-Q2,2028-Q1,2028-Q2,2028-Q3,2031-Q4,2022-Q1,2031-Q2,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.750358,175.213815
IP005511,6/03/2024,Hamilton City Council,Rotokauri Greenway and Swale Corridors.,New strategic stormwater floodway and swale enabling further development in the Rotokauri growth area on Hamiltons north-west. Implementation planned between 2028 and 2032.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Water,25 - 50 million,2020-Q1,2022-Q2,2028-Q1,2028-Q2,2028-Q3,2032-Q4,2022-Q1,2032-Q2,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.750358,175.213815
IP008743,11/03/2024,Hamilton City Council,IAF Hamilton City Reservoir Phase 1 & Booster Pump Station.,20+ML Reservoir booster pump station and network of pipe connection from water treatment plant to downstream water netwrok in Hamilton central city.,,In planning,Fully funded,Open,Early contractor involvement,Waikato,,,Water,50 - 100 million,,,2024-Q4,2026-Q2,2026-Q2,2028-Q2,2022-Q4,2028-Q3,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],,
IP008744,11/03/2024,Hamilton City Council,IAF Hamilton City Reactive Three Waters Reticulation.,Three waters reticulation and associated works required to enable housing in Hamilton central city. Timing location and required reticulation will be determined by needs of developments committed under the Hamilton City IAF Funding Agreement.,,Early planning,Fully funded,To be determined,To be determined,Waikato,,,Water,5 - 25 million,,,,,,,2022-Q4,2026-Q4,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],,
IP008898,6/03/2024,Hamilton City Council,Transport Choices (CERF).,Programme of works to cover multimodal transport options around Hamilton City as part of Government CERF funding. Plan to procure as 3 bundles of work.,,In procurement,Fully funded,Open,Construct only,Waikato,,,Transport,25 - 50 million,2022-Q3,2023-Q2,2023-Q2,2023-Q3,2023-Q4,2024-Q2,2023-Q1,2024-Q3,
https://www.hamilton.govt.nz/our-city/city-development/Pages/default.aspx,,[email address],-37.786061,175.281503
IP008932,12/03/2024,Hamilton City Council,Museum internal environment Upgrade.,Upgrade of Museum internal environment.,,In procurement,Fully funded,To be determined,Construct only,Waikato,,,Community facilities,1 - 5 million,,,2024-Q1,2024-Q2,2024-Q3,2024-Q4,2023-Q1,2025-Q2,,,[email address],,
IP008933,6/03/2024,Hamilton City Council,Ranfurly Gully Wastewater Renewal.,Removal of failing wastewater pipeline out of the gully to the adjacent street including reversal of some private drainage.,,In planning,Fully funded,Selective,Early contractor involvement,Waikato,,,Water,5 - 25 million,2024-Q2,2021-Q3,2022-Q3,2022-Q4,2024-Q2,2027-Q2,2024-Q2,2027-Q4,,,[email address],,
IP010810,21/03/2024,Hauraki District Council,1016_011 - Pavement Rehabilitation - Pukekauri - Waitawheta.,Land transport.,,Under construction,Part funded,Open,Construct only,Waikato,,,Transport,1 - 5 million,,,,,,,2021-Q2,2024-Q2,,,,,
IP010811,21/03/2024,Hauraki District Council,1017_001 - Sealed Road Resurfacing.,Land transport.,,Under construction,Part funded,Open,Construct only,Waikato,,,Transport,1 - 5 million,,,,,,,2023-Q3,2023-Q2,,,,,
IP010812,21/03/2024,Hauraki District Council,1030_001 - District Wide Pipe Renewal Programme (Service Continuity).,Water supply.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Water,1 - 5 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010813,21/03/2024,Hauraki District Council,1145_001 - Ngatea library and service centre.,Property.,,In planning,Fully funded,To be determined,To be determined,Waikato,,,Community facilities,1 - 5 million,,,,,,,2023-Q2,2026-Q2,,,,,
IP010814,21/03/2024,Hauraki District Council,1146_001 - Paeroa Urban Streetscape.,Land transport.,,On hold,Part funded,To be determined,Other,Waikato,,,Transport,1 - 5 million,,,,,,,2021-Q3,2026-Q2,,,,,
IP010815,21/03/2024,Hauraki District Council,1225_001 - Waihi Urban Streetscape (Street Lights).,Land transport.,,Early planning,Fully funded,To be determined,Other,Waikato,,,Transport,1 - 5 million,,,,,,,2023-Q1,2025-Q2,,,,,
IP010816,21/03/2024,Hauraki District Council,1263_001 - Paeroa Upgrading WWTP.,Wastewater.,,Under construction,Fully funded,Open,Design and construct,Waikato,,,Water,25 - 50 million,,,,,,,2022-Q4,2026-Q1,,,,,
IP010817,21/03/2024,Hauraki District Council,1272_001 - Waihi Second Membrane.,Water supply.,,Under construction,Fully funded,Direct,Design and construct,Waikato,,,Water,1 - 5 million,,,,,,,2023-Q2,2024-Q4,,,,,
IP010818,21/03/2024,Hauraki District Council,1279_001 - Raw water tank Kerepehi.,Water supply.,,Under construction,Fully funded,Open,Design and construct,Waikato,,,Water,1 - 5 million,,,,,,,2021-Q3,2024-Q3,,,,,
IP010819,21/03/2024,Hauraki District Council,1280_001 - Kerepehi raw water main.,Water supply.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Water,5 - 25 million,,,,,,,2021-Q4,2024-Q3,,,,,
IP010820,21/03/2024,Hauraki District Council,1285_001 - Ngatea Southern Estate Subdivision.,Property.,,Early planning,Fully funded,Open,Design and construct,Waikato,,,Commercial,25 - 50 million,,,,,,,2021-Q3,2028-Q2,,,,,
IP000001,5/03/2024,Health New Zealand,Facilities Infrastructure Remediation Programme - Stage 1 - Auckland DHB.,This project requires remediation of urgent infrastructure at Auckland City Hospital and Greenlane Clinical Centre to address high risk of service failure (as evidenced by detailed infrastructure assessments undertaken).,,Under construction,Fully funded,To be determined,To be determined,Auckland,,,Health,250 - 500 million,,2018-Q3,2018-Q3,2018-Q4,2019-Q2,2025-Q2,2018-Q3,2025-Q2,,,,,
IP000008,5/03/2024,Health New Zealand,Radiology Relocation to Harley Gray – Middlemore Hospital - Counties Manukau DHB.,This project will relocate existing radiology department from the earthquake prone Galbraith building (20 at IL4) to the Harley Gray building which was designed to accommodate the clinical areas for Radiology.,,Under construction,Fully funded,To be determined,Construct only,Auckland,,,Health,5 - 25 million,,2019-Q4,,,2024-Q1,2025-Q4,2019-Q4,2025-Q4,,,,,
IP000013,5/03/2024,Health New Zealand,New Dunedin Hospital Campus Inpatients.,73 500 m2 Inpatients building for the new Dunedin Hospital campus being built across the ex-Cadbury and Wilson blocks in central Dunedin.,,Under construction,Fully funded,Open,Early contractor involvement,Otago,,,Health,1 billion +,,2020-Q3,2021-Q4,2021-Q4,2023-Q2,2029-Q1,2020-Q3,2029-Q1,,,,-45.8761848,
IP000013.1,5/03/2024,Health New Zealand,New Dunedin Hospital Campus Outpatients.,15 000 m2 Outpatients building for the new Dunedin Hospital campus being built across the ex-Cadbury and Wilson blocks in central Dunedin.,,Under construction,Fully funded,Open,Construct only,Otago,,,Health,100 - 250 million,,2020-Q3,2021-Q4,2021-Q4,2022-Q2,2026-Q3,2020-Q3,2026-Q3,,,,-45.8761848,
IP006714,5/03/2024,Health New Zealand,Scott Building Reclad.,Recladding of Scott building (Clinical Block) due to systemic cladding failure.,,Post implementation ,Fully funded,Open,Construct only,Auckland,,,Health,25 - 50 million,,2017-Q3,2018-Q1,2018-Q2,2019-Q2,2023-Q4,2017-Q3,2023-Q4,,,,,
IP000601,5/03/2024,Health New Zealand,Acute Adult Mental Health Facility - MidCentral DHB.,This project is a new build of an Acute Adult Mental Health facility currently on the main campus. This project is underway due to the physical environment and design having been identified as detrimental to healthcare and safety.,,Under construction,Fully funded,Open,Other,Manawatū - Whanganui,,,Health,50 - 100 million,,2020-Q4,2022-Q3,2022-Q4,2023-Q1,2025-Q2,2020-Q4,2025-Q2,,,,,
IP000602,5/03/2024,Health New Zealand,Adult Mental Health Facility - Tranche 1 - Waikato DHB.,The Facility Project requires replacement of the Acute Adult Mental Health facility (Tranche 1). This project also considers satellite facilities and expansion of forensics within 3 tranches from 2018 to 2024.,,In procurement,Fully funded,Open,Construct only,Waikato,,,Health,100 - 250 million,,2022-Q2,2022-Q4,,2023-Q3,2026-Q3,2022-Q2,2026-Q3,,,,,
IP000603,5/03/2024,Health New Zealand,Taranaki Base Hospital Redevelopment - Project Maunga - Stage 2 - Taranaki DHB.,This project is stage two of a three stage inpatient building programme. Stage 1 was completed in 2014. Recent seismic assessment informed the DHB had five earthquake prone buildings (IL4 buildings (critical post-disaster) below 34%) and four tunnels carr.,,Under construction,Fully funded,Open,Construct only,Taranaki,,,Health,250 - 500 million,,2020-Q3,2021-Q4,,2022-Q2,2025-Q1,2020-Q3,2025-Q1,,,,,
IP000604,5/03/2024,Health New Zealand,Dual Mental Health and Addictions Unit - Tairawhiti DHB.,This project is an upgrade of the Mental Health Facility to accommodate additional detox capabilities.,,Under construction,Fully funded,Open,Construct only,Gisborne,,,Health,25 - 50 million,,2020-Q3,2022-Q2,,2022-Q3,2024-Q4,2020-Q3,2024-Q4,,,,,
IP000607,5/03/2024,Health New Zealand,Acute Mental Health Unit - Hutt Valley DHB.,This project is for a new fit for purpose facility that will provide a safe more therapeutic and culturally appropriate environment with improved whanau spaces.,,Under construction,Fully funded,Open,Other,Wellington,,,Health,5 - 25 million,,2022-Q2,,2022-Q3,2022-Q3,2024-Q2,2022-Q3,2024-Q2,,,,,
IP000608,5/03/2024,Health New Zealand,Paediatric Intensive Care Unit and Intensive Care Unit Child Health expansion - Auckland DHB.,This project will deliver extra capacity for this critical national service to meet the 30 per cent growth in demand in the last three years. This investment is expected to increase the number of beds to around 30 and there will also be larger support are.,,Under construction,Fully funded,To be determined,Construct only,Auckland,,,Health,25 - 50 million,,2020-Q4,2021-Q2,2023-Q2,2022-Q2,2026-Q1,2020-Q4,2026-Q1,,,,,
IP000610,5/03/2024,Health New Zealand,Surgical Services Expansion Unit - MidCentral DHB.,This project is to provide increased capacity to address growing demand. This investment is expected to support two additional theatres; two new procedure rooms; a new cardiac catheterisation laboratory and improved recovery facilities.,,Post implementation ,Fully funded,Open,Other,Manawatū - Whanganui,,,Health,25 - 50 million,,2020-Q3,2021-Q4,2021-Q4,2021-Q4,2023-Q4,2020-Q3,2023-Q4,,,,,
IP003168,5/03/2024,Health New Zealand,Manukau Health Park - Counties Manukau DHB.,Critical infrastructure needed to support relocation and expansion of clinical services planned in short / medium term on Manukau site including new plant room / substations HVAC medical gases IT parking and other essential infrastructure. Establish.,,Under construction,Fully funded,Selective,Construct only,Auckland,,,Health,250 - 500 million,,2020-Q4,2020-Q4,2022-Q4,2022-Q1,2025-Q4,2020-Q4,2025-Q4,,,,,
IP003169,5/03/2024,Health New Zealand,Building Recladding - Counties Manukau DHB.,Year 2 of Stage 2 of the recladding programme to address critical leaky building and cladding failure issues on the Manukau Surgical Hospital and McIndoe buildings. Business case now includes Re-cladding of Kidz First and McIndoe ambulance bay which was p.,,In procurement,Fully funded,Open,Design and construct,Auckland,,,Health,50 - 100 million,,2021-Q4,2022-Q3,2023-Q3,2025-Q2,2027-Q2,2021-Q4,2027-Q2,,,,,
IP003174,5/03/2024,Health New Zealand,Linear Accelerators - Auckland DHB.,Linear Accelerator(s) for Auckland DHB.,,Under construction,Fully funded,Selective,Construct only,Auckland,,,Health,5 - 25 million,,2021-Q1,2023-Q1,2023-Q2,2023-Q3,2024-Q2,2021-Q1,2024-Q2,,,,,
IP003175,5/03/2024,Health New Zealand,Copper Pipes - Capital & Coast DHB.,Replacement of corroding hot-water pipes in Wellington Hospital.,,Under construction,Fully funded,Open,Construct only,Wellington,,,Health,50 - 100 million,,2020-Q4,2020-Q3,2020-Q4,2021-Q1,2026-Q3,2020-Q4,2026-Q3,,,,,
IP003178,5/03/2024,Health New Zealand,SCBU and Upgrade of Maternity Facilities - Hutt Valley DHB.,Facility redevelopment to improve care and outcomes for hapu mama pepe and whanau. Note completion date is speculative.,,In planning,Fully funded,Open,Construct only,Wellington,,,Health,5 - 25 million,,2020-Q4,2021-Q1,2024-Q1,2024-Q2,,2020-Q4,2025-Q4,,,,,
IP003180,5/03/2024,Health New Zealand,Wairau Boilers.,Replacement of boilers with an energy efficient sustainable option.,,Under construction,Fully funded,Open,Construct only,Nelson,,,Health,5 - 25 million,,2022-Q2,2022-Q4,2023-Q3,2023-Q4,2024-Q2,2022-Q2,2024-Q2,,,,,
IP003184,5/03/2024,Health New Zealand,Mental Health Facility Upgrade - Taranaki DHB.,Refurbish and upgrade of mental health facility.,,In procurement,Fully funded,Open,Construct only,Taranaki,,,Health,5 - 25 million,,2020-Q4,2022-Q3,2023-Q3,2024-Q1,2025-Q2,2020-Q4,2025-Q2,,,,,
IP003186,5/03/2024,Health New Zealand,Regional Chemotherapy Services - Whanganui DHB.,New build of a local outpatient chemotherapy unit.,,Post implementation ,Fully funded,Direct,Design and construct,Manawatū - Whanganui,,,Health,< 1 million,,2020-Q4,2023-Q2,2023-Q2,2023-Q4,2023-Q4,2020-Q4,2023-Q4,,,,,
IP003190,5/03/2024,Health New Zealand,Urgent Interim Works - Def Main Gastroenterology Audiology ICU - Southern DHB.,Redevelopment of gastroenterology audiology and ICU facilities and a deferred maintenance programme at Dunedin Hospital.,,Under construction,Fully funded,Open,Other,Southland,,,Health,25 - 50 million,,2015-Q3,2016-Q1,2023-Q3,2016-Q3,2025-Q1,2015-Q3,2025-Q1,,,,,
IP000014,5/03/2024,Health New Zealand,Elective Capacity and Inpatient Beds and Supporting Infrastructure - Waitemata DHB.,This project will deliver additional capacity in elective theatres; inpatient beds; and endoscopy suite and centralised sterile services department for Waitemata District Health Board to meet immediate and short-term future capacity requirements. The curr.,,Under construction,Fully funded,Open,Early contractor involvement,Auckland,,,Health,250 - 500 million,,2019-Q2,2020-Q3,2020-Q4,2020-Q4,2024-Q1,2019-Q2,2024-Q1,,,,,
IP003194,5/03/2024,Health New Zealand,Facilities Infrastructure Remediation Programme - Tranche 2 - Auckland DHB.,Building Resilience - New central plant tunnels and future integration.,,Under construction,Fully funded,Open,Construct only,Auckland,,,Health,250 - 500 million,,2019-Q4,2020-Q1,2022-Q2,2021-Q4,2025-Q4,2019-Q4,2025-Q4,,,,,
IP003195,5/03/2024,Health New Zealand,Mauri Ora – Mental Health & Addiction Services Facilities Redevelopment - Lakes DHB.,Replacement and capacity expansion of current mental health facility due to age (40+ years) life-expired (eg water ingress electrical infrastructure issues) and clinically inappropriate and too small. Two additional beds on completion and four more avai.,,Under construction,Fully funded,To be determined,To be determined,Waikato,,,Health,25 - 50 million,,2020-Q3,2022-Q2,2023-Q3,2022-Q4,2025-Q3,2020-Q3,2025-Q3,,,,,
IP006600,5/03/2024,Health New Zealand,Parkside Enhancements - Tranche One.,Upgrade aims to address many facility issues that hinder staff’s ability to provide an adequate level of care for their patients. The proposed investment will support the refurbishment of the wards in Parkside building at Christchurch Hospital.,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Health,5 - 25 million,,2021-Q3,2021-Q3,2022-Q3,2022-Q4,2024-Q1,2021-Q3,2024-Q1,,,,,
IP003198,5/03/2024,Health New Zealand,Radiology Facilities Redevelopment - Hawke's Bay DHB.,Refurbishment of Radiology Buildings.,,In planning,Fully funded,Open,Early contractor involvement,Hawke's Bay,,,Health,25 - 50 million,,2020-Q2,2023-Q3,2023-Q3,2024-Q2,2026-Q4,2020-Q2,2026-Q4,,,,,
IP003199,5/03/2024,Health New Zealand,Surgical Services Expansion Project - Hawke's Bay DHB.,Surgical Services Expansion Project (SSEP) - Bringing theatre 8 online previously shelled.,,Under construction,Fully funded,Open,Construct only,Hawke's Bay,,,Health,5 - 25 million,,2018-Q3,2019-Q4,2020-Q4,2021-Q1,2024-Q2,2018-Q3,2024-Q2,,,,,
IP004772,5/03/2024,Health New Zealand,Christchurch Hospital Redevelopment Tower 3.,Potential refurbishment and renovation of the Parkside building to accommodate the remaining clinical services that are not relocating to ASB. It comprises a series of related projects linked to the hospital redevelopment programme and renovation and the.,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Health,100 - 250 million,,2020-Q4,2022-Q2,2022-Q4,2023-Q1,2025-Q4,2020-Q4,2025-Q4,,,,,
IP003197,5/03/2024,Health New Zealand,Seismic upgrades - Hawke's Bay DHB.,Seismic strengthening remediation urgent works on theatres radiology and acute assessment unit.,,Under construction,Fully funded,Open,Construct only,Hawke's Bay,,,Health,5 - 25 million,,2019-Q2,2019-Q4,2020-Q4,2021-Q1,2024-Q1,2019-Q2,2024-Q1,,,,,
IP004775,5/03/2024,Health New Zealand,Northland DHB Linear Accelerators.,Replacement of Linac and Bunker as part of regional services.,,Under construction,Fully funded,Open,Construct only,Northland,,,Health,50 - 100 million,,2022-Q1,2023-Q3,2023-Q4,2024-Q1,2026-Q1,2022-Q1,2026-Q1,,,,,
IP004776,5/03/2024,Health New Zealand,Taranaki DHB Linear Accelerators.,Replacement of Linac and Bunker as part of regional services.,,Under construction,Fully funded,Open,Construct only,Taranaki,,,Health,25 - 50 million,,2022-Q1,2022-Q1,2023-Q3,2023-Q4,2025-Q3,2022-Q1,2025-Q3,,,,,
IP004777,5/03/2024,Health New Zealand,Linear Accelerators - Hawke's Bay DHB.,Replacement of Linac and Bunker as part of regional services. Note completion date is speculative.,,In planning,Fully funded,To be determined,To be determined,Hawke's Bay,,,Health,25 - 50 million,,2021-Q4,,,,,2021-Q4,2026-Q4,,,,,
IP006589,5/03/2024,Health New Zealand,Keeping the Lights on - Stage 2 (Dunedin Hospital Transition Programme - Maintenance).,Essential maintenance projects to maintain services until completion of the new Dunedin Hospital development. (Critical Infrastructure Works).,,Under construction,Fully funded,Open,Other,Southland,,,Health,5 - 25 million,,2019-Q4,2022-Q1,2025-Q1,2022-Q1,2025-Q4,2019-Q4,2025-Q4,,,,,
IP006592,5/03/2024,Health New Zealand,Waitakere Hospital Urgent Inpatient Capacity Project.,Redevelopment of the Waitakere Hospital in order to deliver increased capacity to the region. Scope to comprise of a 30-bed inpatient ward block but not an Intensive Care Unit.,,Under construction,Fully funded,Open,Early contractor involvement,Auckland,,,Health,50 - 100 million,,2021-Q4,2022-Q4,2023-Q3,2023-Q4,2026-Q1,2021-Q4,2026-Q1,,,,,
IP006595,5/03/2024,Health New Zealand,Compliance Works.,Compliance works for Canterbury DHB.,,Under construction,Fully funded,Open,Other,Canterbury,,,Health,50 - 100 million,,2021-Q3,2021-Q4,,2021-Q3,2026-Q2,2021-Q3,2026-Q2,,,,,
IP006596,5/03/2024,Health New Zealand,Building for the Future Tranche 1.,Waitemata and Auckland DHBs must reach a formal contracted agreement on the use of capacity by Auckland DHB prior to business case submission.,,Under construction,Fully funded,Direct,Early contractor involvement,Auckland,,,Health,25 - 50 million,,2021-Q4,2020-Q3,2022-Q2,2023-Q1,2024-Q2,2021-Q4,2024-Q2,,,,,
IP006597,5/03/2024,Health New Zealand,Whangarei Hospital Redevelopment - Project Pihi Kaha.,Replacement of a large section of the main hospital block. This will add capacity and will be a key enabler for the DHB’s goal of addressing the growing health inequities in the region. The scope is yet to be determined and will be confirmed in the fina.,,In planning,Fully funded,Open,Early contractor involvement,Northland,,,Health,500 million - 1 billion,,2022-Q2,2025-Q1,2027-Q2,2027-Q2,2031-Q3,2022-Q2,2031-Q3,,,,,
IP006599,5/03/2024,Health New Zealand,Hillmorton Hospital Campus Masterplan – Stage 1.,Scope to be maximum forensic inpatient capacity within signalled budget (expected to be approximately 30 beds) plus supporting infrastructure and consistent with the Master Site Plan.,,In planning,Fully funded,Open,Construct only,Canterbury,,,Health,100 - 250 million,,2022-Q2,2023-Q3,2024-Q4,2024-Q4,2027-Q3,2022-Q2,2027-Q3,,,,,
IP004773,5/03/2024,Health New Zealand,Infrastructure Programme - Tranche 1.,Mitigation of DHB-wide risks in relation to critical assets and building resilience including:• single points of failure of key infrastructural assets• integrity of building fabric• seismic strength of buildings• asbestos in buildings.,,Under construction,Fully funded,Open,Construct only,Auckland,,,Health,25 - 50 million,,2020-Q1,2019-Q3,2022-Q1,2022-Q2,2024-Q1,2022-Q2,2024-Q1,,,,,
IP006602,5/03/2024,Health New Zealand,Procedure Rooms Upgrade.,Fit-out and purchase equipment to upgrade two procedure rooms to increase orthopaedic elective and ophthalmology procedures capacity in main theatre rooms. The changes will be aligned with the Surgical Expansion Project to minimise disruption to electiv. Note completion date is early estimate - project on hold.,,On hold,Fully funded,Open,Construct only,Hawke's Bay,,,Health,1 - 5 million,,2020-Q4,2021-Q2,2020-Q3,2021-Q3,,2021-Q3,2021-Q4,,,,,
IP006603,5/03/2024,Health New Zealand,Hawkes Bay DHB Main Electrical Supply Upgrade.,Replacement the DHB’s aging main electrical switchboards in hospital buildings.,,Under construction,Fully funded,Open,Construct only,Hawke's Bay,,,Health,1 - 5 million,,2020-Q4,2020-Q4,2021-Q1,2021-Q1,2024-Q2,2020-Q4,2024-Q2,,,,,
IP006606,5/03/2024,Health New Zealand,Upgrade of Mental Health Inpatient Unit (Wahi Oranga).,Funding to support the DHB to reconfigure services and deliver more modern patient centred care. The acute area nursing station and entrance will be refurbished improving safety and client engagement.,,Under construction,Fully funded,Open,Construct only,Marlborough,,,Health,1 - 5 million,,2020-Q4,2022-Q4,2023-Q2,2023-Q2,2024-Q4,2020-Q4,2024-Q4,,,,,
IP006608,5/03/2024,Health New Zealand,New Community Mental Health Facility.,This funding will enable the DHB to purchase and fit-out a building in Whangarei to co-locate and integrate community mental health services improving health outcomes.,,Under construction,Fully funded,Open,Construct only,Northland,,,Health,5 - 25 million,,2020-Q3,2022-Q1,2022-Q1,2022-Q1,2024-Q4,2020-Q3,2024-Q4,,,,,
IP006609,5/03/2024,Health New Zealand,Rural Primary Birthing Unit in Central Otago.,Additional facility required due to rapid and sustained population growth in Central Otago.,,Under construction,Fully funded,Open,Design and construct,Southland,,,Health,5 - 25 million,,2021-Q4,2022-Q2,2023-Q4,2023-Q4,2025-Q4,2021-Q4,2025-Q4,,,,,
IP006610,5/03/2024,Health New Zealand,Outpatients Refurbishment.,This funding will enable the outpatients’ area to be re-fitted for a triaging area new office and clinic space which will better position the DHB for future models of care including virtual consultations.,,Under construction,Fully funded,To be determined,To be determined,Wellington,,,Health,< 1 million,,2020-Q4,2020-Q3,2023-Q3,2024-Q1,2024-Q2,2020-Q4,2024-Q2,,,,,
IP006611,5/03/2024,Health New Zealand,West Coast DHB Mental Health Unit.,A new purpose-built resilient facility to provide a modern therapeutic environment and enable contemporary models of care.,,In planning,Fully funded,Open,Construct only,West Coast,,,Health,5 - 25 million,,2021-Q4,2023-Q2,2024-Q1,2024-Q3,2026-Q3,2021-Q4,2026-Q3,,,,,
IP003192,5/03/2024,Health New Zealand,Critical Works - Package 2 (Capacity & Compliance) - Northland DHB.,Address some of the key clinical service areas that face capacity constraints and should provide relief until the new hospital is commissioned. There are four projects to provide interim solutions for four services:● Special Care Baby Unit (SCBU)●.,,Under construction,Fully funded,Open,Construct only,Northland,,,Health,25 - 50 million,,2020-Q2,2021-Q3,2021-Q4,2022-Q1,2024-Q1,2020-Q2,2024-Q1,,,,,
IP006715,5/03/2024,Health New Zealand,Generators High Voltage Network TEC Infrastructure Replacements and Upgrades.,Electrical upgrade including supply to site and replacement of ageing generators.,,In planning,Fully funded,Open,Design and construct,Wellington,,,Health,5 - 25 million,,2021-Q4,2021-Q4,2024-Q2,2025-Q3,2027-Q2,2021-Q4,2027-Q2,,,,,
IP006716,5/03/2024,Health New Zealand,Renewal of Vertical Transport (Lifts) - Tranche 2.,Renewal of failing lifts in seven buildings across Wellington Regional Hospital.,,Under construction,Fully funded,Direct,Design and construct,Wellington,,,Health,5 - 25 million,,2021-Q4,2022-Q2,2023-Q2,2023-Q3,2025-Q3,2021-Q4,2025-Q3,,,,,
IP006717,5/03/2024,Health New Zealand,Waitākere – Electrical Infrastructure.,Upgrade to critical elements of Waitākere Hospital's electrical infrastructure. This is an urgent need to address specific electrical infrastructure obsolescence single points of failure and risks.,,In planning,Fully funded,Open,Construct only,Auckland,,,Health,5 - 25 million,,2021-Q4,2022-Q1,,2023-Q3,2024-Q4,2021-Q4,2024-Q4,,,,,
IP008221,5/03/2024,Health New Zealand,Core Infrastructure Upgrade.,A comprehensive risk-based review by Beca will identify a critical infrastructure upgrade roadmap. This funding is a placeholder for any urgent works required. Phased upgrade of essential infrastructure across all CMDHB sites e.g. as power lifts air-.,,In planning,Fully funded,Open,Other,Auckland,,,Health,25 - 50 million,,2022-Q2,2022-Q3,2025-Q1,2025-Q1,2026-Q4,2023-Q2,2026-Q4,,,,,
IP008222,5/03/2024,Health New Zealand,New Child and Youth Health Community Hub.,Centralised location for a one stop shop providing services for children and youth.,,In planning,Fully funded,Open,Construct only,Gisborne,,,Health,1 - 5 million,,2021-Q4,2023-Q3,2023-Q4,2024-Q1,2025-Q1,2024-Q1,2025-Q1,,,,,
IP008223,5/03/2024,Health New Zealand,E Tū Wairua Hinegaro Mason Clinic Redevelopment - Tranche 1.,Replacement of existing facilities that are at end of life and/or no longer fit for purpose and comprise ability to deliver the appropriate models of care to patients. - Includes Land Purchase and replacement facility.,,Under construction,Fully funded,Open,Early contractor involvement,Auckland,,,Health,100 - 250 million,,2020-Q1,2022-Q3,2022-Q4,2023-Q1,2025-Q3,2023-Q2,2025-Q3,,,,,
IP008224,5/03/2024,Health New Zealand,Otara Spinal Unit and Adult Rehabilitation Unit.,The specialiast rehabilitation centre project will relocate the Auckland Regional Spinal Unit from CMDHB's Otara campus at Middlemore Hospital into a new purpose build factility at the new Manukau Health park. This will be a 60 bed combined spinal and non.,,In planning,Fully funded,Open,Construct only,Auckland,,,Health,100 - 250 million,,2022-Q2,2023-Q4,2024-Q3,2024-Q4,2027-Q2,2023-Q4,2027-Q2,,,,,
IP008225,5/03/2024,Health New Zealand,Generator and Electrical Upgrade and Electrical Supply to Site.,Electrical upgrade including supply to site and replacement of ageing generators.,,In procurement,Fully funded,Open,Other,Gisborne,,,Health,5 - 25 million,,2021-Q4,,2023-Q2,2024-Q2,2025-Q1,2022-Q4,2025-Q1,,,,,
IP008226,5/03/2024,Health New Zealand,Woman Child and Family Facility Upgrade.,Upgrade of Woman Child and Family Facilities to meet health and safety standards.,,Under construction,Fully funded,To be determined,To be determined,Waikato,,,Health,5 - 25 million,,2021-Q2,2022-Q1,,2022-Q1,2024-Q3,2022-Q2,2024-Q3,,,,,
IP008701,5/03/2024,Health New Zealand,Endoscopy Unit Expansion Christchurch Hospital.,Fit out of four new procedure rooms construction of two new procedure rooms and the refurbishment of two existing procedure rooms to provide additional capacity within the endoscopy unit at Christchurch Hospital.,,In planning,Fully funded,Open,Construct only,Canterbury,,,Health,5 - 25 million,,2023-Q1,2023-Q3,2024-Q2,2024-Q3,2025-Q1,2023-Q1,2025-Q1,,,,,
IP008702,5/03/2024,Health New Zealand,Waitematā Infrastructure Services Remediation Programme - Tranche 1B.,Programme of remediation projects of critical plant and equipment to ensure compliance with relevant standards and legislation and projects enabling and supporting campus resilience.,,In planning,Fully funded,Open,To be determined,Auckland,,,Health,25 - 50 million,,2023-Q3,2023-Q4,2023-Q3,2023-Q3,2026-Q2,2023-Q3,2026-Q2,,,,,
IP008703,5/03/2024,Health New Zealand,Bay of Plenty Seismic Strengthening (Building 20 and Kitchen Refurbishment).,Structural upgrade of building to protect IL4 services (includes relocation of kitchen).,,In planning,Fully funded,Limited,Construct only,Bay of Plenty,,,Health,5 - 25 million,,2023-Q2,2024-Q1,2024-Q1,2024-Q2,2025-Q3,2023-Q2,2025-Q3,,,,,
IP008705,5/03/2024,Health New Zealand,Front of Whare & ED Refurbishment.,Addresses seismic configuration and capacity issues. Significant planning required so this will deliver first phase only.,,In planning,Fully funded,Open,Early contractor involvement,Wellington,,,Health,100 - 250 million,,2023-Q3,,,2024-Q1,2027-Q4,2023-Q3,2027-Q4,,,,,
IP009582,5/03/2024,Health New Zealand,Acute Mental Health and Addictions Facility (Te Whare Awhiora).,Upgrade of MH Facility to accommodate additional detox capabilities.,,Under construction,Fully funded,Open,Construct only,Gisborne,,,Health,25 - 50 million,,2020-Q3,2022-Q2,,2022-Q3,2024-Q4,2020-Q3,2024-Q4,,,,,
IP009858,5/03/2024,Health New Zealand,Replacement of end-of-life network devices Northern Region.,Replacement of 826 end-of-life network devices.,,Under construction,Fully funded,Open,To be determined,North Island,,,Health,5 - 25 million,,2021-Q1,,2023-Q2,2022-Q3,2024-Q2,2021-Q1,2024-Q2,,,,,
IP009868,5/03/2024,Health New Zealand,Kaitaia Hospital Weathertightness Remediation.,Weatherproofing to extend building lifespan.,,In planning,Fully funded,Open,Construct only,Northland,,,Health,5 - 25 million,,2023-Q2,2024-Q2,2024-Q3,2024-Q3,2026-Q2,2023-Q2,2026-Q2,,,,,
IP009870,5/03/2024,Health New Zealand,Acute Mental Health Unit Tranche 2 - Main Works.,Replacement of the Te Whare Ahuru Mental Health Unit.,,In planning,Fully funded,Direct,Early contractor involvement,Wellington,,,Health,50 - 100 million,,2022-Q2,2022-Q1,2022-Q1,2024-Q2,2026-Q4,2022-Q2,2026-Q4,,,,,
IP010747,5/03/2024,Health New Zealand,Tokoroa ED Reconfiguration.,Reconfiguration of Tokoroa Hospital to improve infectious disease management enlarge front of house provide flexible space and repurpose a consultation room as a plaster room.,,Under construction,Fully funded,Direct,Construct only,Waikato,,,Health,1 - 5 million,,2020-Q3,,2022-Q4,2023-Q1,2024-Q1,2020-Q3,2024-Q1,,,,,
IP010748,5/03/2024,Health New Zealand,SMHS Relocation from The Princess Margaret Hospital (TPMH) to Hillmorton.,New facilities to enable the relocation of the following mental health services from TPMH campus: - Mothers and Babies (M&B) and South Island Eating Disorders (SIEDs) inpatient and outpatient services - Child Adolescent and Family (CAF) inpatient services and a separate - High and Complex inpatient unit (formally known as the Seager Clinic).,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Health,50 - 100 million,,2019-Q2,,2020-Q4,2021-Q1,2024-Q1,2019-Q2,2024-Q1,,,,,
IP010749,5/03/2024,Health New Zealand,Energy Centre and Services Tunnel.,Redevelopment of Energy Centre and Services Tunnel post 2011 Canterbury Earthquakes.,,Under construction,Fully funded,Open,Design and construct,Canterbury,,,Health,50 - 100 million,,2019-Q4,,,2017-Q1,2024-Q2,2019-Q4,2024-Q2,,,,,
IP010750,5/03/2024,Health New Zealand,Te Rau Kawakawa Buller Integrated Family Health Centre (IFHC).,Development of Buller Integrated Family Health Centre in Westport.,,Under construction,Fully funded,Open,Construct only,West Coast,,,Health,5 - 25 million,,2019-Q1,,2021-Q2,2021-Q2,2024-Q4,2019-Q1,2024-Q4,,,,,
IP010751,5/03/2024,Health New Zealand,Construction of Waitākere Primary Birthing Unit .,Construction of a 970sqm primary birthing facility which includes six birthing/postnatal suites to meet the urgent demand for maternity services in the West Auckland area.,,In planning,Fully funded,Open,Early contractor involvement,Auckland,,,Health,5 - 25 million,,2020-Q2,2024-Q1,2024-Q2,2024-Q2,2025-Q2,2020-Q2,2025-Q2,,,,,
IP010752,5/03/2024,Health New Zealand,Project Whakatupuranga (Nelson Hospital Redevelopment).,Design and construction of a new Acute Services Building and refurbishment of existing clinical buildings across the campus to address seismic issues and critical services infrastructure.,,In planning,Fully funded,Open,To be determined,Nelson,,,Health,50 - 100 million,,2024-Q1,,,,2031-Q4,2024-Q1,2031-Q4,,,,,
IP010753,5/03/2024,Health New Zealand,Critical Infrastructure Interim Works Palmerston North Hospital.,This is Phase 2 of the Electrical Systems Strategy and comprises the replacement of the Low Voltage Substation 1 together with the associated essential services cables and installation of a new high voltage and LV substation 6 to support both the Acute Mental Health Unit and other site developments.,,In procurement,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Health,25 - 50 million,,2023-Q2,2023-Q3,2023-Q3,2024-Q1,2025-Q4,2023-Q2,2025-Q4,,,,,
IP010754,5/03/2024,Health New Zealand,Te Whare Maiangiangi Remediaton and Expansion - Tauranga.,New build of a 24 bed mental health and addiction service facility.,,In planning,Fully funded,Open,Construct only,Bay of Plenty,,,Health,5 - 25 million,,2023-Q4,2024-Q2,2024-Q3,2024-Q3,2027-Q3,2023-Q4,2027-Q3,,,,,
IP010755,5/03/2024,Health New Zealand,Nelson Hospital ED Reconfiguration.,An extension to Nelson ED to support the current and increasing ED attendances until a new ED is completed as part of the broader hospital redevelopment.,,In planning,Fully funded,Open,Early contractor involvement,Nelson,,,Health,1 - 5 million,,2021-Q2,2023-Q4,,2024-Q2,2025-Q4,2021-Q2,2025-Q4,,,,,
IP010756,5/03/2024,Health New Zealand,Waimarino Health Centre Extension.,Health Centre redevelopment to co-locate primary and community services.,,In procurement,Fully funded,Open,Construct only,Manawatū - Whanganui,,,Health,1 - 5 million,,2021-Q4,,2024-Q3,2024-Q4,2025-Q3,2021-Q4,2025-Q3,,,,,
IP009310,14/03/2024,Hurunui District Council,Water - New Connections - Rural - District Wide.,Water - New Connections - Rural - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009311,14/03/2024,Hurunui District Council,Water - New Connections - Rural - District Wide.,Water - New Connections - Urban - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009312,14/03/2024,Hurunui District Council,Water - WS Network Modelling - District Wide.,Water - WS Network Modelling - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009313,14/03/2024,Hurunui District Council,Water - WS AMP Review including demand/Los review of schemes - District Wide.,Water - WS AMP Review including demand/Los review of schemes - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2023-Q3,2030-Q2,,,,,
IP009314,14/03/2024,Hurunui District Council,Water - Rail/SH road Crossing ducts including consenting - District Wide.,Water - Rail/SH road Crossing ducts including consenting - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009315,14/03/2024,Hurunui District Council,Rural Small Reservoir Replacement Programme (12 no. in mutiple locations across district).,Water - Rural Small Reservoir Replacement Programme (12 no. in mutiple locations across district) - District Wide.,,Under construction,Fully funded,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2022-Q3,2024-Q2,,,,,
IP009316,14/03/2024,Hurunui District Council,Water - Pipe LoS Upgrade (identified during water applications & by watermen) - District Wide.,Water - Pipe LoS Upgrade (identified during water applications & by watermen) - District Wide.,,Under construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Water,5 - 25 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009318,14/03/2024,Hurunui District Council,Water - Flow Metering improvement - District Wide.,Water - Flow Metering improvement - District Wide.,,Under construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009319,14/03/2024,Hurunui District Council,Water - Water asset fencing - Districit Wide.,Water - Water asset fencing - Districit Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009320,14/03/2024,Hurunui District Council,Water - Facility Criticality - District Wide.,Water - Facility Criticality - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009321,14/03/2024,Hurunui District Council,Water - Pump replacement - District Wide.,Water - Pump replacement - District Wide.,,Under construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009322,14/03/2024,Hurunui District Council,Water - Pump Shed Upgrades - District Wide.,Water - Pump Shed Upgrades - District Wide.,,Under construction,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2031-Q2,,,,,
IP009323,14/03/2024,Hurunui District Council,Water - Reticulation Renewals (Very High and High Crtically Aged Based) - District Wide.,Water - Reticulation Renewals (Very High and High Crtically Aged Based) - District Wide.,,Under construction,Funding source confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009324,14/03/2024,Hurunui District Council,Water - Water application Rural physical works - 20m length - District Wide.,Water - Water application Rural physical works - 20m length - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009325,14/03/2024,Hurunui District Council,Water - Water application Township physical works - 20m length - District Wide.,Water - Water application Township physical works - 20m length - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009326,14/03/2024,Hurunui District Council,Water - Resource Consents - ECAN (Application for Abstraction) - District Wide.,Water - Resource Consents - ECAN (Application for Abstraction) - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009327,14/03/2024,Hurunui District Council,Water - Break Pressure Tank replacements - District Wide.,Water - Break Pressure Tank replacements - District Wide.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2027-Q2,,,,,
IP009329,14/03/2024,Hurunui District Council,Water - Submersible pump renewal - District Wide.,Water - Submersible pump renewal - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009330,14/03/2024,Hurunui District Council,Water - RTU renewal - District Wide.,Water - RTU renewal - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009331,14/03/2024,Hurunui District Council,Water - PLC renewal - District Wide.,Water - PLC renewal - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009332,14/03/2024,Hurunui District Council,Water - VSD renewal - District Wide.,Water - VSD renewal - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009333,14/03/2024,Hurunui District Council,Water - Drinking water standards upgrades - Amberley /Kowhai.,Water - Drinking water standards upgrades - Amberley /Kowhai.,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2024-Q2,,,,,
IP009338,14/03/2024,Hurunui District Council,Water - Drinking water standards upgrades - Cheviot.,Water - Drinking water standards upgrades - Cheviot.,,Under construction,Fully funded,Selective,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2023-Q3,2024-Q3,,,,,
IP009341,14/03/2024,Hurunui District Council,Water - Drinking water standards upgrades - Hurunui #1.,Water - Drinking water standards upgrades - Hurunui #1.,,Under construction,Fully funded,Open,Design and construct,Canterbury,,,Water,1 - 5 million,,,,,,,2022-Q3,2024-Q3,,,,,
IP009342,14/03/2024,Hurunui District Council,Water - Drinking water standards upgrades - Kaiwara.,Water - Drinking water standards upgrades - Kaiwara.,,In procurement,Fully funded,Selective,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009343,14/03/2024,Hurunui District Council,Water - Drinking water standards upgrades - Lower Waitohi.,Water - Drinking water standards upgrades - Lower Waitohi.,,Under construction,Fully funded,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2024-Q3,,,,,
IP009344,14/03/2024,Hurunui District Council,Water - Drinking water standards upgrades - Parnassus.,Water - Drinking water standards upgrades - Parnassus.,,Under construction,Fully funded,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2024-Q3,,,,,
IP009347,14/03/2024,Hurunui District Council,Water - Drinking water standards upgrades - Waiau Rural Water.,Water - Drinking water standards upgrades - Waiau Rural Water.,,Under construction,Fully funded,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2024-Q3,,,,,
IP009349,14/03/2024,Hurunui District Council,Water - Drinking water standards upgrades - Non Scheme related.,Water - Drinking water standards upgrades - Non Scheme related.,,Under construction,Fully funded,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2025-Q2,,,,,
IP009350,14/03/2024,Hurunui District Council,Water - 5ML Reservoir (planning design and build) - Amberley.,Water - 5ML Reservoir (planning design and build) - Amberley.,,Under construction,Fully funded,Open,Design and construct,Canterbury,,,Water,1 - 5 million,,,,,,,2023-Q3,2024-Q4,,,,,
IP009351,14/03/2024,Hurunui District Council,Water - Well head inspection (SH1) WSP - Amberley.,Water - Well head inspection (SH1) WSP - Amberley.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009352,14/03/2024,Hurunui District Council,Water - SH1 bore - Amberley.,Water - SH1 bore - Amberley.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2028-Q3,2030-Q2,,,,,
IP009353,14/03/2024,Hurunui District Council,Water - Cones Road to Henrys Road Ring Main.,Water - Cones Road to Henrys Road Ring Main.,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP009361,14/03/2024,Hurunui District Council,Water - Cheviot Main Pipe upgrade (225mm Main Res to Barnes Junction) - Cheviot.,Water - Cheviot Main Pipe upgrade (225mm Main Res to Barnes Junction) - Cheviot.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009363,14/03/2024,Hurunui District Council,New PS & Res to alleviate pressure issues on Conical Hill (Y1 - Options Report/Y2 - Works).,Water - New PS & Res to alleviate pressure issues on Conical Hill (Y1 - Options Report/Y2 - Works) - Hanmer Springs.,,In planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2025-Q2,,,,,
IP009366,14/03/2024,Hurunui District Council,Water - Additional treated water storage required - Hanmer Springs.,Water - Additional treated water storage required - Hanmer Springs.,,Early planning,Funding source confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2023-Q3,2025-Q2,,,,,
IP009367,14/03/2024,Hurunui District Council,Review study of storage on the Hawarden-Waikari supply.,Water - Review study of storage on the Hawarden-Waikari supply to determine improvements for distribution and increase resilience - Hawarden-Waikari.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2022-Q3,2025-Q2,,,,,
IP009378,14/03/2024,Hurunui District Council,Water - DWSNZ Full Compliance Works - POE Treatment - Balmoral.,Water - DWSNZ Full Compliance Works - POE Treatment - Balmoral.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009379,14/03/2024,Hurunui District Council,Wastewater - Wastewater application physical works - 20m length - District Wide.,Wastewater - Wastewater application physical works - 20m length - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009380,14/03/2024,Hurunui District Council,Wastewater - Pipe Renewals (V High/High Criticality Age based replacement) - District Wide.,Wastewater - Pipe Renewals (V High/High Criticality Age based replacement) - District Wide.,,Under construction,Funding source confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2022-Q3,2031-Q2,,,,,
IP009381,14/03/2024,Hurunui District Council,Wastewater - Pipe Renewals (Medium/Low Criticality Age based replacement) - District Wide.,Wastewater - Pipe Renewals (Medium/Low Criticality Age based replacement) - District Wide.,,Under construction,Funding source confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2022-Q3,2030-Q2,,,,,
IP009382,14/03/2024,Hurunui District Council,Wastewater - Facility Renewals - District Wide.,Wastewater - Facility Renewals - District Wide.,,Under construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009383,14/03/2024,Hurunui District Council,Wastewater - WW Network Modelling (calibration/model updates) - District Wide.,Wastewater - WW Network Modelling (calibration/model updates) - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009384,14/03/2024,Hurunui District Council,Wastewater - WW AMP Review - District Wide.,Wastewater - WW AMP Review - District Wide.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2023-Q3,2030-Q2,,,,,
IP009385,14/03/2024,Hurunui District Council,Wastewater - Preliminary investigation report on options for unsewered townships - District Wide.,Wastewater - Preliminary investigation report on options for unsewered townships - District Wide.,,In planning,Fully funded,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP009386,14/03/2024,Hurunui District Council,Wastewater - CCTV work - District Wide.,Wastewater - CCTV work - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009387,14/03/2024,Hurunui District Council,Wastewater - Sludge assessment - District Wide.,Wastewater - Sludge assessment - District Wide.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2028-Q3,2029-Q2,,,,,
IP009388,14/03/2024,Hurunui District Council,Resource Consent Capacity assessment and options report - investigative works preparation of AEE.,Wastewater - Resource Consent Capacity assessment and options report - investigative works preparation of AEE conultation plus final options - Amberley.,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2024-Q2,,,,,
IP009389,14/03/2024,Hurunui District Council,Wastewater - Submit new Consent (by 10 June 2024) - Amberley.,Wastewater - Submit new Consent (by 10 June 2024) - Amberley.,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2022-Q3,2024-Q2,,,,,
IP009390,14/03/2024,Hurunui District Council,Wastewater - Land purchase or process upgrade - Amberley.,Wastewater - Land purchase or process upgrade - Amberley.,,Under construction,Fully funded,Open,Design and construct,Canterbury,,,Water,1 - 5 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP009393,14/03/2024,Hurunui District Council,Wastewater - Resource Consent Disposal Investigation & assessment (preliminary) - Cheviot.,Wastewater - Resource Consent Disposal Investigation & assessment (preliminary) - Cheviot.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009394,14/03/2024,Hurunui District Council,Resource Consent Disposal Finalisation (Expiry Date June 2030 Submit by Dec 2029).,Wastewater - Resource Consent Disposal Finalisation (Expiry Date June 2030 Submit by Dec 2029) - Cheviot.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2027-Q3,2031-Q2,,,,,
IP009395,14/03/2024,Hurunui District Council,Wastewater - Sludge Assessment & Analysis - Cheviot.,Wastewater - Sludge Assessment & Analysis - Cheviot.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2028-Q3,2029-Q2,,,,,
IP009397,14/03/2024,Hurunui District Council,Wastewater - Resource Consent Disposal Investigation & assessment (preliminary) - Greta Valley.,Wastewater - Resource Consent Disposal Investigation & assessment (preliminary) - Greta Valley.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009398,14/03/2024,Hurunui District Council,Resource Consent Disposal Investigation & assessment (Expiry March 2030 Submit by Sept 2029).,Wastewater - Resource Consent Disposal Investigation & assessment (Expiry March 2030 Submit by Sept 2029) - Greta Valley.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2027-Q3,2028-Q2,,,,,
IP009399,14/03/2024,Hurunui District Council,Wastewater - Sludge Assessment & Analysis - Greta Valley.,Wastewater - Sludge Assessment & Analysis - Greta Valley.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2028-Q3,2029-Q2,,,,,
IP009400,14/03/2024,Hurunui District Council,Wastewater - Desludging (provisional depending on outcome of survey) - Greta Valley.,Wastewater - Desludging (provisional depending on outcome of survey) - Greta Valley.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2025-Q2,2027-Q2,,,,,
IP009401,14/03/2024,Hurunui District Council,Pond Sampling for Consent planning (inlet/outlet samples every 2 months) - includes sampler time.,Wastewater - Pond Sampling for Consent planning (inlet/outlet samples every 2 months) - includes sampler time - Greta Valley.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009402,14/03/2024,Hurunui District Council,Wastewater - Resource Consent Disposal Investigation & assessment (preliminary) - Motunau Beach.,Wastewater - Resource Consent Disposal Investigation & assessment (preliminary) - Motunau Beach.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009403,14/03/2024,Hurunui District Council,Resource Consent Disposal Investigation & assessment (Expiry March 2030 Submit by Sept 2029).,Wastewater - Resource Consent Disposal Investigation & assessment (Expiry March 2030 Submit by Sept 2029) - Motunau Beach.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2027-Q3,2030-Q2,,,,,
IP009404,14/03/2024,Hurunui District Council,Wastewater - Sludge Assessment & Analysis - Motunau Beach.,Wastewater - Sludge Assessment & Analysis - Motunau Beach.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2028-Q3,2029-Q2,,,,,
IP009405,14/03/2024,Hurunui District Council,Wastewater - Desludging (provisional depending on outcome of survey) - Motunau Beach.,Wastewater - Desludging (provisional depending on outcome of survey) - Motunau Beach.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2030-Q2,2031-Q2,,,,,
IP009406,14/03/2024,Hurunui District Council,Pond Sampling for Consent planning (inlet/outlet samples every 2 months) - includes sampler time.,Wastewater - Pond Sampling for Consent planning (inlet/outlet samples every 2 months) - includes sampler time - Motunau Beach.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009407,14/03/2024,Hurunui District Council,Wastewater - Desludging (Pond 1 & 2) - moved back to 2028 following assessment - Hanmer Springs.,Wastewater - Desludging (Pond 1 & 2) - moved back to 2028 following assessment - Hanmer Springs.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2028-Q3,2029-Q2,,,,,
IP009408,14/03/2024,Hurunui District Council,Wastewater - Sludge Survey Assessment & Analysis (all ponds) - Hanmer Springs.,Wastewater - Sludge Survey Assessment & Analysis (all ponds) - Hanmer Springs.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009411,14/03/2024,Hurunui District Council,Wastewater - Pond Sampling for Consent planning (5 samples every quarter) - Hawarden.,Wastewater - Pond Sampling for Consent planning (5 samples every quarter) - Hawarden.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2027-Q2,,,,,
IP009412,14/03/2024,Hurunui District Council,Wastewater - Resource Consent Disposal Investigation & assessment (Consultants) - Hawarden.,Wastewater - Resource Consent Disposal Investigation & assessment (Consultants) - Hawarden.,,Under construction,Fully funded,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2022-Q3,2024-Q2,,,,,
IP009413,14/03/2024,Hurunui District Council,Wastewater - Submit New Consent (before 31 Oct 2026) - Hawarden.,Wastewater - Submit New Consent (before 31 Oct 2026) - Hawarden.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2027-Q2,,,,,
IP009414,14/03/2024,Hurunui District Council,Wastewater - Enabling Works for new consent - Hawarden.,Wastewater - Enabling Works for new consent - Hawarden.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2026-Q3,2027-Q2,,,,,
IP009416,14/03/2024,Hurunui District Council,Resource Consent Disposal Investigation & assessment (Expiry July 2030 Submit by Feb 2030).,Wastewater - Resource Consent Disposal Investigation & assessment (Expiry July 2030 Submit by Feb 2030) - Waikari.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2027-Q3,2030-Q2,,,,,
IP009426,14/03/2024,Hurunui District Council,Stormwater - Resource Consents - ECAN (District Wide Consent Finalisation) - District Wide.,Stormwater - Resource Consents - ECAN (District Wide Consent Finalisation) - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009427,14/03/2024,Hurunui District Council,Stormwater - Installation of Raven flow meters - District Wide.,Stormwater - Installation of Raven flow meters - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009428,14/03/2024,Hurunui District Council,Stormwater - CCTV work - District Wide.,Stormwater - CCTV work - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009429,14/03/2024,Hurunui District Council,Stormwater - SW AMP Review - District Wide.,Stormwater - SW AMP Review - District Wide.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2023-Q3,2030-Q2,,,,,
IP009434,14/03/2024,Hurunui District Council,Stormwater - Hill runoff cut-off drain to Eastern Drain - Amberley.,Stormwater - Hill runoff cut-off drain to Eastern Drain - Amberley.,,Under construction,Fully funded,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2022-Q3,2024-Q2,,,,,
IP009435,14/03/2024,Hurunui District Council,Stormwater - Remediation work for Leithfield Outfall Structure - Amberley.,Stormwater - Remediation work for Leithfield Outfall Structure - Amberley.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009436,14/03/2024,Hurunui District Council,Stormwater - Restoration of Amberley Beach Northern Lagoon - Amberley.,Stormwater - Restoration of Amberley Beach Northern Lagoon - Amberley.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2026-Q2,,,,,
IP009438,14/03/2024,Hurunui District Council,Stormwater - Eastern Drain naturalisation and enhancement - Amberley.,Stormwater - Eastern Drain naturalisation and enhancement - Amberley.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2026-Q3,2027-Q2,,,,,
IP009439,14/03/2024,Hurunui District Council,Stormwater - Dry Gully naturalisation and enhancement - Amberley.,Stormwater - Dry Gully naturalisation and enhancement - Amberley.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2027-Q3,2028-Q2,,,,,
IP009440,14/03/2024,Hurunui District Council,Stormwater - Survey works modelling & Design to upgrade 9 culverts in Dock creek - Amberley.,Stormwater - Survey works modelling & Design to upgrade 9 culverts in Dock creek - Amberley.,,Under construction,Fully funded,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2021-Q3,2024-Q2,,,,,
IP009442,14/03/2024,Hurunui District Council,Stormwater - Leithfield Beach - Drain Construction at Penfold Square - Amberley.,Stormwater - Leithfield Beach - Drain Construction at Penfold Square - Amberley.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2030-Q3,2031-Q2,,,,,
IP009443,14/03/2024,Hurunui District Council,Stormwater - Flow diversion at eastern end of Ward Road - Cheviot.,Stormwater - Flow diversion at eastern end of Ward Road - Cheviot.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009444,14/03/2024,Hurunui District Council,Stormwater - Retention pond in private land near Cheviot Motel - Cheviot.,Stormwater - Retention pond in private land near Cheviot Motel - Cheviot.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009445,14/03/2024,Hurunui District Council,Stormwater - Drainage improvement in the area to the south boundary of township - Cheviot.,Stormwater - Drainage improvement in the area to the south boundary of township - Cheviot.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2026-Q3,2027-Q2,,,,,
IP009446,14/03/2024,Hurunui District Council,Stormwater - No. 1 Lindsay Terrace – Flow diversion through Domain - Motunau Beach.,Stormwater - No. 1 Lindsay Terrace – Flow diversion through Domain - Motunau Beach.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2029-Q3,2030-Q2,,,,,
IP009447,14/03/2024,Hurunui District Council,Stormwater - Upgrading size of Flax Stream culvert crossing under State Highway 7A - Hanmer Springs.,Stormwater - Upgrading size of Flax Stream culvert crossing under State Highway 7A - Hanmer Springs.,,In planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2023-Q3,2025-Q2,,,,,
IP009448,14/03/2024,Hurunui District Council,Flax stream flow control device installation at intersection of Flax and Hospital stream.,Stormwater - Flax stream flow control device installation at intersection of Flax and Hospital stream - Hanmer Springs.,,In planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009449,14/03/2024,Hurunui District Council,Stormwater - New pipe connection in Conical Rd - Hanmer Springs.,Stormwater - New pipe connection in Conical Rd - Hanmer Springs.,,In planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2023-Q3,2025-Q2,,,,,
IP009450,14/03/2024,Hurunui District Council,Stormwater - Drainage improvement work in Scarborough Terrace - Sub catchment 3 - Hanmer Springs.,Stormwater - Drainage improvement work in Scarborough Terrace - Sub catchment 3 - Hanmer Springs.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2029-Q3,2030-Q2,,,,,
IP009451,14/03/2024,Hurunui District Council,Stormwater - Argelins/Jacks Pass project - Hanmer Springs.,Stormwater - Argelins/Jacks Pass project - Hanmer Springs.,,In planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,,,2022-Q3,2025-Q2,,,,,
IP009453,14/03/2024,Hurunui District Council,Stormwater - Improvement work in Heritage pond and Chisholm pond - Hanmer Springs.,Stormwater - Improvement work in Heritage pond and Chisholm pond - Hanmer Springs.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2027-Q3,2028-Q2,,,,,
IP009454,14/03/2024,Hurunui District Council,Stormwater - Drainage improvement work in Scarborough Terrace - Sub catchment 4 - Hanmer Springs.,Stormwater - Drainage improvement work in Scarborough Terrace - Sub catchment 4 - Hanmer Springs.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009455,14/03/2024,Hurunui District Council,Stormwater - Drainage improvement work in Scarborough Terrace - Sub catchment 2 - Hanmer Springs.,Stormwater - Drainage improvement work in Scarborough Terrace - Sub catchment 2 - Hanmer Springs.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2026-Q3,2027-Q2,,,,,
IP009456,14/03/2024,Hurunui District Council,Stormwater - Drainage improvement work in Scarborough Terrace - Sub catchment 1 - Hanmer Springs.,Stormwater - Drainage improvement work in Scarborough Terrace - Sub catchment 1 - Hanmer Springs.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2027-Q3,2028-Q2,,,,,
IP009457,14/03/2024,Hurunui District Council,Stormwater - No 51 Allandale Road – Construct a 450m open drain and a culvert across - Hawarden.,Stormwater - No 51 Allandale Road – Construct a 450m open drain and a culvert across - Hawarden.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2022-Q3,2025-Q2,,,,,
IP009458,14/03/2024,Hurunui District Council,Stormwater - Flow diversion at south east corner of 8 Moore Street - Hawarden.,Stormwater - Flow diversion at south east corner of 8 Moore Street - Hawarden.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009459,14/03/2024,Hurunui District Council,Stormwater - Drain cleaning at Seymour ST - Hawarden.,Stormwater - Drain cleaning at Seymour ST - Hawarden.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009460,14/03/2024,Hurunui District Council,Stormwater - Cut off drain along Kellaway Terrace to Little drive - Waikari.,Stormwater - Cut off drain along Kellaway Terrace to Little drive - Waikari.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009461,14/03/2024,Hurunui District Council,Stormwater - New drain section through Waikari Domain - Waikari.,Stormwater - New drain section through Waikari Domain - Waikari.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,,2026-Q3,2027-Q2,,,,,
IP009462,14/03/2024,Hurunui District Council,Subsidised Roading - Unsealed Road Metalling - District Wide.,Subsidised Roading - Unsealed Road Metalling - District Wide.,,Under construction,Funding source confirmed,Open,Construct only,Canterbury,,,Transport,5 - 25 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009463,14/03/2024,Hurunui District Council,Subsidised Roading - Sealed Road Resurfacing - District Wide.,Subsidised Roading - Sealed Road Resurfacing - District Wide.,,Under construction,Funding source confirmed,Open,Construct only,Canterbury,,,Transport,5 - 25 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009464,14/03/2024,Hurunui District Council,Subsidised Roading - Drainage Renewals - District Wide.,Subsidised Roading - Drainage Renewals - District Wide.,,Under construction,Funding source confirmed,Open,Construct only,Canterbury,,,Transport,1 - 5 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009465,14/03/2024,Hurunui District Council,Subsidised Roading - Sealed Road Pavement Rehab - District Wide.,Subsidised Roading - Sealed Road Pavement Rehab - District Wide.,,Under construction,Funding source confirmed,Open,Construct only,Canterbury,,,Transport,5 - 25 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009466,14/03/2024,Hurunui District Council,Subsidised Roading - Structures Component Replcm’ts - District Wide.,Subsidised Roading - Structures Component Replcm’ts - District Wide.,,Under construction,Funding source confirmed,Open,Construct only,Canterbury,,,Transport,1 - 5 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009467,14/03/2024,Hurunui District Council,Subsidised Roading - Bridge and structures renewals - District Wide.,Subsidised Roading - Bridge and structures renewals - District Wide.,,Under construction,Funding source confirmed,Open,Construct only,Canterbury,,,Transport,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009468,14/03/2024,Hurunui District Council,Subsidised Roading - Traffic Services Renewals - District Wide.,Subsidised Roading - Traffic Services Renewals - District Wide.,,Under construction,Funding source confirmed,Open,Construct only,Canterbury,,,Transport,1 - 5 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009469,14/03/2024,Hurunui District Council,Subsidised Roading - Low Cost Low Risk Capital Works - District Wide.,Subsidised Roading - Low Cost Low Risk Capital Works - District Wide.,,Under construction,Funding source confirmed,Open,Construct only,Canterbury,,,Transport,5 - 25 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009473,14/03/2024,Hurunui District Council,Special Purpose Roading - Traffic Services Renewal - District Wide.,Special Purpose Roading - Traffic Services Renewal - District Wide.,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Transport,< 1 million,,,,,,,2021-Q3,2024-Q2,,,,,
IP009474,14/03/2024,Hurunui District Council,General Footpath Renewals (NZTA Funded) - District Wide.,General Footpath Renewals (NZTA Funded) - District Wide.,,Under construction,Funding source confirmed,Open,Construct only,Canterbury,,,Transport,1 - 5 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009475,14/03/2024,Hurunui District Council,Planned Footpath Renewals - Amberley.,Planned Footpath Renewals - Amberley.,,Under construction,Funding source confirmed,Open,Construct only,Canterbury,,,Transport,< 1 million,,,,,,,2022-Q3,2031-Q2,,,,,
IP009476,14/03/2024,Hurunui District Council,Planned Footpath Renewals - Leithfield.,Planned Footpath Renewals - Leithfield.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Transport,< 1 million,,,,,,,2025-Q3,2028-Q2,,,,,
IP009477,14/03/2024,Hurunui District Council,Planned Footpath Renewals - Culverden.,Planned Footpath Renewals - Culverden.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Transport,< 1 million,,,,,,,2024-Q3,2031-Q2,,,,,
IP009479,14/03/2024,Hurunui District Council,Planned Footpath Renewals - Waiau.,Planned Footpath Renewals - Waiau.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Transport,< 1 million,,,,,,,2028-Q3,2031-Q2,,,,,
IP009480,14/03/2024,Hurunui District Council,Planned Footpath Renewals - Cheviot.,Planned Footpath Renewals - Cheviot.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Transport,< 1 million,,,,,,,2028-Q3,2030-Q2,,,,,
IP009481,14/03/2024,Hurunui District Council,Planned Footpath Renewals - Waipara.,Planned Footpath Renewals - Waipara.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Transport,< 1 million,,,,,,,2024-Q3,2026-Q2,,,,,
IP009482,14/03/2024,Hurunui District Council,Planned Footpath Renewals - Hanmer Springs.,Planned Footpath Renewals - Hanmer Springs.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Transport,< 1 million,,,,,,,2023-Q3,2025-Q2,,,,,
IP009483,14/03/2024,Hurunui District Council,Planned Footpath Renewals - Hawarden.,Planned Footpath Renewals - Hawarden.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Transport,< 1 million,,,,,,,2025-Q3,2031-Q2,,,,,
IP009484,14/03/2024,Hurunui District Council,Planned Footpath Renewals - Waikari.,Planned Footpath Renewals - Waikari.,,Early planning,Funding source to be confirmed,Open,Construct only,Canterbury,,,Transport,< 1 million,,,,,,,2026-Q3,2027-Q2,,,,,
IP009485,14/03/2024,Hurunui District Council,New Footpaths - Amberley.,New Footpaths - Amberley.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Transport,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009486,14/03/2024,Hurunui District Council,New Footpaths - Amberley Ward.,New Footpaths - Amberley Ward.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Transport,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009489,14/03/2024,Hurunui District Council,Roadside Construction - Street Lighting - Hanmer Springs.,Roadside Construction - Street Lighting - Hanmer Springs.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Transport,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009492,14/03/2024,Hurunui District Council,Hamner Springs Subdivision Expenditure.,Hamner Springs Subdivision Expenditure.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Transport,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009495,14/03/2024,Hurunui District Council,Social Housing - Internal refurbishments (34 units @ $30 000 each over 20 years) - District Wide.,Social Housing - Internal refurbishments (34 units @ $30 000 each over 20 years) - District Wide.,,Under construction,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Housing,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009496,14/03/2024,Hurunui District Council,Heat Pump Replacements (34 units @ $2 500 each over 10 years) - District Wide.,Heat Pump Replacements (34 units @ $2 500 each over 10 years) - District Wide.,,Under construction,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Housing,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009497,14/03/2024,Hurunui District Council,Social Housing - Oven Replacements (34 units $50 000 over 10 years) - District Wide.,Social Housing - Oven Replacements (34 units $50 000 over 10 years) - District Wide.,,Under construction,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Housing,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009502,14/03/2024,Hurunui District Council,Social Housing - 20 Seddon Street Replacing Roof - Cheviot.,Social Housing - 20 Seddon Street Replacing Roof - Cheviot.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Housing,< 1 million,,,,,,,2029-Q3,2030-Q2,,,,,
IP009503,14/03/2024,Hurunui District Council,Social Housing - Internal Refurbishments (2 houses @ $35 000 each over 20 years) - District Wide.,Social Housing - Internal Refurbishments (2 houses @ $35 000 each over 20 years) - District Wide.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Housing,< 1 million,,,,,,,2023-Q3,2030-Q2,,,,,
IP009506,14/03/2024,Hurunui District Council,Earthquake Prone Buildings strengthening work - District Wide.,Earthquake Prone Buildings strengthening work - District Wide.,,Early planning,Funding source to be confirmed,Open,Design and construct,Canterbury,,,Community facilities,1 - 5 million,,,,,,,2023-Q3,2028-Q2,,,,,
IP009510,14/03/2024,Hurunui District Council,Medical Centre - Interior Paint - Culverden.,Medical Centre - Interior Paint - Culverden.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Health,< 1 million,,,,,,,2029-Q3,2030-Q2,,,,,
IP009511,14/03/2024,Hurunui District Council,Medical Centre - Exterior Paint - Culverden.,Medical Centre - Exterior Paint - Culverden.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Health,< 1 million,,,,,,,2029-Q3,2030-Q2,,,,,
IP009512,14/03/2024,Hurunui District Council,Medical Centre - Parking area resealing (from previous LTP) - Culverden.,Medical Centre - Parking area resealing (from previous LTP) - Culverden.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Health,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP009513,14/03/2024,Hurunui District Council,Medical Centre - Floor coverings replacement - Culverden.,Medical Centre - Floor coverings replacement - Culverden.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Health,< 1 million,,,,,,,2029-Q3,2030-Q2,,,,,
IP009517,14/03/2024,Hurunui District Council,Medical Centre - Exterior repaint - Cheviot.,Medical Centre - Exterior repaint - Cheviot.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Health,< 1 million,,,,,,,2028-Q3,2029-Q2,,,,,
IP009518,14/03/2024,Hurunui District Council,Medical Centre - Internal paint - Cheviot.,Medical Centre - Internal paint - Cheviot.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Health,< 1 million,,,,,,,2026-Q3,2027-Q2,,,,,
IP009519,14/03/2024,Hurunui District Council,Medical Centre - Carpet renewal/repairs (from previous LTP) - Hanmer Springs.,Medical Centre - Carpet renewal/repairs (from previous LTP) - Hanmer Springs.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Health,< 1 million,,,,,,,2027-Q3,2028-Q2,,,,,
IP009520,14/03/2024,Hurunui District Council,Medical Centre - External and Roof Painting - Hanmer Springs.,Medical Centre - External and Roof Painting - Hanmer Springs.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Health,< 1 million,,,,,,,2028-Q3,2029-Q2,,,,,
IP009527,14/03/2024,Hurunui District Council,Leithfield Beach Community Centre - Exterior Paint including roof.,Leithfield Beach Community Centre - Exterior Paint including roof.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Community facilities,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009529,14/03/2024,Hurunui District Council,Leithfield Beach Community Centre - Vinyl replacement.,Leithfield Beach Community Centre - Vinyl replacement.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Community facilities,< 1 million,,,,,,,2028-Q3,2029-Q2,,,,,
IP009532,14/03/2024,Hurunui District Council,Walking & Cycling Routes - Amberley.,Walking & Cycling Routes - Amberley.,,Under construction,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Community facilities,< 1 million,,,,,,,2022-Q3,2025-Q2,,,,,
IP009535,14/03/2024,Hurunui District Council,Cemeteries - berm construction - district wide.,Cemeteries - berm construction - district wide.,,Under construction,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Community facilities,< 1 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP009537,14/03/2024,Hurunui District Council,Amberley Domain - Eastern Reserve Purchase - Amberley.,Amberley Domain - Eastern Reserve Purchase - Amberley.,,In planning,Fully funded,Selective,Construct only,Canterbury,,,Community facilities,< 1 million,,,,,,,2022-Q3,2025-Q2,,,,,
IP009539,14/03/2024,Hurunui District Council,Amberley Domain Turf Management - Amberley.,Amberley Domain Turf Management - Amberley.,,Under construction,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Community facilities,< 1 million,,,,,,,2022-Q3,2028-Q2,,,,,
IP009540,14/03/2024,Hurunui District Council,Amberley Reserves - Neighbourhood Reserves - Amberley.,Amberley Reserves - Neighbourhood Reserves - Amberley.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Community facilities,< 1 million,,,,,,,2022-Q3,2029-Q2,,,,,
IP009541,14/03/2024,Hurunui District Council,Amberley Reserves - Passive Links - Amberley.,Amberley Reserves - Passive Links - Amberley.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Community facilities,< 1 million,,,,,,,2022-Q3,2031-Q2,,,,,
IP009542,14/03/2024,Hurunui District Council,Amberley Reserves - Chamberlain Park - Edging Shade sails Replace seesaw etc.,Amberley Reserves - Chamberlain Park - Edging Shade sails Replace seesaw extend and 2 additions items - Amberley.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Community facilities,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009543,14/03/2024,Hurunui District Council,Amberley Beach Reserve - Tennis Courts - Amberley.,Amberley Beach Reserve - Tennis Courts - Amberley.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Community facilities,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009545,14/03/2024,Hurunui District Council,Leithfield Beach Reserve - Electrical accessway abultion blocks - Leithfield.,Leithfield Beach Reserve - Electrical accessway abultion blocks - Leithfield.,,Under construction,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Community facilities,< 1 million,,,,,,,2022-Q3,2028-Q2,,,,,
IP009547,14/03/2024,Hurunui District Council,Waiau Village Green Reserve - Playground Equipment - Waiau.,Waiau Village Green Reserve - Playground Equipment - Waiau.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Community facilities,< 1 million,,,,,,,2022-Q3,2026-Q2,,,,,
IP009548,14/03/2024,Hurunui District Council,Scargill Motunau Recreation Reserve - Access Way Sealing - Greta Valley.,Scargill Motunau Recreation Reserve - Access Way Sealing - Greta Valley.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Community facilities,< 1 million,,,,,,,2023-Q3,2025-Q2,,,,,
IP009549,14/03/2024,Hurunui District Council,Scargill Motunau Recreation Reserve - Septic Tank System at Cricket Pavilion - Greta Valley.,Scargill Motunau Recreation Reserve - Septic Tank System at Cricket Pavilion - Greta Valley.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Community facilities,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009550,14/03/2024,Hurunui District Council,Glenmark Reserve - Walkway from Village to Reserve - Waipara.,Glenmark Reserve - Walkway from Village to Reserve - Waipara.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP009552,14/03/2024,Hurunui District Council,Motunau Beach Reserve - South Cliff Protection - Motunau Beach.,Motunau Beach Reserve - South Cliff Protection - Motunau Beach.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Community facilities,< 1 million,,,,,,,2023-Q3,2028-Q2,,,,,
IP009564,14/03/2024,Hurunui District Council,Transfer Stations - Transfer Station Improvements for Cheviot Township - Cheviot.,Transfer Stations - Transfer Station Improvements for Cheviot Township - Cheviot.,,In planning,Funding source confirmed,Selective,Construct only,Canterbury,,,Waste management,< 1 million,,,,,,,2022-Q3,2025-Q2,,,,,
IP009569,14/03/2024,Hurunui District Council,Transfer Stations - Amberley TS - replacement of the forklift - Amberley.,Transfer Stations - Amberley TS - replacement of the forklift - Amberley.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Waste management,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009570,14/03/2024,Hurunui District Council,Transfer Stations - Amberley TS - replace out of hours recycling bins - Amberley.,Transfer Stations - Amberley TS - replace out of hours recycling bins - Amberley.,,Early planning,Fully funded,Selective,Construct only,Canterbury,,,Waste management,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP009573,14/03/2024,Hurunui District Council,Transfer Stations - Amberley transfer station - expansion and upgrade - Amberley.,Transfer Stations - Amberley transfer station - expansion and upgrade - Amberley.,,Early planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Waste management,1 - 5 million,,,,,,,2023-Q3,2028-Q2,,,,,
IP009576,14/03/2024,Hurunui District Council,Offices - Full Repaint Exterior Cheviot - Cheviot.,Offices - Full Repaint Exterior Cheviot - Cheviot.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Community facilities,< 1 million,,,,,,,2023-Q3,2026-Q2,,,,,
IP009578,14/03/2024,Hurunui District Council,Offices - Interior Repaint Hanmer SS - Hanmer Springs.,Offices - Interior Repaint Hanmer SS - Hanmer Springs.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Community facilities,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009579,14/03/2024,Hurunui District Council,Offices - Interior Repaint Cheviot SS - Cheviot.,Offices - Interior Repaint Cheviot SS - Cheviot.,,Early planning,Funding source to be confirmed,Direct,Construct only,Canterbury,,,Community facilities,< 1 million,,,,,,,2023-Q3,2026-Q2,,,,,
IP008583,26/11/2023,Hutt City Council,Cross Valley Connections.,A three stage programme of investment in Hutt City that involves walking cycling and accessibility active mode improvements on Petone Esplanade Hutt Road and Ewen Bridge; bus priority improvements at key intersections and developing improved active mode and micromobility access plans to the Petone Ava and Woburn train stations. Stage two (2025-2028) will involve improvements to the Gracefield interchange and stage three (2028 onwards) will look at a new east-west multi-modal transport corridor that caters for all users.,,In planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Transport,25 - 50 million,2024-Q2,2025-Q2,2025-Q1,2028-Q2,2027-Q3,2032-Q4,2021-Q4,2032-Q4,,,Declan Millin,,
IP008584,30/11/2023,Hutt City Council,Tupua Horo Nuku.,A shared path stretching 4.4km along the Eastern Bays from Ma-koromiko to Ngau matau.,,Under construction,Funding source confirmed,Direct,Alliance,Wellington,,,Transport,50 - 100 million,,,,,2022-Q3,2026-Q2,2019-Q3,2026-Q2,
https://www.huttcity.govt.nz/council/our-projects/cycleways-and-shared-paths/cycleways-and-shared-paths-tupua-horo-nuku,,Rona Lemalu,,
IP008585,6/11/2023,Hutt City Council,Micromobility Programme.,A series of projects to develop a connected cycleway network across Hutt City. This also includes accessibility and walking improvements.,,On hold,Funding source to be confirmed,Open,Design and construct,Wellington,,,Transport,5 - 25 million,2020-Q3,2021-Q2,2025-Q1,2026-Q4,,,2020-Q3,2032-Q4,,,Declan Millin,,
IP008925,11/03/2024,Hutt City Council,Te Takamori o Te Awa Kairangi (RiverLink(.,A partnership programme with Greater Wellington Regional Council Waka Kotahi Taranaki Whānui ki Te Upoko o Te Ika (Taranaki Whānui) and Ngāti Toa Rangitira (Ngāti Toa) and Hutt City Council to reorient the city to face and connect with Te Awa Kairangi and respond to climate change by:- Providing resilient transport options- Improving flood protection- Stimulating and support Urban regeneration and economic development. Note - Project dates need to be updated and we will do so in due course and report these back to Infrastructure Commission in the next report.,,In procurement,Funding source to be confirmed,Open,Alliance,Wellington,,,Other not specified,500 million - 1 billion,2019-Q2,2021-Q3,2022-Q4,2023-Q4,,,2019-Q2,2027-Q4,,,Rachel Heka,,
IP008926,11/03/2023,Hutt City Council,Infrastructure Acceleration Funding.,Delivery of the following infrastructure projects in line with the Funding Agreement with Kāinga Ora:- Melling Stormwater Pipeline- Woburn Stormwater Pipeline- Wastewater PipelineProjects are to faciliate housing development in Lower Hutt.,,In planning,Funding source confirmed,Open,To be determined,Wellington,,,Water,100 - 250 million,2021-Q3,2022-Q4,,,2025-Q3,2028-Q2,2022-Q3,2028-Q2,,,Rachel Heka,,
IP009899,6/11/2023,Hutt City Council,Naenae Town Centre Development.,Seismic strengthening and refurbishment of old Nanae Post Office conversion to Community Centre.,,Under construction,Fully funded,Open,Construct only,Wellington,,,Community facilities,5 - 25 million,,,,,2023-Q1,2024-Q2,2021-Q4,2024-Q4,
https://www.huttcity.govt.nz/council/our-projects/naenae-projects,,[email address],,
IP009900,30/11/2023,Hutt City Council,Eastern Hutt Road - Response and Recovery.,Remediation works of three slip sites along Eastern Hutt Road. The works involve the construction of erosion control matting shotcrete retaining wall and catch fences at 46 Holborn Drive 58-60 Holborn Drive and 29-30 Whitechapel Grove.,,Under construction,Funding source confirmed,Direct,Construct only,Wellington,,,Transport,5 - 25 million,,,2023-Q2,2023-Q3,2023-Q3,2024-Q1,2023-Q3,2024-Q1,
https://www.huttcity.govt.nz/council/our-projects/eastern-hutt-road-slip,,Arun Joy,,
IP010456,30/11/2023,Hutt City Council,Naenae Town Centre Development.,Enhancements to Walter Mildenhall Park - incoporating active play relaxation space and hard/soft landscaping.,,In planning,Fully funded,Open,Construct only,Wellington,,,Community facilities,1 - 5 million,,,,,2024-Q4,2025-Q2,2023-Q3,2026-Q2,
https://www.huttcity.govt.nz/council/our-projects/naenae-projects,,[email address],,
IP010457,1/11/2023,Hutt City Council,Naenae Pool and Ftness Centre.,New build - Naenae Pool and Fitness Centre featuring 50m FINA compliant competition pool deep leisure toddler's pool changing rooms front-of-house/staff offices reception desk and foyer fitness centre.,,Under construction,Fully funded,Open,Design and construct,Wellington,,,Community facilities,50 - 100 million,,,,,2022-Q3,2024-Q3,2020-Q3,2025-Q3,
https://www.huttcity.govt.nz/council/our-projects/naenae-projects,,[email address],,
kaOrProject_1000,31/12/2023,Kāinga Ora–Homes and Communities,Cheshire St A (EPCCNW) Cannons Creek Porirua.,This housing development project includes infrastructure to deliver 4 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,,,,,,2024-Q3,2021-Q1,2024-Q3,,,[email address],,
kaOrProject_1001,31/12/2023,Kāinga Ora–Homes and Communities,Westmeath St (EPWN ) Waitangirua Porirua.,This housing development project includes infrastructure to deliver 4 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,,,,,,2024-Q4,2021-Q1,2024-Q4,,,[email address],,
kaOrProject_1004,31/12/2023,Kāinga Ora–Homes and Communities,Mahia Rd Wattle Downs Auckland (OSM).,This housing development project includes infrastructure to deliver 13 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,,,,,,2024-Q4,2021-Q3,2024-Q4,,,[email address],,
kaOrProject_1015,31/12/2023,Kāinga Ora–Homes and Communities,Weymouth Rd Manurewa Auckland (OSM).,This housing development project includes infrastructure to deliver 24 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,,,,,,2024-Q4,2021-Q3,2024-Q4,,,[email address],,
kaOrProject_1017,31/12/2023,Kāinga Ora–Homes and Communities,Northcote Road Te Hapara Gisborne.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Gisborne,,,Housing,< 1 million,2022-Q3,,,,2023-Q2,2024-Q1,2021-Q4,2024-Q1,,,[email address],,
kaOrProject_1026,31/12/2023,Kāinga Ora–Homes and Communities,Harvey Cres Thames.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1031,31/12/2023,Kāinga Ora–Homes and Communities,Heath St & Saint Andrews Hamilton (OSM).,This housing development project includes infrastructure to deliver 4 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,,,,,,2024-Q3,2021-Q3,2024-Q3,,,[email address],,
kaOrProject_1032,31/12/2023,Kāinga Ora–Homes and Communities,Heath St & Saint Andrews Hamilton (OSM).,This housing development project includes infrastructure to deliver 4 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,,,,,,2024-Q3,2021-Q3,2024-Q3,,,[email address],,
kaOrProject_1045,31/12/2023,Kāinga Ora–Homes and Communities,Mount Pleasant Rd & Harvey Cres Thames.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,2023-Q1,,,,,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1053,31/12/2023,Kāinga Ora–Homes and Communities,Donald Rd Kaitaia Northland.,This housing development project includes infrastructure to deliver 15 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,5 - 25 million,,,,,,2025-Q2,2021-Q3,2025-Q2,,,[email address],,
kaOrProject_1054,31/12/2023,Kāinga Ora–Homes and Communities,Reuben Plc & Nawton Hamilton (OSM).,This housing development project includes infrastructure to deliver 11 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,5 - 25 million,2022-Q4,,,,2023-Q4,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1055,31/12/2023,Kāinga Ora–Homes and Communities,College Pl & Bankwood Rd Chartwell Hamilton (OSM).,This housing development project includes infrastructure to deliver 12 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,5 - 25 million,2022-Q4,,,,,2024-Q3,2021-Q3,2024-Q3,,,[email address],,
kaOrProject_1056,31/12/2023,Kāinga Ora–Homes and Communities,Riselaw St Mairehau Christchurch.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q1,,,,2023-Q4,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1059,31/12/2023,Kāinga Ora–Homes and Communities,Molesworth St & Taita Lower Hutt.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,Direct,Construct only,Wellington,,,Housing,1 - 5 million,2022-Q4,,2023-Q1,2023-Q2,2023-Q2,2024-Q2,2019-Q4,2024-Q2,,,[email address],,
kaOrProject_1060,31/12/2023,Kāinga Ora–Homes and Communities,Harper St & Gonville Whanganui.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Housing,1 - 5 million,2023-Q2,,,,2023-Q4,2024-Q2,2021-Q1,2024-Q2,,,[email address],,
kaOrProject_1061,31/12/2023,Kāinga Ora–Homes and Communities,Harper St Gonville Whanganui.,This housing development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,Direct,Construct only,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q2,,2023-Q1,,2023-Q4,2024-Q1,2021-Q1,2024-Q1,,,[email address],,
kaOrProject_1062,31/12/2023,Kāinga Ora–Homes and Communities,Puriri St & Gonville Whanganui.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,Direct,Construct only,Manawatū - Whanganui,,,Housing,1 - 5 million,2023-Q2,,2023-Q1,,2023-Q4,2024-Q2,2021-Q1,2024-Q2,,,[email address],,
kaOrProject_1064,31/12/2023,Kāinga Ora–Homes and Communities,Vinegar Hill Rd Tikipunga Whangarei.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,Limited ,Construct only,Northland,,,Housing,5 - 25 million,2022-Q4,,2022-Q4,2023-Q1,2023-Q3,2024-Q2,2021-Q2,2024-Q2,,,[email address],,
kaOrProject_1065,31/12/2023,Kāinga Ora–Homes and Communities,Lambeth Cres Redwood Christchurch.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q2,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1066,31/12/2023,Kāinga Ora–Homes and Communities,Thomason Ave Motueka.,This housing development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,To be determined,To be determined,Tasman,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q3,2024-Q2,2021-Q2,2024-Q2,,,[email address],,
kaOrProject_1067,31/12/2023,Kāinga Ora–Homes and Communities,Marsden Road Stoke Nelson.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,1 - 5 million,2022-Q3,,,,,2024-Q4,2021-Q3,2024-Q4,,,[email address],,
kaOrProject_1068,31/12/2023,Kāinga Ora–Homes and Communities,Albertson Ave Port Chalmers Dunedin.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Otago,,,Housing,1 - 5 million,2023-Q1,,,,2023-Q4,2024-Q2,2021-Q1,2024-Q2,,,[email address],,
kaOrProject_1070,31/12/2023,Kāinga Ora–Homes and Communities,Wayside Ave Burnside Christchurch.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q3,,,,,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1071,31/12/2023,Kāinga Ora–Homes and Communities,Clyde Rd Aorangi Rd & Nyton Place Bryndwr Christchurch.,This housing development project includes infrastructure to deliver 8 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,2022-Q3,,,,,2024-Q4,2021-Q3,2024-Q4,,,[email address],,
kaOrProject_1072,31/12/2023,Kāinga Ora–Homes and Communities,Uxbridge St Northcote Christchurch.,This housing development project includes infrastructure to deliver 7 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q3,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1073,31/12/2023,Kāinga Ora–Homes and Communities,Grahams Rd Burnside Christchurch.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q1,,,,2023-Q4,2024-Q3,2021-Q3,2024-Q3,,,[email address],,
kaOrProject_1074,31/12/2023,Kāinga Ora–Homes and Communities,Mysore St Khandallah Wellington.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2022-Q4,,,,,2024-Q3,2021-Q1,2024-Q3,,,[email address],,
kaOrProject_1076,31/12/2023,Kāinga Ora–Homes and Communities,Holcombe Pl & Studholme St Somerfield Christchurch.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1077,31/12/2023,Kāinga Ora–Homes and Communities,Rawlings St Bader Hamilton.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,Direct,Construct only,Waikato,,,Housing,1 - 5 million,2022-Q3,,2022-Q4,2023-Q1,2023-Q2,2024-Q1,2021-Q4,2024-Q1,,,[email address],,
kaOrProject_1078,31/12/2023,Kāinga Ora–Homes and Communities,Fitzroy Ave Bader Hamilton.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,Limited ,Construct only,Waikato,,,Housing,1 - 5 million,2022-Q3,,2023-Q1,2023-Q2,,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1079,31/12/2023,Kāinga Ora–Homes and Communities,Albertson Ave Port Chalmers Dunedin.,This housing development project includes infrastructure to deliver 2 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Otago,,,Housing,1 - 5 million,2023-Q1,,,,,2024-Q2,2021-Q2,2024-Q2,,,[email address],,
kaOrProject_1080,31/12/2023,Kāinga Ora–Homes and Communities,Clyde Rd Bryndwr Christchurch.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q1,,,,,2024-Q4,2021-Q3,2024-Q4,,,[email address],,
kaOrProject_1082,31/12/2023,Kāinga Ora–Homes and Communities,Albertson Ave Port Chalmers Dunedin.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Otago,,,Housing,1 - 5 million,2023-Q1,,,,,2024-Q2,2021-Q2,2024-Q2,,,[email address],,
kaOrProject_1083,31/12/2023,Kāinga Ora–Homes and Communities,Kenney Cres & Fairfield Hamilton.,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,Direct,Construct only,Waikato,,,Housing,5 - 25 million,2022-Q3,,2022-Q4,2022-Q4,2023-Q1,2024-Q1,2021-Q3,2024-Q1,,,[email address],,
kaOrProject_1084,31/12/2023,Kāinga Ora–Homes and Communities,Campbell Road & Massey Avenue Greenlane Auckland.,This housing development project includes infrastructure to deliver 7 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q4,,,,,2025-Q2,2021-Q3,2025-Q2,,,[email address],,
kaOrProject_1085,31/12/2023,Kāinga Ora–Homes and Communities,Mysore St Khandallah Wellington.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2022-Q4,,,,,2024-Q3,2021-Q1,2024-Q3,,,[email address],,
kaOrProject_1086,31/12/2023,Kāinga Ora–Homes and Communities,Tyne St & & Essex St Marchwiel Timaru.,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q3,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1087,31/12/2023,Kāinga Ora–Homes and Communities,Cole Pl Te Atatu South Auckland.,This housing development project includes infrastructure to deliver 15 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q2,2024-Q1,2017-Q2,2024-Q1,,,[email address],,
kaOrProject_1088,31/12/2023,Kāinga Ora–Homes and Communities,Rawlings St & Willis St Bader Hamilton.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,Direct,Construct only,Waikato,,,Housing,5 - 25 million,2022-Q3,,2022-Q4,2023-Q1,2023-Q4,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1089,31/12/2023,Kāinga Ora–Homes and Communities,Citril Pl & Papakura Auckland.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q1,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1091,31/12/2023,Kāinga Ora–Homes and Communities,Wanaka Street Tikipunga Whangarei.,This housing development project includes infrastructure to deliver 55 new units.,,Under Construction,Fully funded,To be determined,To be determined,Northland,,,Housing,5 - 25 million,2022-Q1,,,,2023-Q3,2024-Q3,2022-Q1,2024-Q3,,,[email address],,
kaOrProject_1095,31/12/2023,Kāinga Ora–Homes and Communities,Albertson Ave Port Chalmers Dunedin.,This housing development project includes infrastructure to deliver 11 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Otago,,,Housing,5 - 25 million,2023-Q2,,,,,2025-Q1,2021-Q2,2025-Q1,,,[email address],,
kaOrProject_1096,31/12/2023,Kāinga Ora–Homes and Communities,Henwood Rd (AO) Mangere Auckland.,This land development project includes infrastructure to deliver 1 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q2,2020-Q3,2024-Q2,,,[email address],,
kaOrProject_1098,31/12/2023,Kāinga Ora–Homes and Communities,Hendon Ave & (OWB) Owairaka Auckland.,This land development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q2,2024-Q1,2020-Q3,2024-Q1,,,[email address],,
kaOrProject_1099,31/12/2023,Kāinga Ora–Homes and Communities,Manchester St Takaro Palmerston North.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,5 - 25 million,2022-Q4,,,,,2024-Q3,2021-Q1,2024-Q3,,,[email address],,
kaOrProject_110,31/12/2023,Kāinga Ora–Homes and Communities,Hill Cres New Lynn.,This housing development project includes infrastructure to deliver 44 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,25 - 50 million,2019-Q3,,,,2021-Q4,2024-Q1,2012-Q3,2024-Q1,,,[email address],,
kaOrProject_1100,31/12/2023,Kāinga Ora–Homes and Communities,Hendon Rd Enderley Hamilton.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,2022-Q4,,,,2023-Q4,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1101,31/12/2023,Kāinga Ora–Homes and Communities,Winstone Avenue Chartwell Hamilton.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,5 - 25 million,2022-Q4,,,,2023-Q4,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1102,31/12/2023,Kāinga Ora–Homes and Communities,Bader Street Bader Hamilton.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,2023-Q2,,,,2023-Q4,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1103,31/12/2023,Kāinga Ora–Homes and Communities,Korimako Street Frankton Hamilton.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,Direct,Design and construct,Waikato,,,Housing,1 - 5 million,2022-Q4,,2022-Q4,2023-Q1,,2024-Q3,2021-Q4,2024-Q3,,,[email address],,
kaOrProject_1104,31/12/2023,Kāinga Ora–Homes and Communities,Holland Rd Fairfield Hamilton.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,Direct,Construct only,Waikato,,,Housing,1 - 5 million,2022-Q4,,2023-Q2,,2023-Q4,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1105,31/12/2023,Kāinga Ora–Homes and Communities,Pine Avenue Melville Hamilton.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,Direct,Design and construct,Waikato,,,Housing,1 - 5 million,2022-Q4,,2022-Q4,2022-Q4,2023-Q4,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1106,31/12/2023,Kāinga Ora–Homes and Communities,Colson St Avalon Lower Hutt.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,Direct,Construct only,Wellington,,,Housing,1 - 5 million,2022-Q4,,2023-Q1,2023-Q2,2023-Q3,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1107,31/12/2023,Kāinga Ora–Homes and Communities,Greers Rd & Truman Rd Bryndwr Christchurch.,This housing development project includes infrastructure to deliver 16 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,2023-Q3,,,,,2024-Q4,2019-Q2,2024-Q4,,,[email address],,
kaOrProject_1108,31/12/2023,Kāinga Ora–Homes and Communities,Oxford Tce & Avalon Lower Hutt.,This housing development project includes infrastructure to deliver 15 new units.,,In Procurement,Funding Source Confirmed,Limited ,Construct only,Wellington,,,Housing,5 - 25 million,2023-Q4,,2023-Q2,,,2025-Q3,2019-Q3,2025-Q3,,,[email address],,
kaOrProject_1112,31/12/2023,Kāinga Ora–Homes and Communities,Valentine St & & Cargill St Papakura Auckland.,This housing development project includes infrastructure to deliver 9 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q4,,,,,2025-Q4,2021-Q3,2025-Q4,,,[email address],,
kaOrProject_1113,31/12/2023,Kāinga Ora–Homes and Communities,Lister Pl Lister Cres & Geddis Ave Maraenui Napier.,This housing development project includes infrastructure to deliver 30 new units.,,In Procurement,Funding Source Confirmed,Limited ,Construct only,Hawke's Bay,,,Housing,5 - 25 million,2023-Q2,,2023-Q2,,,2025-Q3,2021-Q3,2025-Q3,,,[email address],,
kaOrProject_1114,31/12/2023,Kāinga Ora–Homes and Communities,Yeats Crescent & Marshall Street Fairfield Hamilton.,This housing development project includes infrastructure to deliver 10 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,5 - 25 million,2022-Q4,,,,2023-Q4,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1115,31/12/2023,Kāinga Ora–Homes and Communities,Redmond Street Judea Tauranga.,This housing development project includes infrastructure to deliver 8 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,5 - 25 million,2023-Q2,,,,,2024-Q4,2021-Q3,2024-Q4,,,[email address],,
kaOrProject_1117,31/12/2023,Kāinga Ora–Homes and Communities,Union Rd Howick Auckland.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2023-Q2,,,,2023-Q3,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1118,31/12/2023,Kāinga Ora–Homes and Communities,Puhinui Rd Papatoetoe Auckland.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q4,,,,2023-Q2,2024-Q1,2021-Q4,2024-Q1,,,[email address],,
kaOrProject_1119,31/12/2023,Kāinga Ora–Homes and Communities,Reseda Pl Papatoetoe Auckland.,This housing development project includes infrastructure to deliver 8 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,,,,,,2025-Q2,2021-Q4,2025-Q2,,,[email address],,
kaOrProject_1123,31/12/2023,Kāinga Ora–Homes and Communities,Clark Rd & Griffin St Kamo Whangarei.,This housing development project includes infrastructure to deliver 12 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,5 - 25 million,,,,,,2025-Q4,2019-Q2,2025-Q4,,,[email address],,
kaOrProject_1124,31/12/2023,Kāinga Ora–Homes and Communities,Paramount Pde Tikipunga Whangarei.,This housing development project includes infrastructure to deliver 17 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,5 - 25 million,,,,,,2025-Q4,2021-Q1,2025-Q4,,,[email address],,
kaOrProject_1125,31/12/2023,Kāinga Ora–Homes and Communities,Redmond Street Judea Tauranga.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,Limited ,Construct only,Bay of Plenty,,,Housing,1 - 5 million,2023-Q1,,2023-Q1,2023-Q2,2023-Q3,2024-Q1,2021-Q3,2024-Q1,,,[email address],,
kaOrProject_1126,31/12/2023,Kāinga Ora–Homes and Communities,Chilcott Rd Henderson Auckland.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q3,2024-Q3,2020-Q2,2024-Q3,,,[email address],,
kaOrProject_1127,31/12/2023,Kāinga Ora–Homes and Communities,Athlone Cres & Stellin St Epuni Lower Hutt.,This housing development project includes infrastructure to deliver 16 new units.,,In Procurement,Funding Source Confirmed,Limited ,Construct only,Wellington,,,Housing,5 - 25 million,2023-Q3,,2023-Q2,,,2025-Q3,2019-Q3,2025-Q3,,,[email address],,
kaOrProject_1128,31/12/2023,Kāinga Ora–Homes and Communities,Lister Cres Maraenui Napier.,This housing development project includes infrastructure to deliver 16 new units.,,In Procurement,Funding Source Confirmed,Limited ,Construct only,Hawke's Bay,,,Housing,5 - 25 million,2022-Q3,,2023-Q2,,,2025-Q1,2021-Q3,2025-Q1,,,[email address],,
kaOrProject_1129,31/12/2023,Kāinga Ora–Homes and Communities,Gem Street Pukehangi Rotorua.,This housing development project includes infrastructure to deliver 10 new units.,,Under Construction,Fully funded,Direct,Construct only,Bay of Plenty,,,Housing,5 - 25 million,2023-Q1,,2022-Q4,2023-Q2,2023-Q3,2024-Q2,2018-Q2,2024-Q2,,,[email address],,
kaOrProject_1130,31/12/2023,Kāinga Ora–Homes and Communities,Daventry St Waterview Auckland.,This housing development project includes infrastructure to deliver 18 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2023-Q3,,,,,2024-Q3,2020-Q3,2024-Q3,,,[email address],,
kaOrProject_1131,31/12/2023,Kāinga Ora–Homes and Communities,Kawaha Point Road Fairy Springs Rotorua.,This housing development project includes infrastructure to deliver 16 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,5 - 25 million,2023-Q3,,,,,2025-Q2,2018-Q2,2025-Q2,,,[email address],,
kaOrProject_1132,31/12/2023,Kāinga Ora–Homes and Communities,Coxhead Rd & Thompson Tce Manurewa Auckland.,This housing development project includes infrastructure to deliver 22 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2023-Q2,,,,,2025-Q1,2021-Q3,2025-Q1,,,[email address],,
kaOrProject_1134,31/12/2023,Kāinga Ora–Homes and Communities,Redmond Street Judea Tauranga.,This housing development project includes infrastructure to deliver 16 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,5 - 25 million,2023-Q4,,,,,2025-Q2,2021-Q3,2025-Q2,,,[email address],,
kaOrProject_1135,31/12/2023,Kāinga Ora–Homes and Communities,Kowhai St Harris St & Naenae Rd Taita Lower Hutt.,This housing development project includes infrastructure to deliver 25 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,5 - 25 million,,,,,,2025-Q3,2019-Q2,2025-Q3,,,[email address],,
kaOrProject_1136,31/12/2023,Kāinga Ora–Homes and Communities,Totara Avenue New Lynn Auckland.,This housing development project includes infrastructure to deliver 84 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,50 - 100 million,,,,,,2027-Q4,2021-Q3,2027-Q4,,,[email address],,
kaOrProject_1137,31/12/2023,Kāinga Ora–Homes and Communities,Reid Rd New Lynn Auckland.,This housing development project includes infrastructure to deliver 47 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,25 - 50 million,,,,,,2025-Q2,2021-Q4,2025-Q2,,,[email address],,
kaOrProject_1138,31/12/2023,Kāinga Ora–Homes and Communities,Main South Rd & Sockburn Christchurch.,This housing development project includes infrastructure to deliver 108 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,50 - 100 million,,,,,,2027-Q1,2020-Q4,2027-Q1,,,[email address],,
kaOrProject_1139,31/12/2023,Kāinga Ora–Homes and Communities,Alfred St A & Church St Onehunga Auckland.,This housing development project includes infrastructure to deliver 29 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,25 - 50 million,,,,,,2026-Q2,2020-Q2,2026-Q2,,,[email address],,
kaOrProject_1140,31/12/2023,Kāinga Ora–Homes and Communities,Surrey Cres Grey Lynn Auckland.,This housing development project includes infrastructure to deliver 36 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,25 - 50 million,,,,,,2025-Q1,2015-Q4,2025-Q1,,,[email address],,
kaOrProject_1142,31/12/2023,Kāinga Ora–Homes and Communities,Budge St Mayfield Blenheim.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,Limited ,Construct only,Marlborough,,,Housing,1 - 5 million,2023-Q2,,2023-Q4,,,2024-Q3,2017-Q4,2024-Q3,,,[email address],,
kaOrProject_1143,31/12/2023,Kāinga Ora–Homes and Communities,Stratford St Whitney Blenheim.,This housing development project includes infrastructure to deliver 13 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,5 - 25 million,2022-Q4,,,,,2024-Q3,2018-Q2,2024-Q3,,,[email address],,
kaOrProject_1144,31/12/2023,Kāinga Ora–Homes and Communities,Constable Cres Onekawa Napier.,This housing development project includes infrastructure to deliver 13 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,5 - 25 million,2023-Q4,,,,,2025-Q3,2018-Q2,2025-Q3,,,[email address],,
kaOrProject_1145,31/12/2023,Kāinga Ora–Homes and Communities,Atawhai Dr & The Wood Nelson.,This housing development project includes infrastructure to deliver 18 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,5 - 25 million,,,,,,2025-Q1,2018-Q2,2025-Q1,,,[email address],,
kaOrProject_1147,31/12/2023,Kāinga Ora–Homes and Communities,Flay Cres Burnside Christchurch.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q3,2018-Q3,2024-Q3,,,[email address],,
kaOrProject_1148,31/12/2023,Kāinga Ora–Homes and Communities,Brentwood Ave Croydon Ave & Botanical Rd B Highbury Palmerston North.,This housing development project includes infrastructure to deliver 35 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,25 - 50 million,,,,,,2026-Q1,2018-Q4,2026-Q1,,,[email address],,
kaOrProject_1150,31/12/2023,Kāinga Ora–Homes and Communities,Fortune St Mairehau Christchurch.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q4,,,,2023-Q3,2024-Q2,2019-Q2,2024-Q2,,,[email address],,
kaOrProject_1151,31/12/2023,Kāinga Ora–Homes and Communities,Riccarton Rd Riccarton Christchurch.,This housing development project includes infrastructure to deliver 36 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,25 - 50 million,,,,,,2026-Q3,2019-Q3,2026-Q3,,,[email address],,
kaOrProject_1152,31/12/2023,Kāinga Ora–Homes and Communities,Hewer Cres Naenae Lower Hutt.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q2,2019-Q3,2024-Q2,,,[email address],,
kaOrProject_1153,31/12/2023,Kāinga Ora–Homes and Communities,Oxford Tce & Lincoln Ave Epuni Lower Hutt.,This housing development project includes infrastructure to deliver 15 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,5 - 25 million,2023-Q1,,,,,2025-Q2,2019-Q3,2025-Q2,,,[email address],,
kaOrProject_1154,31/12/2023,Kāinga Ora–Homes and Communities,Baldwin St Moera Lower Hutt.,This housing development project includes infrastructure to deliver 9 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,5 - 25 million,2023-Q4,,,,,2024-Q4,2019-Q3,2024-Q4,,,[email address],,
kaOrProject_1155,31/12/2023,Kāinga Ora–Homes and Communities,Pukepoto Rd A & Tangonge Cres Kaitaiai Far North.,This housing development project includes infrastructure to deliver 11 new units.,,In Planning,Funding Source Confirmed,Direct,Construct only,Northland,,,Housing,5 - 25 million,,,2023-Q3,,,2024-Q4,2019-Q4,2024-Q4,,,[email address],,
kaOrProject_1156,31/12/2023,Kāinga Ora–Homes and Communities,Ngatiapa St Tukanae St & Rahui St A Strathmore Park Wellington.,This housing development project includes infrastructure to deliver 50 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,25 - 50 million,,,,,,2026-Q4,2019-Q4,2026-Q4,,,[email address],,
kaOrProject_1157,31/12/2023,Kāinga Ora–Homes and Communities,Nuku St & Strathmore Park Wellington.,This housing development project includes infrastructure to deliver 40 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,25 - 50 million,,,,,,2026-Q4,2019-Q4,2026-Q4,,,[email address],,
kaOrProject_1158,31/12/2023,Kāinga Ora–Homes and Communities,Hobson St Woolston Christchurch.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q1,,,,2023-Q4,2024-Q2,2020-Q1,2024-Q2,,,[email address],,
kaOrProject_1159,31/12/2023,Kāinga Ora–Homes and Communities,Graham St Blenheim Marlborough.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q3,2020-Q1,2024-Q3,,,[email address],,
kaOrProject_1161,31/12/2023,Kāinga Ora–Homes and Communities,Rowe Pl Burwood Christchurch.,This housing development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q3,,,,2023-Q3,2024-Q1,2020-Q2,2024-Q1,,,[email address],,
kaOrProject_1164,31/12/2023,Kāinga Ora–Homes and Communities,Hobson St & Woolston Christchurch.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q1,,,,2023-Q4,2024-Q2,2020-Q2,2024-Q2,,,[email address],,
kaOrProject_1166,31/12/2023,Kāinga Ora–Homes and Communities,Raurenga Ave Royal Oak Auckland.,This housing development project includes infrastructure to deliver 9 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2023-Q3,,,,,2025-Q4,2020-Q3,2025-Q4,,,[email address],,
kaOrProject_1168,31/12/2023,Kāinga Ora–Homes and Communities,Balmoral Rd & Townsend Pl B Tikipunga Whangarei.,This housing development project includes infrastructure to deliver 25 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,5 - 25 million,,,,,,2026-Q2,2020-Q4,2026-Q2,,,[email address],,
kaOrProject_1169,31/12/2023,Kāinga Ora–Homes and Communities,Coventry St A Farnham Ave & Croydon Ave Highbury Palmerston North.,This housing development project includes infrastructure to deliver 34 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,25 - 50 million,,,,,,2026-Q1,2020-Q4,2026-Q1,,,[email address],,
kaOrProject_1171,31/12/2023,Kāinga Ora–Homes and Communities,Paramount Pde & & Hawea Pl Tikipunga Whangarei.,This housing development project includes infrastructure to deliver 21 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,5 - 25 million,,,,,,2026-Q2,2021-Q1,2026-Q2,,,[email address],,
kaOrProject_1172,31/12/2023,Kāinga Ora–Homes and Communities,George St Stokes Valley Lower Hutt.,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,Limited ,Construct only,Wellington,,,Housing,5 - 25 million,2022-Q4,,2023-Q1,2023-Q2,2023-Q4,2024-Q4,2021-Q1,2024-Q4,,,[email address],,
kaOrProject_1173,31/12/2023,Kāinga Ora–Homes and Communities,Hamua Grv & Waiwhetu North Lower Hutt.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2022-Q4,,,,,2024-Q4,2021-Q1,2024-Q4,,,[email address],,
kaOrProject_1175,31/12/2023,Kāinga Ora–Homes and Communities,St John Street Opotiki.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,Direct,Construct only,Bay of Plenty,,,Housing,1 - 5 million,2023-Q2,,2023-Q3,2023-Q4,,2024-Q2,2021-Q2,2024-Q2,,,[email address],,
kaOrProject_1176,31/12/2023,Kāinga Ora–Homes and Communities,Balneavis Place A & Brabant Street Opotiki.,This housing development project includes infrastructure to deliver 17 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,5 - 25 million,2023-Q3,,,,,2024-Q2,2021-Q2,2024-Q2,,,[email address],,
kaOrProject_1177,31/12/2023,Kāinga Ora–Homes and Communities,Ford Street Opotiki.,This housing development project includes infrastructure to deliver 11 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,5 - 25 million,2023-Q2,,,,,2024-Q3,2021-Q2,2024-Q3,,,[email address],,
kaOrProject_1178,31/12/2023,Kāinga Ora–Homes and Communities,Great South Rd Manurewa Auckland.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q4,,,,2023-Q4,2024-Q3,2021-Q2,2024-Q3,,,[email address],,
kaOrProject_1179,31/12/2023,Kāinga Ora–Homes and Communities,Helvetia Rd C Pukekohe Auckland.,This housing development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,Direct,Construct only,Auckland,,,Housing,< 1 million,2023-Q2,,2023-Q1,2023-Q2,2023-Q3,2024-Q1,2021-Q2,2024-Q1,,,[email address],,
kaOrProject_1180,31/12/2023,Kāinga Ora–Homes and Communities,High St & A Mosgiel Dunedin.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Otago,,,Housing,1 - 5 million,2023-Q1,,,,,2024-Q3,2021-Q2,2024-Q3,,,[email address],,
kaOrProject_1181,31/12/2023,Kāinga Ora–Homes and Communities,Doon St Mosgiel Dunedin.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Otago,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q2,2021-Q2,2024-Q2,,,[email address],,
kaOrProject_1182,31/12/2023,Kāinga Ora–Homes and Communities,Green St & A Mosgiel Dunedin.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Otago,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q4,2021-Q2,2024-Q4,,,[email address],,
kaOrProject_1183,31/12/2023,Kāinga Ora–Homes and Communities,Doon St & Mosgiel Dunedin.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Otago,,,Housing,1 - 5 million,2023-Q1,,,,,2024-Q4,2021-Q2,2024-Q4,,,[email address],,
kaOrProject_1184,31/12/2023,Kāinga Ora–Homes and Communities,Spey St & A Mosgiel Dunedin.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Otago,,,Housing,1 - 5 million,2023-Q1,,,,,2024-Q4,2021-Q2,2024-Q4,,,[email address],,
kaOrProject_1185,31/12/2023,Kāinga Ora–Homes and Communities,Waiwhetu Rd & Hardy St Waterloo Lower Hutt.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,Direct,Construct only,Wellington,,,Housing,1 - 5 million,2022-Q4,,2023-Q1,2023-Q2,2023-Q4,2024-Q3,2021-Q2,2024-Q3,,,[email address],,
kaOrProject_1186,31/12/2023,Kāinga Ora–Homes and Communities,Anglesea St Hamilton.,This housing development project includes infrastructure to deliver 10 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,5 - 25 million,,,,,,2026-Q2,2021-Q2,2026-Q2,,,[email address],,
kaOrProject_1187,31/12/2023,Kāinga Ora–Homes and Communities,Carroll St Dunedin Central Dunedin.,This housing development project includes infrastructure to deliver 41 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Otago,,,Housing,25 - 50 million,,,,,,2025-Q1,2021-Q3,2025-Q1,,,[email address],,
kaOrProject_1189,31/12/2023,Kāinga Ora–Homes and Communities,Grosmont Terrace Brookfield Tauranga.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,Limited ,Construct only,Bay of Plenty,,,Housing,1 - 5 million,2022-Q4,,2023-Q1,2023-Q2,2023-Q3,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1190,31/12/2023,Kāinga Ora–Homes and Communities,Churton Cres & Gillespie St Taita Lower Hutt.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,Direct,Construct only,Wellington,,,Housing,1 - 5 million,2022-Q4,,2023-Q1,2023-Q2,2023-Q3,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1192,31/12/2023,Kāinga Ora–Homes and Communities,Examiner St Nelson City Nelson.,This housing development project includes infrastructure to deliver 29 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,25 - 50 million,,,,,,2026-Q2,2021-Q3,2026-Q2,,,[email address],,
kaOrProject_1193,31/12/2023,Kāinga Ora–Homes and Communities,Charles St A & B Blenheim Central Blenheim.,This housing development project includes infrastructure to deliver 4 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,1 - 5 million,,,,,,2024-Q4,2021-Q3,2024-Q4,,,[email address],,
kaOrProject_1194,31/12/2023,Kāinga Ora–Homes and Communities,George St Blenheim Central Blenheim.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q4,2021-Q3,2024-Q4,,,[email address],,
kaOrProject_1195,31/12/2023,Kāinga Ora–Homes and Communities,Muller Rd & Weld St Blenheim Central Blenheim.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q4,2021-Q3,2024-Q4,,,[email address],,
kaOrProject_1196,31/12/2023,Kāinga Ora–Homes and Communities,Scott St Redwoodtown Blenheim.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1197,31/12/2023,Kāinga Ora–Homes and Communities,Graham St Blenheim Central Blenheim.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q3,2021-Q3,2024-Q3,,,[email address],,
kaOrProject_1199,31/12/2023,Kāinga Ora–Homes and Communities,Clutha Cres & Awatere St Clover Park Auckland.,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2023-Q3,,,,,2025-Q1,2021-Q3,2025-Q1,,,[email address],,
kaOrProject_1200,31/12/2023,Kāinga Ora–Homes and Communities,Smith St & Bray St Woolston Christchurch.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q1,,,,2023-Q3,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1201,31/12/2023,Kāinga Ora–Homes and Communities,Hollyford Ave Bryndwr Christchurch.,This housing development project includes infrastructure to deliver 8 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,2023-Q1,,,,,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1202,31/12/2023,Kāinga Ora–Homes and Communities,Church St & Onehunga Auckland.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2023-Q2,,,,,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1203,31/12/2023,Kāinga Ora–Homes and Communities,Coventry St & Hull Pl Highbury Palmerston North.,This housing development project includes infrastructure to deliver 8 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,5 - 25 million,,,,,,2025-Q1,2021-Q3,2025-Q1,,,[email address],,
kaOrProject_1205,31/12/2023,Kāinga Ora–Homes and Communities,Ranolf Street & Malfroy Street Glenholme Rotorua.,This housing development project includes infrastructure to deliver 24 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,5 - 25 million,,,,,,2026-Q1,2021-Q3,2026-Q1,,,[email address],,
kaOrProject_1206,31/12/2023,Kāinga Ora–Homes and Communities,Raurenga Ave & Royal Oak Auckland.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2023-Q1,,,,2023-Q4,2024-Q4,2021-Q4,2024-Q4,,,[email address],,
kaOrProject_1207,31/12/2023,Kāinga Ora–Homes and Communities,Raurenga Ave Royal Oak Auckland.,This housing development project includes infrastructure to deliver 24 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2023-Q2,,,,,2025-Q4,2021-Q4,2025-Q4,,,[email address],,
kaOrProject_1208,31/12/2023,Kāinga Ora–Homes and Communities,Raumanga Valley Rd Raumanga Whangarei.,This housing development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,Direct,Construct only,Northland,,,Housing,1 - 5 million,2022-Q4,,2023-Q1,2023-Q1,2023-Q2,2024-Q1,2021-Q4,2024-Q1,,,[email address],,
kaOrProject_1209,31/12/2023,Kāinga Ora–Homes and Communities,Namata Rd Onehunga Auckland.,This housing development project includes infrastructure to deliver 12 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2023-Q2,,,,2023-Q3,2024-Q3,2021-Q4,2024-Q3,,,[email address],,
kaOrProject_1210,31/12/2023,Kāinga Ora–Homes and Communities,Hewer Cres Naenae Lower Hutt.,This housing development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2023-Q2,,,,2023-Q3,2024-Q1,2021-Q4,2024-Q1,,,[email address],,
kaOrProject_1213,31/12/2023,Kāinga Ora–Homes and Communities,Cardiff Rd & Opal Ave Pakuranga Auckland.,This housing development project includes infrastructure to deliver 13 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q4,,,,2023-Q4,2025-Q1,2021-Q4,2025-Q1,,,[email address],,
kaOrProject_1214,31/12/2023,Kāinga Ora–Homes and Communities,Bright Cres Maraenui Napier.,This housing development project includes infrastructure to deliver 9 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,5 - 25 million,2023-Q1,,,,,2024-Q3,2021-Q4,2024-Q3,,,[email address],,
kaOrProject_1215,31/12/2023,Kāinga Ora–Homes and Communities,Lowry Tce Marewa Napier.,This housing development project includes infrastructure to deliver 8 new units.,,In Planning,Funding Source Confirmed,Limited ,Construct only,Hawke's Bay,,,Housing,5 - 25 million,,,2023-Q3,,,2024-Q4,2021-Q4,2024-Q4,,,[email address],,
kaOrProject_1216,31/12/2023,Kāinga Ora–Homes and Communities,Bedford Rd & Lowry Tce Marewa Napier.,This housing development project includes infrastructure to deliver 7 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,5 - 25 million,2023-Q3,,,,,2024-Q4,2021-Q4,2024-Q4,,,[email address],,
kaOrProject_1217,31/12/2023,Kāinga Ora–Homes and Communities,Seddon Cres Marewa Napier.,This housing development project includes infrastructure to deliver 10 new units.,,In Procurement,Funding Source Confirmed,Limited ,Construct only,Hawke's Bay,,,Housing,5 - 25 million,2023-Q3,,2023-Q3,,,2025-Q1,2021-Q4,2025-Q1,,,[email address],,
kaOrProject_1219,31/12/2023,Kāinga Ora–Homes and Communities,King St Kensington Whangarei.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Northland,,,Housing,1 - 5 million,2023-Q3,,,,2023-Q4,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1220,31/12/2023,Kāinga Ora–Homes and Communities,Everitt Rd Cooper Cres & Ross Ave Otara Auckland.,This housing development project includes infrastructure to deliver 22 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2023-Q3,,,,,2024-Q4,2021-Q4,2024-Q4,,,[email address],,
kaOrProject_1221,31/12/2023,Kāinga Ora–Homes and Communities,Geraldine Rd & Featherston Cres & Otara Auckland.,This housing development project includes infrastructure to deliver 13 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2023-Q1,,,,,2024-Q4,2021-Q4,2024-Q4,,,[email address],,
kaOrProject_1222,31/12/2023,Kāinga Ora–Homes and Communities,Tilbury St Fairfield Lower Hutt.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,Direct,Construct only,Wellington,,,Housing,1 - 5 million,2022-Q4,,2023-Q1,2023-Q2,2023-Q4,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1223,31/12/2023,Kāinga Ora–Homes and Communities,Tiaka Pl Pakuranga Auckland.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q4,,,,2023-Q2,2024-Q1,2021-Q4,2024-Q1,,,[email address],,
kaOrProject_1224,31/12/2023,Kāinga Ora–Homes and Communities,Tiaka Pl Pakuranga Auckland.,This housing development project includes infrastructure to deliver 10 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q4,,,,2023-Q3,2024-Q1,2021-Q4,2024-Q1,,,[email address],,
kaOrProject_1225,31/12/2023,Kāinga Ora–Homes and Communities,Bristol St Trentham Upper Hutt.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,Limited ,Construct only,Wellington,,,Housing,1 - 5 million,2022-Q4,,2023-Q1,2023-Q2,2023-Q3,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1226,31/12/2023,Kāinga Ora–Homes and Communities,Bristol St Trentham Upper Hutt.,This housing development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,Limited ,Construct only,Wellington,,,Housing,1 - 5 million,2022-Q4,,2023-Q1,2023-Q2,2023-Q3,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1227,31/12/2023,Kāinga Ora–Homes and Communities,Fergusson Dr Trentham Upper Hutt.,This housing development project includes infrastructure to deliver 1 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2023-Q2,,,,2023-Q3,2024-Q1,2021-Q4,2024-Q1,,,[email address],,
kaOrProject_1228,31/12/2023,Kāinga Ora–Homes and Communities,McHardie St Trentham Upper Hutt.,This housing development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2023-Q2,,,,2023-Q3,2024-Q1,2021-Q4,2024-Q1,,,[email address],,
kaOrProject_1230,31/12/2023,Kāinga Ora–Homes and Communities,McHardie St & Miro St Trentham Upper Hutt.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2023-Q2,,,,2023-Q3,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1232,31/12/2023,Kāinga Ora–Homes and Communities,Finlayson Ave Clendon Park Auckland.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2023-Q4,,,,,2025-Q1,2021-Q4,2025-Q1,,,[email address],,
kaOrProject_1233,31/12/2023,Kāinga Ora–Homes and Communities,Brent Pl & Sunlands Dr Manurewa Auckland.,This housing development project includes infrastructure to deliver 11 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q4,,,,2023-Q3,2024-Q4,2021-Q4,2024-Q4,,,[email address],,
kaOrProject_1234,31/12/2023,Kāinga Ora–Homes and Communities,Marr Rd Manurewa Auckland.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q3,2024-Q3,2021-Q4,2024-Q3,,,[email address],,
kaOrProject_1235,31/12/2023,Kāinga Ora–Homes and Communities,Jupiter St & Tairere Cres Papakura Auckland.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q2,2024-Q3,2021-Q4,2024-Q3,,,[email address],,
kaOrProject_1241,31/12/2023,Kāinga Ora–Homes and Communities,Cambridge Tce Inner Kaiti Gisborne.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,To be determined,To be determined,Gisborne,,,Housing,1 - 5 million,,,,,2023-Q3,2024-Q1,2021-Q4,2024-Q1,,,[email address],,
kaOrProject_1242,31/12/2023,Kāinga Ora–Homes and Communities,Huxley Rd Outer Kaiti Gisborne.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Gisborne,,,Housing,1 - 5 million,2023-Q3,,,,,2025-Q1,2021-Q4,2025-Q1,,,[email address],,
kaOrProject_1246,31/12/2023,Kāinga Ora–Homes and Communities,Sewell St Linwood Christchurch.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q1,,,,,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1247,31/12/2023,Kāinga Ora–Homes and Communities,Marriotts Rd & Rookwood Ave New Brighton Christchurch.,This housing development project includes infrastructure to deliver 12 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,2023-Q3,,,,,2025-Q1,2021-Q4,2025-Q1,,,[email address],,
kaOrProject_1248,31/12/2023,Kāinga Ora–Homes and Communities,Bateman Ave Bryndwr Christchurch.,This housing development project includes infrastructure to deliver 7 new units.,,In Procurement,Funding Source Confirmed,Direct,Construct only,Canterbury,,,Housing,1 - 5 million,2023-Q2,,2023-Q2,,,2024-Q3,2021-Q4,2024-Q3,,,[email address],,
kaOrProject_1250,31/12/2023,Kāinga Ora–Homes and Communities,Guildford Burnside Christchurch.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1251,31/12/2023,Kāinga Ora–Homes and Communities,Aurea Ave Pakuranga Auckland.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,Direct,Construct only,Auckland,,,Housing,1 - 5 million,2022-Q4,,2023-Q3,2023-Q4,,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1253,31/12/2023,Kāinga Ora–Homes and Communities,Edgewater Dr Pakuranga Auckland.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q4,,,,,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1256,31/12/2023,Kāinga Ora–Homes and Communities,Hukanui Rd Chartwell Hamilton.,This housing development project includes infrastructure to deliver 10 new units.,,In Procurement,Funding Source Confirmed,Limited ,Construct only,Waikato,,,Housing,5 - 25 million,2023-Q2,,2023-Q3,2023-Q3,,2024-Q4,2022-Q1,2024-Q4,,,[email address],,
kaOrProject_1264,31/12/2023,Kāinga Ora–Homes and Communities,Breckons Ave & Beatrice Pl Nawton Hamilton.,This housing development project includes infrastructure to deliver 8 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,5 - 25 million,2022-Q4,,,,,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1265,31/12/2023,Kāinga Ora–Homes and Communities,Breckons Avenue Nawton Hamilton.,This housing development project includes infrastructure to deliver 7 new units.,,Under Construction,Fully funded,Direct,Construct only,Waikato,,,Housing,1 - 5 million,2022-Q4,,2023-Q1,2023-Q2,2023-Q4,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1266,31/12/2023,Kāinga Ora–Homes and Communities,Grange Ave Nawton Hamilton.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q3,,,,2023-Q4,2024-Q4,2023-Q3,2024-Q4,,,[email address],,
kaOrProject_1267,31/12/2023,Kāinga Ora–Homes and Communities,Roy Street Nawton Hamilton.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,Limited ,Construct only,Waikato,,,Housing,1 - 5 million,2022-Q4,,2023-Q2,2023-Q3,2023-Q4,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1269,31/12/2023,Kāinga Ora–Homes and Communities,Killarney Rd Frankton Hamilton.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,2022-Q4,,,,2023-Q4,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1271,31/12/2023,Kāinga Ora–Homes and Communities,Cameron Road Gate Pa Tauranga.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,Limited ,Construct only,Bay of Plenty,,,Housing,1 - 5 million,2023-Q1,,2023-Q1,2023-Q2,2023-Q2,2024-Q1,2022-Q1,2024-Q1,,,[email address],,
kaOrProject_1274,31/12/2023,Kāinga Ora–Homes and Communities,Nile Street Waterloo Hutt Valley (OSM).,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1276,31/12/2023,Kāinga Ora–Homes and Communities,Dunarnan Avonside Chch.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q2,,,,2023-Q4,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1277,31/12/2023,Kāinga Ora–Homes and Communities,Grey Rd Timaru.,This housing development project includes infrastructure to deliver 38 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,25 - 50 million,,,,,,2025-Q3,2022-Q1,2025-Q3,,,[email address],,
kaOrProject_1278,31/12/2023,Kāinga Ora–Homes and Communities,Romilly St Westport.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,West Coast,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1280,31/12/2023,Kāinga Ora–Homes and Communities,Devon St Glenholme Rotorua.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,1 - 5 million,2023-Q4,,,,,2024-Q3,2022-Q1,2024-Q3,,,[email address],,
kaOrProject_1281,31/12/2023,Kāinga Ora–Homes and Communities,Scott St Redwoodtown Blenheim.,This housing development project includes infrastructure to deliver 2 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1283,31/12/2023,Kāinga Ora–Homes and Communities,Tyler St Rangiora.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q4,2022-Q2,2024-Q4,,,[email address],,
kaOrProject_1284,31/12/2023,Kāinga Ora–Homes and Communities,Kawai St Nelson.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,1 - 5 million,2022-Q3,,,,,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1287,31/12/2023,Kāinga Ora–Homes and Communities,Black Street Wairoa (State).,This housing development project includes infrastructure to deliver 20 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2022-Q3,,,,,2025-Q3,2021-Q3,2025-Q3,,,[email address],,
kaOrProject_1297,31/12/2023,Kāinga Ora–Homes and Communities,Waimapu St Greerton Tauranga.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2022-Q2,,,,2023-Q2,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1341,31/12/2023,Kāinga Ora–Homes and Communities,Domain Tce Spreydon Christchurch.,This housing development project includes infrastructure to deliver 24 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q4,2024-Q4,2022-Q1,2024-Q4,,,[email address],,
kaOrProject_1343,31/12/2023,Kāinga Ora–Homes and Communities,Opawa Road Hillsborough Christchurch.,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2022-Q2,,,,2023-Q3,2024-Q2,2021-Q1,2024-Q2,,,[email address],,
kaOrProject_1345,31/12/2023,Kāinga Ora–Homes and Communities,Vine Street Auckland.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q2,,,,,2024-Q4,2021-Q4,2024-Q4,,,[email address],,
kaOrProject_1348,31/12/2023,Kāinga Ora–Homes and Communities,Ballance Place Marewa Napier.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2022-Q3,,,,,2024-Q3,2022-Q2,2024-Q3,,,[email address],,
kaOrProject_1349,31/12/2023,Kāinga Ora–Homes and Communities,Clevedon Rd & Papakura.,This housing development project includes infrastructure to deliver 18 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q2,,,,2023-Q4,2024-Q3,2022-Q2,2024-Q3,,,[email address],,
kaOrProject_1350,31/12/2023,Kāinga Ora–Homes and Communities,Latham St Marewa Napier.,This housing development project includes infrastructure to deliver 7 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2022-Q3,,,,,2024-Q3,2022-Q2,2024-Q3,,,[email address],,
kaOrProject_1351,31/12/2023,Kāinga Ora–Homes and Communities,Beerescourt Rd Beerescourt Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2022-Q3,,,,2023-Q2,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1352,31/12/2023,Kāinga Ora–Homes and Communities,Oxford Street Lansdowne Masterton.,This housing development project includes infrastructure to deliver 7 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,< 1 million,2022-Q3,,,,2023-Q3,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1354,31/12/2023,Kāinga Ora–Homes and Communities,Netherlands Avenue & Kelston Auckland.,This housing development project includes infrastructure to deliver 11 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q3,,,,2023-Q2,2024-Q1,2022-Q3,2024-Q1,,,[email address],,
kaOrProject_1355,31/12/2023,Kāinga Ora–Homes and Communities,Frank Grey Place Otahuhu Auckland.,This housing development project includes infrastructure to deliver 11 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q2,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_136,31/12/2023,Kāinga Ora–Homes and Communities,Point Chevalier Rd Great North Rd Pt Chevalier Auckland.,This housing development project includes infrastructure to deliver 63 new units.,,Under Construction,Fully funded,Direct,Design and construct,Auckland,,,Housing,25 - 50 million,2019-Q4,,2020-Q2,2020-Q2,2022-Q3,2024-Q2,2014-Q1,2024-Q2,,,[email address],,
kaOrProject_1360,31/12/2023,Kāinga Ora–Homes and Communities,Steele Rd A Tamarau Gisborne.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Gisborne,,,Housing,< 1 million,2022-Q2,,,,2023-Q2,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1363,31/12/2023,Kāinga Ora–Homes and Communities,Glenview Rd Glen Eden Auckland.,This housing development project includes infrastructure to deliver 24 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q4,2024-Q3,2022-Q1,2024-Q3,,,[email address],,
kaOrProject_1364,31/12/2023,Kāinga Ora–Homes and Communities,Harbour View Rd Te Atatu Peninsula Auckland.,This housing development project includes infrastructure to deliver 18 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q3,2024-Q4,2022-Q2,2024-Q4,,,[email address],,
kaOrProject_1367,31/12/2023,Kāinga Ora–Homes and Communities,King Street Rangiora.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2022-Q2,,,,2023-Q4,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1369,31/12/2023,Kāinga Ora–Homes and Communities,Metcalfe Road Ranui Auckland.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q2,,,,2023-Q1,2024-Q3,2021-Q2,2024-Q3,,,[email address],,
kaOrProject_1372,31/12/2023,Kāinga Ora–Homes and Communities,Puriri Rd Manurewa Auckland.,This housing development project includes infrastructure to deliver 12 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q1,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1373,31/12/2023,Kāinga Ora–Homes and Communities,Rimu St Gate Pa Tauranga.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2022-Q2,,,,2023-Q3,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1374,31/12/2023,Kāinga Ora–Homes and Communities,Royton Ave & Yates Rd Mangere East Auckland.,This housing development project includes infrastructure to deliver 13 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q2,,,,2023-Q4,2024-Q4,2022-Q2,2024-Q4,,,[email address],,
kaOrProject_1376,31/12/2023,Kāinga Ora–Homes and Communities,Seymour Rd Sunnyvale Auckland.,This housing development project includes infrastructure to deliver 12 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q3,,,,2023-Q2,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1377,31/12/2023,Kāinga Ora–Homes and Communities,Southampton St East Hastings.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2022-Q2,,,,2023-Q1,2024-Q1,2022-Q1,2024-Q1,,,[email address],,
kaOrProject_1379,31/12/2023,Kāinga Ora–Homes and Communities,Wainoni Rd Chch.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2022-Q2,,,,2023-Q1,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_138,31/12/2023,Kāinga Ora–Homes and Communities,Beach Haven Rd Beach Haven Auckland.,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,Limited ,Design and construct,Auckland,,,Housing,5 - 25 million,2019-Q4,,2022-Q1,2022-Q2,2023-Q1,2024-Q1,2017-Q3,2024-Q1,,,[email address],,
kaOrProject_1380,31/12/2023,Kāinga Ora–Homes and Communities,Wildberry St Christchurch.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2022-Q2,,,,2023-Q4,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1381,31/12/2023,Kāinga Ora–Homes and Communities,Gloucester Rd Manurewa Auckland.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q2,,,,2022-Q3,2024-Q1,2022-Q1,2024-Q1,,,[email address],,
kaOrProject_1384,31/12/2023,Kāinga Ora–Homes and Communities,Waimea Road Nelson.,This housing development project includes infrastructure to deliver 29 new units.,,Under Construction,Fully funded,To be determined,To be determined,Marlborough,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q4,2024-Q3,2022-Q2,2024-Q3,,,[email address],,
kaOrProject_1385,31/12/2023,Kāinga Ora–Homes and Communities,Saxbys Road Glenview Ham.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2022-Q2,,,,,2024-Q3,2022-Q2,2024-Q3,,,[email address],,
kaOrProject_1387,31/12/2023,Kāinga Ora–Homes and Communities,Collett Road Otara.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q2,,,,2023-Q3,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1389,31/12/2023,Kāinga Ora–Homes and Communities,Massey Rd Mangere Auckland.,This housing development project includes infrastructure to deliver 15 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q2,,,,2023-Q2,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1392,31/12/2023,Kāinga Ora–Homes and Communities,Urlich Dr Ranui Auckland.,This housing development project includes infrastructure to deliver 10 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q2,,,,2023-Q1,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1397,31/12/2023,Kāinga Ora–Homes and Communities,Hayes Avenue Tauranga.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2022-Q2,,,,2023-Q3,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1399,31/12/2023,Kāinga Ora–Homes and Communities,Larissa Avenue Henderson.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q3,,,,2023-Q2,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_14,31/12/2023,Kāinga Ora–Homes and Communities,Springhill: McCullough Street Mount Roskill Auckland same site.,This housing development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,,,,,,2024-Q2,2019-Q3,2024-Q2,,,[email address],,
kaOrProject_1400,31/12/2023,Kāinga Ora–Homes and Communities,Linton Street Palmerston North.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2022-Q2,,,,2023-Q1,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1401,31/12/2023,Kāinga Ora–Homes and Communities,Storey Avenue Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2022-Q3,,,,2022-Q4,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1407,31/12/2023,Kāinga Ora–Homes and Communities,Tirimoana Road Te Atatu South Auckland.,This housing development project includes infrastructure to deliver 7 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q2,,,,2022-Q2,2024-Q1,2020-Q4,2024-Q1,,,[email address],,
kaOrProject_1409,31/12/2023,Kāinga Ora–Homes and Communities,Worsley Street Gisborne.,This housing development project includes infrastructure to deliver 31 new units.,,Under Construction,Fully funded,To be determined,To be determined,Gisborne,,,Housing,5 - 25 million,2021-Q4,,,,2022-Q2,2024-Q1,2021-Q1,2024-Q1,,,[email address],,
kaOrProject_1415,31/12/2023,Kāinga Ora–Homes and Communities,Lorne Street Mosgiel Dunedin.,This housing development project includes infrastructure to deliver 18 new units.,,Under Construction,Fully funded,To be determined,To be determined,Otago,,,Housing,5 - 25 million,2023-Q1,,,,2023-Q3,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1417,31/12/2023,Kāinga Ora–Homes and Communities,Hazelmere Cres & Te Awamutu.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,2022-Q4,,,,,2025-Q2,2021-Q3,2025-Q2,,,[email address],,
kaOrProject_1418,31/12/2023,Kāinga Ora–Homes and Communities,Hazelmere Cres & Te Awamutu.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,2022-Q4,,,,,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1419,31/12/2023,Kāinga Ora–Homes and Communities,TH Rewi Street & Te Awamutu.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,2022-Q4,,,,,2024-Q4,2021-Q3,2024-Q4,,,[email address],,
kaOrProject_1420,31/12/2023,Kāinga Ora–Homes and Communities,Scott St & Browning St Cambridge Waikato.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,2022-Q4,,,,,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1430,31/12/2023,Kāinga Ora–Homes and Communities,Beach Rd Te Atatu Peninsula Auckland.,This housing development project includes infrastructure to deliver 12 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,,,,,2023-Q4,2024-Q3,2017-Q2,2024-Q3,,,[email address],,
kaOrProject_1432,31/12/2023,Kāinga Ora–Homes and Communities,Tranmere Rd & Haultain St Fairfield Hamilton.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,5 - 25 million,2023-Q1,,,,2023-Q4,2024-Q2,2018-Q2,2024-Q2,,,[email address],,
kaOrProject_1433,31/12/2023,Kāinga Ora–Homes and Communities,Eden Cres Waverley Invercargill.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,Direct,Construct only,Southland,,,Housing,1 - 5 million,2023-Q2,,2023-Q3,2023-Q4,2023-Q4,2024-Q4,2018-Q2,2024-Q4,,,[email address],,
kaOrProject_1436,31/12/2023,Kāinga Ora–Homes and Communities,Crete Street & Salonika Street Whakatane.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q3,2018-Q2,2024-Q3,,,[email address],,
kaOrProject_1443,31/12/2023,Kāinga Ora–Homes and Communities,Kendal Ave A Burnside Christchurch.,This housing development project includes infrastructure to deliver 10 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,,,,,,2024-Q4,2020-Q2,2024-Q4,,,[email address],,
kaOrProject_1445,31/12/2023,Kāinga Ora–Homes and Communities,Tiki Pl & Peter Snell Rd Ruakaka Whangarei.,This housing development project includes infrastructure to deliver 25 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,5 - 25 million,,,,,,2026-Q2,2020-Q2,2026-Q2,,,[email address],,
kaOrProject_1449,31/12/2023,Kāinga Ora–Homes and Communities,Hollyford Ave & Earnslaw Cres Bryndwr Christchurch.,This housing development project includes infrastructure to deliver 26 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,,,,,,2024-Q4,2020-Q3,2024-Q4,,,[email address],,
kaOrProject_1450,31/12/2023,Kāinga Ora–Homes and Communities,Huia St Camberley Hastings.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,1 - 5 million,2023-Q4,,,,,2024-Q4,2020-Q4,2024-Q4,,,[email address],,
kaOrProject_1455,31/12/2023,Kāinga Ora–Homes and Communities,Masefield Ave Maraenui Napier.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,1 - 5 million,2023-Q1,,,,2023-Q3,2024-Q1,2021-Q1,2024-Q1,,,[email address],,
kaOrProject_1456,31/12/2023,Kāinga Ora–Homes and Communities,Stewart Street Whakatane.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,5 - 25 million,2023-Q1,,,,,2024-Q3,2021-Q2,2024-Q3,,,[email address],,
kaOrProject_1458,31/12/2023,Kāinga Ora–Homes and Communities,Burgess St Green Island Dunedin.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Otago,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q3,2021-Q2,2024-Q3,,,[email address],,
kaOrProject_1464,31/12/2023,Kāinga Ora–Homes and Communities,Crosher Pl Silverdale Hamilton.,This housing development project includes infrastructure to deliver 5 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,,,,,,2025-Q2,2021-Q3,2025-Q2,,,[email address],,
kaOrProject_1466,31/12/2023,Kāinga Ora–Homes and Communities,Holdsworth Ave Trentham Upper Hutt.,This housing development project includes infrastructure to deliver 7 new units.,,Under Construction,Fully funded,Limited ,Construct only,Wellington,,,Housing,5 - 25 million,2023-Q1,,2023-Q2,,2023-Q3,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_1467,31/12/2023,Kāinga Ora–Homes and Communities,Gardiner St & Blenheim.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q3,2021-Q3,2024-Q3,,,[email address],,
kaOrProject_1468,31/12/2023,Kāinga Ora–Homes and Communities,Hutcheson St & Churchill St Mayfield Blenheim.,This housing development project includes infrastructure to deliver 10 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,5 - 25 million,,,,,,2025-Q1,2021-Q3,2025-Q1,,,[email address],,
kaOrProject_1473,31/12/2023,Kāinga Ora–Homes and Communities,Barker Rd Marewa Napier.,This housing development project includes infrastructure to deliver 12 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q3,2024-Q1,2021-Q4,2024-Q1,,,[email address],,
kaOrProject_1480,31/12/2023,Kāinga Ora–Homes and Communities,Whakatiki St A Trentham Upper Hutt.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,Limited ,Construct only,Wellington,,,Housing,1 - 5 million,2023-Q1,,2023-Q2,,2023-Q4,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1482,31/12/2023,Kāinga Ora–Homes and Communities,King Street Stewart Street & Washer Avenue Whakatane.,This housing development project includes infrastructure to deliver 53 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,25 - 50 million,,,,,,2025-Q4,2021-Q4,2025-Q4,,,[email address],,
kaOrProject_1484,31/12/2023,Kāinga Ora–Homes and Communities,Lovatt Cres Kensington Whangarei.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,1 - 5 million,2023-Q4,,,,,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1485,31/12/2023,Kāinga Ora–Homes and Communities,Pomaria Rd Henderson Auckland.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,,,,,2023-Q3,2024-Q1,2021-Q4,2024-Q1,,,[email address],,
kaOrProject_1491,31/12/2023,Kāinga Ora–Homes and Communities,Boyne Ave Northcote Christchurch.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1492,31/12/2023,Kāinga Ora–Homes and Communities,Boyne Ave Northcote Christchurch.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q3,2021-Q4,2024-Q3,,,[email address],,
kaOrProject_1493,31/12/2023,Kāinga Ora–Homes and Communities,Churchill St A Kensington Whangarei.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,1 - 5 million,2023-Q4,,,,,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1499,31/12/2023,Kāinga Ora–Homes and Communities,King St Kensington Whangarei.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,Direct,Design and construct,Northland,,,Housing,1 - 5 million,2023-Q3,,2023-Q3,,2023-Q4,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1501,31/12/2023,Kāinga Ora–Homes and Communities,King St Kensington Whangarei.,This housing development project includes infrastructure to deliver 9 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,5 - 25 million,,,,,,2025-Q2,2022-Q1,2025-Q2,,,[email address],,
kaOrProject_1512,31/12/2023,Kāinga Ora–Homes and Communities,Abbott St Te Hapara Gisborne.,This housing development project includes infrastructure to deliver 3 new units.,,In Planning,Funding Source Confirmed,To be determined,Construct only,Gisborne,,,Housing,1 - 5 million,,,2023-Q3,,,2024-Q3,2022-Q1,2024-Q3,,,[email address],,
kaOrProject_1513,31/12/2023,Kāinga Ora–Homes and Communities,De Costa Ave Te Hapara Gisborne.,This housing development project includes infrastructure to deliver 3 new units.,,In Planning,Funding Source Confirmed,To be determined,Construct only,Gisborne,,,Housing,1 - 5 million,,,2023-Q3,,,2024-Q3,2022-Q1,2024-Q3,,,[email address],,
kaOrProject_1521,31/12/2023,Kāinga Ora–Homes and Communities,Kara St Outer Kaiti Gisborne.,This housing development project includes infrastructure to deliver 2 new units.,,In Planning,Funding Source Confirmed,Direct,Construct only,Gisborne,,,Housing,1 - 5 million,,,2023-Q3,,,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1525,31/12/2023,Kāinga Ora–Homes and Communities,Lowe St Camberley Hastings.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,1 - 5 million,2023-Q4,,,,,2024-Q4,2022-Q1,2024-Q4,,,[email address],,
kaOrProject_1526,31/12/2023,Kāinga Ora–Homes and Communities,Wall Rd Raureka Hastings.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,1 - 5 million,2023-Q1,,,,2023-Q4,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1527,31/12/2023,Kāinga Ora–Homes and Communities,Willowpark Rd N Mayfair Hastings.,This housing development project includes infrastructure to deliver 3 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,1 - 5 million,,,,,,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1534,31/12/2023,Kāinga Ora–Homes and Communities,Lovelock Street Whakatane.,This housing development project includes infrastructure to deliver 7 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,5 - 25 million,2023-Q1,,,,,2024-Q3,2022-Q1,2024-Q3,,,[email address],,
kaOrProject_154,31/12/2023,Kāinga Ora–Homes and Communities,Epuni Lower Hutt STAGE (Precincts & ) Lower Hutt.,This housing development project includes infrastructure to deliver 93 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,50 - 100 million,2020-Q1,,,,2021-Q4,2024-Q2,2017-Q2,2024-Q2,,,[email address],,
kaOrProject_1541,31/12/2023,Kāinga Ora–Homes and Communities,Fairfield Rd & Haultain St Enderley Hamilton.,This housing development project includes infrastructure to deliver 7 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,5 - 25 million,,,,,,2025-Q1,2022-Q1,2025-Q1,,,[email address],,
kaOrProject_1545,31/12/2023,Kāinga Ora–Homes and Communities,Apanui Avenue & Pounama Place Whakatane.,This housing development project includes infrastructure to deliver 14 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,5 - 25 million,2023-Q4,,,,,2025-Q3,2022-Q1,2025-Q3,,,[email address],,
kaOrProject_1551,31/12/2023,Kāinga Ora–Homes and Communities,Tamingi St & Tiki Pl Ruakaka Whangarei.,This housing development project includes infrastructure to deliver 33 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,25 - 50 million,,,,,,2026-Q1,2022-Q1,2026-Q1,,,[email address],,
kaOrProject_1552,31/12/2023,Kāinga Ora–Homes and Communities,Bower Ave New Brighton.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q2,,,,2023-Q4,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1553,31/12/2023,Kāinga Ora–Homes and Communities,Tamingi St & Peter Snell Rd Ruakaka Whangarei.,This housing development project includes infrastructure to deliver 2 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,1 - 5 million,,,,,,2025-Q2,2022-Q1,2025-Q2,,,[email address],,
kaOrProject_1554,31/12/2023,Kāinga Ora–Homes and Communities,Creek Rd Ashburton.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q1,,,,,2024-Q4,2022-Q1,2024-Q4,,,[email address],,
kaOrProject_1555,31/12/2023,Kāinga Ora–Homes and Communities,Galbraith St Allenton Ashburton.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,Limited ,Construct only,Canterbury,,,Housing,1 - 5 million,2023-Q1,,2023-Q3,,,2024-Q3,2022-Q1,2024-Q3,,,[email address],,
kaOrProject_1556,31/12/2023,Kāinga Ora–Homes and Communities,Masters St Greymouth.,This housing development project includes infrastructure to deliver 5 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,West Coast,,,Housing,1 - 5 million,,,,,,2025-Q2,2022-Q1,2025-Q2,,,[email address],,
kaOrProject_1557,31/12/2023,Kāinga Ora–Homes and Communities,Hall St Cobden Greymouth.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,West Coast,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1558,31/12/2023,Kāinga Ora–Homes and Communities,Murray St Mosgiel.,This housing development project includes infrastructure to deliver 9 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Otago,,,Housing,5 - 25 million,,,,,,2025-Q1,2022-Q1,2025-Q1,,,[email address],,
kaOrProject_1559,31/12/2023,Kāinga Ora–Homes and Communities,Galbraith St Allenton Ashburton.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q1,,,,,2024-Q3,2022-Q1,2024-Q3,,,[email address],,
kaOrProject_1560,31/12/2023,Kāinga Ora–Homes and Communities,Galbraith St Allenton Ashburton.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q1,,,,,2024-Q3,2022-Q1,2024-Q3,,,[email address],,
kaOrProject_1562,31/12/2023,Kāinga Ora–Homes and Communities,Tucker St Allenton Ashburton.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q1,,,,,2024-Q3,2022-Q1,2024-Q3,,,[email address],,
kaOrProject_1564,31/12/2023,Kāinga Ora–Homes and Communities,Lawrence Street A Te Kuiti.,This housing development project includes infrastructure to deliver 11 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,5 - 25 million,2023-Q3,,,,,2025-Q1,2022-Q1,2025-Q1,,,[email address],,
kaOrProject_1565,31/12/2023,Kāinga Ora–Homes and Communities,Middlebrook Drive Katikati.,This housing development project includes infrastructure to deliver 18 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,5 - 25 million,,,,,,2025-Q3,2022-Q1,2025-Q3,,,[email address],,
kaOrProject_1567,31/12/2023,Kāinga Ora–Homes and Communities,Garaway Street Whakatane.,This housing development project includes infrastructure to deliver 8 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,5 - 25 million,2023-Q1,,,,,2024-Q4,2022-Q1,2024-Q4,,,[email address],,
kaOrProject_157,31/12/2023,Kāinga Ora–Homes and Communities,Brookside Tce Bryndwr Christchurch.,This housing development project includes infrastructure to deliver 236 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,100 - 250 million,2020-Q1,,,,2022-Q1,2024-Q2,2017-Q1,2024-Q2,,,[email address],,
kaOrProject_1571,31/12/2023,Kāinga Ora–Homes and Communities,Hoffman St Hokitika.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,West Coast,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q4,2022-Q2,2024-Q4,,,[email address],,
kaOrProject_1572,31/12/2023,Kāinga Ora–Homes and Communities,Hoffman St Hokitika.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,West Coast,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q4,2022-Q2,2024-Q4,,,[email address],,
kaOrProject_1573,31/12/2023,Kāinga Ora–Homes and Communities,Jollie St Hokitika.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,West Coast,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q4,2022-Q2,2024-Q4,,,[email address],,
kaOrProject_1574,31/12/2023,Kāinga Ora–Homes and Communities,Tyler St Rangiora Christchurch.,This housing development project includes infrastructure to deliver 1 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2023-Q4,,,,,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1575,31/12/2023,Kāinga Ora–Homes and Communities,Whakatiki St Trentham Upper Hutt.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,Limited ,Construct only,Wellington,,,Housing,1 - 5 million,2023-Q1,,2023-Q2,,2023-Q3,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1580,31/12/2023,Kāinga Ora–Homes and Communities,Burlington St Sydenha Christchurch.,This housing development project includes infrastructure to deliver 14 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,2023-Q3,,,,,2025-Q1,2022-Q2,2025-Q1,,,[email address],,
kaOrProject_1581,31/12/2023,Kāinga Ora–Homes and Communities,Totara St Trentham Upper Hutt.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,Limited ,Construct only,Wellington,,,Housing,1 - 5 million,2023-Q1,,2023-Q2,,2023-Q3,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1582,31/12/2023,Kāinga Ora–Homes and Communities,Masters Pl Kaitaia Far North.,This housing development project includes infrastructure to deliver 2 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,1 - 5 million,,,,,,2025-Q2,2022-Q2,2025-Q2,,,[email address],,
kaOrProject_1584,31/12/2023,Kāinga Ora–Homes and Communities,Addington Ave Manurewa Auckland.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2023-Q1,,,,2023-Q3,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1588,31/12/2023,Kāinga Ora–Homes and Communities,UNI Mackay Street Thames.,This housing development project includes infrastructure to deliver 1 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,,,,,,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1589,31/12/2023,Kāinga Ora–Homes and Communities,Waimea Rd A Nelson.,This housing development project includes infrastructure to deliver 8 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,5 - 25 million,,,,,,2025-Q1,2022-Q2,2025-Q1,,,[email address],,
kaOrProject_1590,31/12/2023,Kāinga Ora–Homes and Communities,Kawai St Nelson South Nelson.,This housing development project includes infrastructure to deliver 4 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,1 - 5 million,,,,,,2024-Q3,2022-Q2,2024-Q3,,,[email address],,
kaOrProject_1591,31/12/2023,Kāinga Ora–Homes and Communities,Campbell St Nelson South Nelson.,This housing development project includes infrastructure to deliver 3 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,1 - 5 million,,,,,,2024-Q3,2022-Q2,2024-Q3,,,[email address],,
kaOrProject_1594,31/12/2023,Kāinga Ora–Homes and Communities,Norrie Smith Ave Flat Bush Auckland.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,,,,,,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1614,31/12/2023,Kāinga Ora–Homes and Communities,Myers Rd Manurewa Auckland.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,,,,,,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1618,31/12/2023,Kāinga Ora–Homes and Communities,Addington Ave Manurewa Auckland.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,,,,,2023-Q2,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1619,31/12/2023,Kāinga Ora–Homes and Communities,East St Greytown.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2023-Q4,,,,,2024-Q3,2022-Q2,2024-Q3,,,[email address],,
kaOrProject_1621,31/12/2023,Kāinga Ora–Homes and Communities,Balloch St & Shifnal Dr Manurewa Auckland.,This housing development project includes infrastructure to deliver 10 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2023-Q3,,,,,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1627,31/12/2023,Kāinga Ora–Homes and Communities,Brighton Rd Green Island Dunedin.,This housing development project includes infrastructure to deliver 8 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Otago,,,Housing,5 - 25 million,2023-Q4,,,,,2025-Q1,2022-Q2,2025-Q1,,,[email address],,
kaOrProject_1628,31/12/2023,Kāinga Ora–Homes and Communities,Allenby Ave Dunedin.,This housing development project includes infrastructure to deliver 8 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Otago,,,Housing,5 - 25 million,,,,,,2024-Q4,2022-Q2,2024-Q4,,,[email address],,
kaOrProject_1630,31/12/2023,Kāinga Ora–Homes and Communities,OPC Bridge Street Opotiki.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,1 - 5 million,,,,,2023-Q4,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1632,31/12/2023,Kāinga Ora–Homes and Communities,WHH Union Street B Victoria Rotorua.,This housing development project includes infrastructure to deliver 1 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,,,,,,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1643,31/12/2023,Kāinga Ora–Homes and Communities,Adamson Cres Invercargill.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Southland,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q4,2022-Q3,2024-Q4,,,[email address],,
kaOrProject_1644,31/12/2023,Kāinga Ora–Homes and Communities,Taurus Cres A Beach Haven Auckland.,This housing development project includes infrastructure to deliver 1 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2023-Q4,,,,,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1645,31/12/2023,Kāinga Ora–Homes and Communities,Castor Cres & Calliope Cres A& A Matahourua Cres A Esk Pl Hazard Grv Cannons Creek Porirua.,This housing development project includes infrastructure to deliver 54 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,25 - 50 million,,,,,,2025-Q4,2019-Q3,2025-Q4,,,[email address],,
kaOrProject_1646,31/12/2023,Kāinga Ora–Homes and Communities,Mt Albert Rd & Buckley Rd Royal Oak Auckland.,This housing development project includes infrastructure to deliver 10 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2023-Q4,,,,,2025-Q1,2020-Q2,2025-Q1,,,[email address],,
kaOrProject_1647,31/12/2023,Kāinga Ora–Homes and Communities,Mt Albert Rd & A Royal Oak Auckland.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2023-Q2,,,,2023-Q4,2024-Q2,2020-Q2,2024-Q2,,,[email address],,
kaOrProject_1651,31/12/2023,Kāinga Ora–Homes and Communities,Flat Bush Rd Clover Park Auckland.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2023-Q2,,,,2023-Q3,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1660,31/12/2023,Kāinga Ora–Homes and Communities,Grosvenor St Redwood Christchurch.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q3,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1662,31/12/2023,Kāinga Ora–Homes and Communities,Konini Rd A.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,,,,,,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1665,31/12/2023,Kāinga Ora–Homes and Communities,Ludhiana St.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q4,,,,2023-Q3,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1669,31/12/2023,Kāinga Ora–Homes and Communities,Paddington St & Uxbridge St.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q4,,,,2023-Q3,2024-Q1,2021-Q3,2024-Q1,,,[email address],,
kaOrProject_1673,31/12/2023,Kāinga Ora–Homes and Communities,Sapphire St.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q4,,,,2023-Q3,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1675,31/12/2023,Kāinga Ora–Homes and Communities,Tutuki St A Waterview Auckland.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,,,,,,2024-Q1,2022-Q1,2024-Q1,,,[email address],,
kaOrProject_1676,31/12/2023,Kāinga Ora–Homes and Communities,Uxbridge Street Northcote (PV).,This housing development project includes infrastructure to deliver 10 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,2023-Q2,,,,2023-Q3,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1678,31/12/2023,Kāinga Ora–Homes and Communities,Roebuck Road Te Hapara Gi.,This housing development project includes infrastructure to deliver 10 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Gisborne,,,Housing,< 1 million,2022-Q3,,,,,2024-Q4,2022-Q3,2024-Q4,,,[email address],,
kaOrProject_1679,31/12/2023,Kāinga Ora–Homes and Communities,Three Skulls Rd lot Upper Hutt.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,< 1 million,2022-Q3,,,,2023-Q3,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_168,31/12/2023,Kāinga Ora–Homes and Communities,Roseman Ave & A (RSF) Akarana Auckland HLC Roskill South Stage B.,This land development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2020-Q2,,,,2021-Q4,2024-Q2,2019-Q1,2024-Q2,,,[email address],,
kaOrProject_1680,31/12/2023,Kāinga Ora–Homes and Communities,Lyndhurst St Awapuni Gisborne.,This housing development project includes infrastructure to deliver 11 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Gisborne,,,Housing,< 1 million,2022-Q3,,,,,2025-Q3,2022-Q3,2025-Q3,,,[email address],,
kaOrProject_1682,31/12/2023,Kāinga Ora–Homes and Communities,Domain Road Papamoa Beach.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2022-Q3,,,,2023-Q3,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1684,31/12/2023,Kāinga Ora–Homes and Communities,Crinan Street Appleby Ivercargill.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,To be determined,To be determined,Southland,,,Housing,< 1 million,2022-Q3,,,,2022-Q3,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_1687,31/12/2023,Kāinga Ora–Homes and Communities,Stirling Street Raureka .,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2022-Q3,,,,2023-Q3,2024-Q2,2022-Q3,2024-Q2,,,[email address],,
kaOrProject_1688,31/12/2023,Kāinga Ora–Homes and Communities,Kuripuni St Kuripuni Masterton.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,< 1 million,2022-Q3,,,,2023-Q4,2024-Q2,2022-Q3,2024-Q2,,,[email address],,
kaOrProject_1692,31/12/2023,Kāinga Ora–Homes and Communities,Matthews Road Tamaru Gisborne.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,To be determined,To be determined,Gisborne,,,Housing,< 1 million,2022-Q3,,,,2023-Q3,2024-Q2,2022-Q3,2024-Q2,,,[email address],,
kaOrProject_1695,31/12/2023,Kāinga Ora–Homes and Communities,St Kilda Place A&B Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q1,2022-Q3,2024-Q1,,,[email address],,
kaOrProject_1696,31/12/2023,Kāinga Ora–Homes and Communities,North Street Palmerston.,This housing development project includes infrastructure to deliver 10 new units.,,Under Construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2022-Q3,,,,2023-Q1,2024-Q1,2021-Q4,2024-Q1,,,[email address],,
kaOrProject_1699,31/12/2023,Kāinga Ora–Homes and Communities,Steele Rd Tamaru Gisborne.,This housing development project includes infrastructure to deliver 11 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Gisborne,,,Housing,< 1 million,2022-Q3,,,,,2024-Q4,2022-Q3,2024-Q4,,,[email address],,
kaOrProject_1700,31/12/2023,Kāinga Ora–Homes and Communities,Racecourse Rd C Waipukurau.,This housing development project includes infrastructure to deliver 12 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2022-Q3,,,,,2025-Q1,2022-Q3,2025-Q1,,,[email address],,
kaOrProject_1701,31/12/2023,Kāinga Ora–Homes and Communities,Black St Wairoa (Trans).,This housing development project includes infrastructure to deliver 10 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2022-Q3,,,,,2024-Q4,2022-Q3,2024-Q4,,,[email address],,
kaOrProject_1704,31/12/2023,Kāinga Ora–Homes and Communities,Terrace Rd Parkvale Hastings.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2022-Q3,,,,,2024-Q3,2022-Q2,2024-Q3,,,[email address],,
kaOrProject_1705,31/12/2023,Kāinga Ora–Homes and Communities,Rimu Street Mahora Hastings.,This housing development project includes infrastructure to deliver 10 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2022-Q3,,,,,2024-Q3,2022-Q3,2024-Q3,,,[email address],,
kaOrProject_1707,31/12/2023,Kāinga Ora–Homes and Communities,Garrick Place Hamilton.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2022-Q3,,,,2023-Q3,2024-Q1,2022-Q3,2024-Q1,,,[email address],,
kaOrProject_1711,31/12/2023,Kāinga Ora–Homes and Communities,Bankwood Rd Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2022-Q3,,,,2023-Q3,2024-Q2,2022-Q3,2024-Q2,,,[email address],,
kaOrProject_1713,31/12/2023,Kāinga Ora–Homes and Communities,Newcastle Rd Dinsdale Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2022-Q3,,,,2023-Q3,2024-Q1,2022-Q3,2024-Q1,,,[email address],,
kaOrProject_1714,31/12/2023,Kāinga Ora–Homes and Communities,Great South Rd Otahuhu Auckland.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q3,,,,2023-Q2,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1717,31/12/2023,Kāinga Ora–Homes and Communities,Swaffield Rd Papatoetoe Auckland.,This housing development project includes infrastructure to deliver 10 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q2,2024-Q1,2022-Q3,2024-Q1,,,[email address],,
kaOrProject_1720,31/12/2023,Kāinga Ora–Homes and Communities,Brent Pl & Manurewa Auckland.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q3,,,,,2024-Q3,2022-Q3,2024-Q3,,,[email address],,
kaOrProject_1727,31/12/2023,Kāinga Ora–Homes and Communities,Halswell Junction Road.,This housing development project includes infrastructure to deliver 17 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q1,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1728,31/12/2023,Kāinga Ora–Homes and Communities,Awa Road Wellington.,This housing development project includes infrastructure to deliver 11 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,< 1 million,2022-Q3,,,,2023-Q3,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1735,31/12/2023,Kāinga Ora–Homes and Communities,Reeves Road & Pakuranga Auckland.,This housing development project includes infrastructure to deliver 15 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q3,,,,2023-Q2,2024-Q1,2022-Q3,2024-Q1,,,[email address],,
kaOrProject_1736,31/12/2023,Kāinga Ora–Homes and Communities,Pine Avenue New Brighton.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2022-Q3,,,,2023-Q2,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1738,31/12/2023,Kāinga Ora–Homes and Communities,Percival Street Rangiora.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2022-Q3,,,,2023-Q2,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1739,31/12/2023,Kāinga Ora–Homes and Communities,Mount View Road Hamilton.,This housing development project includes infrastructure to deliver 15 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2022-Q3,,,,2023-Q2,2024-Q4,2022-Q2,2024-Q4,,,[email address],,
kaOrProject_1740,31/12/2023,Kāinga Ora–Homes and Communities,Wallace Rd Mangere Bridge Auckland.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q3,,,,2023-Q3,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1744,31/12/2023,Kāinga Ora–Homes and Communities,Kimpton Rd Papatoetoe Auckland.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q3,,,,2022-Q2,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1788,31/12/2023,Kāinga Ora–Homes and Communities,RBH Amohau Street & Eruera Street Rotorua.,This housing development project includes infrastructure to deliver 3 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,1 - 5 million,,,,,,2024-Q3,2018-Q2,2024-Q3,,,[email address],,
kaOrProject_1810,31/12/2023,Kāinga Ora–Homes and Communities,Weaver St Whau Valley Whangarei.,This housing development project includes infrastructure to deliver 18 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,5 - 25 million,,,,,,2026-Q2,2022-Q1,2026-Q2,,,[email address],,
kaOrProject_1811,31/12/2023,Kāinga Ora–Homes and Communities,Ferry Rd & Olliviers Rd a Christchurch.,This housing development project includes infrastructure to deliver 39 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,25 - 50 million,,,,,,2026-Q1,2022-Q1,2026-Q1,,,[email address],,
kaOrProject_1812,31/12/2023,Kāinga Ora–Homes and Communities,Haselden St Westport.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,West Coast,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_1814,31/12/2023,Kāinga Ora–Homes and Communities,Fantame St Castor Cres C & Miranda St AD (EPCCNE) Cannons Creek Porirua.,This housing development project includes infrastructure to deliver 34 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,25 - 50 million,,,,,,2026-Q1,2022-Q1,2026-Q1,,,[email address],,
kaOrProject_1816,31/12/2023,Kāinga Ora–Homes and Communities,Firth St Cobden Greymouth.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,West Coast,,,Housing,1 - 5 million,2023-Q4,,,,,2025-Q2,2022-Q2,2025-Q2,,,[email address],,
kaOrProject_1823,31/12/2023,Kāinga Ora–Homes and Communities,Hamilton St East Gore Gore.,This housing development project includes infrastructure to deliver 24 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Southland,,,Housing,5 - 25 million,,,,,,2025-Q1,2022-Q2,2025-Q1,,,[email address],,
kaOrProject_1847,31/12/2023,Kāinga Ora–Homes and Communities,Selak Pl Glen Eden Auckland.,This housing development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,,,,,2023-Q3,2024-Q1,2022-Q3,2024-Q1,,,[email address],,
kaOrProject_1848,31/12/2023,Kāinga Ora–Homes and Communities,Pererika St Victoria Rotorua.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,1 - 5 million,,,,,,2024-Q2,2022-Q3,2024-Q2,,,[email address],,
kaOrProject_1854,31/12/2023,Kāinga Ora–Homes and Communities,Kerrs Rd Linwood.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q3,,,,,2025-Q1,2022-Q3,2025-Q1,,,[email address],,
kaOrProject_1855,31/12/2023,Kāinga Ora–Homes and Communities,Nile St Nelson.,This housing development project includes infrastructure to deliver 16 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,5 - 25 million,2023-Q3,,,,,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_1859,31/12/2023,Kāinga Ora–Homes and Communities,Camden St Redwood Christchurch.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q4,,,,2023-Q3,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1869,31/12/2023,Kāinga Ora–Homes and Communities,Osprey St Pandora Pl.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,,,,,,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1870,31/12/2023,Kāinga Ora–Homes and Communities,Alfred St Onehunga Auckland.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,,,,,,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1881,31/12/2023,Kāinga Ora–Homes and Communities,Simeon St Spreydon Christchurch.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q1,,,,2023-Q4,2024-Q2,2020-Q2,2024-Q2,,,[email address],,
kaOrProject_1887,31/12/2023,Kāinga Ora–Homes and Communities,Ealing & Paddington St.,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,2023-Q1,,,,2023-Q3,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1893,31/12/2023,Kāinga Ora–Homes and Communities,[PV] Barker Rd Marewa Napier.,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,5 - 25 million,2023-Q3,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1894,31/12/2023,Kāinga Ora–Homes and Communities,PV Rutherford Rd Marewa.,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1896,31/12/2023,Kāinga Ora–Homes and Communities,[PV] Herdman St Hoon Hay.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q1,,,,,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1897,31/12/2023,Kāinga Ora–Homes and Communities,Uxbridge St Northcote.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q2,,,,2023-Q1,2024-Q1,2022-Q4,2024-Q1,,,[email address],,
kaOrProject_1900,31/12/2023,Kāinga Ora–Homes and Communities,Barton Place Marewa Napier.,This housing development project includes infrastructure to deliver 30 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,1 - 5 million,2022-Q4,,,,,2025-Q3,2022-Q3,2025-Q3,,,[email address],,
kaOrProject_1901,31/12/2023,Kāinga Ora–Homes and Communities,Aldwins Road Linwood Chc.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2022-Q4,,,,2023-Q4,2025-Q1,2022-Q4,2025-Q1,,,[email address],,
kaOrProject_1902,31/12/2023,Kāinga Ora–Homes and Communities,Ferguson Street Manurewa East Auckland.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q2,2021-Q2,2024-Q2,,,[email address],,
kaOrProject_1904,31/12/2023,Kāinga Ora–Homes and Communities,Fitzherbert St Featherston.,This housing development project includes infrastructure to deliver 11 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,< 1 million,2022-Q4,,,,,2024-Q3,2022-Q3,2024-Q3,,,[email address],,
kaOrProject_1905,31/12/2023,Kāinga Ora–Homes and Communities,Guys rd & and Cottesmore.,This housing development project includes infrastructure to deliver 48 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,25 - 50 million,2022-Q4,,,,2023-Q1,2024-Q3,2022-Q2,2024-Q3,,,[email address],,
kaOrProject_1906,31/12/2023,Kāinga Ora–Homes and Communities,Lake Road Hamilton.,This housing development project includes infrastructure to deliver 13 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2022-Q4,,,,,2024-Q3,2022-Q2,2024-Q3,,,[email address],,
kaOrProject_1909,31/12/2023,Kāinga Ora–Homes and Communities,Weymouth Rd Auckland.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q4,,,,2023-Q1,2024-Q2,2022-Q3,2024-Q2,,,[email address],,
kaOrProject_1910,31/12/2023,Kāinga Ora–Homes and Communities,Peter Snell Road Ruakaka.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Northland,,,Housing,< 1 million,2022-Q4,,,,2023-Q2,2024-Q1,2022-Q3,2024-Q1,,,[email address],,
kaOrProject_1914,31/12/2023,Kāinga Ora–Homes and Communities,Tureiti Place Turangi AA.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1915,31/12/2023,Kāinga Ora–Homes and Communities,Princess Street Te Awamutu.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q1,2022-Q4,2024-Q1,,,[email address],,
kaOrProject_1916,31/12/2023,Kāinga Ora–Homes and Communities,Richmond Street Maraenui Napier AA.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2022-Q4,,,,,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_1917,31/12/2023,Kāinga Ora–Homes and Communities,Fitzroy Street Feilding.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2022-Q4,,,,2023-Q1,2024-Q1,2022-Q4,2024-Q1,,,[email address],,
kaOrProject_1918,31/12/2023,Kāinga Ora–Homes and Communities,Chadwick Road Greerton Tauranga.,This housing development project includes infrastructure to deliver 12 new units.,,Under Construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2022-Q4,,,,2023-Q4,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_1919,31/12/2023,Kāinga Ora–Homes and Communities,Rotokawa Street Taupo.,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1920,31/12/2023,Kāinga Ora–Homes and Communities,Clayton Road Rotorua.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2022-Q4,,,,,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_1922,31/12/2023,Kāinga Ora–Homes and Communities,Matai Street Raureka Hastings.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2022-Q4,,,,2023-Q4,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1923,31/12/2023,Kāinga Ora–Homes and Communities,Island View Road Western Heights Rotorua.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2022-Q4,,,,,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_1924,31/12/2023,Kāinga Ora–Homes and Communities,Hood Ave Upper Hutt.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,< 1 million,2022-Q4,,,,,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_1925,31/12/2023,Kāinga Ora–Homes and Communities,Huia Grove Upper Hutt.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,< 1 million,2022-Q4,,,,2023-Q1,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1931,31/12/2023,Kāinga Ora–Homes and Communities,Dalrymple Road Mangapapa Gisborne.,This housing development project includes infrastructure to deliver 32 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Gisborne,,,Housing,< 1 million,2022-Q4,,,,,2025-Q3,2021-Q3,2025-Q3,,,[email address],,
kaOrProject_1932,31/12/2023,Kāinga Ora–Homes and Communities,Queen Street Westport.,This housing development project includes infrastructure to deliver 14 new units.,,Under Construction,Fully funded,To be determined,To be determined,West Coast,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1933,31/12/2023,Kāinga Ora–Homes and Communities,Robertson Rd Ranui Auckland.,This housing development project includes infrastructure to deliver 16 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q4,,,,2023-Q4,2024-Q2,2022-Q3,2024-Q2,,,[email address],,
kaOrProject_1934,31/12/2023,Kāinga Ora–Homes and Communities,Wilkin St Ashburton.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2022-Q4,,,,,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_1935,31/12/2023,Kāinga Ora–Homes and Communities,Tawa Crescent Manurewa Auckland.,This housing development project includes infrastructure to deliver 7 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q4,,,,,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_1936,31/12/2023,Kāinga Ora–Homes and Communities,Kamo Road Regent Whangare.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Northland,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_1938,31/12/2023,Kāinga Ora–Homes and Communities,Glen Lynne Ave Queenwood Hamilton.,This housing development project includes infrastructure to deliver 10 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q1,2022-Q3,2024-Q1,,,[email address],,
kaOrProject_1939,31/12/2023,Kāinga Ora–Homes and Communities,Wellington St Christchurch.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2022-Q4,,,,2023-Q4,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1940,31/12/2023,Kāinga Ora–Homes and Communities,Kettle Street Point Chevalier Auckland.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q4,,,,2023-Q1,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_1941,31/12/2023,Kāinga Ora–Homes and Communities,Norman St Nawton Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2022-Q4,,,,2023-Q2,2024-Q1,2022-Q3,2024-Q1,,,[email address],,
kaOrProject_1943,31/12/2023,Kāinga Ora–Homes and Communities,Sturdee Road Manurewa Auckland.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q3,,,,,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_1944,31/12/2023,Kāinga Ora–Homes and Communities,Tancred St Linwood Chch.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2022-Q4,,,,2023-Q4,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1945,31/12/2023,Kāinga Ora–Homes and Communities,Ruskin Terrace Dunedin.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,To be determined,To be determined,Otago,,,Housing,< 1 million,2022-Q4,,,,2023-Q1,2024-Q1,2022-Q3,2024-Q1,,,[email address],,
kaOrProject_1946,31/12/2023,Kāinga Ora–Homes and Communities,Wellesley Rd Napier South Naiper.,This housing development project includes infrastructure to deliver 12 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2022-Q4,,,,,2024-Q4,2022-Q4,2024-Q4,,,[email address],,
kaOrProject_195,31/12/2023,Kāinga Ora–Homes and Communities,Laurel St Mt Albert Auckland.,This housing development project includes infrastructure to deliver 13 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2020-Q3,,,,2023-Q1,2024-Q2,2019-Q2,2024-Q2,,,[email address],,
kaOrProject_1950,31/12/2023,Kāinga Ora–Homes and Communities,Firth Street Hamilton.,This housing development project includes infrastructure to deliver 14 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1951,31/12/2023,Kāinga Ora–Homes and Communities,Old Taupiri Rd Ngaruawahia.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2022-Q4,,,,2023-Q2,2024-Q1,2022-Q3,2024-Q1,,,[email address],,
kaOrProject_1953,31/12/2023,Kāinga Ora–Homes and Communities,Silvester Street Chch.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1954,31/12/2023,Kāinga Ora–Homes and Communities,Southland Road Hastings.,This housing development project includes infrastructure to deliver 10 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2022-Q4,,,,,2024-Q4,2022-Q4,2024-Q4,,,[email address],,
kaOrProject_1955,31/12/2023,Kāinga Ora–Homes and Communities,St Aubyn St East Parkvale Hastings.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2022-Q4,,,,2023-Q2,2024-Q1,2022-Q4,2024-Q1,,,[email address],,
kaOrProject_1956,31/12/2023,Kāinga Ora–Homes and Communities,Hill Rd The Gardens Auck.,This housing development project includes infrastructure to deliver 17 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q4,,,,2023-Q2,2024-Q2,2022-Q3,2024-Q2,,,[email address],,
kaOrProject_1958,31/12/2023,Kāinga Ora–Homes and Communities,Clarkin Rd Fairfield Hamilton (AA).,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q1,2022-Q4,2024-Q1,,,[email address],,
kaOrProject_1959,31/12/2023,Kāinga Ora–Homes and Communities,Rochester St Chch.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1960,31/12/2023,Kāinga Ora–Homes and Communities,Bush St Naenae Lower Hutt.,This housing development project includes infrastructure to deliver 13 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,< 1 million,2022-Q4,,,,,2024-Q3,2022-Q3,2024-Q3,,,[email address],,
kaOrProject_1961,31/12/2023,Kāinga Ora–Homes and Communities,Dalkeith Place Opaheke Papakura.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q4,,,,2023-Q1,2024-Q1,2022-Q4,2024-Q1,,,[email address],,
kaOrProject_1962,31/12/2023,Kāinga Ora–Homes and Communities,Marriotts Rd New Brighton.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1963,31/12/2023,Kāinga Ora–Homes and Communities,Hirini Street Kaiti Gisborne.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Gisborne,,,Housing,< 1 million,2022-Q4,,,,,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_1965,31/12/2023,Kāinga Ora–Homes and Communities,High Street Masterton.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,< 1 million,2022-Q4,,,,2023-Q4,2024-Q1,2022-Q4,2024-Q1,,,[email address],,
kaOrProject_1966,31/12/2023,Kāinga Ora–Homes and Communities,Gladstone Rd Gisborne AA.,This housing development project includes infrastructure to deliver 15 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Gisborne,,,Housing,< 1 million,2022-Q4,,,,,2024-Q4,2022-Q4,2024-Q4,,,[email address],,
kaOrProject_1967,31/12/2023,Kāinga Ora–Homes and Communities,Reeves Rd A & Pakuranga Auckland.,This housing development project includes infrastructure to deliver 14 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1968,31/12/2023,Kāinga Ora–Homes and Communities,James St Mangapapa Gisborne.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Gisborne,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_1970,31/12/2023,Kāinga Ora–Homes and Communities,Highland Drive Pukete Hamilton (AA).,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2022-Q4,,,,2023-Q2,2024-Q1,2022-Q4,2024-Q1,,,[email address],,
kaOrProject_1972,31/12/2023,Kāinga Ora–Homes and Communities,High Street North Carterto.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,< 1 million,2022-Q4,,,,,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_1973,31/12/2023,Kāinga Ora–Homes and Communities,Mangere Rd Auckland.,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_1974,31/12/2023,Kāinga Ora–Homes and Communities,Nogat avenue Papatoetoe.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q4,,,,2023-Q2,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_1975,31/12/2023,Kāinga Ora–Homes and Communities,De Lautour Road Kaiti Gisborne.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,To be determined,To be determined,Gisborne,,,Housing,< 1 million,2022-Q4,,,,2023-Q2,2024-Q1,2022-Q4,2024-Q1,,,[email address],,
kaOrProject_1978,31/12/2023,Kāinga Ora–Homes and Communities,Thomson Ave Dinsdale Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q1,2022-Q4,2024-Q1,,,[email address],,
kaOrProject_1979,31/12/2023,Kāinga Ora–Homes and Communities,Sheppard St Gate Pa Tauranga.,This housing development project includes infrastructure to deliver 11 new units.,,Under Construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1980,31/12/2023,Kāinga Ora–Homes and Communities,Kenney Crescent Fairfield AA.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2022-Q4,,,,2023-Q2,2024-Q1,2022-Q4,2024-Q1,,,[email address],,
kaOrProject_1981,31/12/2023,Kāinga Ora–Homes and Communities,Browning St Manurewa East Auckland.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1982,31/12/2023,Kāinga Ora–Homes and Communities,Blanes Road Weymouth Auckland (AA).,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1984,31/12/2023,Kāinga Ora–Homes and Communities,Manson Street Gate Pa Tauranga.,This housing development project includes infrastructure to deliver 19 new units.,,Under Construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2022-Q4,,,,2023-Q4,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_1985,31/12/2023,Kāinga Ora–Homes and Communities,Plunket Street Saint Leonards Hastings AA.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1986,31/12/2023,Kāinga Ora–Homes and Communities,Alexander Ave Papatoetoe.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1987,31/12/2023,Kāinga Ora–Homes and Communities,Eskdale Road Birkdale Auck.,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q4,,,,2023-Q2,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_1988,31/12/2023,Kāinga Ora–Homes and Communities,Worksop Road Masterton (AA).,This housing development project includes infrastructure to deliver 12 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,< 1 million,2022-Q4,,,,,2024-Q4,2022-Q4,2024-Q4,,,[email address],,
kaOrProject_1989,31/12/2023,Kāinga Ora–Homes and Communities,Reynolds Street.,This housing development project includes infrastructure to deliver 13 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,< 1 million,2022-Q4,,,,2023-Q3,2024-Q1,2022-Q4,2024-Q1,,,[email address],,
kaOrProject_1991,31/12/2023,Kāinga Ora–Homes and Communities,View Rd Henderson Auckland.,This housing development project includes infrastructure to deliver 17 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q4,,,,2022-Q4,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_2019,31/12/2023,Kāinga Ora–Homes and Communities,Kupe St & Hawaiki St Orakei Auckland.,This housing development project includes infrastructure to deliver 14 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,,,,,,2025-Q2,2020-Q4,2025-Q2,,,[email address],,
kaOrProject_2020,31/12/2023,Kāinga Ora–Homes and Communities,Bisset Rd Pt Taraire A (THOON) Kaikohe.,This housing development project includes infrastructure to deliver 41 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,25 - 50 million,,,,,,2026-Q1,2021-Q4,2026-Q1,,,[email address],,
kaOrProject_2023,31/12/2023,Kāinga Ora–Homes and Communities,Clayton Rd Pukehangi Rotorua.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q3,,,,,2024-Q3,2023-Q3,2024-Q3,,,[email address],,
kaOrProject_2026,31/12/2023,Kāinga Ora–Homes and Communities,Ward St Cobden Greymouth.,This housing development project includes infrastructure to deliver 8 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,West Coast,,,Housing,5 - 25 million,,,,,,2025-Q1,2022-Q2,2025-Q1,,,[email address],,
kaOrProject_2030,31/12/2023,Kāinga Ora–Homes and Communities,Andrew St Ashburton.,This housing development project includes infrastructure to deliver 2 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_2033,31/12/2023,Kāinga Ora–Homes and Communities,Aldgate St.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q3,,,,2023-Q3,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_2035,31/12/2023,Kāinga Ora–Homes and Communities,Breens Rd.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q1,,,,2023-Q4,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_2043,31/12/2023,Kāinga Ora–Homes and Communities,Tankerville Rd.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
kaOrProject_2047,31/12/2023,Kāinga Ora–Homes and Communities,Ashmore Pl.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,,,,,,2024-Q2,2022-Q3,2024-Q2,,,[email address],,
kaOrProject_2049,31/12/2023,Kāinga Ora–Homes and Communities,Ribot Pl Manurewa Auckland.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,,,,,,2024-Q2,2022-Q3,2024-Q2,,,[email address],,
kaOrProject_2061,31/12/2023,Kāinga Ora–Homes and Communities,[PV] Guildford Street.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q1,,,,,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
kaOrProject_2066,31/12/2023,Kāinga Ora–Homes and Communities,[PV] Grahams Road .,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q2,,,,2023-Q3,2024-Q1,2023-Q1,2024-Q1,,,[email address],,
kaOrProject_2068,31/12/2023,Kāinga Ora–Homes and Communities,[PV] Heath Street Burnside.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q4,,,,,2024-Q1,2023-Q1,2024-Q1,,,[email address],,
kaOrProject_2069,31/12/2023,Kāinga Ora–Homes and Communities,[PV] O'Leary Street.,This housing development project includes infrastructure to deliver 12 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,2023-Q1,,,,2023-Q4,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
kaOrProject_2072,31/12/2023,Kāinga Ora–Homes and Communities,Charlcott St Burnside Christchurch.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q1,,,,2023-Q3,2024-Q1,2023-Q1,2024-Q1,,,[email address],,
kaOrProject_2077,31/12/2023,Kāinga Ora–Homes and Communities,[PV] Buchanans Road.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,,,,,,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
kaOrProject_2095,31/12/2023,Kāinga Ora–Homes and Communities,Geraldine St Christchurch.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2023-Q1,,,,2023-Q3,2024-Q1,2023-Q1,2024-Q1,,,[email address],,
kaOrProject_2097,31/12/2023,Kāinga Ora–Homes and Communities,Clyde Street Hamilton East Hamilton.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q1,,,,2023-Q3,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
kaOrProject_21,31/12/2023,Kāinga Ora–Homes and Communities,Springhill: Yee Place Mount Wellington Auckland to be resited at A Harris St Huntly.,This housing development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,,,,,,2024-Q1,2017-Q4,2024-Q1,,,[email address],,
kaOrProject_2101,31/12/2023,Kāinga Ora–Homes and Communities,Irvine St Frankton Hamilton.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q1,,,,2023-Q3,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
kaOrProject_2102,31/12/2023,Kāinga Ora–Homes and Communities,Gloucester Rd Manurewa Auckland.,This housing development project includes infrastructure to deliver 7 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q1,,,,2022-Q2,2024-Q1,2023-Q1,2024-Q1,,,[email address],,
kaOrProject_2105,31/12/2023,Kāinga Ora–Homes and Communities,Skipton St Mangere (AA).,This housing development project includes infrastructure to deliver 7 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q1,,,,,2025-Q2,2022-Q4,2025-Q2,,,[email address],,
kaOrProject_2106,31/12/2023,Kāinga Ora–Homes and Communities,Romilly St Westport.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,To be determined,To be determined,West Coast,,,Housing,< 1 million,2023-Q1,,,,2022-Q2,2024-Q1,2023-Q1,2024-Q1,,,[email address],,
kaOrProject_2107,31/12/2023,Kāinga Ora–Homes and Communities,Church Street Gate Pa Tauranga.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q1,,,,2023-Q3,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
kaOrProject_2108,31/12/2023,Kāinga Ora–Homes and Communities,Chadwick Road Greerton Tauranga.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q1,,,,2023-Q4,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
kaOrProject_2109,31/12/2023,Kāinga Ora–Homes and Communities,Shakespeare St Greymouth.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,West Coast,,,Housing,< 1 million,2023-Q1,,,,,2024-Q3,2022-Q3,2024-Q3,,,[email address],,
kaOrProject_2110,31/12/2023,Kāinga Ora–Homes and Communities,Coldwell Place Chartwell Hamilton.,This housing development project includes infrastructure to deliver 13 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q1,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_2111,31/12/2023,Kāinga Ora–Homes and Communities,Allen Street Morrinsville Waikato.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q1,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_2112,31/12/2023,Kāinga Ora–Homes and Communities,hukanui Road Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q1,,,,2023-Q2,2024-Q1,2022-Q4,2024-Q1,,,[email address],,
kaOrProject_2114,31/12/2023,Kāinga Ora–Homes and Communities,Seddon Street Rangiora.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2023-Q1,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_2115,31/12/2023,Kāinga Ora–Homes and Communities,Boucher Ave Te Puke.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q1,,,,,2024-Q4,2022-Q4,2024-Q4,,,[email address],,
kaOrProject_2116,31/12/2023,Kāinga Ora–Homes and Communities,English St Saint Andrews Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q1,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_2118,31/12/2023,Kāinga Ora–Homes and Communities,Raikes Avenue Te Awamutu AA.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q1,,,,2023-Q3,2024-Q1,2022-Q4,2024-Q1,,,[email address],,
kaOrProject_2119,31/12/2023,Kāinga Ora–Homes and Communities,Fairy Springs Road Rotorua.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q1,,,,,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_2120,31/12/2023,Kāinga Ora–Homes and Communities,Rosebank Rd Avondale Auckland.,This housing development project includes infrastructure to deliver 32 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q1,,,,,2025-Q2,2022-Q3,2025-Q2,,,[email address],,
kaOrProject_2122,31/12/2023,Kāinga Ora–Homes and Communities,Albert St & Palmerston North.,This housing development project includes infrastructure to deliver 12 new units.,,Under Construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Housing,1 - 5 million,2023-Q1,,,,2023-Q4,2025-Q1,2023-Q1,2025-Q1,,,[email address],,
kaOrProject_2123,31/12/2023,Kāinga Ora–Homes and Communities,Beach Grove Kaiapoi.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2023-Q1,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_2124,31/12/2023,Kāinga Ora–Homes and Communities,Comries Rd Chartwell Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q1,,,,2023-Q3,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
kaOrProject_2125,31/12/2023,Kāinga Ora–Homes and Communities,Southland Road Hastings.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2023-Q1,,,,,2024-Q4,2022-Q4,2024-Q4,,,[email address],,
kaOrProject_2126,31/12/2023,Kāinga Ora–Homes and Communities,Lake Road Koutu Rotorua.,This housing development project includes infrastructure to deliver 20 new units.,,Under Construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q1,,,,2023-Q3,2024-Q4,2023-Q1,2024-Q4,,,[email address],,
kaOrProject_2127,31/12/2023,Kāinga Ora–Homes and Communities,Tomoana Rd Mahora Hastings.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2023-Q1,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_2128,31/12/2023,Kāinga Ora–Homes and Communities,Beatty Rd Pukekohe Auckland.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q1,,,,,2025-Q2,2023-Q1,2025-Q2,,,[email address],,
kaOrProject_2129,31/12/2023,Kāinga Ora–Homes and Communities,Massine Place Auckland.,This housing development project includes infrastructure to deliver 2 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q1,,,,,2024-Q3,2023-Q1,2024-Q3,,,[email address],,
kaOrProject_2130,31/12/2023,Kāinga Ora–Homes and Communities,Doyle Street.,This housing development project includes infrastructure to deliver 8 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,West Coast,,,Housing,< 1 million,2023-Q1,,,,,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_2131,31/12/2023,Kāinga Ora–Homes and Communities,Neale Avenue Nelson.,This housing development project includes infrastructure to deliver 26 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,< 1 million,2023-Q1,,,,,2025-Q1,2022-Q2,2025-Q1,,,[email address],,
kaOrProject_2132,31/12/2023,Kāinga Ora–Homes and Communities,Gloucester Street Linwood.,This housing development project includes infrastructure to deliver 12 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2023-Q1,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_2133,31/12/2023,Kāinga Ora–Homes and Communities,Mahoe St Melville Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q1,,,,2023-Q4,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
kaOrProject_2135,31/12/2023,Kāinga Ora–Homes and Communities,Victoria Street Rotorua.,This housing development project includes infrastructure to deliver 36 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,1 - 5 million,2023-Q1,,,,,2025-Q1,2022-Q3,2025-Q1,,,[email address],,
kaOrProject_2138,31/12/2023,Kāinga Ora–Homes and Communities,Awaroa Road & Sunnyvale Auckland.,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q1,,,,2023-Q4,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_2139,31/12/2023,Kāinga Ora–Homes and Communities,Royal View Rd Te Atatu South Auckland.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q1,,,,,2024-Q4,2022-Q4,2024-Q4,,,[email address],,
kaOrProject_2140,31/12/2023,Kāinga Ora–Homes and Communities,Albert Street Auckland.,This housing development project includes infrastructure to deliver 11 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q1,,,,2023-Q3,2024-Q3,2023-Q1,2024-Q3,,,[email address],,
kaOrProject_2141,31/12/2023,Kāinga Ora–Homes and Communities,Dampier Street Avondale (AA).,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q1,,,,,2024-Q4,2022-Q4,2024-Q4,,,[email address],,
kaOrProject_2142,31/12/2023,Kāinga Ora–Homes and Communities,School Road Gisborne.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Gisborne,,,Housing,< 1 million,2023-Q1,,,,,2024-Q4,2022-Q4,2024-Q4,,,[email address],,
kaOrProject_2144,31/12/2023,Kāinga Ora–Homes and Communities,Houchens Rd Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q1,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_2145,31/12/2023,Kāinga Ora–Homes and Communities,High St Greymouth.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,West Coast,,,Housing,< 1 million,2023-Q1,,,,,2024-Q3,2022-Q3,2024-Q3,,,[email address],,
kaOrProject_2146,31/12/2023,Kāinga Ora–Homes and Communities,Kauika Road B & Avenues Whangarei.,This housing development project includes infrastructure to deliver 95 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,5 - 25 million,2023-Q1,,,,,2026-Q2,2022-Q3,2026-Q2,,,[email address],,
kaOrProject_2147,31/12/2023,Kāinga Ora–Homes and Communities,Alexander Crescent Aucklan.,This housing development project includes infrastructure to deliver 57 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2023-Q1,,,,2023-Q4,2025-Q2,2022-Q2,2025-Q2,,,[email address],,
kaOrProject_2148,31/12/2023,Kāinga Ora–Homes and Communities,Mansfield Road Rotorua.,This housing development project includes infrastructure to deliver 49 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q1,,,,,2025-Q3,2022-Q2,2025-Q3,,,[email address],,
kaOrProject_2150,31/12/2023,Kāinga Ora–Homes and Communities,Bordesley St Chch.,This housing development project includes infrastructure to deliver 16 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2022-Q4,,,,2023-Q4,2025-Q2,2022-Q2,2025-Q2,,,,,
kaOrProject_2174,31/12/2023,Kāinga Ora–Homes and Communities,Mangere Precinct Stormwater Bundle.,This is for the delivery of stormwater infrastructure projects for the Mangere precinct.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Water,< 1 million,,,,,2025-Q1,2031-Q3,2025-Q1,2031-Q3,,,[email address],,
kaOrProject_2180,31/12/2023,Kāinga Ora–Homes and Communities,Tamaki Precinct Transport Bundle.,This is for the delivery of transport infrastructure projects for the Tamaki precinct.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Transport,< 1 million,,,,,2022-Q2,2030-Q4,2022-Q2,2030-Q4,,,[email address],,
kaOrProject_2182,31/12/2023,Kāinga Ora–Homes and Communities,Tamaki Precinct Stormwater Bundle 1.,This is for the delivery of stormwater infrastructure projects for the Tamaki precinct.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Water,< 1 million,,,,,2024-Q4,2025-Q4,2024-Q4,2025-Q4,,,[email address],,
kaOrProject_2185,31/12/2023,Kāinga Ora–Homes and Communities,Tamaki Precinct Water Supply Bundle.,This is for the delivery of water supply infrastructure projects for the Tamaki precinct.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Water,< 1 million,,,,,2024-Q1,2027-Q2,2024-Q1,2027-Q2,,,[email address],,
kaOrProject_2188,31/12/2023,Kāinga Ora–Homes and Communities,Palmerston St Westport.,This housing development project includes infrastructure to deliver 8 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,West Coast,,,Housing,5 - 25 million,,,,,,2025-Q1,2022-Q2,2025-Q1,,,[email address],,
kaOrProject_2200,31/12/2023,Kāinga Ora–Homes and Communities,Buick St Blenheim.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,To be determined,To be determined,Marlborough,,,Housing,< 1 million,2023-Q2,,,,2023-Q2,2024-Q1,2023-Q1,2024-Q1,,,[email address],,
kaOrProject_2202,31/12/2023,Kāinga Ora–Homes and Communities,Wellesbourne St Palmerston North.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q2,,,,2023-Q2,2024-Q1,2022-Q4,2024-Q1,,,[email address],,
kaOrProject_2203,31/12/2023,Kāinga Ora–Homes and Communities,Chamberlain Street Feilding.,This housing development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q2,,,,2023-Q2,2024-Q1,2023-Q2,2024-Q1,,,[email address],,
kaOrProject_2205,31/12/2023,Kāinga Ora–Homes and Communities,Riverbend Rd b b Napier AA.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2023-Q2,,,,2022-Q4,2024-Q1,2023-Q2,2024-Q1,,,[email address],,
kaOrProject_2206,31/12/2023,Kāinga Ora–Homes and Communities,Lear Street Morrinsville.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q2,,,,2023-Q4,2024-Q1,2023-Q1,2024-Q1,,,[email address],,
kaOrProject_2207,31/12/2023,Kāinga Ora–Homes and Communities,Monckton St Feilding.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q2,,,,2023-Q3,2024-Q2,2023-Q2,2024-Q2,,,[email address],,
kaOrProject_2208,31/12/2023,Kāinga Ora–Homes and Communities,Rotokawa Street Taupo.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q2,,,,2023-Q4,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
kaOrProject_2209,31/12/2023,Kāinga Ora–Homes and Communities,Napier St Dunedin.,This housing development project includes infrastructure to deliver 18 new units.,,Under Construction,Fully funded,To be determined,To be determined,Otago,,,Housing,< 1 million,2023-Q2,,,,2023-Q2,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
kaOrProject_2210,31/12/2023,Kāinga Ora–Homes and Communities,Cloten Road Stratford Taranaki.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Taranaki,,,Housing,< 1 million,2023-Q2,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_2211,31/12/2023,Kāinga Ora–Homes and Communities,Egmont Street Whanganui.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q2,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_2212,31/12/2023,Kāinga Ora–Homes and Communities,West St West End Palmerston North.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q2,,,,,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_2213,31/12/2023,Kāinga Ora–Homes and Communities,Chedworth Ave Chedworth Hamilton.,This housing development project includes infrastructure to deliver 10 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q2,,,,2023-Q3,2024-Q3,2023-Q2,2024-Q3,,,[email address],,
kaOrProject_2214,31/12/2023,Kāinga Ora–Homes and Communities,Marybeth Place Rosehill Papakura AA.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q2,,,,2023-Q3,2024-Q2,2023-Q2,2024-Q2,,,[email address],,
kaOrProject_2215,31/12/2023,Kāinga Ora–Homes and Communities,Rifle Range Rd Dinsdale Hamilton.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q2,,,,,2024-Q3,2023-Q2,2024-Q3,,,[email address],,
kaOrProject_2216,31/12/2023,Kāinga Ora–Homes and Communities,Mardon Road Fairfield Hamilton AA.,This housing development project includes infrastructure to deliver 10 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q2,,,,2023-Q4,2024-Q3,2023-Q2,2024-Q3,,,[email address],,
kaOrProject_2217,31/12/2023,Kāinga Ora–Homes and Communities,Coopers Road Dallington.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2023-Q2,,,,2023-Q3,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
kaOrProject_2218,31/12/2023,Kāinga Ora–Homes and Communities,Seymour Street Hornby.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2023-Q2,,,,2023-Q4,2024-Q2,2023-Q2,2024-Q2,,,[email address],,
kaOrProject_2219,31/12/2023,Kāinga Ora–Homes and Communities,Vernall Street Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q2,,,,2023-Q4,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
kaOrProject_2220,31/12/2023,Kāinga Ora–Homes and Communities,Savage Crescent Napier.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2023-Q2,,,,,2024-Q3,2023-Q1,2024-Q3,,,[email address],,
kaOrProject_2221,31/12/2023,Kāinga Ora–Homes and Communities,Oxford Street Richmond.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Tasman,,,Housing,< 1 million,2023-Q2,,,,,2024-Q3,2023-Q1,2024-Q3,,,[email address],,
kaOrProject_2222,31/12/2023,Kāinga Ora–Homes and Communities,Rangiamohia Rd Turangi.,This housing development project includes infrastructure to deliver 7 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q2,,,,,2024-Q3,2023-Q1,2024-Q3,,,[email address],,
kaOrProject_2223,31/12/2023,Kāinga Ora–Homes and Communities,Totara Dr Pukete Hamilton AA.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q2,,,,,2024-Q3,2023-Q2,2024-Q3,,,[email address],,
kaOrProject_2224,31/12/2023,Kāinga Ora–Homes and Communities,Goldsmith St Maeroa Hamilton.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q2,,,,,2024-Q3,2023-Q2,2024-Q3,,,[email address],,
kaOrProject_2225,31/12/2023,Kāinga Ora–Homes and Communities,Ottawa Road Christchurch.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2023-Q2,,,,2023-Q4,2024-Q3,2022-Q1,2024-Q3,,,[email address],,
kaOrProject_2226,31/12/2023,Kāinga Ora–Homes and Communities,Travis Rd New Brighton.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2023-Q2,,,,,2024-Q3,2023-Q1,2024-Q3,,,[email address],,
kaOrProject_2227,31/12/2023,Kāinga Ora–Homes and Communities,Owen Street Feilding.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q2,,,,,2024-Q3,2023-Q2,2024-Q3,,,[email address],,
kaOrProject_2228,31/12/2023,Kāinga Ora–Homes and Communities,Tonga Street Taupo.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q2,,,,,2024-Q3,2023-Q1,2024-Q3,,,[email address],,
kaOrProject_2229,31/12/2023,Kāinga Ora–Homes and Communities,Herbert St Richmond.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Tasman,,,Housing,< 1 million,2023-Q2,,,,,2024-Q4,2023-Q2,2024-Q4,,,[email address],,
kaOrProject_2230,31/12/2023,Kāinga Ora–Homes and Communities,Killarney Road & Burrows Place.,This housing development project includes infrastructure to deliver 31 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q2,,,,,2025-Q2,2022-Q4,2025-Q2,,,[email address],,
kaOrProject_2231,31/12/2023,Kāinga Ora–Homes and Communities,Highland Ave Titirangi.,This housing development project includes infrastructure to deliver 11 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q2,,,,2023-Q4,2024-Q4,2023-Q1,2024-Q4,,,[email address],,
kaOrProject_2232,31/12/2023,Kāinga Ora–Homes and Communities,Cook St Nixon St & Coates St Hamilton AA.,This housing development project includes infrastructure to deliver 16 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q2,,,,,2024-Q4,2023-Q2,2024-Q4,,,[email address],,
kaOrProject_2233,31/12/2023,Kāinga Ora–Homes and Communities,Ranolf Street Glenholme .,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q2,,,,,2024-Q4,2023-Q2,2024-Q4,,,[email address],,
kaOrProject_2234,31/12/2023,Kāinga Ora–Homes and Communities,Baycroft Avenue Parkvale Tauranga AA.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q2,,,,2023-Q4,2024-Q4,2023-Q2,2024-Q4,,,[email address],,
kaOrProject_2235,31/12/2023,Kāinga Ora–Homes and Communities,Garrick Place Beerescourt Hamilton.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q2,,,,,2024-Q4,2023-Q1,2024-Q4,,,[email address],,
kaOrProject_2236,31/12/2023,Kāinga Ora–Homes and Communities,Wellington Rd Marton ManawatuWhanganui.,This housing development project includes infrastructure to deliver 8 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q2,,,,,2025-Q1,2023-Q2,2025-Q1,,,[email address],,
kaOrProject_2237,31/12/2023,Kāinga Ora–Homes and Communities,Gisborne Rd Te Puke Tauranga.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q2,,,,,2025-Q1,2023-Q2,2025-Q1,,,[email address],,
kaOrProject_2238,31/12/2023,Kāinga Ora–Homes and Communities,Ford Road A & B Fordlands Rotorua.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q2,,,,2023-Q4,2025-Q1,2023-Q1,2025-Q1,,,[email address],,
kaOrProject_2239,31/12/2023,Kāinga Ora–Homes and Communities,Roosevelt Rd Western Heights Rotorua.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q2,,,,,2025-Q1,2023-Q2,2025-Q1,,,[email address],,
kaOrProject_2240,31/12/2023,Kāinga Ora–Homes and Communities,Clinton Av & Auckland.,This housing development project includes infrastructure to deliver 10 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q2,,,,,2025-Q1,2023-Q2,2025-Q1,,,[email address],,
kaOrProject_2241,31/12/2023,Kāinga Ora–Homes and Communities,Don Buck Road Massey Auckland.,This housing development project includes infrastructure to deliver 10 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q2,,,,,2025-Q1,2023-Q1,2025-Q1,,,[email address],,
kaOrProject_2242,31/12/2023,Kāinga Ora–Homes and Communities,Cole Street Dannevirke.,This housing development project includes infrastructure to deliver 7 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q2,,,,,2025-Q1,2023-Q2,2025-Q1,,,[email address],,
kaOrProject_2243,31/12/2023,Kāinga Ora–Homes and Communities,Rawhiti St Greerton Ta.,This housing development project includes infrastructure to deliver 10 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q2,,,,,2025-Q1,2023-Q2,2025-Q1,,,[email address],,
kaOrProject_2244,31/12/2023,Kāinga Ora–Homes and Communities,Avenue Rd Otahuhu Auckland.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q2,,,,,2025-Q1,2023-Q1,2025-Q1,,,[email address],,
kaOrProject_2245,31/12/2023,Kāinga Ora–Homes and Communities,Old Taupo Road Hillcrest Rotorua.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q2,,,,,2025-Q1,2023-Q2,2025-Q1,,,[email address],,
kaOrProject_2246,31/12/2023,Kāinga Ora–Homes and Communities,Lancaster Road Beach Haven Auckland AA.,This housing development project includes infrastructure to deliver 12 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q2,,,,2023-Q4,2025-Q1,2023-Q1,2025-Q1,,,[email address],,
kaOrProject_2247,31/12/2023,Kāinga Ora–Homes and Communities,Galbraith St Ngaruawahia.,This housing development project includes infrastructure to deliver 20 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q2,,,,,2025-Q2,2023-Q1,2025-Q2,,,[email address],,
kaOrProject_2248,31/12/2023,Kāinga Ora–Homes and Communities,Brookfield Terrace Tauranga.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q2,,,,,2025-Q2,2023-Q1,2025-Q2,,,[email address],,
kaOrProject_2249,31/12/2023,Kāinga Ora–Homes and Communities,Gossamer Drive Pakuranga Heights Auckland.,This housing development project includes infrastructure to deliver 13 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q2,,,,,2025-Q2,2023-Q2,2025-Q2,,,[email address],,
kaOrProject_2250,31/12/2023,Kāinga Ora–Homes and Communities,Margaret St Roslyn Palmerston North.,This housing development project includes infrastructure to deliver 14 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q2,,,,,2025-Q2,2023-Q1,2025-Q2,,,[email address],,
kaOrProject_2251,31/12/2023,Kāinga Ora–Homes and Communities,Makoura Rd Masterton.,This housing development project includes infrastructure to deliver 12 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,< 1 million,2023-Q2,,,,,2025-Q2,2023-Q1,2025-Q2,,,[email address],,
kaOrProject_2252,31/12/2023,Kāinga Ora–Homes and Communities,Kelvin Road a Papakura Auckland.,This housing development project includes infrastructure to deliver 24 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2023-Q2,,,,,2025-Q3,2022-Q4,2025-Q3,,,[email address],,
kaOrProject_2253,31/12/2023,Kāinga Ora–Homes and Communities,Reeves Rd Pakuranga (AA).,This housing development project includes infrastructure to deliver 12 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q2,,,,,2025-Q3,2022-Q4,2025-Q3,,,[email address],,
kaOrProject_2259,31/12/2023,Kāinga Ora–Homes and Communities,Comries Rd Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q2,,,,2023-Q4,2024-Q2,2023-Q2,2024-Q2,,,[email address],,
kaOrProject_2260,31/12/2023,Kāinga Ora–Homes and Communities,Chamberlain St Feilding.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q2,,,,,2024-Q3,2023-Q2,2024-Q3,,,[email address],,
kaOrProject_2270,31/12/2023,Kāinga Ora–Homes and Communities,McKinnon Cres C Otangarei Whangarei.,This housing development project includes infrastructure to deliver 20 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,5 - 25 million,,,,,,2026-Q4,2022-Q3,2026-Q4,,,[email address],,
kaOrProject_2271,31/12/2023,Kāinga Ora–Homes and Communities,RBH Rimu Street Glenholme Rotorua.,This housing development project includes infrastructure to deliver 2 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,1 - 5 million,,,,,,2024-Q3,2023-Q1,2024-Q3,,,[email address],,
kaOrProject_2272,31/12/2023,Kāinga Ora–Homes and Communities,Seafield Pl South New Brighton Christchurch.,This housing development project includes infrastructure to deliver 2 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,,,,,,2024-Q4,2023-Q2,2024-Q4,,,[email address],,
kaOrProject_2273,31/12/2023,Kāinga Ora–Homes and Communities,Princes St Netherby Ashburton.,This housing development project includes infrastructure to deliver 3 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,,,,,,2024-Q4,2023-Q2,2024-Q4,,,[email address],,
kaOrProject_2275,31/12/2023,Kāinga Ora–Homes and Communities,Hobson Street Kawerau.,This housing development project includes infrastructure to deliver 2 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,1 - 5 million,,,,,,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
kaOrProject_2304,31/12/2023,Kāinga Ora–Homes and Communities,Fairy Springs Road Fairy Springs Rotorua.,This housing development project includes infrastructure to deliver 10 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q3,,,,,2025-Q1,2022-Q4,2025-Q1,,,[email address],,
kaOrProject_2305,31/12/2023,Kāinga Ora–Homes and Communities,Greta Street Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q3,,,,,2024-Q3,2023-Q1,2024-Q3,,,[email address],,
kaOrProject_2306,31/12/2023,Kāinga Ora–Homes and Communities,Taradale Rd Napier.,This housing development project includes infrastructure to deliver 7 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2023-Q3,,,,,2025-Q3,2023-Q3,2025-Q3,,,[email address],,
kaOrProject_2307,31/12/2023,Kāinga Ora–Homes and Communities,Beach Rd Christchurch.,This housing development project includes infrastructure to deliver 8 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2023-Q3,,,,,2025-Q3,2023-Q3,2025-Q3,,,[email address],,
kaOrProject_2308,31/12/2023,Kāinga Ora–Homes and Communities,Clark Road Kerikeri.,This housing development project includes infrastructure to deliver 22 new units.,,Under Construction,Fully funded,To be determined,To be determined,Northland,,,Housing,< 1 million,2023-Q3,,,,2023-Q4,2025-Q2,2023-Q1,2025-Q2,,,[email address],,
kaOrProject_2309,31/12/2023,Kāinga Ora–Homes and Communities,Dixon Ave Hawera.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Taranaki,,,Housing,< 1 million,2023-Q3,,,,,2025-Q3,2023-Q3,2025-Q3,,,[email address],,
kaOrProject_2310,31/12/2023,Kāinga Ora–Homes and Communities,Grigg Street & Kaitaia.,This housing development project includes infrastructure to deliver 17 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,< 1 million,2023-Q3,,,,,2025-Q1,2023-Q2,2025-Q1,,,[email address],,
kaOrProject_2313,31/12/2023,Kāinga Ora–Homes and Communities,Mansel Ave Hamilton.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q3,,,,,2024-Q4,2023-Q2,2024-Q4,,,[email address],,
kaOrProject_2314,31/12/2023,Kāinga Ora–Homes and Communities,Park St Hokitika.,This housing development project includes infrastructure to deliver 2 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,West Coast,,,Housing,< 1 million,2023-Q3,,,,,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_2315,31/12/2023,Kāinga Ora–Homes and Communities,McKenzie Street Levin.,This housing development project includes infrastructure to deliver 16 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q3,,,,,2024-Q4,2023-Q3,2024-Q4,,,[email address],,
kaOrProject_2316,31/12/2023,Kāinga Ora–Homes and Communities,Nottingham Ave Halswell.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2023-Q3,,,,2023-Q4,2024-Q2,2023-Q2,2024-Q2,,,[email address],,
kaOrProject_2317,31/12/2023,Kāinga Ora–Homes and Communities,Aberdeen Rd Te Hapara Gisborne.,This housing development project includes infrastructure to deliver 12 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Gisborne,,,Housing,< 1 million,2023-Q3,,,,,2025-Q4,2023-Q3,2025-Q4,,,[email address],,
kaOrProject_2318,31/12/2023,Kāinga Ora–Homes and Communities,Alison St Mangakakahi Rotorua.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q3,,,,,2024-Q4,2023-Q2,2024-Q4,,,[email address],,
kaOrProject_2319,31/12/2023,Kāinga Ora–Homes and Communities,Belvedere St Te Puke.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q3,,,,,2025-Q1,2023-Q2,2025-Q1,,,[email address],,
kaOrProject_2320,31/12/2023,Kāinga Ora–Homes and Communities,Birkenhead Ave Birkenhead Auckland AA.,This housing development project includes infrastructure to deliver 15 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q3,,,,,2025-Q3,2023-Q2,2025-Q3,,,[email address],,
kaOrProject_2321,31/12/2023,Kāinga Ora–Homes and Communities,Boucher Rd Te Puke.,This housing development project includes infrastructure to deliver 11 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q3,,,,,2025-Q3,2023-Q2,2025-Q3,,,[email address],,
kaOrProject_2322,31/12/2023,Kāinga Ora–Homes and Communities,Brookland Rd Western Heights Rotorua.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q3,,,,,2025-Q1,2023-Q2,2025-Q1,,,[email address],,
kaOrProject_2324,31/12/2023,Kāinga Ora–Homes and Communities,Clayton Rd Rotorua.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q3,,,,,2025-Q1,2023-Q3,2025-Q1,,,[email address],,
kaOrProject_2325,31/12/2023,Kāinga Ora–Homes and Communities,Elizabeth St Rotorua.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q3,,,,,2024-Q4,2023-Q3,2024-Q4,,,[email address],,
kaOrProject_2326,31/12/2023,Kāinga Ora–Homes and Communities,English St Christchurch.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2023-Q3,,,,2023-Q4,2024-Q2,2023-Q2,2024-Q2,,,[email address],,
kaOrProject_2327,31/12/2023,Kāinga Ora–Homes and Communities,Fairy Springs Rd Rotorua.,This housing development project includes infrastructure to deliver 15 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q3,,,,,2025-Q1,2023-Q2,2025-Q1,,,[email address],,
kaOrProject_2328,31/12/2023,Kāinga Ora–Homes and Communities,Finlayson Ave Aucklan.,This housing development project includes infrastructure to deliver 7 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q3,,,,,2025-Q3,2023-Q3,2025-Q3,,,[email address],,
kaOrProject_2329,31/12/2023,Kāinga Ora–Homes and Communities,Fitzherbert St Hokitika.,This housing development project includes infrastructure to deliver 2 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,West Coast,,,Housing,< 1 million,2023-Q3,,,,,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
kaOrProject_2330,31/12/2023,Kāinga Ora–Homes and Communities,Fitzherbert St Hokitika.,This housing development project includes infrastructure to deliver 9 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,West Coast,,,Housing,< 1 million,2023-Q3,,,,,2024-Q4,2023-Q2,2024-Q4,,,[email address],,
kaOrProject_2331,31/12/2023,Kāinga Ora–Homes and Communities,Frederick St West Mahora Hastings.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2023-Q3,,,,,2025-Q3,2023-Q3,2025-Q3,,,[email address],,
kaOrProject_2333,31/12/2023,Kāinga Ora–Homes and Communities,Hyde Avenue Nawton Hamilton.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q3,,,,,2024-Q3,2023-Q3,2024-Q3,,,[email address],,
kaOrProject_2334,31/12/2023,Kāinga Ora–Homes and Communities,Irvine St Frankton Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q3,,,,2023-Q4,2025-Q3,2023-Q3,2025-Q3,,,[email address],,
kaOrProject_2335,31/12/2023,Kāinga Ora–Homes and Communities,Kings Drive Levin.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q3,,,,2023-Q4,2024-Q3,2023-Q1,2024-Q3,,,[email address],,
kaOrProject_2336,31/12/2023,Kāinga Ora–Homes and Communities,Lisa Cres Mangakakahi Rot.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q3,,,,,2025-Q3,2023-Q2,2025-Q3,,,[email address],,
kaOrProject_2337,31/12/2023,Kāinga Ora–Homes and Communities,Maich Road Auckland.,This housing development project includes infrastructure to deliver 15 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q3,,,,,2025-Q2,2023-Q1,2025-Q2,,,[email address],,
kaOrProject_2338,31/12/2023,Kāinga Ora–Homes and Communities,McKenzie Rd Mangere Bridge Auckland.,This housing development project includes infrastructure to deliver 43 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q3,,,,,2025-Q4,2022-Q3,2025-Q4,,,[email address],,
kaOrProject_2339,31/12/2023,Kāinga Ora–Homes and Communities,Merivale Rd Parkvale Tauranga.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q3,,,,,2025-Q1,2023-Q2,2025-Q1,,,[email address],,
kaOrProject_2340,31/12/2023,Kāinga Ora–Homes and Communities,Norman St Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q3,,,,,2025-Q3,2023-Q2,2025-Q3,,,[email address],,
kaOrProject_2341,31/12/2023,Kāinga Ora–Homes and Communities,Oakfield Cres Hamilton.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q3,,,,2023-Q4,2024-Q4,2023-Q3,2024-Q4,,,[email address],,
kaOrProject_2342,31/12/2023,Kāinga Ora–Homes and Communities,Ottawa Rd Wainoni Christchurch.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2023-Q3,,,,,2024-Q4,2023-Q2,2024-Q4,,,[email address],,
kaOrProject_2343,31/12/2023,Kāinga Ora–Homes and Communities,Ottawa Rd Christchurch.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2023-Q3,,,,,2024-Q3,2023-Q2,2024-Q3,,,[email address],,
kaOrProject_2344,31/12/2023,Kāinga Ora–Homes and Communities,Oxford Street Ashhurst.,This housing development project includes infrastructure to deliver 10 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q3,,,,,2025-Q3,2023-Q2,2025-Q3,,,[email address],,
kaOrProject_2345,31/12/2023,Kāinga Ora–Homes and Communities,Princess St Tauranga.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q3,,,,,2025-Q1,2023-Q3,2025-Q1,,,[email address],,
kaOrProject_2346,31/12/2023,Kāinga Ora–Homes and Communities,Raymond St Fairview Downs Hamilton AA.,This housing development project includes infrastructure to deliver 2 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q3,,,,,2024-Q3,2023-Q2,2024-Q3,,,[email address],,
kaOrProject_2347,31/12/2023,Kāinga Ora–Homes and Communities,Rifle Range Road Taupo.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q2,,,,,2024-Q3,2023-Q2,2024-Q3,,,[email address],,
kaOrProject_2348,31/12/2023,Kāinga Ora–Homes and Communities,Stanley Rd a Gisborne.,This housing development project includes infrastructure to deliver 8 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Gisborne,,,Housing,< 1 million,2023-Q3,,,,,2025-Q3,2023-Q3,2025-Q3,,,[email address],,
kaOrProject_2349,31/12/2023,Kāinga Ora–Homes and Communities,Trafalgar St A Levin.,This housing development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q3,,,,2023-Q4,2024-Q3,2023-Q3,2024-Q3,,,[email address],,
kaOrProject_2350,31/12/2023,Kāinga Ora–Homes and Communities,Ulster St Hamilton.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q3,,,,,2024-Q3,2023-Q2,2024-Q3,,,[email address],,
kaOrProject_2352,31/12/2023,Kāinga Ora–Homes and Communities,Keiss St Blenheim.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Marlborough,,,Housing,< 1 million,2023-Q3,,,,2023-Q3,2024-Q2,2023-Q2,2024-Q2,,,[email address],,
kaOrProject_2366,31/12/2023,Kāinga Ora–Homes and Communities,Girling Ave Blenheim.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,1 - 5 million,2023-Q4,,,,,2024-Q3,2022-Q2,2024-Q3,,,[email address],,
kaOrProject_2367,31/12/2023,Kāinga Ora–Homes and Communities,Dido Pl (EPCCNEA) Cannons Creek Porirua.,This land development project includes infrastructure to deliver 2 new units.,,In Planning,Funding Source Confirmed,Direct,Construct only,Wellington,,,Housing,1 - 5 million,,,2023-Q3,,,2024-Q3,2022-Q2,2024-Q3,,,[email address],,
kaOrProject_2384,31/12/2023,Kāinga Ora–Homes and Communities,Oakland St.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q1,,,,2023-Q3,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_2385,31/12/2023,Kāinga Ora–Homes and Communities,Boundary Rd Clover Park Auckland.,This housing development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_2390,31/12/2023,Kāinga Ora–Homes and Communities,Mahia Rd Wattle Downs Auckland.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,,,,,,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
kaOrProject_2393,31/12/2023,Kāinga Ora–Homes and Communities,Churton Cres Taita Lower Hutt.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,,,,,,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
kaOrProject_2406,31/12/2023,Kāinga Ora–Homes and Communities,Willow St Ashburton.,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
kaOrProject_2407,31/12/2023,Kāinga Ora–Homes and Communities,Eden Pl & Aorangi Rd Bryndwr.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q3,,,,2023-Q4,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
kaOrProject_2410,31/12/2023,Kāinga Ora–Homes and Communities,Virgil Pl Northcote Christchurch.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,,,,,,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
kaOrProject_2411,31/12/2023,Kāinga Ora–Homes and Communities,Morrison Ave Northcote Christchurch.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q3,,,,2023-Q3,2024-Q1,2023-Q1,2024-Q1,,,[email address],,
kaOrProject_2413,31/12/2023,Kāinga Ora–Homes and Communities,[PV] Primrose Street.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q3,,,,2023-Q3,2024-Q1,2023-Q2,2024-Q1,,,[email address],,
kaOrProject_2418,31/12/2023,Kāinga Ora–Homes and Communities,Hoani St Northcote Christchurch.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q2,2023-Q2,2024-Q2,,,[email address],,
kaOrProject_2425,31/12/2023,Kāinga Ora–Homes and Communities,Eastdale Rd Avondale Auckland.,This housing development project includes infrastructure to deliver 1 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q4,,,,,2024-Q4,2023-Q1,2024-Q4,,,[email address],,
kaOrProject_2428,31/12/2023,Kāinga Ora–Homes and Communities,Camden St Northcote Christchurch.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q2,2019-Q1,2024-Q2,,,[email address],,
kaOrProject_2431,31/12/2023,Kāinga Ora–Homes and Communities,Haukore Street Hairini Tauranga.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,Direct,Construct only,Bay of Plenty,,,Housing,1 - 5 million,2022-Q1,,2022-Q3,2022-Q4,2023-Q1,2024-Q1,2019-Q1,2024-Q1,,,[email address],,
kaOrProject_2432,31/12/2023,Kāinga Ora–Homes and Communities,Greers Rd Bishopdale Christchurch.,This housing development project includes infrastructure to deliver 3 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,,,,,,2025-Q2,2019-Q3,2025-Q2,,,[email address],,
kaOrProject_2433,31/12/2023,Kāinga Ora–Homes and Communities,Oxford Tce Avalon Lower Hutt.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2022-Q3,,,,,2024-Q2,2019-Q3,2024-Q2,,,[email address],,
kaOrProject_2434,31/12/2023,Kāinga Ora–Homes and Communities,Holcombe Pl & Studholme St Somerfield Christchurch.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q1,,,,2023-Q4,2024-Q2,2020-Q2,2024-Q2,,,[email address],,
kaOrProject_2435,31/12/2023,Kāinga Ora–Homes and Communities,Courtenay Cres & Winthrop Way (AO) Mangere Auckland.,This land development project includes infrastructure to deliver 27 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,,,,,,2027-Q1,2020-Q3,2027-Q1,,,[email address],,
kaOrProject_2436,31/12/2023,Kāinga Ora–Homes and Communities,Ellesmere Cres & Tui Pl Highbury Palmerston North.,This housing development project includes infrastructure to deliver 19 new units.,,Under Construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,,,,,,2031-Q3,2020-Q4,2031-Q3,,,[email address],,
kaOrProject_2438,31/12/2023,Kāinga Ora–Homes and Communities,Mysore St Khandallah Wellington.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2022-Q4,,,,,2024-Q3,2021-Q1,2024-Q3,,,[email address],,
kaOrProject_2439,31/12/2023,Kāinga Ora–Homes and Communities,Darlington Rd Miramar Wellington.,This housing development project includes infrastructure to deliver 40 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,< 1 million,,,,,,2028-Q4,2021-Q2,2028-Q4,,,[email address],,
kaOrProject_2440,31/12/2023,Kāinga Ora–Homes and Communities,Maher St & McLeod St AD Elderslea Upper Hutt.,This housing development project includes infrastructure to deliver 27 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,< 1 million,,,,,,2028-Q2,2021-Q2,2028-Q2,,,[email address],,
kaOrProject_2441,31/12/2023,Kāinga Ora–Homes and Communities,Hei Hei Rd Hei Hei Christchurch.,This housing development project includes infrastructure to deliver 3 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,,,,,,2025-Q1,2021-Q3,2025-Q1,,,[email address],,
kaOrProject_2442,31/12/2023,Kāinga Ora–Homes and Communities,King St Kensington Whangarei.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,1 - 5 million,2023-Q4,,,,,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
kaOrProject_2443,31/12/2023,Kāinga Ora–Homes and Communities,De Costa Ave Te Hapara Gisborne.,This housing development project includes infrastructure to deliver 3 new units.,,In Planning,Funding Source Confirmed,To be determined,Construct only,Gisborne,,,Housing,1 - 5 million,,,2023-Q3,,,2024-Q3,2022-Q1,2024-Q3,,,[email address],,
kaOrProject_2444,31/12/2023,Kāinga Ora–Homes and Communities,Grange Avenue Nawton Hamilton.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,2022-Q4,,,,,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
kaOrProject_2445,31/12/2023,Kāinga Ora–Homes and Communities,Balmoral Rd Tikipunga Whangarei.,This housing development project includes infrastructure to deliver 4 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,1 - 5 million,,,,,,2025-Q3,2022-Q2,2025-Q3,,,[email address],,
kaOrProject_2446,31/12/2023,Kāinga Ora–Homes and Communities,Russell St A Westport West Coast.,This housing development project includes infrastructure to deliver 2 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,West Coast,,,Housing,1 - 5 million,,,,,,2025-Q3,2022-Q3,2025-Q3,,,[email address],,
kaOrProject_2447,31/12/2023,Kāinga Ora–Homes and Communities,Blenheim Rd & Arthur St Upper Riccarton Christchurch.,This housing development project includes infrastructure to deliver 44 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,25 - 50 million,,,,,,2026-Q2,2022-Q4,2026-Q2,,,[email address],,
kaOrProject_2448,31/12/2023,Kāinga Ora–Homes and Communities,Bellona Pl (CCNE) Cannons Creek Porirua.,This land development project includes infrastructure to deliver 9 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,5 - 25 million,,,,,,2026-Q1,2022-Q4,2026-Q1,,,[email address],,
kaOrProject_2449,31/12/2023,Kāinga Ora–Homes and Communities,Castor Cres (EPCCNE) Cannons Creek Porirua.,This land development project includes infrastructure to deliver 14 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,5 - 25 million,,,,,,2025-Q4,2022-Q4,2025-Q4,,,[email address],,
kaOrProject_2450,31/12/2023,Kāinga Ora–Homes and Communities,Danube Ln A Glen Eden Auckland.,This housing development project includes infrastructure to deliver 1 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,,,,,,2025-Q2,2023-Q1,2025-Q2,,,[email address],,
kaOrProject_2451,31/12/2023,Kāinga Ora–Homes and Communities,MHS Ranolf Street Glenholme Rotorua.,This housing development project includes infrastructure to deliver 2 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,,,,,,2024-Q3,2023-Q1,2024-Q3,,,[email address],,
kaOrProject_2452,31/12/2023,Kāinga Ora–Homes and Communities,Namata Rd Onehunga Auckland.,This housing development project includes infrastructure to deliver 4 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,,,,,,2024-Q4,2023-Q2,2024-Q4,,,[email address],,
kaOrProject_2453,31/12/2023,Kāinga Ora–Homes and Communities,Old Wairoa Rd Papakura Auckland.,This housing development project includes infrastructure to deliver 2 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,,,,,,2024-Q4,2023-Q2,2024-Q4,,,[email address],,
kaOrProject_2454,31/12/2023,Kāinga Ora–Homes and Communities,Waimea Rd Bishopdale Nelson.,This housing development project includes infrastructure to deliver 8 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Marlborough,,,Housing,5 - 25 million,,,,,,2025-Q2,2023-Q3,2025-Q2,,,[email address],,
kaOrProject_2457,31/12/2023,Kāinga Ora–Homes and Communities,Lyttelton St Somerfield Christchurch.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q1,2020-Q2,2024-Q1,,,[email address],,
kaOrProject_2471,31/12/2023,Kāinga Ora–Homes and Communities,Camden St Redwood Christchurch.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q4,,,,2023-Q4,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
kaOrProject_2516,31/12/2023,Kāinga Ora–Homes and Communities,McKenzie St Levin.,This housing development project includes infrastructure to deliver 2 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q4,,,,,2024-Q4,2023-Q4,2024-Q4,,,[email address],,
kaOrProject_2517,31/12/2023,Kāinga Ora–Homes and Communities,Main Road South Raumati Beach Paraparaumu.,This housing development project includes infrastructure to deliver 26 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,< 1 million,2023-Q4,,,,,2025-Q3,2022-Q3,2025-Q3,,,[email address],,
kaOrProject_2518,31/12/2023,Kāinga Ora–Homes and Communities,Port St E Fielding.,This housing development project includes infrastructure to deliver 20 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,,,,,,2026-Q2,2023-Q3,2026-Q2,,,[email address],,
kaOrProject_2519,31/12/2023,Kāinga Ora–Homes and Communities,Ruahine Street.,This housing development project includes infrastructure to deliver 7 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q4,,,,,2025-Q3,2023-Q3,2025-Q3,,,[email address],,
kaOrProject_2520,31/12/2023,Kāinga Ora–Homes and Communities,Taradale Rd Napier.,This housing development project includes infrastructure to deliver 10 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2023-Q4,,,,,2025-Q3,2023-Q4,2025-Q3,,,[email address],,
kaOrProject_2521,31/12/2023,Kāinga Ora–Homes and Communities,Queenwood Rd Levin.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q4,,,,,2024-Q2,2023-Q3,2024-Q2,,,[email address],,
kaOrProject_2522,31/12/2023,Kāinga Ora–Homes and Communities,Doon St Mosgiel Dunedin.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Otago,,,Housing,< 1 million,2023-Q4,,,,,2024-Q4,2023-Q3,2024-Q4,,,[email address],,
kaOrProject_2523,31/12/2023,Kāinga Ora–Homes and Communities,Mahana Road Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q4,,,,,2025-Q3,2023-Q4,2025-Q3,,,[email address],,
kaOrProject_2524,31/12/2023,Kāinga Ora–Homes and Communities,Hukanui Rd Chartwell Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q4,,,,,2025-Q3,2023-Q3,2025-Q3,,,[email address],,
kaOrProject_2525,31/12/2023,Kāinga Ora–Homes and Communities,Alexandra Street Te Awamutu.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q4,,,,,2025-Q2,2023-Q3,2025-Q2,,,[email address],,
kaOrProject_2526,31/12/2023,Kāinga Ora–Homes and Communities,River Road Kawerau.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q4,,,,,2025-Q1,2023-Q1,2025-Q1,,,[email address],,
kaOrProject_2527,31/12/2023,Kāinga Ora–Homes and Communities,Heretaunga St Palmerston.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q4,,,,,2025-Q3,2023-Q2,2025-Q3,,,[email address],,
kaOrProject_2528,31/12/2023,Kāinga Ora–Homes and Communities,Nash St Napier.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2023-Q4,,,,,2025-Q4,2023-Q4,2025-Q4,,,[email address],,
kaOrProject_2529,31/12/2023,Kāinga Ora–Homes and Communities,Malfroy Road Victoria Rotorua.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q3,,,,,2025-Q1,2022-Q4,2025-Q1,,,[email address],,
kaOrProject_2530,31/12/2023,Kāinga Ora–Homes and Communities,Hukanui Road Chartwell.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q4,,,,,2024-Q3,2023-Q3,2024-Q3,,,[email address],,
kaOrProject_2531,31/12/2023,Kāinga Ora–Homes and Communities,Greta St Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q4,,,,,2025-Q3,2023-Q4,2025-Q3,,,[email address],,
kaOrProject_2532,31/12/2023,Kāinga Ora–Homes and Communities,St Aubyn St New Plymouth.,This housing development project includes infrastructure to deliver 16 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Taranaki,,,Housing,< 1 million,2023-Q4,,,,,2026-Q1,2023-Q3,2026-Q1,,,[email address],,
kaOrProject_2533,31/12/2023,Kāinga Ora–Homes and Communities,Totara Dr Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q4,,,,,2025-Q3,2023-Q4,2025-Q3,,,[email address],,
kaOrProject_2534,31/12/2023,Kāinga Ora–Homes and Communities,Warwick Road Hastings.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2023-Q4,,,,,2025-Q3,2023-Q4,2025-Q3,,,[email address],,
kaOrProject_2535,31/12/2023,Kāinga Ora–Homes and Communities,Thomson Ave Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q4,,,,,2025-Q3,2023-Q4,2025-Q3,,,[email address],,
kaOrProject_2536,31/12/2023,Kāinga Ora–Homes and Communities,Murdoch Cres & Whangarei.,This housing development project includes infrastructure to deliver 12 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,< 1 million,2023-Q4,,,,,2025-Q3,2023-Q3,2025-Q3,,,[email address],,
kaOrProject_2537,31/12/2023,Kāinga Ora–Homes and Communities,Warwick Avenue Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q4,,,,,2025-Q3,2023-Q4,2025-Q3,,,[email address],,
kaOrProject_2538,31/12/2023,Kāinga Ora–Homes and Communities,Portal Cres Hamilton.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q4,,,,,2024-Q3,2023-Q4,2024-Q3,,,[email address],,
kaOrProject_2539,31/12/2023,Kāinga Ora–Homes and Communities,Main South Rd Hornby.,This housing development project includes infrastructure to deliver 8 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2023-Q4,,,,,2025-Q3,2023-Q4,2025-Q3,,,[email address],,
kaOrProject_2540,31/12/2023,Kāinga Ora–Homes and Communities,Titoki St a Palmerston Nort.,This housing development project includes infrastructure to deliver 1 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q4,,,,,2024-Q3,2023-Q3,2024-Q3,,,[email address],,
kaOrProject_2541,31/12/2023,Kāinga Ora–Homes and Communities,Liverpool St Levin.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,< 1 million,2023-Q4,,,,,2025-Q3,2023-Q3,2025-Q3,,,[email address],,
kaOrProject_2542,31/12/2023,Kāinga Ora–Homes and Communities,Mackworth St Woolston Christchurch.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2023-Q4,,,,,2025-Q3,2023-Q3,2025-Q3,,,[email address],,
kaOrProject_2543,31/12/2023,Kāinga Ora–Homes and Communities,Kamo Road & Whangarei.,This housing development project includes infrastructure to deliver 18 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,< 1 million,2023-Q4,,,,,2026-Q1,2023-Q2,2026-Q1,,,[email address],,
kaOrProject_2544,31/12/2023,Kāinga Ora–Homes and Communities,Argyll Stirling TRG.,This housing development project includes infrastructure to deliver 12 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q4,,,,,2026-Q1,2023-Q4,2026-Q1,,,[email address],,
kaOrProject_2545,31/12/2023,Kāinga Ora–Homes and Communities,Irvine Street Frankton Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q4,,,,,2025-Q3,2023-Q4,2025-Q3,,,[email address],,
kaOrProject_2546,31/12/2023,Kāinga Ora–Homes and Communities,Mears Rd Hamilton.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q4,,,,,2025-Q3,2023-Q4,2025-Q3,,,[email address],,
kaOrProject_2547,31/12/2023,Kāinga Ora–Homes and Communities,Queen St West Hastings.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2023-Q4,,,,,2025-Q3,2023-Q4,2025-Q3,,,[email address],,
kaOrProject_2548,31/12/2023,Kāinga Ora–Homes and Communities,McAnnalley St Manurewa East Auckland.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q4,,,,,2025-Q3,2023-Q4,2025-Q3,,,[email address],,
kaOrProject_2549,31/12/2023,Kāinga Ora–Homes and Communities,Kea Street Selwyn Heights Rotorua.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,< 1 million,2023-Q4,,,,,2025-Q2,2023-Q2,2025-Q2,,,[email address],,
kaOrProject_2550,31/12/2023,Kāinga Ora–Homes and Communities,Myers Rd Auckland.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2023-Q4,,,,2023-Q1,2024-Q1,2023-Q4,2024-Q1,,,[email address],,
kaOrProject_2551,31/12/2023,Kāinga Ora–Homes and Communities,Taranaki St Wellington.,This housing development project includes infrastructure to deliver 36 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,< 1 million,2023-Q4,,,,2023-Q4,2024-Q4,2023-Q1,2024-Q4,,,[email address],,
kaOrProject_2552,31/12/2023,Kāinga Ora–Homes and Communities,Park Road Wellington.,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,< 1 million,2023-Q4,,,,2023-Q1,2024-Q1,2023-Q3,2024-Q1,,,[email address],,
kaOrProject_2553,31/12/2023,Kāinga Ora–Homes and Communities,Broadway Stratford.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Taranaki,,,Housing,< 1 million,2023-Q4,,,,2023-Q4,2024-Q2,2023-Q3,2024-Q2,,,[email address],,
kaOrProject_2554,31/12/2023,Kāinga Ora–Homes and Communities,McQuarrie St Invercargill.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Southland,,,Housing,< 1 million,2023-Q4,,,,2023-Q4,2024-Q2,2023-Q3,2024-Q2,,,[email address],,
kaOrProject_2555,31/12/2023,Kāinga Ora–Homes and Communities,Heaphy Tce Fairfield Hamilton.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,< 1 million,2023-Q4,,,,2021-Q4,2024-Q1,2023-Q3,2024-Q1,,,[email address],,
kaOrProject_2568,31/12/2023,Kāinga Ora–Homes and Communities,Mt Roskill Precinct Transport Project Bundle.,This is for the delivery of transport infrastructure projects for the Mt Roskill precinct.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Transport,< 1 million,,,,,2023-Q2,2026-Q2,2023-Q2,2026-Q2,,,[email address],,
kaOrProject_2569,31/12/2023,Kāinga Ora–Homes and Communities,Mt Roskill Precinct Stormwater Bundle.,This is for the delivery of stormwater infrastructure projects for the Mt Roskill precinct.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Water,< 1 million,,,,,2023-Q3,2029-Q2,2023-Q3,2029-Q2,,,[email address],,
kaOrProject_2570,31/12/2023,Kāinga Ora–Homes and Communities,Mt Roskill Precinct Minor Utilities.,This is for the delivery of utilities infrastructure projects for the Mt Roskill precinct.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,,,,,2028-Q1,2029-Q1,2028-Q1,2029-Q1,,,[email address],,
kaOrProject_2571,31/12/2023,Kāinga Ora–Homes and Communities,Mt Roskill Precinct Water Supply Bundle.,This is for the delivery of water supply infrastructure projects for the Mt Roskill precinct.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Water,< 1 million,,,,,2022-Q1,2028-Q1,2022-Q1,2028-Q1,,,[email address],,
kaOrProject_2572,31/12/2023,Kāinga Ora–Homes and Communities,Mt Roskill Precinct Wastewater Bundle.,This is for the delivery of wastewater infrastructure projects for the Mt Roskill precinct.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Water,< 1 million,,,,,2025-Q1,2028-Q1,2025-Q1,2028-Q1,,,[email address],,
kaOrProject_2573,31/12/2023,Kāinga Ora–Homes and Communities,Mt Roskill Precinct Park Bundle.,This is for the delivery of park infrastructure projects for the Mt Roskill precinct.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Community facilities,< 1 million,,,,,2023-Q3,2026-Q4,2023-Q3,2026-Q4,,,[email address],,
kaOrProject_2574,31/12/2023,Kāinga Ora–Homes and Communities,Mangere Precinct Transport Bundle.,This is for the delivery of transport infrastructure projects for the Mangere precinct.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Transport,< 1 million,,,,,2025-Q1,2029-Q4,2025-Q1,2029-Q4,,,[email address],,
kaOrProject_2575,31/12/2023,Kāinga Ora–Homes and Communities,Mangere Precinct Water Supply Bundle.,This is for the delivery of water supply infrastructure projects for the Mangere precinct.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Water,< 1 million,,,,,2024-Q4,2035-Q4,2024-Q4,2035-Q4,,,[email address],,
kaOrProject_2576,31/12/2023,Kāinga Ora–Homes and Communities,Mangere Precinct Wastewater Bundle.,This is for the delivery of wastewater infrastructure projects for the Mangere precinct.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Water,< 1 million,,,,,2024-Q1,2031-Q2,2024-Q1,2031-Q2,,,[email address],,
kaOrProject_2577,31/12/2023,Kāinga Ora–Homes and Communities,Mangere Precinct Utilities Bundle.,This is for the delivery of utilities infrastructure projects for the Mt Roskill precinct.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,,,,,2025-Q1,2030-Q2,2025-Q1,2030-Q2,,,[email address],,
kaOrProject_2578,31/12/2023,Kāinga Ora–Homes and Communities,Tamaki Precinct Wastewater Bundle.,This is for the delivery of wastewater infrastructure projects for the Tamaki precinct.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Water,< 1 million,,,,,2022-Q3,2025-Q1,2022-Q3,2025-Q1,,,[email address],,
kaOrProject_260,31/12/2023,Kāinga Ora–Homes and Communities,Edmonton Ave Oranga (EDA) Auckland HLC.,This land development project includes infrastructure to deliver 29 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2020-Q4,,,,2023-Q1,2024-Q4,2019-Q1,2024-Q4,,,[email address],,
kaOrProject_282,31/12/2023,Kāinga Ora–Homes and Communities,Elmdon St A & Bede Pl Mangere Auckland.,This land development project includes infrastructure to deliver 20 new units.,,Under Construction,Fully funded,Limited ,Design and construct,Auckland,,,Housing,5 - 25 million,2021-Q1,,2021-Q1,2021-Q2,2022-Q3,2024-Q1,2019-Q4,2024-Q1,,,[email address],,
kaOrProject_293,31/12/2023,Kāinga Ora–Homes and Communities,St George St Papatoetoe Auckland.,This housing development project includes infrastructure to deliver 28 new units.,,Under Construction,Fully funded,Direct,Construct only,Auckland,,,Housing,5 - 25 million,2021-Q1,,2021-Q4,2022-Q2,2022-Q4,2024-Q3,2020-Q1,2024-Q3,,,[email address],,
kaOrProject_296,31/12/2023,Kāinga Ora–Homes and Communities,Bevin Pl Aorangi Rd Clyde Rd Bryndwr Christchurch.,This housing development project includes infrastructure to deliver 16 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,2020-Q4,,,,2022-Q3,2024-Q1,2018-Q2,2024-Q1,,,[email address],,
kaOrProject_297,31/12/2023,Kāinga Ora–Homes and Communities,Wesley Street Pukekohe.,This housing development project includes infrastructure to deliver 31 new units.,,Under Construction,Fully funded,Limited ,Design and construct,Auckland,,,Housing,5 - 25 million,2021-Q1,,2021-Q1,2021-Q3,2022-Q2,2024-Q1,2017-Q1,2024-Q1,,,[email address],,
kaOrProject_299,31/12/2023,Kāinga Ora–Homes and Communities,Coromandel St & Balmoral Tce Newtown Wellington.,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,Limited ,Construct only,Wellington,,,Housing,5 - 25 million,2021-Q1,,2021-Q4,,2023-Q1,2024-Q3,2014-Q3,2024-Q3,,,[email address],,
kaOrProject_300,31/12/2023,Kāinga Ora–Homes and Communities,Coromandel St Wellington.,This housing development project includes infrastructure to deliver 21 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,5 - 25 million,2021-Q1,,,,,2025-Q1,2018-Q2,2025-Q1,,,[email address],,
kaOrProject_305,31/12/2023,Kāinga Ora–Homes and Communities,Rockfield Rd & Edmonton Ave Oranga (RC) Auckland HLC.,This land development project includes infrastructure to deliver 42 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2021-Q1,,,,,2026-Q3,2019-Q1,2026-Q3,,,[email address],,
kaOrProject_307,31/12/2023,Kāinga Ora–Homes and Communities,Victoria Ave & Seddon St & Pukekohe.,This housing development project includes infrastructure to deliver 25 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2021-Q1,,,,2023-Q3,2025-Q1,2020-Q2,2025-Q1,,,[email address],,
kaOrProject_319,31/12/2023,Kāinga Ora–Homes and Communities,Northcote N & N Superlot: Potter Avenue & & Greenslade Crescent Northcote Auckland (Stage ).,This land development project includes infrastructure to deliver 88 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,50 - 100 million,2021-Q1,,,,2022-Q1,2024-Q1,2017-Q3,2024-Q1,,,[email address],,
kaOrProject_324,31/12/2023,Kāinga Ora–Homes and Communities,Northcote N Superlot:: Cadness Street & Northcote Auckland (Stage ).,This land development project includes infrastructure to deliver 55 new units.,,Under Construction,Fully funded,Limited ,Construct only,Auckland,,,Housing,25 - 50 million,2021-Q2,,2021-Q2,2021-Q3,2022-Q1,2024-Q2,2017-Q3,2024-Q2,,,[email address],,
kaOrProject_329,31/12/2023,Kāinga Ora–Homes and Communities,Gladstone Rd & Mill Rd Te Hapara Gisborne.,This housing development project includes infrastructure to deliver 22 new units.,,Under Construction,Fully funded,Limited ,Construct only,Gisborne,,,Housing,5 - 25 million,2021-Q2,,2022-Q4,2023-Q1,2023-Q3,2024-Q3,2019-Q3,2024-Q3,,,[email address],,
kaOrProject_331,31/12/2023,Kāinga Ora–Homes and Communities,Harvard Pl & Bader Dr Mangere Auckland SL (HLC).,This land development project includes infrastructure to deliver 42 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,,,,,,2025-Q4,2018-Q2,2025-Q4,,,[email address],,
kaOrProject_335,31/12/2023,Kāinga Ora–Homes and Communities,Niger St & Castor Cres AB & Miranda St B (EPCCNE) Cannons Creek Porirua.,This housing development project includes infrastructure to deliver 18 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,5 - 25 million,2021-Q2,,,,2023-Q3,2024-Q3,2017-Q4,2024-Q3,,,[email address],,
kaOrProject_353,31/12/2023,Kāinga Ora–Homes and Communities,Atkinson Ave Otahuhu Auckland.,This housing development project includes infrastructure to deliver 18 new units.,,Under Construction,Fully funded,Limited ,Design and construct,Auckland,,,Housing,5 - 25 million,2021-Q3,,2021-Q3,2021-Q4,2023-Q2,2024-Q4,2020-Q1,2024-Q4,,,[email address],,
kaOrProject_361,31/12/2023,Kāinga Ora–Homes and Communities,Hindmarsh St Johnsonville Wellington.,This housing development project includes infrastructure to deliver 30 new units.,,Under Construction,Fully funded,To be determined,Design and construct,Wellington,,,Housing,5 - 25 million,2021-Q3,,2021-Q3,2021-Q3,2022-Q4,2024-Q1,2019-Q3,2024-Q1,,,[email address],,
kaOrProject_373,31/12/2023,Kāinga Ora–Homes and Communities,Richardson Rd Owairaka (OW) Auckland HLC.,This land development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2021-Q3,,,,2021-Q4,2024-Q2,2019-Q3,2024-Q2,,,[email address],,
kaOrProject_390,31/12/2023,Kāinga Ora–Homes and Communities,Donegal Street Avondale Auckland.,This housing development project includes infrastructure to deliver 31 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,25 - 50 million,2021-Q3,,,,2023-Q2,2024-Q4,2018-Q4,2024-Q4,,,[email address],,
kaOrProject_392,31/12/2023,Kāinga Ora–Homes and Communities,Mayflower Cl & Henwood Rd (AO) Mangere Auckland HLC.,This land development project includes infrastructure to deliver 11 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2021-Q4,,,,,2024-Q4,2020-Q1,2024-Q4,,,[email address],,
kaOrProject_397,31/12/2023,Kāinga Ora–Homes and Communities,Murdoch Cres Raumanga Whangarei.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,Direct,Construct only,Northland,,,Housing,1 - 5 million,2022-Q2,,2022-Q1,2022-Q2,2022-Q4,2024-Q1,2020-Q3,2024-Q1,,,[email address],,
kaOrProject_401,31/12/2023,Kāinga Ora–Homes and Communities,Cardinal Pl & Riddell Rd Glendowie Auckland.,This housing development project includes infrastructure to deliver 42 new units.,,In Procurement,Funding Source Confirmed,Limited ,Construct only,Auckland,,,Housing,25 - 50 million,2021-Q4,,2022-Q4,2023-Q1,,2025-Q2,2019-Q4,2025-Q2,,,[email address],,
kaOrProject_402,31/12/2023,Kāinga Ora–Homes and Communities,May Rd & (RS) Akarana Roskill South Stage A Auckland HLC.,This land development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2021-Q4,,,,2022-Q4,2024-Q1,2019-Q1,2024-Q1,,,[email address],,
kaOrProject_404,31/12/2023,Kāinga Ora–Homes and Communities,Haumaru Greenslade Crescent Northcote Auckland.,This housing development project includes infrastructure to deliver 52 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,25 - 50 million,2022-Q2,,,,,2025-Q1,2019-Q4,2025-Q1,,,[email address],,
kaOrProject_406,31/12/2023,Kāinga Ora–Homes and Communities,Evans Bay Pde AD Kilbirnie Wellington.,This housing development project includes infrastructure to deliver 80 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,50 - 100 million,2021-Q4,,,,,2026-Q2,2018-Q2,2026-Q2,,,[email address],,
kaOrProject_408,31/12/2023,Kāinga Ora–Homes and Communities,Fowlds Ave & A Sandringham Auckland.,This housing development project includes infrastructure to deliver 15 new units.,,Under Construction,Fully funded,Limited ,Design and construct,Auckland,,,Housing,5 - 25 million,2022-Q2,,2021-Q4,2022-Q1,2022-Q3,2024-Q2,2020-Q2,2024-Q2,,,[email address],,
kaOrProject_410,31/12/2023,Kāinga Ora–Homes and Communities,Te Wharekaihua Grove Turangi.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,Direct,Construct only,Bay of Plenty,,,Housing,1 - 5 million,2022-Q3,,2022-Q3,2022-Q4,2023-Q2,2024-Q1,2020-Q3,2024-Q1,,,[email address],,
kaOrProject_416,31/12/2023,Kāinga Ora–Homes and Communities,Renton Rd Mt Albert Auckland.,This housing development project includes infrastructure to deliver 13 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2021-Q3,,,,,2024-Q4,2012-Q3,2024-Q4,,,[email address],,
kaOrProject_424,31/12/2023,Kāinga Ora–Homes and Communities,Oranga Ave & Houpara St Oranga (OR) HLC.,This land development project includes infrastructure to deliver 18 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2021-Q4,,,,2022-Q3,2024-Q2,2020-Q1,2024-Q2,,,[email address],,
kaOrProject_425,31/12/2023,Kāinga Ora–Homes and Communities,Parekarangi Grove Turangi.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,Direct,Construct only,Bay of Plenty,,,Housing,1 - 5 million,2022-Q3,,2022-Q3,2022-Q4,2023-Q2,2024-Q1,2020-Q3,2024-Q1,,,[email address],,
kaOrProject_426,31/12/2023,Kāinga Ora–Homes and Communities,Bader Dr (MW) Mangere Auckland HLC.,This land development project includes infrastructure to deliver 18 new units.,,In Procurement,Funding Source Confirmed,Limited ,Construct only,Auckland,,,Housing,5 - 25 million,2021-Q3,,2023-Q1,2023-Q2,,2025-Q2,2020-Q2,2025-Q2,,,[email address],,
kaOrProject_431,31/12/2023,Kāinga Ora–Homes and Communities,Fawn St & Calliope Cres (EPCCNEA) Cannons Creek Porirua.,This housing development project includes infrastructure to deliver 7 new units.,,In Procurement,Funding Source Confirmed,Limited ,Construct only,Wellington,,,Housing,1 - 5 million,2022-Q2,,2023-Q2,,,2024-Q3,2020-Q2,2024-Q3,,,[email address],,
kaOrProject_436,31/12/2023,Kāinga Ora–Homes and Communities,Raewyn St & Morningside Whangarei.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Northland,,,Housing,1 - 5 million,2022-Q3,,,,2022-Q4,2024-Q2,2019-Q4,2024-Q2,,,[email address],,
kaOrProject_440,31/12/2023,Kāinga Ora–Homes and Communities,Guerin St & Kaikohe Far North.,This housing development project includes infrastructure to deliver 2 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,1 - 5 million,,,,,,2025-Q1,2019-Q4,2025-Q1,,,[email address],,
kaOrProject_442,31/12/2023,Kāinga Ora–Homes and Communities,Fairway Dr Kamo Whangarei.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,Direct,Construct only,Northland,,,Housing,1 - 5 million,2022-Q1,,2022-Q2,2022-Q3,2023-Q1,2024-Q1,2019-Q2,2024-Q1,,,[email address],,
kaOrProject_443,31/12/2023,Kāinga Ora–Homes and Communities,Bisset Rd Kaikohe Far North.,This housing development project includes infrastructure to deliver 1 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,< 1 million,,,,,,2024-Q4,2019-Q4,2024-Q4,,,[email address],,
kaOrProject_444,31/12/2023,Kāinga Ora–Homes and Communities,De Merle St & Kaikohe Far North.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,Direct,Construct only,Northland,,,Housing,1 - 5 million,2022-Q3,,2023-Q3,2023-Q3,2023-Q4,2024-Q2,2020-Q2,2024-Q2,,,[email address],,
kaOrProject_446,31/12/2023,Kāinga Ora–Homes and Communities,Mangakahia Rd Kaikohe Far North.,This housing development project includes infrastructure to deliver 2 new units.,,In Planning,Funding Source Confirmed,Direct,Construct only,Northland,,,Housing,1 - 5 million,,,2023-Q3,,,2025-Q1,2019-Q4,2025-Q1,,,[email address],,
kaOrProject_447,31/12/2023,Kāinga Ora–Homes and Communities,Purdy St Kaikohe Far North.,This housing development project includes infrastructure to deliver 2 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,1 - 5 million,,,,,,2025-Q1,2019-Q4,2025-Q1,,,[email address],,
kaOrProject_452,31/12/2023,Kāinga Ora–Homes and Communities,Mount Royal Ave (OW) Owairaka Auckland.,This land development project includes infrastructure to deliver 15 new units.,,Under Construction,Fully funded,Limited ,Design and construct,Auckland,,,Housing,5 - 25 million,2021-Q4,,2021-Q4,2022-Q1,2022-Q4,2024-Q3,2020-Q2,2024-Q3,,,[email address],,
kaOrProject_453,31/12/2023,Kāinga Ora–Homes and Communities,Hazel Ave & A (OL) Three Kings Auckland.,This land development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,Direct,Construct only,Auckland,,,Housing,5 - 25 million,2022-Q2,,2022-Q2,2022-Q3,2022-Q4,2024-Q2,2020-Q3,2024-Q2,,,[email address],,
kaOrProject_454,31/12/2023,Kāinga Ora–Homes and Communities,Tairere Crescent & Tatariki Street Rosehill Papakura.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q1,,,,2022-Q4,2024-Q1,2020-Q4,2024-Q1,,,[email address],,
kaOrProject_455,31/12/2023,Kāinga Ora–Homes and Communities,New North Rd Mt Albert Auckland.,This housing development project includes infrastructure to deliver 33 new units.,,In Procurement,Funding Source Confirmed,Limited ,Design and construct,Auckland,,,Housing,25 - 50 million,2022-Q3,,2022-Q3,2023-Q1,,2026-Q2,2019-Q4,2026-Q2,,,[email address],,
kaOrProject_460,31/12/2023,Kāinga Ora–Homes and Communities,Roscommon Rd & Neems Pl Manurewa Auckland.,This housing development project includes infrastructure to deliver 11 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2021-Q4,,,,2022-Q3,2024-Q1,2020-Q4,2024-Q1,,,[email address],,
kaOrProject_463,31/12/2023,Kāinga Ora–Homes and Communities,Elm St & Racecourse Parade Avondale Auckland.,This housing development project includes infrastructure to deliver 139 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,100 - 250 million,2022-Q2,,,,,2027-Q1,2018-Q2,2027-Q1,,,[email address],,
kaOrProject_464,31/12/2023,Kāinga Ora–Homes and Communities,Parkdale Cres & Kaitaia Far North.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,Direct,Construct only,Northland,,,Housing,1 - 5 million,2022-Q3,,2022-Q3,2022-Q4,,2025-Q1,2019-Q4,2025-Q1,,,[email address],,
kaOrProject_465,31/12/2023,Kāinga Ora–Homes and Communities,Rosamund Ave & New Windsor Rd (OLB) New Windsor Auckland.,This land development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q2,,,,2022-Q4,2024-Q1,2020-Q3,2024-Q1,,,[email address],,
kaOrProject_466,31/12/2023,Kāinga Ora–Homes and Communities,Mount Smart Rd & Roosevelt Ave Oranga (RS) HLC.,This land development project includes infrastructure to deliver 38 new units.,,In Procurement,Funding Source Confirmed,Limited ,Design and construct,Auckland,,,Housing,5 - 25 million,2022-Q1,,2022-Q1,2022-Q2,,2025-Q4,2020-Q1,2025-Q4,,,[email address],,
kaOrProject_467,31/12/2023,Kāinga Ora–Homes and Communities,Brandon Road Glen Eden Auckland.,This housing development project includes infrastructure to deliver 35 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,25 - 50 million,2022-Q3,,,,,2025-Q3,2018-Q4,2025-Q3,,,[email address],,
kaOrProject_469,31/12/2023,Kāinga Ora–Homes and Communities,Arlington & Mt Cook Wellington.,This housing development project includes infrastructure to deliver 301 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,250 - 500 million,2021-Q4,,,,,2027-Q4,2018-Q3,2027-Q4,,,[email address],,
kaOrProject_471,31/12/2023,Kāinga Ora–Homes and Communities,Dido Pl & Calliope Cres AE (EPCCNEA) Cannons Creek Porirua.,This housing development project includes infrastructure to deliver 7 new units.,,In Procurement,Funding Source Confirmed,Limited ,Construct only,Wellington,,,Housing,5 - 25 million,2022-Q3,,2023-Q3,,,2024-Q3,2020-Q3,2024-Q3,,,[email address],,
kaOrProject_472,31/12/2023,Kāinga Ora–Homes and Communities,Hendon Ave & (OWA) Owairaka Auckland.,This land development project includes infrastructure to deliver 5 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,,,,,,2026-Q2,2020-Q2,2026-Q2,,,[email address],,
kaOrProject_477,31/12/2023,Kāinga Ora–Homes and Communities,Ross Crescent Fairfield Hamilton.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,Limited ,Construct only,Waikato,,,Housing,5 - 25 million,2022-Q1,,2022-Q3,2022-Q4,2023-Q1,2024-Q2,2020-Q3,2024-Q2,,,[email address],,
kaOrProject_478,31/12/2023,Kāinga Ora–Homes and Communities,Edinburgh Avenue Rosehill Papakura.,This housing development project includes infrastructure to deliver 13 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q2,,,,,2024-Q4,2020-Q4,2024-Q4,,,[email address],,
kaOrProject_479,31/12/2023,Kāinga Ora–Homes and Communities,Hendon Ave & Hargest Tce (OW) Owairaka Auckland.,This land development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,Limited ,Design and construct,Auckland,,,Housing,5 - 25 million,2021-Q4,,2021-Q4,2022-Q1,2022-Q4,2024-Q2,2020-Q2,2024-Q2,,,[email address],,
kaOrProject_481,31/12/2023,Kāinga Ora–Homes and Communities,Owairaka Ave & (OW) Owairaka Auckland.,This land development project includes infrastructure to deliver 4 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,,,,,,2026-Q2,2020-Q2,2026-Q2,,,[email address],,
kaOrProject_482,31/12/2023,Kāinga Ora–Homes and Communities,Sussex Street & Grove Road & Mayfair Hastings.,This housing development project includes infrastructure to deliver 24 new units.,,In Procurement,Funding Source Confirmed,Direct,Construct only,Hawke's Bay,,,Housing,5 - 25 million,2023-Q4,,2022-Q4,,,2025-Q2,2019-Q2,2025-Q2,,,[email address],,
kaOrProject_483,31/12/2023,Kāinga Ora–Homes and Communities,Lamb Tce & Waterworth Ave Onekawa Napier.,This housing development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2022-Q3,,,,2023-Q3,2024-Q2,2018-Q2,2024-Q2,,,[email address],,
kaOrProject_484,31/12/2023,Kāinga Ora–Homes and Communities,Ross St & Onerahi Whangarei.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,Direct,Construct only,Northland,,,Housing,1 - 5 million,2022-Q1,,2022-Q4,2023-Q1,2023-Q2,2024-Q2,2019-Q4,2024-Q2,,,[email address],,
kaOrProject_485,31/12/2023,Kāinga Ora–Homes and Communities,Northcote N Superlot: Kaka Street Northcote Auckland (Stage ).,This land development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q4,,,,2023-Q2,2024-Q2,2017-Q1,2024-Q2,,,[email address],,
kaOrProject_486,31/12/2023,Kāinga Ora–Homes and Communities,Puroto Road AA Meadowbank Auckland.,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2023-Q2,,,,2023-Q3,2024-Q2,2019-Q4,2024-Q2,,,[email address],,
kaOrProject_487,31/12/2023,Kāinga Ora–Homes and Communities,Lynton Road Mount Wellington Auckland.,This housing development project includes infrastructure to deliver 50 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,25 - 50 million,,,,,,2025-Q4,2019-Q1,2025-Q4,,,[email address],,
kaOrProject_490,31/12/2023,Kāinga Ora–Homes and Communities,Beauchamp Dr & Reverie Pl Massey Auckland.,This housing development project includes infrastructure to deliver 65 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,25 - 50 million,2022-Q1,,,,,2025-Q1,2015-Q4,2025-Q1,,,[email address],,
kaOrProject_492,31/12/2023,Kāinga Ora–Homes and Communities,Parau Street Mount Roskill Auckland.,This housing development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2023-Q2,,,,2023-Q3,2024-Q2,2017-Q1,2024-Q2,,,[email address],,
kaOrProject_493,31/12/2023,Kāinga Ora–Homes and Communities,Haukore Street Hairini Tauranga.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,Direct,Construct only,Bay of Plenty,,,Housing,1 - 5 million,2022-Q2,,2022-Q4,2023-Q2,2023-Q4,2024-Q3,2019-Q1,2024-Q3,,,[email address],,
kaOrProject_495,31/12/2023,Kāinga Ora–Homes and Communities,Allen Bell Dr & Kaitaia Far North.,This housing development project includes infrastructure to deliver 6 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,1 - 5 million,,,,,,2025-Q3,2020-Q3,2025-Q3,,,[email address],,
kaOrProject_496,31/12/2023,Kāinga Ora–Homes and Communities,Gt South Road Papatoetoe Auckland.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q2,,,,2023-Q3,2024-Q2,2018-Q3,2024-Q2,,,[email address],,
kaOrProject_498,31/12/2023,Kāinga Ora–Homes and Communities,William Blofield Ave & Sandringham Rd Ext Wesley Auckland.,This housing development project includes infrastructure to deliver 31 new units.,,Under Construction,Fully funded,Limited ,Design and construct,Auckland,,,Housing,25 - 50 million,2022-Q1,,2022-Q1,2022-Q2,2023-Q2,2025-Q2,2019-Q1,2025-Q2,,,[email address],,
kaOrProject_500,31/12/2023,Kāinga Ora–Homes and Communities,Rosehill Drive Rosehill Papakura.,This housing development project includes infrastructure to deliver 10 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q1,,,,2022-Q4,2024-Q2,2020-Q4,2024-Q2,,,[email address],,
kaOrProject_502,31/12/2023,Kāinga Ora–Homes and Communities,Kain St (OL) Mt Eden Auckland.,This housing development project includes infrastructure to deliver 7 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2021-Q4,,,,,2024-Q2,2020-Q4,2024-Q2,,,[email address],,
kaOrProject_503,31/12/2023,Kāinga Ora–Homes and Communities,Great North Road AB & Cadman Avenue Waterview Auckland.,This housing development project includes infrastructure to deliver 40 new units.,,Under Construction,Fully funded,Limited ,Construct only,Auckland,,,Housing,25 - 50 million,2022-Q2,,2022-Q3,2023-Q1,2023-Q3,2025-Q2,2017-Q1,2025-Q2,,,[email address],,
kaOrProject_504,31/12/2023,Kāinga Ora–Homes and Communities,Roscommon Road Clendon Park Auckland.,This housing development project includes infrastructure to deliver 29 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q2,,,,,2025-Q2,2020-Q3,2025-Q2,,,[email address],,
kaOrProject_507,31/12/2023,Kāinga Ora–Homes and Communities,Endeavour Avenue Flagstaff Hamilton.,This housing development project includes infrastructure to deliver 60 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,25 - 50 million,,,,,,2026-Q3,2018-Q3,2026-Q3,,,[email address],,
kaOrProject_509,31/12/2023,Kāinga Ora–Homes and Communities,Holmes Dr West Harbour Auckland.,This housing development project includes infrastructure to deliver 18 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,,,,,,2027-Q2,2019-Q4,2027-Q2,,,[email address],,
kaOrProject_510,31/12/2023,Kāinga Ora–Homes and Communities,Waihi Road Judea Tauranga.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,Direct,Construct only,Bay of Plenty,,,Housing,5 - 25 million,2022-Q1,,2022-Q3,2022-Q3,2023-Q1,2024-Q1,2019-Q1,2024-Q1,,,[email address],,
kaOrProject_511,31/12/2023,Kāinga Ora–Homes and Communities,Hendon Ave Owairaka Auckland (SL) HLC.,This land development project includes infrastructure to deliver 50 new units.,,In Procurement,Funding Source Confirmed,Direct,Design and construct,Auckland,,,Housing,25 - 50 million,2022-Q2,,2022-Q2,2022-Q4,,2026-Q3,2019-Q3,2026-Q3,,,[email address],,
kaOrProject_513,31/12/2023,Kāinga Ora–Homes and Communities,Te Mauri Paihere Ki Mangakootukutuku (Collins Road ) Melville Hamilton.,This housing development project includes infrastructure to deliver 47 new units.,,In Procurement,Funding Source Confirmed,Limited ,Construct only,Waikato,,,Housing,25 - 50 million,,,2023-Q2,,,2026-Q1,2018-Q4,2026-Q1,,,[email address],,
kaOrProject_514,31/12/2023,Kāinga Ora–Homes and Communities,Alabaster Dr Papatoetoe Auckland.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q2,,,,2023-Q3,2024-Q1,2020-Q1,2024-Q1,,,[email address],,
kaOrProject_515,31/12/2023,Kāinga Ora–Homes and Communities,Narada Pl Papatoetoe Auckland.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q3,2024-Q2,2020-Q1,2024-Q2,,,[email address],,
kaOrProject_516,31/12/2023,Kāinga Ora–Homes and Communities,Roscommon Road Clendon Park Auckland.,This housing development project includes infrastructure to deliver 11 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q1,,,,2022-Q4,2024-Q1,2020-Q3,2024-Q1,,,[email address],,
kaOrProject_518,31/12/2023,Kāinga Ora–Homes and Communities,Mulgan Street New Windsor Auckland.,This housing development project includes infrastructure to deliver 25 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,,,,,,2025-Q1,2020-Q1,2025-Q1,,,[email address],,
kaOrProject_519,31/12/2023,Kāinga Ora–Homes and Communities,Ruapehu St Paraparaumu Kapiti.,This housing development project includes infrastructure to deliver 2 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2021-Q4,,,,,2024-Q2,2020-Q4,2024-Q2,,,[email address],,
kaOrProject_520,31/12/2023,Kāinga Ora–Homes and Communities,Wrantage Street & Holford Street Westown New Plymouth.,This housing development project includes infrastructure to deliver 15 new units.,,Under Construction,Fully funded,To be determined,To be determined,Taranaki,,,Housing,5 - 25 million,2022-Q4,,,,2023-Q2,2024-Q4,2019-Q2,2024-Q4,,,[email address],,
kaOrProject_521,31/12/2023,Kāinga Ora–Homes and Communities,Felix St & (OR) Onehunga Auckland HLC Stage.,This land development project includes infrastructure to deliver 27 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q1,,,,2023-Q1,2024-Q2,2020-Q2,2024-Q2,,,[email address],,
kaOrProject_522,31/12/2023,Kāinga Ora–Homes and Communities,Cottrell Crescent Onekawa Napier.,This housing development project includes infrastructure to deliver 13 new units.,,In Procurement,Funding Source Confirmed,Limited ,Construct only,Hawke's Bay,,,Housing,5 - 25 million,2022-Q3,,2023-Q2,,,2025-Q1,2021-Q2,2025-Q1,,,[email address],,
kaOrProject_523,31/12/2023,Kāinga Ora–Homes and Communities,Jordan Ave & Mt Smart Rd Onehunga (North).,This housing development project includes infrastructure to deliver 186 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,100 - 250 million,,,,,,2028-Q2,2012-Q2,2028-Q2,,,[email address],,
kaOrProject_524,31/12/2023,Kāinga Ora–Homes and Communities,Beatty Place & Hood Street Mayfair Hastings.,This housing development project includes infrastructure to deliver 13 new units.,,In Planning,Funding Source Confirmed,Limited ,Construct only,Hawke's Bay,,,Housing,5 - 25 million,,,2023-Q1,,,2025-Q4,2019-Q3,2025-Q4,,,[email address],,
kaOrProject_527,31/12/2023,Kāinga Ora–Homes and Communities,Haukore Street Hairini Tauranga.,This housing development project includes infrastructure to deliver 11 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,5 - 25 million,2023-Q1,,,,,2025-Q1,2019-Q1,2025-Q1,,,[email address],,
kaOrProject_528,31/12/2023,Kāinga Ora–Homes and Communities,Tiverton Road & New Windsor Road New Windsor Auckland.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q3,2024-Q2,2020-Q4,2024-Q2,,,[email address],,
kaOrProject_533,31/12/2023,Kāinga Ora–Homes and Communities,Nash Rd & McGregor St (WKB) Waikowhai Auckland HLC.,This land development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,Direct,Construct only,Auckland,,,Housing,5 - 25 million,2023-Q3,,2023-Q4,2023-Q4,,2024-Q3,2020-Q2,2024-Q3,,,[email address],,
kaOrProject_534,31/12/2023,Kāinga Ora–Homes and Communities,Albrecht Ave & Quona Ave (WK) Waikowhai Auckland HLC.,This land development project includes infrastructure to deliver 21 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,,,,,,2026-Q2,2020-Q2,2026-Q2,,,[email address],,
kaOrProject_536,31/12/2023,Kāinga Ora–Homes and Communities,Wairau Avenue & A & Riversdale Road Avondale Auckland.,This housing development project includes infrastructure to deliver 8 new units.,,In Procurement,Funding Source Confirmed,Limited ,Construct only,Auckland,,,Housing,5 - 25 million,2022-Q2,,2022-Q4,2023-Q2,,2025-Q2,2020-Q2,2025-Q2,,,[email address],,
kaOrProject_537,31/12/2023,Kāinga Ora–Homes and Communities,Leaver Place & Mahia Road Weymouth Auckland.,This housing development project includes infrastructure to deliver 25 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2023-Q1,,,,2023-Q3,2024-Q3,2020-Q1,2024-Q3,,,[email address],,
kaOrProject_538,31/12/2023,Kāinga Ora–Homes and Communities,Mayflower Cl (AO) Mangere Auckland HLC.,This land development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2023-Q1,,,,2023-Q3,2024-Q2,2020-Q1,2024-Q2,,,[email address],,
kaOrProject_539,31/12/2023,Kāinga Ora–Homes and Communities,Ferry Rd Woolston Christchurch.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q2,,,,2023-Q3,2024-Q2,2020-Q3,2024-Q2,,,[email address],,
kaOrProject_540,31/12/2023,Kāinga Ora–Homes and Communities,Kowhai Ave Kaikohe Far North.,This housing development project includes infrastructure to deliver 7 new units.,,In Procurement,Funding Source Confirmed,Limited ,Construct only,Northland,,,Housing,1 - 5 million,2022-Q2,,2022-Q3,,,2025-Q2,2019-Q4,2025-Q2,,,[email address],,
kaOrProject_543,31/12/2023,Kāinga Ora–Homes and Communities,Harper Street Liddy Place & Papakura Auckland.,This housing development project includes infrastructure to deliver 13 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q2,2025-Q1,2021-Q2,2025-Q1,,,[email address],,
kaOrProject_544,31/12/2023,Kāinga Ora–Homes and Communities,Matheson Street Papakura Auckland.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q4,,,,2023-Q2,2024-Q1,2021-Q2,2024-Q1,,,[email address],,
kaOrProject_545,31/12/2023,Kāinga Ora–Homes and Communities,Pembrook Street Papakura Auckland.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q4,,,,,2024-Q3,2021-Q2,2024-Q3,,,[email address],,
kaOrProject_546,31/12/2023,Kāinga Ora–Homes and Communities,Waiari Road Conifer Grove Takanini.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q2,,,,,2024-Q3,2021-Q2,2024-Q3,,,[email address],,
kaOrProject_548,31/12/2023,Kāinga Ora–Homes and Communities,Dominion Road Papakura Auckland.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q2,,,,2023-Q2,2024-Q1,2021-Q2,2024-Q1,,,[email address],,
kaOrProject_550,31/12/2023,Kāinga Ora–Homes and Communities,Venables Avenue Cornford Place & Cottrell Crescent Onekawa Napier.,This housing development project includes infrastructure to deliver 13 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q4,2025-Q1,2018-Q2,2025-Q1,,,[email address],,
kaOrProject_552,31/12/2023,Kāinga Ora–Homes and Communities,Vernall Street A A B & Nawton Hamilton.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,Direct,Construct only,Waikato,,,Housing,5 - 25 million,2022-Q2,,2022-Q3,2022-Q4,2022-Q4,2024-Q2,2021-Q2,2024-Q2,,,[email address],,
kaOrProject_554,31/12/2023,Kāinga Ora–Homes and Communities,Montgomery Crescent Bader Hamilton.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,Limited ,Construct only,Waikato,,,Housing,1 - 5 million,2022-Q2,,2022-Q4,2023-Q1,2023-Q1,2024-Q1,2021-Q2,2024-Q1,,,[email address],,
kaOrProject_556,31/12/2023,Kāinga Ora–Homes and Communities,Odlin Crescent Nawton Hamilton.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,Direct,Construct only,Waikato,,,Housing,5 - 25 million,2022-Q2,,2022-Q4,2023-Q1,2023-Q1,2024-Q2,2021-Q2,2024-Q2,,,[email address],,
kaOrProject_557,31/12/2023,Kāinga Ora–Homes and Communities,Wharenui Tce & Rangiora Ave Roslyn Palmerston North.,This housing development project includes infrastructure to deliver 14 new units.,,Under Construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q2,2024-Q2,2020-Q3,2024-Q2,,,[email address],,
kaOrProject_558,31/12/2023,Kāinga Ora–Homes and Communities,Sussex Street Mayfair Hastings.,This housing development project includes infrastructure to deliver 16 new units.,,Under Construction,Fully funded,Direct,Construct only,Hawke's Bay,,,Housing,5 - 25 million,2022-Q4,,2022-Q4,2023-Q2,2023-Q3,2024-Q2,2019-Q3,2024-Q2,,,[email address],,
kaOrProject_561,31/12/2023,Kāinga Ora–Homes and Communities,Oxford Tce Avalon Lower Hutt.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2022-Q3,,,,,2024-Q2,2019-Q3,2024-Q2,,,[email address],,
kaOrProject_566,31/12/2023,Kāinga Ora–Homes and Communities,Sidey Place Marewa Napier.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q2,2024-Q1,2021-Q1,2024-Q1,,,[email address],,
kaOrProject_568,31/12/2023,Kāinga Ora–Homes and Communities,Bledisloe Road Maraenui Napier.,This housing development project includes infrastructure to deliver 9 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,5 - 25 million,2023-Q4,,,,,2024-Q4,2020-Q4,2024-Q4,,,[email address],,
kaOrProject_569,31/12/2023,Kāinga Ora–Homes and Communities,Bledisloe Road Maraenui Napier.,This housing development project includes infrastructure to deliver 19 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,5 - 25 million,2023-Q4,,,,,2025-Q2,2020-Q4,2025-Q2,,,[email address],,
kaOrProject_570,31/12/2023,Kāinga Ora–Homes and Communities,Cottrell Crescent Onekawa Napier.,This housing development project includes infrastructure to deliver 8 new units.,,In Procurement,Funding Source Confirmed,Limited ,Construct only,Hawke's Bay,,,Housing,5 - 25 million,2022-Q3,,2023-Q2,,,2024-Q4,2018-Q2,2024-Q4,,,[email address],,
kaOrProject_572,31/12/2023,Kāinga Ora–Homes and Communities,Bishops Lane A Nawton Hamilton.,This housing development project includes infrastructure to deliver 12 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,5 - 25 million,2022-Q2,,,,2023-Q2,2024-Q2,2021-Q2,2024-Q2,,,[email address],,
kaOrProject_573,31/12/2023,Kāinga Ora–Homes and Communities,Northcote N. Superlot: Cadness Street Northccote Auckland (Stage ).,This land development project includes infrastructure to deliver 56 new units.,,Under Construction,Fully funded,Limited ,Construct only,Auckland,,,Housing,25 - 50 million,2022-Q2,,2022-Q3,2022-Q3,2022-Q4,2024-Q4,2017-Q1,2024-Q4,,,[email address],,
kaOrProject_574,31/12/2023,Kāinga Ora–Homes and Communities,Fleming Crescent Maraenui Napier.,This housing development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2022-Q3,,,,2023-Q2,2024-Q1,2021-Q1,2024-Q1,,,[email address],,
kaOrProject_575,31/12/2023,Kāinga Ora–Homes and Communities,Hillary Crescent Maraenui Napier.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q3,2024-Q1,2021-Q1,2024-Q1,,,[email address],,
kaOrProject_576,31/12/2023,Kāinga Ora–Homes and Communities,Lister Crescent Maraenui Napier.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q2,2024-Q1,2021-Q1,2024-Q1,,,[email address],,
kaOrProject_577,31/12/2023,Kāinga Ora–Homes and Communities,Massey Crescent Marewa Napier.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,Direct,Construct only,Hawke's Bay,,,Housing,1 - 5 million,2022-Q3,,2022-Q3,2022-Q4,2023-Q3,2024-Q1,2021-Q1,2024-Q1,,,[email address],,
kaOrProject_578,31/12/2023,Kāinga Ora–Homes and Communities,Nuffield Avenue Marewa Napier.,This housing development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Housing,< 1 million,2022-Q3,,,,2023-Q2,2024-Q1,2021-Q1,2024-Q1,,,[email address],,
kaOrProject_583,31/12/2023,Kāinga Ora–Homes and Communities,Maunu Rd Woodhill Whangarei.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,Direct,Design and construct,Northland,,,Housing,1 - 5 million,2022-Q4,,2022-Q4,2022-Q4,2023-Q4,2024-Q2,2019-Q4,2024-Q2,,,[email address],,
kaOrProject_585,31/12/2023,Kāinga Ora–Homes and Communities,Exminster Street Blockhouse Bay Auckland.,This housing development project includes infrastructure to deliver 18 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,,,,,,2025-Q2,2020-Q1,2025-Q2,,,[email address],,
kaOrProject_588,31/12/2023,Kāinga Ora–Homes and Communities,Hitchings Avenue Onekawa Napier.,This housing development project includes infrastructure to deliver 10 new units.,,Under Construction,Fully funded,Limited ,Construct only,Hawke's Bay,,,Housing,5 - 25 million,2022-Q2,,2022-Q4,2023-Q2,2023-Q3,2024-Q2,2018-Q2,2024-Q2,,,[email address],,
kaOrProject_590,31/12/2023,Kāinga Ora–Homes and Communities,Venables Ave & McLaren Cres Onekawa Napier.,This housing development project includes infrastructure to deliver 15 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Hawke's Bay,,,Housing,5 - 25 million,2022-Q4,,,,,2024-Q4,2020-Q4,2024-Q4,,,[email address],,
kaOrProject_592,31/12/2023,Kāinga Ora–Homes and Communities,Kettle St Pt Chevalier Auckland.,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q2,,,,,2024-Q4,2021-Q2,2024-Q4,,,[email address],,
kaOrProject_593,31/12/2023,Kāinga Ora–Homes and Communities,Mexted Cres (EPRA) Ranui Porirua.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q4,2024-Q3,2021-Q1,2024-Q3,,,[email address],,
kaOrProject_594,31/12/2023,Kāinga Ora–Homes and Communities,Riverpark Cres Henderson Auckland.,This housing development project includes infrastructure to deliver 7 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q2,,,,,2025-Q2,2021-Q2,2025-Q2,,,[email address],,
kaOrProject_595,31/12/2023,Kāinga Ora–Homes and Communities,New Windsor Rd (OL) New Windsor Auckland.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q1,,,,2023-Q2,2024-Q1,2020-Q4,2024-Q1,,,[email address],,
kaOrProject_597,31/12/2023,Kāinga Ora–Homes and Communities,School Rd A Morningside Auckland.,This housing development project includes infrastructure to deliver 41 new units.,,In Planning,Funding Source Confirmed,Limited ,Design and construct,Auckland,,,Housing,25 - 50 million,,,2023-Q1,,,2026-Q2,2020-Q4,2026-Q2,,,[email address],,
kaOrProject_598,31/12/2023,Kāinga Ora–Homes and Communities,Church St Hokowhitu Palmerston North.,This housing development project includes infrastructure to deliver 65 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,25 - 50 million,2022-Q3,,,,,2026-Q1,2020-Q1,2026-Q1,,,[email address],,
kaOrProject_599,31/12/2023,Kāinga Ora–Homes and Communities,Reynolds St & Taita Dr Taita Lower Hutt.,This housing development project includes infrastructure to deliver 21 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,5 - 25 million,2022-Q4,,,,2023-Q3,2025-Q1,2019-Q2,2025-Q1,,,[email address],,
kaOrProject_602,31/12/2023,Kāinga Ora–Homes and Communities,Vicki St Sockburn Christchurch.,This housing development project includes infrastructure to deliver 13 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q2,2024-Q2,2020-Q3,2024-Q2,,,[email address],,
kaOrProject_603,31/12/2023,Kāinga Ora–Homes and Communities,Hazelmere Crescent & Te Awamutu.,This housing development project includes infrastructure to deliver 10 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q3,2024-Q2,2021-Q1,2024-Q2,,,[email address],,
kaOrProject_605,31/12/2023,Kāinga Ora–Homes and Communities,Great North Rd Grey Lynn Auckland.,This housing development project includes infrastructure to deliver 59 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,50 - 100 million,,,,,,2027-Q3,2018-Q1,2027-Q3,,,[email address],,
kaOrProject_606,31/12/2023,Kāinga Ora–Homes and Communities,Endeavour St Lyall Bay Wellington.,This housing development project includes infrastructure to deliver 16 new units.,,In Procurement,Funding Source Confirmed,Limited ,Construct only,Wellington,,,Housing,5 - 25 million,2022-Q3,,2023-Q3,,,2025-Q2,2019-Q3,2025-Q2,,,[email address],,
kaOrProject_607,31/12/2023,Kāinga Ora–Homes and Communities,Rugby St & Raleigh St A Awapuni Palmerston North.,This housing development project includes infrastructure to deliver 58 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,25 - 50 million,2022-Q3,,,,,2025-Q2,2020-Q3,2025-Q2,,,[email address],,
kaOrProject_609,31/12/2023,Kāinga Ora–Homes and Communities,Strathmore Ave Strathmore Park Wellington.,This housing development project includes infrastructure to deliver 8 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,5 - 25 million,2022-Q3,,,,,2024-Q3,2020-Q2,2024-Q3,,,[email address],,
kaOrProject_610,31/12/2023,Kāinga Ora–Homes and Communities,Calliope Cres Castor Cres & Hazard Grv & (CCNEAABC) Cannons Creek Porirua.,This housing development project includes infrastructure to deliver 9 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,5 - 25 million,2022-Q3,,,,,2024-Q3,2019-Q3,2024-Q3,,,[email address],,
kaOrProject_612,31/12/2023,Kāinga Ora–Homes and Communities,Weymouth Road Weymouth Auckland.,This housing development project includes infrastructure to deliver 48 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,25 - 50 million,,,,,,2026-Q2,2020-Q1,2026-Q2,,,[email address],,
kaOrProject_613,31/12/2023,Kāinga Ora–Homes and Communities,Rowlands Ave & Waipuna Rd & Mt Wellington Auckland.,This housing development project includes infrastructure to deliver 180 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,100 - 250 million,,,,,,2028-Q2,2019-Q1,2028-Q2,,,[email address],,
kaOrProject_614,31/12/2023,Kāinga Ora–Homes and Communities,Blockhouse Bay Road & Holbrook Street A Avondale Auckland.,This housing development project includes infrastructure to deliver 95 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,50 - 100 million,,,,,,2028-Q2,2018-Q2,2028-Q2,,,[email address],,
kaOrProject_615,31/12/2023,Kāinga Ora–Homes and Communities,Osterley Way Manukau Auckland.,This housing development project includes infrastructure to deliver 123 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,100 - 250 million,,,,,,2027-Q2,2019-Q4,2027-Q2,,,[email address],,
kaOrProject_619,31/12/2023,Kāinga Ora–Homes and Communities,Ranolf St Rotorua.,This housing development project includes infrastructure to deliver 12 new units.,,Under Construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Housing,5 - 25 million,2022-Q1,,,,2022-Q1,2024-Q2,2021-Q2,2024-Q2,,,[email address],,
kaOrProject_723,31/12/2023,Kāinga Ora–Homes and Communities,Orchard St Avondale Auckland.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q3,,,,,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_726,31/12/2023,Kāinga Ora–Homes and Communities,Justine St (EPCCSE ) Cannons Creek Porirua (OSM).,This housing development project includes infrastructure to deliver 2 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q3,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_729,31/12/2023,Kāinga Ora–Homes and Communities,Kingsway Ave Sandringham Auckland.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q3,,,,,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_731,31/12/2023,Kāinga Ora–Homes and Communities,Broadway & Tawanui Rd Kaikohe.,This housing development project includes infrastructure to deliver 36 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,25 - 50 million,,,,,,2025-Q2,2021-Q3,2025-Q2,,,[email address],,
kaOrProject_732,31/12/2023,Kāinga Ora–Homes and Communities,Triton Ave & Tyburnia Owairaka.,This housing development project includes infrastructure to deliver 24 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q3,,,,,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_740,31/12/2023,Kāinga Ora–Homes and Communities,Lyon St Glengarry Invercargill.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Southland,,,Housing,1 - 5 million,2022-Q4,,,,2023-Q2,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_747,31/12/2023,Kāinga Ora–Homes and Communities,Astrolabe St (EPCCSE) Cannons Creek Porirua.,This housing development project includes infrastructure to deliver 2 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q3,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_750,31/12/2023,Kāinga Ora–Homes and Communities,Bellona Pl (EPCCNEB) Cannons Creek Porirua.,This housing development project includes infrastructure to deliver 2 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q2,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_754,31/12/2023,Kāinga Ora–Homes and Communities,Orontes St Shirley ChCh.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q4,,,,2023-Q2,2024-Q1,2021-Q3,2024-Q1,,,[email address],,
kaOrProject_755,31/12/2023,Kāinga Ora–Homes and Communities,Fowlds Ave A Sandringham Auckland.,This housing development project includes infrastructure to deliver 10 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,,,,,,2025-Q1,2021-Q3,2025-Q1,,,[email address],,
kaOrProject_758,31/12/2023,Kāinga Ora–Homes and Communities,Dominion Rd Mt Roskill Auckland.,This housing development project includes infrastructure to deliver 12 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q3,,,,,2025-Q1,2021-Q3,2025-Q1,,,[email address],,
kaOrProject_768,31/12/2023,Kāinga Ora–Homes and Communities,Lambeth Rd (OL) Sandringham Auckland.,This land development project includes infrastructure to deliver 12 new units.,,In Procurement,Funding Source Confirmed,Direct,Construct only,Auckland,,,Housing,5 - 25 million,2023-Q2,,2023-Q3,,,2025-Q2,2020-Q3,2025-Q2,,,[email address],,
kaOrProject_78,31/12/2023,Kāinga Ora–Homes and Communities,Leach St New Plymouth.,This housing development project includes infrastructure to deliver 44 new units.,,Under Construction,Fully funded,To be determined,To be determined,Taranaki,,,Housing,5 - 25 million,2021-Q3,,,,2022-Q2,2024-Q2,2021-Q2,2024-Q2,,,[email address],,
kaOrProject_781,31/12/2023,Kāinga Ora–Homes and Communities,Holland Rd & Davey Pl Hamilton (OSM).,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,5 - 25 million,2022-Q4,,,,2023-Q4,2024-Q3,2021-Q3,2024-Q3,,,[email address],,
kaOrProject_819,31/12/2023,Kāinga Ora–Homes and Communities,Montgomery Cres Hamilton (OSM).,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,2022-Q4,,,,,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_820,31/12/2023,Kāinga Ora–Homes and Communities,Yvonne St Hamilton (OSM).,This housing development project includes infrastructure to deliver 4 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,,,,,,2024-Q4,2021-Q3,2024-Q4,,,[email address],,
kaOrProject_822,31/12/2023,Kāinga Ora–Homes and Communities,Stokes Cres Hamilton (OSM).,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,2022-Q4,,,,2023-Q3,2024-Q1,2021-Q3,2024-Q1,,,[email address],,
kaOrProject_823,31/12/2023,Kāinga Ora–Homes and Communities,Crawshaw Dr & Hamilton (OSM).,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,2022-Q4,,,,2023-Q4,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_824,31/12/2023,Kāinga Ora–Homes and Communities,Aileen Pl Hamilton (OSM).,This housing development project includes infrastructure to deliver 7 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,2022-Q4,,,,2023-Q4,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_825,31/12/2023,Kāinga Ora–Homes and Communities,Aspiring Cr Hamilton (OSM).,This housing development project includes infrastructure to deliver 7 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,2022-Q4,,,,,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_827,31/12/2023,Kāinga Ora–Homes and Communities,Rawlings St Hamilton (OSM).,This housing development project includes infrastructure to deliver 10 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,5 - 25 million,2022-Q4,,,,,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_828,31/12/2023,Kāinga Ora–Homes and Communities,Peacockes Rd AC AB Hamilton.,This housing development project includes infrastructure to deliver 14 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,5 - 25 million,2022-Q4,,,,2023-Q4,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_829,31/12/2023,Kāinga Ora–Homes and Communities,Aileen Pl Hamilton (OSM).,This housing development project includes infrastructure to deliver 12 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,5 - 25 million,2022-Q4,,,,2023-Q4,2024-Q3,2021-Q3,2024-Q3,,,[email address],,
kaOrProject_830,31/12/2023,Kāinga Ora–Homes and Communities,Marshall St Hamilton (OSM).,This housing development project includes infrastructure to deliver 11 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,5 - 25 million,2022-Q4,,,,,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_836,31/12/2023,Kāinga Ora–Homes and Communities,Gilberthorpes Rd & Amuri St Hei Hei Christchurch.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q2,,,,2023-Q3,2024-Q1,2019-Q3,2024-Q1,,,[email address],,
kaOrProject_839,31/12/2023,Kāinga Ora–Homes and Communities,Wood St Wainuiomata Lower Hutt.,This housing development project includes infrastructure to deliver 35 new units.,,In Planning,Funding Source Confirmed,Direct,Design and construct,Wellington,,,Housing,25 - 50 million,,,2019-Q4,,,2025-Q4,2019-Q4,2025-Q4,,,[email address],,
kaOrProject_843,31/12/2023,Kāinga Ora–Homes and Communities,Hinemoa St Spreydon Christchurch.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q3,,,,,2024-Q2,2020-Q2,2024-Q2,,,[email address],,
kaOrProject_845,31/12/2023,Kāinga Ora–Homes and Communities,Gilberthorpes Rd Hei Hei Christchurch.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q2,,,,2023-Q2,2024-Q1,2019-Q3,2024-Q1,,,[email address],,
kaOrProject_847,31/12/2023,Kāinga Ora–Homes and Communities,Hillary Cres Upper Riccarton Christchurch.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q2,2024-Q1,2019-Q3,2024-Q1,,,[email address],,
kaOrProject_848,31/12/2023,Kāinga Ora–Homes and Communities,Knowles St Mariehau Christchurch.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q1,,,,2023-Q3,2024-Q1,2021-Q2,2024-Q1,,,[email address],,
kaOrProject_851,31/12/2023,Kāinga Ora–Homes and Communities,Lavelle Rd Henderson Auck.,This housing development project includes infrastructure to deliver 7 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2021-Q4,,,,2022-Q4,2024-Q1,2021-Q4,2024-Q1,,,[email address],,
kaOrProject_857,31/12/2023,Kāinga Ora–Homes and Communities,Garreg Rd Bryndwr Christchurch.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q3,2024-Q2,2020-Q2,2024-Q2,,,[email address],,
kaOrProject_859,31/12/2023,Kāinga Ora–Homes and Communities,Lindon St Rangiora Christchurch.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q2,,,,2023-Q2,2024-Q1,2021-Q3,2024-Q1,,,[email address],,
kaOrProject_860,31/12/2023,Kāinga Ora–Homes and Communities,Rangitoto Road Auckland.,This housing development project includes infrastructure to deliver 14 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,< 1 million,2022-Q2,,,,2023-Q2,2024-Q2,2021-Q2,2024-Q2,,,[email address],,
kaOrProject_861,31/12/2023,Kāinga Ora–Homes and Communities,Highbury Pl Avonside Christchurch.,This housing development project includes infrastructure to deliver 11 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q4,2024-Q2,2020-Q2,2024-Q2,,,[email address],,
kaOrProject_862,31/12/2023,Kāinga Ora–Homes and Communities,Gilberthorpes Rd Islington Christchurch.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q3,2024-Q3,2019-Q3,2024-Q3,,,[email address],,
kaOrProject_864,31/12/2023,Kāinga Ora–Homes and Communities,Amyes Rd Hornby Christchurch.,This housing development project includes infrastructure to deliver 10 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,2022-Q2,,,,2023-Q2,2024-Q3,2020-Q2,2024-Q3,,,[email address],,
kaOrProject_867,31/12/2023,Kāinga Ora–Homes and Communities,Humariri St & Katoa St Pt Chevalier Auckland.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q2,2024-Q1,2021-Q2,2024-Q1,,,[email address],,
kaOrProject_868,31/12/2023,Kāinga Ora–Homes and Communities,Whites Line East Waiwhetu North Lower Hutt.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2022-Q4,,,,,2024-Q3,2021-Q1,2024-Q3,,,[email address],,
kaOrProject_870,31/12/2023,Kāinga Ora–Homes and Communities,Tawhiri Rd & & Ngatiawa St One Tree Hill Auckland.,This housing development project includes infrastructure to deliver 7 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q2,,,,2023-Q4,2025-Q2,2020-Q4,2025-Q2,,,[email address],,
kaOrProject_872,31/12/2023,Kāinga Ora–Homes and Communities,Hart St Woolston Christchurch.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q3,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_875,31/12/2023,Kāinga Ora–Homes and Communities,Aorangi Rd Bryndwr Christchurch.,This housing development project includes infrastructure to deliver 9 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q3,2024-Q2,2020-Q1,2024-Q2,,,[email address],,
kaOrProject_878,31/12/2023,Kāinga Ora–Homes and Communities,Valonia St (OL) New Windsor Auckland.,This housing development project includes infrastructure to deliver 2 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q4,2021-Q2,2024-Q4,,,[email address],,
kaOrProject_879,31/12/2023,Kāinga Ora–Homes and Communities,Princess Pl & Williams St Kaiapoi Christchurch.,This housing development project includes infrastructure to deliver 7 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q2,,,,2023-Q4,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_88,31/12/2023,Kāinga Ora–Homes and Communities,Richardson Rd Mt Roskill Auckland (SB) HLC.,This land development project includes infrastructure to deliver 23 new units.,,In Planning,Funding Source Confirmed,Direct,Construct only,Auckland,,,Housing,5 - 25 million,2018-Q3,,2022-Q1,2022-Q2,2022-Q3,2026-Q3,2018-Q2,2026-Q3,,,[email address],,
kaOrProject_881,31/12/2023,Kāinga Ora–Homes and Communities,Montgomery St & Cambridge St Levin Horowhenua.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Housing,5 - 25 million,2022-Q4,,,,2023-Q4,2024-Q2,2018-Q3,2024-Q2,,,[email address],,
kaOrProject_885,31/12/2023,Kāinga Ora–Homes and Communities,Church St Rangiora Christchurch.,This housing development project includes infrastructure to deliver 7 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q2,2024-Q1,2021-Q3,2024-Q1,,,[email address],,
kaOrProject_886,31/12/2023,Kāinga Ora–Homes and Communities,DHS: Omapere Road A Kaikohe.,This housing development project includes infrastructure to deliver 1 new units.,,Under Construction,Fully funded,To be determined,To be determined,Northland,,,Housing,< 1 million,,,,,2023-Q4,2024-Q1,2021-Q3,2024-Q1,,,[email address],,
kaOrProject_887,31/12/2023,Kāinga Ora–Homes and Communities,Turner St B Kaeo Far North.,This housing development project includes infrastructure to deliver 1 new units.,,In Procurement,Funding Source Confirmed,Direct,Construct only,Northland,,,Housing,< 1 million,2022-Q2,,2022-Q4,2023-Q1,,2025-Q1,2018-Q2,2025-Q1,,,[email address],,
kaOrProject_888,31/12/2023,Kāinga Ora–Homes and Communities,Whittle Pl (OL) New Windsor Auckland.,This land development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2023-Q3,,,,,2025-Q2,2020-Q3,2025-Q2,,,[email address],,
kaOrProject_889,31/12/2023,Kāinga Ora–Homes and Communities,Methuen Rd (OL) New Windsor Auckland.,This land development project includes infrastructure to deliver 2 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,,,,,,2025-Q1,2020-Q3,2025-Q1,,,[email address],,
kaOrProject_890,31/12/2023,Kāinga Ora–Homes and Communities,Jollie St & Nalder Pl Linwood Christchurch.,This housing development project includes infrastructure to deliver 16 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,2022-Q2,,,,,2024-Q3,2021-Q2,2024-Q3,,,[email address],,
kaOrProject_892,31/12/2023,Kāinga Ora–Homes and Communities,Warden St Richmond Christchurch.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q3,2024-Q1,2021-Q3,2024-Q1,,,[email address],,
kaOrProject_893,31/12/2023,Kāinga Ora–Homes and Communities,Quinns Rd Christchurch.,This housing development project includes infrastructure to deliver 5 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,< 1 million,2021-Q3,,,,2023-Q1,2024-Q1,2021-Q3,2024-Q1,,,[email address],,
kaOrProject_894,31/12/2023,Kāinga Ora–Homes and Communities,Bucklands Beach Road & Gills Road Half Moon Bay Auckland.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q3,,,,,2025-Q3,2021-Q2,2025-Q3,,,[email address],,
kaOrProject_895,31/12/2023,Kāinga Ora–Homes and Communities,Jollie St Linwood Christchurch.,This housing development project includes infrastructure to deliver 19 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,2022-Q2,,,,2023-Q2,2024-Q1,2021-Q2,2024-Q1,,,[email address],,
kaOrProject_896,31/12/2023,Kāinga Ora–Homes and Communities,Domain Road & Whakatane.,This housing development project includes infrastructure to deliver 4 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,1 - 5 million,2023-Q1,,,,,2024-Q3,2021-Q2,2024-Q3,,,[email address],,
kaOrProject_897,31/12/2023,Kāinga Ora–Homes and Communities,Ohauiti Road Hairini Tauranga.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,Direct,Construct only,Bay of Plenty,,,Housing,1 - 5 million,2023-Q1,,2023-Q1,,2023-Q3,2024-Q2,2021-Q2,2024-Q2,,,[email address],,
kaOrProject_898,31/12/2023,Kāinga Ora–Homes and Communities,Winthrop Way (AOA) Mangere Auckland.,This land development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2023-Q2,,,,2023-Q3,2024-Q2,2020-Q3,2024-Q2,,,[email address],,
kaOrProject_899,31/12/2023,Kāinga Ora–Homes and Communities,Mayflower Cl (AO) Mangere Auckland.,This land development project includes infrastructure to deliver 10 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q3,2024-Q2,2020-Q3,2024-Q2,,,[email address],,
kaOrProject_900,31/12/2023,Kāinga Ora–Homes and Communities,Slim St & Montgomery Cres Bader Hamilton.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,Limited ,Construct only,Waikato,,,Housing,5 - 25 million,2022-Q3,,2023-Q1,,2023-Q3,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_901,31/12/2023,Kāinga Ora–Homes and Communities,Perry Pl & Bader St Bader Hamilton.,This housing development project includes infrastructure to deliver 8 new units.,,Under Construction,Fully funded,Limited ,Construct only,Waikato,,,Housing,5 - 25 million,2022-Q3,,2022-Q4,2023-Q2,2023-Q3,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_905,31/12/2023,Kāinga Ora–Homes and Communities,Douglas Cres Fairfield Hamilton.,This housing development project includes infrastructure to deliver 6 new units.,,Under Construction,Fully funded,Direct,Construct only,Waikato,,,Housing,1 - 5 million,2022-Q3,,2022-Q4,2022-Q4,2023-Q2,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_907,31/12/2023,Kāinga Ora–Homes and Communities,Princess Pl & Williams St Kaiapoi.,This housing development project includes infrastructure to deliver 14 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q4,2024-Q4,2021-Q3,2024-Q4,,,[email address],,
kaOrProject_909,31/12/2023,Kāinga Ora–Homes and Communities,Titoki St Te Atatu Peninsula Auckland.,This housing development project includes infrastructure to deliver 8 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q3,,,,,2025-Q1,2017-Q2,2025-Q1,,,[email address],,
kaOrProject_91,31/12/2023,Kāinga Ora–Homes and Communities,Northcote N Superlot: Fraser Avenue Northcote Auckland (Stage ).,This land development project includes infrastructure to deliver 30 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2018-Q4,,,,2021-Q4,2024-Q1,2017-Q3,2024-Q1,,,[email address],,
kaOrProject_910,31/12/2023,Kāinga Ora–Homes and Communities,Aspen St & Victor St Avondale Auckland.,This housing development project includes infrastructure to deliver 21 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,,,,,,2026-Q2,2020-Q1,2026-Q2,,,[email address],,
kaOrProject_911,31/12/2023,Kāinga Ora–Homes and Communities,Maher Pl (EPRA) Ranui Porirua.,This housing development project includes infrastructure to deliver 8 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,5 - 25 million,2022-Q4,,,,,2024-Q4,2020-Q2,2024-Q4,,,[email address],,
kaOrProject_912,31/12/2023,Kāinga Ora–Homes and Communities,Rowcliffe Cres & Holland St Avonside Christchurch.,This housing development project includes infrastructure to deliver 22 new units.,,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Housing,5 - 25 million,2023-Q2,,,,2023-Q4,2024-Q2,2019-Q1,2024-Q2,,,[email address],,
kaOrProject_913,31/12/2023,Kāinga Ora–Homes and Communities,Hyde St Wainuiomata Lower Hutt.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,Construct only,Wellington,,,Housing,1 - 5 million,2023-Q1,,2023-Q3,,,2024-Q4,2019-Q3,2024-Q4,,,[email address],,
kaOrProject_914,31/12/2023,Kāinga Ora–Homes and Communities,Watchfield Cl Mangere West. MWA (HLC).,This land development project includes infrastructure to deliver 18 new units.,,Under Construction,Fully funded,Direct,Design and construct,Auckland,,,Housing,5 - 25 million,2022-Q1,,2022-Q2,2022-Q3,2023-Q1,2024-Q3,2019-Q4,2024-Q3,,,[email address],,
kaOrProject_918,31/12/2023,Kāinga Ora–Homes and Communities,Waiwhetu Rd Fairfield Lower Hutt.,This housing development project includes infrastructure to deliver 8 new units.,,In Procurement,Funding Source Confirmed,Limited ,Construct only,Wellington,,,Housing,5 - 25 million,2023-Q1,,2023-Q2,,,2025-Q1,2019-Q3,2025-Q1,,,[email address],,
kaOrProject_92,31/12/2023,Kāinga Ora–Homes and Communities,Northcote N Superlot: Fraser Avenue & Richardson Place Northcote Auckland (Stage ).,This land development project includes infrastructure to deliver 24 new units.,,Under Construction,Fully funded,Direct,Construct only,Auckland,,,Housing,25 - 50 million,2018-Q4,,2022-Q3,2022-Q4,2019-Q2,2024-Q1,2017-Q3,2024-Q1,,,[email address],,
kaOrProject_920,31/12/2023,Kāinga Ora–Homes and Communities,Winthrop Way & Mayflower Cres (AO) Mangere Auckland.,This land development project includes infrastructure to deliver 23 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,,,,,,2026-Q1,2020-Q3,2026-Q1,,,[email address],,
kaOrProject_921,31/12/2023,Kāinga Ora–Homes and Communities,Rawlings St & Pine Ave Bader Hamilton.,This housing development project includes infrastructure to deliver 13 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,5 - 25 million,2022-Q4,,,,2023-Q3,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_922,31/12/2023,Kāinga Ora–Homes and Communities,Formby Ave Pt Chevalier Auckland.,This housing development project includes infrastructure to deliver 2 new units.,,Under Construction,Fully funded,Direct,Construct only,Auckland,,,Housing,1 - 5 million,2022-Q3,,2023-Q3,2023-Q4,2023-Q3,2024-Q3,2021-Q2,2024-Q3,,,[email address],,
kaOrProject_923,31/12/2023,Kāinga Ora–Homes and Communities,Godley St Waiwhetu North Lower Hutt.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,Direct,Construct only,Wellington,,,Housing,1 - 5 million,2023-Q1,,2023-Q3,,,2024-Q4,2021-Q1,2024-Q4,,,[email address],,
kaOrProject_924,31/12/2023,Kāinga Ora–Homes and Communities,Crewe Cres & Bolton Pl Horowhitu Palmerston North.,This housing development project includes infrastructure to deliver 39 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Housing,25 - 50 million,2023-Q2,,,,,2026-Q2,2018-Q3,2026-Q2,,,[email address],,
kaOrProject_925,31/12/2023,Kāinga Ora–Homes and Communities,Waiohua Road & A Greenlane. Auckland.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q3,2024-Q2,2020-Q2,2024-Q2,,,[email address],,
kaOrProject_926,31/12/2023,Kāinga Ora–Homes and Communities,Burberry Road RD Drury.,This housing development project includes infrastructure to deliver 24 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2023-Q3,,,,2023-Q3,2024-Q4,2020-Q4,2024-Q4,,,[email address],,
kaOrProject_929,31/12/2023,Kāinga Ora–Homes and Communities,Felix St (OR) Onehunga Auckland HLC Stage.,This land development project includes infrastructure to deliver 24 new units.,,Under Construction,Fully funded,Limited ,Construct only,Auckland,,,Housing,5 - 25 million,2022-Q1,,2023-Q1,2023-Q2,,2025-Q1,2021-Q4,2025-Q1,,,[email address],,
kaOrProject_930,31/12/2023,Kāinga Ora–Homes and Communities,Walker Rd Pt Chevalier Auckland.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,1 - 5 million,2022-Q3,,,,2023-Q2,2024-Q1,2021-Q2,2024-Q1,,,[email address],,
kaOrProject_931,31/12/2023,Kāinga Ora–Homes and Communities,Notley St Westmere Auckland.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,Limited ,Construct only,Auckland,,,Housing,1 - 5 million,2022-Q3,,2023-Q3,2023-Q4,2023-Q4,2024-Q3,2021-Q3,2024-Q3,,,[email address],,
kaOrProject_934,31/12/2023,Kāinga Ora–Homes and Communities,Chester Ave & Ross St Onerahi Whangarei.,This housing development project includes infrastructure to deliver 9 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,5 - 25 million,,,,,,2026-Q1,2019-Q4,2026-Q1,,,[email address],,
kaOrProject_935,31/12/2023,Kāinga Ora–Homes and Communities,Chester Ave & Ross St & Onerahi Whangarei.,This housing development project includes infrastructure to deliver 17 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,5 - 25 million,,,,,,2026-Q1,2019-Q4,2026-Q1,,,[email address],,
kaOrProject_936,31/12/2023,Kāinga Ora–Homes and Communities,Chester Ave Onerahi Whangarei.,This housing development project includes infrastructure to deliver 18 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Northland,,,Housing,5 - 25 million,,,,,,2026-Q1,2019-Q4,2026-Q1,,,[email address],,
kaOrProject_938,31/12/2023,Kāinga Ora–Homes and Communities,Marion Ave & (OL) Mt Roskill Auckland.,This land development project includes infrastructure to deliver 9 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2023-Q1,,,,,2025-Q2,2020-Q3,2025-Q2,,,[email address],,
kaOrProject_939,31/12/2023,Kāinga Ora–Homes and Communities,Esperanto Rd & Grantham Rd Papatoetoe Auckland.,This housing development project includes infrastructure to deliver 12 new units.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,2022-Q3,,,,2023-Q2,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_940,31/12/2023,Kāinga Ora–Homes and Communities,Mays Rd & Captain Springs Rd Onehunga Auckland.,This housing development project includes infrastructure to deliver 14 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,,,,,,2026-Q2,2020-Q2,2026-Q2,,,[email address],,
kaOrProject_941,31/12/2023,Kāinga Ora–Homes and Communities,Mays Rd & Onehunga Auckland.,This housing development project includes infrastructure to deliver 11 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,,,,,,2025-Q3,2021-Q1,2025-Q3,,,[email address],,
kaOrProject_942,31/12/2023,Kāinga Ora–Homes and Communities,North Street Palmerston No.,This housing development project includes infrastructure to deliver 50 new units.,,Under Construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Housing,5 - 25 million,2021-Q3,,,,2022-Q3,2024-Q4,2021-Q3,2024-Q4,,,[email address],,
kaOrProject_943,31/12/2023,Kāinga Ora–Homes and Communities,Sandringham Rd & Harwood St (OL) Sandringham Auckland.,This housing development project includes infrastructure to deliver 24 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,5 - 25 million,,,,,,2026-Q1,2020-Q4,2026-Q1,,,[email address],,
kaOrProject_944,31/12/2023,Kāinga Ora–Homes and Communities,Marlowe Rd & & Bolton St D Blockhouse Bay Auckland.,This housing development project includes infrastructure to deliver 68 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,50 - 100 million,2023-Q2,,,,,2027-Q3,2020-Q1,2027-Q3,,,[email address],,
kaOrProject_945,31/12/2023,Kāinga Ora–Homes and Communities,Hargest Tce & Alamein Tce Owairaka (OW) – HLC.,This land development project includes infrastructure to deliver 42 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,25 - 50 million,,,,,,2025-Q4,2020-Q3,2025-Q4,,,[email address],,
kaOrProject_946,31/12/2023,Kāinga Ora–Homes and Communities,Vincent St Auckland Central Auckland.,This housing development project includes infrastructure to deliver 53 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,25 - 50 million,,,,,,2028-Q1,2021-Q1,2028-Q1,,,[email address],,
kaOrProject_948,31/12/2023,Kāinga Ora–Homes and Communities,Ulster St New Windsor Auckland.,This housing development project includes infrastructure to deliver 32 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Auckland,,,Housing,25 - 50 million,,,,,,2026-Q4,2020-Q1,2026-Q4,,,[email address],,
kaOrProject_954,31/12/2023,Kāinga Ora–Homes and Communities,Matene St Otaki Kapiti.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2022-Q4,,,,2023-Q2,2024-Q1,2018-Q2,2024-Q1,,,[email address],,
kaOrProject_955,31/12/2023,Kāinga Ora–Homes and Communities,Matene St Otaki Kapiti.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,5 - 25 million,2023-Q3,,,,,2024-Q2,2021-Q1,2024-Q2,,,[email address],,
kaOrProject_956,31/12/2023,Kāinga Ora–Homes and Communities,Mill Rd Otaki Kapiti.,This housing development project includes infrastructure to deliver 3 new units.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2022-Q4,,,,2023-Q2,2024-Q1,2021-Q2,2024-Q1,,,[email address],,
kaOrProject_958,31/12/2023,Kāinga Ora–Homes and Communities,Perth Street Fairfield Mosgiel.,This housing development project includes infrastructure to deliver 2 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Otago,,,Housing,1 - 5 million,2023-Q3,,,,2023-Q4,2024-Q2,2017-Q4,2024-Q2,,,[email address],,
kaOrProject_959,31/12/2023,Kāinga Ora–Homes and Communities,Stirling Cres Mosgiel Dunedin (RHP).,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Otago,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q4,2018-Q2,2024-Q4,,,[email address],,
kaOrProject_960,31/12/2023,Kāinga Ora–Homes and Communities,Oban St Mosgiel.,This housing development project includes infrastructure to deliver 2 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Otago,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q2,2021-Q1,2024-Q2,,,[email address],,
kaOrProject_969,31/12/2023,Kāinga Ora–Homes and Communities,Waiwhetu Road Waterloo Hutt Valley (OSM).,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q4,2021-Q3,2024-Q4,,,[email address],,
kaOrProject_971,31/12/2023,Kāinga Ora–Homes and Communities,Athlone Crescent Avalon Hutt Valley (OSM).,This housing development project includes infrastructure to deliver 2 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2023-Q3,,,,,2024-Q4,2021-Q3,2024-Q4,,,[email address],,
kaOrProject_972,31/12/2023,Kāinga Ora–Homes and Communities,Athlone Crescent Avalon Hutt Valley (OSM).,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2023-Q1,,,,,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_976,31/12/2023,Kāinga Ora–Homes and Communities,Clothier St Putararu.,This housing development project includes infrastructure to deliver 4 new units.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Housing,1 - 5 million,2023-Q2,,,,,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_978,31/12/2023,Kāinga Ora–Homes and Communities,WHH Rewa Crescent Murupara.,This housing development project includes infrastructure to deliver 2 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Bay of Plenty,,,Housing,1 - 5 million,,,,,,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
kaOrProject_979,31/12/2023,Kāinga Ora–Homes and Communities,King St & Whakatane.,This housing development project includes infrastructure to deliver 5 new units.,,In Procurement,Funding Source Confirmed,Direct,Construct only,Bay of Plenty,,,Housing,1 - 5 million,2023-Q1,,2023-Q1,,,2024-Q3,2021-Q2,2024-Q3,,,[email address],,
kaOrProject_980,31/12/2023,Kāinga Ora–Homes and Communities,Lyall Pl Bryndwr Christchurch.,This housing development project includes infrastructure to deliver 3 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,,,,,,2025-Q1,2021-Q3,2025-Q1,,,[email address],,
kaOrProject_981,31/12/2023,Kāinga Ora–Homes and Communities,Kirk St Otaki Kapiti.,This housing development project includes infrastructure to deliver 6 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,5 - 25 million,2023-Q3,,,,,2024-Q2,2018-Q2,2024-Q2,,,[email address],,
kaOrProject_984,31/12/2023,Kāinga Ora–Homes and Communities,Totara St Otaki Kapiti.,This housing development project includes infrastructure to deliver 2 new units.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,2023-Q1,,,,,2024-Q2,2018-Q2,2024-Q2,,,[email address],,
kaOrProject_994,31/12/2023,Kāinga Ora–Homes and Communities,Castor Cres & Miranda St (EPCCNE) Cannons Creek Porirua.,This housing development project includes infrastructure to deliver 9 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,5 - 25 million,,,,,,2024-Q4,2021-Q1,2024-Q4,,,[email address],,
kaOrProject_995,31/12/2023,Kāinga Ora–Homes and Communities,Castor Cres (EPCCNEC) Cannons Creek Porirua.,This housing development project includes infrastructure to deliver 6 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,,,,,,2024-Q3,2021-Q1,2024-Q3,,,[email address],,
kaOrProject_996,31/12/2023,Kāinga Ora–Homes and Communities,Cornwall Cres (EPCCNW ) Cannons Creek Porirua.,This housing development project includes infrastructure to deliver 2 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,,,,,,2024-Q4,2021-Q1,2024-Q4,,,[email address],,
kaOrProject_997,31/12/2023,Kāinga Ora–Homes and Communities,Westmeath St & Warspite Ave (EPWN) Waitangirua Porirua.,This housing development project includes infrastructure to deliver 4 new units.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Wellington,,,Housing,1 - 5 million,,,,,,2024-Q4,2021-Q1,2024-Q4,,,[email address],,
IP010403,16/11/2023,Kaipara District Council,11093 Mangawhai SW (Eveline street).,SW network improvements include bank stabiliation at Eveline Street as uncontrolled runoff from road has potential cause further land instability.,,In planning,Fully funded,To be determined,Construct only,Northland,,,Water,1 - 5 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010404,16/11/2023,Kaipara District Council,13044 Dargaville Wastewater Renewals.,pipe or point assets are renewed or replaced. ~ Between 25-100m of pipe in an urban environment.,,In planning,Fully funded,Direct,To be determined,Northland,,,Water,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010406,16/11/2023,Kaipara District Council,13049 Alamar Carpark.,Retaining wall foothpath improvements and sealing of the car park.,,In procurement,Fully funded,Open,Construct only,Northland,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010407,16/11/2023,Kaipara District Council,14007 Pahi toilet replacements.,Pre-fabricated new toilet building and new wastewater system.,,In procurement,Fully funded,Selective,Construct only,Northland,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010408,16/11/2023,Kaipara District Council,14026 Te Kopuru Dargaville Stopbank.,1.7km of stopbank improvements between Dargaville and Te Kopuru.,,Post implementation ,Fully funded,Selective,Construct only,Northland,,,Environmental,< 1 million,,,,,2023-Q2,2024-Q1,2022-Q3,2024-Q2,,,,,
IP010409,16/11/2023,Kaipara District Council,14027 Raupo LD Internal Stopbanks.,Stopbank improvements and new floodgate in the Raupo Drainage area.,,In procurement,Fully funded,Open,Construct only,Northland,,,Environmental,1 - 5 million,,,,,2024-Q1,2024-Q2,2023-Q3,2024-Q2,,,,,
IP010411,16/11/2023,Kaipara District Council,14036 Maungaturoto Wastewater Renewals.,pipe or point assets are renewed or replaced. ~ Between 25-100m of pipe in an urban environment.,,In planning,Fully funded,Open,Construct only,Northland,,,Water,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010412,16/11/2023,Kaipara District Council,14038 Capacity upgrades to 5000 connections.,improve treatment plant quality to increase effieiciency and connection capacity.,,In procurement,Fully funded,Selective,To be determined,Northland,,,Water,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010413,16/11/2023,Kaipara District Council,14039 Extensions to reticulation including new disposal system.,investigate and establish new disposal system options to enable further extensions to the reticulated WW network.,,In planning,Fully funded,Limited,Design and construct,Northland,,,Water,1 - 5 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010415,16/11/2023,Kaipara District Council,Bower Gate Farm (Stopbank construction).,Buidling a stopbank in the Bower area of Raupo drainage district.,,Under construction,Fully funded,To be determined,Construct only,Northland,,,Environmental,< 1 million,,,,,2024-Q1,2024-Q2,2023-Q3,2024-Q2,,,,,
IP010416,16/11/2023,Kaipara District Council,15000 Mangawhai upgrade units.,upgrades required for pensioner housing units.,,Early planning,Fully funded,To be determined,To be determined,Northland,,,Community facilities,1 - 5 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010417,16/11/2023,Kaipara District Council,9999 183 Dargaville and Mangawhai New Library Design and Planning (3 Waters funded).,Design and consenting for community hub.,,Early planning,Fully funded,To be determined,To be determined,Northland,,,Community facilities,1 - 5 million,,,,,,,2022-Q3,2025-Q2,,,,,
IP010418,16/11/2023,Kaipara District Council,9999 183 Dargaville and Mangawhai New Library Design and Planning (3 Waters funded).,Design and consenting for community hub.,,Early planning,Fully funded,To be determined,To be determined,Northland,,,Community facilities,1 - 5 million,,,,,,,2022-Q3,2025-Q2,,,,,
IP010419,16/11/2023,Kaipara District Council,15002 Kaiwaka Rangiora Rd park development.,Car park and topilet reesign and refurbishment to provide facilities for trailer boat parking.,,In procurement,Fully funded,Open,Construct only,Northland,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010420,16/11/2023,Kaipara District Council,15014 Dargaville watermain renewals.,Idenitification and renewal of critical water network assets in Dargaville.,,In planning,Fully funded,Selective,To be determined,Northland,,,Water,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010421,16/11/2023,Kaipara District Council,15015 Maungaturoto water renewals.,Continuation of FY22 project along SH12.,,In planning,Fully funded,Selective,To be determined,Northland,,,Water,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010422,16/11/2023,Kaipara District Council,15017 Mangawhai Coastal Walkway (Breve St track).,TBD after stormwater work is completed.,,In planning,Fully funded,To be determined,Construct only,Northland,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010424,16/11/2023,Kaipara District Council,Baylys Beach Refurbishment.,Resolve structual integrity issues and upgrade existing facility creating disabled access and improved asthetics.,,In procurement,Fully funded,To be determined,Construct only,Northland,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010425,16/11/2023,Kaipara District Council,15065 Storm damage - Awakino Rail embankment reconstruction.,Repair the rail embankment from the damage caused by the breach in Feb. Design and construct an upgrade to the rail embankament to improve performance as a flood protection device.,,In planning,Fully funded,To be determined,Construct only,Northland,,,Environmental,< 1 million,,,,,,,2023-Q2,2024-Q2,,,,,
IP010426,16/11/2023,Kaipara District Council,9999 Storm damage - Robert Street SW design.,rain events flooding threatened habitable floors requires new piped outfall near the cul-de-sac end of Robert St.,,In procurement,Fully funded,To be determined,To be determined,Northland,,,Water,< 1 million,,,,,,,2023-Q2,2024-Q2,,,,,
IP010427,16/11/2023,Kaipara District Council,9999 Storm damage -63H Jack Boyd Drive - phase 1.,Rock armouring to alleviate nuisance erosion at the outfall and along the downstream flow path.,,Post implementation ,Fully funded,Selective,Construct only,Northland,,,Water,< 1 million,,,,,2023-Q4,2023-Q4,2023-Q2,2024-Q1,,,,,
IP010429,16/11/2023,Kaipara District Council,15084 Storm damage - 300KVA Generator.,Supply and installation of a 300kVA generator at the Mangawhai WWTP.,,In procurement,Fully funded,Selective,Other,Northland,,,Water,< 1 million,,,,,,,2023-Q2,2024-Q2,,,,,
IP010430,16/11/2023,Kaipara District Council,15085 Storm damage - Dargaville town stopbank repair.,Repair and stabilise sections of the existing bank and/or wooden wall.,,In planning,Fully funded,To be determined,To be determined,Northland,,,Water,< 1 million,,,,,,,2023-Q2,2024-Q2,,,,,
IP010431,16/11/2023,Kaipara District Council,15086 Storm damage - Maturation Ponds height.,Increase height of the pond bunds to prevent future inundation and increase resilience of the Dargaville WWTP.,,In planning,Fully funded,Selective,To be determined,Northland,,,Water,< 1 million,,,,,,,2023-Q2,2024-Q2,,,,,
IP010432,16/11/2023,Kaipara District Council,9999 127 Waiatua Dam Design.,Improved source water resilience in Dargaville through increasing quality and storage capacity of dam.,,On hold,Fully funded,To be determined,To be determined,Northland,,,Water,< 1 million,,,,,,,2022-Q3,2024-Q2,,,,,
IP010433,16/11/2023,Kaipara District Council,9999 154 Maungaturoto Water treatment plant upgrade (sand filters).,replacement of sand filters.,,In planning,Fully funded,Direct,Design and construct,Northland,,,Water,1 - 5 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010434,16/11/2023,Kaipara District Council,9999 166 Safety Improvements for Parks.,Safety Improvements at playgrounds parks and openspaces.,,In procurement,Fully funded,Direct,Design and construct,Northland,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010435,16/11/2023,Kaipara District Council,9999 199 Reclad hall.,repair and reclad the Dargaville town hall; scope may change now some of it is to be removed.,,Early planning,Fully funded,To be determined,To be determined,Northland,,,Community facilities,1 - 5 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010436,16/11/2023,Kaipara District Council,9999 202 Dargaville WWTP upgrades.,New inlet screen and pond curtains to imporve the effective treatment capacity of the existing WWTP ponds.,,In planning,Fully funded,Open,To be determined,Northland,,,Water,1 - 5 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010437,16/11/2023,Kaipara District Council,9999 219 Kaiwaka WWTP Design and upgrades.,reduce the amount of solids going to the membrane filter. This might be done with wetland improvements prefiltration or a combination of solutions.,,In planning,Fully funded,Open,To be determined,Northland,,,Water,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010438,16/11/2023,Kaipara District Council,9999 246 Breve St Stormwater upgrade.,Bank erosion due to SW dischare needs appropriately sized rock rip rap and planting.,,Early planning,Fully funded,To be determined,Construct only,Northland,,,Water,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010439,16/11/2023,Kaipara District Council,9999 113 Tinopai Campground wastewater improvements.,Renew and relocate a portion of the drip irrigation field. Liaise with the campground and FENZ who share the land to find an acceptable solution.,,Early planning,Fully funded,Open,To be determined,Northland,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP010440,16/11/2023,Kaipara District Council,Pouto Wharf.,new 55m jetty and wharfhead at Pouto.,,Under construction,Fully funded,Selective,Construct only,Northland,,,Community facilities,< 1 million,,,,,2023-Q1,2024-Q1,2023-Q3,2024-Q2,,,,,
IP010441,16/11/2023,Kaipara District Council,Mangawhai Community Park Drainage.,To provide a long-term drainage solutionthrough the Mangawhai Community Parkand increase the Parks resilience for anyfuture weather events.,,In procurement,Funding source to be confirmed,To be determined,Design and construct,Northland,,,Water,< 1 million,,,,,,,2023-Q2,2024-Q2,,,,,
MBIE_R01.00778,18/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Kaipara Kickstart (Analysis and Feasibility Study - Wharves (Kaipara Moana Activation Plan).,This project aims to begin the redevelopment of the biggest harbour in New Zealand. An investigation and analysis of financial and economic benefits for a network of wharves together with stakeholder engagement will be conducted. Kaipara District Council.,,Under construction,Fully funded,To be determined,Other,Northland,,,Transport,1 - 5 million,,,,,,,2020-Q2,2024-Q2,,,,,
MBIE_R01.01942,18/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Redevelopment of Strategic Roads in the Far North - Ruapekapeka Road.,Priority 1 Routes Required for Economic Development. Provide a safe and resilient route suitable for HCV’s and HPMV’s from State Highway 15 south of Kaikohe to an upgraded rail hub at Otiria Moerewa via Ngapipito Road and SH1 Otiria Road.,,Under construction,Fully funded,To be determined,Other,Northland,,,Transport,5 - 25 million,,,,,,,2020-Q3,2024-Q2,,,,,
MBIE_R01.11645,14/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Kaikohe BerryFruit.,To construct a new packhouse coolstore and staff facilities and an extension of the Kaikohe Berryfruit strawberry growing platform.,,In planning,Fully funded,To be determined,Other,Northland,,,Commercial,1 - 5 million,,,,,,,2023-Q4,2036-Q4,,,,,
MBIE_R02.01210,18/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Redevelopment of Taupō Airport.,Development of the Taupō Airport terminal apron and carpark.,,Under construction,Fully funded,To be determined,Other,Waikato,,,Transport,5 - 25 million,,,,,,,2020-Q1,2025-Q1,,,,,
MBIE_R02.02375,18/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Renovations – Marae: Te Whakatūtuki o Wharekawa Marae.,Renovate our whare waananga whare waka external manuhiri & paepae shelter lighting & storage/seating in whare Tūpuna waka taua Te Kootuiti Tuarua (maintenance) insulation & fencing the perimeter of the marae reservation.,,Under construction,Fully funded,To be determined,Other,Waikato,,,Community facilities,< 1 million,,,,,,,2021-Q1,2023-Q2,,,,,
MBIE_R02.04054,14/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Clean Technology for Fertiliser.,To develop a manufacturing facility for controlled-release fertiliser coating at He Ahi industrial park in Taupō.,,Under construction,Fully funded,To be determined,Other,Waikato,,,Energy,1 - 5 million,,,,,,,2023-Q2,2033-Q3,,,,,
MBIE_R02.06181,14/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Maraetai Road lntermodal Business Park (MRIBP).,To provide 18 new development ready industrial zoned lots for a new business park connected to the existing Tokoroa Road Rail Terminal.,,Under construction,Fully funded,To be determined,Other,Waikato,,,Commercial,1 - 5 million,,,,,,,2023-Q3,2026-Q3,,,,,
MBIE_R03.01294.G,18/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",KPID - Kawerau Off-Highway Road (Grant).,The capability of carrying oversized vehicles and will provide a cost effective fully off-highway connection to the proposed Container Terminal surrounding plantation forest estates and the Putauaki Industrial Zone.,,Under construction,Fully funded,To be determined,Other,Bay of Plenty,,,Transport,1 - 5 million,,,,,,,2020-Q2,2024-Q1,,,,,
MBIE_R03.01371,18/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Kawerau Container Terminal Rail Siding.,The development of a Kawerau Container Terminal with rail siding access and related infrastructure. The terminal would be developed adjacent the current KiwiRail yard with a second line being built to create a rail siding.,,In planning,Fully funded,To be determined,Other,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2020-Q3,2026-Q2,,,,,
MBIE_R03.02475,18/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Renovations – Marae: Ruatahuna Marae Renovation Cluster - PARENT DEAL.,Renovation & Refurbishment of a cluster of 10 Marae – Ōpūtao Marae Kakanui (Tīpapa) Marae Tatahoata Marae Uwhiārae Marae Mātaatua Marae (Te Urewera-Paramount Marae for Tuhoe) Ōhāua te Rangi Marae Te Wai-iti Marae Mataatua II Marae.,,Under construction,Fully funded,To be determined,Other,Bay of Plenty,,,Community facilities,1 - 5 million,,,,,,,2020-Q4,2023-Q4,,,,,
MBIE_R03.02753,18/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Renovations – Marae: Supremegroup Marae Renovation Cluster - PARENT DEAL.,Renovation of Marae cluster (Waikirikiri Maungaroa Omaio Kutarere Rangitihi and Te Putere o Potaka Marae).,,Under construction,Fully funded,To be determined,Other,Bay of Plenty,,,Community facilities,1 - 5 million,,,,,,,2020-Q4,2023-Q1,,,,,
MBIE_R03.06205,14/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Peka Industrial Park.,To develop a total of 40 hectares into an industrial park over the next 5 years.,,In planning,Fully funded,To be determined,Other,Bay of Plenty,,,Commercial,5 - 25 million,,,,,,,2023-Q4,2027-Q2,,,,,
MBIE_R04.00035,18/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Tairawhiti Roading Package - PARENT DEAL.,For ‘two years of catch-up’ on critical road transport repairs and upgrades so Tairāwhiti can have a fit-for-purpose road network that is essential to the economic social and cultural prosperity of our region.,,Under construction,Fully funded,To be determined,Other,Gisborne,,,Transport,50 - 100 million,,,,,,,2019-Q2,2024-Q2,,,,,
MBIE_R04.02266,18/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Renovations – Marae - PARENT DEAL.,Rongowhakaata lwi Trust on behalf of Whakato Marae Te Pahou Marae and Ohako Marae -Marae renovations / improvements - a cluster of two marae.,,Under construction,Fully funded,To be determined,Other,Gisborne,,,Community facilities,1 - 5 million,,,,,,,2020-Q4,2023-Q2,,,,,
MBIE_R04.03304,18/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Renovations – Marae: Ma Wai Ra E Taurima - Manutuke.,Cluster application - Renovation and refurbishments for Tairawhiti (Hinepare) Marae Tinatoka Marae Rangiwaho Marae Ohinewaiapu Marae Rahui Marae Te Poho o Rawiri Marae and Manutuke Marae.,,Under construction,Fully funded,To be determined,Other,Gisborne,,,Community facilities,< 1 million,,,,,,,2020-Q4,2023-Q2,,,,,
MBIE_R04.03425,18/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Renovations – Marae: Ma Wai Ra e Taurima - Ngati Porou Marae Renovations Project - PARENT DEAL.,Parent Deal for 7x clusters & the Te Aroha Kanarahi Charitable Trust Cluster.,,Under construction,Fully funded,To be determined,Other,Gisborne,,,Community facilities,5 - 25 million,,,,,,,2020-Q4,2023-Q2,,,,,
MBIE_R04.04063,14/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Toitū Tairāwhiti Housing Project.,To develop a construction facility in Gisborne to build prefabricated houses addressing the housing shortage in the region.,,Under construction,Fully funded,To be determined,Other,Gisborne,,,Housing,1 - 5 million,,,,,,,2022-Q4,2028-Q3,,,,,
MBIE_R05.04069,14/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",BBI Wood Products Limited Project.,To construct a facility to deliver a vocational training programme aimed at disadvantaged youth in the area. This training programme is supported by the Ministry for Social Development.,,Under construction,Fully funded,To be determined,Other,Hawke's Bay,,,Education,1 - 5 million,,,,,,,2023-Q2,2031-Q2,,,,,
MBIE_R05.05992,14/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Seed Drying Facility.,To construct a seed drying unit in Central Hawke's Bay including an economic activation plan to benefit local seed growers.,,Under construction,Fully funded,To be determined,Other,Hawke's Bay,,,Commercial,< 1 million,,,,,,,2023-Q3,2024-Q4,,,,,
MBIE_R05.06214,14/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",The Limery Expansion - Additional storage and logistics facility.,To construct a storage and logistics facility to increase operational capacity and enhance logistical efficiencies of existing production.,,In planning,Fully funded,To be determined,Other,Hawke's Bay,,,Commercial,< 1 million,,,,,,,2023-Q3,2024-Q3,,,,,
MBIE_R06.01262,18/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Lower Whanganui River Training Structures.,Strengthening the lower river training structures at the mouth and along the lower reach of the Whanganui River.,,Under construction,Fully funded,To be determined,Other,Manawatū - Whanganui,,,Transport,5 - 25 million,,,,,,,2020-Q3,2029-Q1,,,,,
MBIE_R06.04050,14/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Plentyful manufacturing facility in Marton to produce bioplastic packaging products.,To develop a manufacturing facility in Marton to produce a biodegradable alternative to packaging products which are oil-based.,,In planning,Fully funded,To be determined,Other,Manawatū - Whanganui,,,Commercial,1 - 5 million,,,,,,,2023-Q2,2030-Q2,,,,,
MBIE_R07.02199,18/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Renovations – Marae: Te Tauraka Waka A Maui Marae Sustainability Project.,Intend to build resilience and enable our marae ro become more sustainable and iser friendly as a rurally based asset for our hapu Iwi and the wider community.,,Under construction,Fully funded,To be determined,Other,West Coast,,,Community facilities,< 1 million,,,,,,,2020-Q4,2023-Q2,,,,,
MBIE_R07.06176,14/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Greymouth/Mawhera Resurgence Project.,To construct a new multi-purpose community facility for commercial and public use as a library commercial retail and hospitality space and community area.,,In planning,Fully funded,To be determined,Other,West Coast,,,Community facilities,1 - 5 million,,,,,,,2023-Q4,2025-Q3,,,,,
MBIE_R08.04044.E,14/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Plant-based Beverages.,To build a plant-based beverage manufacturing facility in mid-Canterbury.,,In planning,Fully funded,To be determined,Other,Canterbury,,,Commercial,5 - 25 million,,,,,,,2023-Q4,2025-Q3,,,,,
MBIE_R08.06724,14/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Fraser Park Redevelopment.,To redevelop Fraser Park facility to be a multi-event arena.,,Under construction,Fully funded,To be determined,Other,Canterbury,,,Community facilities,< 1 million,,,,,,,2023-Q2,2024-Q1,,,,,
MBIE_R08.11924,14/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Tāwhaki Aerospace at Kaitorete Spit.,To build a 1km sealed runway and ancillary hangar infrastructure to support the growing New Zealand aerospace sector.,,In planning,Fully funded,To be determined,Other,Canterbury,,,Transport,5 - 25 million,,,,,,,2023-Q4,2024-Q3,,,,,
MBIE_R09.06075,14/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Southland Hop Processing Facility Expansion Project.,To construct and install a purpose built hop processing and storage facility in Garston for the purpose of accelerating the expansion of hop growing and processing operations.,,In planning,Fully funded,To be determined,Other,Southland,,,Commercial,1 - 5 million,,,,,,,2023-Q4,2026-Q1,,,,,
MBIE_R10.02388,18/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Renovations – Marae: Te Paepae o Te Raukura (Takitūtū) Marae Refurbishment.,Upgrades to the ablution blocks kitchen area water supply vegetation fencing and driveways and Drainage.,,Under construction,Fully funded,To be determined,Other,Taranaki,,,Community facilities,< 1 million,,,,,,,2020-Q4,2023-Q1,,,,,
MBIE_R10.02392,18/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Renovations – Marae: Te Niho o Te Atiawa Refurbishing Project.,Internal and external refurbishment of Wharenui Wharekai and Wharepaku and landscaping grounds are planned in the project.,,Under construction,Fully funded,To be determined,Other,Taranaki,,,Community facilities,< 1 million,,,,,,,2020-Q4,2024-Q2,,,,,
MBIE_R11.11662,14/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Waingawa Water Resilience - Process Water Project.,To establish a deep water bore water storage and water reticulation network for the Waingawa Industrial Estate in Carterton and increase the regions resilience to drought.,,In planning,Fully funded,To be determined,Other,Wellington,,,Water,1 - 5 million,,,,,,,2023-Q4,2024-Q3,,,,,
MBIE_R12.04104,14/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Port Tarakohe Upgrade Project.,To undertake essential upgrade works to support commercial users of Port Tarakohe in Golden Bay in particular the growing aquaculture industry.,,In planning,Fully funded,To be determined,Other,Tasman,,,Transport,5 - 25 million,,,,,,,2023-Q4,2038-Q4,,,,,
MBIE_R13.06206,14/12/2023,"Kānoa - Ministry of Business, Innovation and Employment",Scapegrace Distillery Expansion - Phase Two.,To build and fit out a new distillery facility located in Cromwell Otago.,,Under construction,Fully funded,To be determined,Other,Otago,,,Commercial,1 - 5 million,,,,,,,2023-Q4,2030-Q4,,,,,
IP008173,15/03/2024,Kapiti Coast District Council,Cycleways Walkways and Bridleways.,Three-year programme of cycleway walkway and bridleway renewals upgrades and new assets. Includes on-road and off-road cycleways.,,Under construction,Fully funded,To be determined,Construct only,Wellington,,,Transport,1 - 5 million,,,,,,,2021-Q3,2024-Q2,,,,,
IP008174,15/03/2024,Kapiti Coast District Council,Footpath programme.,Three-year programme of footpath renewals upgrades and new assets.,,Under construction,Fully funded,To be determined,Construct only,Wellington,,,Transport,1 - 5 million,,,,,,,2021-Q3,2024-Q2,,,,,
IP008175,15/03/2024,Kapiti Coast District Council,Hautere and Ōtaki treatment plant upgrades.,Drilling of new bores upgrade to controls filtration system and new building construction at Hautere. Bore drilling and upgrades to water treatment process at Tasman Rd water treatment plant.,,In procurement,Fully funded,Limited,Early contractor involvement,Wellington,,,Water,5 - 25 million,,,2023-Q1,2023-Q2,2023-Q3,2024-Q4,2021-Q3,2024-Q2,
https://www.kapiticoast.govt.nz/your-council/projects/our-towns/te-horo/hautere-water-treatment-plant-upgrade,,,,
IP008176,15/03/2024,Kapiti Coast District Council,Ihakara-Arawhata Link Rd.,A new road linking Kapiti Road (at Arawhata intersection) and Ihakara St to address traffic congestion and enable further establishment of Rimu Rd to a main street.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Transport,25 - 50 million,,,,,,,2020-Q3,2026-Q2,,,,,
IP008177,15/03/2024,Kapiti Coast District Council,Maclean Park - Stage 2 Upgrade.,Redevelopment of Maclean Park including an upgraded skatepark and amenity building including a Changing Places facility.,,In procurement,Fully funded,Selective,Design and construct,Wellington,,,Community facilities,1 - 5 million,,,2023-Q1,2023-Q3,2024-Q1,2025-Q1,2022-Q3,2024-Q3,
https://haveyoursay.kapiticoast.govt.nz/maclean-park-refresh,,,,
IP008179,15/03/2024,Kapiti Coast District Council,New rising main Otaki.,New wastewater rising main in Otaki.,,In planning,Funding source confirmed,Open,Construct only,Wellington,,,Water,< 1 million,,,2024-Q1,2024-Q2,2024-Q3,2024-Q4,2022-Q3,2024-Q2,,,,,
IP008180,15/03/2024,Kapiti Coast District Council,Older persons' housing renewals.,Three-year programme of renewals to Council's 118 rental properties for older persons.,,Under construction,Fully funded,Limited,Construct only,Wellington,,,Housing,1 - 5 million,,,,,,,2021-Q3,2024-Q2,,,,,
IP008181,15/03/2024,Kapiti Coast District Council,Ōtaki Library renewals.,Renewal of Ōtaki Library building.,,In planning,Funding source confirmed,To be determined,To be determined,Wellington,,,Community facilities,5 - 25 million,,,,,,,2024-Q3,2028-Q2,,,,,
IP008182,15/03/2024,Kapiti Coast District Council,Ōtaki Pool upgrade stage 2.,Upgrade of Ōtaki Pool heating system and changing facilities.,,In planning,Funding source to be confirmed,To be determined,Construct only,Wellington,,,Community facilities,5 - 25 million,,,,,,,2022-Q3,2027-Q2,,,,,
IP008183,15/03/2024,Kapiti Coast District Council,Otaki WWTP.,Various works at Ōtaki Wastewater Treatment Plant including pond desludging new aerators clarifier bridge replacement and other renewals over 6 years.,,Under construction,Funding source confirmed,Open,Construct only,Wellington,,,Water,1 - 5 million,,,2023-Q3,2023-Q4,2023-Q4,2024-Q2,2021-Q3,2027-Q2,,,,,
IP008184,15/03/2024,Kapiti Coast District Council,Otaraua Park Stage 2.,Construction of a new sports pavilion and amenity block and drainage improvements. Part of a 20-year development plan for Otaraua Park.,,On hold,Funding source to be confirmed,Procurement not required,Procurement not required,Wellington,,,Community facilities,5 - 25 million,,,,,,,2021-Q3,2025-Q2,
https://www.kapiticoast.govt.nz/your-council/projects/otaraua-park/,,,,
IP008185,15/03/2024,Kapiti Coast District Council,Paekākāriki Seawall replacement.,Replacement of the 900m long Paekākāriki seawall to improve protection of Marine Parade public infrastructure and the beach environment.,,In planning,Funding source confirmed,To be determined,Construct only,Wellington,,,Environmental,5 - 25 million,,,,,,,2021-Q3,2027-Q2,
https://www.kapiticoast.govt.nz/your-council/projects/our-towns/paekakariki/paekakariki-seawall/,,,,
IP008186,15/03/2024,Kapiti Coast District Council,Paraparaumu WWTP.,Various upgrades to Paraparaumu Wastewater Treatment Plant including pond relining inlet works and improvements to treatment process over 6 years.,,Under construction,Funding source confirmed,Open,Construct only,Wellington,,,Water,5 - 25 million,,,,,,,2021-Q3,2027-Q2,,,,,
IP008187,15/03/2024,Kapiti Coast District Council,Public Toilets - Otaki Pavilion.,Earthquake strengthening and upgrade of Otaki Beach pavilion toilet block a heritage listed building.,,In planning,Funding source confirmed,To be determined,To be determined,Wellington,,,Community facilities,1 - 5 million,,,,,,,2024-Q4,2026-Q2,,,,,
IP008188,15/03/2024,Kapiti Coast District Council,Raumati South seawall replacement.,Renewal of 987m timber seawall at Raumati South over 11 years.,,In planning,Funding source confirmed,To be determined,To be determined,Wellington,,,Environmental,25 - 50 million,,,,,2027-Q3,2034-Q2,2021-Q3,2034-Q2,,,,,
IP008189,15/03/2024,Kapiti Coast District Council,Ōtaki Reservoir.,Design and construction of a new 5.5ml reservoir at Ōtaki.,,Under construction,Funding source confirmed,Open,Construct only,Wellington,,,Water,5 - 25 million,,,2023-Q3,2023-Q4,2024-Q2,2024-Q4,2022-Q3,2024-Q1,,,,,
IP008190,15/03/2024,Kapiti Coast District Council,Blue Bluff - Otāki Gorge Road repairs.,Investigation and implementation of a medium to long-term solution for the closed section of Ōtaki Gorge Rd.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Transport,1 - 5 million,,,,,2024-Q4,2026-Q4,2022-Q3,2026-Q4,
https://www.kapiticoast.govt.nz/your-council/projects/our-towns/otaki/otaki-gorge-road/,,,,
IP008191,15/03/2024,Kapiti Coast District Council,SH1 Revocation.,Works to transform the former SH1 into a fit-for-purpose local road in collaboration with Waka Kotahi. Includes road improvements kerbs shared paths cycle lanes planting and urban design speed limits and renaming of roads.,,Under construction,Fully funded,Open,Construct only,Wellington,,,Transport,5 - 25 million,,,,,,,2017-Q3,2025-Q2,
https://www.kapiticoast.govt.nz/your-council/projects/sh1/,,,,
IP008192,15/03/2024,Kapiti Coast District Council,Stormwater projects - district-wide.,Various upgrades and renewals throughout Kapiti Coast District over 3-year LTP period 2021-24.,,In planning,Funding source confirmed,Open,To be determined,Wellington,,,Water,5 - 25 million,,,,,,,2021-Q3,2024-Q2,,,,,
IP008193,15/03/2024,Kapiti Coast District Council,Paraparaumu Community Centre.,Replacement of the closed Te Newhanga Community Centre in Paraparaumu.,,Early planning,Funding source confirmed,Open,To be determined,Wellington,,,Community facilities,5 - 25 million,,,,,,,2023-Q1,2025-Q2,,,,,
IP008194,15/03/2024,Kapiti Coast District Council,Paraparaumu Transport Hub.,Construction a new urban pedestrian plaza on both sides of the former SH1 connecting to Paraparaumu Train Station.,,Under construction,Fully funded,Limited,Early contractor involvement,Wellington,,,Transport,5 - 25 million,,,2022-Q1,2022-Q3,2022-Q3,2024-Q1,2021-Q3,2024-Q1,
https://www.kapiticoast.govt.nz/your-council/projects/our-towns/paraparaumu-town-centre/paraparaumu-transport-hub-upgrade/,,,,
IP008195,15/03/2024,Kapiti Coast District Council,Waikanae Duplicate Rising Main.,Completion of a duplicate wastewater rising main to provide additional pumping capacity for future growth in Waikanae.,,Early planning,Funding source confirmed,To be determined,To be determined,Wellington,,,Water,1 - 5 million,,,,,,,2021-Q3,2024-Q2,,,,,
IP008196,15/03/2024,Kapiti Coast District Council,Waikanae Library project.,Design and construction of a new Waikanae Library and service centre.,,In planning,Funding source confirmed,Open,To be determined,Wellington,,,Community facilities,5 - 25 million,,,2024-Q4,2025-Q1,2025-Q1,2026-Q2,2021-Q3,2026-Q2,,,,,
IP008197,15/03/2024,Kapiti Coast District Council,Waikanae Park.,Development of Waikanae Park into a Destination Park.,,In planning,Funding source confirmed,To be determined,To be determined,Wellington,,,Community facilities,1 - 5 million,,,,,,,2023-Q3,2026-Q2,,,,,
IP008198,15/03/2024,Kapiti Coast District Council,Waikanae water treatment plant.,Various upgrades to Waikanae Water Treatment Plant to improve drinking water safety and resilience. Includes new clarifier plant equipment and buildings.,,Under construction,Fully funded,Limited,Early contractor involvement,Wellington,,,Water,25 - 50 million,,,2023-Q1,2023-Q3,2023-Q4,2025-Q4,2020-Q3,2025-Q3,,,,,
IP008199,15/03/2024,Kapiti Coast District Council,Wharemauku block wall and Marine Pde revetment.,Replacement of Wharemauku and Marine Parade concrete block coastal protection.,,Early planning,Funding source confirmed,To be determined,To be determined,Wellington,,,Environmental,1 - 5 million,,,,,,,2021-Q3,2025-Q2,,,,,
IP009596,15/03/2024,Kapiti Coast District Council,Amohia St Stormwater Upgrade.,Installation of new stormwater pipes manholes sumps and leads from Iver trask Place to Amohia St in Paraparaumu town centre.,,Under construction,Fully funded,Open,Construct only,Wellington,,,Water,5 - 25 million,,,2022-Q2,2022-Q2,2023-Q1,2024-Q1,2022-Q1,2024-Q1,
https://www.kapiticoast.govt.nz/your-council/projects/our-towns/paraparaumu-town-centre/amohia-street-stormwater/,,,,
IP000176.1,5/12/2023,KiwiRail Limited,Auckland Metro Rail Network Programme - Wiri to Quay Park.,This project is to deliver Wiri to Quay Park capacity enhancements. Funded through NZ Upgrade Programme. This project is part of a programme to enhance the capacity of the Auckland Metro Rail Network.,,Under construction,Fully funded,Open,Design and construct,Auckland,,,Transport,250 - 500 million,,,,,,,2020-Q1,2025-Q1,
https://www.kiwirail.co.nz/our-network/our-regions/amp/the-third-main-line/,,,,
IP000176.2,5/12/2023,KiwiRail Limited,Auckland Metro Rail Network Programme - Papakura to Pukekohe Electrification.,This project is the electrification of the Papakura to Pukekohe line. Funded through NZ Upgrade Programme. This project is part of a programme to enhance the capacity of the Auckland Metro Rail Network.,,Under construction,Fully funded,Open,Construct only,Auckland,,,Transport,250 - 500 million,,,,,,,2020-Q1,2024-Q3,
https://www.kiwirail.co.nz/our-network/our-regions/amp/papakura-to-pukekohe-electrification/,,,,
IP000176.3,5/12/2023,KiwiRail Limited,Auckland Metro Rail Network Programme - Additional Traction Feed (West).,This project is to deliver a new traction feed (SFC). This project is part of a programme to ensure there is sufficient power to the Auckland Metro Rail Network to meet the demands from City Rail Link.,,Under construction,Funding source confirmed,Open,Construct only,Auckland,,,Transport,50 - 100 million,,,,,,,2022-Q1,2025-Q2,,,,,
IP000176.4,5/12/2023,KiwiRail Limited,Auckland Metro Rail Network Programme - Auckland Train Control Centre.,This project is to deliver a Train Control Centre. This project is part of a programme to enhance the capacity of the Auckland Metro Rail Network.,,Under construction,Fully funded,Selective,Early contractor involvement,Auckland,,,Transport,25 - 50 million,,,,,,,2021-Q3,2024-Q1,
https://www.kiwirail.co.nz/our-network/our-regions/amp/,,,,
IP000176.5,5/12/2023,KiwiRail Limited,Auckland Metro Rail Network Programme - Accelerated Renewals.,This project is to deliver accelerated renewals (Rail Network Growth Impact Management). This project is part of a programme to enhance the capacity of the Auckland Metro Rail Network.,,Under construction,Fully funded,Selective,Other,Auckland,,,Transport,250 - 500 million,,,,,,,2020-Q4,2027-Q2,
https://www.kiwirail.co.nz/our-network/our-regions/amp/,,,,
IP000180.3,5/12/2023,KiwiRail Limited,Rolling Stock Procurement & Mechanical Facilities - Tier 2&3 Mechanical facilities.,This project will upgrade a number of KiwiRail's Tier 2 & 3 mechanical depots across New Zealand. It is part of a larger Rolling Stock Procurement and Mechanical Facilities Programme. Work is across several depots throughout NZ involving building yards a.,,In procurement,Fully funded,To be determined,Other,Nationwide,,,Transport,5 - 25 million,,,,,,,2019-Q3,2025-Q2,,,,,
IP000181,5/12/2023,KiwiRail Limited,Wellington Metro Rail Network Programme - Stage 2 - Power Supply Renewal and Upgrade.,This project is the renewal and upgrade of power supply (including new traction poles and overhead wires). This is Stage 2 of the Wellington Metro Rail Network Programme.,,Under construction,Fully funded,Open,Design and construct,Wellington,,,Transport,100 - 250 million,,,,,,,2017-Q3,2023-Q4,
https://www.kiwirail.co.nz/our-network/our-regions/wellington/,,,,
IP000182,5/12/2023,KiwiRail Limited,Wellington Metro Rail Network Programme - Stage 3 - Track and Civil Infrastructure Renewals.,This project includes track and civil infrastructure catch up renewals for the Wellington Metro Rail Network. This is Stage 3 of the Wellington Metro Rail Network Programme.,,Under construction,Fully funded,Limited,Other,Wellington,,,Transport,100 - 250 million,,,,,,,2018-Q3,2026-Q2,
https://www.kiwirail.co.nz/our-network/our-regions/wellington/,,,,
IP000183,5/12/2023,KiwiRail Limited,Wellington Metro Rail Network Programme - Stage 4 - Network Capacity Improvements.,This project delivers network capacity improvements to allow the introduction of a more intensive commuter train timetable from 2022. This includes double tracking; upgrades at Plimmerton station and Wellington and strengthened train power supply. This is.,,Under construction,Fully funded,Open,Other,Wellington,,,Transport,100 - 250 million,,,,,,,2018-Q3,2025-Q1,
https://www.kiwirail.co.nz/our-network/our-regions/wellington/,,,,
IP000705,5/03/2024,KiwiRail Limited,Wellington Metro Rail Network Programme - Stage 6b - Wairarapa Infrastructure Upgrades.,This project will deliver infrastructure upgrades to increase line capacity and support increased frequency of passenger services. This is part of the NZ Upgrade Programme.,,Under construction,Fully funded,Open,Other,Wellington,,,Transport,100 - 250 million,,,,,,,2020-Q3,2025-Q4,
https://www.kiwirail.co.nz/our-network/our-regions/wellington/,,,,
IP000706,5/12/2023,KiwiRail Limited,Wellington Metro Rail Network Programme - Stage 5 -.,This project will upgrade the rail network signalling system and provide automated train protection as part of the Wellington Metro programme.,,Early planning,Funding source confirmed,Selective,Design and construct,Wellington,,,Transport,250 - 500 million,2022-Q3,2025-Q2,,,,,2020-Q3,2028-Q2,
https://www.kiwirail.co.nz/our-network/our-regions/wellington/,,,,
IP003200,5/12/2023,KiwiRail Limited,Auckland Metro Rail Network Programme - Drury Rail Stations.,Funded through NZ Upgrade Programme - includes new railway stations roading connections park and ride facilities bus interchange and active mode connections.,,In procurement,Fully funded,Open,Construct only,Auckland,,,Transport,250 - 500 million,,,,,,,2020-Q4,2025-Q4,
https://www.kiwirail.co.nz/our-network/our-regions/amp/drury-rail-stations/,,,,
IP003201,5/12/2023,KiwiRail Limited,Rolling Stock Procurement & Mechanical Facilities - Mechanical Depots - Woburn.,This project will upgrade and redevelop KiwiRail's Woburn site into a National Component Repair and Inventory Centre. It is part of a larger Rolling Stock Procurement and Mechanical Facilities Programme. The project has several phases (Seismic Strengthen.,,Under construction,Fully funded,To be determined,To be determined,Wellington,,,Transport,50 - 100 million,,,,,,,2019-Q3,2025-Q2,,,,,
IP003202,5/12/2023,KiwiRail Limited,Rolling Stock Procurement & Mechanical Facilities - Waltham South Island Mechanical Hub.,This project will build a new South Island Mechanical Hub at Waltham. It is part of a larger Rolling Stock Procurement and Mechanical Facilities Programme.,,Under construction,Fully funded,Open,Design and construct,Canterbury,,,Transport,50 - 100 million,,,,,2021-Q3,2024-Q3,2019-Q3,2024-Q3,
https://www.kiwirail.co.nz/our-network/our-regions/waltham/,,,,
IP003204,5/12/2023,KiwiRail Limited,Wellington Metro Rail Network Programme - Stage 6a - Wellington Train Station Safety Improvements.,This includes a range of safety improvements in the Wellington station junction area. This is part of the NZ Upgrade Programme.,,Under construction,Fully funded,Selective,Construct only,Wellington,,,Transport,100 - 250 million,,,,,,,2020-Q3,2025-Q1,
https://www.kiwirail.co.nz/our-network/our-regions/wellington/,,,,
IP005897,5/12/2023,KiwiRail Limited,Hillside Redevelopment - Wagon Assembly Workshop.,This project further redevelops and upgrades the Hillside workshops in Dunedin with the construction of a wagon assembly facility workshop and offices. Project also includes demolitions of existing buildings.,,Under construction,Fully funded,Open,Construct only,Otago,,,Transport,50 - 100 million,,,,,,,2019-Q4,2024-Q3,
https://www.kiwirail.co.nz/our-network/our-regions/hillside-workshops-redevelopment/,,,,
IP006532,5/01/2024,KiwiRail Limited,Whangarei to Otiria.,Upgrading the line between Otiria to Whangārei to 18-tonne axle capability and system improvements including yard/CT sites and log loading areas. This project is part of the NZ Upgrade Programme.,,Under construction,Fully funded,Limited,Construct only,Northland,,,Transport,50 - 100 million,,,,,,,2022-Q1,2024-Q4,
https://www.kiwirail.co.nz/our-network/our-regions/northland-rail-rejuvenation/,,,,
IP010398,5/12/2023,KiwiRail Limited,Auckland Metro - Third and Fourth Main (Westfield to Pukekohe).,Four tracks between Westfield Junction and Pukekohe enabling higher capacity through separation of traffic types (express services and freight vs. all stops metro). Project also includes grade separation of Westfield Junction.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Transport,1 billion +,,,,,,,2024-Q3,2042-Q4,,,,,
IP010399,5/12/2023,KiwiRail Limited,Auckland Metro - Avondale to Southdown.,Two-track rail corridor on KiwiRail's existing Avondale to Southdown designation to be used by freight and passenger services. Shared Crosstown corridor enabling port options and freeing the inner isthmus for higher frequency passenger services. This project will also include grade separation of Avondale junction.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Transport,1 billion +,,,,,,,2024-Q3,2050-Q4,,,,,
IP010400,5/12/2023,KiwiRail Limited,Auckland Metro - Signalling and telecommunications.,Upgrade signalling for capacity including ETCS Level 2. Project enables greater capacity optimised train frequencies and reliability.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Transport,250 - 500 million,,,,,,,2024-Q3,2032-Q4,,,,,
IP008863,8/03/2024,Lincoln University,Ivey West and Memorial Hall EQ Repair.,Repair and remediation of EQ damaged heritage buildings.,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Education,5 - 25 million,,,,,,,2022-Q4,2024-Q3,,,,,
IP008864,8/03/2024,Lincoln University,Lincoln University Energy Farm.,Ground mounted solar array construction.,,In procurement,Fully funded,Open,Other,Canterbury,,,Energy,1 - 5 million,,,,,,,2023-Q4,2024-Q4,,,,,
IP008865,8/03/2024,Lincoln University,Heating and Infrastruture Upgrade.,Power and Heating upgrade for Main Campus.,,Under construction,Fully funded,Selective,Other,Canterbury,,,Energy,5 - 25 million,,,,,,,2020-Q2,2025-Q1,,,,,
IP008866,8/03/2024,Lincoln University,Burns Building Demolition.,Demolition of multistory building using sustainable methodology.,,Under construction,Fully funded,Selective,Other,Canterbury,,,Education,1 - 5 million,,,,,,,2023-Q3,2024-Q3,,,,,
IP008867,8/03/2024,Lincoln University,George Forbes Repair and Strengthen Phase 3.,Repair stengthen and and redevelopment of multistory building.,,Under construction,Funding source confirmed,Selective,Other,Canterbury,,,Education,5 - 25 million,,,,,,,2023-Q4,2025-Q1,,,,,
IP008868,8/03/2024,Lincoln University,Library EQ repair and Extension.,Repair stengthen and and redevelopment of multistory building.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Education,5 - 25 million,,,,,,,2025-Q1,2026-Q1,,,,,
IP008869,8/03/2024,Lincoln University,Whare Development.,Develop new cultural facility.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Education,1 - 5 million,,,,,,,2024-Q4,2025-Q4,,,,,
IP008870,8/03/2024,Lincoln University,New Accomodation Hall.,Replacement on campus accomodation faciltiies for students.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Housing,50 - 100 million,,,,,,,2025-Q1,2026-Q4,,,,,
IP008871,8/03/2024,Lincoln University,New Housing Accomodation.,Replacement on campus accomodation faciltiies for students.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Housing,1 - 5 million,,,,,,,2023-Q4,2025-Q4,,,,,
IP008872,8/03/2024,Lincoln University,Lincoln Agritech Ltd.,New office laboratories and workshops on campus.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Education,5 - 25 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010740,8/03/2024,Lincoln University,New Glasshouses.,Replacement of existing glasshouses.,,Under construction,Funding source confirmed,Limited,Construct only,Canterbury,,,Education,1 - 5 million,,,,,,,2024-Q3,2025-Q1,,,,,
IP010741,8/03/2024,Lincoln University,Ivey Roof Upgrade.,Upgrade end of life roof.,,In procurement,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,1 - 5 million,,,,,,,2024-Q1,2024-Q3,,,,,
IP000185,1/12/2023,Manawatu District Council,Feilding Enabling Growth Infrastructure Project.,The purpose of this project is to develop the required lead infrastructure in Feilding to support and enable residential and industrial growth.,,In procurement,Fully funded,To be determined,Construct only,Manawatū - Whanganui,,,Transport,5 - 25 million,,,,,,,2017-Q3,2028-Q2,
https://www.mdc.govt.nz/Documents/Plans,,,,
IP000186,1/12/2023,Manawatu District Council,Community Hub/Library Redevelopment.,The project is the redevelopment and upgrade of the existing Feilding Public Library.,,Under construction,Fully funded,To be determined,Design and construct,Manawatū - Whanganui,,,Community facilities,5 - 25 million,,,,,2022-Q3,2024-Q2,2017-Q4,2024-Q3,
https://www.mdc.govt.nz/Documents/Plans,,,,
IP000189,1/12/2023,Manawatu District Council,Feilding Wastewater Centralisation Project - Sanson Rongotea Halcombe Cheltenham and Kimbolton.,The purpose of this project is to centralise all wastewater treatment plants within Feilding by developing a new network of integrated pipelines and pump stations.,,Under construction,Fully funded,To be determined,Construct only,Manawatū - Whanganui,,,Water,5 - 25 million,,,2019-Q4,2020-Q1,2020-Q2,2025-Q2,2017-Q3,2025-Q2,
https://www.mdc.govt.nz/Documents/Plans,,,,
IP000191,1/12/2023,Manawatu District Council,Feilding Water Resiliance.,The provide water resilience to Feilding by replacing the surface intake at Barrows Road and Almadale treatment plant with a new bore and treatment plant in Feilding. Project will also include a new WTP at Campbell Rd seismic strengthening of main trunk.,,Under construction,Fully funded,To be determined,Design and construct,Manawatū - Whanganui,,,Water,1 - 5 million,2017-Q3,2018-Q3,2019-Q1,2019-Q2,2019-Q2,2025-Q3,2021-Q4,2025-Q3,
https://www.mdc.govt.nz/Documents/Plans,,,,
IP000192,1/12/2023,Manawatu District Council,Feilding Water Supply Treatment Upgrades.,The purpose of this project is to renew the aging surface water supply in Feilding via the construction of a new bore and storage reservoir.,,Under construction,Funding source confirmed,To be determined,Design and construct,Manawatū - Whanganui,,,Water,1 - 5 million,,,,2021-Q3,2022-Q2,2025-Q2,2017-Q3,2025-Q2,
https://www.mdc.govt.nz/Documents/Plans,,,,
IP000193,1/12/2023,Manawatu District Council,Manawatu District Stormwater Upgrades.,The purpose of this project is to upgrade the existing stormwater systems across the district with a primary focus on the upgrade of existing infrastructure within urban areas.,,Under construction,Fully funded,To be determined,Construct only,Manawatū - Whanganui,,,Water,5 - 25 million,,,,,2022-Q2,2024-Q2,2017-Q3,2028-Q2,
https://www.mdc.govt.nz/Documents/Plans,,,,
IP000194,1/12/2023,Manawatu District Council,Manawatu District Wastewater Renewals.,The purpose of this project is to renew the existing wastewater infrastructure within the Manawatu District.,,In planning,Funding source to be confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Water,5 - 25 million,,,,,,,2017-Q3,2028-Q2,
https://www.mdc.govt.nz/Documents/Plans,,,,
IP000195,1/12/2023,Manawatu District Council,Manawatu Road Maintenance Programme.,This programme includes the maintenance and renewal of the roading network in the Manawatu District.,,Under construction,Fully funded,Open,Construct only,Manawatū - Whanganui,,,Transport,100 - 250 million,2017-Q3,2018-Q3,2019-Q3,2019-Q3,2019-Q3,2024-Q2,2021-Q3,2024-Q2,
https://www.mdc.govt.nz/Documents/Plans,,,,
IP005899,1/12/2023,Manawatu District Council,Guard rail: various sites.,Low cost low risk roading improvements: This work category provides for the construction / implementation of low-cost low-risk improvements to the transport system.,,Under construction,Fully funded,Direct,Construct only,Manawatū - Whanganui,,,Transport,< 1 million,,,2023-Q3,2024-Q2,2023-Q3,2024-Q2,2022-Q1,2024-Q2,,,,,
IP005900,1/12/2023,Manawatu District Council,River scour protection: various sites.,Resilience improvements: This work category provides for non-routine work to protect assets from damage.,,Under construction,Fully funded,Direct,Construct only,Manawatū - Whanganui,,,Environmental,< 1 million,,,2023-Q3,2023-Q3,2023-Q3,2024-Q2,2021-Q3,2024-Q2,,,,,
IP005901,1/12/2023,Manawatu District Council,Speed Management: various sites.,Road to Zero: This work category provides for the construction / implementation of high priority low-cost low-risk improvements to the transport system.,,Under construction,Fully funded,Direct,Construct only,Manawatū - Whanganui,,,Transport,< 1 million,,,,,2024-Q3,2025-Q2,2021-Q3,2025-Q2,,,,,
IP005902,1/12/2023,Manawatu District Council,New footpaths and cycle routes: various sites.,Walking and Cycling Improvements: This work category provides for the construction / implementation of new or improved walking facilities.,,Under construction,Fully funded,Direct,Construct only,Manawatū - Whanganui,,,Transport,1 - 5 million,,,,,,,2022-Q1,2024-Q2,,,,,
IP008715,1/12/2023,Manawatu District Council,Feilding Wastewater Centralisation Project - Sanson.,The purpose of this project is to centralise all wastewater treatment plants within Feilding by developing a new network of integrated pipelines and pump stations. We received funding from NZDF as Ohakea waste will be piped to MWWTP for treatment.,,Under construction,Fully funded,To be determined,Construct only,Manawatū - Whanganui,,,Water,5 - 25 million,,,2019-Q4,2020-Q1,2020-Q2,2023-Q4,2017-Q3,2024-Q1,
https://www.mdc.govt.nz/Documents/Plans,,,,
IP008716,1/12/2023,Manawatu District Council,Feilding Wastewater Centralisation Project - Rongotea.,The purpose of this project is to centralise all wastewater treatment plants within Feilding by developing a new network of integrated pipelines and pump stations.,,Under construction,Fully funded,To be determined,Construct only,Manawatū - Whanganui,,,Water,5 - 25 million,,,2019-Q4,2020-Q1,2020-Q2,2024-Q3,2022-Q3,2024-Q3,
https://www.mdc.govt.nz/Documents/Plans,,,,
IP008717,1/12/2023,Manawatu District Council,Feilding Water Resiliance - New Bore.,New Feilding bore to replace surface intake.,,Under construction,Fully funded,To be determined,Design and construct,Manawatū - Whanganui,,,Water,1 - 5 million,2017-Q3,2018-Q3,2019-Q1,2019-Q2,2019-Q2,2024-Q3,2021-Q4,2024-Q3,
https://www.mdc.govt.nz/Documents/Plans,,,,
IP008718,1/12/2023,Manawatu District Council,Feilding Water Resiliance - trunk main.,install rising main from new bore to MacDonald Heights reservoirs.,,In planning,Fully funded,To be determined,Design and construct,Manawatū - Whanganui,,,Water,1 - 5 million,2017-Q3,2018-Q3,2019-Q1,2019-Q2,2023-Q3,2024-Q3,2023-Q3,2024-Q3,
https://www.mdc.govt.nz/Documents/Plans,,,,
IP008654,15/11/2023,Marlborough District Council,Marlborough River Protection.,Flood response for Marlborough Region.,,Under construction,Funding source to be confirmed,To be determined,Design and construct,Marlborough,,,Water,1 - 5 million,,,,,,,2021-Q2,2024-Q2,,,,,
IP008655,15/11/2023,Marlborough District Council,New Sports Pavilion.,A &P park Sports pavillion.,,In planning,Funding source confirmed,To be determined,Design and construct,Marlborough,,,Community facilities,1 - 5 million,,,,,,,2022-Q3,2024-Q2,,,,,
IP008657,15/11/2023,Marlborough District Council,Roading.,Marlborough Sounds Roading recovery project.,,In planning,Funding source to be confirmed,To be determined,Design and construct,Marlborough,,,Transport,250 - 500 million,,,,,,,2022-Q3,2028-Q2,,,,,
IP008658,15/11/2023,Marlborough District Council,Havelock Water.,Water Treatment and Pipeline.,,In planning,Funding source to be confirmed,To be determined,Design and construct,Marlborough,,,Water,5 - 25 million,,,,,,,2021-Q1,2025-Q2,,,,,
IP008659,15/11/2023,Marlborough District Council,Blenheim Water.,Upgrade of existing water treatment for Blenheim town ship.,,In planning,Funding source to be confirmed,To be determined,Design and construct,Marlborough,,,Water,5 - 25 million,,,,,,,2021-Q3,2025-Q2,,,,,
IP008660,15/11/2023,Marlborough District Council,Riverlands Water.,New water source Treatment and Pipeline.,,In planning,Funding source to be confirmed,To be determined,Design and construct,Marlborough,,,Water,5 - 25 million,,,,,,,2019-Q3,2025-Q2,,,,,
IP008934,15/11/2023,Marlborough District Council,Blenheim CBD Street scape Invigoration.,Town Paving/paths.,,Under construction,Funding source confirmed,To be determined,Construct only,Marlborough,,,Community facilities,1 - 5 million,,,,,,,2023-Q1,2024-Q2,,,,,
IP008935,15/11/2023,Marlborough District Council,Blenheim Stormwater Upgrade.,Town Branch drain for the secion of Connors and CMP.,,In planning,Funding source confirmed,To be determined,Design and construct,Marlborough,,,Water,1 - 5 million,,,,,,,2024-Q4,2026-Q4,,,,,
IP008936,15/11/2023,Marlborough District Council,Awatere Water.,Point of entry treatment for rural supplies not served by the Seddon Water Treatmetnt Plant.,,In planning,Funding source confirmed,To be determined,Design and construct,Marlborough,,,Water,1 - 5 million,,,,,,,2023-Q2,2024-Q2,,,,,
IP008937,15/11/2023,Marlborough District Council,Sewage Pump Station - Alabama Road.,Replacement Pump station with improved seismic and hydraulic performance.,,In planning,Funding source confirmed,To be determined,Design and construct,Marlborough,,,Water,5 - 25 million,,,2023-Q4,,,,2024-Q2,2025-Q4,,,,,
IP010839,28/02/2024,Marlborough District Council,tormwater town Branch Drain sec 3b.,Stormwater Drain.,,Under construction,Funding source confirmed,Selective,Construct only,Marlborough,,,Water,1 - 5 million,,,2024-Q1,,,,2024-Q1,2024-Q3,,,,,
IP005992,3/11/2023,McConnell Property Limited,Build to Rent - Gasometer Takapuna.,Market leading 'Build to Rent' residential development of 350 apartments shared amenity and retail/commercial in Takapuna. A critical step of Eke Panuku's plan for the regeneration of Takapuna as identified in the Takapuna Framework Plans.,,In planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Housing,250 - 500 million,,,,,,,2021-Q2,2026-Q3,,,[email address],,
IP005910,11/12/2023,Meridian Energy Limited,Harapaki Wind Farm.,The Harapaki project is a $450M wind farm investment which has spanned 36 months of construction. Once completed the site will have 41 turbines around 4.3MW each – 176MW capacity in total that will generate around 540 GWh of renewable energy per annum. Enough to power over 70 000 households each year. Currently significant civil infrastructure has been built which includes sealed access roads piled foundations hardstands and laydown areas. A service building facility (O&M) has been built. This is a based for the permanent maintenance technicians and spare parts storage parts are held. The asset will be operated for 30-years under an operations and maintenance agreement.A total of 27 turbines have been fully erected with a further 5 at various stages of assembly. All componentry’s have been moved up to site so no further disruptions to the public roads.A 33kV electrical cable reticulation system throughout the site has been laid and completed. This connects every turbine to the substation on the wind farm.A 220kV grid connected substation to export power to the main grid on Transpower’s Whirinaki to Wairakei circuit is now fully operational and the first half of turbines are generating electricity..,,Under construction,Fully funded,Open,Construct only,Hawke's Bay,,,Energy,250 - 500 million,,2021-Q1,,,2021-Q3,2024-Q3,2021-Q1,2024-Q3,
https://www.meridianenergy.co.nz/who-we-are/our-power-stations/wind/harapaki,,[email address],-39.2504,176.683
IP008745,11/12/2023,Meridian Energy Limited,Ruakākā Energy Park Battery.,Meridian's Ruakākā Energy Park is a two-phase project including an approved 100MW/200MWh Battery Energy Storage System (BESS) and a prospective 120MW Solar Farm development. The solar farm is still in the consenting phase. Site village has been established and the relevant teams are based onsite in the portable offices including three main contractor companies.Civil foundations are well underway. First shipment of battery containers have arrived to the port in Northland and are being stored. Building works have began on the Switching Station and also Transpower has started integration works at Bream Bay.,,Under construction,Fully funded,Limited,Construct only,Northland,,,Energy,100 - 250 million,,2022-Q4,,,2023-Q1,2024-Q3,2022-Q4,2024-Q3,
https://www.meridianenergy.co.nz/power-stations/ruakaka-energy-park,,[email address],-35.848888,174.47763
IP000201,1/03/2024,Ministry for Primary Industries,Laboratory and Biocontainment Greenhouse New Build and Relocation - Tamaki.,This project involves moving the Plant Health and Environment Laboratory facility currently in Tamaki in East Auckland. The project also includes building a new Plant Health and Environment Laboratory and Biocontainment Greenhouse.,,In planning,Funding source confirmed,Open,Early contractor involvement,Auckland,,,Science and research,500 million - 1 billion,2022-Q1,2023-Q1,2023-Q1,2023-Q3,2025-Q2,2028-Q2,2022-Q1,2029-Q2,
https://www.mpi.govt.nz/science/laboratories/plant-health-and-environment-laboratory/new-plant-health-and-environment-laboratory/,,PH&[email address],,
IP004176,1/03/2024,Ministry for Primary Industries,Interim Post-Entry Quarantine Facility Expansion.,This project is to deliver an interim PEQ facility to alleviate the severe lack of PEQ capacity.,,Under construction,Fully funded,Open,Construct only,Auckland,,,Science and research,5 - 25 million,,,2020-Q4,2021-Q3,2022-Q2,2023-Q4,2020-Q4,2024-Q2,
https://www.mpi.govt.nz/science/laboratories/plant-health-and-environment-laboratory/new-plant-health-and-environment-laboratory/post-entry-quarantine-facility-under-construction/,,PH&[email address],,
IP000072,18/03/2024,Ministry of Education,Edgecumbe College Redevelopment.,This project is the redevelopment of Edgecumbe College.,,Under review,Funding source confirmed,Selective,Early contractor involvement,Bay of Plenty,,,Education,5 - 25 million,2016-Q3,,2022-Q2,2022-Q4,2022-Q4,2026-Q4,2016-Q3,2026-Q4,
https://www.education.govt.nz/school/property/,,,-37.967933,176.827537
IP000078,18/03/2024,Ministry of Education,Kamo High School Redevelopment.,This project is a redevelopment at Kamo High School.,,Under construction,Funding source confirmed,Selective,Early contractor involvement,Northland,,,Education,25 - 50 million,2017-Q4,,2021-Q4,2022-Q3,2022-Q3,2025-Q1,2021-Q4,2025-Q1,
https://www.education.govt.nz/school/property/,,,-35.684394,174.302813
IP000089,18/03/2024,Ministry of Education,Mt Aspiring College Redevelopment.,This project is a redevelopment at Mt Aspiring College.,,Under construction,Funding source confirmed,Selective,Construct only,Otago,,,Education,50 - 100 million,2017-Q4,,2020-Q3,2021-Q1,2021-Q1,2026-Q2,2020-Q3,2026-Q2,
https://www.education.govt.nz/school/property/,,,-44.68733,169.136772
IP000097,18/03/2024,Ministry of Education,Owairaka District School New Build.,This project is a new build at Owairaka District School.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2018-Q1,,2022-Q3,2023-Q2,2023-Q2,2025-Q2,2022-Q3,2025-Q2,
https://www.education.govt.nz/school/property/,,,-36.895219,174.715658
IP000106,18/03/2024,Ministry of Education,Taihape Area School Redevelopment.,This project is a redevelopment at Taihape Area School.,,Under review,Funding source confirmed,Selective,Construct only,Manawatū - Whanganui,,,Education,25 - 50 million,2019-Q2,,2024-Q1,2024-Q1,2024-Q2,2026-Q4,2024-Q1,2026-Q4,
https://www.education.govt.nz/school/property/,,,-39.675966,175.801514
IP000108,18/03/2024,Ministry of Education,Te Wharekura o Manurewa New Build.,This project is a new build at Te Wharekura o Manurewa.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,25 - 50 million,2017-Q2,,2021-Q3,2022-Q1,2022-Q1,2024-Q2,2021-Q3,2024-Q2,
https://www.education.govt.nz/school/property/,,,-37.02442,174.85734
IP000112,18/03/2024,Ministry of Education,Tauranga Girls' College Redevelopment.,This project is a redevelopment at Tauranga Girls' College.,,Under construction,Funding source confirmed,Selective,Construct only,Bay of Plenty,,,Education,5 - 25 million,2018-Q2,,2021-Q4,2023-Q2,2023-Q3,2024-Q3,2021-Q4,2024-Q3,
https://www.education.govt.nz/school/property/,,,-37.712366,176.144959
IP000115,18/03/2024,Ministry of Education,Wainuiomata High School Redevelopment.,This project is a redevelopment at Wainuiomata High School.,,Under construction,Funding source confirmed,Selective,Construct only,Wellington,,,Education,50 - 100 million,2017-Q2,,2020-Q3,2020-Q4,2020-Q4,2025-Q1,2020-Q3,2025-Q1,
https://www.education.govt.nz/school/property/,,,-41.251669,174.936203
IP000117,18/03/2024,Ministry of Education,Wellington East Girls' College Redevelopment.,This project is a redevelopment at Wellington East Girls' College.,,Under construction,Funding source confirmed,Selective,Construct only,Wellington,,,Education,5 - 25 million,2021-Q3,,2021-Q2,2021-Q3,2021-Q3,2024-Q3,2021-Q2,2024-Q3,
https://www.education.govt.nz/school/property/,,,-41.302357,174.785007
IP000202,18/03/2024,Ministry of Education,Allenton School Redevelopment.,This project is a redevelopment at Allenton School.,,Under review,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,5 - 25 million,2017-Q4,,2021-Q2,2021-Q3,2021-Q3,2023-Q4,2021-Q2,2023-Q4,
https://www.education.govt.nz/school/property/,,,-43.885885,171.741452
IP000206,18/03/2024,Ministry of Education,Johnsonville School New Build.,This project is a new build at Johnsonville School.,,Under construction,Funding source confirmed,Selective,Construct only,Wellington,,,Education,5 - 25 million,2019-Q2,,2021-Q3,2022-Q2,2022-Q2,2024-Q2,2021-Q3,2024-Q2,
https://www.education.govt.nz/school/property/,,,-41.219321,174.805557
IP000212,18/03/2024,Ministry of Education,Papamoa College New Build.,This project is a new build at Papamoa College.,,Under review,Funding source confirmed,Selective,Design and construct,Bay of Plenty,,,Education,25 - 50 million,2021-Q4,,2018-Q4,2021-Q4,2021-Q4,2025-Q1,2018-Q4,2025-Q1,
https://www.education.govt.nz/school/property/,,,-37.714028,176.302674
IP000214,18/03/2024,Ministry of Education,Ruakaka School Redevelopment.,This project is a redevelopment at Ruakaka School.,,Under construction,Funding source confirmed,Selective,Construct only,Northland,,,Education,5 - 25 million,2021-Q2,,2022-Q3,2022-Q4,2022-Q4,2024-Q4,2022-Q3,2024-Q4,
https://www.education.govt.nz/school/property/,,,-35.89824,174.440861
IP000221,18/03/2024,Ministry of Education,Manukura School New Build.,This project is a new build at Manukura School.,,Under construction,Funding source confirmed,Selective,Design and construct,Manawatū - Whanganui,,,Education,50 - 100 million,2023-Q1,,2019-Q4,2022-Q3,2022-Q3,2024-Q1,2019-Q4,2024-Q1,
https://www.education.govt.nz/school/property/,,,-40.372516,175.629464
IP000222,18/03/2024,Ministry of Education,Sunnydene Special School New Build.,This project is a new build at Sunnydene Special School.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,25 - 50 million,2017-Q2,,2023-Q4,2023-Q4,2023-Q4,2025-Q4,2023-Q4,2025-Q4,
https://www.education.govt.nz/school/property/,,,-36.9051,174.752
IP000223,18/03/2024,Ministry of Education,TKKM o Te Wananga Whare Tapere o Takitimu New Build.,This project is a new build at TKKM o Te Wananga Whare Tapere o Takitimu.,,Under construction,Funding source confirmed,Selective,Design and construct,Hawke's Bay,,,Education,25 - 50 million,2015-Q1,,2020-Q3,2022-Q1,2022-Q1,2024-Q2,2020-Q3,2024-Q2,
https://www.education.govt.nz/school/property/,,,-39.64343,176.856058
IP000227,18/03/2024,Ministry of Education,Ashburton Intermediate Redevelopment.,This project is a redevelopment at Ashburton Intermediate.,,Under construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,5 - 25 million,2017-Q4,,2021-Q2,2021-Q3,2021-Q3,2025-Q3,2021-Q2,2025-Q3,
https://www.education.govt.nz/school/property/,,,-43.901069,171.758827
IP000231,18/03/2024,Ministry of Education,Botany Downs Secondary College Redevelopment.,This project is a redevelopment at Botany Downs Secondary College.,,Under review,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2018-Q4,,2024-Q2,2024-Q3,2024-Q3,2028-Q3,2023-Q4,2028-Q3,
https://www.education.govt.nz/school/property/,,,-36.934108,174.915446
IP000238,18/03/2024,Ministry of Education,Mt Roskill Grammar Redevelopment.,This project is a redevelopment at Mt Roskill Grammar.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2018-Q4,,2021-Q3,2022-Q1,2022-Q2,2025-Q1,2021-Q3,2025-Q1,
https://www.education.govt.nz/school/property/,,,-36.912708,174.747139
IP000241,18/03/2024,Ministry of Education,Otumoetai College Redevelopment.,This project is a redevelopment at Otumoetai College.,,Under review,Funding source confirmed,Selective,Early contractor involvement,Bay of Plenty,,,Education,25 - 50 million,2018-Q2,,2023-Q2,2023-Q4,2024-Q1,2029-Q1,2023-Q2,2029-Q1,
https://www.education.govt.nz/school/property/,,,-37.678754,176.129106
IP000243,18/03/2024,Ministry of Education,South Wellington Intermediate Redevelopment.,This project is a redevelopment at South Wellington Intermediate.,,Under review,Funding source confirmed,Selective,Early contractor involvement,Wellington,,,Education,5 - 25 million,2018-Q4,,2025-Q2,2025-Q2,2025-Q3,2027-Q1,2024-Q3,2027-Q1,
https://www.education.govt.nz/school/property/,,,-41.318187,174.780255
IP002736,18/03/2024,Ministry of Education,Shirley Intermediate Redevelopment.,This project is a redevelopment at Shirley Intermediate.,,Under construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,5 - 25 million,2018-Q1,,2021-Q1,2021-Q3,2021-Q4,2024-Q2,2021-Q1,2024-Q2,
https://www.education.govt.nz/school/property/,,,-43.508313,172.661644
IP002742,18/03/2024,Ministry of Education,Rototuna Junior & Senior High School New Build.,This project is a new build at Rototuna Junior & Senior High School.,,Under construction,Funding source confirmed,Selective,Design and construct,Waikato,,,Education,25 - 50 million,2022-Q3,,2021-Q2,2022-Q1,2022-Q1,2024-Q3,2021-Q2,2024-Q3,
https://www.education.govt.nz/school/property/,,,-37.716113,175.263497
IP002743,18/03/2024,Ministry of Education,Waimauku School Redevelopment.,This project is a redevelopment at Waimauku School.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2019-Q3,,2022-Q2,2022-Q4,2022-Q4,2024-Q2,2022-Q2,2024-Q2,
https://www.education.govt.nz/school/property/,,,-36.769953,174.491337
IP002748,18/03/2024,Ministry of Education,Mangere College New Build.,This project is a new build at Mangere College.,,Early planning,Funding source confirmed,Selective,To be determined,Auckland,,,Education,5 - 25 million,,,2031-Q2,2031-Q2,2031-Q3,2032-Q2,2031-Q2,2032-Q2,
https://www.education.govt.nz/school/property/,,,-36.959618,174.791589
IP002750,18/03/2024,Ministry of Education,Yaldhurst Model School Redevelopment.,This project is a redevelopment at Yaldhurst Model School.,,Under construction,Funding source confirmed,Selective,Design and construct,Canterbury,,,Education,1 - 5 million,2019-Q2,,2022-Q2,2022-Q3,2022-Q3,2024-Q1,2022-Q2,2024-Q1,
https://www.education.govt.nz/school/property/,,,-43.510194,172.502189
IP002754,18/03/2024,Ministry of Education,Lynfield College Redevelopment.,This project is a redevelopment at Lynfield College.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,25 - 50 million,2020-Q2,,2022-Q4,2022-Q4,2023-Q1,2024-Q4,2022-Q4,2024-Q4,
https://www.education.govt.nz/school/property/,,,-36.921035,174.715436
IP002756,18/03/2024,Ministry of Education,Marshland School New Build.,This project is a new build at Marshland School.,,Under construction,Funding source confirmed,Selective,Design and construct,Canterbury,,,Education,5 - 25 million,2019-Q4,,2021-Q3,2023-Q3,2023-Q3,2024-Q3,2021-Q3,2024-Q3,
https://www.education.govt.nz/school/property/,,,-43.472028,172.664748
IP002757,18/03/2024,Ministry of Education,Russley School Redevelopment.,This project is a redevelopment at Russley School.,,Under construction,Funding source confirmed,Selective,Design and construct,Canterbury,,,Education,5 - 25 million,2019-Q4,,2020-Q4,2022-Q4,2022-Q4,2025-Q2,2020-Q4,2025-Q2,
https://www.education.govt.nz/school/property/,,,-43.517895,172.544704
IP002758,18/03/2024,Ministry of Education,Cannons Creek School Redevelopment.,This project is a redevelopment at Cannons Creek School.,,Under construction,Funding source confirmed,Selective,Construct only,Wellington,,,Education,5 - 25 million,2019-Q4,,2022-Q1,2022-Q4,2022-Q4,2024-Q3,2022-Q1,2024-Q3,
https://www.education.govt.nz/school/property/,,,-41.140746,174.865675
IP002759,18/03/2024,Ministry of Education,Kirkwood Intermediate Redevelopment.,This project is a redevelopment at Kirkwood Intermediate.,,Under construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,5 - 25 million,2013-Q4,,2022-Q3,2023-Q1,2023-Q1,2024-Q4,2022-Q3,2024-Q4,
https://www.education.govt.nz/school/property/,,,-43.530607,172.585501
IP002760,18/03/2024,Ministry of Education,Tauranga Boys' College New Build.,This project is a new build at Tauranga Boys' College.,,Under review,Funding source confirmed,Selective,Construct only,Bay of Plenty,,,Education,5 - 25 million,2020-Q4,,2021-Q3,2022-Q1,2022-Q2,2023-Q4,2021-Q3,2023-Q4,
https://www.education.govt.nz/school/property/,,,-37.702139,176.156216
IP002764,18/03/2024,Ministry of Education,Mangapapa School Redevelopment.,This project is a redevelopment at Mangapapa School.,,Under construction,Funding source confirmed,Selective,Construct only,Gisborne,,,Education,5 - 25 million,2018-Q4,,2020-Q3,2021-Q1,2021-Q1,2025-Q1,2020-Q3,2025-Q1,
https://www.education.govt.nz/school/property/,,,-38.647988,178.019915
IP002774,18/03/2024,Ministry of Education,Marlborough Girls College and Marlborough Boys College Merged Campus Redevelopment.,This project is a redevelopment at Marlborough Girls College and Marlborough Boys College Merged Campus.,,In planning,Funding source confirmed,Selective,Design and construct,Marlborough,,,Education,100 - 250 million,,,2024-Q2,2024-Q3,2024-Q3,2028-Q1,2024-Q2,2028-Q1,
https://www.education.govt.nz/school/property/,,,-41.5071,173.9445
IP004082,18/03/2024,Ministry of Education,Burnside High School Redevelopment.,This project is a redevelopment at Burnside High School.,,Under construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,5 - 25 million,2013-Q4,,2022-Q1,2022-Q2,2022-Q2,2025-Q4,2022-Q1,2025-Q4,
https://www.education.govt.nz/school/property/,,,-43.50732,172.57771
IP004084,18/03/2024,Ministry of Education,Elmwood Normal School Redevelopment.,This project is a redevelopment at Elmwood Normal School.,,Under construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,5 - 25 million,2013-Q4,,2022-Q3,2022-Q4,2022-Q4,2025-Q1,2022-Q3,2025-Q1,
https://www.education.govt.nz/school/property/,,,-43.513814,172.614755
IP004085,18/03/2024,Ministry of Education,Fendalton Open Air School Redevelopment.,This project is a redevelopment at Fendalton Open Air School.,,Under construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,5 - 25 million,2013-Q4,,2022-Q3,2022-Q4,2022-Q4,2025-Q1,2022-Q3,2025-Q1,
https://www.education.govt.nz/school/property/,,,-43.517081,172.591149
IP004086,18/03/2024,Ministry of Education,Heaton Normal Intermediate Redevelopment.,This project is a redevelopment at Heaton Normal Intermediate.,,Under construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,25 - 50 million,2013-Q4,,2021-Q3,2022-Q1,2022-Q2,2024-Q4,2021-Q3,2024-Q4,
https://www.education.govt.nz/school/property/,,,-43.510414,172.615407
IP004087,18/03/2024,Ministry of Education,Ilam School Redevelopment.,This project is a redevelopment at Ilam School.,,In procurement,Funding source confirmed,Selective,Design and construct,Canterbury,,,Education,1 - 5 million,2013-Q4,,2023-Q1,2024-Q2,2024-Q3,2025-Q4,2023-Q1,2025-Q4,
https://www.education.govt.nz/school/property/,,,-43.526413,172.579696
IP004089,18/03/2024,Ministry of Education,Papanui High School Redevelopment.,This project is a redevelopment at Papanui High School.,,Under construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,25 - 50 million,2013-Q4,,2021-Q4,2021-Q4,2022-Q1,2024-Q3,2021-Q4,2024-Q3,
https://www.education.govt.nz/school/property/,,,-43.491042,172.606715
IP004091,18/03/2024,Ministry of Education,Riccarton High School Redevelopment.,This project is a redevelopment at Riccarton High School.,,Under construction,Funding source confirmed,Selective,Design and construct,Canterbury,,,Education,25 - 50 million,2013-Q4,,2021-Q3,2022-Q3,2022-Q4,2025-Q2,2021-Q3,2025-Q2,
https://www.education.govt.nz/school/property/,,,-43.535895,172.566365
IP004094,18/03/2024,Ministry of Education,Templeton School Redevelopment.,This project is a redevelopment at Templeton School.,,Under construction,Funding source confirmed,Selective,Design and construct,Canterbury,,,Education,5 - 25 million,2013-Q4,,2021-Q4,2022-Q4,2023-Q1,2024-Q2,2021-Q4,2024-Q2,
https://www.education.govt.nz/school/property/,,,-43.550162,172.472361
IP004095,18/03/2024,Ministry of Education,Twizel Area School Redevelopment.,This project is a redevelopment at Twizel Area School.,,Early planning,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,1 - 5 million,2022-Q2,,2025-Q4,2026-Q1,2026-Q1,2028-Q3,2025-Q4,2028-Q3,
https://www.education.govt.nz/school/property/,,,-44.255248,170.098059
IP004096,18/03/2024,Ministry of Education,Wairakei School (Christchurch) Redevelopment.,This project is a redevelopment at Wairakei School (Christchurch).,,Under construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,5 - 25 million,2022-Q2,,2022-Q3,2022-Q4,2022-Q4,2024-Q1,2022-Q3,2024-Q1,
https://www.education.govt.nz/school/property/,,,-43.500167,172.588282
IP004097,18/03/2024,Ministry of Education,Chelsea School Redevelopment.,This project is a redevelopment at Chelsea School.,,Under construction,Funding source confirmed,Selective,Design and construct,Auckland,,,Education,5 - 25 million,2019-Q3,,2022-Q2,2022-Q4,2022-Q4,2024-Q4,2022-Q2,2024-Q4,
https://www.education.govt.nz/school/property/,,,-36.816259,174.70762
IP004098,18/03/2024,Ministry of Education,Clutha Valley School Redevelopment.,This project is a redevelopment at Clutha Valley School.,,Under construction,Funding source confirmed,Selective,Construct only,Otago,,,Education,5 - 25 million,2018-Q4,,2022-Q2,2022-Q3,2022-Q3,2024-Q3,2022-Q2,2024-Q3,
https://www.education.govt.nz/school/property/,,,-46.093588,169.550575
IP004101,18/03/2024,Ministry of Education,Ellesmere College Redevelopment.,This project is a redevelopment at Ellesmere College.,,In procurement,Funding source confirmed,Selective,Design and construct,Canterbury,,,Education,25 - 50 million,2018-Q4,,2022-Q1,2024-Q1,2024-Q2,2026-Q1,2022-Q1,2026-Q1,
https://www.education.govt.nz/school/property/,,,-43.757832,172.292414
IP004103,18/03/2024,Ministry of Education,Greytown School Redevelopment.,This project is a redevelopment at Greytown School.,,Under construction,Funding source confirmed,Selective,Construct only,Wellington,,,Education,5 - 25 million,2020-Q3,,2020-Q4,2021-Q2,2021-Q3,2024-Q2,2020-Q4,2024-Q2,
https://www.education.govt.nz/school/property/,,,-41.082514,175.460429
IP004104,18/03/2024,Ministry of Education,Hastings Boys' High School Redevelopment.,This project is a redevelopment at Hastings Boys' High School.,,Under construction,Funding source confirmed,Selective,Construct only,Hawke's Bay,,,Education,5 - 25 million,2019-Q3,,2022-Q1,2022-Q3,2022-Q4,2024-Q4,2022-Q1,2024-Q4,
https://www.education.govt.nz/school/property/,,,-39.650209,176.834935
IP004108,18/03/2024,Ministry of Education,Maungaraki School Redevelopment.,This project is a redevelopment at Maungaraki School.,,Under construction,Funding source confirmed,Selective,Construct only,Wellington,,,Education,1 - 5 million,2022-Q2,,2021-Q3,2022-Q2,2022-Q2,2024-Q2,2021-Q3,2024-Q2,
https://www.education.govt.nz/school/property/,,,-41.209627,174.87814
IP004109,18/03/2024,Ministry of Education,Opotiki College Redevelopment.,This project is a redevelopment at Opotiki College.,,Under review,Funding source confirmed,Selective,Construct only,Bay of Plenty,,,Education,5 - 25 million,2018-Q4,,2022-Q1,2023-Q3,2023-Q4,2025-Q2,2022-Q1,2025-Q2,
https://www.education.govt.nz/school/property/,,,-38.013132,177.288103
IP004110,18/03/2024,Ministry of Education,Parakai School Redevelopment.,This project is a redevelopment at Parakai School.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2019-Q2,,2021-Q4,2022-Q1,2022-Q2,2024-Q1,2021-Q4,2024-Q1,
https://www.education.govt.nz/school/property/,,,-36.663249,174.432924
IP004112,18/03/2024,Ministry of Education,Pukekohe High School Redevelopment.,This project is a redevelopment at Pukekohe High School.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2022-Q4,,2022-Q3,2022-Q4,2022-Q4,2024-Q1,2022-Q3,2024-Q2,
https://www.education.govt.nz/school/property/,,,-37.204552,174.905825
IP004113,18/03/2024,Ministry of Education,Sara Cohen School Redevelopment.,This project is a redevelopment at Sara Cohen School.,,Under construction,Funding source confirmed,Selective,Construct only,Otago,,,Education,5 - 25 million,2018-Q3,,2022-Q1,2022-Q4,2022-Q4,2024-Q4,2022-Q1,2024-Q4,
https://www.education.govt.nz/school/property/,,,-45.898837,170.482778
IP004115,18/03/2024,Ministry of Education,TKKM o Nga Mokopuna Redevelopment.,This project is a redevelopment at TKKM o Nga Mokopuna.,,Under review,Funding source confirmed,Selective,Construct only,Wellington,,,Education,5 - 25 million,2018-Q4,,2024-Q3,2024-Q4,2024-Q4,2026-Q4,2024-Q3,2026-Q4,
https://www.education.govt.nz/school/property/,,,-41.320703,174.831726
IP004117,18/03/2024,Ministry of Education,Western Heights High School Redevelopment.,This project is a redevelopment at Western Heights High School.,,Under review,Funding source confirmed,Selective,Construct only,Bay of Plenty,,,Education,5 - 25 million,2019-Q2,,2024-Q2,2024-Q2,2024-Q3,2025-Q3,2024-Q1,2025-Q3,
https://www.education.govt.nz/school/property/,,,-38.119568,176.221187
IP005443,18/03/2024,Ministry of Education,Alexandra School Combined.,This project is a redevelopment at Alexandra School.,,Under construction,Funding source confirmed,Selective,Construct only,Otago,,,Education,5 - 25 million,2020-Q4,,2023-Q4,2024-Q1,2024-Q1,2026-Q2,2023-Q4,2026-Q2,
https://www.education.govt.nz/school/property/,,,-45.255325,169.389801
IP005444,18/03/2024,Ministry of Education,Andersons Bay School Combined.,This project is a redevelopment at Andersons Bay School.,,In planning,Funding source confirmed,Selective,Construct only,Otago,,,Education,5 - 25 million,2021-Q1,,2024-Q2,2024-Q2,2024-Q3,2025-Q3,2023-Q4,2025-Q3,
https://www.education.govt.nz/school/property/,,,-45.894907,170.535455
IP005445,18/03/2024,Ministry of Education,Arthur Street School Redevelopment.,This project is a redevelopment at Arthur Street School.,,Under construction,Funding source confirmed,Selective,Construct only,Otago,,,Education,5 - 25 million,2019-Q4,,2022-Q1,2022-Q3,2022-Q3,2024-Q2,2022-Q1,2024-Q2,
https://www.education.govt.nz/school/property/,,,-45.872617,170.49515
IP005446,18/03/2024,Ministry of Education,Ashburton College Combined.,This project is a redevelopment at Ashburton College.,,On hold,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,50 - 100 million,2018-Q4,,2022-Q2,2022-Q3,2022-Q3,2025-Q2,2022-Q2,2025-Q2,
https://www.education.govt.nz/school/property/,,,-43.892281,171.750169
IP005447,18/03/2024,Ministry of Education,Christchurch Boys' High School Redelelopment.,This project is a redevelopment at Christchurch Boys' High School.,,Under construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,25 - 50 million,,,2021-Q2,2022-Q1,2022-Q2,2025-Q2,2021-Q2,2025-Q2,
https://www.education.govt.nz/school/property/,,,-43.524811,172.59842
IP005448,18/03/2024,Ministry of Education,Cromwell College Combined.,This project is a redevelopment at Cromwell College.,,Under construction,Funding source confirmed,Selective,Construct only,Otago,,,Education,5 - 25 million,2021-Q3,,2023-Q2,2023-Q3,2023-Q4,2025-Q1,2023-Q2,2025-Q1,
https://www.education.govt.nz/school/property/,,,-45.04349,169.1945
IP005449,18/03/2024,Ministry of Education,Ferndale School (Christchurch) Redevelopment.,This project is a redevelopment at Ferndale School (Christchurch).,,Under construction,Funding source confirmed,Selective,Design and construct,Canterbury,,,Education,5 - 25 million,2013-Q4,,2023-Q4,2024-Q1,2024-Q1,2025-Q3,2023-Q4,2025-Q3,
https://www.education.govt.nz/school/property/,,,-43.517086,172.621648
IP005450,18/03/2024,Ministry of Education,Grants Braes School Roll Growth.,This project is a new build at Grants Braes School.,,Under construction,Funding source confirmed,Selective,Construct only,Otago,,,Education,1 - 5 million,2020-Q3,,2022-Q1,2023-Q1,2023-Q2,2024-Q2,2022-Q1,2024-Q2,
https://www.education.govt.nz/school/property/,,,-45.884426,170.53346
IP005451,18/03/2024,Ministry of Education,Maitai School Redevelopment.,This project is a redevelopment at Maitai School.,,In planning,Funding source to be confirmed,Selective,Construct only,Marlborough,,,Education,25 - 50 million,,,2024-Q2,2024-Q3,2024-Q3,2025-Q3,2024-Q2,2025-Q3,
https://www.education.govt.nz/school/property/,,,-41.273325,173.291893
IP005452,18/03/2024,Ministry of Education,Otago Boys' High School Redevelopment.,This project is a redevelopment at Otago Boys' High School.,,Under construction,Funding source confirmed,Selective,Construct only,Otago,,,Education,5 - 25 million,2022-Q1,,2023-Q3,2023-Q4,2023-Q4,2025-Q2,2023-Q3,2025-Q2,
https://www.education.govt.nz/school/property/,,,-45.870985,170.495877
IP005453,18/03/2024,Ministry of Education,Oxford Area School Redevelopment.,This project is a redevelopment at Oxford Area School.,,On hold,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,5 - 25 million,2018-Q2,,2022-Q4,2023-Q1,2023-Q2,2024-Q1,2022-Q4,2024-Q1,
https://www.education.govt.nz/school/property/,,,-43.2942,172.187986
IP005454,18/03/2024,Ministry of Education,Queen Charlotte College Redevelopment.,This project is a redevelopment at Queen Charlotte College.,,Under construction,Funding source confirmed,Selective,Construct only,Marlborough,,,Education,5 - 25 million,2018-Q4,,2023-Q1,2023-Q3,2023-Q3,2025-Q3,2023-Q1,2025-Q3,
https://www.education.govt.nz/school/property/,,,-41.279741,174.02315
IP005455,18/03/2024,Ministry of Education,Salisbury School (Nelson) Redevelopment.,This project is a redevelopment at Salisbury School (Nelson).,,Under review,Funding source confirmed,Selective,Construct only,Tasman,,,Education,25 - 50 million,2019-Q3,,2024-Q2,2024-Q3,2024-Q3,2026-Q2,2024-Q2,2026-Q2,
https://www.education.govt.nz/school/property/,,,-41.337559,173.195399
IP005456,18/03/2024,Ministry of Education,South New Brighton School Combined.,This project is a redevelopment at South New Brighton School.,,Under construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,5 - 25 million,2020-Q3,,2022-Q4,2022-Q4,2022-Q4,2025-Q2,2022-Q4,2025-Q2,
https://www.education.govt.nz/school/property/,,,-43.52622,172.733527
IP005458,18/03/2024,Ministry of Education,TKKM o Te Whanau Tahi Redevelopment.,This project is a redevelopment at TKKM o Te Whanau Tahi.,,In planning,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,1 - 5 million,2013-Q4,,2024-Q3,2024-Q4,2024-Q4,2026-Q4,2023-Q3,2026-Q4,
https://www.education.govt.nz/school/property/,,,-43.564588,172.614592
IP005459,18/03/2024,Ministry of Education,Tongariro School Redevelopment.,This project is a redevelopment at Tongariro School.,,Under construction,Funding source confirmed,Selective,Construct only,Waikato,,,Education,5 - 25 million,2019-Q3,,2022-Q2,2022-Q3,2022-Q4,2024-Q2,2022-Q2,2024-Q2,
https://www.education.govt.nz/school/property/,,,-38.98579,175.815059
IP005460,18/03/2024,Ministry of Education,Karori Normal School Redevelopment.,This project is a redevelopment at Karori Normal School.,,Under construction,Funding source confirmed,Selective,Early contractor involvement,Wellington,,,Education,5 - 25 million,2018-Q4,,2022-Q4,2023-Q3,2023-Q3,2025-Q3,2022-Q4,2025-Q3,
https://www.education.govt.nz/school/property/,,,-41.284073,174.741874
IP005461,18/03/2024,Ministry of Education,Mana College Redevelopment.,This project is a redevelopment at Mana College.,,Under construction,Funding source confirmed,Selective,Construct only,Wellington,,,Education,25 - 50 million,2018-Q4,,2022-Q3,2022-Q4,2022-Q4,2024-Q4,2022-Q3,2024-Q4,
https://www.education.govt.nz/school/property/,,,-41.127967,174.831116
IP005462,18/03/2024,Ministry of Education,Te Kura-a-iwi o Whakatupuranga Rua Mano Redevelopment Combined.,This project is a redevelopment at Te Kura-a-iwi o Whakatupuranga Rua Mano.,,Under review,Funding source confirmed,Selective,Construct only,Wellington,,,Education,5 - 25 million,2021-Q2,,2024-Q2,2024-Q2,2024-Q3,2025-Q3,2021-Q2,2025-Q3,
https://www.education.govt.nz/school/property/,,,-40.750958,175.133546
IP005463,18/03/2024,Ministry of Education,Spotswood College Redevelopment.,This project is a redevelopment at Spotswood College.,,Under review,Funding source confirmed,Selective,Construct only,Taranaki,,,Education,5 - 25 million,,,2024-Q4,2024-Q4,2025-Q1,2027-Q2,2024-Q4,2027-Q2,
https://www.education.govt.nz/school/property/,,,-39.071205,174.036087
IP005464,18/03/2024,Ministry of Education,Eskdale School Combined.,This project is a redevelopment at Eskdale School.,,Under construction,Funding source confirmed,Selective,Construct only,Hawke's Bay,,,Education,5 - 25 million,2019-Q3,,2022-Q2,2022-Q3,2022-Q3,2025-Q3,2022-Q2,2025-Q3,
https://www.education.govt.nz/school/property/,,,-39.402535,176.85281
IP005465,18/03/2024,Ministry of Education,Tamatea Intermediate Redevelopment.,This project is a redevelopment at Tamatea Intermediate.,,Under construction,Funding source confirmed,Selective,Construct only,Hawke's Bay,,,Education,25 - 50 million,2019-Q3,,2022-Q1,2022-Q3,2022-Q4,2024-Q4,2022-Q1,2024-Q4,
https://www.education.govt.nz/school/property/,,,-39.514748,176.872722
IP005466,18/03/2024,Ministry of Education,Tiaho Primary School Redevelopment.,This project is a redevelopment at Tiaho Primary School.,,Under review,Funding source confirmed,Selective,Construct only,Hawke's Bay,,,Education,5 - 25 million,2020-Q3,,2024-Q4,2024-Q4,2025-Q1,2025-Q4,2023-Q2,2025-Q4,
https://www.education.govt.nz/school/property/,,,-39.04303,177.419994
IP005467,18/03/2024,Ministry of Education,Otahuhu College Redevelopment.,This project is a redevelopment at Otahuhu College.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,1 - 5 million,2020-Q4,,2025-Q1,2025-Q2,2025-Q2,2027-Q3,2025-Q1,2027-Q3,
https://www.education.govt.nz/school/property/,,,-36.953118,174.840645
IP005468,18/03/2024,Ministry of Education,Sommerville School New School.,This project is a new school at Sommerville School.,,Under review,Funding source confirmed,Selective,Construct only,Auckland,,,Education,25 - 50 million,2018-Q2,,2024-Q2,2024-Q3,2024-Q3,2026-Q3,2024-Q3,2026-Q3,
https://www.education.govt.nz/school/property/,,,-36.893943,174.86605
IP005469,18/03/2024,Ministry of Education,Albany School Combined.,This project is a redevelopment at Albany School.,,Under construction,Funding source confirmed,Selective,Design and construct,Auckland,,,Education,25 - 50 million,2021-Q2,,2021-Q1,2022-Q1,2022-Q2,2024-Q3,2021-Q1,2024-Q3,
https://www.education.govt.nz/school/property/,,,-36.736702,174.690624
IP005470,18/03/2024,Ministry of Education,May Road School Roll Growth.,This project is a new build at May Road School.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2021-Q1,,2022-Q3,2022-Q3,2022-Q4,2024-Q4,2022-Q3,2024-Q4,
https://www.education.govt.nz/school/property/,,,-36.915293,174.730592
IP005471,18/03/2024,Ministry of Education,Sutton Park School Combined.,This project is a redevelopment at Sutton Park School.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2021-Q2,,2022-Q1,2023-Q1,2023-Q1,2024-Q1,2021-Q2,2024-Q1,
https://www.education.govt.nz/school/property/,,,-36.957182,174.821816
IP005473,18/03/2024,Ministry of Education,Botany Downs School Combined.,This project is a redevelopment at Botany Downs School.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2021-Q1,,2022-Q1,2022-Q4,2022-Q4,2024-Q1,2022-Q1,2024-Q1,
https://www.education.govt.nz/school/property/,,,-36.912085,174.922774
IP005474,18/03/2024,Ministry of Education,Conifer Grove School Combined.,This project is a redevelopment at Conifer Grove School.,,On hold,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2021-Q2,,2022-Q3,2023-Q2,2023-Q3,2024-Q2,2022-Q3,2024-Q2,
https://www.education.govt.nz/school/property/,,,-37.048539,174.911616
IP005475,18/03/2024,Ministry of Education,Wiri Central School Roll Growth.,This project is a new build at Wiri Central School.,,On hold,Funding source confirmed,Selective,Construct only,Auckland,,,Education,25 - 50 million,2020-Q4,,2023-Q2,2023-Q4,2023-Q4,2025-Q1,2023-Q2,2025-Q1,
https://www.education.govt.nz/school/property/,,,-37.000487,174.885458
IP005476,18/03/2024,Ministry of Education,Albany Senior High School Redevelopment.,This project is a redevelopment at Albany Senior High School.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2020-Q4,,2022-Q1,2022-Q2,2022-Q3,2024-Q1,2022-Q1,2024-Q1,
https://www.education.govt.nz/school/property/,,,-36.730178,174.695766
IP005477,18/03/2024,Ministry of Education,Somerville Intermediate School Redevelopment.,This project is a redevelopment at Somerville Intermediate School.,,In procurement,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2018-Q2,,2024-Q1,2024-Q2,2024-Q2,2026-Q2,2018-Q2,2026-Q2,
https://www.education.govt.nz/school/property/,,,-36.91284,174.93907
IP005558,18/03/2024,Ministry of Education,Paraparaumu College Redevelopment.,This project is for a Redevelopment at Paraparaumu College.,,Under review,Funding source confirmed,Selective,Early contractor involvement,Wellington,,,Education,5 - 25 million,,,2024-Q3,2024-Q3,2024-Q4,2026-Q2,2024-Q2,2026-Q2,
https://www.education.govt.nz/school/property/,,,-40.888259,175.003987
IP005559,18/03/2024,Ministry of Education,Maungaraki School Redevelopment.,This project is for a Redevelopment at Maungaraki School.,,Under construction,Funding source confirmed,Selective,Construct only,Wellington,,,Education,5 - 25 million,2021-Q3,,2022-Q4,2023-Q2,2023-Q2,2024-Q3,2022-Q4,2024-Q3,
https://www.education.govt.nz/school/property/,,,-41.209627,174.87814
IP005560,18/03/2024,Ministry of Education,TKKM o Te Ara Whanui Redevelopment.,This project is for a Redevelopment at TKKM o Te Ara Whanui.,,Under construction,Funding source confirmed,Selective,Construct only,Wellington,,,Education,5 - 25 million,2021-Q2,,2022-Q3,2022-Q4,2023-Q1,2025-Q3,2022-Q3,2025-Q3,
https://www.education.govt.nz/school/property/,,,-41.217843,174.888332
IP005561,18/03/2024,Ministry of Education,South Wellington Intermediate New Build.,This project is for a New Build at South Wellington Intermediate.,,Under review,Funding source confirmed,Selective,Construct only,Wellington,,,Education,1 - 5 million,2021-Q2,,2024-Q3,2024-Q4,2024-Q4,2026-Q2,2021-Q2,2026-Q2,
https://www.education.govt.nz/school/property/,,,-41.318187,174.780255
IP005565,18/03/2024,Ministry of Education,Ellerslie School Redevelopment.,This project is for a Redevelopment at Ellerslie School.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2021-Q2,,2024-Q3,2024-Q4,2025-Q1,2026-Q1,2024-Q3,2026-Q3,
https://www.education.govt.nz/school/property/,,,-36.898634,174.805734
IP005567,18/03/2024,Ministry of Education,Henderson Intermediate Redevelopment.,This project is for a Redevelopment at Henderson Intermediate.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2021-Q2,,2022-Q1,2022-Q4,2022-Q4,2024-Q2,2022-Q1,2024-Q2,
https://www.education.govt.nz/school/property/,,,-36.867743,174.627984
IP005568,18/03/2024,Ministry of Education,Kaipara College Redevelopment.,This project is for a Redevelopment at Kaipara College.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,25 - 50 million,2021-Q2,,2022-Q4,2023-Q3,2023-Q3,2025-Q2,2022-Q4,2025-Q2,
https://www.education.govt.nz/school/property/,,,-36.680156,174.459138
IP005569,18/03/2024,Ministry of Education,Mt Albert Grammar School Redevelopment.,This project is for a Redevelopment at Mt Albert Grammar School.,,Under construction,Funding source confirmed,Selective,Design and construct,Auckland,,,Education,25 - 50 million,2021-Q2,,2021-Q3,2022-Q2,2022-Q2,2024-Q2,2021-Q3,2024-Q2,
https://www.education.govt.nz/school/property/,,,-36.884707,174.725349
IP005570,18/03/2024,Ministry of Education,Murrays Bay School Redevelopment.,This project is for a Redevelopment at Murrays Bay School.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2021-Q2,,2022-Q4,2022-Q4,2023-Q1,2024-Q1,2022-Q4,2024-Q1,
https://www.education.govt.nz/school/property/,,,-36.733044,174.746691
IP005571,18/03/2024,Ministry of Education,Northcote College Redevelopment.,This project is for a Redevelopment at Northcote College.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2018-Q2,,2022-Q3,2022-Q4,2022-Q4,2026-Q1,2022-Q3,2026-Q1,
https://www.education.govt.nz/school/property/,,,-36.808881,174.733677
IP005573,18/03/2024,Ministry of Education,Puhinui School Redevelopment.,This project is for a Redevelopment at Puhinui School.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2021-Q2,,2022-Q2,2022-Q4,2022-Q4,2024-Q1,2022-Q2,2024-Q1,
https://www.education.govt.nz/school/property/,,,-36.985961,174.866042
IP005574,18/03/2024,Ministry of Education,Riverhead School Redevelopment.,This project is for a Redevelopment at Riverhead School.,,Under construction,Funding source confirmed,Selective,Early contractor involvement,Auckland,,,Education,5 - 25 million,2022-Q4,,2023-Q1,2023-Q3,2023-Q3,2025-Q1,2023-Q1,2025-Q1,
https://www.education.govt.nz/school/property/,,,-36.753222,174.593955
IP005575,18/03/2024,Ministry of Education,Rutherford School Redevelopment.,This project is for a Redevelopment at Rutherford School.,,Under construction,Funding source confirmed,Selective,Design and construct,Auckland,,,Education,5 - 25 million,2021-Q2,,2021-Q4,2023-Q3,2023-Q3,2024-Q4,2021-Q4,2024-Q4,
https://www.education.govt.nz/school/property/,,,-36.852559,174.648899
IP005576,18/03/2024,Ministry of Education,Target Road School Redevelopment.,This project is for a Redevelopment at Target Road School.,,In procurement,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2021-Q2,,2024-Q1,2024-Q1,2024-Q2,2025-Q2,2021-Q2,2025-Q2,
https://www.education.govt.nz/school/property/,,,-36.76338,174.733365
IP005577,18/03/2024,Ministry of Education,TKKM o Mangere Redevelopment.,This project is for a Redevelopment at TKKM o Mangere.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2021-Q2,,2024-Q2,2024-Q3,2024-Q3,2026-Q4,2021-Q2,2026-Q4,
https://www.education.govt.nz/school/property/,,,-36.96407,174.79608
IP005580,18/03/2024,Ministry of Education,Te Wharekura o Mauao School Roll Growth.,This project is roll growth for Te Wharekura o Mauao.,,Under construction,Funding source confirmed,Selective,Construct only,Bay of Plenty,,,Education,5 - 25 million,2021-Q4,,2023-Q3,2023-Q4,2023-Q4,2025-Q2,2023-Q3,2025-Q2,
https://www.education.govt.nz/school/property/,,,-37.691216,176.109724
IP005582,18/03/2024,Ministry of Education,Hamilton Girls' High School Redevelopment.,This project is a redevelopment at Hamilton Girls' High School.,,Under review,Funding source confirmed,Selective,Construct only,Waikato,,,Education,25 - 50 million,2022-Q2,,2024-Q4,2025-Q1,2025-Q1,2026-Q2,2022-Q2,2026-Q2,
https://www.education.govt.nz/school/property/,,,-37.789062,175.277353
IP005583,18/03/2024,Ministry of Education,Don Buck School Roll Growth.,This project is a roll growth at Don Buck School.,,On hold,Funding source confirmed,Selective,Design and construct,Auckland,,,Education,5 - 25 million,,,2031-Q1,2031-Q2,2031-Q3,2032-Q2,2031-Q1,2032-Q2,
https://www.education.govt.nz/school/property/,,,-36.851211,174.609884
IP005584,18/03/2024,Ministry of Education,Finlayson Park School Combined.,This project is a combined at Finlayson Park School.,,Under review,Funding source confirmed,Selective,Construct only,Auckland,,,Education,25 - 50 million,2022-Q2,,2028-Q2,2028-Q3,2028-Q3,2030-Q1,2028-Q2,2030-Q1,
https://www.education.govt.nz/school/property/,,,-37.032006,174.87199
IP005585,18/03/2024,Ministry of Education,Gladstone School (Auckland) Combined.,This project is a combined at Gladstone School (Auckland).,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2021-Q3,,2022-Q1,2022-Q4,2022-Q4,2024-Q2,2022-Q1,2024-Q2,
https://www.education.govt.nz/school/property/,,,-36.880183,174.71247
IP005586,18/03/2024,Ministry of Education,Glen Innes School Combined.,This project is a combined at Glen Innes School.,,In procurement,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,,2024-Q1,2024-Q1,2024-Q1,2025-Q1,2024-Q1,2025-Q1,
https://www.education.govt.nz/school/property/,,,-36.874151,174.857045
IP005587,18/03/2024,Ministry of Education,Glen Taylor School Combined.,This project is a combined at Glen Taylor School.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,,2023-Q4,2024-Q1,2024-Q1,2025-Q1,2023-Q4,2025-Q1,
https://www.education.govt.nz/school/property/,,,-36.869826,174.863975
IP005588,18/03/2024,Ministry of Education,Green Bay Primary School Combined.,This project is a combined at Green Bay Primary School.,,On hold,Funding source confirmed,Selective,Design and construct,Auckland,,,Education,5 - 25 million,2021-Q3,,2025-Q4,2026-Q1,2026-Q1,2027-Q1,2025-Q4,2027-Q1,
https://www.education.govt.nz/school/property/,,,-36.931682,174.672668
IP005589,18/03/2024,Ministry of Education,Hurupaki School Redevelopment.,This project is a redevelopment at Hurupaki School.,,Under construction,Funding source confirmed,Selective,Construct only,Northland,,,Education,1 - 5 million,,,2023-Q1,2023-Q2,2023-Q2,2024-Q2,2023-Q1,2024-Q2,
https://www.education.govt.nz/school/property/,,,-35.687424,174.289272
IP005591,18/03/2024,Ministry of Education,Mahurangi College Roll Growth.,This project is a roll growth at Mahurangi College.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2021-Q3,,2024-Q2,2024-Q3,2024-Q3,2025-Q4,2021-Q3,2025-Q4,
https://www.education.govt.nz/school/property/,,,-36.406517,174.655544
IP005592,18/03/2024,Ministry of Education,Massey Primary School Roll Growth.,This project is a roll growth at Massey Primary School.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,,2027-Q3,2027-Q4,2027-Q4,2029-Q4,2027-Q3,2029-Q4,
https://www.education.govt.nz/school/property/,,,-36.839541,174.600248
IP005594,18/03/2024,Ministry of Education,Orakei School Combined.,This project is a combined at Orakei School.,,Early planning,Funding source confirmed,Selective,Design and construct,Auckland,,,Education,5 - 25 million,,,2031-Q2,2031-Q2,2031-Q3,2032-Q2,2030-Q3,2032-Q2,
https://www.education.govt.nz/school/property/,,,-36.858376,174.815043
IP005595,18/03/2024,Ministry of Education,Pt England School Combined.,This project is a combined at Pt England School.,,On hold,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,,2023-Q4,2023-Q4,2024-Q1,2031-Q3,2023-Q4,2031-Q3,
https://www.education.govt.nz/school/property/,,,-36.882824,174.866626
IP005597,18/03/2024,Ministry of Education,Tamaki College Roll Growth.,This project is a roll growth at Tamaki College.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,25 - 50 million,,,2029-Q2,2029-Q3,2029-Q3,2031-Q1,2029-Q2,2031-Q1,
https://www.education.govt.nz/school/property/,,,-36.877943,174.867271
IP005598,18/03/2024,Ministry of Education,Tamaki School Combined.,This project is a combined at Tamaki School.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,25 - 50 million,,,2030-Q2,2030-Q3,2030-Q3,2032-Q1,2029-Q2,2032-Q1,
https://www.education.govt.nz/school/property/,,,-36.89468,174.864557
IP005599,18/03/2024,Ministry of Education,Tauraroa Area School Roll Growth.,This project is a roll growth at Tauraroa Area School.,,Under review,Funding source confirmed,Selective,Construct only,Northland,,,Education,1 - 5 million,2021-Q2,,2024-Q3,2024-Q3,2024-Q4,2025-Q4,2023-Q4,2025-Q4,
https://www.education.govt.nz/school/property/,,,-35.873069,174.218169
IP005600,18/03/2024,Ministry of Education,Rosehill College Combined.,This project is a combined at Rosehill College.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,,2032-Q3,2032-Q4,2032-Q4,2033-Q4,2032-Q3,2033-Q4,
https://www.education.govt.nz/school/property/,,,-37.076585,174.936559
IP005601,18/03/2024,Ministry of Education,Rosehill Intermediate Combined.,This project is a combined at Rosehill Intermediate.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2023-Q2,,2024-Q2,2024-Q2,2024-Q3,2025-Q2,2024-Q1,2025-Q2,
https://www.education.govt.nz/school/property/,,,-37.078203,174.935794
IP005602,18/03/2024,Ministry of Education,Orewa College Roll Growth.,This project is a roll growth at Orewa College.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2021-Q4,,2028-Q3,2028-Q4,2028-Q4,2029-Q4,2028-Q3,2029-Q4,
https://www.education.govt.nz/school/property/,,,-36.591698,174.689747
IP005603,18/03/2024,Ministry of Education,TKKM o Nga Maungarongo Combined.,This project is a combined at TKKM o Nga Maungarongo.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2021-Q3,,2024-Q2,2024-Q3,2024-Q3,2025-Q3,2024-Q1,2025-Q3,
https://www.education.govt.nz/school/property/,,,-36.888352,174.726823
IP005604,18/03/2024,Ministry of Education,Western Heights School (Auckland) Roll Growth.,This project is a roll growth at Western Heights School (Auckland).,,Under construction,Funding source confirmed,Selective,Design and construct,Auckland,,,Education,5 - 25 million,2021-Q3,,2022-Q1,2023-Q3,2023-Q4,2024-Q4,2022-Q1,2024-Q4,
https://www.education.govt.nz/school/property/,,,-36.882467,174.616385
IP005605,18/03/2024,Ministry of Education,Western Springs College Combined.,This project is a combined at Western Springs College.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,25 - 50 million,,,2026-Q1,2026-Q2,2026-Q3,2028-Q2,2026-Q1,2028-Q2,
https://www.education.govt.nz/school/property/,,,-36.861976,174.717535
IP005606,18/03/2024,Ministry of Education,Willow Park School Roll Growth.,This project is a roll growth at Willow Park School.,,In procurement,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2021-Q4,,2023-Q4,2024-Q1,2024-Q2,2025-Q3,2023-Q4,2025-Q3,
https://www.education.govt.nz/school/property/,,,-36.797397,174.733482
IP005607,18/03/2024,Ministry of Education,Gore High School Redevelopment.,This project is a redevelopment at Gore High School.,,Early planning,Funding source to be confirmed,Selective,Construct only,Southland,,,Education,25 - 50 million,2021-Q3,,2024-Q4,2025-Q1,2025-Q1,2028-Q4,2024-Q4,2028-Q4,
https://www.education.govt.nz/school/property/,,,-46.10355,168.930258
IP005608,18/03/2024,Ministry of Education,James Hargest College Redevelopment.,This project is a redevelopment at James Hargest College.,,Early planning,Funding source confirmed,Selective,Construct only,Southland,,,Education,1 - 5 million,2021-Q3,,2025-Q2,2025-Q2,2025-Q3,2027-Q2,2021-Q3,2027-Q2,
https://www.education.govt.nz/school/property/,,,-46.390629,168.384284
IP006616,18/03/2024,Ministry of Education,Albany Junior High School Redevelopment.,This project is a redevelopment at Albany Junior High School.,,In procurement,Funding source confirmed,Selective,Early contractor involvement,Auckland,,,Education,5 - 25 million,2022-Q1,,2023-Q2,2024-Q2,2024-Q2,2029-Q4,2023-Q2,2029-Q4,
https://www.education.govt.nz/school/property/,,,-36.749098,174.692581
IP006617,18/03/2024,Ministry of Education,Alfriston College Redevelopment.,This project is a redevelopment at Alfriston College.,,Under review,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2021-Q4,,2026-Q1,2026-Q1,2026-Q2,2021-Q4,2028-Q2,2026-Q3,
https://www.education.govt.nz/school/property/,,,-37.017649,174.919792
IP006618,18/03/2024,Ministry of Education,Kamo Intermediate Roll Growth.,This project is a roll growth at Kamo Intermediate.,,Under review,Funding source confirmed,Selective,Construct only,Northland,,,Education,1 - 5 million,,,2024-Q3,2024-Q3,2024-Q4,2026-Q1,2024-Q1,2026-Q1,
https://www.education.govt.nz/school/property/,,,-35.687981,174.305611
IP006619,18/03/2024,Ministry of Education,Ruapotaka School Roll Growth.,This project is a roll growth at Ruapotaka School.,,On hold,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,,2028-Q2,2028-Q2,2028-Q3,2029-Q4,2028-Q2,2029-Q4,
https://www.education.govt.nz/school/property/,,,-36.888067,174.860646
IP006620,18/03/2024,Ministry of Education,Willowbank School (Howick) Roll Growth.,This project is a roll growth at Willowbank School (Howick).,,On hold,Funding source confirmed,Selective,Construct only,Auckland,,,Education,1 - 5 million,2021-Q4,,2023-Q2,2023-Q4,2024-Q1,2025-Q1,2023-Q2,2025-Q1,
https://www.education.govt.nz/school/property/,,,-36.948733,174.914146
IP006621,18/03/2024,Ministry of Education,Rolleston Secondary New Build.,This project is a new build at Rolleston Secondary.,,In planning,Funding source confirmed,Selective,Design and construct,Canterbury,,,Education,5 - 25 million,,,2024-Q2,2024-Q3,2024-Q3,2026-Q1,2024-Q2,2026-Q1,
https://www.education.govt.nz/school/property/,,,-43.6042,172.3892
IP006622,18/03/2024,Ministry of Education,Aurora College Redevelopment.,This project is a redevelopment at Aurora College.,,Under construction,Funding source confirmed,Selective,Construct only,Southland,,,Education,25 - 50 million,2021-Q4,,2023-Q2,2023-Q4,2023-Q4,2025-Q4,2023-Q2,2025-Q4,
https://www.education.govt.nz/school/property/,,,-46.43114,168.384079
IP006623,18/03/2024,Ministry of Education,Napier Boys' High School Redevelopment.,This project is a redevelopment at Napier Boys' High School.,,Under construction,Funding source confirmed,Selective,Construct only,Hawke's Bay,,,Education,5 - 25 million,2021-Q3,,2023-Q3,2023-Q4,2023-Q4,2025-Q3,2023-Q3,2025-Q3,
https://www.education.govt.nz/school/property/,,,-39.514768,176.916453
IP006624,18/03/2024,Ministry of Education,Napier Girls' High School Redevelopment.,This project is a redevelopment at Napier Girls' High School.,,Under construction,Funding source confirmed,Selective,Construct only,Hawke's Bay,,,Education,5 - 25 million,2021-Q3,,2023-Q4,2023-Q4,2023-Q4,2025-Q4,2023-Q4,2025-Q4,
https://www.education.govt.nz/school/property/,,,-39.48566,176.915037
IP006626,18/03/2024,Ministry of Education,Te Akau ki Papamoa Primary School Combined.,This project is a combined at Te Akau ki Papamoa Primary School.,,On hold,Funding source confirmed,Selective,Construct only,Bay of Plenty,,,Education,1 - 5 million,2021-Q4,,2023-Q2,2023-Q3,2023-Q4,2024-Q4,2023-Q2,2024-Q4,
https://www.education.govt.nz/school/property/,,,-37.706322,176.288173
IP006690,18/03/2024,Ministry of Education,Mount Maunganui College Combined.,This Project is a Combined at Mount Maunganui College.,,Under review,Funding source confirmed,Selective,Construct only,Bay of Plenty,,,Education,1 - 5 million,2021-Q2,,2024-Q3,2024-Q3,2024-Q4,2026-Q4,2021-Q2,2026-Q4,
https://www.education.govt.nz/school/property/,,,-37.706322,176.288173
IP006691,18/03/2024,Ministry of Education,Greenpark School (Tauranga) Redevelopment.,This Project is a Redevelopment at Greenpark School (Tauranga).,,On hold,Funding source confirmed,Selective,Construct only,Bay of Plenty,,,Education,1 - 5 million,2021-Q4,,2023-Q3,2023-Q4,2026-Q3,2027-Q4,2023-Q3,2027-Q4,
https://www.education.govt.nz/school/property/,,,-37.706322,176.288173
IP006692,18/03/2024,Ministry of Education,Kuranui College Roll Growth.,This Project is a Roll Growth at Kuranui College.,,Under review,Funding source confirmed,Selective,To be determined,Wellington,,,Education,1 - 5 million,2023-Q2,,2022-Q4,2023-Q1,2023-Q1,2023-Q4,2022-Q4,2023-Q4,
https://www.education.govt.nz/school/property/,,,-37.706322,176.288173
IP006693,18/03/2024,Ministry of Education,Pokeno School Roll Growth.,This Project is a Roll Growth at Pokeno School.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2022-Q1,,2022-Q3,2023-Q1,2023-Q1,2024-Q2,2022-Q3,2024-Q2,
https://www.education.govt.nz/school/property/,,,-37.243489,175.01488
IP006694,18/03/2024,Ministry of Education,Takapuna Grammar School Redevelopment.,This Project is a Redevelopment at Takapuna Grammar School.,,Under construction,Funding source confirmed,Selective,Early contractor involvement,Auckland,,,Education,1 - 5 million,,,2022-Q4,2023-Q3,2023-Q4,2024-Q4,2022-Q4,2024-Q4,
https://www.education.govt.nz/school/property/,,,-37.706322,176.288173
IP006695,18/03/2024,Ministry of Education,James Cook High School Roll Growth.,This Project is a Roll Growth at James Cook High School.,,Under review,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2023-Q2,,2024-Q1,2024-Q2,2024-Q2,2025-Q2,2024-Q1,2025-Q2,
https://www.education.govt.nz/school/property/,,,-37.706322,176.288173
IP006696,18/03/2024,Ministry of Education,Kowhai Intermediate Roll Growth.,This Project is a Roll Growth at Kowhai Intermediate.,,Under review,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2022-Q2,,2032-Q3,2032-Q4,2032-Q4,2033-Q4,2022-Q2,2033-Q4,
https://www.education.govt.nz/school/property/,,,-37.706322,176.288173
IP006697,18/03/2024,Ministry of Education,Ormiston Senior College New School Expansion.,This Project is a New School Expansion at Ormiston Senior College.,,Under review,Funding source confirmed,Selective,Construct only,Auckland,,,Education,25 - 50 million,,,2024-Q2,2024-Q2,2024-Q3,2025-Q4,2024-Q2,2025-Q4,
https://www.education.govt.nz/school/property/,,,-37.706322,176.288173
IP006698,18/03/2024,Ministry of Education,Whenuapai School Roll Growth.,This Project is a Roll Growth at Whenuapai School.,,On hold,Funding source confirmed,Selective,Design and construct,Auckland,,,Education,5 - 25 million,2022-Q4,,2027-Q3,2027-Q4,2027-Q4,2029-Q2,2027-Q3,2029-Q2,
https://www.education.govt.nz/school/property/,,,-36.793237,174.618891
IP006699,18/03/2024,Ministry of Education,Chapel Downs School Roll Growth.,This Project is a Roll Growth at Chapel Downs School.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,25 - 50 million,2023-Q1,,2026-Q2,2026-Q3,2026-Q3,2028-Q3,2024-Q3,2028-Q2,
https://www.education.govt.nz/school/property/,,,-36.979496,174.900669
IP006700,18/03/2024,Ministry of Education,Kohimarama School Roll Growth.,This Project is a Roll Growth at Kohimarama School.,,On hold,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,,2023-Q1,2023-Q4,2024-Q1,2025-Q1,2023-Q1,2025-Q1,
https://www.education.govt.nz/school/property/,,,-36.854781,174.837156
IP006701,18/03/2024,Ministry of Education,Viscount School Roll Growth.,This Project is a Roll Growth at Viscount School.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,2022-Q4,,2027-Q3,2027-Q4,2027-Q4,2029-Q4,2027-Q3,2029-Q4,
https://www.education.govt.nz/school/property/,,,-36.967462,174.791455
IP006702,18/03/2024,Ministry of Education,Waitakere College Roll Growth.,This Project is a Roll Growth at Waitakere College.,,Under review,Funding source confirmed,Selective,Design and construct,Auckland,,,Education,1 - 5 million,2022-Q4,,2024-Q3,2024-Q4,2024-Q4,2026-Q4,2023-Q4,2026-Q2,
https://www.education.govt.nz/school/property/,,,-36.867097,174.620712
IP006703,18/03/2024,Ministry of Education,Waiuku College Roll Growth.,This Project is a Roll Growth at Waiuku College.,,On hold,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,,2023-Q4,2024-Q4,2024-Q4,2025-Q4,2023-Q4,2025-Q4,
https://www.education.govt.nz/school/property/,,,-37.251019,174.725723
IP008148,18/03/2024,Ministry of Education,Te Aratai College Roll Growth.,This project is a Roll Growth at Te Aratai College.,,In planning,Funding source confirmed,Selective,Other,Canterbury,,,Education,1 - 5 million,2022-Q2,,2024-Q2,2024-Q2,2024-Q2,2025-Q4,2022-Q2,2025-Q4,
https://www.education.govt.nz/school/property/,,,-43.523836,172.661247
IP008149,18/03/2024,Ministry of Education,South Hornby School Roll Growth.,This project is a Roll Growth at South Hornby School.,,In procurement,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,1 - 5 million,2023-Q1,,2023-Q2,2024-Q1,2024-Q2,2024-Q4,2023-Q2,2024-Q4,
https://www.education.govt.nz/school/property/,,,-43.547122,172.529047
IP008150,18/03/2024,Ministry of Education,Lemonwood Grove School New School Expansion.,This project is a New School Expansion at Lemonwood Grove School.,,Under construction,Funding source confirmed,Selective,Design and construct,Canterbury,,,Education,5 - 25 million,2022-Q4,,2023-Q3,2023-Q3,2023-Q4,2024-Q2,2023-Q3,2024-Q2,
https://www.education.govt.nz/school/property/,,,-43.622673,172.386021
IP008151,18/03/2024,Ministry of Education,Te Wharekura o Arowhenua Roll Growth.,This project is a Roll Growth at Te Wharekura o Arowhenua.,,In planning,Funding source confirmed,Selective,Construct only,Southland,,,Education,1 - 5 million,2022-Q2,,2024-Q2,2024-Q2,2024-Q2,2025-Q1,2022-Q2,2025-Q1,
https://www.education.govt.nz/school/property/,,,-46.416528,168.394643
IP008152,18/03/2024,Ministry of Education,Lincoln High School Redevelopment.,This project is a Redevelopment at Lincoln High School.,,In procurement,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,5 - 25 million,2021-Q4,,2023-Q4,2024-Q1,2024-Q2,2025-Q2,2023-Q3,2025-Q2,
https://www.education.govt.nz/school/property/,,,-43.635766,172.485673
IP008153,18/03/2024,Ministry of Education,Nayland College Roll Growth.,This project is a Roll Growth at Nayland College.,,In planning,Funding source confirmed,Selective,Construct only,Tasman,,,Education,5 - 25 million,2022-Q2,,2024-Q3,2024-Q4,2024-Q4,2025-Q4,2022-Q2,2025-Q4,
https://www.education.govt.nz/school/property/,,,-41.305048,173.232706
IP008611,18/03/2024,Ministry of Education,Hillmorton High School Roll Growth.,This project is a Roll Growth at Hillmorton High School.,,Under construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,5 - 25 million,2023-Q1,,2022-Q4,2023-Q2,2023-Q2,2024-Q4,2022-Q4,2024-Q4,
https://www.education.govt.nz/school/property/,,,-43.55768,172.592782
IP008613,18/03/2024,Ministry of Education,Pokeno School Redevelopment.,This project is a Redevelopment at Pokeno School.,,Under review,Funding source confirmed,Selective,Construct only,Auckland,,,Education,25 - 50 million,2022-Q2,,2024-Q2,2024-Q2,2024-Q3,2026-Q4,2022-Q2,2026-Q4,
https://www.education.govt.nz/school/property/,,,-37.243489,175.01488
IP008614,18/03/2024,Ministry of Education,Sir Keith Park School Roll Growth.,This project is a Roll Growth at Sir Keith Park School.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,,2024-Q3,2024-Q3,2024-Q4,2025-Q4,2024-Q3,2025-Q4,
https://www.education.govt.nz/school/property/,,,-36.955425,174.802486
IP008615,18/03/2024,Ministry of Education,Blomfield Special School and Resource Ctre Roll Growth.,This project is a Roll Growth at Blomfield Special School and Resource Ctre.,,On hold,Funding source confirmed,Selective,Construct only,Northland,,,Education,5 - 25 million,,,2023-Q3,2023-Q3,2023-Q4,2024-Q4,2023-Q3,2024-Q4,
https://www.education.govt.nz/school/property/,,,-35.730665,174.314314
IP008616,18/03/2024,Ministry of Education,Te Anau School Roll Growth.,This project is a Roll Growth at Te Anau School.,,In planning,Funding source confirmed,Selective,Construct only,Southland,,,Education,1 - 5 million,2022-Q4,,2024-Q2,2024-Q2,2024-Q3,2025-Q1,2023-Q2,2024-Q2,
https://www.education.govt.nz/school/property/,,,-45.413459,167.718043
IP008617,18/03/2024,Ministry of Education,May Road School Roll Growth.,This project is a Roll Growth at May Road School.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,,2025-Q2,2025-Q2,2025-Q3,2026-Q4,2025-Q1,2026-Q4,
https://www.education.govt.nz/school/property/,,,-36.915293,174.730592
IP008618,18/03/2024,Ministry of Education,Cashmere High School Roll Growth.,This project is a Roll Growth at Cashmere High School.,,Under construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,5 - 25 million,,,2023-Q4,2024-Q1,2024-Q1,2025-Q1,2023-Q4,2025-Q1,
https://www.education.govt.nz/school/property/,,,-43.56457,172.623861
IP008619,18/03/2024,Ministry of Education,Te Rōhutu Whio New School Expansion.,This project is a New School Expansion at Te Rōhutu Whio.,,Under review,Funding source confirmed,Selective,Design and construct,Canterbury,,,Education,5 - 25 million,2022-Q4,,2025-Q2,2025-Q2,2025-Q3,2026-Q2,2025-Q1,2026-Q2,
https://www.education.govt.nz/school/property/,,,-43.612025,172.404486
IP008620,18/03/2024,Ministry of Education,Gulf Harbour School Roll Growth.,This project is a Roll Growth at Gulf Harbour School.,,In planning,Funding source confirmed,Selective,To be determined,Auckland,,,Education,5 - 25 million,,,2024-Q2,2024-Q3,2024-Q3,2025-Q1,2024-Q2,2025-Q1,
https://www.education.govt.nz/school/property/,,,-36.610568,174.799514
IP008621,18/03/2024,Ministry of Education,Mangawhai Beach School Roll Growth.,This project is a Roll Growth at Mangawhai Beach School.,,Early planning,Funding source confirmed,Selective,Construct only,Northland,,,Education,5 - 25 million,,,2027-Q2,2027-Q2,2027-Q3,2028-Q4,2027-Q2,2028-Q4,
https://www.education.govt.nz/school/property/,,,-36.128844,174.57708
IP008622,18/03/2024,Ministry of Education,Wharenui School Roll Growth.,This project is a Roll Growth at Wharenui School.,,Under construction,Funding source confirmed,Selective,Design and construct,Canterbury,,,Education,1 - 5 million,2023-Q2,,2022-Q4,2023-Q3,2023-Q3,2024-Q1,2022-Q4,2024-Q1,
https://www.education.govt.nz/school/property/,,,-43.536311,172.596742
IP008623,18/03/2024,Ministry of Education,Stanmore Bay School Roll Growth.,This project is a Roll Growth at Stanmore Bay School.,,On hold,Funding source confirmed,Selective,To be determined,Auckland,,,Education,5 - 25 million,,,2023-Q2,2023-Q3,2023-Q3,2024-Q3,2023-Q2,2024-Q3,
https://www.education.govt.nz/school/property/,,,-36.62347,174.727916
IP008625,18/03/2024,Ministry of Education,Taita College Redevelopment.,This project is a Redevelopment at Taita College.,,Under review,Funding source confirmed,Selective,Construct only,Wellington,,,Education,25 - 50 million,2022-Q1,,2024-Q2,2024-Q2,2024-Q2,2027-Q2,2022-Q1,2027-Q2,
https://www.education.govt.nz/school/property/,,,-41.176079,174.966401
IP008626,18/03/2024,Ministry of Education,Henderson High School Roll Growth.,This project is a Roll Growth at Henderson High School.,,On hold,Funding source confirmed,Selective,Design and construct,Auckland,,,Education,5 - 25 million,2023-Q1,,2028-Q3,2029-Q2,2029-Q3,2030-Q4,2028-Q3,2030-Q4,
https://www.education.govt.nz/school/property/,,,-36.883656,174.628205
IP008627,18/03/2024,Ministry of Education,Orewa Beach School Roll Growth.,This project is a Roll Growth at Orewa Beach School.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,1 - 5 million,,,2028-Q2,2028-Q2,2028-Q3,2029-Q2,2028-Q2,2029-Q2,
https://www.education.govt.nz/school/property/,,,-36.579615,174.688479
IP008628,18/03/2024,Ministry of Education,Hornby High School Roll Growth.,This project is a Roll Growth at Hornby High School.,,Under review,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,5 - 25 million,2022-Q2,,2026-Q2,2026-Q2,2026-Q3,2027-Q3,2026-Q2,2027-Q3,
https://www.education.govt.nz/school/property/,,,-43.538179,172.527635
IP008629,18/03/2024,Ministry of Education,Mahurangi College Roll Growth.,This project is a Roll Growth at Mahurangi College.,,Early planning,Funding source confirmed,Selective,To be determined,Auckland,,,Education,5 - 25 million,,,2025-Q3,2025-Q4,2025-Q4,2026-Q4,2024-Q4,2026-Q4,
https://www.education.govt.nz/school/property/,,,-36.406517,174.655544
IP008630,18/03/2024,Ministry of Education,Long Bay School Roll Growth.,This project is a Roll Growth at Long Bay School.,,Early planning,Funding source confirmed,Selective,To be determined,Auckland,,,Education,5 - 25 million,,,2025-Q1,2025-Q2,2025-Q3,2026-Q3,2025-Q1,2026-Q3,
https://www.education.govt.nz/school/property/,,,-36.691084,174.734597
IP008631,18/03/2024,Ministry of Education,Wellsford School Roll Growth.,This project is a Roll Growth at Wellsford School.,,Early planning,Funding source confirmed,Selective,To be determined,Auckland,,,Education,5 - 25 million,,,2028-Q4,2029-Q1,2029-Q1,2030-Q2,2028-Q4,2030-Q2,
https://www.education.govt.nz/school/property/,,,-36.284045,174.515608
IP008632,18/03/2024,Ministry of Education,Glenbrae Primary School Roll Growth.,This project is a Roll Growth at Glenbrae Primary School.,,On hold,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,,2023-Q3,2024-Q2,2024-Q2,2025-Q2,2023-Q3,2025-Q2,
https://www.education.govt.nz/school/property/,,,-36.873361,174.870065
IP008633,18/03/2024,Ministry of Education,Ararira Springs Primary- Te Puna o Ararira New School Expansion.,This project is a New School Expansion at Ararira Springs Primary- Te Puna o Ararira.,,Under review,Funding source confirmed,Selective,Design and construct,Canterbury,,,Education,5 - 25 million,2022-Q4,,2025-Q2,2025-Q2,2025-Q3,2026-Q2,2022-Q4,2026-Q2,
https://www.education.govt.nz/school/property/,,,-43.648092,172.492975
IP008634,18/03/2024,Ministry of Education,TKKM o Waitaha Roll Growth.,This project is a Roll Growth at TKKM o Waitaha.,,Early planning,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,5 - 25 million,,,2024-Q4,2025-Q1,2025-Q1,2026-Q1,2024-Q4,2026-Q1,
https://www.education.govt.nz/school/property/,,,-43.551181,172.656331
IP008724,18/03/2024,Ministry of Education,Golden Bay High School Roll Growth.,This project is a Roll Growth at Golden Bay High School.,,Under review,Funding source confirmed,Selective,Construct only,Tasman,,,Education,1 - 5 million,,,2024-Q4,2024-Q4,2024-Q4,2025-Q3,2024-Q4,2025-Q3,
https://www.education.govt.nz/school/property/,,,-40.848048,172.808357
IP008725,18/03/2024,Ministry of Education,Collingwood Area School Roll Growth.,This project is a Roll Growth at Collingwood Area School.,,Under review,Funding source confirmed,Selective,Construct only,Tasman,,,Education,1 - 5 million,,,2025-Q4,2025-Q4,2025-Q4,2026-Q4,2025-Q4,2026-Q4,
https://www.education.govt.nz/school/property/,,,-40.682214,172.680023
IP008726,18/03/2024,Ministry of Education,Scott Point School New School Expansion.,This project is a New School Expansion at Scott Point School.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,,2025-Q2,2025-Q2,2025-Q3,2026-Q2,2024-Q2,2026-Q2,
https://www.education.govt.nz/school/property/,,,-36.802388,174.660507
IP008727,18/03/2024,Ministry of Education,Wainuiomata Primary School Redevelopment.,This project is a Redevelopment at Wainuiomata Primary School.,,Under construction,Funding source confirmed,Selective,Construct only,Wellington,,,Education,1 - 5 million,2023-Q1,,2023-Q3,2023-Q4,2024-Q1,2024-Q4,2023-Q3,2024-Q4,
https://www.education.govt.nz/school/property/,,,-41.275343,174.955785
IP008729,18/03/2024,Ministry of Education,Te Kura o Tuahiwi Roll Growth.,This project is a Roll Growth at Te Kura o Tuahiwi.,,In planning,Funding source confirmed,Selective,Other,Canterbury,,,Education,1 - 5 million,2023-Q2,,2024-Q2,2024-Q2,2024-Q3,2025-Q2,2023-Q3,2025-Q2,
https://www.education.govt.nz/school/property/,,,-43.334247,172.643796
IP008730,18/03/2024,Ministry of Education,Wesley Primary School Roll Growth.,This project is a Roll Growth at Wesley Primary School.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,25 - 50 million,2022-Q4,,2026-Q3,2026-Q4,2026-Q4,2028-Q2,2026-Q3,2028-Q2,
https://www.education.govt.nz/school/property/,,,-36.899937,174.727705
IP008731,18/03/2024,Ministry of Education,Te Uho O Te Nikau Primary School Roll Growth.,This project is a Roll Growth at Te Uho O Te Nikau Primary School.,,In procurement,Funding source confirmed,Selective,Other,Auckland,,,Education,1 - 5 million,,,2023-Q2,2025-Q1,2025-Q1,2025-Q4,2023-Q2,2025-Q4,
https://www.education.govt.nz/school/property/,,,-36.976126,174.926097
IP008733,18/03/2024,Ministry of Education,Opunake High School Redevelopment.,This project is a Redevelopment at Opunake High School.,,Under review,Funding source confirmed,Selective,Construct only,Taranaki,,,Education,1 - 5 million,,,2024-Q2,2024-Q3,2024-Q3,2025-Q2,2023-Q1,2025-Q2,
https://www.education.govt.nz/school/property/,,,-39.45064,173.851541
IP008734,18/03/2024,Ministry of Education,Otago Boys' High School Redevelopment.,This project is a Redevelopment at Otago Boys' High School.,,Under construction,Funding source confirmed,Selective,Construct only,Otago,,,Education,5 - 25 million,,,2023-Q3,2023-Q4,2023-Q4,2024-Q3,2023-Q3,2024-Q3,
https://www.education.govt.nz/school/property/,,,-45.870985,170.495877
IP008735,18/03/2024,Ministry of Education,Amuri Area School Combined.,This project is a Combined at Amuri Area School.,,Early planning,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,1 - 5 million,2022-Q2,,2027-Q2,2027-Q2,2027-Q3,2029-Q4,2022-Q2,2029-Q4,
https://www.education.govt.nz/school/property/,,,-42.771117,172.848257
IP008736,18/03/2024,Ministry of Education,Hillmorton High School Roll Growth.,This project is a Roll Growth at Hillmorton High School.,,Early planning,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,5 - 25 million,,,2025-Q2,2025-Q2,2025-Q3,2026-Q3,2025-Q1,2026-Q3,
https://www.education.govt.nz/school/property/,,,-43.55768,172.592782
IP008737,18/03/2024,Ministry of Education,James Cook High School Roll Growth.,This project is a Roll Growth at James Cook High School.,,On hold,Funding source confirmed,Selective,Other,Auckland,,,Education,5 - 25 million,,,2024-Q3,2024-Q3,2024-Q4,2024-Q1,2024-Q3,2024-Q1,
https://www.education.govt.nz/school/property/,,,-37.03498,174.885978
IP008739,18/03/2024,Ministry of Education,Lynfield College Redevelopment.,This project is a Redevelopment at Lynfield College.,,Under review,Funding source confirmed,Selective,Construct only,Auckland,,,Education,1 - 5 million,2018-Q3,,2024-Q1,2024-Q2,2024-Q2,2026-Q1,2024-Q1,2026-Q1,
https://www.education.govt.nz/school/property/,,,-36.921035,174.715436
IP008740,18/03/2024,Ministry of Education,Kowhai School Roll Growth.,This project is a Roll Growth at Kowhai School.,,On hold,Funding source confirmed,Selective,Design and construct,Hawke's Bay,,,Education,1 - 5 million,,,2023-Q4,2023-Q4,2024-Q1,2025-Q1,2023-Q4,2025-Q1,
https://www.education.govt.nz/school/property/,,,-39.64652,176.841567
IP008741,18/03/2024,Ministry of Education,Three Kings School Roll Growth.,This project is a Roll Growth at Three Kings School.,,On hold,Funding source confirmed,Selective,To be determined,Auckland,,,Education,5 - 25 million,,,2032-Q2,2032-Q2,2032-Q3,2033-Q2,2032-Q2,2033-Q2,
https://www.education.govt.nz/school/property/,,,-36.907366,174.759204
IP008742,18/03/2024,Ministry of Education,Wiri Central School Roll Growth.,This project is a Roll Growth at Wiri Central School.,,On hold,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,,2023-Q2,2023-Q4,2023-Q4,2025-Q1,2023-Q2,2025-Q1,
https://www.education.govt.nz/school/property/,,,-37.000487,174.885458
IP009843,18/03/2024,Ministry of Education,Massey Primary School Roll Growth.,This project is a Roll Growth at Massey Primary School.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,,2027-Q3,2027-Q4,2027-Q4,2029-Q4,2027-Q3,2029-Q4,
https://www.education.govt.nz/school/property/,,,-36.839541,174.600248
IP009844,18/03/2024,Ministry of Education,Arowhenua Maori School Redevelopment.,This project is a Redevelopment at Arowhenua Maori School.,,In planning,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,1 - 5 million,,,2024-Q3,2024-Q3,2024-Q4,2025-Q4,2024-Q3,2025-Q4,
https://www.education.govt.nz/school/property/,,,-44.255105,171.270848
IP009845,18/03/2024,Ministry of Education,Geraldine High School Roll Growth.,This project is a Roll Growth at Geraldine High School.,,In planning,Funding source confirmed,Selective,Design and construct,Canterbury,,,Education,5 - 25 million,,,2024-Q2,2024-Q2,2024-Q2,2025-Q2,2023-Q3,2024-Q4,
https://www.education.govt.nz/school/property/,,,-44.091799,171.248558
IP009847,18/03/2024,Ministry of Education,TKKM o Te Ara Whanui Combined.,This project is a Combined at TKKM o Te Ara Whanui.,,Under review,Funding source confirmed,Selective,To be determined,Wellington,,,Education,1 - 5 million,,,2025-Q1,2025-Q2,2025-Q2,2027-Q3,2025-Q1,2027-Q3,
https://www.education.govt.nz/school/property/,,,-41.217843,174.888332
IP009848,18/03/2024,Ministry of Education,Mangere College Roll Growth.,This project is a Roll Growth at Mangere College.,,Early planning,Funding source confirmed,Selective,To be determined,Auckland,,,Education,1 - 5 million,,,2031-Q2,2031-Q2,2031-Q3,2032-Q2,2031-Q2,2032-Q2,
https://www.education.govt.nz/school/property/,,,-36.959618,174.791589
IP009849,18/03/2024,Ministry of Education,Wesley Intermediate Roll Growth.,This project is a Roll Growth at Wesley Intermediate.,,On hold,Funding source confirmed,Selective,Construct only,Auckland,,,Education,1 - 5 million,,,2023-Q4,2023-Q4,2023-Q4,2027-Q3,2023-Q4,2027-Q3,
https://www.education.govt.nz/school/property/,,,-36.903232,174.729639
IP009850,18/03/2024,Ministry of Education,Newlands Intermediate Combined.,This project is a Combined at Newlands Intermediate.,,Under review,Funding source confirmed,Selective,Construct only,Wellington,,,Education,1 - 5 million,,,2025-Q3,2025-Q4,2025-Q4,2027-Q1,2024-Q1,2026-Q2,
https://www.education.govt.nz/school/property/,,,-41.219122,174.824028
IP009852,18/03/2024,Ministry of Education,Mt Eden Normal School Roll Growth.,This project is a Roll Growth at Mt Eden Normal School.,,Under review,Funding source confirmed,Selective,Construct only,Auckland,,,Education,1 - 5 million,2023-Q2,,2024-Q2,2024-Q3,2024-Q3,2025-Q2,2024-Q1,2025-Q2,
https://www.education.govt.nz/school/property/,,,-36.876971,174.756557
IP009857,18/03/2024,Ministry of Education,Raroa Normal Intermediate Combined.,This project is a Combined at Raroa Normal Intermediate.,,Under review,Funding source confirmed,Selective,Construct only,Wellington,,,Education,1 - 5 million,2023-Q2,,2025-Q1,2025-Q2,2025-Q2,2027-Q2,2023-Q2,2027-Q2,
https://www.education.govt.nz/school/property/,,,-41.231078,174.800392
IP010377,18/03/2024,Ministry of Education,Otaki College Redevelopment.,This project is a Redevelopment at Otaki College.,,Under review,Funding source confirmed,Selective,Construct only,Wellington,,,Education,1 - 5 million,,,2024-Q2,2024-Q2,2024-Q2,2025-Q2,2024-Q2,2025-Q2,
https://www.education.govt.nz/school/property/,,,-40.759363,175.153793
IP010393,18/03/2024,Ministry of Education,TKKM o Taumarere Roll Growth.,This project is a Roll Growth at TKKM o Taumarere.,,Early planning,Funding source confirmed,Selective,Construct only,Northland,,,Education,1 - 5 million,,,2024-Q4,2024-Q4,2025-Q1,2025-Q3,2024-Q3,2025-Q3,
https://www.education.govt.nz/school/property/,,,-35.388157,174.021052
IP010376,18/03/2024,Ministry of Education,Bohally Intermediate Redevelopment.,This project is a Redevelopment at Bohally Intermediate.,,In planning,Funding source confirmed,Selective,Design and construct,Nelson,,,Education,25 - 50 million,,,2024-Q2,2024-Q2,2024-Q3,2026-Q4,2023-Q4,2026-Q4,
https://www.education.govt.nz/school/property/,,,-41.504564,173.944347
IP010374,18/03/2024,Ministry of Education,Tauhara College Redevelopment.,This project is a Redevelopment at Tauhara College.,,Under review,Funding source confirmed,Selective,Early contractor involvement,Bay of Plenty,,,Education,1 - 5 million,,,2024-Q4,2025-Q1,2025-Q1,2026-Q2,2023-Q4,2026-Q1,
https://www.education.govt.nz/school/property/,,,-36.884707,174.725349
IP010390,18/03/2024,Ministry of Education,TKKM o Otepoti Roll Growth.,This project is a Roll Growth at TKKM o Otepoti.,,Early planning,Funding source confirmed,Selective,Construct only,Otago,,,Education,5 - 25 million,,,2024-Q4,2025-Q1,2025-Q1,2026-Q2,2024-Q2,2026-Q1,
https://www.education.govt.nz/school/property/,,,-45.900146,170.410354
IP010373,18/03/2024,Ministry of Education,South West Flat Bush Primary New School.,This project is a New School at South West Flat Bush Primary.,,Early planning,Funding source confirmed,Selective,Design and construct,Auckland,,,Education,25 - 50 million,,,2025-Q2,2025-Q2,2025-Q3,2026-Q4,2023-Q4,2026-Q4,
https://www.education.govt.nz/school/property/,,,-37.519057,177.180645
IP010381,18/03/2024,Ministry of Education,Massey-Redhills Primary School New School.,This project is a New School at Massey-Redhills Primary School.,,Under review,Funding source confirmed,Selective,Construct only,Auckland,,,Education,25 - 50 million,,,2024-Q3,2024-Q4,2024-Q4,2026-Q3,2024-Q1,2026-Q3,
https://www.education.govt.nz/school/property/,,,-36.811364,174.621631
IP010383,18/03/2024,Ministry of Education,Te Kura Kaupapa Māori o Hokianga Roll Growth.,This project is a Roll Growth at Te Kura Kaupapa Māori o Hokianga.,,Under review,Funding source confirmed,Selective,Construct only,Northland,,,Education,1 - 5 million,,,2024-Q3,2024-Q4,2024-Q4,2025-Q4,2024-Q1,2025-Q4,
https://www.education.govt.nz/school/property/,,,-35.473084,173.406341
IP010388,18/03/2024,Ministry of Education,Waitaki Boys' High School Redevelopment.,This project is a Redevelopment at Waitaki Boys' High School.,,In planning,Funding source confirmed,Selective,Construct only,Otago,,,Education,1 - 5 million,,,2024-Q2,2024-Q3,2024-Q3,2025-Q2,2024-Q2,2025-Q2,
https://www.education.govt.nz/school/property/,,,-45.076998,170.99382
IP010392,18/03/2024,Ministry of Education,Te Kura o Ōmanaia Roll Growth.,This project is a Roll Growth at Te Kura o Ōmanaia.,,In planning,Funding source confirmed,Selective,Construct only,Northland,,,Education,1 - 5 million,,,2024-Q3,2024-Q4,2024-Q4,2025-Q2,2024-Q3,2025-Q2,
https://www.education.govt.nz/school/property/,,,-35.456578,173.524334
IP010396,18/03/2024,Ministry of Education,Chapel Downs Junior College New School.,This project is a New School at Chapel Downs Junior College.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,25 - 50 million,,,2024-Q3,2024-Q4,2024-Q4,2026-Q4,2024-Q3,2026-Q4,
https://www.education.govt.nz/school/property/,,,-37.519057,177.180645
IP010378,18/03/2024,Ministry of Education,Ōtūmoetai College Roll Growth.,This project is a Roll Growth at Ōtūmoetai College.,,On hold,Funding source confirmed,Selective,Design and construct,Bay of Plenty,,,Education,1 - 5 million,,,2024-Q1,2024-Q2,2024-Q2,2029-Q1,2024-Q1,2029-Q1,
https://www.education.govt.nz/school/property/,,,-37.678754,176.129106
IP010379,18/03/2024,Ministry of Education,Selwyn Park School Roll Growth.,This project is a Roll Growth at Selwyn Park School.,,Under review,Funding source confirmed,Selective,Construct only,Northland,,,Education,1 - 5 million,,,,,2024-Q2,2025-Q1,2024-Q1,2025-Q1,
https://www.education.govt.nz/school/property/,,,-35.932934,173.875985
IP010382,18/03/2024,Ministry of Education,Remuera Intermediate Redevelopment.,This project is a Redevelopment at Remuera Intermediate.,,Under review,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,,2024-Q2,2024-Q2,2024-Q3,2025-Q4,2024-Q1,2025-Q4,
https://www.education.govt.nz/school/property/,,,-36.886299,174.799566
IP010380,18/03/2024,Ministry of Education,St Leonards Road School Roll Growth.,This project is a Roll Growth at St Leonards Road School.,,Under review,Funding source confirmed,Selective,Construct only,Auckland,,,Education,1 - 5 million,,,2024-Q2,2024-Q2,2024-Q3,2025-Q1,2024-Q1,2025-Q1,
https://www.education.govt.nz/school/property/,,,-36.898887,174.662759
IP010375,18/03/2024,Ministry of Education,Mt Albert Grammar School Roll Growth.,This project is a Roll Growth at Mt Albert Grammar School.,,In planning,Funding source confirmed,Selective,Design and construct,Auckland,,,Education,25 - 50 million,,,2024-Q3,2024-Q4,2024-Q4,2026-Q1,2023-Q4,2026-Q1,
https://www.education.govt.nz/school/property/,,,-36.884707,174.725349
IP010391,18/03/2024,Ministry of Education,Kerikeri High School Roll Growth.,This project is a Roll Growth at Kerikeri High School.,,Under review,Funding source confirmed,Selective,Construct only,Northland,,,Education,1 - 5 million,,,2024-Q3,2024-Q4,2024-Q4,2026-Q3,2024-Q2,2026-Q3,
https://www.education.govt.nz/school/property/,,,-35.228354,173.955389
IP010394,18/03/2024,Ministry of Education,TKKM o Kaikohe Roll Growth.,This project is a Roll Growth at TKKM o Kaikohe.,,Under review,Funding source confirmed,Selective,Construct only,Northland,,,Education,1 - 5 million,,,2024-Q3,2024-Q4,2024-Q4,2028-Q4,2024-Q3,2028-Q4,
https://www.education.govt.nz/school/property/,,,-35.399996,173.803359
IP010385,18/03/2024,Ministry of Education,TKKM o Te Whanau Tahi Redevelopment.,This project is a Redevelopment at TKKM o Te Whanau Tahi.,,In planning,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,25 - 50 million,,,2024-Q3,2024-Q4,2024-Q4,2026-Q4,2024-Q2,2026-Q4,
https://www.education.govt.nz/school/property/,,,-43.564588,172.614592
IP010386,18/03/2024,Ministry of Education,Otamatea High School Roll Growth.,This project is a Roll Growth at Otamatea High School.,,Under review,Funding source confirmed,Selective,Construct only,Northland,,,Education,1 - 5 million,,,2024-Q3,2024-Q4,2024-Q4,2027-Q3,2024-Q2,2027-Q3,
https://www.education.govt.nz/school/property/,,,-36.117231,174.365259
IP010397,18/03/2024,Ministry of Education,Lynfield College Redevelopment.,This project is a Redevelopment at Lynfield College.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,1 - 5 million,,,2024-Q3,2024-Q4,2024-Q4,2025-Q2,2024-Q3,2025-Q2,
https://www.education.govt.nz/school/property/,,,-36.921035,174.715436
IP010387,18/03/2024,Ministry of Education,Te Kura o Te Kao Roll Growth.,This project is a Roll Growth at Te Kura o Te Kao.,,Under review,Funding source confirmed,Selective,Construct only,Northland,,,Education,25 - 50 million,,,2024-Q3,2024-Q4,2024-Q4,2025-Q3,2024-Q2,2025-Q2,
https://www.education.govt.nz/school/property/,,,-34.654712,172.965948
IP010389,18/03/2024,Ministry of Education,Wellington High School and Com Ed Centre Combined.,This project is a Combined at Wellington High School and Com Ed Centre.,,Under review,Funding source confirmed,Selective,Construct only,Wellington,,,Education,5 - 25 million,,,2024-Q4,2025-Q1,2025-Q1,2027-Q4,2024-Q2,2027-Q4,
https://www.education.govt.nz/school/property/,,,-41.300724,174.774692
IP010395,18/03/2024,Ministry of Education,Te Kura o Waikare Roll Growth.,This project is a Roll Growth at Te Kura o Waikare.,,Under review,Funding source confirmed,Selective,Construct only,Northland,,,Education,1 - 5 million,,,2024-Q4,2025-Q1,2025-Q1,2026-Q1,2024-Q4,2026-Q1,
https://www.education.govt.nz/school/property/,,,-35.339899,174.234208
IP010384,18/03/2024,Ministry of Education,Green Bay High School Roll Growth.,This project is a Roll Growth at Green Bay High School.,,Under review,Funding source confirmed,Selective,Design and construct,Auckland,,,Education,1 - 5 million,,,2025-Q1,2025-Q2,2025-Q2,2027-Q1,2024-Q1,2027-Q1,
https://www.education.govt.nz/school/property/,,,-36.93095,174.669395
IP005512,14/03/2024,Ministry of Justice,Tauranga-Moana Innovative Courthouse.,Tauranga - Moana Courthouse - Major Courthouse Replacement or Refurbishment to build innovative courthouse.,,In planning,Fully funded,Open,Construct only,Bay of Plenty,,,Justice,100 - 250 million,,,2024-Q2,2025-Q1,2024-Q3,2027-Q2,2020-Q2,2028-Q2,,,"Commercial Services Property Portfolio Team
[email address]",-37.68,176.17
IP005513,14/03/2024,Ministry of Justice,Whanganui Innovative Courthouse.,Major Courthouse Replacement in Whanganui.,,In planning,Funding source confirmed,Open,Early contractor involvement,Manawatū - Whanganui,,,Justice,50 - 100 million,,,2023-Q2,2023-Q3,2024-Q4,2027-Q2,2020-Q3,2028-Q2,,,"Commercial Services Property Portfolio Team
[email address]",-39.93,175.04
IP005514,14/03/2024,Ministry of Justice,North Shore District Court Cladding and Seismic remediation.,To repair the seismic deficiencies and the weathertightness failures of the roof and cladding of building and repair all damage and defects resulting from the water ingress.,,Under construction,Fully funded,Open,Construct only,Auckland,,,Justice,5 - 25 million,2020-Q4,2021-Q2,2021-Q1,2021-Q1,2021-Q4,2023-Q4,2019-Q1,2024-Q4,,,"Commercial Services Property Portfolio Team
[email address]",-36.73,174.71
IP005517,14/03/2024,Ministry of Justice,Wellington District Court Internal Refurbishment.,Health Safety and Security internal upgrades including seismic strengthening and refit.,,In planning,Fully funded,Open,Early contractor involvement,Wellington,,,Justice,25 - 50 million,,,2024-Q1,2024-Q2,2024-Q3,2026-Q2,2020-Q4,2027-Q3,,,"Commercial Services Property Portfolio Team
[email address]",-41.28,174.78
IP005518,14/03/2024,Ministry of Justice,Auckland District Court Cladding Stage 2.,External cladding refurbishment 12 storey building.,,In procurement,Funding source confirmed,Open,Construct only,Auckland,,,Justice,5 - 25 million,,,2023-Q1,2023-Q4,2024-Q2,2025-Q3,2017-Q1,2026-Q3,,,"Commercial Services Property Portfolio Team
[email address]",-36.85,174.76
IP005519,14/03/2024,Ministry of Justice,Hastings Māori Land Court Fitout.,Relocation and internal fitout of Māori land Court.,,In planning,Funding source confirmed,Open,Construct only,Hawke's Bay,,,Justice,1 - 5 million,,,2024-Q2,2024-Q2,2024-Q3,2025-Q1,2020-Q3,2026-Q1,,,"Commercial Services Property Portfolio Team
[email address]",,
IP005521,14/03/2024,Ministry of Justice,Manukau DC Level 2 Fitout.,Manukau District Court interior fitout of new courtrooms.,,In procurement,Funding source confirmed,Open,Construct only,Auckland,,,Justice,25 - 50 million,,,2023-Q2,2023-Q4,2024-Q1,2025-Q3,2021-Q4,2026-Q3,,,"Commercial Services Property Portfolio Team
[email address]",-36.99,174.88
IP005522,14/03/2024,Ministry of Justice,Rotorua Innovative Courts Development.,This project will investigate the requirements and property options at Rotorua High/Distrct Court and Hauora House (Maori Land Court) to provide a fit for purpose modern safe facility that improves customer satisfaction working conditions and supports.,,Early planning,Funding source confirmed,Open,Construct only,Bay of Plenty,,,Justice,50 - 100 million,,,,,,,2021-Q3,2028-Q1,,,"Commercial Services Property Portfolio Team
[email address]",,
IP009813,14/03/2024,Ministry of Justice,Wellington High Court Seismic Stage 2.,Seismic upgrades to increase the resilience of the building.,,In planning,Funding source confirmed,Open,Early contractor involvement,Wellington,,,Justice,25 - 50 million,,2023-Q3,2024-Q1,2024-Q4,2025-Q2,2028-Q1,2023-Q3,2029-Q1,,,"Commercial Services Property Portfolio Team
[email address]",-36.99,174.88
IP009815,14/03/2024,Ministry of Justice,Auckland District Court Seismic Stage 2.,Seismic upgrades to increase the resilience of the building.,,In procurement,Funding source confirmed,Open,Early contractor involvement,Auckland,,,Justice,50 - 100 million,,2023-Q3,2022-Q4,2023-Q4,2024-Q2,2027-Q4,2023-Q3,2028-Q4,,,"Commercial Services Property Portfolio Team
[email address]",,
IP010372,14/03/2024,Ministry of Justice,Hamilton High Court Seismic Stage 2.,Seismic upgrades to increase the resilience of the building.,,In planning,Funding source confirmed,Open,Construct only,Waikato,,,Justice,50 - 100 million,,2023-Q3,2023-Q4,2024-Q1,2024-Q3,2028-Q1,2023-Q3,2029-Q1,,,"Commercial Services Property Portfolio Team
[email address]",,
NeCC500173553631,28/02/2024,Nelson City Council,WC141 Maitai Valley Road Flood Repairs.,Carry out Flood repairs on Maitai Valley Rd near the Nile Street on a slip above and below the road. .,,In procurement,Funding source confirmed,Open,Construct only,Nelson,,,Transport,< 1 million,,,,,,,2024-Q2,2024-Q2,,,,,
NeCC500173753624,28/02/2024,Nelson City Council,WC 141 Days Track Flood Repairs.,Stormwater improvements and track reinstatement.,,Under construction,Funding source confirmed,Direct,Design and construct,Nelson,,,Transport,< 1 million,,,,,,,2023-Q1,2024-Q2,,,,,
NeCC500173553623,28/02/2024,Nelson City Council,WC 141 Kokoroa Road Flood Repairs.,Exact scope and scale TBC.,,On hold,Funding source to be confirmed,To be determined,Design and construct,Nelson,,,Transport,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
NeCC500173553628,28/02/2024,Nelson City Council,Wc141 Atmore Terrace Flood Repairs.,soil nail to the slipface and road reinstatement complete; lower shoulder repairs underway.,,Under construction,Funding source confirmed,Direct,Design and construct,Nelson,,,Transport,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
NeCC500173553633,28/02/2024,Nelson City Council,WC141 Flood Recovery - Unspecified.,various small recovery projects in different phases.,,In planning,Funding source confirmed,To be determined,To be determined,Nelson,,,Transport,< 1 million,,,,,,,2023-Q1,2027-Q2,,,,,
NeCC500173553625,28/02/2024,Nelson City Council,WC141 Little Todd Valley Road Flood Repairs.,Exact scope and scale TBC.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Nelson,,,Transport,< 1 million,,,,,,,2023-Q1,2025-Q2,,,,,
NeCC500173553626,28/02/2024,Nelson City Council,WC141 Maori Road Flood Repair.,Initial design complete.,,Early planning,Funding source confirmed,Direct,Design and construct,Nelson,,,Transport,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
NeCC500173553627,28/02/2024,Nelson City Council,WC141 Ross Road Flood Repairs.,investigations underway.,,Early planning,Funding source confirmed,Direct,Design and construct,Nelson,,,Transport,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
NeCC500173553635,28/02/2024,Nelson City Council,WC141 slip repair 5 Maitai Road.,pallisade wall for underslip.,,Under construction,Funding source confirmed,Open,Design and construct,Nelson,,,Transport,< 1 million,,,,,,,2024-Q2,2024-Q2,,,,,
NeCC500173553621,28/02/2024,Nelson City Council,WC141 Todd Valley Road Flood Repairs.,Exact scope and scale TBC.,,Early planning,Funding source confirmed,Direct,Design and construct,Nelson,,,Transport,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
NeCC3388,28/02/2024,Nelson City Council,Maitai Pump Station Upgrade.,Water pump station upgrade.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Nelson,,,Water,1 - 5 million,,,,,,,2028-Q3,2029-Q3,,,,,
NeCC551079752984,28/02/2024,Nelson City Council,Stoke Centre Enhancements.,TBC.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Nelson,,,Transport,< 1 million,,,,,,,2027-Q1,2028-Q2,,,,,
NeCC500173553637,28/02/2024,Nelson City Council,WC 141 Glen Creek washout repairs.,Flooding Damage Repairwork.,,Under construction,Funding source confirmed,Open,Design and construct,Nelson,,,Transport,1 - 5 million,,,,,,,2022-Q3,2024-Q2,,,,,
NeCC500173553622,28/02/2024,Nelson City Council,WC141 Devenish Place Flood Repairs.,Stage 1 Road Reconstruction. Stage 2 Intake upgrades.,,In planning,Funding source confirmed,Direct,Design and construct,Nelson,,,Transport,1 - 5 million,,,,,,,2022-Q3,2025-Q2,,,,,
NeCC500273653039,18/03/2024,Nelson City Council,Structures replacement/component replacement.,site specific retaining wall structural repairs or replacements. Suffolk Road retaining wall is currently highest priority.,,In procurement,Funding source confirmed,Open,To be determined,Nelson,,,Transport,< 1 million,,,,,,,2024-Q1,2024-Q3,,,,,
NeCC500173652980,28/02/2024,Nelson City Council,WC216 Trafalgar Centre Footbridge.,Renewal of Pedestrian bridge superstructure.,,Under construction,Funding source confirmed,Open,Construct only,Nelson,,,Transport,< 1 million,,,,,,,2024-Q2,2024-Q2,,,,,
NeCC500179553227,28/02/2024,Nelson City Council,WC 341L Waimea Road Franklyn Street intersection improvement.,intersection upgrade incl traffic signals.,,In planning,Funding source confirmed,Open,Construct only,Nelson,,,Transport,1 - 5 million,,,,,,,2025-Q3,2027-Q2,,,,,
NeCC500179553009,28/02/2024,Nelson City Council,WC 341Z Toi Toi/Vanguard intersection upgrade.,intersection upgrade traffic signals.,,In procurement,Funding source confirmed,Open,Construct only,Nelson,,,Transport,1 - 5 million,,,,,,,2024-Q3,2027-Q2,,,,,
NeCC551073553217,28/02/2024,Nelson City Council,CBD Carpark Resurfacing.,Resurfacing of carpark areas.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Nelson,,,Transport,1 - 5 million,,,,,,,2026-Q1,2030-Q1,,,,,
NeCC50027150,28/02/2024,Nelson City Council,Renewals: Street/Garden Furniture.,seats and planter boxes tree surrounds etc.,,Under construction,Funding source confirmed,Direct,Other,Nelson,,,Transport,< 1 million,,,,,,,2022-Q1,2024-Q4,,,,,
NeCC500179553512,28/02/2024,Nelson City Council,School speed reduction sites.,TBC through speed management planning.,,Early planning,Funding source to be confirmed,Open,Construct only,Nelson,,,Transport,1 - 5 million,,,,,,,2023-Q1,2026-Q2,,,,,
NeCC500179553211,28/02/2024,Nelson City Council,Waimea Road priority bus lanes - detailed business case.,Consultant package for detailed business case and concept designs to inform funding and land purchase and future detailed design package.,,In planning,Funding source to be confirmed,Open,Other,Nelson,,,Transport,1 - 5 million,,,,,,,2025-Q1,2027-Q1,,,,,
NeCC500173551540,28/02/2024,Nelson City Council,WC 212 Sealed Road Resurfacing.,road resurfacing.,,Under construction,Funding source confirmed,Direct,Design and construct,Nelson,,,Transport,1 - 5 million,,,,,,,2022-Q4,2028-Q2,,,,,
NeCC500173551539,28/02/2024,Nelson City Council,WC 214 Sealed Road Pavement Rehabilitation.,road reconstruction.,,Under construction,Funding source confirmed,Open,Construct only,Nelson,,,Transport,1 - 5 million,,,,,,,2025-Q2,2027-Q2,,,,,
NeCC500173703078,28/02/2024,Nelson City Council,WC 222 Traffic Services Renewal - Lighting.,Exact scope and scale TBC.,,Under construction,Funding source confirmed,Direct,Design and construct,Nelson,,,Transport,< 1 million,,,,,,,2022-Q4,2027-Q3,,,,,
NeCC500176553172,28/02/2024,Nelson City Council,WC 324 Polstead Main Road Stoke Intersection Upgrade.,intersection upgrade.,,Early planning,Funding source to be confirmed,Open,Construct only,Nelson,,,Transport,1 - 5 million,,,,,,,2030-Q1,2032-Q1,,,,,
NeCC500179552934,28/02/2024,Nelson City Council,WC 324 Quarantine/Nayland intersection upgrades.,intersection upgrade.,,Early planning,Funding source to be confirmed,To be determined,Construct only,Nelson,,,Transport,1 - 5 million,,,,,,,2034-Q1,2036-Q2,,,,,
NeCC500179803212,28/02/2024,Nelson City Council,WC 341 Cross Town Links Brook to Central Programme.,cycleway constuction in road corridor.,,Early planning,Funding source to be confirmed,Open,Construct only,Nelson,,,Transport,1 - 5 million,,,,,,,2028-Q1,2030-Q2,,,,,
NeCC500179553062,28/02/2024,Nelson City Council,WC 341 Elm Street Intersection safety improvements.,intersection upgrade.,,Early planning,Funding source confirmed,Open,Construct only,Nelson,,,Transport,1 - 5 million,,,,,,,2032-Q1,2034-Q1,,,,,
NeCC500176551375,28/02/2024,Nelson City Council,WC 341 Marsden Valley Ridgeway Upgrade.,intersection upgrade.,,Early planning,Funding source to be confirmed,To be determined,Construct only,Nelson,,,Transport,1 - 5 million,,,,,,,2028-Q1,2030-Q1,,,,,
NeCC500179803233,28/02/2024,Nelson City Council,WC 452 Atawhai Shared path extension to Todds Valley.,cycleway constuction in road corridor.,,Early planning,Funding source to be confirmed,To be determined,Construct only,Nelson,,,Transport,1 - 5 million,,,,,,,2028-Q1,2030-Q1,,,,,
NeCC500178903225,28/02/2024,Nelson City Council,WC 452 Nile Street cycle facilities.,cycleway TBC because maybe delivered through Transport choises.,,Early planning,Funding source to be confirmed,Open,Construct only,Nelson,,,Transport,1 - 5 million,,,,,,,2026-Q1,2028-Q1,,,,,
NeCC500173751494,28/02/2024,Nelson City Council,WC225 Renewals: Footpaths.,Exact scope and scale TBC.,,In planning,Funding source confirmed,Open,Construct only,Nelson,,,Transport,1 - 5 million,,,,,,,2023-Q1,2024-Q2,,,,,
NeCC500173751494.1,28/02/2024,Nelson City Council,WC225 Renewals: Footpaths.,Exact scope and scale TBC.,,Early planning,Funding source to be confirmed,Open,Construct only,Nelson,,,Transport,1 - 5 million,,,,,,,2025-Q1,2027-Q1,,,,,
NeCC500173903523,28/02/2024,Nelson City Council,WC341 School speed sign upgrades.,replacement and new electronic speed signs TBC through speed management planning.,,Early planning,Funding source confirmed,To be determined,Construct only,Nelson,,,Transport,< 1 million,,,,,,,2023-Q1,2025-Q2,,,,,
NeCC500179753582,28/02/2024,Nelson City Council,WC341 W Andrew Street crossing.,Raised safety platform.,,In planning,Funding source confirmed,Open,Construct only,Nelson,,,Transport,< 1 million,,,,,,,2024-Q1,2025-Q2,,,,,
NeCC500179753581,28/02/2024,Nelson City Council,WC341 W Stoke Youth Park ped refuge.,kerb buildout islands and central refuge island reusing some stored materials.,,In planning,Funding source confirmed,Direct,Construct only,Nelson,,,Transport,< 1 million,,,,,,,2023-Q1,2024-Q2,,,,,
NeCC500179753675,28/02/2024,Nelson City Council,WC341W - Maori Road raised crossing.,Raised safety platform.,,In planning,Funding source confirmed,Open,Construct only,Nelson,,,Transport,< 1 million,,,,,,,2026-Q1,2026-Q2,,,,,
NeCC500179803349,28/02/2024,Nelson City Council,WC341W St Vincent St cycleway crash reduction.,TBC planter boxes or just line marking.,,In planning,Funding source to be confirmed,To be determined,To be determined,Nelson,,,Transport,1 - 5 million,,,,,,,2024-Q1,2026-Q2,,,,,
NeCC500175153511,28/02/2024,Nelson City Council,WC341Z Speed Limit changes speed signs.,Regulatory speed signs TBC through speed management planning.,,Early planning,Funding source confirmed,To be determined,Construct only,Nelson,,,Transport,< 1 million,,,,,,,2023-Q1,2025-Q2,,,,,
NeCC556079902335.1,28/02/2024,Nelson City Council,WC532 PT Minor Improvements.,bus stops and bus shelters seats and signage.,,In planning,Funding source confirmed,To be determined,Design and construct,Nelson,,,Transport,< 1 million,,,,,,,2022-Q1,2027-Q2,,,,,
NeCC500279802946,28/02/2024,Nelson City Council,Railway Reserve Lighting.,Better Off Funding electric and solar lights.,,Under construction,Funding source confirmed,Direct,Design and construct,Nelson,,,Transport,1 - 5 million,,,,,,,2023-Q2,2024-Q2,,,,,
NeCC500276553335,28/02/2024,Nelson City Council,Maitai Bayview Growth programme.,TBC when development and contributions are confirmed.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Nelson,,,Transport,1 - 5 million,,,,,,,2026-Q1,2028-Q1,,,,,
NeCC500179553458,28/02/2024,Nelson City Council,WC341L Selwyn Place Pedestrian Crossings.,raised safety platforms.,,In planning,Funding source confirmed,Open,Construct only,Nelson,,,Transport,< 1 million,,,,,,,2026-Q1,2028-Q1,,,,,
NeCC500179753312,28/02/2024,Nelson City Council,WC341W Quarantine Road Bridge Footpath (at Bolt Rd).,Pedestrian Bridge.,,Under construction,Funding source confirmed,Open,Construct only,Nelson,,,Transport,< 1 million,,,,,,,2024-Q2,2024-Q2,,,,,
NeCC700579502314,28/02/2024,Nelson City Council,Atawhai No.2 Reservoir.,Identify and secure suitable reservoir sites for level of service and future growth in the Atawhai area. Reservoir(s) need to be at two different levels to provide for development in the upper areas of the foothills.,,In planning,Funding source confirmed,Open,To be determined,Nelson,,,Water,5 - 25 million,,,,,,,2019-Q1,2027-Q2,,,,,
NeCC700579502810,28/02/2024,Nelson City Council,Maitai Dam Aeration.,Power supply upgrade compressor building air delivery and control system.,,In procurement,Funding source confirmed,Direct,Design and construct,Nelson,,,Water,1 - 5 million,,,,,,,2020-Q3,2026-Q2,,,,,
NeCC500173553636,28/02/2024,Nelson City Council,WC141 Cable Bay Road slip repairs.,Exact scope and scale TBC.,,Under construction,Funding source to be confirmed,Direct,Construct only,Nelson,,,Transport,1 - 5 million,,,,,,,2024-Q1,2024-Q2,,,,,
NeCC640573152879,28/02/2024,Nelson City Council,Atawhai Rising Main Renewal.,Large dia rising main renewal.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Nelson,,,Water,50 - 100 million,,,,,,,2026-Q3,2032-Q2,,,,,
NeCC640576153701,28/02/2024,Nelson City Council,Paru Paru PS and Network upgrades.,Pump Station renewal and significant network upgrades.,,In planning,Funding source to be confirmed,To be determined,To be determined,Nelson,,,Water,5 - 25 million,,,,,,,2024-Q3,2028-Q2,,,,,
NeCC500179553668,28/02/2024,Nelson City Council,WC 341Z - Gloucester Vanguard intersection safety.,intersection upgrade.,,In planning,Funding source confirmed,Open,Construct only,Nelson,,,Transport,< 1 million,,,,,,,2025-Q1,2025-Q2,,,,,
NeCC500179553672,28/02/2024,Nelson City Council,WC341L - Nayland Songer Roundabout safety.,intersection upgrade.,,In planning,Funding source to be confirmed,Open,Construct only,Nelson,,,Transport,< 1 million,,,,,,,2025-Q1,2025-Q2,,,,,
NeCC500179553669,28/02/2024,Nelson City Council,WC341Z - Gloucester St Vincent intersection safety.,intersection upgrade.,,In planning,Funding source to be confirmed,Open,Construct only,Nelson,,,Transport,< 1 million,,,,,,,2025-Q1,2025-Q2,,,,,
NeCC500179553670,28/02/2024,Nelson City Council,WC341Z - Hardy Vanguard intersection safety.,intersection upgrade.,,In planning,Funding source to be confirmed,Open,Construct only,Nelson,,,Transport,< 1 million,,,,,,,2025-Q1,2025-Q2,,,,,
NeCC500179553519,28/02/2024,Nelson City Council,WC341Z Nile Tasman Roundabout raised platform.,intersection upgrade.,,In planning,Funding source confirmed,Open,Other,Nelson,,,Transport,< 1 million,,,,,,,2024-Q1,2024-Q2,,,,,
NeCC500179553518,28/02/2024,Nelson City Council,WC341Z St Vincent Street Toi Toi Street raised roundabout.,intersection upgrade.,,In procurement,Funding source confirmed,Open,Construct only,Nelson,,,Transport,< 1 million,,,,,,,2024-Q1,2024-Q2,,,,,
NeCC500179553564,28/02/2024,Nelson City Council,WC452 SFP Hospital Connection.,cycleway constuction in road corridor.,,Post implementation ,Funding source confirmed,Open,Design and construct,Nelson,,,Transport,1 - 5 million,,,,,,,2024-Q1,2024-Q2,,,,,
NeCC652079122964,28/02/2024,Nelson City Council,Saxton Creek Upgrade Stage 4.,Flood Protection - Upgrading the channel and culverts between Main Road Stoke and Whakatu Drive as a continuation of the upgrade of Saxton Creek from Champion to the sea. Stage 4 construction has commenced.,,Under construction,Funding source confirmed,Selective,Early contractor involvement,Nelson,,,Water,25 - 50 million,,,,,,,2020-Q3,2024-Q1,
https://shape.nelson.govt.nz/saxton-creek-stage-4,,,-41.330636,173.207269
NeCC500276553705,18/03/2024,Nelson City Council,IAF Active Linear Corridor.,road and footpath reconstruction planting and amenity upgrades with utility upgrades.,,Early planning,Funding source confirmed,Open,Construct only,Nelson,,,Transport,25 - 50 million,,,,,,,2024-Q1,2027-Q1,,,,,
NeCC640576303357,28/02/2024,Nelson City Council,NWWTP Process Upgrade.,Process upgrade and/or outfall upgrade.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Nelson,,,Water,5 - 25 million,,,,,,,2028-Q3,2031-Q2,,,,,
NeCC500180000000,18/03/2024,Nelson City Council,Transport Choices package.,public transport services & Maitai pathway included.,,In planning,Funding source to be confirmed,Open,Other,Nelson,,,Transport,< 1 million,,,,,,,2023-Q1,2024-Q2,,,,,
NeCC556075902997,18/03/2024,Nelson City Council,WC 531 CBD interchange - Millers Acre.,construction of new bus depot including parking surfacing structures and building fit out.,,In planning,Funding source to be confirmed,To be determined,To be determined,Nelson,,,Transport,1 - 5 million,,,,,,,2024-Q1,2026-Q1,,,,,
NeCC556075902997.1,18/03/2024,Nelson City Council,WC 531 CBD interchange - Millers Acre - Design package/s.,detailed business case and design of new bus depot.,,In planning,Funding source to be confirmed,To be determined,To be determined,Nelson,,,Transport,< 1 million,,,,,,,2024-Q1,2025-Q1,,,,,
NeCC500179601173,28/02/2024,Nelson City Council,Freshwater Improvements programme.,sump filters.,,Early planning,Funding source to be confirmed,Open,Design and construct,Nelson,,,Transport,1 - 5 million,,,,,,,2027-Q1,2028-Q1,,,,,
NeCC500173601538,28/02/2024,Nelson City Council,WC 213 Drainage Renewals.,Exact scope and scale TBC.,,Early planning,Funding source confirmed,Open,Design and construct,Nelson,,,Transport,< 1 million,,,,,,,2025-Q1,2025-Q4,,,,,
NeCC551079552994,28/02/2024,Nelson City Council,Strawbridge Sq Layout & access improvement.,Carpark resurfacing and preparation works.,,Early planning,Funding source confirmed,Direct,Construct only,Nelson,,,Transport,< 1 million,,,,,,,2026-Q1,2026-Q2,,,,,
NeCC500179552189,28/02/2024,Nelson City Council,2189 WC341 Innovative Streets - Kawai St.,walking and cycling connections footpath and drainage renewals.,,In planning,Funding source to be confirmed,Open,Construct only,Nelson,,,Transport,1 - 5 million,,,,,,,2027-Q1,2028-Q1,,,,,
NeCC640576153328,19/03/2024,Nelson City Council,Cambria/Milton/Nile St and Weka St PS Upgrades and Renewals.,Retic and PS upgrades.,,In planning,Funding source to be confirmed,To be determined,To be determined,Nelson,,,Water,5 - 25 million,,,,,,,2024-Q3,2030-Q2,,,,,
NeCC500272300622,19/03/2024,Nelson City Council,Heritage panel renewal.,like for like renewals.,,Under construction,Funding source confirmed,Direct,Other,Nelson,,,Transport,< 1 million,,,,,,,2022-Q1,2024-Q2,,,,,
NeCC551073551108,19/03/2024,Nelson City Council,Renewal: CBD aesthetic elements.,seats decorative paving lighting etc. Generally like for like but a new programme of paving is planned. Trial in 22/23.,,Under construction,Funding source confirmed,To be determined,Other,Nelson,,,Transport,< 1 million,,,,,,,2022-Q1,2024-Q2,,,,,
NeCCIP009597,18/03/2024,Nelson City Council,Roundabout upgrade design package.,intersection upgrade.,,In planning,Funding source confirmed,Open,Other,Nelson,,,Transport,< 1 million,,,,,,,2023-Q1,2025-Q1,,,,,
NeCC500277701078,19/03/2024,Nelson City Council,Street Garden Dev.,planted areas in road reserve.,,Under construction,Funding source confirmed,Direct,Other,Nelson,,,Transport,< 1 million,,,,,,,2022-Q1,2024-Q2,,,,,
NeCC500277701079,19/03/2024,Nelson City Council,Street Tree Dev.,trees.,,Under construction,Funding source confirmed,Direct,Other,Nelson,,,Transport,< 1 million,,,,,,,2022-Q1,2024-Q2,,,,,
NeCC500179553009.1,18/03/2024,Nelson City Council,Traffic Signals Design package.,Toi Toi Vanguard and Waimea Road Franklyn Street signals designs.,,In planning,Funding source confirmed,Open,Other,Nelson,,,Transport,< 1 million,,,,,,,2023-Q1,2027-Q1,,,,,
NeCC500173553648,18/03/2024,Nelson City Council,WC141 Glen Road flood repairs.,Exact scope and scale TBC.,,In planning,Funding source to be confirmed,To be determined,Construct only,Nelson,,,Transport,< 1 million,,,,,,,2023-Q1,2024-Q2,,,,,
NeCC3328,1/12/2023,Nelson City Council,City Centre Maitai Precinct Intensification Growth Project.,Watermain upgrade.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Nelson,,,Water,5 - 25 million,,,,,,,2026-Q3,2030-Q2,,,,,
IP000175,19/03/2024,New Zealand Antarctic Institute,Redevelopment of Scott Base - Antarctica.,This project is to redevelop Scott Base into a safe fit for purpose facility to support evolving science needs for the next 50 years. It includes the replacement of the existing windfarm supplying renewable energy to Scott Base and the nearby United Stat.,,In procurement,Fully funded,Open,Construct only,Other,,,Science and research,250 - 500 million,2019-Q3,2021-Q2,2019-Q3,2025-Q1,2022-Q1,2028-Q2,2017-Q3,2030-Q2,
https://www.scottbaseredevelopment.govt.nz/projects,,,-77.8482491,166.7429994
IP000018,19/03/2024,New Zealand Defence Force,Arch Hangar Mid-life Intensive Refit.,The Arch-Hangars used by Airforce in Whenuapai were built during the early 1940's. They require a refit of the associated hangar components - fire-suppression; fume extraction; lighting; environmental conditions; heating and cooling; electrical wiring an.,,In planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Defence,5 - 25 million,2020-Q4,2025-Q2,2025-Q2,2026-Q2,2026-Q3,2028-Q1,2020-Q4,2029-Q1,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP000028,19/03/2024,New Zealand Defence Force,Small Boats Storage Wash Down Area and Maintenance Workshop.,This project will provide a fit for purpose storage and wash down facility replacing the current (outdoor) small boat storage area. The aim of this is to provide a facility which will protect the small boats from sea spray; sun; wind; and rain; and enabl.,,In planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Defence,5 - 25 million,2016-Q4,2027-Q2,2027-Q2,2028-Q2,2028-Q3,2029-Q3,2016-Q4,2030-Q3,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP000043,20/03/2024,New Zealand Defence Force,Ohakea Infrastructure Programme - Fuels Precinct.,This project will deliver a new Fuels storage facility. The new Fuel storage facility will meet the demands of (among other things) the introduction into Royal New Zealand Air Force Base Ohakea of the P-8A aircraft.,,Under construction,Fully funded,Open,Construct only,Manawatū - Whanganui,,,Defence,50 - 100 million,2019-Q4,2023-Q3,2023-Q1,2023-Q3,2024-Q1,2025-Q4,2023-Q1,2025-Q4,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP000055,19/03/2024,New Zealand Defence Force,Consolidated Parking - Common Logistics Precinct.,This project requires the development of centralised parking at Linton Camp. Responding to the emerging New Zealand Defence Force parking strategy and the requirement to centralise and consolidate assets the Linton Infrastructure Master Plan indicated the.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Defence,5 - 25 million,2020-Q4,2022-Q4,2022-Q4,2024-Q2,2024-Q3,2025-Q1,2022-Q4,2026-Q2,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP000062,19/03/2024,New Zealand Defence Force,Facilities Maintenance Compound.,This project requires relocating the Facilities Maintenance compound at Burnham. The existing facilities will be impacted by the Consolidated Logistics Project Regional Supply Facility as they are within the new building footprint. Project is currently on hold pending the outcome of the Future FM Contract.,,On hold,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Defence,1 - 5 million,2020-Q4,2028-Q1,2028-Q1,2028-Q3,2028-Q3,2029-Q1,2020-Q4,2029-Q1,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP002564,19/03/2024,New Zealand Defence Force,Consolidated Logistics Project (CLP) - Linton Maintenance Support Facility (MSF).,The Linton MSF is a new military workshop facility for a combined military and 3rd party logistics workforce. The MSF replaces the existing workshop company buildings. The workshop will be fit-for-purpose and built with sufficient size capability and sec.,,Post implementation ,Fully funded,Open,Construct only,Manawatū - Whanganui,,,Defence,25 - 50 million,2016-Q2,2021-Q1,2020-Q2,2021-Q2,2021-Q3,2023-Q3,2016-Q2,2028-Q3,,,,,
IP002565,19/03/2024,New Zealand Defence Force,Consolidated Logistics Project (CLP) - Burnham Maintenance Support Facility (MSF).,The Burnham MSF is a new military workshop facility for a combined military and 3rd party logistics workforce. The MSF replaces the existing workshop company buildings. The workshop will be fit-for-purpose and built with sufficient size capability and.,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Defence,50 - 100 million,2016-Q2,2023-Q1,2023-Q1,2023-Q3,2023-Q3,2025-Q3,2016-Q2,2026-Q3,,,,,
IP002566,19/03/2024,New Zealand Defence Force,Consolidated Logistics Project (CLP) - Linton Regional Supply Facility (RSF).,The Linton RSF is a new warehouse and working area for Goods Distribution Supply Company and a Regional Equipment Pool. The RSF replaces the existing supply company buildings. The facility will be fit-for purpose enabling enhanced management of inwar.,,In planning,Funding source confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Defence,50 - 100 million,2016-Q2,2024-Q2,2024-Q3,2024-Q3,2025-Q1,2027-Q1,2016-Q2,2028-Q3,,,,,
IP002567,19/03/2024,New Zealand Defence Force,Consolidated Logistics Project (CLP) - Burnham Regional Supply Facility (RSF).,The Burnham RSF is a new warehouse and working area for Goods Distribution Supply Company and a Regional Equipment Pool. The RSF replaces the existing supply company buildings. The facility will be fit-for purpose enabling enhanced management of inwar.,,In planning,Funding source confirmed,Open,Design and construct,Canterbury,,,Defence,100 - 250 million,2016-Q2,2025-Q1,2023-Q4,2024-Q3,2025-Q3,2027-Q3,2016-Q2,2028-Q3,,,,,
IP002568,19/03/2024,New Zealand Defence Force,Consolidated Logistics Project (CLP) - Linton Regional Vehicle Storage (RVS).,The Linton RVS is a new storage facility for medium-heavy military vehicles . The building will provide fit for purpose storage shelters consolidated in one location in the Logistics area of the Linton Camp. The facility will include garaging hard-stan.,,In planning,Funding source confirmed,Open,Design and construct,Manawatū - Whanganui,,,Defence,50 - 100 million,2016-Q2,2025-Q3,2025-Q2,2025-Q3,2026-Q3,2027-Q3,2016-Q2,2028-Q3,,,,,
IP003210,28/11/2023,New Zealand Defence Force,Water Supply Upgrade.,Significant upgrade water take and treatment at Linton Camp. May be combined with 'LIN Potable Water Reticulation - Stage 1'. Cost cost estimate will increase.,,In procurement,Funding source confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Defence,5 - 25 million,2018-Q4,2023-Q3,2023-Q3,2024-Q3,2024-Q3,2025-Q3,2018-Q4,2026-Q3,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003211,28/11/2023,New Zealand Defence Force,Potable Water Reticulation Upgrade (Stage 1).,This project provides for the the first stage of replacement of those water assets identified as urgent and high priority. May be combined with LIN - Water Treatment Plant Upgrade'.,,In procurement,Funding source confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Defence,1 - 5 million,2019-Q4,2022-Q4,2023-Q3,2024-Q3,2024-Q3,2025-Q3,2019-Q4,2026-Q3,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003212,28/11/2023,New Zealand Defence Force,Standby Power Replacement.,This project provides for the replacement standby power plant and infrastructure at Base Auckland.,,In procurement,Funding source confirmed,To be determined,Construct only,Auckland,,,Defence,1 - 5 million,2019-Q1,2022-Q3,2022-Q3,2024-Q1,2025-Q2,2025-Q3,2019-Q1,2026-Q3,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003213,28/11/2023,New Zealand Defence Force,Medical & Dental Centre and Aero Evacuation.,This combined projects will complete Stage 2 of the Health and Wellness precinct at Base AK following construction (2016) of the Stage 1 Aviation Medicine Unit (AMU). Will provide a combined medical treatment and wellness facility with centralised service.,,In planning,Funding source confirmed,To be determined,Construct only,Auckland,,,Defence,5 - 25 million,2016-Q4,2024-Q3,2024-Q3,2025-Q3,2025-Q4,2027-Q2,2016-Q4,2028-Q2,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003214,19/03/2024,New Zealand Defence Force,Energy Centre Replacement Project.,This project will replace the existing Burnham boilers used for heating which are at the end of their economic life are a seismic risk with a fuel source system that no longer aligns with policy objectives for energy or fuel source. This project will rep.,,In procurement,Funding source confirmed,Open,Construct only,Canterbury,,,Defence,5 - 25 million,2019-Q4,2023-Q4,2024-Q1,2024-Q2,2024-Q2,2025-Q2,2019-Q4,2026-Q2,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003216,28/11/2023,New Zealand Defence Force,Barrack Single Living Accomodation.,These combined projects will deliver new single living accomodation barrack blocks with projects at Whenuapai.,,In planning,Funding source confirmed,To be determined,Construct only,Auckland,,,Defence,5 - 25 million,2016-Q2,2026-Q3,2026-Q3,2027-Q2,2027-Q3,2029-Q4,2016-Q2,2030-Q2,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003217,28/11/2023,New Zealand Defence Force,Main Gate Stage 1 (Security).,This project improves the layout safety and security of the main gate as the current main gate layout and security functions are not fit for purpose. Project may be phased.,,Under construction,Fully funded,To be determined,Construct only,Auckland,,,Defence,< 1 million,2016-Q4,2022-Q4,2023-Q1,2023-Q2,2023-Q2,2023-Q4,2016-Q4,2024-Q4,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003219,28/11/2023,New Zealand Defence Force,Dental Services and Medical Centre.,These combined projects will deliver renewed and relocated dental medical and wellness hub within the new health and wellbeing precinct of the Infrastruture Mater Plan for Papakura.,,In planning,Funding source confirmed,To be determined,Construct only,Auckland,,,Defence,5 - 25 million,2016-Q4,2024-Q3,2024-Q3,2025-Q3,2025-Q4,2027-Q4,2016-Q4,2028-Q4,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003220,28/11/2023,New Zealand Defence Force,Gym & Physiotherapy.,This project will deliver renewed and relocated gym & physiotherapy facility within the new health & wellbeing precinct of the Infrastruture Mater Plan for Papakura.,,In planning,Funding source confirmed,To be determined,Construct only,Auckland,,,Defence,5 - 25 million,2016-Q4,2024-Q3,2024-Q3,2025-Q3,2024-Q2,2026-Q3,2016-Q4,2027-Q3,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003221,19/03/2024,New Zealand Defence Force,Health & Rehab Centre.,This project intends to provide a compliant fit for purpose medical centre which is required to enable the provision of quality health services to Burnham personnel. The facility is to be located within the Health and wellbeing precinct as directed by th.,,In procurement,Funding source confirmed,To be determined,Construct only,Canterbury,,,Defence,5 - 25 million,2016-Q4,2023-Q2,2023-Q3,2024-Q2,2024-Q2,2025-Q4,2016-Q4,2026-Q4,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003222,28/11/2023,New Zealand Defence Force,Base Operations Security Fence.,Woodbourne is the only Air Force base with shared military/civilian use. This project will enable the safety of civilians undertaking civilian training onsite as certain areas require the ability to restrict some movement to delineate with Airforce traini.,,Under construction,Funding source confirmed,To be determined,Construct only,Marlborough,,,Defence,1 - 5 million,2019-Q4,2021-Q2,2022-Q2,2022-Q3,2022-Q3,2023-Q4,2019-Q4,2024-Q4,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003225,28/11/2023,New Zealand Defence Force,Water Treatment Plant - Upgrade.,Waiouru WTP produces water for Waiouru Military Camp and for Ruapehu District's Waiouru township. This project will secure the long-term treatment of potable water at Waiouru for exiisting users while achieving and maintaining complinace with the DWSNZ.,,In procurement,Funding source confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Defence,5 - 25 million,2018-Q2,2022-Q2,2022-Q2,2024-Q3,2024-Q4,2025-Q4,2018-Q2,2026-Q4,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003227,28/11/2023,New Zealand Defence Force,Washdown Point.,This project will deliver an upgraded solution which meets current environmental compliance while providing sufficient wash-down facilities for the current fleet of NZDF vehicles operating in the Waiouru Military Training Area since the current Washdown.,,In procurement,Funding source confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Defence,5 - 25 million,2019-Q4,2022-Q3,2022-Q3,2024-Q2,2024-Q3,2025-Q4,2019-Q4,2026-Q4,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003229,20/03/2024,New Zealand Defence Force,Ohakea Infrastructure Programme - Initial Civils.,Connect to a district waste water and potable water schemes and develop a new pump station for one part of Base Ohakea.,,Under construction,Fully funded,Open,Construct only,Manawatū - Whanganui,,,Defence,25 - 50 million,2019-Q4,2022-Q3,2022-Q3,2022-Q1,2023-Q2,2024-Q3,2022-Q3,2024-Q3,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003231,5/09/2023,New Zealand Defence Force,Ohakea Infrastructure Programme - Storm Water Phase 1.,Works required to address quantitative and qualitative performance issues on existing Base network to meet operational performance requirements in future state.,,In planning,Funding source to be confirmed,Open,Construct only,Manawatū - Whanganui,,,Defence,5 - 25 million,2019-Q4,2023-Q4,2024-Q3,2025-Q1,2025-Q1,2025-Q4,2024-Q3,2025-Q4,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003234,28/11/2023,New Zealand Defence Force,Potable Water Reticulation.,Potable Water Reticulation.,,In procurement,Funding source confirmed,To be determined,To be determined,Auckland,,,Defence,5 - 25 million,2020-Q4,2023-Q3,2023-Q3,2024-Q2,2024-Q3,2027-Q3,2020-Q4,2028-Q3,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003242,28/11/2023,New Zealand Defence Force,Sea Safety Training School Filtration System Phase 2.,Sea Safety Training School Filtration System Phase 2.,,In planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Defence,1 - 5 million,2020-Q4,2023-Q4,2023-Q4,2024-Q1,2024-Q2,2024-Q4,2020-Q4,2025-Q4,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003243,28/11/2023,New Zealand Defence Force,Dry Dock Portal Crane.,Crane Rehabilitation Programme.,,In planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Defence,5 - 25 million,2020-Q4,2023-Q4,2023-Q4,2024-Q2,2024-Q4,2025-Q4,2020-Q4,2026-Q4,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003244,28/11/2023,New Zealand Defence Force,Naval Fuel Installation Control System.,Naval Fuel Installation Control System.,,In planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Defence,5 - 25 million,2020-Q4,2024-Q1,2024-Q1,2024-Q3,2025-Q1,2025-Q3,2020-Q4,2026-Q3,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003265,28/11/2023,New Zealand Defence Force,Training Area Water Abstraction.,Training Area Water Abstraction.,,In planning,Funding source to be confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Defence,< 1 million,2021-Q2,2023-Q4,2023-Q4,2024-Q2,2024-Q3,2025-Q2,2021-Q2,2025-Q4,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003277,28/11/2023,New Zealand Defence Force,Explosives Storage Facility.,Explosives Storage Facility - provides a fit for purpose building.,,In planning,Funding source to be confirmed,Direct,Design and construct,Manawatū - Whanganui,,,Defence,1 - 5 million,2019-Q4,2024-Q3,2024-Q3,2025-Q2,2025-Q3,2026-Q3,2019-Q4,2027-Q3,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003282,28/11/2023,New Zealand Defence Force,10 Transport Company Facilities.,10 Transport Company Facilities.,,In planning,Funding source to be confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Defence,5 - 25 million,2020-Q4,2026-Q3,2026-Q3,2027-Q2,2027-Q3,2028-Q2,2020-Q4,2029-Q2,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003297,19/03/2024,New Zealand Defence Force,Potable Water Reticulation.,Potable Water Network and Storage.,,In procurement,Funding source confirmed,Selective,Construct only,Canterbury,,,Defence,5 - 25 million,2020-Q4,2023-Q3,2023-Q3,2024-Q2,2024-Q3,2026-Q4,2020-Q4,2027-Q4,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003298,19/03/2024,New Zealand Defence Force,2/1 New Zealand Infantry Regiment Facilities.,2/1 New Zealand Infantry Regiment Facilities.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Defence,25 - 50 million,2020-Q4,2024-Q3,2025-Q1,2025-Q3,2025-Q3,2028-Q4,2020-Q4,2029-Q4,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003299,19/03/2024,New Zealand Defence Force,Waste Water Network.,Waste Water Network.,,In procurement,Funding source confirmed,Selective,Construct only,Canterbury,,,Defence,5 - 25 million,2019-Q3,2023-Q3,2023-Q3,2024-Q2,2024-Q3,2026-Q4,2020-Q4,2027-Q4,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003300,19/03/2024,New Zealand Defence Force,2/4 New Zealand Infantry Regiment Unit Facilities.,2/4 New Zealand Infantry Regiment Unit Facilities.,,On hold,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Defence,1 - 5 million,2020-Q2,2025-Q4,2027-Q1,2027-Q3,2027-Q3,2028-Q3,2020-Q2,2029-Q3,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003301,19/03/2024,New Zealand Defence Force,Defence College Office.,Defence College Office.,,Under construction,Fully funded,Selective,Construct only,Canterbury,,,Defence,1 - 5 million,2020-Q3,2022-Q4,2022-Q4,2023-Q2,2023-Q2,2024-Q2,2022-Q4,2025-Q2,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003302,19/03/2024,New Zealand Defence Force,Single Living Accommodation Relocation.,As a consequence of improvements in logistics at Burnham a number of accommodation facilities are required to be replaced or relocated. The existing facilities are close to end of life and would ordinarily require replacement. The single living accommodation (SLA) is to meet standards set through the NZDF accommodation programme.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Defence,50 - 100 million,2020-Q4,2026-Q3,2026-Q3,2027-Q3,2027-Q3,2029-Q1,2020-Q1,2030-Q1,,,,,
IP003303,19/03/2024,New Zealand Defence Force,Electrical Network and Resilience Phase 1.,Electrical Network and Resilience Phase 1.,,In procurement,Funding source confirmed,Selective,Construct only,Canterbury,,,Defence,5 - 25 million,2019-Q3,2023-Q3,2023-Q3,2024-Q2,2024-Q3,2026-Q4,2020-Q1,2027-Q4,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003305,20/03/2024,New Zealand Defence Force,Potable Water Bore and Network.,Potable Water Bore and Network.,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Defence,1 - 5 million,2019-Q3,2021-Q4,2021-Q4,2023-Q4,2023-Q1,2024-Q2,2020-Q1,2025-Q2,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP003318,20/03/2024,New Zealand Defence Force,Potable Water Supply Storage and Reticulation.,Potable Water Supply Storage and Reticulation.,,In procurement,Fully funded,Open,Construct only,Canterbury,,,Defence,< 1 million,2020-Q4,2022-Q3,2022-Q3,2024-Q1,2024-Q2,2024-Q3,2020-Q1,2025-Q3,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP006380,28/11/2023,New Zealand Defence Force,CSS (Ammo) Hangar & Offices & ESH.,CSS (Ammo) Hangar & Offices.,,In planning,Funding source to be confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Defence,1 - 5 million,2015-Q4,2024-Q2,2024-Q2,2025-Q1,2025-Q2,2026-Q1,2020-Q1,2026-Q3,,,,,
IP006382,28/11/2023,New Zealand Defence Force,Hangar Fire Suppression Deluge Tnk.,Hangar Fire Suppression Deluge Tnk.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Defence,1 - 5 million,2017-Q2,2023-Q4,2023-Q4,2024-Q2,2024-Q3,2025-Q3,2020-Q1,2026-Q3,,,,,
IP006383,20/03/2024,New Zealand Defence Force,Single Living Accommodation.,Being considered as part of the later tranches of the Ohakea Infrastructure Programme Accommodation - provides fit for purpose accommodation for personnel.,,In planning,Funding source to be confirmed,Open,Construct only,Manawatū - Whanganui,,,Defence,50 - 100 million,2019-Q4,2023-Q4,2024-Q1,2025-Q3,2025-Q4,2027-Q2,2024-Q1,2027-Q4,,,,,
IP006384,20/03/2024,New Zealand Defence Force,Airfield Remainder.,Being considered as part of the later tranches of the Ohakea Infrastructure Programme Airfield Remainder - Works required to ensure aircraft are able to transit around the airfield in an operationally efficient manner.,,In planning,Funding source to be confirmed,Open,Construct only,Manawatū - Whanganui,,,Defence,5 - 25 million,2019-Q4,2023-Q4,2024-Q3,2024-Q4,2025-Q1,2025-Q4,2024-Q3,2026-Q1,,,,,
IP006385,20/03/2024,New Zealand Defence Force,Car Parking Phase 2.,Being considered as part of the later tranches of the Ohakea Infrastructure Programme Car Parking Phase 2 - works to provide car park for occupants of the Accommodation onsite.,,In planning,Funding source to be confirmed,Open,Construct only,Manawatū - Whanganui,,,Defence,1 - 5 million,2019-Q4,2023-Q4,2024-Q1,2025-Q3,2026-Q4,2027-Q2,2024-Q1,2027-Q4,,,,,
IP006386,20/03/2024,New Zealand Defence Force,Logistics Warehouse/Camp Pack-Up.,Being considered as part of the later tranches of the Ohakea Infrastructure Programme Logistics Warehouse/Camp Pack-Up - Provides a fit for purpose warehouse that provides safe working conditions for employees.,,In planning,Funding source to be confirmed,Open,Construct only,Manawatū - Whanganui,,,Defence,25 - 50 million,2019-Q4,2023-Q4,2024-Q1,2025-Q3,2025-Q4,2027-Q2,2024-Q1,2027-Q4,,,,,
IP006387,20/03/2024,New Zealand Defence Force,Waste Water Phase 2.,Being considered as part of the later tranches of the Ohakea Infrastructure Programme Waste Water Phase 2 - Works required to ensure waste water infrastructure on base are fit for purpose.,,In planning,Funding source to be confirmed,Open,Construct only,Manawatū - Whanganui,,,Defence,5 - 25 million,2019-Q4,2023-Q4,2024-Q3,2025-Q1,2025-Q1,2026-Q3,2024-Q3,2027-Q2,,,,,
IP006389,28/11/2023,New Zealand Defence Force,Camp HQ and Training Facility.,Camp HQ and Training Facility.,,In planning,Funding source to be confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Defence,5 - 25 million,2020-Q4,2026-Q4,2026-Q4,2027-Q3,2024-Q3,2027-Q3,2020-Q4,2028-Q3,,,,,
IP006390,28/11/2023,New Zealand Defence Force,HV/LV Flight Line Network (FAMC).,HV/LV Flight Line Network (FAMC). The dates indicated are estimates and will likely change as planning continues.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Defence,5 - 25 million,,,,,,,2022-Q4,2025-Q1,,,,,
IP006649,19/03/2024,New Zealand Defence Force,Lecture Rooms.,Lecture Rooms.,,Under construction,Fully funded,Selective,Construct only,Canterbury,,,Defence,1 - 5 million,2021-Q3,2022-Q4,2022-Q4,2023-Q2,2023-Q2,2024-Q3,2021-Q3,2024-Q3,,,,,
IP006650,13/06/2023,New Zealand Defence Force,Managed Fill.,Managed Fill.,,Under construction,Funding source to be confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Defence,1 - 5 million,2021-Q2,2022-Q2,2022-Q2,2022-Q3,2022-Q3,2023-Q4,2022-Q2,2024-Q4,,,,,
IP006651,5/09/2023,New Zealand Defence Force,MSS Ground Support Equipment Storage.,MSS Ground Support Equipment Storage - Provides a covered storage for GSE and an area for its maintenance and to conduct on the job training of trades people on the equipment.,,In procurement,Funding source to be confirmed,Direct,Design and construct,Manawatū - Whanganui,,,Defence,< 1 million,2020-Q1,2022-Q4,2022-Q4,2022-Q4,2024-Q1,2024-Q1,2022-Q4,2024-Q1,,,,,
IP008656,28/11/2023,New Zealand Defence Force,Waste Water Treatment Pond Decommissioning.,Decommission old sewer pond.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Defence,5 - 25 million,2018-Q4,2024-Q1,2024-Q1,2024-Q2,2024-Q3,2025-Q1,2018-Q4,2026-Q1,,,,,
IP008661,28/11/2023,New Zealand Defence Force,Workshop Gantry Cranes.,Replace existing workshop cranes.,,In planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Defence,5 - 25 million,2020-Q4,2025-Q1,2025-Q1,2025-Q4,2026-Q2,2026-Q3,2020-Q4,2027-Q3,,,,,
IP008662,28/11/2023,New Zealand Defence Force,Armoury & Workshop Upgrade.,Armoury & Workshop Upgrade.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Defence,5 - 25 million,2022-Q3,2027-Q2,2027-Q2,2028-Q2,2028-Q3,2029-Q3,2022-Q3,2030-Q3,,,,,
IP008663,28/11/2023,New Zealand Defence Force,Barracks Upgrade.,This Papakura project provides 24 beds of single living-in accommodation and completes the second half of the barracks constructed in 2008. This project starts the phased regeneration of current living-in accommodation needed in the camp.,,In planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Defence,5 - 25 million,2010-Q3,2025-Q1,2025-Q1,2025-Q3,2025-Q4,2026-Q4,2010-Q3,2027-Q4,,,,,
IP008873,28/11/2023,New Zealand Defence Force,Hangar Fire Suppression Deluge Tank.,Hangar Fire Suppression Deluge Tank.,,In planning,Funding source to be confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Defence,5 - 25 million,2017-Q2,2023-Q4,2023-Q4,2023-Q2,2024-Q3,2025-Q3,2017-Q2,2026-Q3,,,,,
IP008927,20/03/2024,New Zealand Defence Force,Ohakea Infrastructure Programme - Potable Water Reticulation.,Being considered as part of the later tranches of the Ohakea Infrastructure Programme the development of further Potable Water Reticulation on base.,,In planning,Funding source to be confirmed,Open,Construct only,Manawatū - Whanganui,,,Defence,1 - 5 million,2020-Q4,2023-Q4,2024-Q3,2025-Q1,2025-Q2,2025-Q3,2024-Q3,2025-Q3,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP009583,28/11/2023,New Zealand Defence Force,Electrical Network Upgrade.,This project’s main scope is to install a section of cable to complete the ring network to make the electrical at Linton Camp more resilient.,,In planning,Funding source to be confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Defence,50 - 100 million,2022-Q4,2024-Q4,2024-Q4,2025-Q3,2025-Q4,2026-Q4,2022-Q4,2027-Q4,,,,,
IP009584,28/11/2023,New Zealand Defence Force,Wahi Tiri.,Refurbishment or replacement of an administrative facility that is non-compliant with modern standards.,,In planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Defence,5 - 25 million,2023-Q2,2024-Q3,2024-Q3,2025-Q3,2025-Q4,2027-Q3,2023-Q2,2028-Q1,,,,,
IP009585,28/11/2023,New Zealand Defence Force,Paint Booth Replacement.,Replacement of the end of life vehicle paint booth at Trentham Camp.,,In planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Defence,1 - 5 million,2022-Q4,2024-Q3,2024-Q3,2025-Q2,2025-Q3,2026-Q3,2022-Q4,2027-Q3,,,,,
IP009586,28/11/2023,New Zealand Defence Force,Technical Training School Laser Testing Wing.,Refurbishment or replacement of a facility for the training of technicians in the maintenance and repair of electronic instruments.,,In planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Defence,< 1 million,2022-Q4,2024-Q3,2024-Q3,2025-Q2,2025-Q3,2026-Q3,2022-Q4,2027-Q3,,,,,
IP009876,20/03/2024,New Zealand Defence Force,Camp Gate Entrances Guardhouse and Security.,The entry control point requires an upgrade to deliver an enhanced modern and fully effective security presence control accessibility and observation environment.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Defence,5 - 25 million,2028-Q1,2030-Q2,2030-Q3,2031-Q2,2031-Q2,2033-Q2,2028-Q1,2034-Q2,,,,,
IP009877,20/03/2024,New Zealand Defence Force,Camp Entrance and Intersection.,The entry control point trafficability lighting signage/way-finding and observation requires an upgrade.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Defence,5 - 25 million,2024-Q1,2025-Q1,2026-Q1,2026-Q2,2026-Q4,2027-Q2,2024-Q1,2028-Q2,,,,,
IP009878,20/03/2024,New Zealand Defence Force,Camp Security Enhancements.,Trentham Military Camp requires multiple security enhancements to the: physical boundary electronic monitoring entry gates and trafficable management changes to enhance the controllable elements for site accessibility.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Defence,5 - 25 million,2024-Q1,2030-Q2,2030-Q3,2031-Q2,2031-Q2,2033-Q2,2024-Q1,2034-Q2,,,,,
IP009879,20/03/2024,New Zealand Defence Force,Electrical Network and Resilence.,The electrical network at West Melton is aging and believed to be contributing to power outages at the site. Consideration will need to be given to an electrical network that can support any future range automation. The project will provide a more reliable and resilient electrical network for the facility.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Defence,5 - 25 million,2028-Q1,2030-Q2,2030-Q3,2031-Q2,2031-Q2,2033-Q2,2028-Q1,2034-Q2,,,,,
IP009880,20/03/2024,New Zealand Defence Force,(NEQ) Flight Line Support.,This project is a direct consequence of recent infrastructural changes to OHA.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Defence,1 - 5 million,2028-Q1,2030-Q2,2030-Q3,2031-Q2,2031-Q2,2033-Q2,2028-Q1,2034-Q2,,,,,
IP009881,30/11/2023,New Zealand Defence Force,Coal Boiler conversion to wood pellets.,NZDF is required to remove all coal boilers by June 2025. This project will introduce two wood-fired boilers as replacements for existing coal fired boilers with the assistance of State Sector Decarbonisation Fund.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Marlborough,,,Defence,5 - 25 million,2023-Q2,2024-Q1,2024-Q1,2024-Q4,2025-Q1,2026-Q1,2023-Q2,2027-Q1,,,,,
IP009882,30/11/2023,New Zealand Defence Force,Coal Boiler conversion to wood pellets [Compliance].,NZDF is required to remove all coal boilers by June 2025. This project will introduce a wood-fired boiler as a replacement with the assistance of State Sector Decarbonisation Fund.,,Early planning,Funding source to be confirmed,To be determined,To be determined,North Island,,,Defence,5 - 25 million,2023-Q2,2024-Q4,2024-Q4,2025-Q3,2025-Q4,2026-Q4,2023-Q2,2027-Q4,,,,,
IP009883,20/03/2024,New Zealand Defence Force,Main Gate.,The entry control point requires an upgrade as it is isolated un-manned and easily by-passed. Relocation of the main gate to behind the Watercare facility will enable a a stop-and-search facility to reduce the number of non-NZDF people entering the training area. The upgrade will deliver an enhanced modern and more effective security presence control accessibility and observation environment.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Defence,1 - 5 million,2028-Q1,2030-Q2,2030-Q3,2031-Q2,2031-Q2,2033-Q2,2028-Q1,2034-Q2,,,,,
IP009884,20/03/2024,New Zealand Defence Force,Waste Water Network.,A complete upgrade of wastewater network to address poor condition and incorporate metering consistent with the approach identified in the national asset metering project. The project will deliver a modern system prepared to handle future needs.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Defence,5 - 25 million,2028-Q1,2030-Q2,2030-Q3,2031-Q2,2031-Q2,2033-Q2,2028-Q1,2034-Q2,,,,,
IP009885,20/03/2024,New Zealand Defence Force,HQ Facility.,Enhance and enlarge the space provided for personnel engaged in planning and management.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Defence,5 - 25 million,2028-Q1,2030-Q2,2030-Q3,2031-Q2,2031-Q2,2033-Q2,2028-Q1,2034-Q2,,,,,
IP009886,20/03/2024,New Zealand Defence Force,Targeted Three Waters Network.,The 3W network is ageing and in poor condition. A targeted upgrade of the wastewater network to address poor condition of network. The project will deliver a functional system able and prepared to handle future development needs.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Defence,5 - 25 million,2028-Q1,2030-Q2,2030-Q3,2031-Q2,2031-Q2,2033-Q2,2028-Q1,2034-Q2,,,,,
IP009887,20/03/2024,New Zealand Defence Force,Standalone waste water infra S/E runway.,This project provides for infrastructure to meet the operational requirements of the enhancements elsewhere on OHA. Future developments to the south-east of the runway would likely require standalone infrastructure. Separate waste water infrastructure allows for more adaptable use of possible expansion areas.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Defence,5 - 25 million,2028-Q1,2030-Q2,2030-Q3,2031-Q2,2031-Q2,2033-Q2,2028-Q1,2034-Q2,,,,,
IP009888,30/11/2023,New Zealand Defence Force,Medical Centre & Hospital Relocation.,Relocated medical centre and hospital closer to the hub of camp incorporating physio and other medical facilities as appropriate. This is expected to result in improved effectiveness of training and wellbeing facilities and contribute to the consolidation of facilities. This medical centre will meet the contemporary requirements of NZDF and will seek to reduce the duplication of shared spaces (such as waiting rooms) through co-location with similar functions.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Defence,< 1 million,2024-Q1,2026-Q1,2026-Q1,2026-Q3,2026-Q4,2027-Q4,2024-Q1,2028-Q4,,,,,
IP009889,20/03/2024,New Zealand Defence Force,DPT Temporary Multi-Purpose Office Accom.,Due to the increasing development density expected on Devonport’s SY there is a need to consolidate functions to allow wider development to occur. This facility will temporarily allow decanted personnel to operate successfully while estate development is underway.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Defence,1 - 5 million,2028-Q1,2030-Q2,2030-Q3,2031-Q2,2031-Q2,2033-Q2,2028-Q1,2034-Q2,,,,,
IP009890,20/03/2024,New Zealand Defence Force,Fire Flight Facility.,This project supports the renewal of Fire and Rescue Capability infrastructure.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Defence,5 - 25 million,2024-Q1,2030-Q2,2030-Q3,2031-Q2,2031-Q2,2033-Q2,2024-Q1,2034-Q2,,,,,
IP009891,20/03/2024,New Zealand Defence Force,Kauri Point Wharf.,The existing wharf is old damaged degraded and becoming increasingly un-fit for purpose with an attendant risk of incidents while providing operational support when load and un-loading operations are underway. The wharf has recently been the subject of significant but ongoing maintenance however it is now prudent to consider and design its replacement.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Defence,25 - 50 million,2028-Q1,2030-Q2,2030-Q3,2031-Q2,2031-Q2,2033-Q2,2028-Q1,2034-Q2,,,,,
IP009892,20/03/2024,New Zealand Defence Force,NZ ARMY Band Practice and Storage.,As a consequence of detailed planning for Logistics at Burnham the NZ Army Band Practice and Storage facility requires relocation. A multi-use facility will allow a higher degree of utilisation and provide secure storage for instruments and ceremonial equipment.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Defence,5 - 25 million,2028-Q1,2030-Q2,2030-Q3,2031-Q2,2031-Q2,2033-Q2,2028-Q1,2034-Q2,,,,,
IP009893,20/03/2024,New Zealand Defence Force,Camp Buffer and Security Screening.,This project is intending to deliver a visual and physical stand-off and better demark between many places of the publically accessible boundary and the camp interior.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Defence,1 - 5 million,2028-Q1,2030-Q2,2030-Q3,2031-Q2,2031-Q2,2033-Q2,2028-Q1,2034-Q2,,,,,
IP009894,20/03/2024,New Zealand Defence Force,Conference Facility (ex. Offrs Mess).,The intention is for the building to receive a refurbishment in order to establish a modern and fit for purpose conference facility for the Camp.,,Early planning,Funding source to be confirmed,To be determined,To be determined,North Island,,,Defence,1 - 5 million,2028-Q1,2030-Q2,2030-Q3,2031-Q2,2031-Q2,2033-Q2,2028-Q1,2034-Q2,,,,,
IP009895,20/03/2024,New Zealand Defence Force,Electrical Network.,The condition security and capacity of the electrical network is considered to be a key horizontal infrastructure risk. Completion of extreme priority works including the provision to re-assess currency of subsequent renewals programmes is required.,,Early planning,Funding source to be confirmed,To be determined,To be determined,North Island,,,Defence,5 - 25 million,2028-Q1,2030-Q2,2030-Q3,2031-Q2,2031-Q2,2033-Q2,2028-Q1,2034-Q2,,,,,
IP009896,19/03/2024,New Zealand Defence Force,Waiouru New Housing.,NZDF to procure and construct 50 new houses and then subsequently sell and leave back the completed development to Ngati Rangi.,,In procurement,Funding source confirmed,Open,Design and construct,Manawatū - Whanganui,,,Defence,50 - 100 million,2023-Q4,2024-Q3,2024-Q2,2024-Q2,2024-Q4,2026-Q1,2023-Q3,2027-Q1,,,,,
IP009897,19/03/2024,New Zealand Defence Force,Housing refurbishments (Manawatu and Burnham).,Refurbishes 13 houses as a pilot project.,,In procurement,Funding source confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Defence,5 - 25 million,2023-Q4,2024-Q2,2024-Q1,2024-Q1,2024-Q3,2025-Q2,2023-Q3,2025-Q1,,,,,
IP009898,6/09/2023,New Zealand Defence Force,AMDM (Accommodation) Linton Pilot.,Provides for new replacement fit-for-purpose Accommodation at Linton.,,In planning,Funding source to be confirmed,To be determined,Public private partnership,Manawatū - Whanganui,,,Defence,500 million - 1 billion,2019-Q1,2023-Q4,2024-Q3,2026-Q1,2026-Q1,2034-Q1,2019-Q1,2034-Q1,,,,,
IP010357,29/11/2023,New Zealand Defence Force,Officer Training School.,Officer Training School.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Defence,25 - 50 million,2022-Q3,2027-Q3,2027-Q3,2028-Q3,2028-Q4,2030-Q3,2022-Q3,2031-Q3,,,,,
IP010726,18/03/2024,New Zealand Defence Force,Arch Hangar Mid-life Light Refit.,The Arch-Hangars used by Airforce in Whenuapai were built during the early 1940's. They require a refit of the associated hangar components - fire-suppression; fume extraction; lighting; environmental conditions; heating and cooling; electrical wiring an.,,In planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Defence,5 - 25 million,2020-Q4,2024-Q2,2024-Q2,2024-Q2,2025-Q3,2027-Q1,2020-Q4,2028-Q1,
http://campsandbases.nzdf.mil.nz/resources/defence-estate-regeneration-plan-refresh/,,,,
IP002801,15/11/2023,New Zealand Post Limited,New Zealand Post's future parcel processing network - investment in Auckland property infrastructure.,New Zealand Post is investing in a new world-class parcel processing centre in Wiri Auckland which opens in 2023.,,Under construction,Fully funded,Selective,Other,Auckland,,,Commercial,25 - 50 million,2019-Q4,2020-Q4,,,2021-Q1,2022-Q4,2019-Q4,2024-Q2,,,[email address],-37.004775,174.856037
IP002802,15/11/2023,New Zealand Post Limited,New Zealand Post's future parcel processing network - investment in Auckland region.,New Zealand Post is investing in new world-class automated parcel processing infrastructure and technology for its Auckland and international operations Material Handling Solution.,,Under construction,Funding source confirmed,Open,Design and construct,Auckland,,,Commercial,100 - 250 million,2019-Q4,2020-Q4,2018-Q4,2020-Q4,2021-Q1,2023-Q4,2019-Q4,2024-Q2,,,[email address],-37.004775,174.856037
IP002805,15/11/2023,New Zealand Post Limited,New Zealand Post's future parcel processing network - investment in technology solutions.,New Zealand Post is investing in new world-class parcel sortation technology solutions in Auckland Central Super Depot to continue to be the best delivery business in New Zealand.,,Under construction,Funding source confirmed,Selective,Design and construct,Auckland,,,Commercial,25 - 50 million,2019-Q4,2020-Q4,2019-Q4,2020-Q4,2020-Q4,2024-Q1,2019-Q4,2024-Q2,,,[email address],,
IP006533,15/11/2023,New Zealand Post Limited,New Zealand Post's future parcel processing network - investment in Auckland property infrastructure.,New Zealand Post is investing in a new parcel processing site in Rosedale Auckland for its new Auckland North Shore Super Depot to open in mid 2024.,,Under construction,Funding source confirmed,Selective,Design and construct,Auckland,,,Commercial,25 - 50 million,2020-Q4,2021-Q3,,,2021-Q4,2024-Q3,2020-Q4,2024-Q4,,,[email address],-36.74726975,174.7060254
IP010442,6/03/2024,Northland Regional Council,Deflection Bank Kawakawa.,Stopbank to protect shops in Kawakawa.,,In planning,Funding source confirmed,Selective,Construct only,Northland,,,Emergency management,< 1 million,,,,,,,2024-Q4,2025-Q2,,,,,
IP010443,6/03/2024,Northland Regional Council,Upper Catchment naturebased detention Kawakawa.,Naturebased detention.,,In planning,Funding source confirmed,To be determined,Design and construct,Northland,,,Emergency management,< 1 million,,,,,,,2024-Q4,2026-Q4,,,,,
IP010444,6/03/2024,Northland Regional Council,Floodway Matangirau.,Floodway construction channel benching.,,In planning,Funding source confirmed,Selective,Construct only,Northland,,,Emergency management,< 1 million,,,,,,,2024-Q4,2025-Q2,,,,,
IP010445,6/03/2024,Northland Regional Council,Flood Scheme Stage 2 Kaeo.,Creek widening river realignment deflection bank extention.,,In planning,Funding source confirmed,Selective,Construct only,Northland,,,Emergency management,1 - 5 million,,,,,,,2024-Q4,2025-Q2,,,,,
IP010932,26/03/2024,Ōpōtiki District Council,Hukutaia - Valves and Hydrants Renewals.,Renewal of water valves andf hydrants in Hukutaia.,,In planning,Funding source to be confirmed,Limited,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2025-Q3,2030-Q3,,,,,
IP010933,26/03/2024,Ōpōtiki District Council,Hukutaia - Booster Station Electrical Control Renewal.,Renewal booster station electrical control unit to maintain LOS.,,In planning,Funding source to be confirmed,Limited,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2032-Q3,,,,,
IP010934,26/03/2024,Ōpōtiki District Council,Hukutaia - Reticulation Renewals.,Renew end of life reticulation assets to maintain LOS.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,1 - 5 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP010935,26/03/2024,Ōpōtiki District Council,Hukutaia - Water Supply LOS and Resliiance - 1 - Planning Phase.,Maintain LOS to the Hukutaia residents and building resilience into the reticulation network to allow for future growth.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q3,,,,,
IP010936,26/03/2024,Ōpōtiki District Council,Hukutaia - Water Supply LOS and Resliiance - 2 - Design Phase.,Maintain LOS to the Hukutaia residents and building resilience into the reticulation network to allow for future growth.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2026-Q3,2027-Q3,,,,,
IP010937,26/03/2024,Ōpōtiki District Council,Hukutaia - Water Supply LOS and Resliiance - 3 - Implementation Phase.,Maintain LOS to the Hukutaia residents and building resilience into the reticulation network to allow for future growth.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,1 - 5 million,,,,,,,2030-Q3,2033-Q3,,,,,
IP010938,26/03/2024,Ōpōtiki District Council,Hukutaia - Stormwater infrastructure development for Hukutaia Growth Area - Phase 01.,Install and provide a stormwater network to Hukutaia that can provide service to current residents and allow for anticipated growth.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,1 - 5 million,,,,,,,2028-Q3,2032-Q3,,,,,
IP010939,26/03/2024,Ōpōtiki District Council,Hukutaia - Stormwater infrastructure development for Hukutaia Growth Area - Phase 02.,Install and provide a stormwater network to Hukutaia that can provide service to current residents and allow for anticipated growth.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,5 - 25 million,,,,,,,2044-Q3,2049-Q3,,,,,
IP010940,26/03/2024,Ōpōtiki District Council,Hukutaia - Wastewater infrastructure development for Hukutaia Growth Area - Phase 01.,Install and provide a new wastewater network to Hukutaia that connects to the existing wastewater network for Ōpōtiki town.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,1 - 5 million,,,,,,,2027-Q3,2030-Q3,,,,,
IP010941,26/03/2024,Ōpōtiki District Council,Hukutaia - Wastewater infrastructure development for Hukutaia Growth Area - Phase 02.,Install and provide a new wastewater network to Hukutaia that connects to the existing wastewater network for Ōpōtiki town.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,1 - 5 million,,,,,,,2033-Q3,2037-Q3,,,,,
IP010942,26/03/2024,Ōpōtiki District Council,Hukutaia - Water Main Renewal - Grant Road - AC Watermain.,Replace the AC watermains with new uPVC/HDPE pipes to maintain LOS and prevent piping failures in the Hukutaia network.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2032-Q3,2033-Q3,,,,,
IP010943,26/03/2024,Ōpōtiki District Council,Hukutaia - Water Main Renewal - Hukutia Rd - AC Watermain.,Replace the AC watermains with new uPVC/HDPE pipes to maintain LOS and prevent piping failures in the Hukutaia network.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2032-Q3,2033-Q3,,,,,
IP010944,26/03/2024,Ōpōtiki District Council,Hukutaia - Water Main Renewal - Woodlands Road - AC Watermain.,Replace the AC watermains with new uPVC/HDPE pipes to maintain LOS and prevent piping failures in the Hukutaia network.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2032-Q3,2033-Q3,,,,,
IP010945,26/03/2024,Ōpōtiki District Council,Hukutaia - WWPS 04 Rising Main Seperation / WWPS05 Upgrade.,Upgrade WWPS04 rising main and WWPS05 to maintain LOS and account for increased growth in the Hukutaia area.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2027-Q3,2029-Q3,,,,,
IP010946,26/03/2024,Ōpōtiki District Council,Ōhiwa - Water Reticulation Renewals.,Renew end of life assets to maintain LOS within the Ōhiwa water supply reticulation.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2026-Q3,2028-Q3,,,,,
IP010947,26/03/2024,Ōpōtiki District Council,Ohiwa - Water Telemetry Upgrade.,Upgrade the Ōhiwa water supply telemerty to assist with maintaining LOS and meeting compliance.,,In planning,Funding source to be confirmed,Limited,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q3,,,,,
IP010948,26/03/2024,Ōpōtiki District Council,Ōhiwa - Water Treatment Renewals.,Renew end of life assets at the Ōhiwa WTP to maintain assets.,,In planning,Funding source to be confirmed,Limited,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP010949,26/03/2024,Ōpōtiki District Council,Opotiki Town - Factory Rd Wastewater Extension - 1 - Design Phase.,Install an extension to the wastewater netwrok to allow for industrial growth.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2031-Q3,2032-Q3,,,,,
IP010950,26/03/2024,Ōpōtiki District Council,Opotiki Town - Factory Rd Wastewater Extension - 2 - Implementation Phase.,Install an extension to the wastewater netwrok to allow for industrial growth.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2032-Q3,2034-Q3,,,,,
IP010951,26/03/2024,Ōpōtiki District Council,Opotiki Town - Flood Water Storage Area - Tarawa Creek.,Provide more storage for stormwater to account for climate change and rising sea levels to maintain LOS for the community in Opotiki.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,1 - 5 million,,,,,,,2034-Q3,2036-Q3,,,,,
IP010952,26/03/2024,Ōpōtiki District Council,Opotiki Town - Otara Booster Station Renewals and Pumps.,Renew end of life assets at the Otara booster station to maintain LOS.,,Early planning,Funding source to be confirmed,Limited,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2026-Q3,2034-Q3,,,,,
IP010953,26/03/2024,Ōpōtiki District Council,Opotiki Town - Reticulation Rehabilitation - 1 - Investigations and Planning.,Rehabilitate active reticulation assets to focus on continuing to reduce infiltration and inflow of stormwater into the wastewater network.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q3,,,,,
IP010954,26/03/2024,Ōpōtiki District Council,Opotiki Town - Reticulation Rehabilitation - 2 - Design and Approvals.,Rehabilitate active reticulation assets to focus on continuing to reduce infiltration and inflow of stormwater into the wastewater network.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q3,,,,,
IP010955,26/03/2024,Ōpōtiki District Council,Opotiki Town - Reticulation Rehabilitation - 3 - Construction.,Rehabilitate active reticulation assets to focus on continuing to reduce infiltration and inflow of stormwater into the wastewater network.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,5 - 25 million,,,,,,,2026-Q3,2031-Q3,,,,,
IP010956,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Rural to Urban Flood Protection - SH 2 Culvert Upgrade - 1 - Investigation & Design.,Upgrade SH2 stormwater culvert in east rural Ōpōtiki to minimise the effect of rural flooding on the eastern urban area of Ōpōtiki.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q3,,,,,
IP010957,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Rural to Urban Flood Protection - SH 2 Culvert Upgrade - 2 - Consent and Approvals.,Upgrade SH2 stormwater culvert in east rural Ōpōtiki to minimise the effect of rural flooding on the eastern urban area of Ōpōtiki.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2026-Q3,2028-Q3,,,,,
IP010958,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Rural to Urban Flood Protection - SH 2 Culvert Upgrade - 3 - Construction.,Upgrade SH2 stormwater culvert in east rural Ōpōtiki to minimise the effect of rural flooding on the eastern urban area of Ōpōtiki.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,1 - 5 million,,,,,,,2030-Q3,2031-Q3,,,,,
IP010959,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town-Rural to Urban Flood Protection-Duke St West Stopbank - 1 - Investigations and Design.,Upgrade Duke Street West Stopbank in east Ōpōtiki to minimise the effect of rural flooding on the eastern urban area of Ōpōtiki.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q3,,,,,
IP010960,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Rural to Urban Flood Protection - Duke St West Stopbank - 2 - Consent.,Upgrade Duke Street West Stopbank in east Ōpōtiki to minimise the effect of rural flooding on the eastern urban area of Ōpōtiki.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2026-Q3,2027-Q3,,,,,
IP010961,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Rural to Urban Flood Protection - Duke St West Stopbank - 3 - Construction.,Upgrade Duke Street West Stopbank in east Ōpōtiki to minimise the effect of rural flooding on the eastern urban area of Ōpōtiki.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2028-Q3,2029-Q3,,,,,
IP010962,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Stormwater Drainage Renewals.,Renew stormwater drainage systems to maintain LOS.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2040-Q3,,,,,
IP010963,26/03/2024,Ōpōtiki District Council,Opotiki Town - Stormwater Main Upgrade - St John Street.,Upgrade St John Street stormwater main to maintain LOS and allow for increased capacity.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2036-Q3,2038-Q3,,,,,
IP010964,26/03/2024,Ōpōtiki District Council,Opotiki Town - Stormwater Portable Pumps and Permanent Sumps - 1 - Planning and Design.,Install a portable/permanent sump stormwater system to allow for increased capacity in the network to maintain LOS during flooding events.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q3,,,,,
IP010965,26/03/2024,Ōpōtiki District Council,Opotiki Town - Stormwater Portable Pumps and Permanent Sumps - 2 - Sump Construction.,Install a portable/permanent sump stormwater system to allow for increased capacity in the network to maintain LOS during flooding events.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2025-Q3,2027-Q3,,,,,
IP010966,26/03/2024,Ōpōtiki District Council,Opotiki Town - Stormwater Portable Pumps and Permanent Sumps - 3 - Existing Pump Upgrade.,Install a portable/permanent sump stormwater system to allow for increased capacity in the network to maintain LOS during flooding events.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q3,,,,,
IP010967,26/03/2024,Ōpōtiki District Council,Opotiki Town - Stormwater Portable Pumps and Permanent Sumps - 4 - New Pump/s Purchase.,Install a portable/permanent sump stormwater system to allow for increased capacity in the network to maintain LOS during flooding events.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2026-Q3,2027-Q3,,,,,
IP010968,26/03/2024,Ōpōtiki District Council,Opotiki Town - Stormwater Pump Station - Tarawa Creek Upgrade.,Provide more capacity for stormwater to account for climate change and rising sea levels to maintain LOS for the community in Opotiki.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,1 - 5 million,,,,,,,2031-Q3,2033-Q3,,,,,
IP010969,26/03/2024,Ōpōtiki District Council,Opotiki Town - Stormwater Pump Station 08 - Church St South - Upgrade.,Provide more capacity for stormwater to account for climate change and rising sea levels to maintain LOS for the community in Opotiki.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2030-Q3,2031-Q3,,,,,
IP010970,26/03/2024,Ōpōtiki District Council,Opotiki Town - Stormwater Pump Stations - Renewals.,Renew end of life pump station assets to maintain LOS.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2049-Q3,,,,,
IP010971,26/03/2024,Ōpōtiki District Council,Opotiki Town - Stormwater Reticulation extensions/upgrades.,Upgrade and extend the stormwater reticulation network to keep up with projected climate change and sea level rise scenarios and maintain or improve LOS within Ōpōtiki to mitigate flooding.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,5 - 25 million,,,,,,,2030-Q3,2054-Q3,,,,,
IP010972,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Stormwater Reticulation Renewals.,Renew end of life assets within the stormwater reticulation to maintain LOS.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,5 - 25 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP010973,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Valves Hydrants and Meters Renewals.,Renew end of life valves hydrants and meters within the Ōpōtiki town reticulation network to maintain LOS to the community.,,In planning,Funding source to be confirmed,Limited,To be determined,Bay of Plenty,,,Water,1 - 5 million,,,,,,,2025-Q3,2041-Q3,,,,,
IP010974,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Wastewater Extension Stage 2 - Otara Rd.,Extend the wastewater reticulation on Otara Road to allow for increased industrial growth.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2031-Q3,2032-Q3,,,,,
IP010975,26/03/2024,Ōpōtiki District Council,Opotiki Town - Wastewater Pump Station 01 Potts Avenue - Upgrade.,Upgrade WWPS01 to allow for additional capacity due to WWPS01 being a critical pumpstation within the wastewater network. All wastewater from Ōpōtiki flows through this pump station and therefore WWPS01 reaches capcity quickly.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,1 - 5 million,,,,,,,2024-Q3,2027-Q3,,,,,
IP010976,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Wastewater Reticulation Renewals.,Renew end of life assets within the wastewater reticulation network to maintain LOS.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,1 - 5 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP010977,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Wastewater reticulation renewals - Waiotahe Drifts - replace PN6 rising main.,Replace PN6 rising main with PN12 to allow for increased capacvity within the wastewater network in the Waiotahe Drifts.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2026-Q3,2028-Q3,,,,,
IP010978,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Wastewater Treatment Renewals.,Renew end of life assets to maintain the Water Treatment Plants assets.,,In planning,Funding source to be confirmed,Limited,To be determined,Bay of Plenty,,,Water,1 - 5 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP010979,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Water Reservoir Lining Renewal.,Renew the lining of the water reservoir at the Ōpōtiki WTP to maintain integrity of the liner.,,In planning,Funding source to be confirmed,Limited,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2028-Q3,2029-Q3,,,,,
IP010980,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Water Reticulation Renewals.,Renew end of life pipe assets within the Ōpōtiki reticulation network to maintain LOS to the community.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,1 - 5 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP010981,26/03/2024,Ōpōtiki District Council,Opotiki Town-Water Reticulation Renewals - 5.8km DN300 uPVC WTP to Ford Street 1 Planning & Design.,Replacement of 5.8 km of DN300 u PVC watermain running from the WTP to Ford Street with new DN300 uPVC-HDPE to reduce the further risk of pipe failures along the watermain.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q3,,,,,
IP010982,26/03/2024,Ōpōtiki District Council,Opotiki Town - Water Reticulation Renewals - 5.8km DN300 uPVC WTP to Ford Street - 2 - Construction.,Replacement of 5.8 km of DN300 u PVC watermain running from the WTP to Ford Street with new DN300 uPVC-HDPE to reduce the further risk of pipe failures along the watermain.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,5 - 25 million,,,,,,,2027-Q3,2052-Q3,,,,,
IP010983,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Water Reticulation Renewals - Opotiki WTP Treated Water Main.,Renew end of life assets on the Ōpōtiki WTP treated watermain to maintain LOS.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2030-Q3,2031-Q3,,,,,
IP010984,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Water Reticulation Upgrades for Harbour.,Upgrade water supply reticulation to account for the increased demand as a result of the harbour project to maintain LOS to community.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2027-Q3,2028-Q3,,,,,
IP010985,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Water Ring Main - Duke St - 1 - Planning and Design Phase.,Install a water supply ring main on Duke Street to allow for increased growth.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2038-Q3,2039-Q3,,,,,
IP010986,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Water Ring Main - Duke St - 2 - Easement Arrangement.,Install a water supply ring main on Duke Street to allow for increased growth.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2039-Q3,2040-Q3,,,,,
IP010987,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Water Ring Main - Duke St - 3 - Construction Phase.,Install a water supply ring main on Duke Street to allow for increased growth.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2040-Q3,2041-Q3,,,,,
IP010988,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Water Treatment Renewals.,Renew end of life assets at the Ōpōtiki WTP to maintain WTPO assets and LOS to Ōpōtiki.,,In planning,Funding source to be confirmed,Limited,To be determined,Bay of Plenty,,,Water,1 - 5 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP010989,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Water Treatment UV Renewals.,Renew end of life UV assets at the Ōpōtiki WTP LOS and compliance.,,In planning,Funding source to be confirmed,Limited,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2025-Q3,2038-Q3,,,,,
IP010990,26/03/2024,Ōpōtiki District Council,Opotiki Town - WWPS01 Rising main to WWTP - Diversion and Upgrade.,Upgrade and divert WWPS01 rising main the WWTP in Ōpōtiki to allow for increased flows from WWPS01 upgrades.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,1 - 5 million,,,,,,,2024-Q3,2028-Q3,,,,,
IP010991,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - WWTP - Stage 1 - New Resource Consent.,Upgrade Ōpōtiki WWTP to meet increased demand and compliance in relation to new resource consent.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2026-Q3,,,,,
IP010992,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - WWTP - Stage 2a - Early Works Design.,Upgrade Ōpōtiki WWTP to meet increased demand and compliance in relation to new resource consent.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q3,,,,,
IP010993,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - WWTP - Stage 2b - Preliminary Design.,Upgrade Ōpōtiki WWTP to meet increased demand and compliance in relation to new resource consent.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q3,,,,,
IP010994,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - WWTP - Stage 3 - Detailed Design.,Upgrade Ōpōtiki WWTP to meet increased demand and compliance in relation to new resource consent.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q3,,,,,
IP010995,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - WWTP - Stage 4a - Construction - Early Works.,Upgrade Ōpōtiki WWTP to meet increased demand and compliance in relation to new resource consent.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,1 - 5 million,,,,,,,2025-Q3,2027-Q3,,,,,
IP010996,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - WWTP - Stage 4b - Construction.,Upgrade Ōpōtiki WWTP to meet increased demand and compliance in relation to new resource consent.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,5 - 25 million,,,,,,,2027-Q3,2033-Q3,,,,,
IP010997,26/03/2024,Ōpōtiki District Council,Opotiki Town Wastewater - Caravan Wastewater Dumpstation.,Install caravan wastewater dumpstation to increase LOS.,,Early planning,Funding source to be confirmed,Limited,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2027-Q3,2029-Q3,,,,,
IP010998,26/03/2024,Ōpōtiki District Council,Te Kaha - Valves Hydrants Meters Pumps Renewals.,Renew end of life valves hydrants and meters within the Te Kaha reticulation network to maintain LOS to the community.,,In planning,Funding source to be confirmed,Limited,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2025-Q3,2039-Q3,,,,,
IP010999,26/03/2024,Ōpōtiki District Council,Te Kaha - Water Reticulation Renewals.,Renew end of life assets within the Te Kaha water supply reticulation network to maintain LOS.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011000,26/03/2024,Ōpōtiki District Council,Te Kaha - Water Treatment Plant Relocation - 1 - New Water Source.,Relocation of Te Kaha WTP to address the raw water quality issues at the current WTP by changing the source water.,,In planning,Funding source to be confirmed,Selective,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q3,,,,,
IP011001,26/03/2024,Ōpōtiki District Council,Te Kaha - Water Treatment Plant Relocation - 2 - Design.,Relocation of Te Kaha WTP to address the raw water quality issues at the current WTP by changing the source water.,,In planning,Funding source to be confirmed,Selective,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q3,,,,,
IP011002,26/03/2024,Ōpōtiki District Council,Te Kaha - Water Treatment Plant Relocation - 3 - Construction.,Relocation of Te Kaha WTP to address the raw water quality issues at the current WTP by changing the source water.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,1 - 5 million,,,,,,,2025-Q3,2026-Q3,,,,,
IP011003,26/03/2024,Ōpōtiki District Council,Te Kaha - Water Treatment Renewals.,Renew end of life assets at the Te Kaha WTP to maintain LOS.,,In planning,Funding source to be confirmed,Limited,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011004,26/03/2024,Ōpōtiki District Council,Te Kaha Water - Booster to OBrien's 1.4km.,Install a booster station to Obrien's to increase LOS.,,Early planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2030-Q3,2031-Q3,,,,,
IP011005,26/03/2024,Ōpōtiki District Council,Te Kaha Water - Reticulation upgrades - Copenhagan Loop.,Upgrade Te Kaha Copenhagan Loop reticulation to maintain LOS.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2030-Q3,2031-Q3,,,,,
IP011006,26/03/2024,Ōpōtiki District Council,Waihau Bay - Wastewater Disposal Field Renewals.,Renew end of life assets for the Waihau Bay wastewater disposal fields to maintain LOS and continue to be compliant.,,In planning,Funding source to be confirmed,Limited,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2029-Q3,2030-Q3,,,,,
IP011007,26/03/2024,Ōpōtiki District Council,Waihau Bay - Wastewater Reticulation Renewals.,Renew end of life assets within the Waihau Bay reticulation to maintain LOS.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011008,26/03/2024,Ōpōtiki District Council,Waihau Bay - Wastewater Treatment Renewals.,Renew end of life assets at the Waihau Bay WTP to maintain LOS.,,In planning,Funding source to be confirmed,Open,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011009,26/03/2024,Ōpōtiki District Council,Wastewater - Condition assessments - CCTV and associatted manhole inspections.,Wastewater - Condition assessments - CCTV and associatted manhole inspections.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2039-Q3,,,,,
IP011010,26/03/2024,Ōpōtiki District Council,Condition Assessments - Structures and MEICA.,Condition Assessments - Structures and MEICA.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2030-Q3,,,,,
IP011011,26/03/2024,Ōpōtiki District Council,Consequential Opex - Construct new stormwater basin - Tarawa Creek.,Consequential Opex - Construct new stormwater basin - Tarawa Creek.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2026-Q3,2053-Q3,,,,,
IP011012,26/03/2024,Ōpōtiki District Council,Consequential Opex - Second pump for stormwater pump station 02 - Tarawa Creek Flood Pump.,Consequential Opex - Second pump for stormwater pump station 02 - Tarawa Creek Flood Pump.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2053-Q3,,,,,
IP011013,26/03/2024,Ōpōtiki District Council,Consequential Opex - Stormwater basin - Wellington/Union Street.,Consequential Opex - Stormwater basin - Wellington/Union Street.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2053-Q3,,,,,
IP011014,26/03/2024,Ōpōtiki District Council,Consequential Opex - Stormwater network development for Hukutaia Growth Area - Phase 01.,Consequential Opex - Stormwater network development for Hukutaia Growth Area - Phase 01.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2027-Q3,2053-Q3,,,,,
IP011015,26/03/2024,Ōpōtiki District Council,Consequential Opex - Upgrade Hukutaia Road water rising main and reservoir.,Consequential Opex - Upgrade Hukutaia Road water rising main and reservoir.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2053-Q3,,,,,
IP011016,26/03/2024,Ōpōtiki District Council,Consequential Opex - Upgrade stormwater pump station 02 - Tarawa Creek Flood Pump.,Consequential Opex - Upgrade stormwater pump station 02 - Tarawa Creek Flood Pump.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2053-Q3,,,,,
IP011017,26/03/2024,Ōpōtiki District Council,Consequential opex - Upgrade stormwater pump station 09 - Wellington Street West Flood Pump.,Consequential opex - Upgrade stormwater pump station 09 - Wellington Street West Flood Pump.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2053-Q3,,,,,
IP011018,26/03/2024,Ōpōtiki District Council,Consequential Opex - Upgrade water treatment plant UV.,Consequential Opex - Upgrade water treatment plant UV.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2053-Q3,,,,,
IP011019,26/03/2024,Ōpōtiki District Council,Consequential Opex - Wastewater treatment plant secondary treatment upgrade.,Consequential Opex - Wastewater treatment plant secondary treatment upgrade.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,5 - 25 million,,,,,,,2025-Q3,2053-Q3,,,,,
IP011020,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town Water - Condition & Performance Assessment.,Ōpōtiki Town Water - Condition & Performance Assessment.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011021,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town Water Supply - Master Planning.,Ōpōtiki Town Water Supply - Master Planning.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2027-Q3,,,,,
IP011022,26/03/2024,Ōpōtiki District Council,Stormwater - Asset Management Plan Support.,Stormwater - Asset Management Plan Support.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2026-Q3,2036-Q3,,,,,
IP011023,26/03/2024,Ōpōtiki District Council,Stormwater - Bylaw.,Stormwater - Bylaw.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q3,,,,,
IP011024,26/03/2024,Ōpōtiki District Council,Stormwater - Channel Cleaning.,Stormwater - Channel Cleaning.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011025,26/03/2024,Ōpōtiki District Council,Stormwater - Condition assessments - CCTV and Flushing.,Stormwater - Condition assessments - CCTV and Flushing.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2039-Q3,,,,,
IP011026,26/03/2024,Ōpōtiki District Council,Stormwater - Condition Assessments - Structures and MEICA.,Stormwater - Condition Assessments - Structures and MEICA.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2030-Q3,,,,,
IP011027,26/03/2024,Ōpōtiki District Council,Stormwater - External Consultant Advice.,Stormwater - External Consultant Advice.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q3,,,,,
IP011028,26/03/2024,Ōpōtiki District Council,Stormwater - Flushing Programme.,Stormwater - Flushing Programme.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011029,26/03/2024,Ōpōtiki District Council,Stormwater - Model Maintenance and Development Assessments.,Stormwater - Model Maintenance and Development Assessments.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011030,26/03/2024,Ōpōtiki District Council,Stormwater - Model Update.,Stormwater - Model Update.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011031,26/03/2024,Ōpōtiki District Council,Te Kaha Water - Master Planning.,Te Kaha Water - Master Planning.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2026-Q3,,,,,
IP011032,26/03/2024,Ōpōtiki District Council,Wastewater - Asset Management Plan Support.,Wastewater - Asset Management Plan Support.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2026-Q3,2036-Q3,,,,,
IP011033,26/03/2024,Ōpōtiki District Council,Wastewater - Bylaw.,Wastewater - Bylaw.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q3,,,,,
IP011034,26/03/2024,Ōpōtiki District Council,Wastewater - External Consultant Advice.,Wastewater - External Consultant Advice.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q3,,,,,
IP011035,26/03/2024,Ōpōtiki District Council,Wastewater - Model Maintenance and Development Assessments.,Wastewater - Model Maintenance and Development Assessments.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011036,26/03/2024,Ōpōtiki District Council,Wastewater - Model Update.,Wastewater - Model Update.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011037,26/03/2024,Ōpōtiki District Council,Wastewater - Wastewater Strategy (I&I Strategy etc).,Wastewater - Wastewater Strategy (I&I Strategy etc).,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2026-Q3,,,,,
IP011038,26/03/2024,Ōpōtiki District Council,Water Supply - Annual Drinking Water Quality Independent Audit.,Water Supply - Annual Drinking Water Quality Independent Audit.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011039,26/03/2024,Ōpōtiki District Council,Water Supply - Asset Management Plan Support.,Water Supply - Asset Management Plan Support.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2026-Q3,2036-Q3,,,,,
IP011040,26/03/2024,Ōpōtiki District Council,Water Supply - Condition Assessments - Structures and MEICA.,Water Supply - Condition Assessments - Structures and MEICA.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2030-Q3,,,,,
IP011041,26/03/2024,Ōpōtiki District Council,Water Supply - External Consultant Advice.,Water Supply - External Consultant Advice.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q3,,,,,
IP011042,26/03/2024,Ōpōtiki District Council,Water Supply - Model Maintenance and Development Assessments.,Water Supply - Model Maintenance and Development Assessments.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011043,26/03/2024,Ōpōtiki District Council,Water Supply - Model Update.,Water Supply - Model Update.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011044,26/03/2024,Ōpōtiki District Council,Water Supply - Ohiwa - Leak Detection.,Water Supply - Ohiwa - Leak Detection.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2024-Q3,,,,,
IP011045,26/03/2024,Ōpōtiki District Council,Water Supply - Opotiki Town - Leak Detection.,Water Supply - Opotiki Town - Leak Detection.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2034-Q3,,,,,
IP011047,26/03/2024,Ōpōtiki District Council,Water Supply - Te Kaha - Leak Detection.,Water Supply - Te Kaha - Leak Detection.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2024-Q3,2034-Q3,,,,,
IP011048,26/03/2024,Ōpōtiki District Council,Water Supply - Water Safety Plan Support.,Water Supply - Water Safety Plan Support.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,,,,,,,2026-Q3,2036-Q3,,,,,
IP011049,26/03/2024,Ōpōtiki District Council,New bins for organics collection.,New bins for organics collection.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2027-Q3,2029-Q3,,,,,
IP011050,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC bailer - tin and can.,Ōpōtiki Town - RRC bailer - tin and can.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2028-Q3,2029-Q3,,,,,
IP011051,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC bailer / compactor.,Ōpōtiki Town - RRC bailer / compactor.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2027-Q3,2028-Q3,,,,,
IP011052,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC bays (existing).,Ōpōtiki Town - RRC bays (existing).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2036-Q3,,,,,
IP011053,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC fencing replacement.,Ōpōtiki Town - RRC fencing replacement.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2044-Q3,,,,,
IP011054,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC hardstand (pavement for existing bays).,Ōpōtiki Town - RRC hardstand (pavement for existing bays).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2033-Q3,,,,,
IP011055,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC hoist (glass).,Ōpōtiki Town - RRC hoist (glass).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2025-Q3,2028-Q3,,,,,
IP011056,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC improved workstation flow.,Ōpōtiki Town - RRC improved workstation flow.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2027-Q3,,,,,
IP011057,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC renewals.,Ōpōtiki Town - RRC renewals.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,1 - 5 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011058,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC security system.,Ōpōtiki Town - RRC security system.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2027-Q3,2028-Q3,,,,,
IP011059,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC upgrades for resource consent compliance.,Ōpōtiki Town - RRC upgrades for resource consent compliance.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2025-Q3,2028-Q3,,,,,
IP011060,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC bailer / compactor building.,Ōpōtiki Town - RRC bailer / compactor building.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2029-Q3,2030-Q3,,,,,
IP011061,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC building facilities.,Ōpōtiki Town - RRC building facilities.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2029-Q3,2030-Q3,,,,,
IP011062,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC building replacement.,Ōpōtiki Town - RRC building replacement.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,1 - 5 million,,,,,,,2034-Q3,2037-Q3,,,,,
IP011063,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC conveyor/sorter.,Ōpōtiki Town - RRC conveyor/sorter.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2033-Q3,2034-Q3,,,,,
IP011064,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC drainage renewals.,Ōpōtiki Town - RRC drainage renewals.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2030-Q3,2033-Q3,,,,,
IP011065,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC Future Green Waste.,Ōpōtiki Town - RRC Future Green Waste.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2037-Q3,2039-Q3,,,,,
IP011066,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC hardstand (gravel).,Ōpōtiki Town - RRC hardstand (gravel).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2027-Q3,2028-Q3,,,,,
IP011067,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC hardstand (pavement for entrance and turning areas).,Ōpōtiki Town - RRC hardstand (pavement for entrance and turning areas).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2028-Q3,2031-Q3,,,,,
IP011068,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC hoist (plastics).,Ōpōtiki Town - RRC hoist (plastics).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2027-Q3,2030-Q3,,,,,
IP011069,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC layout upgrade (existing greenwaste bays).,Ōpōtiki Town - RRC layout upgrade (existing greenwaste bays).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2027-Q3,2029-Q3,,,,,
IP011070,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC layout upgrade (existing greenwaste gravel pavement).,Ōpōtiki Town - RRC layout upgrade (existing greenwaste gravel pavement).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2028-Q3,,,,,
IP011071,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC replace roller doors x 4.,Ōpōtiki Town - RRC replace roller doors x 4.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2030-Q3,2032-Q3,,,,,
IP011072,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC weighbridge renewal.,Ōpōtiki Town - RRC weighbridge renewal.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2048-Q3,2050-Q3,,,,,
IP011073,26/03/2024,Ōpōtiki District Council,Te Kaha - RRC additional glass bins.,Te Kaha - RRC additional glass bins.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2025-Q3,2026-Q3,,,,,
IP011074,26/03/2024,Ōpōtiki District Council,Te Kaha - RRC hardstand (pavement for existing bays).,Te Kaha - RRC hardstand (pavement for existing bays).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2036-Q3,,,,,
IP011075,26/03/2024,Ōpōtiki District Council,Te Kaha - RRC improved workstation flow.,Te Kaha - RRC improved workstation flow.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2025-Q3,2027-Q3,,,,,
IP011076,26/03/2024,Ōpōtiki District Council,Te Kaha - RRC Loader.,Te Kaha - RRC Loader.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2027-Q3,2028-Q3,,,,,
IP011077,26/03/2024,Ōpōtiki District Council,Te Kaha - RRC renewals.,Te Kaha - RRC renewals.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011078,26/03/2024,Ōpōtiki District Council,Te Kaha - RRC upgrades for resource consent compliance.,Te Kaha - RRC upgrades for resource consent compliance.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2025-Q3,2028-Q3,,,,,
IP011079,26/03/2024,Ōpōtiki District Council,Te Kaha - RRC additional hardstand for bays.,Te Kaha - RRC additional hardstand for bays.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2032-Q3,2033-Q3,,,,,
IP011080,26/03/2024,Ōpōtiki District Council,Te Kaha - RRC bays (additional).,Te Kaha - RRC bays (additional).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2032-Q3,2033-Q3,,,,,
IP011081,26/03/2024,Ōpōtiki District Council,Te Kaha - RRC bays (existing).,Te Kaha - RRC bays (existing).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2027-Q3,,,,,
IP011082,26/03/2024,Ōpōtiki District Council,Te Kaha - RRC building facilities.,Te Kaha - RRC building facilities.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2030-Q3,2031-Q3,,,,,
IP011083,26/03/2024,Ōpōtiki District Council,Te Kaha - RRC building replacement.,Te Kaha - RRC building replacement.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,1 - 5 million,,,,,,,2042-Q3,2044-Q3,,,,,
IP011084,26/03/2024,Ōpōtiki District Council,Te Kaha - RRC fencing replacement.,Te Kaha - RRC fencing replacement.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2031-Q3,2032-Q3,,,,,
IP011085,26/03/2024,Ōpōtiki District Council,Te Kaha - RRC hardstand (pavement for entrance and turning areas).,Te Kaha - RRC hardstand (pavement for entrance and turning areas).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2032-Q3,2034-Q3,,,,,
IP011086,26/03/2024,Ōpōtiki District Council,Te Kaha - RRC replace roller doors x 2.,Te Kaha - RRC replace roller doors x 2.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2031-Q3,2032-Q3,,,,,
IP011087,26/03/2024,Ōpōtiki District Council,Waihau Bay - RRC fencing replacement.,Waihau Bay - RRC fencing replacement.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2027-Q3,,,,,
IP011088,26/03/2024,Ōpōtiki District Council,Waihau Bay - RRC improved workstation flow.,Waihau Bay - RRC improved workstation flow.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2027-Q3,2028-Q3,,,,,
IP011089,26/03/2024,Ōpōtiki District Council,Waihau Bay - RRC renewals.,Waihau Bay - RRC renewals.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011090,26/03/2024,Ōpōtiki District Council,Waihau Bay - RRC upgrades for resource consent compliance.,Waihau Bay - RRC upgrades for resource consent compliance.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2025-Q3,2028-Q3,,,,,
IP011091,26/03/2024,Ōpōtiki District Council,Waihau Bay - Hardstand and building expansion.,Waihau Bay - Hardstand and building expansion.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2030-Q3,,,,,
IP011092,26/03/2024,Ōpōtiki District Council,Waihau Bay - RRC bays (additional).,Waihau Bay - RRC bays (additional).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2032-Q3,2033-Q3,,,,,
IP011093,26/03/2024,Ōpōtiki District Council,Waihau Bay - RRC bays (existing).,Waihau Bay - RRC bays (existing).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2030-Q3,,,,,
IP011094,26/03/2024,Ōpōtiki District Council,Waihau Bay - RRC building facilities.,Waihau Bay - RRC building facilities.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2030-Q3,2031-Q3,,,,,
IP011095,26/03/2024,Ōpōtiki District Council,Waihau Bay - RRC building replacement.,Waihau Bay - RRC building replacement.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2040-Q3,2042-Q3,,,,,
IP011096,26/03/2024,Ōpōtiki District Council,Waihau Bay - RRC hardstand (pavement for entrance and turning areas).,Waihau Bay - RRC hardstand (pavement for entrance and turning areas).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2029-Q3,2030-Q3,,,,,
IP011097,26/03/2024,Ōpōtiki District Council,Waihau Bay - RRC hardstand (pavement for existing bays).,Waihau Bay - RRC hardstand (pavement for existing bays).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2031-Q3,,,,,
IP011098,26/03/2024,Ōpōtiki District Council,Waihau Bay - RRC replace roller doors x 2.,Waihau Bay - RRC replace roller doors x 2.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2030-Q3,2031-Q3,,,,,
IP011099,26/03/2024,Ōpōtiki District Council,General - Education and behaviour change.,General - Education and behaviour change.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,1 - 5 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011100,26/03/2024,Ōpōtiki District Council,General - Council waste bylaw review and update.,General - Council waste bylaw review and update.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2026-Q3,2028-Q3,,,,,
IP011101,26/03/2024,Ōpōtiki District Council,General - Design and develop food waste collection system.,General - Design and develop food waste collection system.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2025-Q3,,,,,
IP011102,26/03/2024,Ōpōtiki District Council,General - Food waste collection consequential OPEX.,General - Food waste collection consequential OPEX.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,5 - 25 million,,,,,,,2026-Q3,2054-Q3,,,,,
IP011103,26/03/2024,Ōpōtiki District Council,General - Illegal dumping work.,General - Illegal dumping work.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2026-Q3,2027-Q3,,,,,
IP011104,26/03/2024,Ōpōtiki District Council,General - Resource Recovery Community Initatives.,General - Resource Recovery Community Initatives.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2025-Q3,,,,,
IP011105,26/03/2024,Ōpōtiki District Council,General - Solid Waste Review of Services and Delivery.,General - Solid Waste Review of Services and Delivery.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2025-Q3,,,,,
IP011106,26/03/2024,Ōpōtiki District Council,Supporting businesses on circular opportunities and investigation into funding opportunities.,General - Supporting businesses on circular opportunities and investigation into funding opportunities.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2025-Q3,2054-Q3,,,,,
IP011107,26/03/2024,Ōpōtiki District Council,General - Waste Compliance Monitoring and Enforcement.,General - Waste Compliance Monitoring and Enforcement.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011108,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - Resource Consent.,Ōpōtiki Town - Resource Consent.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2026-Q3,,,,,
IP011109,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC building structural assessment.,Ōpōtiki Town - RRC building structural assessment.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2028-Q3,,,,,
IP011110,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC Consequential plant OPEX.,Ōpōtiki Town - RRC Consequential plant OPEX.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2037-Q3,2054-Q3,,,,,
IP011111,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC Feasibility Study (site suitability fit for purpose).,Ōpōtiki Town - RRC Feasibility Study (site suitability fit for purpose).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2025-Q3,2026-Q3,,,,,
IP011112,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC Future Green Waste.,Ōpōtiki Town - RRC Future Green Waste.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2039-Q3,2054-Q3,,,,,
IP011113,26/03/2024,Ōpōtiki District Council,Ōpōtiki Town - RRC Pest management.,Ōpōtiki Town - RRC Pest management.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011114,26/03/2024,Ōpōtiki District Council,RRC asset register data collection and upgrades across all sites (investigations).,RRC asset register data collection and upgrades across all sites (investigations).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2026-Q3,2027-Q3,,,,,
IP011115,26/03/2024,Ōpōtiki District Council,Te Kaha - Resource Consent.,Te Kaha - Resource Consent.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2026-Q3,,,,,
IP011116,26/03/2024,Ōpōtiki District Council,Te Kaha - RRC Consequential plant OPEX.,Te Kaha - RRC Consequential plant OPEX.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2032-Q3,2054-Q3,,,,,
IP011117,26/03/2024,Ōpōtiki District Council,Te Kaha - RRC Pest management.,Te Kaha - RRC Pest management.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011118,26/03/2024,Ōpōtiki District Council,Te Kaha - RRC RRC building structural assessment.,Te Kaha - RRC RRC building structural assessment.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2028-Q3,,,,,
IP011119,26/03/2024,Ōpōtiki District Council,Waihau Bay - Resource Consent.,Waihau Bay - Resource Consent.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2026-Q3,,,,,
IP011120,26/03/2024,Ōpōtiki District Council,Waihau Bay - RRC building structural assessment.,Waihau Bay - RRC building structural assessment.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2028-Q3,,,,,
IP011121,26/03/2024,Ōpōtiki District Council,Waihau Bay - RRC Consequential plant OPEX.,Waihau Bay - RRC Consequential plant OPEX.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2032-Q3,2054-Q3,,,,,
IP011122,26/03/2024,Ōpōtiki District Council,Waihau Bay - RRC Pest management.,Waihau Bay - RRC Pest management.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011123,26/03/2024,Ōpōtiki District Council,Waihau Bay - RRC tree maintenance.,Waihau Bay - RRC tree maintenance.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Waste management,< 1 million,,,,,,,2025-Q3,2027-Q3,,,,,
IP011124,26/03/2024,Ōpōtiki District Council,Harbour Access Road.,Harbour Access Road.,,Under construction,Funding source to be confirmed,Procurement not required,To be determined,Bay of Plenty,,,Transport,< 1 million,,,,,,,2024-Q3,2024-Q3,,,,,
IP011125,26/03/2024,Ōpōtiki District Council,CBD Kerb & Channel.,CBD Kerb & Channel.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,< 1 million,,,,,,,2024-Q3,2024-Q3,,,,,
IP011126,26/03/2024,Ōpōtiki District Council,Council site access roads.,Council site access roads.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,< 1 million,,,,,,,2024-Q3,2024-Q3,,,,,
IP011127,26/03/2024,Ōpōtiki District Council,Seal extensions.,Seal extensions.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2025-Q3,2025-Q3,,,,,
IP011128,26/03/2024,Ōpōtiki District Council,Emergency Events - Major Events Reserve.,Emergency Events - Major Events Reserve.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,,,,,,,2024-Q3,2024-Q3,,,,,
IP011129,26/03/2024,Ōpōtiki District Council,Footpath renewals.,Footpath renewals.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,,,,,,,2024-Q3,2024-Q3,,,,,
IP011130,26/03/2024,Ōpōtiki District Council,Unsealed Road Metalling.,Unsealed Road Metalling.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2024-Q3,2024-Q3,,,,,
IP011131,26/03/2024,Ōpōtiki District Council,Sealed Road Resurfacing.,Sealed Road Resurfacing.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2024-Q3,2024-Q3,,,,,
IP011132,26/03/2024,Ōpōtiki District Council,Drainage Renewals.,Drainage Renewals.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,,,,,,,2024-Q3,2024-Q3,,,,,
IP011133,26/03/2024,Ōpōtiki District Council,Sealed Road Pavement Rehabilitation.,Sealed Road Pavement Rehabilitation.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2024-Q3,2024-Q3,,,,,
IP011134,26/03/2024,Ōpōtiki District Council,Structures Components Replacement.,Structures Components Replacement.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,,,,,,,2024-Q3,2024-Q3,,,,,
IP011135,26/03/2024,Ōpōtiki District Council,Traffic Services Renewal.,Traffic Services Renewal.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,,,,,,,2024-Q3,2024-Q3,,,,,
IP011136,26/03/2024,Ōpōtiki District Council,Minor Improvements - Low Cost Low Risk.,Minor Improvements - Low Cost Low Risk.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,25 - 50 million,,,,,,,2024-Q3,2024-Q3,,,,,
IP011137,26/03/2024,Ōpōtiki District Council,Structures Renewals.,Structures Renewals.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,,,,,,,2024-Q3,2024-Q3,,,,,
IP011138,26/03/2024,Ōpōtiki District Council,Environmental Renewals.,Environmental Renewals.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,< 1 million,,,,,,,2030-Q3,2030-Q3,,,,,
IP011139,26/03/2024,Ōpōtiki District Council,Transport Hukutaia Growth - Intersection Upgrade / Hukutaia Rd and SH2.,Transport Hukutaia Growth - Intersection Upgrade / Hukutaia Rd and SH2.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2034-Q3,2034-Q3,,,,,
IP011140,26/03/2024,Ōpōtiki District Council,Transport Hukutaia Growth - Minor Road Safety Improvements.,Transport Hukutaia Growth - Minor Road Safety Improvements.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,,,,,,,2026-Q3,2026-Q3,,,,,
IP011141,26/03/2024,Ōpōtiki District Council,Transport Hukutaia Growth - Provision of pedestrian cyclist and mobility improvements.,Transport Hukutaia Growth - Provision of pedestrian cyclist and mobility improvements.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,,,,,,,2029-Q3,2029-Q3,,,,,
IP011142,26/03/2024,Ōpōtiki District Council,Emergency Events - Minor.,Emergency Events - Minor.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,,,,,,,2024-Q3,2024-Q3,,,,,
IP011143,26/03/2024,Ōpōtiki District Council,Asset Management Planning.,Asset Management Planning - subsidised.,,In procurement,Funding source to be confirmed,Selective,Procurement not required,Bay of Plenty,,,Transport,< 1 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011144,26/03/2024,Ōpōtiki District Council,Asset Management Planning.,Asset Management Planning - non-subsidised.,,In procurement,Funding source to be confirmed,Selective,Procurement not required,Bay of Plenty,,,Transport,1 - 5 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011145,26/03/2024,Ōpōtiki District Council,Sealed pavement maintenance.,Sealed pavement maintenance.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,25 - 50 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011146,26/03/2024,Ōpōtiki District Council,Emergency Events - Minor events.,Emergency Events - Minor events.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011147,26/03/2024,Ōpōtiki District Council,Unsealed pavement maintenance.,Unsealed pavement maintenance.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011148,26/03/2024,Ōpōtiki District Council,Structures maintenance.,Structures maintenance.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011149,26/03/2024,Ōpōtiki District Council,Routine drainage maintenance.,Routine drainage maintenance.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011150,26/03/2024,Ōpōtiki District Council,Environmental maintenance.,Environmental maintenance.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011152,26/03/2024,Ōpōtiki District Council,Traffic services maintenance.,Traffic services maintenance.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011153,26/03/2024,Ōpōtiki District Council,Cycle path maintenance.,Cycle path maintenance.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011154,26/03/2024,Ōpōtiki District Council,Footpath maintenance.,Footpath maintenance.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP011155,26/03/2024,Ōpōtiki District Council,Network and asset management.,Network and asset management.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,25 - 50 million,,,,,,,2024-Q3,2054-Q3,,,,,
IP002794,27/11/2023,Ōpōtiki District Council,Ōpōtiki Harbour Development Project.,A pair of engineered sea walls with a dredged channel that provides access in most sea and tide conditions for commercial vessels to a safe boat harbour.,,Under construction,Fully funded,Open,Design and construct,Bay of Plenty,,,Transport,100 - 250 million,2015-Q3,2019-Q4,2016-Q3,2019-Q3,2021-Q2,2024-Q2,2015-Q3,2025-Q1,
https://www.odc.govt.nz/our-council/current-projects/harbour-development/Pages/default.aspx,,Tina Gedson - Ōpōtiki District Council,-37.9921,177.2719
IP006719,30/11/2023,Orion New Zealand Limited,Bromley - Milton 66kV cable install.,As part of our resilience strategy we are replacing our 66kV oil filled cables. This project is the installation of new cables aligned with our subtransmission network architecture.,,Under construction,Funding source confirmed,To be determined,Alliance,Canterbury,,,Energy,25 - 50 million,,,,,,,2022-Q2,2024-Q1,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP006721,7/03/2024,Orion New Zealand Limited,West Rolleston Zone Substation construction.,A new 66/11kV 23MVA higher capacity West Rolleston ZS will be built to replace the bulk supply at Rolleston ZS. The existing Rolleston ZS will be utilised as a remote 11kV switchboard to enable distribution of the new capacity. This new substation will be initially supplied from Islington GXP before being transferred over to Norwood GXP once new circuits are constructed.,,Under construction,Funding source confirmed,To be determined,To be determined,Canterbury,,,Energy,5 - 25 million,,,,,,,2023-Q2,2026-Q1,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP006722,30/11/2023,Orion New Zealand Limited,66kV cable install - Halswell ZS to Hoon Hay ZS.,As part of our resilience strategy we are replacing our 66kV oil filled cables. This project is the installation of new cables aligned with our subtransmission network architecture.,,In planning,Funding source to be confirmed,To be determined,Alliance,Canterbury,,,Energy,5 - 25 million,,,,,,,2024-Q2,2027-Q1,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP006723,30/11/2023,Orion New Zealand Limited,66kV cable install - Milton ZS to Hoon Hay ZS.,As part of our resilience strategy we are replacing our 66kV oil filled cables. This project is the installation of new cables aligned with our subtransmission network architecture.,,In planning,Funding source to be confirmed,To be determined,Alliance,Canterbury,,,Energy,5 - 25 million,,,,,,,2024-Q2,2027-Q1,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP006724,30/11/2023,Orion New Zealand Limited,66kV cable install - Belfast ZS to McFaddens ZS.,As part of our resilience strategy we are replacing our 66kV oil filled cables. This project is the installation of new cables aligned with our subtransmission network architecture.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Energy,5 - 25 million,,,,,,,2025-Q2,2028-Q1,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP006726,30/11/2023,Orion New Zealand Limited,66kV cable install - Addington ZS to Oxford-Tuam ZS.,As part of our resilience strategy we are replacing our 66kV oil filled cables. This project is the installation of new cables aligned with our subtransmission network architecture.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Energy,5 - 25 million,,,,,,,2028-Q2,2031-Q1,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP006727,30/11/2023,Orion New Zealand Limited,66kV cable install - Addington ZS to Milton ZS.,As part of our resilience strategy we are replacing our 66kV oil filled cables. This project is the installation of new cables aligned with our subtransmission network architecture.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Energy,5 - 25 million,,,,,,,2029-Q2,2031-Q1,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP006728,30/11/2023,Orion New Zealand Limited,Shands Rd ZS to Islington / Halswell ZS tower line 66kV cables.,Installation of new cables down Shands Rd to connect Shands Rd substation to the Islington GXP to Halswell ZS 66kV lines.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Energy,5 - 25 million,,,,,,,2031-Q2,2034-Q1,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP006729,30/11/2023,Orion New Zealand Limited,66kV cable install - Addington ZS to Fendalton T1.,As part of our resilience strategy we are replacing our 66kV oil filled cables. This project is the installation of new cables aligned with our subtransmission network architecture.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Energy,5 - 25 million,,,,,,,2030-Q2,2033-Q1,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP006730,30/11/2023,Orion New Zealand Limited,Shands Rd ZS 33kV to 66kV conversion.,Conversion of Shands Rd ZS to 66kV to increase the distribution capacity and increase the subtransmission resilience.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Energy,5 - 25 million,,,,,,,2029-Q2,2032-Q1,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP006731,30/11/2023,Orion New Zealand Limited,66kV cable install - Addington ZS to Fendalton T2.,As part of our resilience strategy we are replacing our 66kV oil filled cables. This project is the installation of new cables aligned with our subtransmission network architecture.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Energy,5 - 25 million,,,,,,,2031-Q2,2034-Q1,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP008636,30/11/2023,Orion New Zealand Limited,66kV cable install - Lancaster ZS to Milton ZS.,As part of our resilience strategy we are replacing our 66kV oil filled cables. This project is the installation of new cables aligned with our subtransmission network architecture.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Energy,5 - 25 million,,,,,,,2026-Q2,2029-Q1,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP008637,30/11/2023,Orion New Zealand Limited,66kV cable install - Armagh ZS to Oxford-Tuam ZS.,As part of our resilience strategy we are replacing our 66kV oil filled cables. This project is the installation of new cables aligned with our subtransmission network architecture.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Energy,5 - 25 million,,,,,,,2027-Q2,2029-Q1,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP008638,7/03/2024,Orion New Zealand Limited,Runners Rd and Dunns Crossing Rd 11kV cable install.,As part of the Burnham ZS construction occurring on Burnham School Rd (primary key IP006721) there are 11kV cable distribution projects to utilise the new capacity and reinforce the network. These projects will require excavation works from the new Orion substation site on Burnham School Rd up Dunns Crossing Rd and along Runners Rd all the way to Burnham Rd.,,Post implementation ,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Energy,1 - 5 million,,,,,,,2023-Q2,2024-Q4,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP008639,30/11/2023,Orion New Zealand Limited,Shands and Hamptons Rd roundabout 33kV.,We are undergrounding the 33kV overhead network to coordinate with SDC's roundabout installment on Shands Rd for the Hamptons Rd intersection.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Energy,1 - 5 million,,,,,,,2023-Q2,2024-Q1,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP010358,30/11/2023,Orion New Zealand Limited,Lincoln South - new zone substation.,A large residential subdivision is being developed on the southern boundary of Lincoln township and requires a new zone substation.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Energy,5 - 25 million,,,,,,,2025-Q2,2028-Q1,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP010359,30/11/2023,Orion New Zealand Limited,Lincoln South ZS - subtransmission extension.,The new Lincoln South substation requires the existing subtransmission network to be extended.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Energy,1 - 5 million,,,,,,,2025-Q2,2028-Q1,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP010360,30/11/2023,Orion New Zealand Limited,66kV cable install - Papanui ZS to McFaddens ZS.,As part of our resilience strategy we are replacing our 66kV oil filled cables. This project is the installation of new cables aligned with our subtransmission network architecture.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Energy,5 - 25 million,,,,,,,2032-Q2,2035-Q1,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP010361,30/11/2023,Orion New Zealand Limited,Norwood ZS to Creyke Rd ZS 66kV cable section.,To extend the supply area of Norwood GXP further out to the east towards Hororata GXP a new 66kV cable is needed.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Energy,5 - 25 million,,,,,,,2028-Q2,2031-Q1,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP010509,30/11/2023,Orion New Zealand Limited,Belfast ZS to Papanui ZS 66kV cable.,To ensure maintain the security of supply to our substations as the load increases a new 66kV needs to be laid from Belfast ZS to Papanui ZS providing a closed-ring supply to Waimakariri and Belfast ZSs.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Energy,25 - 50 million,,,,,,,2033-Q2,2036-Q1,
https://www.oriongroup.co.nz/corporate/corporate-publications/asset-management-plans/,,,,
IP000268,15/03/2024,Palmerston North City Council,CET Arena Manawatu New Southern Stand Project.,This project will deliver a new grandstand and associated facilities at the CET Arena. This project is subject to partial external funding.,,On hold,Funding source to be confirmed,Open,Construct only,Manawatū - Whanganui,,,Community facilities,5 - 25 million,,,,,,,2026-Q3,2028-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP000284,15/03/2024,Palmerston North City Council,Streets for People Project - Stage 3&4.,Public Space Upgrade of Streets surrounding the Square.,,In planning,Funding source to be confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Transport,5 - 25 million,,,,,,,2025-Q3,2027-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP000323,15/03/2024,Palmerston North City Council,City-Wide Stormwater Improvement Works & Resilience.,An ongoing programme that involves various upgrades throughout the City.,,Under construction,Fully funded,Open,Construct only,Manawatū - Whanganui,,,Water,1 - 5 million,,,,,,,2021-Q3,2025-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP000337,15/03/2024,Palmerston North City Council,Urban Cycle Infrastructure Network Improvements.,This project involves upgrading and extending the cycleway network around the City.,,In planning,Fully funded,To be determined,Construct only,Manawatū - Whanganui,,,Transport,1 - 5 million,,,,,,,2021-Q3,2025-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP000347,15/03/2024,Palmerston North City Council,City-wide - Water Main Renewals.,An ongoing programme of water main replacements throughout the city.,,Under construction,Fully funded,Direct,Construct only,Manawatū - Whanganui,,,Water,1 - 5 million,,,,,,,2021-Q3,2025-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP000348,15/03/2024,Palmerston North City Council,Seismic Strengthening of Water Structures.,This project includes works on the following sites; Ngahere Park Reservoir Earthquake shut down valve and Turitea Water Treatment Plant Structure Seismic Assessment.,,Under construction,Fully funded,Open,Construct only,Manawatū - Whanganui,,,Water,1 - 5 million,,,,,,,2020-Q3,2025-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP000354,15/03/2024,Palmerston North City Council,Property - Seismic Strengthening of Council Owned Buildings.,Crematorium – Seismic strengthening work.,,Under construction,Fully funded,Open,Construct only,Manawatū - Whanganui,,,Community facilities,< 1 million,,,,,,,2021-Q3,2024-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP004124,15/03/2024,Palmerston North City Council,Street Light Infill Improvements.,City-wide upgrade of street lighting.,,Under construction,Fully funded,Direct,Construct only,Manawatū - Whanganui,,,Transport,< 1 million,,,,,,,2021-Q3,2024-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP004127,15/03/2024,Palmerston North City Council,City Wide provision of Public Toilets.,Installation of new toilets throughout the City.,,Under construction,Fully funded,Limited,Construct only,Manawatū - Whanganui,,,Water,< 1 million,,,,,,,2021-Q3,2025-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP004131,15/03/2024,Palmerston North City Council,City Reserves - Manawatu River - Framework Implementation.,This project includes the following sites along the Manawatu River including; Waterfront Precinct Lighting Marae Tarata Development Te Motu Poutoa and other new assets along the river front.,,In planning,Funding source to be confirmed,Limited,Construct only,Manawatū - Whanganui,,,Community facilities,1 - 5 million,,,,,,,2021-Q3,2025-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP004133,15/03/2024,Palmerston North City Council,Whakarongo - Installation of Stormwater Systems.,Programme includes; attenuation pond land purchase and downstream channel upgrading works.,,In planning,Fully funded,Direct,Construct only,Manawatū - Whanganui,,,Water,1 - 5 million,,,,,,,2020-Q3,2025-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP004136,15/03/2024,Palmerston North City Council,Roberts/ Railway Road Safety Realignment.,Realignment of intersection to improve sight lines and better cater for freight movement. Land purchase has already been completed. Design only.,,On hold,Funding source to be confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Transport,< 1 million,,,,,,,2020-Q3,2024-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP004144,15/03/2024,Palmerston North City Council,Animal Shelter Development.,Animal shelter Development. Achieving a Pound compliant with the Code of Welfare: Temporary Housing of Companion Animals. 2020/21 is design with construction planned in 2021/22.,,Under construction,Fully funded,Open,Construct only,Manawatū - Whanganui,,,Community facilities,1 - 5 million,,,,,,,2020-Q3,2024-Q1,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP005610,15/03/2024,Palmerston North City Council,Rubbish and Recycling Buildings - Staff Welfare and Health and Safety Improvements.,Rubbish and Recycling Buildings - Staff Welfare and Health and Safety Improvements.,,Under construction,Fully funded,To be determined,Construct only,Manawatū - Whanganui,,,Waste management,< 1 million,,,,,,,2021-Q3,2024-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP005611,15/03/2024,Palmerston North City Council,Turitea WTP - Drinking Water Standards Upgrades.,Programme of work to ensure Turitea Water Treatment Plant is compliant with future Drinking Water Standards revisions post-Havelock North.,,In planning,Fully funded,To be determined,Construct only,Manawatū - Whanganui,,,Water,< 1 million,,,,,,,2021-Q3,2024-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP005613,15/03/2024,Palmerston North City Council,City-wide - Water Supply Resilience - Security of Supply.,Works to protect against the impact of a major earthquake ensuring a reliable supply of water to the community and responders in the aftermath.,,Under construction,Fully funded,To be determined,Construct only,Manawatū - Whanganui,,,Water,< 1 million,,,,,,,2021-Q3,2025-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP005615,5/12/2023,Palmerston North City Council,Turitea WTP - Water Supply Resilience - Upgrades.,Improvements at Turitea Water Treatment Plant and Dams to enhance the resilience of these key facilities.,,Under construction,Fully funded,To be determined,Construct only,Manawatū - Whanganui,,,Water,< 1 million,,,,,,,2021-Q3,2024-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP006661,15/03/2024,Palmerston North City Council,City-wide - Stormwater Network Renewal Works.,Project includes various works throughout the City.,,Under construction,Fully funded,Direct,Construct only,Manawatū - Whanganui,,,Water,< 1 million,,,,,,,2021-Q3,2025-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP006675,15/03/2024,Palmerston North City Council,Crematorium Office Reconfiguration.,This programme provides the office redevelopment part of the Earthquake strengthening project. The existing crematorium office will be reconfigured to enable the administrator and the Sexton co-locate. This better supports activities occurring at the cre.,,Under construction,Fully funded,Open,Construct only,Manawatū - Whanganui,,,Community facilities,< 1 million,,,,,,,2021-Q3,2024-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP006678,15/03/2024,Palmerston North City Council,City Reserves - Capital New.,Programme of works for the City Reserves including; Victoria Esplanade Exotic Aviaries Te Marae o Hine Walkway extensions Victoria Park and Memorial Park.,,Under construction,Fully funded,Selective,Construct only,Manawatū - Whanganui,,,Community facilities,1 - 5 million,,,,,,,2021-Q3,2025-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP006682,15/03/2024,Palmerston North City Council,Regional Shared Path Network Improvements.,Programme of works to improve walking and cycling connections and includes; Manawatu River Cycleway Palmerston North to Feilding Napier Road LED lighting.,,In planning,Fully funded,To be determined,Construct only,Manawatū - Whanganui,,,Transport,1 - 5 million,,,,,,,2021-Q3,2025-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP006685,15/03/2024,Palmerston North City Council,Longburn Rongotea Road/No. 1 Line - Intersection Safety Upgrade.,Longburn Rongotea Road/No. 1 Line - Intersection Safety Upgrade.,,In planning,Fully funded,To be determined,Construct only,Manawatū - Whanganui,,,Transport,< 1 million,,,,,,,2021-Q3,2025-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP006686,15/03/2024,Palmerston North City Council,PNITI – Intersection & bridge improvements.,Intersection & bridge improvements at KB Bridge Replacement and Roberts Line/KB Road roundabout design.,,In planning,Fully funded,To be determined,Construct only,Manawatū - Whanganui,,,Transport,< 1 million,,,,,,,2021-Q3,2025-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP006689,15/03/2024,Palmerston North City Council,City Wide Stormwater Pump Station - Capacity Upgrade.,This project includes various sites throughout the City.,,Under construction,Fully funded,Direct,Construct only,Manawatū - Whanganui,,,Water,< 1 million,,,,,,,2021-Q3,2025-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP008838,15/03/2024,Palmerston North City Council,City wide Urban Cycle Infrastructure Network improvements.,Design and construction of a cycleway along Featherston Street.,,In planning,Fully funded,To be determined,Construct only,Manawatū - Whanganui,,,Transport,1 - 5 million,,,,,,,2023-Q1,2024-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP008839,15/03/2024,Palmerston North City Council,City-wide - Transport Choices - Public Transport.,Design and construction of new bus stops throughout the region.,,In procurement,Fully funded,To be determined,Construct only,Manawatū - Whanganui,,,Transport,1 - 5 million,,,,,,,2023-Q1,2024-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP009587,15/03/2024,Palmerston North City Council,Transport Growth - Ashhurst - Wyndham Street.,Upgrade of Wyndham Street including water and stormwater.,,In procurement,Fully funded,To be determined,Construct only,Manawatū - Whanganui,,,Transport,1 - 5 million,,,,,,,2023-Q4,2024-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP009588,15/03/2024,Palmerston North City Council,Cook Street Roundabout Upgrade.,Replacement of existing roundabout with a more pedestrian and cycle friendly design.,,On hold,Fully funded,To be determined,Construct only,Manawatū - Whanganui,,,Transport,1 - 5 million,,,,,,,2023-Q3,2024-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010255,15/03/2024,Palmerston North City Council,Milson Line Overbridge Improvement.,Milson Line overbridge no longer meets acceptable levels of seismic resistance and could be rendered unusable in a moderate earthquake.,,Early planning,Funding source to be confirmed,To be determined,Design and construct,Manawatū - Whanganui,,,Transport,1 - 5 million,,,,,,,2026-Q3,2028-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010256,15/03/2024,Palmerston North City Council,Tennent Drive Improvements - Food HQ & Massey.,Design and construction of transport improvements along Tennent Drive between Fitzherbert Bridge and Prendergast Road predominantly around Food HQ and Massey University.,,Early planning,Funding source to be confirmed,To be determined,Design and construct,Manawatū - Whanganui,,,Transport,5 - 25 million,,,,,,,2024-Q3,2025-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010257,15/03/2024,Palmerston North City Council,Kelvin Grove Road - Safety Improvements.,Speed management intersection improvement at Stoney Creek Road and vertical realignment and widening of 5 'dips' on Kelvin Grove Road seal widening through to Ashhurst Road.,,Early planning,Funding source to be confirmed,To be determined,Design and construct,Manawatū - Whanganui,,,Transport,5 - 25 million,,,,,,,2026-Q3,2031-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010258,15/03/2024,Palmerston North City Council,Urban Growth - Kakatangiata - Transport.,Ensures Council has the funding available to develop an aligned and coherent transport network for the Kakatangiata Growth Area.,,Early planning,Funding source to be confirmed,To be determined,Design and construct,Manawatū - Whanganui,,,Transport,25 - 50 million,,,,,,,2026-Q3,2034-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010259,15/03/2024,Palmerston North City Council,Pioneer Highway - Improvements.,Improvements to Pioneer Highway and associated intersections to accommodate increased traffic movement improved transport safety and walking & cycling connections.,,Under construction,Part funded,Open,Design and construct,Manawatū - Whanganui,,,Transport,1 - 5 million,,,,,,,2026-Q3,2030-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010260,15/03/2024,Palmerston North City Council,Stoney Creek Road Upgrade.,Stoney Creek Road Upgrade From the rail crossing to Kelvin Grove requires Capital investment as a key commuter link for Whakrongo.,,Early planning,Funding source to be confirmed,To be determined,Design and construct,Manawatū - Whanganui,,,Transport,5 - 25 million,,,,,,,2024-Q3,2028-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010261,15/03/2024,Palmerston North City Council,Enabling PNITI Roberts Line / Kairanga Bunnythorpe intersection improvements.,Roberts Line / Kairanga Bunnythorpe intersection improvements address intersection fatality safety improvement and PNITI future Ring Route capability.,,Early planning,Funding source to be confirmed,To be determined,Design and construct,Manawatū - Whanganui,,,Transport,5 - 25 million,,,,,,,2027-Q3,2029-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010262,15/03/2024,Palmerston North City Council,Transit Hub Redevelopment.,Complete upgrade of the urban bus terminal and reformatting of the streetscape to make it fit for purpose future-proofing for increased services and participation.,,Early planning,Funding source to be confirmed,To be determined,Design and construct,Manawatū - Whanganui,,,Transport,25 - 50 million,,,,,,,2026-Q3,2028-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010263,15/03/2024,Palmerston North City Council,Rangitikei St / Featherston St - Intersection Improvements.,Safety and efficiency improvements of urban intersection on two key routes. Investment assumes management of existing SH is relinquished to Council.,,On hold,Funding source to be confirmed,To be determined,Design and construct,Manawatū - Whanganui,,,Transport,5 - 25 million,,,,,,,2025-Q3,2030-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010264,15/03/2024,Palmerston North City Council,Seismic Strengthening of Council Properties.,Regent Theatre Seismic Strengthening.,,In planning,Funding source to be confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Community facilities,5 - 25 million,,,,,,,2025-Q3,2027-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010265,15/03/2024,Palmerston North City Council,Seismic Strengthening of Council Properties.,Public Library Seismic Strengthening.,,Early planning,Funding source to be confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Community facilities,50 - 100 million,,,,,,,2027-Q3,2029-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010266,15/03/2024,Palmerston North City Council,Seismic Strengthening of Council Properties.,Te Manawa Seismic Strengthening.,,Early planning,Funding source to be confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Community facilities,50 - 100 million,,,,,,,2029-Q3,2031-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010267,15/03/2024,Palmerston North City Council,Seismic Strengthening of Council Properties.,CAB Seismic Strengthening.,,Early planning,Funding source to be confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Community facilities,5 - 25 million,,,,,,,2031-Q3,2033-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010268,15/03/2024,Palmerston North City Council,Seismic Strengthening of Council Properties.,Caccia Birch Seismic Strengthening.,,Early planning,Funding source to be confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Community facilities,5 - 25 million,,,,,,,2033-Q3,2034-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010269,15/03/2024,Palmerston North City Council,CET Arena - Replacement of Grandstand Roof.,The grandstand roof needs to be replaced.,,Early planning,Funding source to be confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Community facilities,1 - 5 million,,,,,,,2026-Q3,2028-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010271,15/03/2024,Palmerston North City Council,CET Arena - Masterplan Development.,Projects include a 2nd artificial pitch and construction of a new Arena 5.,,Early planning,Funding source to be confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Community facilities,5 - 25 million,,,,,,,2024-Q3,2031-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010272,15/03/2024,Palmerston North City Council,Cultural Facilities - New Multicultural Facility.,Construction of a new multicultural facility to support and reflect the diversity in the City.,,Early planning,Funding source to be confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Community facilities,1 - 5 million,,,,,,,2024-Q3,2025-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010273,15/03/2024,Palmerston North City Council,Community Centres - Pasifika Centre Expansion.,This programme is to expand the exisitng facility to meet the space demands of the Pasifika community.,,Early planning,Funding source to be confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Community facilities,1 - 5 million,,,,,,,2024-Q3,2026-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010274,15/03/2024,Palmerston North City Council,Recycling - Materials Recovery Facility Development.,Programme to ensure that Council facilities utlise the most recent technology to optimise efficiency of the recovery of materials presented for diversion at the Materials Recovery Facility.,,Early planning,Funding source to be confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Community facilities,1 - 5 million,,,,,,,2025-Q3,2027-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP010275,15/03/2024,Palmerston North City Council,Manawatu River Park - Te Motu o Poutoa Development Plan.,Rangitane in partnership with Council have been working on a plan to restore the mana of Te Motu o Poutoa / ANZAC Park. The concept plan encompasses a civic marae retail space and cafe.,,In planning,Funding source to be confirmed,To be determined,Construct only,Manawatū - Whanganui,,,Community facilities,5 - 25 million,,,,,,,2024-Q3,2026-Q2,
https://www.pncc.govt.nz/council-city/what-were-doing/major-capital-projects/,,,,
IP008139,6/12/2023,Porirua City Council,Eastern Porirua Regeneration project.,Deliver transport infrastructure improvements as part of the Eastern Porirua Regeneration project being undertaken by Kainga Ora and supported by Porirua City Council Waka Kotahi and Greater Wellington. The project includes the redesign and reconfigurati.,,In planning,Funding source confirmed,Open,To be determined,Wellington,,,Transport,50 - 100 million,,,,,,,2021-Q3,2031-Q2,,,,,
IP008140,6/12/2023,Porirua City Council,Access Kenepuru.,A package of local road walking and cycling improvements required due to the impact of Transmission Gully motorway and significant residential and commercial growth in Kenepuru Landing.,,Under construction,Funding source to be confirmed,Open,Construct only,Wellington,,,Transport,25 - 50 million,,,,,,,2021-Q3,2024-Q2,,,,,
IP008141,17/03/2023,Porirua City Council,Porirua CBD to Titahi Bay shared path.,Construct a shared cycling and pedestrian pathway improve coastal resilience improvements and restore more natural harbour margin enhancing landscape natural character and ecological values along Titahi Bay Road.,,In planning,Funding source to be confirmed,Open,To be determined,Wellington,,,Transport,5 - 25 million,,,,,,,2021-Q3,2024-Q2,,,,,
IP008142,5/12/2023,Porirua City Council,Low Cost Low Risk improvements 2021 - 2023 - PCC Road to Zero - Safety.,School safety speed management ped crossings.,,Under construction,Funding source confirmed,Open,To be determined,Wellington,,,Transport,5 - 25 million,,,,,,,2021-Q3,2024-Q2,,,,,
IP008143,5/12/2023,Porirua City Council,Low Cost Low Risk improvements 2021-2023-PCC Walking and cycling improvements-Better travel options.,Papakowhai other minor walking and cycling improvements.,,Under construction,Funding source confirmed,Open,To be determined,Wellington,,,Transport,5 - 25 million,,,,,,,2021-Q3,2024-Q2,,,,,
IP008144,5/12/2023,Porirua City Council,Low Cost Low Risk improvements 2021 - 2023 - PCC Local road improvements - Better travel options.,Intersection improvements other as agreed as with Waka Kotahi.,,Under construction,Funding source confirmed,Open,To be determined,Wellington,,,Transport,25 - 50 million,,,,,,,2021-Q3,2024-Q2,,,,,
IP008145,5/12/2023,Porirua City Council,Low Cost Low Risk improvements 2021 - 2023 - PCC Maintenance operations and renewals programme.,Maintenance operations and renewals.,,Under construction,Funding source confirmed,Open,Construct only,Wellington,,,Transport,100 - 250 million,,,,,,,2021-Q3,2024-Q2,,,,,
IP006539,19/03/2024,Powerco Limited,Belk Road Zone Substation.,Establish a new zone substation and subtransmission circuits to supply growth in the Tauriko area of Tauranga.,,In planning,Funding source confirmed,To be determined,To be determined,Bay of Plenty,,,Energy,50 - 100 million,,,,,,,2022-Q2,2026-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006541,19/03/2024,Powerco Limited,Te Tumu Zone Substation.,Establish a new zone substation and subtransmission circuits to supply growth in the Te Tumu area.,,Early planning,Funding source confirmed,To be determined,To be determined,Bay of Plenty,,,Energy,5 - 25 million,,,,,,,2032-Q2,2034-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006542,19/03/2024,Powerco Limited,Welcome Bay 2nd Zone Substation.,Establish a new zone substation and subtransmission circuits to supply growth in the Welcome Bay area.,,Early planning,Funding source confirmed,To be determined,To be determined,Bay of Plenty,,,Energy,5 - 25 million,,,,,,,2026-Q2,2032-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006543,19/03/2024,Powerco Limited,Urenui Zone Substation.,Establish a new zone substation and subtransmission circuits to improve network security in the Urenui area.,,Early planning,Funding source confirmed,To be determined,To be determined,Taranaki,,,Energy,5 - 25 million,,,,,,,2024-Q2,2027-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006544,19/03/2024,Powerco Limited,Morrinsville substation upgrade.,Upgrade the Morrinsville substation to supply growth in the area.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Energy,1 - 5 million,,,,,,,2022-Q2,2027-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006545,19/03/2024,Powerco Limited,Rangiuru Business Park substation.,Establish a new zone substation to supply the Rangiuru Business Park.,,In procurement,Fully funded,To be determined,To be determined,Bay of Plenty,,,Energy,5 - 25 million,,,,,,,2023-Q2,2029-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006549,19/03/2024,Powerco Limited,Midhurst Zone Substation.,Establish a new zone substation and subtransmission circuits to supply growth in the Midhurst area.,,In planning,Funding source confirmed,To be determined,To be determined,Bay of Plenty,,,Energy,5 - 25 million,,,,,,,2023-Q1,2023-Q4,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006550,19/03/2024,Powerco Limited,Oropi-Ohauiti substation.,Establish a new zone substation and subtransmission circuits to supply growth in the Oropi area.,,Early planning,Funding source confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Energy,5 - 25 million,,,,,,,2030-Q2,2032-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006551,19/03/2024,Powerco Limited,Normanby Zone Substation.,Establish a new zone substation and subtransmission circuits to improve network security in the Normanby area.,,Early planning,Funding source confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Energy,5 - 25 million,,,,,,,2024-Q2,2027-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006552,19/03/2024,Powerco Limited,Oroua Downs Express Feeder.,Establish a new 11kV feeder to improve network security in the Oroua Downs area.,,Early planning,Funding source confirmed,To be determined,To be determined,Taranaki,,,Energy,5 - 25 million,,,,,,,2030-Q2,2032-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006553,19/03/2024,Powerco Limited,Whalers Gate new Zone Substation.,Establish a new zone substation and subtransmission circuits to supply growth in the Whalers Gate area of New Plymouth.,,In procurement,Fully funded,To be determined,To be determined,Waikato,,,Energy,5 - 25 million,,,,,,,2022-Q1,2024-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006557,19/03/2024,Powerco Limited,North East Industrial establish new substation.,Establish a new zone substation and subtransmission circuits to supply growth in the north-east industrial area of Palmerston North.,,Early planning,Funding source confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Energy,5 - 25 million,,,,,,,2028-Q2,2031-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006563,19/03/2024,Powerco Limited,Oakura substation upgrades.,Upgrade supply capacity to support growth in the Oakura area.,,In planning,Funding source confirmed,To be determined,To be determined,Taranaki,,,Energy,5 - 25 million,,,,,,,2025-Q2,2030-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006564,19/03/2024,Powerco Limited,Hawera GXP Outdoor 33kV CBs indoor conversion.,Replace Transpower's 33kV switchgear at Hawera.,,In procurement,Fully funded,To be determined,To be determined,Taranaki,,,Energy,1 - 5 million,,,,,,,2020-Q1,2025-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006565,19/03/2024,Powerco Limited,Rongotea new zone substation.,Establish a new zone substation and subtransmission circuits to supply growth in the Rongotea area.,,Early planning,Funding source confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Energy,5 - 25 million,,,,,,,2027-Q2,2029-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006567,19/03/2024,Powerco Limited,Mangatarata - New Substation.,Establish a new zone substation and subtransmission circuits to supply growth in the Mangatarata area.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Energy,5 - 25 million,,,,,,,2030-Q2,2032-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006568,19/03/2024,Powerco Limited,Aongatete zone substation renewal.,Replace zone substation equipment to maintain reliable supply to the Aongatete area.,,In procurement,Fully funded,To be determined,To be determined,Bay of Plenty,,,Energy,5 - 25 million,,,,,,,2022-Q2,2024-Q4,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006570,19/03/2024,Powerco Limited,Ashhurst substation.,Establish a new zone substation and subtransmission circuits to supply growth in the Ashhurst area.,,Early planning,Funding source confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Energy,5 - 25 million,,,,,,,2027-Q2,2029-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006572,19/03/2024,Powerco Limited,33kV switchboard at Waihi Rd.,Add a 33kV switchboard at Waihi Rd substation (Tauranga) to support growth in the area.,,Early planning,Funding source confirmed,To be determined,To be determined,Bay of Plenty,,,Energy,1 - 5 million,,,,,,,2029-Q2,2032-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006574,19/03/2024,Powerco Limited,AUFLS relay replacement.,Replace AUFLS relays to comply with new Electricity Authority requirements.,,In procurement,Fully funded,To be determined,To be determined,North Island,,,Energy,1 - 5 million,,,,,,,2021-Q2,2025-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006575,19/03/2024,Powerco Limited,Linton Army Camp zone substation.,Establish a new zone substation to supply growth at the Linton Army Camp.,,Early planning,Funding source confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Energy,5 - 25 million,,,,,,,2029-Q2,2032-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006578,19/03/2024,Powerco Limited,New 33kV Line for Linton Army Camp.,Establish new subtransmission circuits to supply growth at the Linton Army Camp.,,Early planning,Funding source confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Energy,5 - 25 million,,,,,,,2030-Q2,2032-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006580,19/03/2024,Powerco Limited,Cambria substation upgrade.,Upgrade capacity to support growth in the Cambria (Hawera) area.,,Early planning,Funding source confirmed,To be determined,To be determined,Taranaki,,,Energy,1 - 5 million,,,,,,,2035-Q2,2036-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006706,19/03/2024,Powerco Limited,Atuaroa second 33kV circuit.,Atuaroa second 33kV circuit.,,Early planning,Funding source confirmed,To be determined,To be determined,Bay of Plenty,,,Energy,5 - 25 million,,,,,,,2030-Q2,2032-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP006707,19/03/2024,Powerco Limited,Olam Food Ingredients Substation and 33kV Subtransmission Circuit.,33/11kV Substation Construction.,,In planning,Funding source confirmed,To be determined,To be determined,Bay of Plenty,,,Energy,5 - 25 million,,,,,,,2023-Q2,2026-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008159,19/03/2024,Powerco Limited,Manaia substation new 33kV and switchboard.,Upgrade substation with second 33kV line to support growth.,,Early planning,Funding source confirmed,To be determined,To be determined,Taranaki,,,Energy,5 - 25 million,,,,,,,2030-Q2,2033-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008842,19/03/2024,Powerco Limited,Arahina New 11kV Switchroom and Second Transformer.,Arahina New 11kV Switchroom and Second Transformer to meet load forecasts.,,Early planning,Funding source confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Energy,5 - 25 million,,,,,,,2022-Q4,2024-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008843,19/03/2024,Powerco Limited,Second Feilding Zone Substation.,Establish a Second Feilding Zone Substation to meet demand.,,In procurement,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Energy,5 - 25 million,,,,,,,2023-Q2,2024-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008845,19/03/2024,Powerco Limited,Feilding East and West Line Thermal Upgrades.,Feilding East and West Line thermal upgrades for security and demand.,,Early planning,Funding source confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Energy,5 - 25 million,,,,,,,2026-Q2,2028-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008846,19/03/2024,Powerco Limited,Kinleith 110 kV security constraints.,Kinleith 110 kV security constraints to support load growth.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Energy,25 - 50 million,,,,,,,2023-Q1,2032-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008847,19/03/2024,Powerco Limited,Kopu to Kauaeranga 110kV Line.,Kopu to Kauaeranga 110kV Line construction.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Energy,5 - 25 million,,,,,,,2027-Q2,2030-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008848,19/03/2024,Powerco Limited,Mangatarata/Rawerawe - New Subtransmission Circuit.,New Mangatarata Line to supply new substation.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Energy,5 - 25 million,,,,,,,2030-Q2,2032-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008849,19/03/2024,Powerco Limited,Marton 33kV Switchboard ODID Conversion.,Marton 33kV Switchboard ODID Conversion to support new transformers and lines.,,In procurement,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Energy,5 - 25 million,,,,,,,2020-Q2,2024-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008850,19/03/2024,Powerco Limited,Morrinsville North substation.,Construction of Morrinsville North substation.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Energy,5 - 25 million,,,,,,,2022-Q2,2027-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008851,19/03/2024,Powerco Limited,Mount Maunganui area security constraints.,Mount Maunganui area security constraints and load growth.,,Early planning,Funding source confirmed,To be determined,To be determined,Bay of Plenty,,,Energy,50 - 100 million,,,,,,,2023-Q1,2031-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008852,19/03/2024,Powerco Limited,ODID Brunswick.,ODID Brunswick.,,Early planning,Funding source confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Energy,5 - 25 million,,,,,,,2024-Q2,2027-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008853,19/03/2024,Powerco Limited,ODID Mataroa.,ODID Mataroa.,,Early planning,Funding source confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Energy,5 - 25 million,,,,,,,2028-Q2,2030-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008854,19/03/2024,Powerco Limited,Omokoroa 33kV Circuit - Sub Construction.,Omokoroa 33kV Circuit - Sub Construction.,,Early planning,Funding source confirmed,To be determined,To be determined,Bay of Plenty,,,Energy,5 - 25 million,,,,,,,2026-Q1,2027-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008855,19/03/2024,Powerco Limited,Piako 33 - Kereone Tee sub-transmission upgrade.,Upgrade of Piako Walton 33kv circuit.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Energy,5 - 25 million,,,,,,,2022-Q4,2032-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008856,19/03/2024,Powerco Limited,Pukepapa Rd 11kV Upgrade and a New UG 33kV.,Upgrade Pukepapa Road 11KV conductors and feeders.,,In procurement,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Energy,5 - 25 million,,,,,,,2022-Q3,2024-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008857,19/03/2024,Powerco Limited,Putaruru 110/33 kV increase in security.,Install second 110/33 kV transformer at Putaruru substation.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Energy,5 - 25 million,,,,,,,2024-Q2,2026-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008858,19/03/2024,Powerco Limited,Tauranga area security constraints.,Kaitimako - Tauranga 110 kV circuit & Tauranga substation upgrade.,,Early planning,Funding source confirmed,To be determined,To be determined,Bay of Plenty,,,Energy,50 - 100 million,,,,,,,2023-Q1,2029-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008859,19/03/2024,Powerco Limited,Third 33kV Subtransmission line from BRK GXP.,Third 33kV Subtransmission line from BRK GXP.,,Early planning,Funding source confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Energy,5 - 25 million,,,,,,,2029-Q2,2031-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008860,19/03/2024,Powerco Limited,Valley Spur 110 kV double circuit security and voltage constraints.,Valley Spur 110 kV double circuit security and voltage constraints.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Energy,50 - 100 million,,,,,,,2022-Q4,2029-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP008861,19/03/2024,Powerco Limited,WIEL - New Substation.,New substation to support load increases.,,In procurement,Fully funded,To be determined,To be determined,Waikato,,,Energy,5 - 25 million,,,,,,,2021-Q2,2025-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP009837,19/03/2024,Powerco Limited,Feilding Sub 3rd 33kV line.,Feilding Sub 3rd 33kV line.,,In planning,Funding source confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Energy,5 - 25 million,,,,,,,2025-Q2,2028-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP009838,19/03/2024,Powerco Limited,Pahoia (Omokoroa Urban Zone) Substation.,Pahoia/Omokoroa New Substation.,,In procurement,Fully funded,To be determined,To be determined,Bay of Plenty,,,Energy,5 - 25 million,,,,,,,2023-Q2,2026-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP009839,19/03/2024,Powerco Limited,New Egmont Sub to replace Mangorei Regulating Station.,New Egmont Sub to replace Mangorei Regulating Station.,,Early planning,Funding source confirmed,To be determined,To be determined,Taranaki,,,Energy,5 - 25 million,,,,,,,2029-Q2,2033-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP009840,19/03/2024,Powerco Limited,Kinleith Bulk Supply.,Putaruru - Maraetai Road 33 kV link.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Energy,25 - 50 million,,,,,,,2026-Q2,2030-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP009841,19/03/2024,Powerco Limited,New Knoll sub in Bidwells Cutting & Relivening Bidwells 33kV.,New sub in Bidwells Cutting & Relivening Bidwells 33kV.,,Early planning,Funding source confirmed,To be determined,To be determined,Other,,,Energy,5 - 25 million,,,,,,,2024-Q2,2028-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP009842,19/03/2024,Powerco Limited,Inglewood Substation Transformer upgrade.,Inglewood Substation - two Transformer upgrade.,,Early planning,Funding source confirmed,To be determined,To be determined,Taranaki,,,Energy,5 - 25 million,,,,,,,2026-Q2,2029-Q1,
https://www.powerco.co.nz/,,https://www.powerco.co.nz/Contact=contact,,
IP000716,15/03/2024,Queenstown-Lakes District Council,Beacon Point New Reservoir.,This project is for a new (second) 6000m3 reservoir adjacent to existing reservoir at Beacon Point.,,Under construction,Fully funded,To be determined,To be determined,Otago,,,Water,5 - 25 million,2018-Q4,2022-Q1,2022-Q1,2022-Q2,2022-Q4,2024-Q2,2018-Q4,2024-Q2,
https://www.qldc.govt.nz/your-council/major-projects,,,,
IP000717,15/03/2024,Queenstown-Lakes District Council,Quail Rise Reservoir (WS).,This project is to design and construct one new 5000m3 reservoir in Quail Rise.,,Under review,Funding source to be confirmed,To be determined,Design and construct,Otago,,,Water,5 - 25 million,2018-Q4,2023-Q3,2027-Q3,2027-Q4,2028-Q1,2028-Q4,2018-Q4,2028-Q4,
https://www.qldc.govt.nz/your-council/major-projects,,,,
IP000731,15/03/2024,Queenstown-Lakes District Council,Aubrey Rd Rec Reserve SW detention pond.,This project will deliver a stormwater detention pond.,,Under review,Funding source to be confirmed,To be determined,To be determined,Otago,,,Water,5 - 25 million,2019-Q1,2023-Q2,2027-Q3,2028-Q1,2028-Q2,2028-Q3,2019-Q1,2028-Q3,
https://www.qldc.govt.nz/your-council/major-projects,,,,
IP000735,15/03/2024,Queenstown-Lakes District Council,Project Shotover WWTP Stage 3 Upgrade (WW).,This project is to upgrade the wastewater treatment plant as part of Project Shotover.,,Under construction,Fully funded,To be determined,To be determined,Otago,,,Water,25 - 50 million,2019-Q3,2022-Q4,2022-Q2,2023-Q2,2023-Q3,2025-Q4,2019-Q3,2025-Q4,
https://www.qldc.govt.nz/your-council/major-projects,,,,
IP000739,15/03/2024,Queenstown-Lakes District Council,Kingston HIF New Scheme (WS).,This project is to deliver water supply improvements in Kingston. This project is part of the Housing Infrastructure Fund.,,In planning,Funding source to be confirmed,To be determined,To be determined,Otago,,,Water,5 - 25 million,2018-Q1,2019-Q2,2022-Q1,2024-Q3,2022-Q2,2027-Q2,2018-Q1,2027-Q2,
https://www.qldc.govt.nz/your-council/major-projects,,,,
IP000740,15/03/2024,Queenstown-Lakes District Council,Kingston HIF new scheme (WW).,This project is to deliver wastewater service improvements as part of the Lakeview development. This project is part of the Housing Infrastructure Fund.,,In planning,Funding source to be confirmed,To be determined,To be determined,Otago,,,Water,25 - 50 million,2018-Q1,2019-Q2,2024-Q2,2025-Q2,2025-Q2,2026-Q2,2018-Q1,2026-Q2,
https://www.qldc.govt.nz/your-council/major-projects,,,,
IP000741,15/03/2024,Queenstown-Lakes District Council,Kingston HIF New Scheme (SW).,This project is to deliver stormwater servicing improvements as part of the Lakeview development. This project is part of the Housing Infrastructure Fund.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Otago,,,Water,5 - 25 million,2018-Q1,2020-Q3,2024-Q1,2024-Q2,2024-Q2,2027-Q4,2018-Q1,2027-Q4,
https://www.qldc.govt.nz/your-council/major-projects,,,,
IP005905,15/03/2024,Queenstown-Lakes District Council,Glenorchy WTP (WS).,Construction of a New water treatment plant in Glenorchy.,,Under review,Funding source to be confirmed,To be determined,To be determined,Otago,,,Water,1 - 5 million,2020-Q3,2023-Q4,2026-Q4,2027-Q2,2027-Q3,2028-Q1,2020-Q3,2028-Q1,
https://www.qldc.govt.nz/your-council/major-projects,,,,
IP005908,15/03/2024,Queenstown-Lakes District Council,Luggate Water Supply Scheme (WS).,This project is the first stage of the investment in upgrading Luggate township’s water supply. The scope includes the design and construction of three new water supply bores a new water treatment plant and reticulation to the existing network.,,Under review,Funding source to be confirmed,To be determined,To be determined,Otago,,,Water,5 - 25 million,2021-Q2,2023-Q2,2027-Q3,2027-Q4,2028-Q1,2028-Q4,2021-Q2,2028-Q4,
https://www.qldc.govt.nz/your-council/major-projects,,,,
IP005909,15/03/2024,Queenstown-Lakes District Council,Wakatipu Active Travel Network.,Detailed Design of the routes and consenting of those routes in preparation for construction.,,On hold,Funding source to be confirmed,To be determined,To be determined,Otago,,,Transport,1 - 5 million,2020-Q3,2024-Q1,2023-Q4,2024-Q1,2023-Q4,2025-Q4,2020-Q3,2025-Q4,
https://www.qldc.govt.nz/your-council/major-projects,,,,
IP006338,15/03/2024,Queenstown-Lakes District Council,Marine Pde PS Electrical Upgrade (WW).,Pump station upgrade along the lake on Marine Parade.,,Under review,Funding source to be confirmed,To be determined,To be determined,Otago,,,Water,1 - 5 million,2021-Q2,2021-Q1,2027-Q3,2027-Q3,2027-Q3,2027-Q4,2021-Q2,2027-Q4,
https://www.qldc.govt.nz/your-council/major-projects,,,,
IP009835,15/03/2024,Queenstown-Lakes District Council,Cardrona Water Supply Scheme Pipeline WS.,Design and construction of a new water pipeline to convey treated water from the new Cardrona Water Treatment Plant (developed by a third party) to the Cardrona Township.,,Under construction,Funding source confirmed,Open,Construct only,Otago,,,Water,1 - 5 million,2022-Q2,2022-Q4,2023-Q2,2023-Q4,2023-Q4,2024-Q2,2022-Q2,2024-Q2,
https://www.qldc.govt.nz/your-council/major-projects,,,,
IP009836,15/03/2024,Queenstown-Lakes District Council,Wanaka New Waste Facility.,Design for a comprehensive upgrade of the existing Wanaka transfer station facility (wastebusters). Design will include layout and operational changes to facilitate additional resource recovery improve health and safety and increase capacity.,,In planning,Funding source confirmed,To be determined,To be determined,Otago,,,Waste management,1 - 5 million,2020-Q2,2023-Q1,2024-Q3,2025-Q1,2025-Q1,2026-Q1,2023-Q1,2026-Q1,
https://www.qldc.govt.nz/your-council/major-projects,,,,
IP004781,12/09/2023,Queenstown-Lakes District Council,Stone St Upgrades (SW).,To take excess SW from the Alpha series development and remove the SW from entering Bullock creek. A creation of a wetland area to maximise treatment prior to the SW being discharged into lake Wanaka.,,Under review,Funding source to be confirmed,To be determined,To be determined,Otago,,,Water,5 - 25 million,2019-Q1,2027-Q2,2027-Q3,2027-Q4,2028-Q1,2028-Q4,2019-Q1,2028-Q4,
https://www.qldc.govt.nz/your-council/major-projects,,,,
IP002500,29/02/2024,Rau Paenga Limited,Te Pae Christchurch Convention Centre.,Te Pae Christchurch Convention Centre is a world class conventions and exhibitions facility supported by nearby accommodation retail and hospitality offerings. In a competitive environment where convention centres around the world are expanding their capacity to accommodate larger events Te Pae is a boutique facility set in a well organised and compact regenerating city. .,,Post implementation ,Fully funded,Open,Design and construct,Canterbury,,,Community facilities,250 - 500 million,,2016-Q2,2016-Q3,2016-Q4,2017-Q3,2023-Q2,2015-Q3,2025-Q1,
https://www.raupaenga.co.nz/projects/te-pae-christchurch-convention-centre,,"Greg Wilson Director, Programme Delivery
[email address]",-43.538438,172.626751
IP002501,29/02/2024,Rau Paenga Limited,Parakiore Recreation and Sport Centre (formally known as Metro Sports Facility) - Christchurch.,The Parakiore Recreation and Sport Centre will be the largest aquatic and indoor recreation and leisure venue of its kind in New Zealand and will be accessible to people of all ages abilities and skill levels.The Parakiore Recreation and Sport Centre will feature a 50 metre 10-lane competition swimming pool and a separate diving pool large aquatic leisure area five hydroslides fitness spaces and nine indoor courts for sports such as netball volleyball and basketball. The facility will cater for the needs of the recreational educational and high-performance sporting communities.,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Community facilities,250 - 500 million,,2015-Q3,2018-Q2,2018-Q3,2019-Q2,2025-Q3,2013-Q4,2026-Q3,
https://www.raupaenga.co.nz/projects/parakiore-recreation-and-sport-centre,,"Greg Wilson Director, Programme Delivery
[email address]",-43.52968,172.635533
IP009692,22/11/2023,Selwyn District Council,Selwyn Sewerage Scheme (SSS) - Development of the Pines Waste Water Treatment Plant.,This is a staged project and under construction for the past 5 years.,,Under construction,Funding source confirmed,Selective,Design and construct,Canterbury,,,Water,5 - 25 million,,,,,,2027-Q2,2021-Q1,2031-Q1,,,,,
IP009694,22/11/2023,Selwyn District Council,Selwyn Sewerage Scheme (SSS) – Construction of the Ellesmere wastewater pipeline to Pines.,Ellesmere wastewater pipeline to Pines are in final design phase and expect construction to start October / November 2023.,,In procurement,Funding source confirmed,Direct,Early contractor involvement,Canterbury,,,Water,5 - 25 million,,,,,2024-Q2,2025-Q2,2023-Q1,2025-Q2,,,,,
IP009695,22/11/2023,Selwyn District Council,Water supply quality and Level of Service upgrades.,BAU for SDC work.,,Under construction,Funding source confirmed,To be determined,Early contractor involvement,Canterbury,,,Water,5 - 25 million,,,,,2023-Q3,2031-Q1,2021-Q1,2031-Q2,,,,,
IP009696,22/11/2023,Selwyn District Council,Water Supply Capacity Upgrades for Growth.,BAU for SDC work.,,Under construction,Funding source confirmed,To be determined,Early contractor involvement,Canterbury,,,Water,5 - 25 million,,,,,2023-Q3,2031-Q1,2021-Q1,2031-Q2,,,,,
IP009697,22/11/2023,Selwyn District Council,Stormwater flood protection and Capacity Upgrades.,BAU for SDC work.,,Under construction,Funding source confirmed,To be determined,Early contractor involvement,Canterbury,,,Water,5 - 25 million,,,,,2023-Q3,2031-Q1,2021-Q1,2031-Q2,,,,,
IP009698,22/11/2023,Selwyn District Council,Leeston Library and Community Centre.,SDC are considering a combined community centre/library for Leeston that could provide efficiencies in terms of capital build and operating costs. The planned building would be around 900m2 and would combine library (arts culture and lifelong learning services) Council service centre and community recreation and meeting spaces creating a vibrant community hub for Leeston. The mix of uses and spaces needs to reflect both the local and network requirements as well as creating a point of difference. To achieve this a focus on culture and heritage is proposed including connection to the cultural narrative of the locality especially in terms of the proximity to Te Waihora and Te Taumutu Marae (Te Pā o Moki). Potential for contributing to indoor court space is also included as part of the project. Certain stages are complete.,,On hold,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,,,,,,2023-Q1,2026-Q2,,,,,
IP009699,22/11/2023,Selwyn District Council,Birches Road Park in Prebbleton.,This project was included in the 2018-28 LTP and the planning and designation process for this new park has now been completed opening the way for development to start. The park will help to meet demand for sports activities in the Springs Ward and is a short drive from Lincoln to help meet demand for space in this locality where there is an existing deficit in provision. The park will also provide spaces for other passive recreation activities with a dog park and walking tracks and boardwalks planned. The park is well connected being adjacent to the rail trail and only a short distance from Lincoln. The park will be progressively developed over the 10 year planning period on a staged basis with some work planned to start in the 2021/22 financial year. Certain stages are complete.,,Under construction,Funding source confirmed,Limited,To be determined,Canterbury,,,Community facilities,5 - 25 million,,,2023-Q4,2023-Q4,2023-Q4,2024-Q2,2021-Q1,2028-Q1,,,,,
IP009700,22/11/2023,Selwyn District Council,Rolleston Reserve Development.,As part of implementing the Rolleston Town Centre Master Plan the balance of Rolleston Reserve (approximately 4 hectares) will be redeveloped to create a high amenity park that will complement the town centre development and provide attractive spaces for people to use when shopping and visiting the town centre as well as retaining some of the existing recreation and community uses. The concept plan for the town centre development including the park has been consulted on and submissions considered with amendments made based on community feedback. Some work has already been completed (car park development) near Te Ara Ātea. Certain stages are complete.,,Under construction,Funding source confirmed,Limited,Construct only,Canterbury,,,Community facilities,5 - 25 million,,,,,2023-Q2,2024-Q2,2021-Q1,2025-Q1,,,,,
IP009701,22/11/2023,Selwyn District Council,Rolleston Town Square.,This project was included in the 2018-28 LTP and forms part of the Rolleston Town Centre development. The public square will be a very high quality formal space adjacent to the new library that will be a busy focal point for the town and will include: paved promenades to connect buildings; shade structures; water features; public seating; performance space/equipment and an overhead light system. Certain stages are complete.,,Under construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Community facilities,5 - 25 million,,,,,,,2021-Q1,2028-Q1,,,,,
IP009705,22/11/2023,Selwyn District Council,Prebbleton Community Centre.,A proposal for a new Prebbleton Community Centre was included in the 2018-2028 Long term Plan. However following consultation on the Annual Plan 2020/21 the project was deferred until the next Long-term Plan to ensure more information on the location and community needs could be gathered. Demand for a new facility to service Prebbleton is evident with the existing public hall although not owned by Council being earthquake prone and nearing the end of its life. The new community centre is planned to be a flexible facility that can cater for a variety of uses including community groups meetings recreation and leisure programmes and is most likely to be located on Prebbleton Reserve. It would also be built to Importance Level 4 seismic standards so that it can be used as an emergency welfare centre. This adds to the cost but Council has a statutory obligation to provide an emergency centre to this standard somewhere in the District.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,,,,,,2025-Q1,2028-Q1,,,,,
IP009706,22/11/2023,Selwyn District Council,Lincoln Sports Park Extension.,Council has been trying to acquire land to enable the existing reserve to be extended to cater for demand for sports space from predicted growth. It is expected that the land purchase will be completed in 2020/21 and development is planned to commence in 2024/25. This is co-ordinated to occur with the extension of Meijer Drive that will provide access and frontage to the reserve. The project will be undertaken over a number of years and includes development of additional playing fields car parks toilets and enhancement of the water course.,,In planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,1 - 5 million,,,2024-Q2,2024-Q2,2024-Q3,2025-Q2,2024-Q1,2028-Q1,,,,,
IP009707,22/11/2023,Selwyn District Council,District Park Development.,Council purchased the land for a large scale park (100 hectares) to provide future space to accommodate a range of sports recreation and community activities. This site on the eastern edge of Rolleston has strategic advantages in being centrally located and close to major transport links. This park will cater for district-wide recreational/community activities that may not be available in more urban open spaces. Planning for the park will start in 2021/22 but development is not programmed to start until 2024/25. This allows time to complete planning and designation processes and fully understand the key uses and the future interface with neighbouring land. Suggested uses include: major events community gardens a farm park equestrian activities mountain biking ecological restoration areas and a future hub for major sports/recreation activities.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Community facilities,5 - 25 million,,,2024-Q1,2024-Q2,,,2021-Q1,2030-Q1,,,,,
IP009708,22/11/2023,Selwyn District Council,Prebbleton Arterial Intersection Upgrades.,A series of intersections safety improvements subsidised by NZTA to replace priority controlled intersections with roundabouts to improve safety and congestion outcomes on key arterial commuter routes and connectivity to the Southern Motorway. The Shands/Trents Shands/Hamptons & Springs/Hamptons intersections will be upgraded during the 2021-31 LTP.,,Under construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Transport,5 - 25 million,,,2023-Q3,2023-Q4,2024-Q1,2024-Q4,2022-Q1,2025-Q1,,,,,
IP009710,22/11/2023,Selwyn District Council,Lincoln Town Centre.,Upgrades to Gerald Street road frontages and layouts and creation of car public parking facilities to enhance the Lincoln Town Centre access and environment. Also includes intersection upgrades to traffic signals slow speed zones and cycle lanes that connect to the University. Replacement of road pavement substructures that are deteriorating.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,25 - 50 million,,,2024-Q3,2024-Q4,2024-Q4,2027-Q2,2024-Q1,2035-Q1,,,,,
IP009711,22/11/2023,Selwyn District Council,Safe Network Programme Safety Improvements.,A programme of speed limit changes and intersection safety upgrades working under the Ministry of Transport’s Road to Zero strategy. The programme in Selwyn has been co developed with the NZTA and looks to combine both safety works and funding with other road improvements to complete the upgrade of key road routes and parts of the network in a coordinated way.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,,,,2023-Q2,2024-Q2,2024-Q1,2030-Q1,,,,,
IP009712,22/11/2023,Selwyn District Council,Public Transport Facilities Upgrades.,Originating from the Greater Christchurch Partnership Councils share of the “PT Futures” business case programme to improve transport facilities in the District in support of Environment Canterbury’s Metro Bus improved services. Includes upgrades to bus stops with more shelters and seats new and also improved Park N Ride facilities at both Lincoln and Rolleston.,,Early planning,Funding source confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,,,,2023-Q2,2024-Q2,2024-Q1,2030-Q1,,,,,
IP006393,8/12/2023,Spark New Zealand Limited,Mobile Network Infrastructure Upgrade.,Upgrade of Mobile Network Infrastructure to enable the deployment of enhanced LTE services and 5G technology. The primary purpose is to cater to customers with high data needs underpin innovation and free up 4G spectrum to increase capacity in regional.,,Under construction,Fully funded,Selective,Early contractor involvement,Nationwide,,,Communications,100 - 250 million,2021-Q1,2021-Q2,,,2021-Q3,2024-Q2,2021-Q1,2024-Q2,,,,,
IP010808,19.03.24,Taranaki Regional Council,Yarrow Stadium Redevelopment.,Repair reburishment demolition and rebuild of new stand.,,Under construction,Fully funded,Open,Design and construct,Taranaki,,,Community facilities,50 - 100 million,,,2020-Q3,2023-Q3,2020-Q4,20205-Q1,2018-Q3,2025-Q1,,,,,
IP010809,19.03.24,Taranaki Regional Council,Accomodation Review-Demolition & new build of accomodation & compliance upgrades 47 Cloten Rd.,Demolition (in progress) of buildings deemed no longer fit for use. Rebuild of 1350sqm office accomodation (in planning). Heating and cooling and electrical upgrade of main Administration Building. Associated compliance remediation action for building WOF (under procurement).,,In planning,Fully funded,Open,To be determined,Taranaki,,,Community facilities,5 - 25 million,,,,,,,2023-Q3,2025-Q4,,,,,
TasDC46002,25/03/2024,Tasman District Council,Unsealed Road Metalling.,Routine metalling of unsealed roads to mitigate gravel loss.,,Under construction,Fully funded,Open,Construct only,Tasman,,,Transport,5 - 25 million,,,,,,,2024-Q3,2034-Q3,,,,,
TasDC46004,25/03/2024,Tasman District Council,Sealed Road Resurfacing.,Resurfacing of sealed roads.,,Under construction,Fully funded,Open,Construct only,Tasman,,,Transport,50 - 100 million,,,,,,,2024-Q3,2034-Q3,,,,,
TasDC46006,25/03/2024,Tasman District Council,Drainage Renewals.,Renewal of drainage assets including culverts kerb and channel surface water channels and sumps.,,Under construction,Fully funded,Open,Construct only,Tasman,,,Transport,5 - 25 million,,,,,,,2024-Q3,2034-Q3,,,,,
TasDC46008,25/03/2024,Tasman District Council,Pavement Rehabilitation.,Pavement rehabilitation of sealed roads that meet NZTA funding criteria.,,Under construction,Fully funded,Open,Construct only,Tasman,,,Transport,5 - 25 million,,,,,,,2024-Q3,2034-Q3,,,,,
TasDC46011,25/03/2024,Tasman District Council,Traffic Services Renewals.,Renewal of road signs and street lights.,,Under construction,Fully funded,Open,Construct only,Tasman,,,Transport,5 - 25 million,,,,,,,2024-Q3,2034-Q3,,,,,
TasDC46084,25/03/2024,Tasman District Council,Lower Queen Street Widening Stage 1.,Improvements to Lower Queen Street to cater for traffic associated with commercial and residential developments.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Tasman,,,Transport,5 - 25 million,,,,,,,2024-Q3,2027-Q3,,,,,
TasDC66007,25/03/2024,Tasman District Council,Motueka West Discharge System.,Stage 1 of stormwater discharge system works for Motueka West Development area.,,Under construction,Fully funded,Open,Construct only,Tasman,,,Water,5 - 25 million,,,,,,,2023-Q4,2025-Q3,,,,,
TasDC66041,25/03/2024,Tasman District Council,Motueka West Discharge System stage 2.,Stage 2 of stormwater discharge system works for Motueka West development area.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Tasman,,,Water,5 - 25 million,,,,,,,2035-Q3,2041-Q3,,,,,
TasDC66045,25/03/2024,Tasman District Council,Richmond Central Stormwater diversion.,Diversion of runoff from Washbourn Gardens to Gladstone Road. Further diversion to Poutama Drain addressed in TDC Project AMP ID 66015.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Tasman,,,Water,5 - 25 million,,,,,,,2027-Q3,2030-Q3,,,,,
TasDC66097,25/03/2024,Tasman District Council,Capacity upgrades and extensions for intensification in Richmond.,Servicing growth area identified in Nelson-Tasman Future Development Strategy.,,In planning,Funding source confirmed,To be determined,To be determined,Tasman,,,Water,5 - 25 million,,,,,,,2024-Q3,2054-Q3,,,,,
TasDC66090,25/03/2024,Tasman District Council,Richmond South Stormwater Upgrades Programme.,Upgrade of stormwater channels and road crossings including ecological improvements to accommodate growth in Richmond South.,,In planning,Funding source confirmed,Open,Construct only,Tasman,,,Water,50 - 100 million,,,,,,,2024-Q3,2042-Q3,,,,,
TasDC66046,25/03/2024,Tasman District Council,Richmond West Stormwater Upgrades Programme.,Upgrade of stormwater channels and road crossings including ecological improvements to accommodate growth in Richmond West and South.,,In planning,Funding source confirmed,Open,Construct only,Tasman,,,Water,5 - 25 million,,,,,,,2024-Q3,2034-Q3,,,,,
TasDC86027,25/03/2024,Tasman District Council,Mapua Reticulation - Channel Crossing.,Install additional water main from Mapua Wharf under Mapua estuary to Rabbit Island to improve capacity.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Tasman,,,Water,5 - 25 million,,,,,,,2034-Q3,2040-Q3,,,,,
TasDC86037,25/03/2024,Tasman District Council,Redwood Valley WTP & PS - Treatment Rationalisation.,Combine sites into one WTP. Upgrade River Rd bores. Replace/remove all redundant components/buildings at Golden Hills sites new WTP to meet DWSNZ.,,In planning,Funding source confirmed,To be determined,To be determined,Tasman,,,Water,5 - 25 million,,,,,,,2024-Q3,2027-Q3,,,,,
TasDC86050,25/03/2024,Tasman District Council,Richmond Reticulation - Pipe Renewals.,Replacement of cast iron pipes on Edward Roeske Wilkes George William and Gilbert Streets.,,In planning,Funding source to be confirmed,To be determined,To be determined,Tasman,,,Water,5 - 25 million,,,,,,,2026-Q3,2030-Q3,,,,,
TasDC86063,25/03/2024,Tasman District Council,Motueka Reticulation - new water reticulation in unserviced areas.,New reticulation to supply water to unserviced areas.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Tasman,,,Water,5 - 25 million,,,,,,,2038-Q3,2044-Q3,,,,,
TasDC86094,25/03/2024,Tasman District Council,Urban Water Club Reticulation - Valve Renewal.,Renewal of valves within the Urban Water Club schemes.,,Under construction,Funding source confirmed,Selective,Construct only,Tasman,,,Water,5 - 25 million,,,,,,,2024-Q3,2054-Q3,,,,,
TasDC86097,25/03/2024,Tasman District Council,Urban Water Club Reticulation - Meter Renewal.,Renewal of water meters within Urban Water Club schemes.,,Under construction,Funding source confirmed,Selective,Construct only,Tasman,,,Water,5 - 25 million,,,,,,,2024-Q3,2054-Q3,,,,,
TasDC86111,25/03/2024,Tasman District Council,Urban Water Club Reticulation - Renewal.,Renewal of reticulation within the Urban Water Club schemes.,,Under construction,Funding source confirmed,Selective,Construct only,Tasman,,,Water,25 - 50 million,,,,,,,2024-Q3,2054-Q3,,,,,
TasDC86121,25/03/2024,Tasman District Council,Richmond South Reticulation - Low Level Reservoir Stage 1.,Reservoirs(2) to provide storage for Richmond West development and low level areas of Richmond South.,,In planning,Funding source confirmed,To be determined,To be determined,Tasman,,,Water,5 - 25 million,,,,,,,2024-Q3,2026-Q3,,,,,
TasDC86123,25/03/2024,Tasman District Council,Waimea Water Strategy - Brightwater & Wakefield Water Reticulation.,Upgrade Bird Road PS includes land purchase New trunk main from Brightwater to Wakefield New line from Clover Road Bores to existing main at Brightwater WTP New Clover Rd Borefield New Clover Road WTP New Reservoir - additional storage at Wakefield New Reservoir - additional storage at Brightwater.,,In planning,Funding source confirmed,Open,Construct only,Tasman,,,Water,25 - 50 million,,,,,,,2024-Q3,2032-Q3,,,,,
TasDC86178,25/03/2024,Tasman District Council,Richmond Reticulation Upgrades to service growth.,Upgrades of Richmond water supply mains to facilitate intensification growth.,,Early planning,Funding source confirmed,To be determined,To be determined,Tasman,,,Water,5 - 25 million,,,,,,,2027-Q1,2033-Q3,,,,,
TasDC86153,25/03/2024,Tasman District Council,Dovedale - New source & raw water line.,Dovedale - New source & raw water line from Motueka River Valley.,,In planning,Funding source confirmed,To be determined,To be determined,Tasman,,,Water,5 - 25 million,,,,,,,2025-Q3,2028-Q3,,,,,
TasDC96013,25/03/2024,Tasman District Council,Upgrade pressure main under Māpua Channel.,Directional drill a new 315 ID HDPE pipe from Māpua wharf area to Rabbit island.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Tasman,,,Water,5 - 25 million,,,,,,,2037-Q3,2039-Q3,,,,,
TasDC96020,25/03/2024,Tasman District Council,Motueka WWTP - Construction and new reticulation.,Construction of new WWTP and associated reticulation.,,Early planning,Funding source confirmed,To be determined,To be determined,Tasman,,,Water,100 - 250 million,,,,,,,2030-Q3,2035-Q3,,,,,
TasDC96053,25/03/2024,Tasman District Council,Part A - Brightwater Main WWPS Upgrade and pressure main upgrade.,From Brightwater pump station to Burkes Bank. Upgrade WWPS and replace existing pressure main with 2.2 km HDPE 250mm ID PN 12 including 2 air valves and odour control. ’.,,In planning,Funding source confirmed,To be determined,To be determined,Tasman,,,Water,5 - 25 million,,,,,,,2025-Q3,2030-Q3,,,,,
TasDC96080,25/03/2024,Tasman District Council,Part B - New pump station at Wakefield and increase capacity of mains from Wakefield to Burkes Bank.,New WWPS at Bird Road including emergency storage capacity and install new 250mm ID HDPE pressure main including odour control.,,In planning,Funding source confirmed,To be determined,To be determined,Tasman,,,Water,5 - 25 million,,,,,,,2025-Q3,2030-Q3,,,,,
TasDC96081,25/03/2024,Tasman District Council,Part C - New pressure main from Burkes Banks to Beach Road PS connecting in Richmond South PS.,Install 4km of 250mm HDPE from Burkes Bank to Richmond and 3.3km of 300mm HDPE from Richmond South to Beach Road WWPS.,,In planning,Funding source confirmed,To be determined,To be determined,Tasman,,,Water,25 - 50 million,,,,,,,2029-Q3,2034-Q3,,,,,
TasDC96094,25/03/2024,Tasman District Council,Relocate Takaka WWTP.,Relocation and upgrade of the Takaka WWTP.,,Early planning,Funding source confirmed,To be determined,To be determined,Tasman,,,Water,50 - 100 million,,,,,,,2030-Q3,2036-Q3,,,,,
TasDC96047,25/03/2024,Tasman District Council,Richmond South - new pump stations and rising main.,Richmond South - new pump stations and rising main.,,Early planning,Funding source confirmed,To be determined,To be determined,Tasman,,,Water,5 - 25 million,,,,,,,2024-Q3,2032-Q3,,,,,
IP006734,20/03/2024,Tauranga City Council,Cameron Road Stage 1.,Streetscape upgrade from Harrington Street to 17th Avenue including three waters upgrades.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Transport,25 - 50 million,2020-Q2,,2020-Q4,,2021-Q3,,2020-Q1,2024-Q1,,,,,
IP006735,20/03/2024,Tauranga City Council,Cameron Road Stage 2.,Detailed Business Case associated with Cameron Road Stage 2Separate project report exists for Detailed Design & Implementation / Physical Works.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,100 - 250 million,2021-Q3,,2024-Q1,,2025-Q4,,2021-Q3,2029-Q2,,,,,
IP006736,20/03/2024,Tauranga City Council,TSP002 - Hewletts Sub Area (Totara Hull Maunganui).,TSP002 - Hewletts Sub Area (Totara Hull Maunganui).,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,25 - 50 million,2023-Q4,,2025-Q4,,2027-Q4,,2022-Q1,2030-Q4,,,,,
IP006738,20/03/2024,Tauranga City Council,City Centre Public Transport Hub.,The primary outcome for the City Centre public transport facility are facilitating mode-shift and supporting the redevelopment of the City Centre.The project is to confirm a suitable location (or multiple dependent locations) for a public transport hub within the City Centre.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,5 - 25 million,2023-Q2,,2024-Q1,,2024-Q3,,2023-Q2,2024-Q4,,,,,
IP006740,20/03/2024,Tauranga City Council,TSP042 - Safe Network Programme.,Various safety related transport projects.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Transport,100 - 250 million,2022-Q3,,,,,,2022-Q3,2026-Q4,,,,,
IP006750,20/03/2024,Tauranga City Council,Accessible Streets – Area B - Phase 1- Business Case.,The scope is for the Single Stage Business case only. The intention is to deliver a SSBC ( Phase 1) for the Accessible Streets - Area B project that aligns with the Waka Kotahi Business Case Approach. The purpose of the SSBC is to identify and confirm the preferred interventions for delivering the outcomes listed for the residents of Otumoetai/Bellevue/ Brookfield and Judea. Following approvals the project will proceed to Phase 2 and 3 of the project lifecycle.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,5 - 25 million,2022-Q3,,2022-Q3,,2024-Q3,,2022-Q3,2027-Q3,,,,,
IP006759,20/03/2024,Tauranga City Council,Road Rehabilitation.,One rehabilitation project $1m. The remainder of the spend is a mixture of holding strategies until funding is available. 3 year project with Fulton Hogan (current maintenance contractor).,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Transport,50 - 100 million,2023-Q4,,2023-Q4,,2023-Q4,,2023-Q1,2024-Q1,,,,,
IP006760,20/03/2024,Tauranga City Council,Road resurfacing WC212.,Multiple chip seal and asphalt sites (approx 100). Fulton Hogan to deliver as part of the maintenance contractPreseal repairs are completed prior to surfacing works.Carparks included where applicable.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Transport,100 - 250 million,2023-Q3,,2023-Q3,,2023-Q4,,2023-Q1,2024-Q1,,,,,
IP010513,20/03/2024,Tauranga City Council,Papamoa East Interchange Stage 3.,Design and construction of a diamond interchange and The Sands Avenue (south) to connect the new Wairakei Urban Growth Areas to the Tauranga Eastern Link (TEL).,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Transport,50 - 100 million,2021-Q3,,2022-Q3,,2023-Q4,,2021-Q1,2026-Q2,,,,,
IP010514,20/03/2024,Tauranga City Council,Te Okuroa Drive Extension to Te Tumu.,This project will extend Te Okuroa Drive from tie in at The Sands Avenue intersection (constructed under Papamoa East Interchange Phase 2) to Te Tumu boundary road. This project will support the next stage of design development (from concept to detailed) and then through to construction to a suitable standard (metalled not sealed) to faciliate construction traffic to the Mitre 10 on or before 30 September 2024 (seperable portion 1). Full construction of ToD to be completed by 30th June 2025 (seperable portion 2).,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,5 - 25 million,2023-Q3,,2024-Q1,,2024-Q4,,2023-Q3,2025-Q3,,,,,
IP010567,20/03/2024,Tauranga City Council,TSP007 - Turret Road 15th Ave multimodal.,This project involves identification through a SSBC and implementation of a preferred option for development of the 15th Avenue to Welcome Bay transportation corridor delivering multi-modal improvements reduced traffic congestion and improved travel time reliability.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,100 - 250 million,2022-Q2,,2024-Q2,,2025-Q3,,2022-Q2,2027-Q2,,,,,
IP010568,20/03/2024,Tauranga City Council,Arataki Bus Facility - Detailed Business Case.,Delivery of Detailed Business Case to secure funding for a bus interchange facility in Arataki area.N.000008.15.01 - $1 329 477N.000008.15.02 - $34 000 (Optimism Bias)N.000008.15.02 - $97 000 (Contingency).,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,2024-Q1,,2024-Q2,,2024-Q2,,2024-Q1,2024-Q4,,,,,
IP010569,20/03/2024,Tauranga City Council,TSP028 - Taurikura Drive Upgrade.,Network improvements on Taurikura Drive in Tauriko to enable the development of a public transport facility at the Tauranga Crossing shopping center site.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,25 - 50 million,2023-Q3,,2023-Q4,,2024-Q3,,2023-Q3,2028-Q2,,,,,
IP010570,20/03/2024,Tauranga City Council,Domain Road Upgrade.,Reconstruct and future-proof Domain Road between Tara Road and The Gardens Drive for potential future development and subdivision.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,5 - 25 million,2023-Q2,,2023-Q2,,2025-Q1,,2023-Q2,2028-Q3,,,,,
IP010571,20/03/2024,Tauranga City Council,TSP 015 - Te Tumu Internal Multi Modal.,Transportation Business Case for Te Tumu and Wairakei Town Centre for all modes of transport. Tauranga Eastern Corridor Growth/Wairakei Urban Growth Area. Project Size is medium due to the complexity (Land owners and implications to reputation) and the inter-connectivity with PEI and the Waireki Growth Area.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,< 1 million,2022-Q3,,2024-Q1,,2024-Q1,,2022-Q3,2024-Q2,,,,,
IP010572,20/03/2024,Tauranga City Council,Low Cost Low Risk (LCLR).,Multiple low cost low risk transportation projects.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Transport,25 - 50 million,2023-Q3,,2023-Q3,,2024-Q1,,2023-Q3,2024-Q3,,,,,
IP010573,20/03/2024,Tauranga City Council,LCLR-Maranui Street Upgrades and Improvements.,The purpose of the upgrade and improvement Project for Maranui Street is to improve the quality and safety of the road infrastructure for all road users. The project aims to achieve this by carrying out pavement strengthening road widening relocating services constructing kerb and channel footpath and cycle lane. The main goal of the project is to create a more durable and resilient road network that can better withstand the demands of heavy traffic while also providing a safer and more efficient transport system for pedestrians and cyclists. Additionally the project will enhance the overall urban environment and improve the aesthetic appeal of the two roads. Ultimately the project aims to deliver a high-quality road infrastructure that meets the needs of the community and supports the economic development of the area.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,2023-Q2,,2023-Q3,,2024-Q3,,2023-Q2,2025-Q2,,,,,
IP010574,20/03/2024,Tauranga City Council,Maunganui Road - Tui to Hull.,Safety Improvement works on Maunganui Road between Tui Street & Hull Road.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Transport,5 - 25 million,2020-Q2,,2020-Q2,,2024-Q1,,2020-Q2,2025-Q4,,,,,
IP010576,20/03/2024,Tauranga City Council,Keenan Road Urban Growth Area Transport Infrastrcuture SSBC (Western corridor Ring Route: SH29-SH36).,** budget to be finalised ** Development of the Keenan Road UGA is expected to yield approximately 2 500 additional dwellings with associated social infrastructure as part of the wider western corridor which includes the Tauriko West Urban Growth Area and the Tauriko Business Estate (TBE). The Keenan Road UGA is intended to be supported by multi-modal transport options that include public transport and pedestrian and cycling facilities that enable safe and efficient movement within neighbourhoods and with connection to nearby areas. The key transport elements of the SSBC would be the investigation of:•Improved multi-modal access to the growth area;•SH36 between Lakes Boulevard and Pyes Pa Road for consideration of bus lanes and walking cycling infrastructure; •Investigation of Pyes Pa Road between Keenan Road and Cheyne Road for walking cycling public transport and intersection improvements; •Investigation of the Ring route link from SH36 to Kaweroa Drive crossing the Kopurererua stream; •Walking and cycling routes to connect to existing urban areas; and•Consideration of wider connections to potential envisioned UFTI growth areas such as Merrick Road Joyce Road and Belk Road;•Preferred option for the key transport corridors within the Keenan Road UGA as determined through the form and function option assessment.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,< 1 million,2023-Q1,,2024-Q1,,2034-Q2,,2023-Q1,2048-Q2,,,,,
IP010577,20/03/2024,Tauranga City Council,Tauriko West Enabling Works.,Works to enable mode shift and regional growth delivering enabling works that have been identified prior to completion of the Detailed Business Case. The works involve the following on SH29 :1) A new roundabout at Redwood Lane which will link into Tauranga Business Estate2) A new intersection into the Urban Growth Area (initially 2000 housing units)3) Signalisation of the Cambridge Road intersection4) Passenger Transport improvements on the TCC network (Whiore Ave) comprising a bus gate new footpaths and cycleways5) Widening of SH29 between Cambridge Road and the northern access.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,< 1 million,2021-Q3,,2022-Q3,,2024-Q1,,2021-Q3,2027-Q2,,,,,
IP010578,20/03/2024,Tauranga City Council,Bell Road watermain to Te Tumu.,New 450 dia watermain along Bell Road into Te Tumu UGA to add supply route and capacity into both Te Tumu and Wairakei UGAs.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,< 1 million,,,2024-Q2,2024-Q2,2024-Q2,2025-Q3,2024-Q2,2025-Q3,,,,,
IP010759,20/03/2024,Tauranga City Council,KPS-Fraser Street ( between 17th and 18th).,Pedestrian Signalised Crossing with raised speed table.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,2023-Q3,,2023-Q3,,2023-Q3,,2023-Q1,2024-Q2,,,,,
IP010760,20/03/2024,Tauranga City Council,Enabling City Centre Transport Movement.,To undertake Tactical implementation for City Centre Movement framework to align with the requirements set in City Centre Activity Investment plan.These works will encompass the installation of above-ground assets including urban design elements such as planter boxes bollards minor kerb realignment re-linemarking and parking re-orientation.Details of some key routes listed below •Hamilton Street/Harrington Street one-way movement for both Public transport and General vehicle. •Wharf/Willow/Spring clockwise one-way movement.•Grey Street north-bound one-way movement•Elizabeth Street/Grey Street/Willow Street key cycling corridor.•Harrington Street Bus Stop.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Transport,5 - 25 million,2023-Q3,,2023-Q3,,2024-Q1,,2023-Q1,2024-Q2,,,,,
IP010761,20/03/2024,Tauranga City Council,TC787/23 - TSP019 Active Modes & PT City Periphery.,23rd Ave - Cook Street - Faulkner Street - Shared Path and Raise Crossings.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,5 - 25 million,2023-Q1,,2023-Q1,,2024-Q1,,2023-Q1,2024-Q2,,,,,
IP010762,20/03/2024,Tauranga City Council,Wairakei Town Centre - Bluehaven Delivered Projects.,Management of the Development Agreement with Bluehaven for delivery of Wairakei Town Centre including management of the four Bluehaven delivered capex projects. TCC will reimburse Bluehaven for a portion of the costs of construction of The Sands Avenue and The Boulevard road corridors.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,25 - 50 million,2023-Q4,,2024-Q1,,2024-Q3,,2023-Q4,2027-Q1,,,,,
IP010763,20/03/2024,Tauranga City Council,Pavement Rehab - Specific Sites.,Pavement Rehabilitation - Specific Sites. Sites prioritised based on the road classification and condition/age.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,5 - 25 million,2023-Q3,,2023-Q3,,2024-Q1,,2023-Q3,2024-Q2,,,,,
IP006748,20/03/2024,Tauranga City Council,CFIP Memorial Park Aquatics Facility.,Planning design and construction of a new Aquatic Facility in Memorial Park.CFIP Memorial Park Recreation Hub.,,In planning,Fully funded,Selective,Early contractor involvement,Bay of Plenty,,,Community facilities,100 - 250 million,2023-Q3,2024-Q2,2024-Q1,2025-Q4,2024-Q3,2027-Q4,2023-Q3,2028-Q1,,,,,
IP006749,20/03/2024,Tauranga City Council,Indoor Courts 483 Cameron Road.,Refurbish 483 Cameron Road (The Warehouse) building to IL3 to accommodate 4 indoor multi-use courts changing and amenities a reception and storage.,,In procurement,Funding source confirmed,Direct,Design and construct,Bay of Plenty,,,Community facilities,25 - 50 million,2023-Q4,,2024-Q1,2024-Q2,2024-Q2,2024-Q3,2023-Q4,2024-Q4,,,,,
IP010515,20/03/2024,Tauranga City Council,Strand Extension Streetscape (Elizabeth St East/Tunks Reserve).,Reconstruction of Tunks Reserve steps and embankment and streetscape enhancement of Elizabeth Street east of Devonport Road consistent with the Elizabeth Street linear Park.,,Under construction,Fully funded,Open,Construct only,Bay of Plenty,,,Community facilities,5 - 25 million,2022-Q1,,2022-Q4,2023-Q2,2023-Q2,2023-Q4,2022-Q1,2023-Q4,,,,,
IP010516,20/03/2024,Tauranga City Council,Civic Administration Building Fitout.,In 2020 Willis Bond presented an option to Council to build a new building for the purposes of Council Offices. In 2021 the Council approved the proposal including an option to lease the building for a 15 year lease term with further rights of renewal. A budget of $33.1M is included in the LTP 2021-31 towards the fitout costs associated with the new building. The construction of the 10 279m2 multi storey office block funded by Willis Bond and constructed by LT McGuiness is scheduled to be completed in March 2025. .,,Under construction,Fully funded,Direct,Construct only,Bay of Plenty,,,Community facilities,25 - 50 million,2022-Q1,,2023-Q3,2023-Q4,2024-Q1,2025-Q1,2022-Q1,2025-Q2,,,,,
IP010517,20/03/2024,Tauranga City Council,Central Library & Community Hub.,The new Library and Community Hub is a multi-purpose facility that incorporates an integrated customer services function and provides for community activities beyond simply a traditional library. The Library and Community Hub building will feature a mass timber hybrid structure targeting a 6 Green Star rating. Costs updated 2023 Annual Plan per Civic Rebuild Masterplan.,,Under construction,Fully funded,Direct,Construct only,Bay of Plenty,,,Community facilities,50 - 100 million,2021-Q3,,2023-Q3,2024-Q4,2023-Q4,2026-Q2,2021-Q3,2026-Q2,,,,,
IP010518,20/03/2024,Tauranga City Council,Masonic Park Upgrade.,Redevelopment of Masonic Park to link the Waterfront Reserve with Te Manawataki o Te Papa.,,Under construction,Fully funded,Direct,Construct only,Bay of Plenty,,,Community facilities,5 - 25 million,2022-Q3,,2023-Q2,2023-Q4,2023-Q4,2024-Q3,2021-Q3,2024-Q3,,,,,
IP010519,20/03/2024,Tauranga City Council,CWEM (Civic Whare Exhibition Centre and Museum).,Design and Construction of Civic Whare Exhibition Centre and Museum located on Willow and Hamilton Streets.,,In planning,Funding source to be confirmed,Direct,Construct only,Bay of Plenty,,,Community facilities,100 - 250 million,2022-Q3,,2023-Q4,2025-Q3,2024-Q2,2028-Q3,2022-Q2,2028-Q3,,,,,
IP010520,20/03/2024,Tauranga City Council,Strand Waterfront Reserve.,Redevelopment of Strand Reserve in 3 stages - North Central & South. This will include event area Whare Waka Public Toilets Passive area.Playground & Waterpark are listed as a separate project.,,Under construction,Fully funded,Open,Construct only,Bay of Plenty,,,Community facilities,1 - 5 million,2018-Q4,,2023-Q3,2023-Q4,2023-Q1,2024-Q4,2018-Q4,2024-Q4,,,,,
IP010521,20/03/2024,Tauranga City Council,Willow Street Upgrade.,Redevelopment of Willow Street to link the Waterfront Reserve with Te Manawataki o Te Papa.,,Early planning,Funding source to be confirmed,To be determined,Construct only,Bay of Plenty,,,Community facilities,5 - 25 million,2022-Q3,,2023-Q3,2025-Q3,2023-Q4,2028-Q3,2022-Q2,2028-Q3,,,,,
IP010522,20/03/2024,Tauranga City Council,Site A Civic Establishment.,Civic Heart Demolition and Site A Civic Establishment. Civic precinct (administration library and Hamilton street carpark) demolition and site prep.,,In planning,Part funded,Direct,Construct only,Bay of Plenty,,,Community facilities,5 - 25 million,2023-Q1,,2023-Q3,2025-Q3,2023-Q4,2028-Q3,2022-Q2,2028-Q3,,,,,
IP010523,20/03/2024,Tauranga City Council,Art Gallery Door Relocation.,The upgrade to the Tauranga Art Gallery is to better connect the gallery with the new civic precinct works through a re-alignment of the main entry to the Art Gallery. Moving the entry from the Wharf Street corner to the new masonic park side to better connect with Te Manawataki o te papa.,,In planning,Funding source confirmed,To be determined,Construct only,Bay of Plenty,,,Community facilities,5 - 25 million,2023-Q1,,2024-Q2,2024-Q2,2024-Q2,2024-Q4,2023-Q1,2024-Q4,,,,,
IP010525,20/03/2024,Tauranga City Council,Beacon Wharf Upgrade.,The Beacon Services Wharf is an historic wharf used for marine vessel maintenance. The existing wharf is in a derelict state and has been closed due to its condition for several years. The project objective is the renewal of Beacon Wharf into a commercial / recreation space that celebrates cultural values. Option of vessel berthage shall be investigated.,,Under construction,Fully funded,Open,Construct only,Bay of Plenty,,,Community facilities,1 - 5 million,2022-Q3,,2023-Q4,2024-Q1,2023-Q4,2024-Q2,2022-Q3,2024-Q2,,,,,
IP010526,20/03/2024,Tauranga City Council,Dive Crescent Car Park.,Dive Crescent Car Park Upgrade of an at-grade car park on the western side of Dive Crescent.,,Under construction,Fully funded,Open,Construct only,Bay of Plenty,,,Community facilities,1 - 5 million,2022-Q3,,2022-Q4,2022-Q4,2023-Q1,2024-Q2,2022-Q3,2024-Q2,,,,,
IP010527,20/03/2024,Tauranga City Council,Memorial Park to City Centre Pathway - Stage 1.,Construct pedestrian access under the railway line near Matapihi Bridge linking to a Boardwalk connecting with the Southern Strand area.,,Under construction,Fully funded,Open,Construct only,Bay of Plenty,,,Community facilities,5 - 25 million,2021-Q4,,2023-Q1,2023-Q4,2023-Q4,2024-Q3,2021-Q4,2024-Q3,,,,,
IP010764,20/03/2024,Tauranga City Council,Civic Heart Building Demolition Costs.,Demolition of the existing building infrastructure remaining within Site A.,,Under construction,Fully funded,Direct,Construct only,Bay of Plenty,,,Community facilities,1 - 5 million,2023-Q4,,2022-Q1,2022-Q1,2022-Q2,2024-Q2,2021-Q2,2024-Q2,,,,,
IP010765,20/03/2024,Tauranga City Council,Civic Plaza.,Demolition of the Civic Heart building and civic works required for the Site A Establishment project will allow the Civic Precinct and Civic Plaza plans to proceed. The extensive slope of Site A from Durham Street to Willow Street presents challenges to the landscaping design. The Site falls steeply from Durham Street to Willow Street with a difference in level between the two streets of between 8 and 11 metres. This gradient has been addressed through a series of terraces up the site. Large stairways are a feature to the south of the site with an accessible walkway integrated into the landscapeThe Civic Plaza projects include the open places & spaces within the Civic Precinct and includes: •Site levels•Paving•Sculpture Garden•Wharf & Hamilton St footpaths•Amphitheatre•Planting•Through site link.,,In planning,Fully funded,To be determined,Construct only,Bay of Plenty,,,Community facilities,5 - 25 million,2022-Q3,,2023-Q3,2024-Q3,2023-Q4,2028-Q3,2022-Q2,2028-Q3,,,,,
IP010766,20/03/2024,Tauranga City Council,Baycourt Upgrade.,Upgrading of the exterior of Baycourt to tie into the new civic development precinct and allow for an external lift to serve the precinct. Potential upgrades to interior lobbies and toilets as well.,,In planning,Funding source to be confirmed,Direct,Construct only,Bay of Plenty,,,Community facilities,5 - 25 million,2022-Q3,,2024-Q1,2024-Q3,2024-Q3,2027-Q1,2022-Q2,2027-Q1,,,,,
IP010767,20/03/2024,Tauranga City Council,Waterfront Central Plaza (excluding Wharf).,Waterfront reserve between Masonic Park and Wharf Street.,,In planning,Fully funded,Open,Construct only,Bay of Plenty,,,Community facilities,5 - 25 million,2023-Q1,,2024-Q1,2024-Q2,2024-Q3,2025-Q1,2023-Q1,2025-Q1,,,,,
IP010768,20/03/2024,Tauranga City Council,Hamilton Wharf & Durham Streets Footpath Upgrade.,Redevelopment of surrounding streets with Te Manawataki o Te Papa.,,Early planning,Funding source to be confirmed,To be determined,Construct only,Bay of Plenty,,,Community facilities,1 - 5 million,2022-Q3,,2023-Q3,2025-Q3,2023-Q4,2028-Q3,2022-Q2,2028-Q3,,,,,
IP010769,20/03/2024,Tauranga City Council,Central Plaza Wharf.,Redevelopment of waterfront reserve between Masonic Park and Wharf Street.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Community facilities,5 - 25 million,,,2024-Q1,2024-Q2,2024-Q3,2025-Q1,2023-Q1,2025-Q2,,,,,
IP010770,20/03/2024,Tauranga City Council,160 - 176 Devonport Road Carpark.,The land at 160-176 Devonport Road came up for 2022 and Tauranga City Council took the opportunity to purchase it as a strategic city centre land holding. This strategic property acquisition is part of council’s wider strategy to make land available for redevelopment The long-term use of this site on Devonport Road is yet to be determined but we do know that the existing buildings have issues and are unfit for long-term use so can’t provide a good financial return in their current state. Proposal is to demolish the structures and maximise car parking across the site.,,Under construction,Fully funded,Open,Construct only,Bay of Plenty,,,Community facilities,1 - 5 million,,,2023-Q3,2023-Q4,2023-Q4,2024-Q2,2023-Q3,2024-Q4,,,,,
IP010528,20/03/2024,Tauranga City Council,Waterfront Playground Development.,Developing the Waterfront Reserve (currently The Strand carpark) into a green space including the installation of a playground splashpad and associated landscaping elements (e.g. paving seating planting etc.).,,In planning,Fully funded,Open,Design and construct,Bay of Plenty,,,Community facilities,5 - 25 million,,,2022-Q2,2023-Q2,2024-Q1,2024-Q3,2022-Q2,2024-Q3,,,,,
IP010529,20/03/2024,Tauranga City Council,Beachside Holiday Park renewals.,Planned renewals as identified in the condition assessments programme.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Community facilities,1 - 5 million,2023-Q3,,2023-Q3,,2023-Q3,,2023-Q1,2024-Q2,,,,,
IP010530,20/03/2024,Tauranga City Council,Mount Beachside Holiday Park ensuite cabins.,Installation of four ensuite cabins to Mount Beachside Holiday Park.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Community facilities,< 1 million,2023-Q3,,2023-Q3,,2023-Q3,,2022-Q4,2023-Q4,,,,,
IP010531,20/03/2024,Tauranga City Council,Gate Pa Community Centre.,New Gate Pa Community Centre - design and construction.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Community facilities,5 - 25 million,2023-Q2,,2023-Q4,,2024-Q1,,2023-Q1,2025-Q2,,,,,
IP010532,20/03/2024,Tauranga City Council,Cemetery Building Renewals.,Cemetery Renewals.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Community facilities,< 1 million,2023-Q3,,2023-Q3,,2023-Q4,,2022-Q1,2024-Q2,,,,,
IP010533,20/03/2024,Tauranga City Council,New Cremator.,New oversized cremator to replace existing elecfurn cremator.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Community facilities,< 1 million,,,2023-Q1,2023-Q2,2023-Q3,2024-Q2,2023-Q1,2024-Q2,,,,,
IP010534,20/03/2024,Tauranga City Council,Papamoa Beach Shared Path.,The design and construction of a shared path between Papamoa Domain and Parton Road.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Community facilities,1 - 5 million,2021-Q4,,2022-Q1,,2023-Q2,,2021-Q4,2024-Q2,,,,,
IP010535,20/03/2024,Tauranga City Council,Otumoetai / Matua Coastal Pathway.,Design of comprehensive cycling and shared path stretching from the Chapel Street bridge through to the western end of Fergusson Park along the Otumoetai and Matua foreshores. The route needs to be of consistent standard prioritorized programmed for gradual implementation commencing in 2024FY.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Community facilities,< 1 million,2023-Q3,,2023-Q4,,2024-Q2,,2023-Q1,2024-Q2,,,,,
IP010536,20/03/2024,Tauranga City Council,Historic Village - B35a/b Nissan Huts.,A project that came out of FY23 Renewals Bundle - Building 35a/b physical works requires additional design engineering input and consenting documentation before physical works can be completed to restore the buildings to their historic nature.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Community facilities,1 - 5 million,2023-Q3,,2023-Q3,,2023-Q4,,2023-Q1,2024-Q2,,,,,
IP010537,20/03/2024,Tauranga City Council,Complex 2 Upgrade & Renewals.,The purpose of this project is to bring existing Complex 2 Venue Café and Kitchen facilities at the Historic Village up to a compliant level in accordance with the building code reduce health and safety risk for staff working in the spaces and improve service levels of the space for its users.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Community facilities,5 - 25 million,2021-Q3,,2021-Q3,,2022-Q4,,2021-Q1,2026-Q1,,,,,
IP010538,20/03/2024,Tauranga City Council,The Historic Village Building 64.,Refurbishment of the interior at Building 64 at The Historic Village. This includes adding in a kitchen updating interior walls with paint and wallpaper upgrading electrical plans adding in a heat pump. N.000038.16 & N.000038.03.,,Post implementation ,Fully funded,To be determined,To be determined,Bay of Plenty,,,Community facilities,< 1 million,2022-Q4,,2022-Q4,,2023-Q2,,2022-Q4,2024-Q4,,,,,
IP010539,20/03/2024,Tauranga City Council,The Historic Village - The Kiln Shed.,New Kiln Shed for the Arts Hub in the Historic Village.,,In procurement,Fully funded,Selective,Construct only,Bay of Plenty,,,Community facilities,< 1 million,,,2023-Q2,2024-Q3,2023-Q2,2024-Q3,2023-Q2,2024-Q3,,,,,
IP010540,20/03/2024,Tauranga City Council,Kopurererua Valley Realignment Project.,Realignment of the Kopurererua Southern and Northern streams to the natural flow stream.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Community facilities,1 - 5 million,2021-Q1,,2021-Q1,,2021-Q2,,2021-Q1,2026-Q2,,,,,
IP010541,20/03/2024,Tauranga City Council,Marine Facilities Upgrade and Renewals.,Multiple projects involving marine facilities.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Community facilities,25 - 50 million,,,2023-Q4,2024-Q1,2024-Q2,2024-Q4,2023-Q3,2024-Q4,,,,,
IP010545,20/03/2024,Tauranga City Council,Golf Road Reserve - Community share Building.,Project has been combined with Blake Park - Relocate Playcentre - IBIS 150209Project involves getting resource consent for and creating a building platform for the relocated play centre to be built. Community gardens will be located in the rear section of the reserve and the existing building will be refurbished so that it can be bookable for community activities.,,Post implementation ,Fully funded,Open,To be determined,Bay of Plenty,,,Community facilities,< 1 million,2023-Q1,,2023-Q1,,2023-Q3,,2023-Q1,2024-Q1,,,,,
IP010546,20/03/2024,Tauranga City Council,Marine Parade Boardwalk.,Construct pathway along the Marine Parade frontage from the Cenotaph to the Oceanbeach Road roundabout including ancillary facilities to accompany the new facility.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Community facilities,5 - 25 million,2022-Q1,,2022-Q1,,2023-Q1,,2022-Q1,2025-Q1,,,,,
IP010547,20/03/2024,Tauranga City Council,Mauao Placemaking.,The design and construction of placemaking features on Mauao including signage furniture and Celestial compass.Applicable budget code: N.000054.12.01.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Community facilities,< 1 million,2021-Q1,,2021-Q1,,2021-Q2,,2021-Q1,2024-Q3,,,,,
IP010548,20/03/2024,Tauranga City Council,Gordon Spratt Reserve Shared Club Faclity.,Change from original Project Description.New shared club facility to be new building with six single access public toilets three new storage units and a reception room with small kitchen and internal toilets. Once the new public toilets are operational the public toilets in the existing building will be removed to allow the addition of two more changing rooms.Development of a shared club facility on Gordon Spratt Reserve to be constructed on top of current changing rooms and toilets. A needs analysis and Feasibility study has been completed. Council to contribute a minimum 30% with the external funding to be obtained and possible contribution from sporting codes. To be managed by the users of the park and TCC Parks and Reserve Booking Officer. Development of park to be in line with RMP statements for active reserves.th small kitchen and.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Community facilities,5 - 25 million,2023-Q3,,2023-Q3,,2023-Q4,,2023-Q1,2024-Q3,,,,,
IP010549,20/03/2024,Tauranga City Council,Upgrades to sports field network.,To undertake upgrades to the existing sports field network to increase capacity for hours of use by improving turf quality through additions of field drainage and irrigation and growing in more resilient warm season grasses. Also utilising this increased capacity by providing additional floodlights for evening training hour capacity.2022/23 Sports Field improvements Morland Fox Waipuna Parks and Links Ave Reserve. New training lights for Te Wati Arataki and Waipuna Parks2023/24 Program is to revisit Waipuna Park and Morland Fox Park to replace turf that couldn't be planted last year due to extremely wet summer. Also reconfigure fields 3 4 and 5 at Gordon Spratt Reserve to provide four fields (2 football and 2 rugby) plus a new grass cricket block. All four fields will have training lights with one each of football and rugby having game quality lights for night games.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Community facilities,5 - 25 million,2023-Q1,,2023-Q1,,2023-Q3,,2023-Q1,2024-Q2,,,,,
IP010550,20/03/2024,Tauranga City Council,Artificial Turf Installation.,Artificial Turf installation at Links Ave Reserve.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Community facilities,5 - 25 million,2023-Q3,,2023-Q3,,2024-Q3,,2023-Q1,2025-Q2,,,,,
IP010552,20/03/2024,Tauranga City Council,BayPark Master Plan.,The BayPark Masterplan programme has been initiated to assist with the capacity increasing strategy to activate and allow for additional sport codes to utilise facilities across the city The programme will look to design and develop masterplan activities that will be user friendly and feasible and accommodate new and existing facility users at BayPark.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Community facilities,25 - 50 million,2023-Q2,,2023-Q3,,2024-Q2,,2023-Q1,2027-Q4,,,,,
IP010553,20/03/2024,Tauranga City Council,McLaren Falls subsidence and road slip.,Remediation of the road subsidence above the power station and the reconstruction of the road slip of the McLaren Falls access road.,,Post implementation ,Fully funded,To be determined,To be determined,Bay of Plenty,,,Community facilities,< 1 million,2022-Q3,,2022-Q3,,2023-Q3,,2022-Q3,2024-Q4,,,,,
IP010554,20/03/2024,Tauranga City Council,Waitaha Reserve Development.,This project aims to undertake detailed design including community engagement and construction of upgrades to Waitaha Reserve Welcome Bay.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Community facilities,5 - 25 million,2023-Q3,,2023-Q4,,2024-Q1,,2023-Q1,2025-Q2,,,,,
IP010555,20/03/2024,Tauranga City Council,Te Ranga Development.,Funding is be available for several improvements to the Te Ranga Historic Battle Site (e.g. stormwater improvements car park forest walk hillside and wetland planting walkway construction of a tomokanga and or other cultural elements) owned by Ngai Tamarawaho.Some of these improvements will link to the TCC-owned reserve known as Merrick's Farm.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Community facilities,< 1 million,2021-Q3,,2021-Q3,,2024-Q1,,2021-Q3,2024-Q2,,,,,
IP010556,20/03/2024,Tauranga City Council,Matua Park Development.,To renew the playspace in Matua Park to achieve “Local Neighbourhood Playspace” outcomes as identified in the Play Active Recreation Sports Action and Investment Plan. In scope: engagement detailed design communications and construction of a local neighbourhood playspace renewal. Out of scope: investment in other aspects of the park.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Community facilities,< 1 million,2023-Q3,,2023-Q4,,2024-Q1,,2023-Q3,2024-Q2,,,,,
IP010557,20/03/2024,Tauranga City Council,New Skatepark Facility.,To develop a comprehensive implementation plan for a new destination skate facility in Tauranga. The facility will be accessible to a range of people of different ages and abilities and geographical accessible to people within their local neighbourhoods. A specific outcome is to engage with specific user groups (such as; skaters scooters trick BMX and other roller groups) on design and development of a skating facility and improvements to existing ones. Additionally engagement with Mana Whenua and other stakeholder groups to ensure their contributions are heard and flow through all workstreams.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Community facilities,1 - 5 million,2022-Q1,,2022-Q1,,2023-Q1,,2022-Q1,2025-Q1,,,,,
IP010559,20/03/2024,Tauranga City Council,Papamoa Beach Reserve 1 toilet.,Provision of toilet at Papamoa Beach Reserve 1 opposite Stella Place/Hartford Avenue.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Community facilities,< 1 million,2023-Q3,,2024-Q1,,2024-Q3,,2023-Q3,2024-Q4,,,,,
IP010560,20/03/2024,Tauranga City Council,Merivale Community Centre.,Demolish and rebuild the Merivale Community Centre.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Community facilities,5 - 25 million,2023-Q2,,2024-Q1,,2024-Q2,,2023-Q2,2026-Q2,,,,,
IP010562,20/03/2024,Tauranga City Council,Destination Skate Park toilet and kiosk.,Provision of toilet and kiosk for Destination Skate Park.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Community facilities,< 1 million,2023-Q1,,2023-Q3,,2023-Q3,,2023-Q1,2024-Q2,,,,,
IP010563,20/03/2024,Tauranga City Council,Parks & Reserves Renewals - Structures.,Parks structures renewals based on condition grading & depreciation.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Community facilities,5 - 25 million,2023-Q3,,2023-Q3,,2023-Q3,,2023-Q1,2024-Q2,,,,,
IP010564,20/03/2024,Tauranga City Council,Parks Utilities Renewals 2022-31.,Utilities renewals based on condition assessments.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Community facilities,5 - 25 million,2023-Q3,,2023-Q3,,2023-Q3,,2023-Q1,2024-Q2,,,,,
IP010565,20/03/2024,Tauranga City Council,Asbestos Removal.,Budget to be used for whole team when Asbestos discovered.,,Under construction,Fully funded,Selective,Construct only,Bay of Plenty,,,Community facilities,< 1 million,,,2023-Q2,2024-Q3,2023-Q2,2024-Q3,2023-Q2,2024-Q3,,,,,
IP010566,20/03/2024,Tauranga City Council,Parks Roading Renewals.,Parks Roading Renewals Based on asset condition inspections.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Community facilities,5 - 25 million,2023-Q3,,2023-Q3,,2023-Q3,,2023-Q1,2024-Q2,,,,,
IP010771,20/03/2024,Tauranga City Council,Dog Pound Extensions.,Build a small extension to the existing dog pound building for a new reception area and increase office foot print. Install a new dog wash vet nurse area adjust storage area to suit. Install 2 x dangerous dog doors to new external exercise runs. install a new exercise area including sun shades various painting interior and exterior along with flooring upgrade in some areas.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Community facilities,< 1 million,2022-Q4,,2023-Q1,,2024-Q1,,2022-Q4,2024-Q3,,,,,
IP010772,20/03/2024,Tauranga City Council,Cemetery - Works.,Cemetery renewals development landscaping chiller installation.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Community facilities,1 - 5 million,2023-Q4,,2023-Q4,,2023-Q4,,2023-Q1,2024-Q2,,,,,
IP010773,20/03/2024,Tauranga City Council,Pyes Pa Cemetry Shed/Chapel.,Alterations to the Chapel and Pole Shed at Pyes Pa Cemetery.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Community facilities,< 1 million,2023-Q3,,2023-Q3,,2024-Q2,,2023-Q3,2024-Q2,,,,,
IP010774,20/03/2024,Tauranga City Council,Hull Road Level Crossing Upgrade.,Interim upgrade of level crossing (new cyclepath velostrail mats maze gates) to allow the safe opening of the Skate Park.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Community facilities,< 1 million,2023-Q2,,2023-Q2,,2024-Q2,,2023-Q2,2025-Q2,,,,,
IP010775,20/03/2024,Tauranga City Council,Indoor Sports Courts.,New Indoor sports courts.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Community facilities,5 - 25 million,2023-Q3,,2023-Q4,,2024-Q2,,2023-Q3,2025-Q2,,,,,
IP010776,20/03/2024,Tauranga City Council,Blake Park Car Parks.,Design of new car parks for Hull Road and Kawaka Street.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Community facilities,1 - 5 million,2023-Q3,,2023-Q4,,2024-Q3,,2023-Q3,2026-Q2,,,,,
IP010777,20/03/2024,Tauranga City Council,Cambridge Road - Closed Landfill Upgrade.,Cambridge Road closed landfill - infrastructure upgrade and remediation works to comply with Resource Consent.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Environmental,< 1 million,2021-Q2,,2021-Q2,,2021-Q2,,2021-Q1,2024-Q2,,,,,
IP006737,20/03/2024,Tauranga City Council,Te Papa Inten SW Upg Priority Dev Areas.,The intensification of Te Papa peninsula will be enabled with the resolution of many stormwater flooding issues.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,50 - 100 million,2022-Q3,,2023-Q4,,2025-Q4,,2022-Q3,2051-Q1,,,,,
IP006741,20/03/2024,Tauranga City Council,Oropi trunk main upgrade.,Construction of bulk mains.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,25 - 50 million,2023-Q3,,,,,,2023-Q3,2026-Q4,,,,,
IP006744,20/03/2024,Tauranga City Council,Wairakei Rising Main.,New rising main from new pump station at Wairakei to Opal Drive PS. Approved budget is 2021 LTP - new increased costs for 2024 LTP available but not yet approved.Handed over to delivery in 2022 but further feasibility needed to confirm timing flows and rising main size - currently underway.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,5 - 25 million,2023-Q2,,2024-Q2,,2024-Q4,,2023-Q2,2042-Q2,,,,,
IP006745,20/03/2024,Tauranga City Council,Opal Drive to Te Maunga Rising Main.,Opal Drive to Te Maunga Rising Main - 2nd rising main from the Opal Drive PS to Te Maunga WWTP to deliver increased flows from growth in the eastern corridor.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,25 - 50 million,2024-Q2,,2032-Q3,,2033-Q1,,2024-Q1,2038-Q2,,,,,
IP006746,20/03/2024,Tauranga City Council,Opal Dr Pump Station Renewal.,Construction of new pump station including storage to replace an existing pump station that is end of life.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,25 - 50 million,2020-Q4,,2021-Q1,,2024-Q1,,2020-Q4,2025-Q4,,,,,
IP006747,20/03/2024,Tauranga City Council,Main Wairakei Pump Station.,New major pump station at Wairakei to serve Papamoa East growth.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,25 - 50 million,2019-Q4,,2023-Q2,,2025-Q3,,2019-Q4,2028-Q2,,,,,
IP006757,20/03/2024,Tauranga City Council,301-Oropi and Joyce WTP supply Trunk.,Plan and replacement of trunk water mains of Oropi & Joyce network. Critical mains from WTP to Te Papa. Mains & pump stations in high risk area and at end of life.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,25 - 50 million,2022-Q2,,2025-Q3,,2027-Q3,,2022-Q2,2030-Q2,,,,,
IP006758,20/03/2024,Tauranga City Council,Chapel Street Bridge resilience works.,Chapel Street Bridge resilience works.,,On Hold,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,5 - 25 million,,,,,,,2022-Q1,2029-Q3,,,,,
IP006761,20/03/2024,Tauranga City Council,Te Maunga WW Treatment Plant Programme.,Multiple projects surrounding the WWTP.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,250 - 500 million,,,2027-Q3,2028-Q3,2029-Q3,2041-Q2,2027-Q2,2041-Q3,,,,,
IP006763,20/03/2024,Tauranga City Council,Waiari Stage 2 watermain to Mangatawa.,Extension of Waiari trunk main from Welcome Bay Road to Mangatawa Reservoir following SH2.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,25 - 50 million,2022-Q1,,2023-Q4,,2026-Q2,,2022-Q1,2027-Q2,,,,,
IP006764,20/03/2024,Tauranga City Council,Waiari Stage 3 watermain to Mount Maunganui.,Extension of trunk watermain from Mangatawa Reservoir into Mount Manunagui. Related to options assessment for long term reservoir sites in Mount Maunganui as part of reservoir project.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,5 - 25 million,2024-Q3,,2027-Q3,,2029-Q2,,2024-Q1,2033-Q3,,,,,
IP006765,20/03/2024,Tauranga City Council,TC84/21 Tauranga Watermain Upgrades 2021 to 2026.,Five-year contract for renewal of drinking water mains. The contract is developed yearly and the contractor is evaluated on compliance of KPI's. Total budget is approx. $17M over the five-year period.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,50 - 100 million,2021-Q2,,2021-Q2,,2021-Q3,,2021-Q1,2026-Q2,,,,,
IP006766,20/03/2024,Tauranga City Council,WW Reticulation Renewals.,Relining of gravity wastewater mains corroded by hydrogen sulphide relaying of sagged pipes due to soft soils & amp; 100 yr Glazed Earthenware (GEW) pipes in CBD when upgrading roads. Use 10 yr Rolling average. Renewal of deteriorated or damaged pipes.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,100 - 250 million,,,,,,,2023-Q4,2026-Q2,,,,,
IP010579,20/03/2024,Tauranga City Council,Te Tumu Rising main.,Design and construction of 2 x new wastewater RMs (450mm down Te Okuroa and 280mm dia on The Boulevard) to service Te Tumu UGA. Part of the 450 mm main in Te Okurao has already been constructed by Transport. Still need feasibility of western sections connection to new Wairakei PS.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,5 - 25 million,2019-Q3,,2030-Q3,,2034-Q3,,2019-Q3,2039-Q2,,,,,
IP010580,20/03/2024,Tauranga City Council,Cambridge Reservoir trunk main relocations.,Cambridge Reservoir trunk main relocations.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,50 - 100 million,2022-Q2,,2023-Q3,,2026-Q3,,2022-Q2,2030-Q2,,,,,
IP010581,20/03/2024,Tauranga City Council,Stormwater Reticulation Renewals.,Renewal of stormwater mains service lines and other network assets due to upgrade of roads deterioration or similar reason.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,5 - 25 million,,,2022-Q3,2022-Q3,2023-Q2,2026-Q2,2022-Q3,2026-Q2,,,,,
IP010582,20/03/2024,Tauranga City Council,Chadwick Rd watermain to Cameron Rd link.,Chadwick Rd /Pooles Rd watermain link to Cameron Rd from Fraser street.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,5 - 25 million,2022-Q2,,2023-Q3,,2026-Q3,,2022-Q2,2029-Q2,,,,,
IP010583,20/03/2024,Tauranga City Council,Bulk Meter Renewals/Residential meter Renewals.,Replacement of Bulk water meters/Ongoing domestic water meter renewals (incl procurement of meters double check devices strainers and physical install costs).,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,5 - 25 million,,,2022-Q3,2022-Q4,2023-Q1,2023-Q4,2022-Q3,2023-Q4,,,,,
IP010584,20/03/2024,Tauranga City Council,Water Lane booster pump station.,New booster pump station to service Welcome Bay area from the Waiari scheme at Water lane.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,2022-Q2,,2027-Q3,,2028-Q4,,2022-Q2,2031-Q4,,,,,
IP010585,20/03/2024,Tauranga City Council,Water Supply Building renewals.,Renewals of Buildings on Water Treatment and Water Stations providing cover from weather for the plant pumps generators and electrical equipment.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,1 - 5 million,2023-Q3,,2023-Q3,,2023-Q3,,2023-Q1,2024-Q2,,,,,
IP010586,20/03/2024,Tauranga City Council,Water Supply Equipment & Systems.,Procure install and commission field instruments radio telemetry and associated equipment for the management and control of the water supply system.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,1 - 5 million,2023-Q3,,2023-Q3,,2023-Q4,,2023-Q1,2024-Q2,,,,,
IP010587,20/03/2024,Tauranga City Council,Water Fluoridation Implementation.,The implementation of fluoride dosing at the three TCC water treatment plants. The project is the result of a directive issued by the Ministry of Health to fluoridate the Tauranga water supply by 31 July 2024. Ministry of Health have agreed in principle to fund the project. As at July 2023 an agreemnt has not been signed and TCC is front funding the work.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,1 - 5 million,2022-Q3,,2023-Q1,,2023-Q4,,2022-Q1,2024-Q3,,,,,
IP010588,20/03/2024,Tauranga City Council,SW Upgrade Culvert under SH2.,Stormwater is currently predicted to pond on properties as a result of the State Highway 2 (SH2) embankment blocking the natural flow path combines with an undersized culvert. With development of 282 SH2 and increased impervious land flooding is predicted to increase if not appropriate addressed. This project objective is to look at options of installing a larger SW culvert to convey SW flows under the SH2 connecting into an existing open waterway on 283 SH2.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,5 - 25 million,2020-Q1,,2022-Q3,,2024-Q4,,2020-Q1,2025-Q2,,,,,
IP010589,20/03/2024,Tauranga City Council,122911 - Tauriko West High Level Watermain.,Western Corridor - Tauriko WestDescriptionTW IFF 29 - New 250mm water line from Gargan/Taurikura intersection along Gargan to SH29 to feed into Tauriko west. AS per WSP report A985373 delivered by Waka ko tahi Design by WSP.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,5 - 25 million,2021-Q3,,2023-Q3,,2024-Q1,,2021-Q3,2027-Q4,,,,,
IP010590,20/03/2024,Tauranga City Council,122915 - Tauriko West Temporary pump station rising main- initial stage.,This is a new WW main from Tauriko west crossing the SH29 down Whiori ave to the landing PS.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,5 - 25 million,2022-Q3,,2022-Q3,,2024-Q1,,2022-Q3,2027-Q3,,,,,
IP010592,20/03/2024,Tauranga City Council,Mansels Access & Renewal of WW Main.,Construction of an access track in the drainage reserve & amp; construction of a main pipe on piled foundations after settlement. The primary cost is piling required for pipe construction due to poor ground conditions.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,1 - 5 million,2022-Q3,,2022-Q3,,2024-Q3,,2022-Q3,2025-Q3,,,,,
IP010593,20/03/2024,Tauranga City Council,Churchill Road Foreshore Sewer.,To mitigate the Churchill Road foreshore sewer capacity constraints (now and in the future) and reduce resilience risks via the best practicable option.For the feasibility study phase: •Identify and assess options to mitigate the capacity and resilience issues for the Churchill Road foreshore sewer (conveyance storage optimisation etc.)•Agree preferred option •Produce feasibility-level design of the preferred option with costings and a report to inform preliminary designTo identify and assess potions the study will develop a basis if design which includes the capacity of an any pump station pipelines storage tanks etc plus any proposed upgrades done in the upstream network as part of the renewals project. Constraints of the options will be assessed (including geotechnical resilience existing services archaeological etc. and cost/carbon considered.The remaining stages of the project will need to undertake detailed design and construct the preferred option.NOTE approved budget is for the 2021 LTP. We have updated costs for the 2024 LTP which are higher but not approved. Concept solution may change during feasibility which will affect costs.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,5 - 25 million,2022-Q4,,2024-Q3,,2026-Q3,,2022-Q4,2030-Q2,,,,,
IP010594,20/03/2024,Tauranga City Council,Ila Place - Harrisfield dr gravity main.,New 300 mm gravity pipeline to increase capacity. To replace or supplement the capacity of the existing gravity main along Harrisfield Drive from Poike Road to upstream of Ila Place pump station PS076.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,5 - 25 million,2023-Q2,,2024-Q2,,2027-Q3,,2023-Q2,2029-Q1,,,,,
IP010595,20/03/2024,Tauranga City Council,Waste Water Building Renewals.,Renewals to Waste Water pump station and treatment plant buildings.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,1 - 5 million,2023-Q3,,2023-Q3,,2023-Q4,,2023-Q1,2024-Q2,,,,,
IP010596,20/03/2024,Tauranga City Council,WWTP Measuring Carbon Emmissions.,Measure the carbon emissions from City Waters wastewater treatment plants to validate empirical factors that are applied by IPCC and similar guidelines and (if possible) optimise performance to reduce emissions.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,2023-Q2,,2023-Q3,,2023-Q4,,2023-Q1,2024-Q2,,,,,
IP010597,20/03/2024,Tauranga City Council,WS Joyce Rd Mini Hydro.,Install a mini hydro generator on the Joyce Road WTP raw water mains to generate power for the WTP and excess exported to the grid.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,< 1 million,2021-Q3,,2021-Q4,,2022-Q1,,2021-Q1,2024-Q2,,,,,
IP010778,20/03/2024,Tauranga City Council,Opal Drive Rising Main.,The renewal of 1500m of wastewater rising main between Opal Dr pump station and the intersection of Gravatt Rd and Beachwater Dr.,,Post implementation ,Fully funded,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,2020-Q1,,2021-Q1,,2022-Q2,,2020-Q1,2025-Q1,,,,,
IP010779,20/03/2024,Tauranga City Council,Beaumaris Boulevard Flood Mitigation.,Flood mitigation project.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,5 - 25 million,2021-Q4,,2021-Q4,,2023-Q4,,2021-Q1,2025-Q2,,,,,
IP010780,20/03/2024,Tauranga City Council,TC183/23 Kaitemako Reservoir Upgrade.,To repair and upgrade structural integrity of Kaitemako resrvoir.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,5 - 25 million,2020-Q1,,2020-Q1,,2023-Q3,,2020-Q1,2024-Q2,,,,,
IP010781,20/03/2024,Tauranga City Council,Mt Maunganui Reservoir.,New reservoir in Mount Maunganui to replace old and undersized reservoir on Mauao. Larger replacement reservoir on existing site or a new location.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,5 - 25 million,2022-Q3,,2026-Q3,,2029-Q3,,2022-Q3,2032-Q4,,,,,
IP010782,20/03/2024,Tauranga City Council,Resolution SW Flood Mitigation.,The project involves flood mitigation works to remove/reduce DxV flooding to affected properties downstream of Resolution Rd. The works will either include a large dam (meeting NZSOLD guidelines) located in the proximity of 15 Herald Way or a large dia pipe (approx 2m) from 15 Herald Way to the harbour.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,1 - 5 million,2021-Q3,,2021-Q3,,2023-Q4,,2021-Q1,2025-Q2,,,,,
IP010783,20/03/2024,Tauranga City Council,Awaiti Place Stormwater Upgrade.,Stormwater Upgrade.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,5 - 25 million,2021-Q3,,2021-Q3,,2025-Q3,,2021-Q3,2028-Q2,,,,,
IP010784,20/03/2024,Tauranga City Council,SW Inflow Reduction Project.,Ongoing programme to monitor & reduce stormwater infiltration to the wastewater system.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,5 - 25 million,2023-Q3,,2023-Q3,,2023-Q4,,2022-Q4,2024-Q2,,,,,
IP010785,20/03/2024,Tauranga City Council,Waiari Water Supply Programme of Works.,Development of a new water supply scheme for Tauranga City. The project entails the construction of a water intake facility a water treatment plant and installation of 22km of trunk water mains.,,Post implementation ,Fully funded,To be determined,To be determined,Bay of Plenty,,,Water,1 - 5 million,2013-Q1,,2016-Q3,,2018-Q1,,2013-Q1,2024-Q1,,,,,
IP010786,20/03/2024,Tauranga City Council,Eastern Reservoir No.1.,Waiari Water Treatment Plant CapitalProcurement of site & construction of 10 ML concrete Water Supply reservoir to provide service storage for the coastal strip. This is needed urgently to address a deficit in storage against the council's standard of 48 hour average flow.,,Post implementation ,Fully funded,To be determined,To be determined,Bay of Plenty,,,Water,< 1 million,2019-Q4,,2020-Q4,,2021-Q4,,2019-Q1,2024-Q2,,,,,
IP010787,20/03/2024,Tauranga City Council,Tautau Rising Main Duplication.,This project aims to enhance Tauranga's city water supply resilience. Currently there is one single raw water pipeline (CLMS Concrete Lined Mild Steel Pipe) from the Tautau Stream Intake Pump Station to the Oropi Gorge Road Water Reservoir. The CLMS pipe may be damaged during severe seismic events and repairing it within a short timeframe is impossible due to the complicated circumstances along pipe alignment. This project is to construct a duplicate pipeline (HDPE High-Density Polyethylene) to provide resilience and a backup plan in this critical part of the water supply network.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,1 - 5 million,2017-Q2,,2017-Q3,,2023-Q1,,2017-Q1,2025-Q1,,,,,
IP010788,20/03/2024,Tauranga City Council,Water Supply M&E Asset Renewals.,Annual program of rolling water supply mechanical electrical assets in accordance with renewal strategies and asset condition / performance. Each year the program is undertaken as a number of discreet projects that each have their own risk and complexity profile to be managed appropriately.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,5 - 25 million,2022-Q3,,2022-Q4,,2023-Q3,,2022-Q1,2024-Q2,,,,,
IP010789,20/03/2024,Tauranga City Council,Pyes Pa West - Dam 5 / Wetland 5 Design and Construction.,Construction of Dam/SW assets and Wetland to accommodate future development of the Pyes Pa West catchment. Site located at No 642 Kennedy Road (over the Nanako Stream).,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,5 - 25 million,2021-Q3,,2021-Q3,,2023-Q3,,2021-Q1,2025-Q2,,,,,
IP010790,20/03/2024,Tauranga City Council,WW Electrical Upgrades.,Programme to upgrade the electrical & telemetry system of wastewater pumping stations covering obsolescence & renewals of short life assets.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,1 - 5 million,2023-Q3,,2023-Q4,,2023-Q4,,2023-Q1,2024-Q2,,,,,
IP010791,20/03/2024,Tauranga City Council,Wastewater Pumpstations Renewals.,The Wastewater Pumpstation Renewals programme is an ongoing programme falling into the 3-Waters Joint Maintenance Contract with Downer. It commenced in mid-2021 and aims to renew assets in Wastewater Pump Stations as planned via Accela and RIVA Asset Management Systems to ensure efficient and reliable operation.,,Under construction,Fully funded,To be determined,Construct only,Bay of Plenty,,,Water,25 - 50 million,2009-Q3,,2009-Q3,,2009-Q3,,2008-Q4,2054-Q2,,,,,
IP010792,20/03/2024,Tauranga City Council,Johnson Reserve Pipe Upgrade.,Upgrade of 620 m of gravity main to 300mm diameter.,,In procurement,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,1 - 5 million,2022-Q1,,2022-Q4,,2024-Q3,,2022-Q1,2025-Q2,,,,,
IP010793,20/03/2024,Tauranga City Council,Maleme St and Landing Drive upgrade feasibility.,Upgrade existing wastewater trunk assets to provide for the short- medium term growth from the Western Corridor (Tauriko Lower Belk Keenan Rd North & South). Upgrades are assumed needed / possible at Landing Drive pump station commission the existing 2nd Landing Drive RM upgrade trunk system upstream of Maleme St PS and confirm upgrades possible at Maleme St PS. The budget comes from 2 separate LTP projects: 121778 (Maleme St sewer upgrades) and 123637 (Western Corridor Stage 1).,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Water,5 - 25 million,2023-Q4,,2024-Q4,,2026-Q3,,2023-Q4,2028-Q2,,,,,
IP009716,18/03/2024,Thames-Coromandel District Council,Whangamata Boardwalk Extension Esplanade Drive.,Construct a boardwalk approximately 980m in length from the surf Club (Access 9) to Island View Reserve (Access14) at Whangamata.,,On hold,Funding source confirmed,To be determined,Construct only,Waikato,,,Community facilities,1 - 5 million,,,,,2019-Q3,2025-Q2,2019-Q3,2025-Q2,,,,,
IP009717,18/03/2024,Thames-Coromandel District Council,Cormandel Wharf renewal.,Improved facility management leading to an improved user experience. Council working with local community and industry to improve facilities and make them fit for purpose.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,1 - 5 million,,,,,,,2025-Q3,2029-Q2,,,,,
IP009718,18/03/2024,Thames-Coromandel District Council,Thames Sports Precinct.,To move the sportsfields and create a multipurpose building at a sports precinct located at Council owned land.,,On hold,Funding source to be confirmed,To be determined,To be determined,Waikato,,,Community facilities,5 - 25 million,,,,,,,2024-Q3,2028-Q2,,,,,
IP009719,18/03/2024,Thames-Coromandel District Council,Thames sub-regional pool.,To provide a year round swimming facility in Thames.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Waikato,,,Community facilities,5 - 25 million,,,,,,,2025-Q3,2029-Q2,,,,,
IP009720,18/03/2024,Thames-Coromandel District Council,Whitianga explanade reclamation.,Consult and propose the development of the reclamation boat ramp.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,5 - 25 million,,,,,,,2027-Q3,2030-Q2,,,,,
IP009721,18/03/2024,Thames-Coromandel District Council,Te Kouma Rd intersection.,Upgrade intersection to cater for increased traffic for Sugar loaf wharf at Te Kouma Coromandel.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Transport,1 - 5 million,,,,,2019-Q2,2028-Q2,2019-Q2,2028-Q2,,,,,
IP009722,18/03/2024,Thames-Coromandel District Council,Coromandel township bypass.,Bypass to avoid Coromandel town centre.,,In planning,Funding source confirmed,To be determined,Construct only,Waikato,,,Transport,1 - 5 million,,,,,2023-Q2,2027-Q2,2023-Q2,2027-Q2,,,,,
IP009723,18/03/2024,Thames-Coromandel District Council,Nib kerb construction.,Whangamata - Installation of nib kerb and mountable kerb and channel.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Transport,1 - 5 million,,,,,2018-Q4,2026-Q2,2018-Q4,2026-Q2,,,,,
IP009724,18/03/2024,Thames-Coromandel District Council,Minor safey improvements.,Annual ongoing maintenance to roading network to maintain level of service.,,Under construction,Fully funded,Direct,Construct only,Waikato,,,Transport,5 - 25 million,,,,,2018-Q3,2034-Q2,2018-Q3,2034-Q2,,,,,
IP009725,18/03/2024,Thames-Coromandel District Council,Area-wide pavement treatment.,Road rehabilitation projects identified and tendered yearly.,,Under construction,Fully funded,Direct,Construct only,Waikato,,,Transport,5 - 25 million,,,,,2018-Q3,2034-Q2,2018-Q3,2034-Q2,,,,,
IP009726,18/03/2024,Thames-Coromandel District Council,Unsealed road wearing course replacement.,Annual ongoing maintenance to roading network to maintain level of service.,,Under construction,Fully funded,Direct,Construct only,Waikato,,,Transport,5 - 25 million,,,,,2018-Q3,2034-Q2,2018-Q3,2034-Q2,,,,,
IP009727,18/03/2024,Thames-Coromandel District Council,Unsealed road basecourse replacement.,Annual ongoing maintenance to roading network to maintain level of service.,,Under construction,Fully funded,Direct,Construct only,Waikato,,,Transport,5 - 25 million,,,,,2018-Q3,2034-Q2,2018-Q3,2034-Q2,,,,,
IP009728,18/03/2024,Thames-Coromandel District Council,Major drainage control.,Annual ongoing maintenance to roading network to maintain level of service.,,Under construction,Fully funded,Direct,Construct only,Waikato,,,Transport,5 - 25 million,,,,,2018-Q3,2034-Q2,2018-Q3,2034-Q2,,,,,
IP009729,18/03/2024,Thames-Coromandel District Council,Maintenance chip seals.,Annual ongoing maintenance to roading network to maintain level of service.,,Under construction,Fully funded,Direct,Construct only,Waikato,,,Transport,5 - 25 million,,,,,2018-Q3,2034-Q2,2018-Q3,2034-Q2,,,,,
IP009730,18/03/2024,Thames-Coromandel District Council,Thin AC surfacing.,Annual ongoing maintenance to roading network to maintain level of service.,,Under construction,Fully funded,Direct,Construct only,Waikato,,,Transport,5 - 25 million,,,,,2018-Q3,2034-Q2,2018-Q3,2034-Q2,,,,,
IP009731,18/03/2024,Thames-Coromandel District Council,Bridge compenent replacement.,Annual ongoing maintenance to roading network to maintain level of service.,,Under construction,Fully funded,Direct,Construct only,Waikato,,,Transport,1 - 5 million,,,,,2021-Q3,2034-Q2,2021-Q3,2034-Q2,,,,,
IP009732,18/03/2024,Thames-Coromandel District Council,Preventative maintenance.,Annual ongoing maintenance to roading network to maintain level of service.,,Under construction,Fully funded,To be determined,Construct only,Waikato,,,Transport,1 - 5 million,,,,,2021-Q3,2034-Q2,2021-Q3,2034-Q2,,,,,
IP009733,18/03/2024,Thames-Coromandel District Council,Traffic services.,Annual ongoing maintenance to roading network to maintain level of service.,,Under construction,Fully funded,Direct,Construct only,Waikato,,,Transport,1 - 5 million,,,,,2021-Q3,2034-Q2,2021-Q3,2034-Q2,,,,,
IP009740,18/03/2024,Thames-Coromandel District Council,January 2023 storm event.,Approved out of cycle request by Council - Cyclone Hale.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Transport,5 - 25 million,,,,,2023-Q1,2025-Q2,2023-Q1,2025-Q2,,,,,
IP009741,18/03/2024,Thames-Coromandel District Council,February 2023 storm event.,Approved out of cycle request by Council - Cyclone Gabrielle.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Transport,5 - 25 million,,,,,2023-Q1,2025-Q2,2023-Q1,2025-Q2,,,,,
IP009742,18/03/2024,Thames-Coromandel District Council,Whitianga refuse transfer station.,Construction of new refuse transfer station.,,In planning,Fully funded,Open,Design and construct,Waikato,,,Waste management,1 - 5 million,,,,,2018-Q3,2027-Q3,2018-Q3,2027-Q3,,,,,
IP009743,18/03/2024,Thames-Coromandel District Council,Universal metering.,Install universal water meters to all the reticulation networks throughout the district.,,On hold,Fully funded,Open,Construct only,Waikato,,,Water,5 - 25 million,,,,,2021-Q1,2034-Q2,2021-Q1,2034-Q2,,,,,
IP009744,18/03/2024,Thames-Coromandel District Council,Drinking water standards upgrades.,Upgrade of drinking water stations across the Coromandel Peninsula.,,Under construction,Fully funded,Direct,Design and construct,Waikato,,,Water,25 - 50 million,,,,,2016-Q3,2026-Q2,2016-Q3,2026-Q2,,,,,
IP009745,18/03/2024,Thames-Coromandel District Council,Hāhei extensions: » wastewater.,Expand the existing areas of service for wastewater network for the settlement of Hahei.,,Early planning,Funding source confirmed,To be determined,Construct only,Waikato,,,Water,1 - 5 million,,,,,,,2023-Q3,2034-Q2,,,,,
IP009746,18/03/2024,Thames-Coromandel District Council,Hāhei extensions: » water supply.,To develop a new water source for Hahei. This will include an expansion of the existing area of service for the water supply.,,On hold,Funding source confirmed,To be determined,Construct only,Waikato,,,Water,1 - 5 million,,,,,,,2024-Q3,2028-Q2,,,,,
IP009749,18/03/2024,Thames-Coromandel District Council,Wharekaho water supply extension.,To expand the existing areas of service for water network for the settlement of Wharekaho.,,Early planning,Funding source confirmed,To be determined,Construct only,Waikato,,,Water,1 - 5 million,,,,,,,2027-Q3,2028-Q2,,,,,
IP009750,18/03/2024,Thames-Coromandel District Council,Whangamata stormwater improvements.,To inprove the capacity of the existing infrastrcture upgarding and increasing the pipe network .,,Under construction,Fully funded,Open,Construct only,Waikato,,,Water,5 - 25 million,,,,,2023-Q2,2026-Q2,2030-Q2,2026-Q2,,,,,
IP009751,18/03/2024,Thames-Coromandel District Council,Thames Albert Street stormwater improvements.,To inprove the capacity of the existing infrastrcture upgarding and increasing the pipe network .,,On hold,Funding source confirmed,To be determined,Construct only,Waikato,,,Water,< 1 million,,,,,,,2032-Q3,2025-Q2,,,,,
IP009752,18/03/2024,Thames-Coromandel District Council,Pauanui Holland stream improvements: » stormwater.,To improve the stream infrastructure in the area to a agreed level of service standard.,,Under construction,Fully funded,To be determined,Construct only,Waikato,,,Water,5 - 25 million,,,,,2025-Q2,2025-Q2,2021-Q3,2025-Q2,,,,,
IP009753,18/03/2024,Thames-Coromandel District Council,Thames treatment plant upgrade » wastewater.,To upgrade the existing wastewater treatment plant to increase the treatment capacity.,,Under construction,Fully funded,Direct,Construct only,Waikato,,,Water,1 - 5 million,,,,,2025-Q2,2025-Q2,2032-Q3,2025-Q2,,,,,
IP009754,18/03/2024,Thames-Coromandel District Council,Matarangi Treatment plant upgrade » wastewater.,To upgrade the existing wastewater treatment plant to increase the capacity of the plant to meet the future demand.,,Under construction,Fully funded,Open,Design and construct,Waikato,,,Water,5 - 25 million,,,,,2027-Q2,2027-Q2,2031-Q2,2027-Q2,,,,,
IP009755,18/03/2024,Thames-Coromandel District Council,Wharekaho wastewater extension.,To expand the existing areas of service for wastewater network into the settlement of Wharekaho.,,Early planning,Funding source confirmed,To be determined,Construct only,Waikato,,,Water,1 - 5 million,,,,,,,2025-Q3,2030-Q2,,,,,
IP009756,18/03/2024,Thames-Coromandel District Council,Cooks Beach wastewater treatment plant upgrade.,To upgrade the existing wastewater treatment plant to increase the capacity of the plant to meet the future demand.,,Under construction,Fully funded,Limited,Construct only,Waikato,,,Water,1 - 5 million,,,,,2025-Q2,2025-Q2,2023-Q2,2025-Q2,,,,,
IP009758,18/03/2024,Thames-Coromandel District Council,Wastewater process control upgrade.,Extending the telemetry network to connect more remote stations directly to the process control system. Updating treatment plant and pump station PLC/RTU programming.,,Under construction,Fully funded,Direct,Construct only,Waikato,,,Water,1 - 5 million,,,,,2034-Q2,2031-Q2,2022-Q1,2034-Q2,,,,,
IP009759,18/03/2024,Thames-Coromandel District Council,Thames South water system improvements & Puriri Water Treatment Plant.,To improve the capability and sustainability of the Thames South water supplies in Matatoki Puriri Wharepoa Hikutaia and the surrounding rural areas and New water treatment plant to cater for growth in the Thames District.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Water,1 - 5 million,,,,,2026-Q2,2026-Q2,2021-Q4,2026-Q2,,,,,
IP009761,18/03/2024,Thames-Coromandel District Council,Whangamata water system optimisation.,Construct new pipe infrastructure that will improve distribution and balance water supply.,,On hold,Fully funded,To be determined,Construct only,Waikato,,,Water,1 - 5 million,,,,,,,2024-Q3,2030-Q2,,,,,
IP009762,18/03/2024,Thames-Coromandel District Council,Water process control upgrade.,District wide - Extending the telemetry network to connect more remote stations directly to the process control system. Updating treatment plant and pump station PLC/RTU programming.,,Under construction,Fully funded,Direct,Construct only,Waikato,,,Water,1 - 5 million,,,,,2021-Q4,2034-Q2,2021-Q4,2034-Q2,,,,,
IP009763,18/03/2024,Thames-Coromandel District Council,Kōpū marine project.,To construct a fixed piled wharf structure with a T shaped wharf head and concrete floating pontoon.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Community facilities,5 - 25 million,,,,,2020-Q3,2024-Q2,2024-Q3,2024-Q2,,,,,
IP009764,18/03/2024,Thames-Coromandel District Council,Moanatairi Coastal protection seawall renewal.,Renewal of the existing seawall structure and an increased level of service to the stop bank timber parapet wall and foot path.,,In planning,Funding source confirmed,To be determined,Construct only,Waikato,,,Environmental,1 - 5 million,,,,,,,2024-Q3,2032-Q2,,,,,
IP009765,18/03/2024,Thames-Coromandel District Council,Pollen Street infrastructure upgrade - Roading.,Thames town centre upgrade to Stormwater Wastewater Water and Roading.,,In planning,Fully funded,Open,Construct only,Waikato,,,Transport,1 - 5 million,,,,,2022-Q4,2027-Q2,2022-Q4,2027-Q2,,,,,
IP009766,18/03/2024,Thames-Coromandel District Council,Pollen Street infrastructure upgrade - Stormwater Wastewater & Water.,Thames town centre upgrade to Stormwater Wastewater Water and Roading.,,In planning,Fully funded,Open,Construct only,Waikato,,,Water,5 - 25 million,,,,,2022-Q4,2031-Q2,2022-Q4,2031-Q2,,,,,
IP009767,18/03/2024,Thames-Coromandel District Council,Tōtara Valley Road service extensions - Roading.,Upgrade to Totara Valley Road to Stormwater Wastewater Water and Roading to cater for growth in Thames.,,In planning,Fully funded,Open,Construct only,Waikato,,,Transport,5 - 25 million,,,,,2020-Q1,2026-Q2,2020-Q1,2026-Q2,,,,,
IP009768,18/03/2024,Thames-Coromandel District Council,Tōtara Valley Road service extensions - Stormwater Wastewater & Water.,Upgrade to Totara Valley Road to Stormwater Wastewater Water and Roading to cater for growth in Thames.,,In planning,Fully funded,Open,Construct only,Waikato,,,Water,1 - 5 million,,,,,2020-Q1,2027-Q2,2020-Q1,2027-Q2,,,,,
IP010459,18/03/2024,Thames-Coromandel District Council,July 2023 storm event.,Approved out of cycle request by Council.,,In planning,Fully funded,To be determined,Construct only,Waikato,,,Transport,5 - 25 million,,,,,2023-Q4,2026-Q2,2023-Q4,2026-Q2,,,,,
IP010727,18/03/2024,Thames-Coromandel District Council,Tairua Coastal Protection.,Increases the height of the exisitng coastal defence along the Esplande reserve adjacent to Manaia Rd.,,In planning,Funding source to be confirmed,To be determined,To be determined,Waikato,,,Environmental,1 - 5 million,,,,,,,2027-Q3,2029-Q2,,,,,
IP010728,18/03/2024,Thames-Coromandel District Council,Tararu Coastal Protection.,Maintainence of the exisitng bund in the Esplanade reserve including erosion protection.,,In planning,Funding source to be confirmed,To be determined,To be determined,Waikato,,,Environmental,1 - 5 million,,,,,,,2027-Q3,2028-Q2,,,,,
IP010729,18/03/2024,Thames-Coromandel District Council,Te Puru Coastal Protection.,Coastal protection works to increase the height of the existing bund along the Esplanade connecting it to higher ground.,,In planning,Funding source to be confirmed,To be determined,To be determined,Waikato,,,Environmental,1 - 5 million,,,,,,,2027-Q3,2029-Q2,,,,,
IP010730,18/03/2024,Thames-Coromandel District Council,Thames Coastal Protection.,Increases the height of the existing coastal defence/coastal high ground along the Esplande reserve.,,In planning,Funding source to be confirmed,To be determined,To be determined,Waikato,,,Environmental,50 - 100 million,,,,,,,2027-Q3,2030-Q2,,,,,
IP010731,18/03/2024,Thames-Coromandel District Council,Kopu Stormwater Improvements.,Bring the stormwater infrastructure up to a standard that will comply with levels of service.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Water,1 - 5 million,,,,,,,2027-Q3,2034-Q2,,,,,
IP010732,18/03/2024,Thames-Coromandel District Council,Matarangi Stormwater Improvements.,Bring the stormwater infrastructure up to a standard that will comply with levels of service.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Water,1 - 5 million,,,,,,,2025-Q3,2032-Q2,,,,,
IP010733,18/03/2024,Thames-Coromandel District Council,Stormwater Treatment Devices - Consent.,To bring the stormwater infrastructure up to a standard that will comply with the level of service to minimises the environmental impact of protecting habitable areas from flooding.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Water,1 - 5 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP010734,18/03/2024,Thames-Coromandel District Council,Wastewater Whangamata Hetherington Road Rising Main.,Implemententation of a conveyance solution of extending Isabel Pumpstation rising main to Lindsay Pumpstation freeing up capacity in existing gravity main.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Water,1 - 5 million,,,,,,,2024-Q3,2030-Q2,,,,,
IP010735,18/03/2024,Thames-Coromandel District Council,Whitianga Universal Water Meter - Unbundling.,Installation of water meters on each property in Whitianga by unbundling.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Water,1 - 5 million,,,,,,,2027-Q3,2031-Q2,,,,,
IP010736,18/03/2024,Thames-Coromandel District Council,Moewai Road Water Reservoir Replacement.,Replace existing reservpor with a new 3000m3 Permastore (GFS) Tank.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Water,1 - 5 million,,,,,,,2026-Q2,2030-Q2,,,,,
IP010737,18/03/2024,Thames-Coromandel District Council,Watermain Upgrade - Moewai Road to Captain Wood Avenue.,Installation of a new watermain.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Water,1 - 5 million,,,,,,,2025-Q3,2029-Q2,,,,,
IP010738,18/03/2024,Thames-Coromandel District Council,Thames WWI Monument.,Replace retaining walls and improve public space above by creating a community area that can be used for events.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,1 - 5 million,,,,,,,2028-Q3,2029-Q2,,,,,
IP010739,18/03/2024,Thames-Coromandel District Council,Whitianga Esplanade Waterfront Redevelopment Project.,Meet health and safety obligations separating the different activities/services provided in the Whitianga Esplanade Waterfront area. Increase the capacity of both the wharf and the boat ramp to meet growth and demand over the peak periods.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,5 - 25 million,,,,,,,2027-Q3,2030-Q2,,,,,
IP009714,28/06/2023,Timaru District Council,Landsborough Road Bridge replacement.,Bridge replacement.,,In planning,Funding source confirmed,Open,Construct only,Canterbury,,,Transport,1 - 5 million,,,,,2024-Q2,2024-Q3,2023-Q4,2024-Q3,,,,,
IP010447,8/12/2023,Timaru District Council,Contract 2580 - Caroline Bay Stormwater Manhole refurbishment.,Sealing of manholes and sumps at Caroline Bay - needs to be done for the CPLAY playground and proposed stormwater pumpstation.,,Under Construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,2023-Q2,2023-Q4,2023-Q1,2023-Q4,,,,,
IP010796,22/02/2024,Timaru District Council,Contract 2539 - Geraldine Syphon Upgrade.,Construction of a new sewer syphon (DN375 pipe most likely)under the Waihi River in Geraldine that is capable of taking all of the current and future flows.,,Under Construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,2024-Q1,2024-Q2,2018-Q2,2024-Q2,,,,,
IP010797,8/12/2023,Timaru District Council,Contract 2600 - High Street (Timaru) stormwater.,Construction of a DN900 concrete pipe along High St then down Queen St that will connect to the existing outlet. We can then abandon the bluestone arch section which is continually collasping in the Council owned Yard.,,Under Construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,2023-Q3,2024-Q2,2022-Q4,2024-Q2,,,,,
IP010798,8/12/2023,Timaru District Council,Contract 2564 - Waihi River outfall and overland flow path.,Construction of a DN600 concrete pipe with a new outlet to the Waihi River in Geraldine. This will remove the undersized pipe and reduce potential upstream flooding.,,Under Construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,2023-Q3,,2022-Q1,2024-Q1,,,,,
IP010799,8/12/2023,Timaru District Council,Contract 2532 - Pleasant Point concrete watermain renewals.,This project invloves the renewal of cast concrete mains in Pleasant Point ranging in size from 100 - 150mm. Te Ngawai Rd Kumara Tce Maitland St Burgess St Kandahar St Manse Rd and George St.,,Under Construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Water,1 - 5 million,,,,,2023-Q3,,2021-Q3,2024-Q2,,,,,
IP010449,8/12/2023,Timaru District Council,Contract 2595 - Cain Street sewermain.,The goal of this contract is to renew 557m of existing DN150 sewermain along Cain Street from 49 Cain Street to North Street intersection boundary Timaru.,,Under Construction,Funding source confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,,2023-Q2,2022-Q3,2023-Q4,,,,,
IP010451,8/12/2023,Timaru District Council,Contract 2620 - Ewen Road water and sewermain renewal.,Relacment of 2 x sewer mains under Ewen Rd 150mm and 225mm diameter and the upgrading of a DN225 watermain along Ewen Rd from Allnatt St west towards King St Temuka.,,Under Construction,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,2022-Q2,2023-Q4,2022-Q4,2023-Q4,,,,,
IP010800,8/12/2023,Timaru District Council,Contract 2613 - Te Ana Wai Raw Water Reservoir cover.,Design and build of 2 x Raw water pond covers for the raw water ponds for Downlands water supply.,,In Planning,Funding source confirmed,Limited,Design and construct,Canterbury,,,Water,1 - 5 million,,,,,2023-Q4,,2023-Q1,2023-Q4,,,,,
IP010801,8/12/2023,Timaru District Council,Contract 2542 - Gordons Valley Road Watermain upgrade.,Upgrade of 4 747 m of water pipeline in the Gordons Valley and Mt Buster areas to resolve pressure level of service.,,Under Construction,Funding source confirmed,Direct,Design and construct,Canterbury,,,Water,< 1 million,,,,,,,2021-Q2,2024-Q1,,,,,
IP010452,20/03/2023,Timaru District Council,Contract 2469 - Pareora Pipeline Section 2.,Relining an existing 400 pipe with a new potable water liner through the Gorge section.,,Under Construction,Funding source confirmed,Direct,Design and construct,Canterbury,,,Water,1 - 5 million,,,,,2021-Q4,2024-Q3,2021-Q4,2024-Q3,,,,,
IP010454,20/03/2023,Timaru District Council,Aigantighe Art Gallery Seismic Repairs.,Seismic Repairs to House Gallery.,,Under Construction,Funding source confirmed,Open,Construct only,Canterbury,,,Community facilities,1 - 5 million,,,,,2023-Q4,2024-Q3,2023-Q4,2024-Q3,,,,,
IP010455,20/03/2023,Timaru District Council,Resurfacing Contract.,Resurfacing contract for Timaru Waimate and Mackenzie District Council.,,In planning,Funding source confirmed,Open,Construct only,Canterbury,,,Transport,5 - 25 million,,,,,2024-Q3,2027-Q2,2024-Q3,2027-Q2,,,,,
IP010802,28/02/2024,Timaru District Council,Conntract 2587 - Temuka Pump Station.,Temuka water Pump Station for the Reservoir installed.,,Under Construction,Funding source confirmed,Open,Construct only,Canterbury,,,Water,1 - 5 million,,,,,2022-Q3,,2022-Q3,2024-Q1,,,,,
IP010803,28/02/2024,Timaru District Council,Conntract 2588 - Hewling Street Pump Station.,Hewling Street water Pump Station for fire fighting Capacity - Booster Pump Station.,,Under Construction,Funding source confirmed,Open,Construct only,Canterbury,,,Water,< 1 million,,,,,2022-Q3,,2022-Q3,2024-Q1,,,,,
IP010804,28/02/2024,Timaru District Council,Contract 2080 - Ellis Road Watermain Renewal.,Watermain Renewal for future developments.,,Early planning,Funding source confirmed,To be determined,Design and Construct,Canterbury,,,Water,< 1 million,,,,,2024-Q1,2024-Q2,2024-Q1,2024-Q2,,,,,
IP010805,28/02/2024,Timaru District Council,Contract 2531 - Downlands Watermains Upgrade.,Upgrading of Downlands Water Mains.,,Under Construction,Funding source confirmed,To be determined,Construct only,Canterbury,,,Water,< 1 million,,,,,2023-Q2,2024-Q1,2023-Q2,2024-Q1,,,,,
IP010806,28/02/2024,Timaru District Council,Contract 2404 - Mountain View Road Flow Meter.,Flow Meter to Regulate flows on dedicated mains.,,Early planning,Funding source confirmed,Direct,Construct only,Canterbury,,,Water,< 1 million,,,,,2024-Q2,2024-Q2,2023-Q3,2024-Q2,,,,,
IP010807,28/02/2024,Timaru District Council,Contract 2634 - Davisons Road PRV.,Installing Pressure Reducing Valve system on the new main.,,Early planning,Funding source confirmed,Selective,Construct only,Canterbury,,,Water,< 1 million,,,,,2024-Q2,2024-Q3,2024-Q2,2024-Q3,,,,,
IP000361,6/03/2024,Transpower New Zealand Limited,Construction of 220 kV Switching Stations at Orari and Rangitata.,This project addresses the need for investment to manage dynamic voltage stability in the Upper South Island. Two switching stations would be constructed at Orari and Rangitata.,,In planning,Funding source to be confirmed,Selective,Construct only,Canterbury,,,Energy,50 - 100 million,,,,,,,2026-Q2,2029-Q1,
https://www.transpower.co.nz/projects,,,,
IP000362,6/03/2024,Transpower New Zealand Limited,High Voltage Direct Current Cable Replacement - Cook Strait.,This project will replace existing Cook Strait submarine cables which are approaching the end of their planned life.,,Early planning,Funding source to be confirmed,Selective,Construct only,Nationwide,,,Energy,250 - 500 million,,,,,,,2027-Q3,2032-Q2,
https://www.transpower.co.nz/projects,,,,
IP000363,6/03/2024,Transpower New Zealand Limited,Increasing Regional Interconnecting Capacity of Supply - Waikato.,This project would increase capacity of supply to the Waikato regional transmission network and allow for regional load growth.,,Early planning,Funding source to be confirmed,Selective,Construct only,Waikato,,,Energy,25 - 50 million,,,,,,,2026-Q4,2029-Q3,
https://www.transpower.co.nz/projects,,,,
IP000365,6/03/2024,Transpower New Zealand Limited,Brunswick to Stratford Circuit Consolidation.,This project is investigating appropriate approaches to the Brunswick Stratford circuit. This could include upgrading the capacity on the circuit . Details including preferred option and scope are yet to be confirmed.,,In planning,Funding source to be confirmed,Selective,Construct only,Taranaki,,,Energy,50 - 100 million,,,,,,,2032-Q3,2035-Q2,
https://www.transpower.co.nz/projects,,,,
IP000367,6/03/2024,Transpower New Zealand Limited,Reconductoring - Phase Two - Otahuhu to Whakamaru A and B (Rest of Auckland).,This project would replace overhead conductors which are nearing end of life and requiring intervention to manage corrosion on these assets. Details including need date; preferred option; and scope are yet to be confirmed.,,In planning,Funding source to be confirmed,Selective,To be determined,Auckland,,,Energy,25 - 50 million,,,,,,,2025-Q1,2027-Q4,
https://www.transpower.co.nz/projects,,,,
IP000368,6/03/2024,Transpower New Zealand Limited,Voltage Management - Waikato and Upper North Island.,This project is driven by recent and planned decommissioning of thermal generation plants at Otahuhu; Southdown; and Huntly. As there is demand growth in Auckland it is expected to lead to voltage management issues in Waikato and the Upper North Island including Auckland. Solution is the installation of Dynamic Reactive plant (e.g. STATCOMs) at Hamilton and Otahuhu.,,Under construction,Fully funded,Open,Design and construct,Waikato,,,Energy,100 - 250 million,,,,,,,2017-Q2,2026-Q2,
https://www.transpower.co.nz/projects,,,,
IP002506,6/03/2024,Transpower New Zealand Limited,HVDC capacity upgrade to 1400 MW - Lower North Island/ Upper South Island.,This project will increase the installed HVDC capacity to 1400 MW with an additional 4th HVDC cable.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Nationwide,,,Energy,25 - 50 million,,,,,,,2028-Q3,2032-Q2,
https://www.transpower.co.nz/projects,,,,
IP002507,6/03/2024,Transpower New Zealand Limited,Waikato and Upper North Island - Series Capacitors on BHL-WHN line.,Voltage stability and thermal capacity between the central North Island and Auckland will constrain import into the upper North Island region. This project proposes series capacitors to reduce the impedance (electrical length) of a transmission line improving system stability and re-balancing line loading.,,In planning,Funding source to be confirmed,To be determined,Design and construct,Waikato,,,Energy,100 - 250 million,,,,,,,2025-Q3,2030-Q2,
https://www.transpower.co.nz/projects,,,,
IP002508,6/03/2024,Transpower New Zealand Limited,Enabling new connections - Canterbury 66kV Regional Capacity.,As more generation gets built to meet increasing demand and/or replace ageing thermal generation plants investments may be required in some regional networks to ensure new generation can be transported to where the demand is.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Energy,25 - 50 million,,,,,,,2029-Q3,2031-Q2,
https://www.transpower.co.nz/projects,,,,
IP002510,6/03/2024,Transpower New Zealand Limited,Enabling new connections - Marlborough Capacity.,As more generation gets built to meet increasing demand and/or replace ageing thermal generation plants investments may be required in some regional networks to ensure new generation can be transported to where the demand is.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Marlborough,,,Energy,50 - 100 million,,,,,,,2030-Q3,2035-Q2,
https://www.transpower.co.nz/projects,,,,
IP002511,6/03/2024,Transpower New Zealand Limited,Enabling new connections - Southland Capacity.,As more generation gets built to meet increasing demand and/or replace ageing thermal generation plants investments may be required in some regional networks to ensure new generation can be transported to where the demand is.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Southland,,,Energy,50 - 100 million,,,,,,,2031-Q3,2036-Q2,
https://www.transpower.co.nz/projects,,,,
IP004782,6/03/2024,Transpower New Zealand Limited,HVDC Pole 2 Converter Transformer Refurbishment Programme - Lower North Island/ Upper South Island.,This project is refurbishing 8 x HVDC Pole 2 converter transformers located at Haywards and Benmore HVDC converter stations. The HVDC Pole 2 is part of the New Zealand HVDC system that connects the North and South Island electricity transmission systems.,,Under construction,Fully funded,Selective,Construct only,Nationwide,,,Energy,25 - 50 million,,,,,,,2021-Q3,2026-Q2,
https://www.transpower.co.nz/projects,,,,
IP004783,6/03/2024,Transpower New Zealand Limited,Brownhill to Auckland Transmission Capacity.,The project will look to upgrade the transmission capability between Brownhill and Otahuhu. This would likely be achieved by the installation of a transmission cable.,,Early planning,Funding source to be confirmed,Open,Design and construct,North Island,,,Energy,100 - 250 million,,,,,,,2027-Q3,2030-Q2,
https://www.transpower.co.nz/projects,,,,
IP005913,6/03/2024,Transpower New Zealand Limited,Wairakei Ring - Phase 2 - Build.,Further investment in generation in the Bay of Plenty results in constraints on the Wairakei Ring A line. Options for reinforcement include reconductoring or a new transmission Line. Costed and scheduled as new transmission line.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Energy,250 - 500 million,,,,,,,2026-Q3,2033-Q1,
https://www.transpower.co.nz/projects,,,,
IP006767,6/03/2024,Transpower New Zealand Limited,HVDC Pole 2 1000MW 30 Minute Overload Upgrade - Lower North Island/ Upper South Island.,This upgrade enables a further 300MW of short term overload capacity to cover the loss of Pole 3 and so reduces the reserve requirements to cover the tripping of Pole 3.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Nationwide,,,Energy,5 - 25 million,,,,,,,2027-Q3,2030-Q2,
https://www.transpower.co.nz/projects,,,,
IP006768,6/03/2024,Transpower New Zealand Limited,Reconductoring - Manapouri-Tiwai-A.,This project would replace overhead conductors on a section of the Manpouri-Tiwai lines which are nearing end of life and requiring intervention to manage corrosion on these assets. Details including need; preferred option; and scope are yet to be confirmed.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Southland,,,Energy,5 - 25 million,,,,,,,2025-Q3,2027-Q2,
https://www.transpower.co.nz/projects,,,,
IP008132,6/03/2024,Transpower New Zealand Limited,Duplexing - Tokaanu-Whakamaru-A&B (Net Zero Grid Pathways).,This project is to undertake investment to upgrade the capacity of Transpower’s transmission lines and substations in the central North Island. This investment is required due to both demand and renewable generation.,,In procurement,Funding source confirmed,Selective,Design and construct,North Island,,,Energy,50 - 100 million,,,,,,,2023-Q4,2030-Q2,
https://www.transpower.co.nz/projects,,,,
IP008133,6/03/2024,Transpower New Zealand Limited,Tactical thermal upgrade (TTU) - Bunnythorpe-Tokaanu (Net Zero Grid Pathways).,This project is to undertake investment to upgrade the capacity of Transpower’s transmission lines and substations in the central North Island. This investment is required due to both demand and renewable generation.,,In procurement,Funding source confirmed,Selective,Design and construct,North Island,,,Energy,50 - 100 million,,,,,,,2023-Q4,2028-Q2,
https://www.transpower.co.nz/projects,,,,
IP008134,6/03/2024,Transpower New Zealand Limited,Reconductoring - Te Matai.,Peak load at Te Matai (TMI) is forecast to exceed the n-1 110 kV transmission capacity into TMI. Reconductor KMO-TMI and TRK-OKE-TMI with higher capacity conductor.,,Early planning,Funding source to be confirmed,To be determined,To be determined,North Island,,,Energy,25 - 50 million,,,,,,,2026-Q3,2029-Q2,
https://www.transpower.co.nz/projects,,,,
IP008135,6/03/2024,Transpower New Zealand Limited,Islington T3/T7 Transformer Replacement - Christchurch.,This project will replace Transformers that are nearing end of life. The new transformers will be sized to allow for the forecast increase in expected demand.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Energy,5 - 25 million,,,,,,,2028-Q3,2030-Q2,
https://www.transpower.co.nz/projects,,,,
IP008647,6/03/2024,Transpower New Zealand Limited,Haywards Second STATCOM (Net Zero Grid Pathways) - Wellington.,This is project will provide additional reactive support to the HVDC transfer.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Energy,100 - 250 million,,,,,,,2024-Q2,2029-Q2,
https://www.transpower.co.nz/projects,,,,
IP008837,6/03/2024,Transpower New Zealand Limited,T1/T5 Transformer Replacement - Henderson.,This project will replace Transformers that are nearing end of life. The new transformers will be sized to allow for the forecast increase in expected demand.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Energy,25 - 50 million,,,,,,,2035-Q3,2037-Q2,
https://www.transpower.co.nz/projects,,,,
IP009816,6/03/2024,Transpower New Zealand Limited,T22/T23 Transformer Replacement - Culverden.,This project will replace Transformers that are nearing end of life. The new transformers will be sized to allow for the forecast increase in expected demand.,,Early planning,Funding source to be confirmed,To be determined,To be determined,South Island,,,Energy,25 - 50 million,,,,,,,2037-Q3,2039-Q2,
https://www.transpower.co.nz/projects,,,,
IP009817,6/03/2024,Transpower New Zealand Limited,Brownhill - Pakuranga Cable Joint Program - Auckland.,This project is to deliver the replacement of all remaining original cable joints on the Brownhill - Pakuranga Cable circuit.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Energy,50 - 100 million,,,,,,,2023-Q4,2026-Q4,
https://www.transpower.co.nz/projects,,,,
IP010365,6/03/2024,Transpower New Zealand Limited,Duplexing - North Makarewa - Three Mile Hill Line.,This project is to increase the capacity of the North Makarewa–Three Mile Hill circuits to host more than two wind farms. It is expected to require replacing of the existing simplex conductor with duplex conductor.,,Early planning,Funding source to be confirmed,To be determined,To be determined,South Island,,,Energy,100 - 250 million,,,,,,,2030-Q1,2031-Q4,
https://www.transpower.co.nz/projects,,,,
IP010366,6/03/2024,Transpower New Zealand Limited,Edgecumbe - Tarukenga 220kV Line Thermal Upgrade - Bay of Plenty.,This project will allow additional generation to be connected in the eastern Bay of Plenty region. Thermal upgrade could involve earthworks tower strengthening and/or decreasing conductor sag.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Energy,25 - 50 million,,,,,,,2035-Q3,2038-Q2,
https://www.transpower.co.nz/projects,,,,
IP010367,6/03/2024,Transpower New Zealand Limited,Central North Island Transmission Capacity Duplexing Bunnythorpe - Tokaaunu.,As part of our NZGP Stage 2 program we identified the need to enable the efficient dispatch of new generation in the lower North Island. Duplexing involves replacing the existing single wire (simplex) with two wires to increase the circuit's capacity.,,In planning,Funding source to be confirmed,To be determined,To be determined,North Island,,,Energy,100 - 250 million,,,,,,,2029-Q1,2033-Q2,
https://www.transpower.co.nz/projects,,,,
IP010368,6/03/2024,Transpower New Zealand Limited,Central North Island Transmission Capacity. Tactical thermal upgrade (TTU) Bunnythorpe - Wairakei.,As part of our NZGP Stage 2 program we identified the need to enable the efficient dispatch of new generation in the lower North Island. A Tactical thermal upgrade could involve earthworks tower strengthening and/or decreasing conductor sag.,,In planning,Funding source to be confirmed,To be determined,To be determined,North Island,,,Energy,25 - 50 million,,,,,,,2029-Q3,2033-Q2,
https://www.transpower.co.nz/projects,,,,
IP010369,6/03/2024,Transpower New Zealand Limited,Bunnythorpe - Woodville Capacity Increase.,This project would increase the capacity of the Bunnythorpe-Woodville circuits which are currently not sufficiently sized for the existing and future generation development in the area. The project would involve reconductoring the Bunnythorpe to Woodville 110kV circuit.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Energy,25 - 50 million,,,,,,,2025-Q4,2028-Q1,
https://www.transpower.co.nz/projects,,,,
IP010370,6/03/2024,Transpower New Zealand Limited,Tauranga Transmission and Supply Capacity.,This project is to increase transmission capacity between Kaitemako and Tauranga to enable load growth at Tauranga. The type of investment is still to be determined.,,In planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Energy,50 - 100 million,,,,,,,2027-Q4,2030-Q4,
https://www.transpower.co.nz/projects,,,,
IP010694,6/03/2024,Transpower New Zealand Limited,T5/T6 Transformer Replacement - Studholme.,This project will replace Transformers that are nearing end of life. This replacement is considering opportunities to improve resilience based on site risk.,,In planning,Funding source to be confirmed,To be determined,To be determined,South Island,,,Energy,5 - 25 million,,,,,,,2024-Q2,2026-Q4,
https://www.transpower.co.nz/projects,,,,
IP010461,20/03/2024,Unison Networks,2xNew 2.6km 33kV FHL to Flaxmere Feeders.,2xNew 2.6km 33kV FHL to Flaxmere Feeders.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2026-Q2,2028-Q1,,,,,
IP010462,20/03/2024,Unison Networks,33kV double circuit from WTU to Arataki.,33kV double circuit from WTU to Arataki.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,5 - 25 million,,,,,,,2028-Q2,2029-Q1,,,,,
IP010463,20/03/2024,Unison Networks,33kV Mahora & Tomoana feeders 3.3km/each.,33kV Mahora & Tomoana feeders 3.3km/each.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2027-Q2,2030-Q1,,,,,
IP010464,20/03/2024,Unison Networks,Arataki FDR & Arataki-Havelock upgrade.,Arataki FDR & Arataki-Havelock upgrade.,,In planning,Funding source confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,5 - 25 million,,,,,,2025-Q4,2022-Q2,2026-Q2,,,,,
IP010466,20/03/2024,Unison Networks,Camberley ZS rebuild.,Camberley ZS rebuild.,,Under construction,Fully funded,Direct,Design and construct,Hawke's Bay,,,Energy,5 - 25 million,,,,,,2024-Q4,2021-Q2,2025-Q2,,,,,
IP010467,20/03/2024,Unison Networks,Centennial Drive - Te Huka 3 Connection.,Centennial Drive - Te Huka 3 Connection.,,Under construction,Fully funded,Direct,Design and construct,North Island,,,Energy,5 - 25 million,,,,,,2024-Q2,2022-Q2,2025-Q1,,,,,
IP010468,20/03/2024,Unison Networks,CG ZS Awatoto rebuild new location.,CG ZS Awatoto rebuild new location.,,Under construction,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,5 - 25 million,,,,,,2025-Q2,2023-Q2,2025-Q3,,,,,
IP010469,20/03/2024,Unison Networks,CG ZS Esk Rebuild.,CG ZS Esk Rebuild.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2025-Q2,2027-Q1,,,,,
IP010470,20/03/2024,Unison Networks,CG ZS Tutira Rebuild.,CG ZS Tutira Rebuild.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2025-Q2,2027-Q1,,,,,
IP010471,20/03/2024,Unison Networks,Convert VaughanRoad to a 33kV substation.,Convert VaughanRoad to a 33kV substation.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,5 - 25 million,,,,,,,2029-Q2,2032-Q1,,,,,
IP010472,20/03/2024,Unison Networks,Dalbeth install generator.,Dalbeth install generator.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,,2030-Q2,2031-Q1,,,,,
IP010473,20/03/2024,Unison Networks,Design Irongate-Camberley 33kV Feeder.,Design Irongate-Camberley 33kV Feeder.,,In planning,Funding source confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2022-Q2,2030-Q1,,,,,
IP010474,20/03/2024,Unison Networks,Dover Rd Flax single to 3~ overlay.,Dover Rd Flax single to 3~ overlay.,,Post implementation ,Fully funded,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,2024-Q1,2023-Q2,2024-Q2,,,,,
IP010475,20/03/2024,Unison Networks,Faraday ZS - 33kV Outdoor CB Replacement.,Faraday ZS - 33kV Outdoor CB Replacement.,,Under construction,Fully funded,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2022-Q2,2026-Q1,,,,,
IP010476,20/03/2024,Unison Networks,Fernleaf to Ohaaki line.,Fernleaf to Ohaaki line.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,5 - 25 million,,,,,,,2028-Q2,2031-Q1,,,,,
IP010477,20/03/2024,Unison Networks,Fleet St (Fletchers).,Fleet St (Fletchers).,,Under construction,Fully funded,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,2026-Q3,2023-Q2,2027-Q1,,,,,
IP010478,20/03/2024,Unison Networks,Frederick St HBN 119387 to 151278 OHUG.,Frederick St HBN 119387 to 151278 OHUG.,,In planning,Funding source confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,2025-Q1,2022-Q2,2025-Q2,,,,,
IP010479,20/03/2024,Unison Networks,Gordon Road OHUG HB.,Gordon Road OHUG HB.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2022-Q2,2026-Q1,,,,,
IP010480,20/03/2024,Unison Networks,Hastings & Havelock 33kV OHUG Over Flaxm.,Hastings & Havelock 33kV OHUG Over Flaxm.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2026-Q2,2027-Q1,,,,,
IP010481,20/03/2024,Unison Networks,Interruption Cable Group G71 Cottrell Cr.,Interruption Cable Group G71 Cottrell Cr.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2023-Q2,2025-Q1,,,,,
IP010482,20/03/2024,Unison Networks,Kinloch Battery.,Kinloch Battery.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,,2027-Q2,2028-Q1,,,,,
IP010483,20/03/2024,Unison Networks,Laminex Switch Room and Temporary Works.,Laminex Switch Room and Temporary Works.,,Under construction,Fully funded,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,2025-Q3,2023-Q2,2025-Q4,,,,,
IP010484,20/03/2024,Unison Networks,Land for Onkekawa 110kV/33kV 100MVA GXP.,Land for Onkekawa 110kV/33kV 100MVA GXP.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2025-Q2,2026-Q1,,,,,
IP010485,20/03/2024,Unison Networks,Land for upgraded McCain substation.,Land for upgraded McCain substation.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2025-Q2,2026-Q1,,,,,
IP010486,20/03/2024,Unison Networks,LV visibility Rotorua.,LV visibility Rotorua.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,,2025-Q2,2030-Q1,,,,,
IP010487,20/03/2024,Unison Networks,McCains zone substation expansion.,McCains zone substation expansion.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2029-Q2,2030-Q1,,,,,
IP010488,20/03/2024,Unison Networks,New Substation Whakatu.,New Substation Whakatu.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,5 - 25 million,,,,,,,2025-Q2,2027-Q1,,,,,
IP010490,20/03/2024,Unison Networks,Onekawa 110kV reinforcement.,Onekawa 110kV reinforcement.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,5 - 25 million,,,,,,,2026-Q2,2028-Q1,,,,,
IP010491,20/03/2024,Unison Networks,Oturoa Rd ROT 233399 to 233454 Reconduct.,Oturoa Rd ROT 233399 to 233454 Reconduct.,,Under construction,Fully funded,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,2024-Q1,2023-Q2,2024-Q3,,,,,
IP010492,20/03/2024,Unison Networks,Overhead Lines & Fibre (Fletchers).,Overhead Lines & Fibre (Fletchers).,,Under construction,Fully funded,Direct,Design and construct,North Island,,,Energy,5 - 25 million,,,,,,2024-Q2,2023-Q2,2024-Q4,,,,,
IP010493,20/03/2024,Unison Networks,Port of Napier capacity increase.,Port of Napier capacity increase.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,5 - 25 million,,,,,,,2027-Q2,2030-Q1,,,,,
IP010494,20/03/2024,Unison Networks,Rata St Taupo. Replace TX T853 and LV.,Rata St Taupo. Replace TX T853 and LV.,,Under construction,Fully funded,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,2024-Q1,2022-Q2,2024-Q3,,,,,
IP010495,20/03/2024,Unison Networks,Reconductor 11kV Cu Te Kopia Rotorua.,Reconductor 11kV Cu Te Kopia Rotorua.,,Under construction,Fully funded,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,2023-Q4,2022-Q2,2024-Q1,,,,,
IP010496,20/03/2024,Unison Networks,Replace 11kV Cu Hossack Rd Rotorua.,Replace 11kV Cu Hossack Rd Rotorua.,,Under construction,Fully funded,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,2024-Q1,2023-Q2,2024-Q1,,,,,
IP010497,20/03/2024,Unison Networks,Risk reduction relating to double circui.,Risk reduction relating to double circui.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,,2028-Q2,2033-Q1,,,,,
IP010498,20/03/2024,Unison Networks,Roy / Dudley Rd ROT. Reconductor 7/0.064.,Roy / Dudley Rd ROT. Reconductor 7/0.064.,,Under construction,Fully funded,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,2024-Q2,2023-Q2,2024-Q3,,,,,
IP010499,20/03/2024,Unison Networks,Tarawera install generator.,Tarawera install generator.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,,2030-Q2,2031-Q1,,,,,
IP010500,20/03/2024,Unison Networks,Tauhara Stage 2B - Centennial Drive.,Tauhara Stage 2B - Centennial Drive.,,Post implementation ,Fully funded,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,2023-Q4,2021-Q2,2024-Q1,,,,,
IP010501,20/03/2024,Unison Networks,Tauhara Switchroom - 33kV CB's.,Tauhara Switchroom - 33kV CB's.,,Under construction,Fully funded,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,2024-Q2,2023-Q2,2025-Q1,,,,,
IP010502,20/03/2024,Unison Networks,Taupo East Zone Substation (Fletchers).,Taupo East Zone Substation (Fletchers).,,Under construction,Fully funded,Direct,Design and construct,North Island,,,Energy,5 - 25 million,,,,,,2025-Q4,2022-Q2,2026-Q1,,,,,
IP010503,20/03/2024,Unison Networks,Taupo West land purchase and design.,Taupo West land purchase and design.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,5 - 25 million,,,,,,,2025-Q2,2028-Q1,,,,,
IP010504,20/03/2024,Unison Networks,Tomoana ZS 11kV Switchboard replacement.,Tomoana ZS 11kV Switchboard replacement.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,5 - 25 million,,,,,,,2022-Q2,2027-Q1,,,,,
IP010505,20/03/2024,Unison Networks,Upgrade 33kV Windsor & City feeders.,Upgrade 33kV Windsor & City feeders.,,Under construction,Fully funded,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,2026-Q1,2022-Q2,2026-Q2,,,,,
IP010506,20/03/2024,Unison Networks,Upgrade Arataki 33/11kV transformers.,Upgrade Arataki 33/11kV transformers.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2029-Q2,2030-Q1,,,,,
IP010507,20/03/2024,Unison Networks,Upgrade Church Rd ZS 33kV/11kV transform.,Upgrade Church Rd ZS 33kV/11kV transform.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2029-Q2,2030-Q1,,,,,
IP010508,20/03/2024,Unison Networks,Windsor ZS replace outdoor 33kV CBs.,Windsor ZS replace outdoor 33kV CBs.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2021-Q2,2027-Q1,,,,,
IP010700,20/03/2024,Unison Networks,177 Centennial Drive TPO - Fletchers.,177 Centennial Drive TPO - Fletchers.,,Under construction,Fully funded,Direct,Design and construct,North Island,,,Energy,5 - 25 million,,,,,,2025-Q4,2022-Q2,2026-Q1,,,,,
IP010701,20/03/2024,Unison Networks,2x10MVA 33/11kV transf at Maraekakaho ZS.,2x10MVA 33/11kV transf at Maraekakaho ZS.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2031-Q2,2032-Q1,,,,,
IP010702,20/03/2024,Unison Networks,Acacia Bay Feeder Reinforcement.,Acacia Bay Feeder Reinforcement.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,,2026-Q2,2027-Q1,,,,,
IP010703,20/03/2024,Unison Networks,Awatoto 33kV line - Upgrade.,Awatoto 33kV line - Upgrade.,,Under construction,Fully funded,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,2024-Q3,2022-Q2,2024-Q4,,,,,
IP010704,20/03/2024,Unison Networks,Broadlands Conductor Upgrade.,Broadlands Conductor Upgrade.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,,2026-Q2,2027-Q1,,,,,
IP010705,20/03/2024,Unison Networks,Clayton FeederReliability improvements.,Clayton FeederReliability improvements.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,,2025-Q2,2027-Q1,,,,,
IP010706,20/03/2024,Unison Networks,Code Name He-Ahi.,Code Name He-Ahi.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,5 - 25 million,,,,,,,2032-Q2,2033-Q1,,,,,
IP010707,20/03/2024,Unison Networks,Kahuranaki Reconductor 7/16 Cu Section 2.,Kahuranaki Reconductor 7/16 Cu Section 2.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2025-Q2,2026-Q1,,,,,
IP010708,20/03/2024,Unison Networks,Kahuranaki Reconductor 7/16 Cu Section 3.,Kahuranaki Reconductor 7/16 Cu Section 3.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2025-Q2,2026-Q1,,,,,
IP010709,20/03/2024,Unison Networks,Land for New Te Awa Zone Substation.,Land for New Te Awa Zone Substation.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2025-Q2,2026-Q1,,,,,
IP010710,20/03/2024,Unison Networks,New 11kV Feeder at Irongate ZS (Rural).,New 11kV Feeder at Irongate ZS (Rural).,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2025-Q2,2026-Q1,,,,,
IP010711,20/03/2024,Unison Networks,New 15km 33kV Maraekakaho feeder.,New 15km 33kV Maraekakaho feeder.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2032-Q2,2033-Q1,,,,,
IP010712,20/03/2024,Unison Networks,New 33kV Switch board at Runanga.,New 33kV Switch board at Runanga.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,,2031-Q2,2032-Q1,,,,,
IP010713,20/03/2024,Unison Networks,New Te Awa Zone Substation Build.,New Te Awa Zone Substation Build.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,5 - 25 million,,,,,,,2030-Q2,2031-Q1,,,,,
IP010714,20/03/2024,Unison Networks,OHUG 1.3km on 33kV Flaxmere & Camberley.,OHUG 1.3km on 33kV Flaxmere & Camberley.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,5 - 25 million,,,,,,,2025-Q2,2027-Q1,,,,,
IP010715,20/03/2024,Unison Networks,Pukehangi Area Feeder Augmentation.,Pukehangi Area Feeder Augmentation.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,,2026-Q2,2028-Q1,,,,,
IP010716,20/03/2024,Unison Networks,Reduce SWER circuits in Taupo Plains.,Reduce SWER circuits in Taupo Plains.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,,2027-Q2,2028-Q1,,,,,
IP010717,20/03/2024,Unison Networks,Third Havelock Area ZS.,Third Havelock Area ZS.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,5 - 25 million,,,,,,,2027-Q2,2028-Q1,,,,,
IP010718,20/03/2024,Unison Networks,Transfer Tarawera & Fenton park to V rd.,Transfer Tarawera & Fenton park to V rd.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,,2030-Q2,2031-Q1,,,,,
IP010719,20/03/2024,Unison Networks,Upgrade Hamurana Voltage regulator.,Upgrade Hamurana Voltage regulator.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,,2025-Q2,2027-Q1,,,,,
IP010720,20/03/2024,Unison Networks,Vaughan Road cable.,Vaughan Road cable.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,5 - 25 million,,,,,,,2023-Q2,2028-Q1,,,,,
IP010721,20/03/2024,Unison Networks,Vaughan Road Switchroom.,Vaughan Road Switchroom.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,,2027-Q2,2028-Q1,,,,,
IP010722,20/03/2024,Unison Networks,Waimarama Feeder capacity upgrades.,Waimarama Feeder capacity upgrades.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2028-Q2,2029-Q1,,,,,
IP010723,20/03/2024,Unison Networks,Waipa ZS 2 new transformers and cables.,Waipa ZS 2 new transformers and cables.,,Early planning,Funding source to be confirmed,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,,2030-Q2,2031-Q1,,,,,
IP010724,20/03/2024,Unison Networks,Yankee Rd ROT. Reconductor 7/0.064.,Yankee Rd ROT. Reconductor 7/0.064.,,In planning,Funding source confirmed,Direct,Design and construct,North Island,,,Energy,1 - 5 million,,,,,,2024-Q3,2023-Q2,2024-Q4,,,,,
IP010725,20/03/2024,Unison Networks,Zone Substation security upgrades 25/26.,Zone Substation security upgrades 25/26.,,Early planning,Funding source to be confirmed,Direct,Design and construct,Hawke's Bay,,,Energy,1 - 5 million,,,,,,,2025-Q2,2026-Q1,,,,,
IP002798,20/03/2024,University of Auckland,New Recreation and Wellness Centre (B310).,The University of Auckland is developing an international quality Recreation and Wellness Centre in the City Campus. The Recreation and Wellness Centre will accommodate several sporting facilities including two sports halls a swimming pool squash courts.,,Under construction,Funding source confirmed,Open,Construct only,Auckland,,,Education,250 - 500 million,,2018-Q4,2019-Q3,2020-Q4,2020-Q4,2024-Q3,2020-Q4,2024-Q3,,,,,
IP005436,20/03/2024,University of Auckland,Education and Social Work - B104 Old Choral Hall.,B104 (Old Choral Hall) is a Grade 1 Heritage Building and is to become the heart / central base for EDSW move to the city campus. B104 requires a seismic upgrade heritage refurbishment addition of a new lift replacement of building services installat.,,Under construction,Funding source confirmed,Open,Construct only,Auckland,,,Education,50 - 100 million,,2020-Q2,2021-Q4,2022-Q3,2022-Q3,2025-Q2,2020-Q2,2025-Q3,,,,,
IP008938,20/03/2024,University of Auckland,Education and Social Work B113.,The B113 project forms part of the Faculty of Education and Social Work (EDSW) workstream initiated by the planned strategic divestment of the University of Auckland’s (UoA) Epsom campus. A key driver for the Project is to relocate EDSW to the city campus.,,Post implementation ,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,2023-Q1,2023-Q2,2023-Q4,2023-Q3,2024-Q2,2020-Q2,2024-Q3,,,,,
IP008939,20/03/2024,University of Auckland,O'Rorke Hall Stages 1 & 2.,Refurbishment of an existing student accommodation facility.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,25 - 50 million,,2023-Q2,2022-Q4,2023-Q3,2022-Q4,2025-Q2,2022-Q2,2025-Q3,,,,,
IP008940,20/03/2024,University of Auckland,Education and Social Work B114.,The B114 project forms part of the Faculty of Education and Social Work (EDSW) workstream initiated by the planned strategic divestment of the University of Auckland’s (UoA) Epsom campus. A key driver for the Project is to relocate EDSW to the city campus.,,Post implementation ,Funding source confirmed,Selective,Construct only,Auckland,,,Education,1 - 5 million,,2023-Q1,2023-Q3,2023-Q3,2023-Q3,2024-Q1,2020-Q2,2024-Q1,,,,,
IP008941,20/03/2024,University of Auckland,University Hall Apartments - B436.,Refurbishment of an existing student accommodation facility.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,2023-Q4,2023-Q4,2024-Q1,2024-Q2,2025-Q2,2023-Q1,2025-Q3,,,,,
IP008942,20/03/2024,University of Auckland,Newmarket Campus Landscape Project.,New hard and soft landscaping infrastructure and roading improvements.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,2023-Q2,2023-Q3,2023-Q3,2023-Q4,2024-Q2,2021-Q2,2025-Q3,,,,,
IP008943,20/03/2024,University of Auckland,Carrick Place - B581.,Refurbishment of an existing tertiary education building.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,1 - 5 million,,2024-Q2,2024-Q3,2024-Q4,2024-Q4,2025-Q3,2023-Q2,2026-Q3,,,,,
IP008944,20/03/2024,University of Auckland,Glasgow Place - B509.,Refurbishment of an existing tertiary education building.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Education,1 - 5 million,,2024-Q2,2024-Q3,2024-Q4,2024-Q4,2025-Q3,2023-Q2,2024-Q2,,,,,
IP008945,20/03/2024,University of Auckland,B409 Security Building refurbishment.,Refurbishmant of an existing support building.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,1 - 5 million,,2023-Q2,2023-Q3,2023-Q4,2023-Q4,2024-Q2,2023-Q2,2024-Q3,,,,,
IP009807,20/03/2024,University of Auckland,B421 - Architectural Refurbishment.,Refurbishmant of an existing tertiary education building.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Education,25 - 50 million,,2024-Q3,2024-Q4,2024-Q1,2025-Q2,2027-Q4,2023-Q2,2027-Q2,,,,,
IP009808,20/03/2024,University of Auckland,Whitaker Place Hall Demolition.,Demolition of B601 602 603.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,2023-Q4,2023-Q4,2023-Q4,2023-Q4,2024-Q3,2023-Q2,2024-Q3,,,,,
IP009810,20/03/2024,University of Auckland,B109 LVL1 and 1M Student Spaces.,Converting to collaborative student study spaces.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,2023-Q3,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2023-Q2,2024-Q1,,,,,
IP010757,20/03/2024,University of Auckland,Leigh Marine Aquaria Update.,New build research facility and associated seawater infrastructure.,,Under construction,Funding source confirmed,Selective,Construct only,Auckland,,,Education,5 - 25 million,,,,,,,2021-Q3,2025-Q1,,,,,
UoCB1945,21/03/2023,University of Canterbury,Boiler House conversion and site works.,Conversion and site works.,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Water,5 - 25 million,,,,,2022-Q4,2024-Q2,2022-Q2,2024-Q2,,,,,
UoCB1946,21/03/2023,University of Canterbury,GSHP Plant room.,New artesian bores new plant room.,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Water,5 - 25 million,,,,,2022-Q4,2024-Q2,2022-Q2,2024-Q2,,,,,
UoCB1956,21/03/2023,University of Canterbury,Biological Sciences Accelerator.,Demolition of building and Construction of new build.,,In planning,Funding source confirmed,Limited,To be determined,Canterbury,,,Education,5 - 25 million,,,2023-Q1,,,,2023-Q4,2026-Q4,,,,,
UoCB1961,21/03/2023,University of Canterbury,Dovedale Boiler.,Removal of coal sourced central Boiler plant strategic options being investigated for replacement.,,Early planning,Funding source confirmed,Selective,Construct only,Canterbury,,,Education,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
UoCB3010,21/03/2023,University of Canterbury,Julius von Haast.,Minor building fitout works L6 Science Dept relocations.,,Under construction,Fully funded,Selective,Construct only,Canterbury,,,Education,< 1 million,,,2022-Q4,,2023-Q4,2024-Q1,2023-Q1,2024-Q2,,,,,
UoCB1947,21/03/2023,University of Canterbury,Karl Popper.,Refurbishment of Karl Popper Levels 1-4.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Education,1 - 5 million,,,,,,,2023-Q4,2025-Q3,,,,,
IP000370,11/03/2024,University of Otago,Arana Residential College Seismic and Fire Compliance Upgrades - Dunedin.,This project seeks to address building upgrades required for the college to keep pace with changing building standards and legislation.,,Under construction,Fully funded,Open,Construct only,Otago,,,Education,5 - 25 million,2021-Q2,2022-Q1,2022-Q1,2023-Q4,2024-Q1,2024-Q4,2021-Q2,2025-Q1,
https://www.otago.ac.nz/campus-development/projects/underway/index.html,,,,
IP000384,11/03/2024,University of Otago,Science 3 Building Fire Protection System Upgrade - Dunedin.,This project seeks to preserve business continuity and reduce constraints on changes to future building use by upgrading the fire protection system.,,Under construction,Fully funded,Open,Construct only,Otago,,,Education,1 - 5 million,2019-Q1,2020-Q2,2020-Q2,2020-Q4,2021-Q1,2024-Q2,2019-Q1,2024-Q2,
https://www.otago.ac.nz/campus-development/projects/underway/otago824093.html,,,,
IP000389,11/03/2024,University of Otago,University of Otago Christchurch Campus Redevelopment.,This project seeks to address growth and continuation concerns by constructing a purpose-built facility supporting research; learning and teaching for the University of Otago - Christchurch in the new Christchurch Health Precinct. This project is Stage 1 of the University of Otago - Christchurch Campus Redevelopment.,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Education,100 - 250 million,2016-Q2,2018-Q3,2021-Q1,2022-Q4,2022-Q2,2026-Q1,2016-Q2,2026-Q1,
https://www.otago.ac.nz/campus-development/projects/underway/otago706965.html,,,,
IP006582,11/03/2024,University of Otago,Aquinas Residential College Extension - Dunedin.,This project seeks to address a lack of accomodation capacity by building an extension to the college.,,Under construction,Fully funded,Limited,Early contractor involvement,Otago,,,Education,5 - 25 million,2020-Q1,2021-Q4,2021-Q4,2021-Q4,2022-Q2,2024-Q2,2020-Q1,2025-Q2,
https://www.otago.ac.nz/campus-development/projects/underway/index.html,,,,
IP008154,11/03/2024,University of Otago,University Plaza and Otago Business School Buildings - Dunedin.,This project seeks to maximise space utilisation support aspirations and foster collegiality across the Dunedin Campus.,,Under construction,Fully funded,Direct,Design and construct,Otago,,,Education,5 - 25 million,2022-Q2,2022-Q4,2023-Q3,2024-Q1,2023-Q3,2024-Q3,2022-Q2,2025-Q2,
https://www.otago.ac.nz/campus-development/projects/underway/index.html,,,,
IP008709,11/03/2024,University of Otago,University of Otago Wellington Lecture Theatre Seismic Upgrades - Wellington.,This project seeks to preserve building continuity by upgrading the seismic strength of the Lecture Theatre Building to enable teaching and learning functions to resume at this facility on the Wellington Campus.,,Post implementation ,Fully funded,Direct,Early contractor involvement,Wellington,,,Education,5 - 25 million,2022-Q1,2022-Q4,2022-Q4,2023-Q2,2023-Q2,2024-Q1,2022-Q1,2025-Q1,
https://www.otago.ac.nz/campus-development/projects/underway/index.html,,,,
IP008710,11/03/2024,University of Otago,University of Otago Wellington Link Block Further Adaptions - Wellington.,This project seeks to explore options for fit-out and upgrades to the Link Block to enable teaching and learning functions to be located on the Wellington Campus.,,Under construction,Fully funded,Direct,Construct only,Wellington,,,Education,5 - 25 million,2022-Q4,2023-Q2,2023-Q2,2023-Q3,2023-Q3,2024-Q2,2022-Q4,2025-Q2,
https://www.otago.ac.nz/campus-development/projects/underway/index.html,,,,
IP010746,11/03/2024,University of Otago,Consumer and Applied Sciences Building Seismic Strengthening.,This project seeks to address seismic functionality and compliance issues in the Consumer and Applied Sciences Building.,,Under construction,Fully funded,Open,Other,Otago,,,Education,5 - 25 million,2019-Q4,2020-Q4,2020-Q4,2022-Q4,2023-Q1,2024-Q3,2019-Q4,2025-Q2,
https://www.otago.ac.nz/administration/service_divisions/campus-development/projects/underway/food-science-redevelopment,,,,
IP006787,15/03/2024,Upper Hutt City Council,Akatārawa Cemetery redevelopment.,Expand and develop land owned adjacent to the Cemetery to support required future capacity.,,In procurement,Fully funded,Open,Construct only,Wellington,,,Community facilities,1 - 5 million,,,,,2025-Q1,2026-Q1,2021-Q3,2026-Q1,
https://www.upperhuttcity.com/Your-Council/Our-projects-and-initiatives/Akat%C4%81rawa-Cemetery-Development,,[email address],,
IP006781,5/12/2023,Upper Hutt City Council,Akatārawa Pump Station & Storage Upgrade.,Upgrade existing facilities for expected growth requirements.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Water,5 - 25 million,,,,,,,2036-Q3,2039-Q2,,,,,
IP006778,5/12/2023,Upper Hutt City Council,Akatārawa Reservoir Upgrade.,Upgrade existing facilities for expected growth requirements.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Water,25 - 50 million,,,,,,,2032-Q3,2035-Q2,,,,,
IP008719,15/03/2024,Upper Hutt City Council,Beechwood Lane Bridge.,A project is underway to repair and refurbish the old Beechwood Lane Bridge.,,Under construction,Fully funded,Selective,Design and construct,Wellington,,,Transport,< 1 million,,,,,2024-Q1,2024-Q2,2016-Q1,2024-Q2,
https://www.upperhuttcity.com/Your-Council/Our-projects-and-initiatives/Beechwood-Lane-Bridge,,[email address],,
IP006770,15/03/2024,Upper Hutt City Council,City Centre Paving Revitalisation.,To update the paving and street furniture in the city centre CBD.,,In procurement,Fully funded,Selective,Construct only,Wellington,,,Community facilities,5 - 25 million,,,2025-Q4,2025-Q4,2026-Q1,2028-Q1,2021-Q3,2028-Q1,,,[email address],,
IP006789,15/03/2024,Upper Hutt City Council,Community Hub.,Develop and construct building for community groups by providing office space and shared spaces for meetings programmes and activities.,,Early planning,Funding source to be confirmed,Open,To be determined,Wellington,,,Community facilities,5 - 25 million,,,,,,,2028-Q2,2035-Q2,,,[email address],,
IP006790,5/12/2023,Upper Hutt City Council,Drinking Water network renewals.,Renewal of potable water mains.,,Under construction,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Water,100 - 250 million,,,,,,,2021-Q3,2041-Q2,,,,,
IP006772,5/12/2023,Upper Hutt City Council,Drinking water reservoir seismic strengthening - Cruickshank.,The reservoirs requiring seismic strengthening in order to meet goals around providing 80% of normal supply to 80% of customers within 30 days of a major event.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Water,1 - 5 million,,,,,,,2031-Q3,2033-Q2,,,,,
IP006773,5/12/2023,Upper Hutt City Council,Drinking water reservoir seismic strengthening - Trentham.,The reservoirs requiring seismic strengthening in order to meet goals around providing 80% of normal supply to 80% of customers within 30 days of a major event.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Water,1 - 5 million,,,,,,,2031-Q3,2033-Q2,,,,,
IP006788,15/03/2024,Upper Hutt City Council,Fergusson/Gibbons/Main intersection upgrade.,This project is to upgrade the intersection by realignment of the intersection to accommodate vehicle volumes to cater for efficient passenger transport and an anticipated increase in heavy vehicles using this route.,,In planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Transport,5 - 25 million,,,,,2027-Q2,2028-Q2,2023-Q3,2028-Q2,,,[email address],,
IP006774,15/03/2024,Upper Hutt City Council,Fergusson/Ward/Whakatiki Intersection upgrade.,Significant development is planned and is underway on Alexander Road and the previously owned Research site on Ward Street. This is resulting in a substantial increase in traffic using the Fergusson/Ward/Whakatiki intersections. Each intersection is c.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Transport,1 - 5 million,,,,,2029-Q2,2030-Q2,2022-Q3,2030-Q2,,,[email address],,
IP006785,15/03/2024,Upper Hutt City Council,H2O Xtream Upgrade.,Upgrade and expand the current facility with the addition of new water space improved slides and other attractions to enhance aquatic opportunities for the community.,,Under construction,Fully funded,Open,Early contractor involvement,Wellington,,,Community facilities,50 - 100 million,,,,,2022-Q4,2025-Q1,2021-Q3,2025-Q1,
https://www.upperhuttcity.com/Your-Council/Our-projects-and-initiatives/H2O-Xtream-upgrade-project,,[email address],,
IP006786,15/03/2024,Upper Hutt City Council,Maidstone Community Sports Hub.,To develop and construct a sports hub for multi-sport utilisation.,,Post implementation ,Fully funded,Open,Early contractor involvement,Wellington,,,Community facilities,25 - 50 million,,,,,2022-Q4,2024-Q1,2021-Q3,2024-Q1,
https://www.upperhuttcity.com/Your-Council/Our-projects-and-initiatives/Maidstone-Community-Sports-Hub,,[email address],,
IP006771,15/03/2024,Upper Hutt City Council,Maidstone Park Artifical Turf Replacements.,Replace existing artificial turfs at the park - these are multi-sport turfs with 12 year lifespans.,,Under construction,Fully funded,Selective,Design and construct,Wellington,,,Community facilities,1 - 5 million,,,,,,,2024-Q2,2034-Q2,
https://www.upperhuttcity.com/News/Maidstone-Hockey-turf-due-for-replacement-in-2024,,[email address],,
IP006776,5/12/2023,Upper Hutt City Council,Maidstone Reservoir Upgrade.,Upgrade existing facilities for expected growth requirements.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Water,5 - 25 million,,,,,,,2031-Q3,2033-Q2,,,,,
IP006777,5/12/2023,Upper Hutt City Council,Mangaroa/Te Mārua Reservoir Upgrade.,Upgrade existing facilities for expected growth requirements.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Water,25 - 50 million,,,,,,,2033-Q3,2036-Q2,,,,,
IP006793,15/03/2024,Upper Hutt City Council,Parks & Playgrounds renewals programme.,Renewal of park amenties - buildings playgrounds pathways & signage.,,Under construction,Fully funded,To be determined,To be determined,Wellington,,,Community facilities,5 - 25 million,,,,,,,2021-Q3,2041-Q2,,,[email address],,
IP006780,5/12/2023,Upper Hutt City Council,Pinehaven - Blue Mountains Storage Upgrade.,Upgrade existing facilities for expected growth requirements.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Water,5 - 25 million,,,,,,,2032-Q3,2033-Q2,,,,,
IP006779,5/12/2023,Upper Hutt City Council,Pinehaven Reservoir Upgrade.,Upgrade existing facilities for expected growth requirements.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Water,50 - 100 million,,,,,,,2035-Q3,2038-Q2,,,,,
IP006783,5/12/2023,Upper Hutt City Council,Pinehaven Stream Improvements.,Upgrade the road culverts and do stream works to reduce the frequency of property floodings in the area.,,Under construction,Fully funded,To be determined,To be determined,Wellington,,,Water,5 - 25 million,,,,,2021-Q3,2023-Q1,2019-Q3,2024-Q2,,,,,
IP006775,15/03/2024,Upper Hutt City Council,Silverstream Bridge Replacement.,Replace the existing bridge with a higher capacity bridge and meet resilency expectations.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Transport,25 - 50 million,,,,,2030-Q2,2032-Q2,2024-Q3,2032-Q2,,,[email address],,
IP006782,15/03/2024,Upper Hutt City Council,Tōtara Park Bridge Widening.,To widen the existing bridge from Tōtara Park to SH2 to ease traffic congestion and flow.,,In planning,Funding source confirmed,To be determined,To be determined,Wellington,,,Transport,1 - 5 million,,,,,2025-Q2,2026-Q2,2022-Q3,2026-Q2,,,[email address],,
IP006792,15/03/2024,Upper Hutt City Council,Transport network renewals.,Renewal of transport links.,,In planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Transport,100 - 250 million,,,,,,,2021-Q3,2041-Q2,,,[email address],,
IP006791,5/12/2023,Upper Hutt City Council,Wastewater network renewals.,Renewal of waste water sewer mains.,,Under construction,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Water,100 - 250 million,,,,,,,2021-Q3,2041-Q2,,,,,
IP010821,15/03/2024,Upper Hutt City Council,H2O Xtream Hydrotherapy Pool Extension.,H2O Xtream Upgrade - Hydrotherapy Pool (Extension from the main pool).,,Early planning,Funding source confirmed,To be determined,To be determined,Wellington,,,Community facilities,5 - 25 million,,,,,2031-Q2,2032-Q2,2030-Q2,2032-Q2,
https://www.upperhuttcity.com/Your-Council/Our-projects-and-initiatives/H2O-Xtream-upgrade-project,,[email address],,
IP010822,15/03/2024,Upper Hutt City Council,Civic Centre Upgrade.,Stage two - Full Upgrade (Modernization).,,Early planning,Funding source confirmed,Open,Early contractor involvement,Wellington,,,Community facilities,25 - 50 million,,,,,,,2035-Q2,2045-Q2,
https://www.upperhuttcity.com/Your-Council/Our-projects-and-initiatives/Civic-Centre-upgrade-project,,[email address],,
IP008892,9/03/2024,Waikato District Council,Ngaruawahia - Festival Way (between Galbraith and Old Taupiri Rd).,Construct a new road with associated services to enable further residential development in the Ngaruawahia north area.,,Under construction,Funding source confirmed,Open,Construct only,Waikato,,,Transport,5 - 25 million,,,,,,,2023-Q1,2025-Q4,,,EPMO (WDC),,
IP008931,9/03/2024,Waikato District Council,Pokeno Main Street.,Pokeno Main Street Upgrade aims to create a safer more accessible attractive and vibrant street environment while future-proofing Pokeno’s Main Street for growth development and investment. The rehabilitation and beautification works will transform the town centre and main street into a vibrant and thriving central area that brings a sense of pride to the community and is safe and welcoming for all.,,Under construction,Funding source confirmed,Direct,Alliance,Waikato,,,Transport,1 - 5 million,,,,,,,2022-Q3,2024-Q3,,,EPMO (WDC),,
IP009136,9/03/2024,Waikato District Council,Gilmour St residual.,Gilmour St residual.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2023-Q1,2023-Q1,,,EPMO (WDC),,
IP009138,9/03/2024,Waikato District Council,Buckland road minor improvements 2024.,Int of Buckland Rd and George St. Safer Intersections. Urban Roundabout. Pending detailed scoping and allocation to PM.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,1 - 5 million,,,,,,,2022-Q3,2025-Q3,,,EPMO (WDC),,
IP009139,9/03/2024,Waikato District Council,Council Facilities / Aquatic Centres / Huntly / Boiler replacement.,Inspection required to determine the life expectancy of the boiler also to determine the most energy efficient replacement.,,In planning,Funding source confirmed,Open,Other,Waikato,,,Community facilities,< 1 million,,,,,,,2023-Q2,2023-Q3,,,EPMO (WDC),,
IP009140,9/03/2024,Waikato District Council,Ngaruawahia Aquatic Centre New entrance.,Form a new entranceway off Market St to improve access to the pool . This is following on from the fence replacement to make the pool more visible and increase security.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q1,,,EPMO (WDC),,
IP009141,9/03/2024,Waikato District Council,Council Facilities / Aquatic centres / Ngaruawahia Pools / Stormwater.,Replacement of stormwater catch-pit (drain in front right corner with back to changing rooms).,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2022-Q4,2022-Q4,,,EPMO (WDC),,
IP009144,9/03/2024,Waikato District Council,Tuakau Dog Pound New Build.,New Build of Dog Pound. Dependent on feasibility study to decide between separate buildings or centralised. # Figures require QS.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,5 - 25 million,,,,,,,2021-Q4,2024-Q2,,,EPMO (WDC),,
IP009147,9/03/2024,Waikato District Council,Ngaruawahia Hall Improvements.,To determine the viability to rectify identified earthquake-prone issues outlined in all 3 BECA reports for the Ngaruawahia Memorial Hall versus other plans for the Hall. Bundled in this project are other relevant hall works. Refer to in scope.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2021-Q4,2024-Q4,,,EPMO (WDC),,
IP009148,9/03/2024,Waikato District Council,Tuakau Hall Refurbishment.,The project is a combination of seismic repairs roof remedials floor resurfacing. Additional scope to remove of the fabric from main hall walls repair wall surface and repainted potential acoustic panel installation maybe required.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,1 - 5 million,,,,,,,2022-Q3,2024-Q1,,,EPMO (WDC),,
IP009153,9/03/2024,Waikato District Council,Council Facilities / Public Toilets / Pokeno Toilet Replacement.,This budget is for the replacement of the pokeno Toilet after the existing block was found to have rot in the baseplates and condemed. This budget is to cover the cost of building a new facility to replace the existing.,,Under construction,Funding source confirmed,Selective,Construct only,Waikato,,,Community facilities,< 1 million,,,,,,,2023-Q2,2024-Q3,,,EPMO (WDC),,
IP009156,9/03/2024,Waikato District Council,Council Offices / Ngaruawahia / Exterior Cladding.,To peer review initial assessment reports by others to identify and understand the extent of water ingress damage to the buildings caused by sub-standard cladding systems. Repair urgent work identified to limit further deterioration to the building. New cladding design and remediate all weather tightness work to comply with new building standards.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2021-Q4,2024-Q2,,,EPMO (WDC),,
IP009157,9/03/2024,Waikato District Council,Dean road/Great South Road intersection upgrade.,Updated from DFH schedule 21/6/2020. INT - 13 Gt South Rd - Dean Rd Intersection. Pending detailed scoping and allocation to PM.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2022-Q2,2024-Q4,,,EPMO (WDC),,
IP009160,9/03/2024,Waikato District Council,District Wide Toilets - Te Kowhai.,Construct one modular unit (two pans) public toilet within Te Kowhai Village Green. Connection of Water Waste and Electrical services.,,Under construction,Funding source confirmed,Selective,Construct only,Waikato,,,Community facilities,< 1 million,,,,,,,2021-Q1,2024-Q1,,,EPMO (WDC),,
IP009163,9/03/2024,Waikato District Council,Fullerton road bridge.,FULLERTON RD 1400 CULVERT. Bridge Replacement. Severe corrosion to 10m length of both corrugated steel barrels. Adjoining 11m length of concrete pipe is in good condition. Will go the Alliance as TCE/variation in Yr 2 of LTP.,,Under construction,Funding source confirmed,Direct,Alliance,Waikato,,,Transport,1 - 5 million,,,,,,,2022-Q3,2023-Q4,,,EPMO (WDC),,
IP009164,9/03/2024,Waikato District Council,Great South Road and Pokeno Road Intersection Upgrade.,Great Sth Rd/Pokeno Intersection. Intersection Transformation. roundabout.,,In planning,Funding source confirmed,Direct,Alliance,Waikato,,,Transport,1 - 5 million,,,,,,,2022-Q3,2024-Q3,,,EPMO (WDC),,
IP009165,9/03/2024,Waikato District Council,Great South Road Leathams Bridge - Professional Services.,Great South Road Leathams Bridge - Professional Services.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2022-Q3,2023-Q1,,,EPMO (WDC),,
IP009167,9/03/2024,Waikato District Council,Great South Road South of Huntly - Remove Passing Lanes.,Remove passing lanes (mainly through changing the linemarking) extended wide centre line to edge of speed change south of Huntly. Remove VMS sign & w-section barrier just outside of Huntly. Clear vegetation where it blocks sight lines along the corridor.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,1 - 5 million,,,,,,,2023-Q1,2023-Q1,,,EPMO (WDC),,
IP009169,9/03/2024,Waikato District Council,Harrisville Road Bridge Replacements.,The main objective of this project is to replace the existing two-lane bridge in the town of Tuakau while incorporating a new pedestrian bridge. This replacement project will encompass the relocation of critical infrastructure including water and waste mains two HV cables main trunk fibre and the main trunk gas line to accommodate the services and pedestrian bridge.During construction one lane of traffic will be routed through the existing services bridge minimizing disruptions and delays around the town. To facilitate the additional services bridge the acquisition of adjacent land will be necessary.The new bridge will be designed as a HN-HO-72 rated hollow core concrete structure renowned for its strength durability and cost-effectiveness. Moreover a portion of the project budget will be allocated to decorative enhancements ensuring the bridge's visual appeal befits its prominent central location in Tuakau.,,In planning,Funding source confirmed,Open,Design and construct,Waikato,,,Transport,< 1 million,,,,,,,2022-Q3,2026-Q3,,,EPMO (WDC),,
IP009170,9/03/2024,Waikato District Council,Harrisville road safety network improvements 2023.,Harrisville Logan - Buckville SNP. Safer Corridors with Speed Management. Wide Centreline/corridor improvements and/or interactive warning signs.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2022-Q3,2024-Q3,,,EPMO (WDC),,
IP009171,9/03/2024,Waikato District Council,Helenslee road minor improvements.,Helenslee road upgrade -Munro to SH1 Interchange. Urban corridor upgrade. Corridor widening to meet growth (likely constructed as part of the development on the northern side of the road - developer funded).,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2022-Q3,2024-Q2,,,EPMO (WDC),,
IP009173,9/03/2024,Waikato District Council,Horotiu Link Road.,Construct a new safe intersection to link Horotiu road with the new road in to the POAL site. Also close the Horotiu road rail crossing.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,1 - 5 million,,,,,,,2021-Q1,2025-Q3,,,EPMO (WDC),,
IP009174,9/03/2024,Waikato District Council,Huia road resilience improvements.,Flood prevention and resilience project. Throttling the culvert at Huia Road and raising the road. Unlikely to be spent apart from geotech and survey.THIS IS THE CULVERT AT HUIA NOT THE LARGE BRIDGE.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,1 - 5 million,,,,,,,2023-Q1,2025-Q2,,,EPMO (WDC),,
IP009177,9/03/2024,Waikato District Council,Huntly - WEX North End Roundabout.,Huntly - WEX North End Roundabout.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2023-Q1,2023-Q1,,,EPMO (WDC),,
IP009178,9/03/2024,Waikato District Council,Huntly Main Road Rail Bridge Protection North.,Huntly Main Road Rail Bridge Protection North.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,1 - 5 million,,,,,,,2022-Q3,2023-Q2,,,EPMO (WDC),,
IP009179,9/03/2024,Waikato District Council,Huntly transfer station Hard Stand of unpaved areas.,Huntly Refuse Transfer Station access road rehabilitation.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2022-Q4,2024-Q2,,,EPMO (WDC),,
IP009180,9/03/2024,Waikato District Council,Intersection (Roundabout) Upgrade Munro/Pokeno.,"Carryover project. Previous description in PR-1616 - ""NZTA have asked for this to be included in an SSI project 76% FAR $54 for land purchase completion of prof services and land this FY 100k Total cost 1.5m in next LTP"". It's not clear how this now sits in the LTP. Ross/Gareth to confirm. ** project deferred to next LTP period no tefar available to complete to be funded via structure plan DC's (prof services) in next ltp allow for land aquisition for an urban style roundabout like lake/horotiu bridge rd intersection. first part of prof services is to determine land requirements.",,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,1 - 5 million,,,,,,,2022-Q3,2025-Q2,,,EPMO (WDC),,
IP009184,9/03/2024,Waikato District Council,Mangatawhiri road minor improvements.,Mangatawhiri Road (High risk motorcycle route). Arterial Safety Upgrade. Barriers along curves ATPs (Midline and centreline). Pending detailed scoping and allocation to PM.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2022-Q3,2024-Q2,,,EPMO (WDC),,
IP009185,9/03/2024,Waikato District Council,Mercer Ferry Bridge.,Mercer Ferry Bridge.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2022-Q3,2022-Q4,,,EPMO (WDC),,
IP009187,9/03/2024,Waikato District Council,Munro Road Resilience and Footpath.,Flood prevention and resilience project. Upgrading the culvert beneath Munro Road and Raising the road. Unlikely to be spent apart from Geotech and Survey.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2021-Q3,2024-Q4,,,EPMO (WDC),,
IP009188,9/03/2024,Waikato District Council,Ngaruawahia - Saulbrey to Rangimarie Rd Connector plus T connection back to Great South Rd.,01/03/2024 - This is a Roading project. Luke to confirm status.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,5 - 25 million,,,,,,,2023-Q1,2023-Q1,,,EPMO (WDC),,
IP009190,9/03/2024,Waikato District Council,North Waikato Resource Recovery Centre.,Site Investigations.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Waste management,< 1 million,,,,,,,2022-Q3,2023-Q2,,,EPMO (WDC),,
IP009191,9/03/2024,Waikato District Council,The Point Ngaruawahia.,The purpose of this project is to implement the improvements identified in The Point Reserve and Kiingitanga Reserve Management Plan 2019. Projects identified include multiple medium sized projects including parking freedom camping facilities jetty structure cycle-way planting signage (historical and cultural) BBQ facilities and landscaping.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2022-Q4,2024-Q4,,,EPMO (WDC),,
IP009193,9/03/2024,Waikato District Council,Lake Kainui Drainage Management.,This budget is to undertake the recommendations for drainage management works as outlined in the Boffa Miskell Report 2020 as well as resovle man made erosion issues.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2022-Q1,2024-Q1,,,EPMO (WDC),,
IP009194,9/03/2024,Waikato District Council,Greenslade Road Reserve Playground.,Develop Greenslade Road land into a park to meet the requirements of the parks Strategy. HG - changed funding split from 100% Growth funded as agreed in DC meeting.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,1 - 5 million,,,,,,,2023-Q1,2024-Q2,,,EPMO (WDC),,
IP009195,9/03/2024,Waikato District Council,Hukanui Playground.,Funding for the development of Hukanui Park. Proposal is to move the principals house to be able to utilise the space at the rear of the reserve. Concept plan and project need to be defined futher.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2022-Q3,2025-Q3,,,EPMO (WDC),,
IP009197,9/03/2024,Waikato District Council,Buckland Road Playground.,The purpose of this project is to develop a neighborhood playground.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2022-Q4,2024-Q4,,,EPMO (WDC),,
IP009210,9/03/2024,Waikato District Council,Tumate Mahuta Carpark Upgrade.,The existing car park will be upgraded. Line marking will formalise parking with islands and speed humps to minimise antisocial behavior and remove access for Truck and Trailers. Budget in PR22048.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q2,,,EPMO (WDC),,
IP009214,9/03/2024,Waikato District Council,Matangi – Jack Foster Reserve Carpark Upgrade.,A carpark will be formalised within the Jack Foster Reserve catering for reserve and school users. Bollards will be installed between the new carpark and balance of the reserve.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q4,,,EPMO (WDC),,
IP009219,9/03/2024,Waikato District Council,The Point Ngaruawahia - Carpark.,The Point Ngaruawahia - Carpark.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2022-Q3,2024-Q3,,,EPMO (WDC),,
IP009222,9/03/2024,Waikato District Council,Onewhero -Sports Domain Carpark Upgrade.,The existing car park will be upgraded this includes changing to a one way system to improve traffic flow parallel parks off Hall Road Courtesy Crossing between the fields formalising parking near the club rooms bus parking upgrading the freedom camping loop and making the exit onto Parsons Road safer.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q2,,,EPMO (WDC),,
IP009228,9/03/2024,Waikato District Council,Carparks - Puketirini Parks and Reserves.,Accessway off Rotowaro Road will be repaired and the access road to the main car park will be upgraded several potholes throughout the car park will be repaired as well.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2022-Q3,2024-Q2,,,EPMO (WDC),,
IP009231,9/03/2024,Waikato District Council,Open Spaces / Sports and Recreation / Carparks / Raglan - Manu Bay Reserve.,Open Spaces / Sports and Recreation / Carparks / Raglan - Manu Bay Reserve.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2022-Q3,2023-Q1,,,EPMO (WDC),,
IP009232,9/03/2024,Waikato District Council,Open Spaces / Sports and Recreation / Carparks / Raglan - Munro Sports Park Car park.,Open Spaces / Sports and Recreation / Carparks / Raglan - Munro Sports Park Car park.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2022-Q3,2022-Q3,,,EPMO (WDC),,
IP009234,9/03/2024,Waikato District Council,Raglan - Papahua Recreation Reserve Carpark Upgrade.,October 2023 - The section of Marine Parade between the campground and end car park will be upgraded making the road wider sealing the overflow parking entrance to the sports grounds and installing speed humps to slow traffic.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q2,,,EPMO (WDC),,
IP009236,9/03/2024,Waikato District Council,Open Spaces / Sports and Recreation / Carparks / Raglan - Wainui Beach Carpark.,The Beach Car Park entrance and exit will be repaired and completed with a new Asphalt surface.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q3,,,EPMO (WDC),,
IP009238,9/03/2024,Waikato District Council,Raglan Art Centre Carpark.,The carpark suffers from major cracking and lifting of the surfacing due to poor ground water drainage which has weakened the subgrade. After a full site analysis the following limitations have been identified as key requirements to adhere to for project delivery success and an improved asset value using cost vs benefits. Site constraints: An existing concrete retaining wall will be undermined if full pavement rehab or any ground improvements are suggested. If incorrect construction methodology design and specifications are not suitability assessed against the constraints the works will not deliver value. Ground water needs diverting or stormwater management as part of extending the longevity of the new assets. The ground conditions have localised saturated weak spots an engineered solution is required rather than the normal pavement rehab. The carpark design requires a long-term asset improvement not just a repair The design needs to allow for differential heights water surface run off working within confined area limited budget and approvals from the Heritage NZ. The existing concrete retaining wall has been structurally analysed to be a high risk to the car parking works therefore to be counted as part of the carparking package of works. In situ engineering improvements required to avoid over engineering the minimum requirements.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2022-Q3,2024-Q1,,,EPMO (WDC),,
IP009246,9/03/2024,Waikato District Council,Tuakau - Henderson Hall Street Carpark Upgrade.,Carpark Upgrade.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q2,,,EPMO (WDC),,
IP009249,9/03/2024,Waikato District Council,Dr John Lightbody Carpark Upgrade.,Upgrading the existing car park in front of the Tuakau Pool sealing the car park on the western side of Escott's Road and creating a new car park between the club rooms and pool. All of these will be joined by a footpath with safety measures including a raised table to slow cars across Escott's Road.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2021-Q4,2024-Q1,,,EPMO (WDC),,
IP009250,9/03/2024,Waikato District Council,Tuakau - St Stephens Avenue Carpark Upgrade.,Existing carpark next to the public toilets will be upgraded formalising the entry and exit. Line marking and a loading zone will be created.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q4,,,EPMO (WDC),,
IP009251,9/03/2024,Waikato District Council,Tuakau - West Street Carpark Upgrade.,Upgrade Carpark.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q2,,,EPMO (WDC),,
IP009253,9/03/2024,Waikato District Council,Dr John Lightbody Court Renewal.,Resurface the courts. Consult with Tuakau youth group and the Tuakau Combined Sports Society to determine the use of the courts (netball basketball tennis other etc.). Assess the need for lighting improvements and condition of any existing lighting. If possible upgrade the lighting with available budget. If not future proof for lighting upgrade.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2021-Q3,2024-Q2,,,EPMO (WDC),,
IP009256,9/03/2024,Waikato District Council,Pukekawa Tennis Court Renewal.,The court surface and minor related assets (tennis nets basketball hoops bench seats etc.) are due for renewal.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2022-Q4,2024-Q2,,,EPMO (WDC),,
IP009261,9/03/2024,Waikato District Council,Blunt Rd Te Kauwhata walkway.,To complete an existing walkway from Saleyard Road north parallel to the railway line turning east along road reserve currently ending at the existing road reserve end.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2022-Q3,2022-Q3,,,EPMO (WDC),,
IP009263,9/03/2024,Waikato District Council,Rotokauri walkway.,To complete an existing walkway around part of Lake Rotokauri to extend the full distance around the lake. The walkway will be created through native plantings and wetland areas on the lake margin. Approx Length 1.5km.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2021-Q3,2024-Q2,,,EPMO (WDC),,
IP009265,9/03/2024,Waikato District Council,Te Kauwhata Domain walkway.,To build a walkway around the perimeter of the Te Kauwhata Domain.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2022-Q4,2024-Q2,,,EPMO (WDC),,
IP009267,9/03/2024,Waikato District Council,Paterson Park Playground.,The purpose of Neighbourhood playgrounds is to provide play amenities to the local neighbourhood serving children living in the immediate neighbourhood. In urban situations such as in Huntly and Ngaruawahia the adequacy of distribution can be determined by comparing travel distance from households to the nearest playground. In Council’s strategy a simple 800m radius ‘as the crow flies” has been adopted for the local catchment of each playground in urban situations. This would provide most households with a playground within a ten-minute walk.Council’s 2017 Playground Strategy identified a number of playgrounds for renewal. However due to funding or the delays during 2020 many of the proposals did not eventuate. Through the 2021 LTP additional funding was sought to “catch-up”. Many of the playgrounds that were deferred can now be replaced as intended under the Playground Strategy.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2023-Q2,2024-Q3,,,EPMO (WDC),,
IP009269,9/03/2024,Waikato District Council,Pokeno - Albert Street (includes realignment to connect to Selby St).,Pokeno - Albert Street (includes realignment to connect to Selby St).,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2023-Q1,2023-Q1,,,EPMO (WDC),,
IP009271,9/03/2024,Waikato District Council,Pokeno Road Bridge Footpath and Road Widening.,Flood prevention and resilience project. Upgrade to Pokeno Road bridge to improve the level of service and increase capacity.JB comment - May be some investigation costs incurred this year bulk of spend in Yr 2.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,1 - 5 million,,,,,,,2023-Q1,2025-Q3,,,EPMO (WDC),,
IP009273,9/03/2024,Waikato District Council,Raglan CBD - Stage 2 Innovating Streets.,Raglan CBD - Stage 2 Innovating Streets.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2023-Q1,2023-Q1,,,EPMO (WDC),,
IP009275,9/03/2024,Waikato District Council,Raglan Sports Pavilion (Changing Rooms) Painting.,First major maintenance since construction to ensure building is waterproof and interior is fit for purpose and aesthetically pleasing.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2023-Q1,2023-Q4,,,EPMO (WDC),,
IP009276,9/03/2024,Waikato District Council,Raglan transfer station capital renewals.,Xtreme Zero Waste Asphalting of unsealed areas.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Waste management,< 1 million,,,,,,,2021-Q3,2023-Q3,,,EPMO (WDC),,
IP009279,9/03/2024,Waikato District Council,River Road and Lake Road Roundabout.,Intersection transformation as part of R2Z programme and support increased turning traffic movements accessing SH1 (State Highway 1)An urban fringe scale roundabout is proposed identical in geometry to the River road/Horotiu bridge road roundabout.Preliminary design to establish land requirements and key design considerations including impacts on services and to determine if additional works are required on the River Rd approaches from Lake Rd as there is a significant sag in the road that affects approach visibility to be complete 2022/23Detail Design and construction 2023/24.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2022-Q3,2024-Q2,,,EPMO (WDC),,
IP009281,9/03/2024,Waikato District Council,Scott Road urbanisation/roundabout for Te Kauwhata.,Scott Road urbanisation/roundabout for Te Kauwhata.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,1 - 5 million,,,,,,,2023-Q1,2023-Q1,,,EPMO (WDC),,
IP009282,9/03/2024,Waikato District Council,Paterson Park & Huntly West Sports Complex Lighting Upgrade.,Design and installation for:Paterson Park Ngaruawahia - new lights and polesHuntly Rugby Park - new lights only.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2021-Q1,2024-Q2,,,EPMO (WDC),,
IP009285,9/03/2024,Waikato District Council,Tuakau - New connector road.,Tuakau - New connector road.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,1 - 5 million,,,,,,,2023-Q1,2023-Q1,,,EPMO (WDC),,
IP009286,9/03/2024,Waikato District Council,Tuakau aquatic centre.,Ito build a new entrance hall with views to the poll and concourse on the side of the existing building and rearrange the existing entrance into additional storage and delivery space. Access to existing pipework and infrastructure will be maintained within the secure storage area. The existing staff workroom will have cash handling and ticketing activities removed and available staff related work activities only.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2020-Q3,2023-Q4,,,EPMO (WDC),,
IP009289,9/03/2024,Waikato District Council,Upgrade to Great South Road Bridge.,Upgrade to Great South Road Bridge to improve level of service and increase capacity.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2023-Q1,2023-Q1,,,EPMO (WDC),,
IP009290,9/03/2024,Waikato District Council,Woodlands Carpark & Gardeners Compound Upgrade.,To investigate and implement short term projects as outlined in the Woodlands Estate Reserve Management Plan. Project include redesign of carpark relocation of gardeners depo workshop and plant storage and construction of playgroup – if budget permits.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2023-Q1,2024-Q2,,,EPMO (WDC),,
IP009291,9/03/2024,Waikato District Council,Woodlands Lighting and Security Upgrade.,Two fold:Undertake maintenance on key lights and power supplies which are faulty in conjunction with the installation of a new street light at the entrance to increase staff safetySecondly plan for lighting redevelopment and increasing the level of service as budget becomes available.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2023-Q1,2025-Q2,,,EPMO (WDC),,
IP009293,9/03/2024,Waikato District Council,Wainui Road Raglan Footpath.,Wainui Road Raglan Footpath.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2022-Q3,2023-Q1,,,EPMO (WDC),,
IP009295,9/03/2024,Waikato District Council,WEX Bell Street Huntly Crossing improvements.,WEX Bell Street Huntly Crossing improvements.,,Early planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,1 - 5 million,,,,,,,2023-Q1,2023-Q1,,,EPMO (WDC),,
IP009298,9/03/2024,Waikato District Council,Whitikahu road minor improvements.,Collector Safety Upgrade. Whitikahu Road (including section past school) 2 parts split into nltp 1+2 750k+600k. Renew line markings ATPs; corridor safety upgrade/edge protection. Pending detailed scoping and allocation to PM.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2023-Q1,2024-Q3,,,EPMO (WDC),,
IP010894,9/03/2024,Waikato District Council,LTP2018 Landowner Obligations.,District wide fencing tree works etc related to land owner obligation.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2018-Q3,2022-Q3,,,EPMO (WDC),,
IP010903,9/03/2024,Waikato District Council,Huntly Historic Rail Station – Building Relocation.,•Relocate the Historic Railway station building from Lake Puketerini to Raahui Pookeka | Huntly Railway Station.•Landscape and make good the relocated building by integrating it into the platform and station site.•Design the refurbishment of public toilets within the building.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,< 1 million,,,,,,,2020-Q2,2024-Q1,,,EPMO (WDC),,
IP010904,9/03/2024,Waikato District Council,Raglan Wharf.,Sub-project linked to a programme.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,1 - 5 million,,,,,,,2021-Q2,2024-Q2,,,EPMO (WDC),,
IP010905,9/03/2024,Waikato District Council,Gordonton road improvements.,Two components under the one budget code in Yr 1 of LTP* Gordonton Rd - 40m N Borman Rd - Taylor Rd - SST stage 1. Safe System Transformation. Side Barrier. Moved from CC731 as per Gareth's instructions. Budget $3.5m* Lake Gordonton - Horsham Downs SNP. Safety Management/corridor improvements/Speed Management. Budget $750kFunded by NZTA (per Ross and Gareth but still not in TIO). Is undergoing further discussion with NZTA as to priority. SSI application going to waka kotahi board end august funding will be available early septemberprof services complete report by LMC submitted with SSICOST ESTIMATES AND DRAWING COMPLETE READY TO NEGOTIATE WITH ALLIANCE.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,1 - 5 million,,,,,,,2021-Q3,2024-Q2,,,EPMO (WDC),,
IP010906,9/03/2024,Waikato District Council,Pookeno Rd resilience - Bridge to Munro Rd.,"The bridge Road. to Munro resilience project is a vital infrastructure upgrade with the Pokeno Structure Plan aimed at enhancing the resilience and functionality of the road network. The decision to upgrade this road to handle the increasing traffic volumes due to population growth and development in the area. The road was prone to congestion leading to delays reduced efficiency and safety concerns. Also this road posed challenges for motorists pedestrians cyclists due to inadequate road design and insufficient safety measures. The upgrade aims to provide improved connectivity reduce travel times enhance road safety and accommodate future development and population increases.****** 11/08/2022 - Gareth comments - This project is for Pokeno rd not for munro rd- Bridge to Munro rd intersection - I have no idea why there is work being done on munro rd - the project brief was provided to Community projects august 2021 and its clear where the project is and what needs to be done **********THIS IS NOT PART OF THE PROJECT WORKS ****** ""Additional budget required as indicated on DFH schedule. Updated from 21/06/2020 DFH schedule. This project has two components - $420k for reshaping entrance into new sports park and the balance is changes associated with road itself such as raising the road. Design work will start this year but bulk of spend is next year."".",,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,1 - 5 million,,,,,,,2021-Q3,2025-Q2,,,EPMO (WDC),,
IP010907,9/03/2024,Waikato District Council,Mangatangi road minor improvements.,Mangatangi Road (High risk motorcycle route). Arterial Safety Upgrade. Wider shoulders; Improved line markings -bridge barrier installation. Will go the Alliance as TCE/variation in Yr 2 of LTP.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2022-Q3,2024-Q2,,,EPMO (WDC),,
IP010908,9/03/2024,Waikato District Council,River road minor improvements 2023.,River road - Ngaruawahia to lake rd. Safer Corridors. Safety improvements associated with rehabs. Will go as variation/TCE to Alliance during Year 2.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2022-Q3,2024-Q2,,,EPMO (WDC),,
IP010909,9/03/2024,Waikato District Council,Highway 22 resilience improvements.,Highway 22 Tuakau-Waingaro (High Risk Motorcycle Route). road safety improvements align with motorcycle crash reductions Expected to go to Alliance as part of TCE/variation in Yr 2 of LTP.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2022-Q3,2024-Q2,,,EPMO (WDC),,
IP010910,9/03/2024,Waikato District Council,Ridge Road Pokeno Road Safety Network Improvements.,Road Ridge Road pokeno R2Z. Safer Corridors. Side Barrier/corridor improvements.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2022-Q3,2024-Q2,,,EPMO (WDC),,
IP010911,9/03/2024,Waikato District Council,Tahuna road minor improvements 2024.,Tahuna Rd - Mangatea Rd - 1530m W Mohring Rd - SSM. Safety Management. Side Barrier/corridor improvements. Pending detailed scoping and allocation of PM.,,In planning,Funding source confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2022-Q3,2024-Q2,,,EPMO (WDC),,
IP010912,9/03/2024,Waikato District Council,Three Waters Reform - Transition.,To transition Waikato District Council's waters' service delivery which is delivered in partnership with Watercare Services Limited to Entity B as apart of the Government led Three Waters Reform Programme. This has to be completed by 1 June 2024 or any such date prescribed by The Government whilst levels of service are maintained with minimal disruption to customers.,,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Water,< 1 million,,,,,,,2022-Q1,2024-Q2,,,EPMO (WDC),,
IP010913,9/03/2024,Waikato District Council,Venues and Events / Campgrounds / Raglan Holiday Park Papahua.,"To upgrade and refurbished old assets within the Campground to new and operational standards ""Fit for Purpose"".",,Under construction,Funding source confirmed,To be determined,To be determined,Waikato,,,Community facilities,1 - 5 million,,,,,,,2023-Q2,2028-Q4,,,EPMO (WDC),,
IP009044,11/03/2024,Waimakariri District Council,Kaiapoi Reticulation Sample Points.,Installation of reticulation sample points on the Kaiapoi scheme to improve coverage of water quality sampling.,,Under construction,Fully funded,Direct,Construct only,Canterbury,,,Water,< 1 Million,,,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2023-Q3,2024-Q2,,,,,
IP009045,11/03/2024,Waimakariri District Council,Western Wells Flowmeter Installation.,Installation of flowmeter on Western Wells line at Ayers St water headworks.,,Under construction,Fully funded,Selective,Construct only,Canterbury,,,Water,< 1 Million,,,2023-Q4,2023-Q4,2024-Q1,2024-Q2,2023-Q3,2024-Q2,,,,,
IP009047,11/03/2024,Waimakariri District Council,Mandeville New Sampling Points.,new sampling points in Mandeville/Fernside distribution system.,,Under construction,Fully funded,Direct,Construct only,Canterbury,,,Water,< 1 Million,,,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2023-Q3,2024-Q2,,,,,
IP009048,11/03/2024,Waimakariri District Council,Cust Water Sampling Point.,New sample point for scheme.,,Under construction,Fully funded,Direct,Construct only,Canterbury,,,Water,< 1 Million,,,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2023-Q3,2024-Q2,,,,,
IP009049,11/03/2024,Waimakariri District Council,Ohoka New Sample Point.,New sample point on Ohoka scheme.,,Under construction,Fully funded,Direct,Construct only,Canterbury,,,Water,< 1 Million,,,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2023-Q3,2024-Q2,,,,,
IP009050,11/03/2024,Waimakariri District Council,Woodend Pegasus Sample Points.,new sample point on Woodend Pegasus scheme.,,Under construction,Fully funded,Direct,Construct only,Canterbury,,,Water,< 1 Million,,,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2023-Q3,2024-Q2,,,,,
IP009051,11/03/2024,Waimakariri District Council,Oxford Rural No.2 Sample Point.,New Sample Point.,,Under construction,Fully funded,Direct,Construct only,Canterbury,,,Water,< 1 Million,,,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2023-Q3,2024-Q2,,,,,
IP009052,11/03/2024,Waimakariri District Council,Oxford Rural 1 Sample Point.,new sample point on Oxford Rural 1 scheme.,,Under construction,Fully funded,Direct,Construct only,Canterbury,,,Water,< 1 Million,,,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2023-Q3,2024-Q2,,,,,
IP009053,11/03/2024,Waimakariri District Council,Rangiora New Sample Point.,new sample point in Rangiora.,,Under construction,Fully funded,Direct,Construct only,Canterbury,,,Water,< 1 Million,,,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2023-Q3,2024-Q2,,,,,
IP009054,11/03/2024,Waimakariri District Council,Oxford Rural No.1 Generator Installation.,Installation of generator on Oxford Rural No.1 scheme one at McPhedrons consideration of one at Rockford Road HW.,,In procurement,Fully funded,Open,Construct only,Canterbury,,,Water,< 1 Million,,,2023-Q4,2023-Q4,2024-Q1,2024-Q2,2023-Q3,2024-Q2,,,,,
IP009057,11/03/2024,Waimakariri District Council,Kings Ave Water Headworks Building Improvements.,Improvements to Waikuku Beach water headworks building as part of wider site upgrades involving drainage and sewer. Introduced as staff submission to 23/24 Annual Plan following request from 3 Waters Manager.,,In procurement,Fully funded,Open,Construct only,Canterbury,,,Water,< 1 Million,,,2023-Q4,2024-Q1,2024-Q1,2024-Q2,2023-Q3,2024-Q2,,,,,
IP009060,11/03/2024,Waimakariri District Council,Kaiapoi - Rising main replacement.,Raven Quay rising main replacement.,,In procurement,Fully funded,Direct,Construct only,Canterbury,,,Water,< 1 Million,,,2024-Q1,2024-Q1,2024-Q2,2024-Q2,2023-Q3,2024-Q2,,,,,
IP010651,11/03/2024,Waimakariri District Council,Pegasus - Electrical repairs at pump stations 23/24.,Flow meter replacement at Infinity Drive PS and Kaiwari Drive PS.,,Under construction,Fully funded,Direct,Construct only,Canterbury,,,Water,< 1 Million,,,,,2024-Q1,2024-Q2,2023-Q3,2024-Q2,,,,,
IP009070,11/03/2024,Waimakariri District Council,Kaiapoi WWTP Screens Replacements.,Replacement of aging Step screens.,,In planning,Fully funded,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,2024-Q2,2024-Q3,2025-Q1,2025-Q1,2023-Q3,2025-Q2,,,,,
IP009071,11/03/2024,Waimakariri District Council,Rangiora EDS Pump Station - 3rd Pump Installation.,This is for the installation of the third pump into the Rangiora EDS pump station.,,Under construction,Fully funded,Direct,Construct only,Canterbury,,,Water,< 1 Million,,,,,2023-Q4,2024-Q1,2023-Q3,2024-Q1,,,,,
IP009078,11/03/2024,Waimakariri District Council,Palmer / Church Pipework Upgrade.,Pipe upgrade from Douglas Street to Chruch Street.,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Water,< 1 Million,,,2023-Q4,2024-Q1,2024-Q1,2024-Q2,2023-Q3,2024-Q2,,,,,
IP009086,11/03/2024,Waimakariri District Council,Cones Road Drain Upgrade.,Upgrade of the Cones Road Drain opposite Fawcetts Road.,,In procurement,Fully funded,Open,Construct only,Canterbury,,,Water,< 1 Million,,,2024-Q1,2024-Q1,2024-Q1,2024-Q2,2023-Q3,2024-Q2,,,,,
IP009089,11/03/2024,Waimakariri District Council,School Road Drainage Upgrade.,School Road Drainage Upgrade.,,In planning,Fully funded,Open,Construct only,Canterbury,,,Water,< 1 Million,,,2024-Q3,2024-Q3,2024-Q4,2024-Q4,2023-Q3,2025-Q1,,,,,
IP010652,11/03/2024,Waimakariri District Council,Railway Drain Treatment.,Stormwater treatment improvements at the northern end of Railway Drain.,,In planning,Fully funded,Open,Construct only,Canterbury,,,Water,< 1 Million,,,2024-Q3,,2024-Q4,,2023-Q3,2025-Q2,,,,,
IP009092,11/03/2024,Waimakariri District Council,Lineside Road Drainage Upgrade Stage 2.,New pipework in Lineside Road (Railway Road to Flaxton Road) and in Railway Road at the outfall.,,In procurement,Fully funded,Open,Construct only,Canterbury,,,Water,< 1 Million,,,2024-Q1,2024-Q1,2024-Q2,2024-Q2,2023-Q3,2024-Q2,,,,,
IP010653,11/03/2024,Waimakariri District Council,Three Brooks Enhancement Work - North Brook / Geddis Street.,Repair and replacement of timber lined drain - Package 2 and 3. Section of Geddis Street drain between High Street and Geddis Street. Section of North Brook between West Belt and Elisabieth Street.,,In planning,Fully funded,Open,Construct only,Canterbury,,,Water,< 1 Million,,,2024-Q3,2024-Q3,,,2023-Q3,2024-Q2,,,,,
IP009098,11/03/2024,Waimakariri District Council,Beswick SW Pump Station Modification.,Modifications to the Beswick Street PS to address inlet chamber and building.,,In planning,Fully funded,Selective,Design and construct,Canterbury,,,Water,< 1 Million,,,2024-Q1,2024-Q1,2024-Q2,2024-Q2,2023-Q3,2024-Q2,,,,,
IP009099,11/03/2024,Waimakariri District Council,Ranfurly Street Pipe Upgrade.,Upgrade the Ranfurly Street stormwater pipe from Dale Street to the outfall to the Can River.,,In planning,Fully funded,Open,Construct only,Canterbury,,,Water,< 1 Million,,,2024-Q3,,,,2023-Q3,2024-Q2,,,,,
IP009103,11/03/2024,Waimakariri District Council,Feldwick Drain PS Improvements.,Functional improvements to the Feldwick Drain PS inlcuding flapgate replacement new screens and handrails and removal of the retaining walls.,,In procurement,Fully funded,Open,Construct only,Canterbury,,,Water,< 1 Million,,,2024-Q1,2024-Q1,2024-Q2,2024-Q2,2023-Q3,2024-Q2,,,,,
IP009105,11/03/2024,Waimakariri District Council,Stalkers Road Drainage Improvements.,Drainage improvements in Stalkers Road Woodend. 220m of 300mm pipe and 120m of new drain to provide an overflow to Kairaki Creek.,,In procurement,Fully funded,Open,Construct only,Canterbury,,,Water,< 1 Million,,,2023-Q4,2024-Q1,2024-Q1,2024-Q2,2023-Q3,2024-Q2,,,,,
IP009108,11/03/2024,Waimakariri District Council,Pearsons Drain Capacity Improvements.,Capacity improvements along Pearsons Drain in Oxford.,,In planning,Fully funded,Open,Construct only,Canterbury,,,Water,< 1 Million,,,2024-Q3,2024-Q3,2024-Q3,2024-Q3,2023-Q3,2024-Q4,,,,,
IP009112,11/03/2024,Waimakariri District Council,Swindells Road Drainage Upgrade.,Swindells Road Drainaeg Upgrade.,,In planning,Fully funded,Direct,Design and construct,Canterbury,,,Water,< 1 Million,,,2024-Q1,2024-Q1,2024-Q2,2024-Q3,2023-Q3,2024-Q3,,,,,
IP008748,11/03/2024,Waimakariri District Council,Kaiapoi UV Treatment Implementation.,Implementation of UV treatment in Kaiapoi. Installation of UV reactors at both Darnley Square and Peraki Street water headworks downstream of the reservoirs.,,Under construction,Fully funded,Selective,Construct only,Canterbury,,,Water,1 - 5 Million,,,2023-Q3,2023-Q4,2023-Q4,2024-Q2,2023-Q3,2024-Q2,,,,,
IP008749,11/03/2024,Waimakariri District Council,Domain Road UV Treatment Implementation.,Installation of UV treatment system at Domain Road headworks that supplies both Oxford URban and Rural No.2 water supply schemes.,,Under construction,Fully funded,Selective,Construct only,Canterbury,,,Water,1 - 5 Million,,,2023-Q3,2023-Q4,2023-Q4,2024-Q2,2023-Q3,2024-Q2,,,,,
IP008756,11/03/2024,Waimakariri District Council,Pegasus UV Upgrade.,Installation of UV treatment equipment at Pegasus.,,Under construction,Fully funded,Selective,Construct only,Canterbury,,,Water,1 - 5 Million,,,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2023-Q3,2024-Q2,,,,,
IP008786,11/03/2024,Waimakariri District Council,Rangiora - Central Rangiora Capacity Upgrade Stage 6.,Installation of new trunk main through Rangiora. Johns Road to White Street (300mm).,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Water,< 1 Million,,,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2023-Q3,2024-Q2,,,,,
IP008787,11/03/2024,Waimakariri District Council,Rangiora - Central Rangiora Capacity Upgrade Stage 8.,Installation of new trunk main through Rangiora. King Street - Queen to Blackett Street.,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Water,1 - 5 Million,,,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2023-Q3,2024-Q2,,,,,
IP008895,11/03/2024,Waimakariri District Council,Rangiora UV Treatment Installation.,To install UV treatment on Rangiora Water Supply scheme.,,Under construction,Fully funded,Selective,Construct only,Canterbury,,,Water,1 - 5 Million,,,2023-Q3,2023-Q4,2023-Q4,2024-Q2,2023-Q3,2024-Q2,,,,,
IP009009,11/03/2024,Waimakariri District Council,McPhedrons Road UV Intsallation.,installation of UV treatment at the McPhedrons Road site.,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Water,< 1 Million,,,2023-Q4,2024-Q1,2024-Q1,2024-Q2,2023-Q3,2024-Q2,,,,,
IP009013,11/03/2024,Waimakariri District Council,Darnley Square Supply Main Upgrade.,New 450mm PE main along Smith Street and Sewell Street to connect into existing 450mm and 375mm mains.,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Water,< 1 Million,,,2023-Q3,2023-Q3,2024-Q1,2024-Q2,2023-Q3,2024-Q2,,,,,
IP009020,11/03/2024,Waimakariri District Council,Oxford Urban and Oxford No 2 Source Upgrade 1 (Oxford No 2 Share).,Develop a third 45 L/s Source for Oxford Urban and Oxford No at Domain Road.,,Under construction,Fully funded,Selective,Construct only,Canterbury,,,Water,< 1 Million,,,2023-Q3,2023-Q3,2023-Q4,2024-Q2,2023-Q3,2024-Q2,,,,,
IP009043,11/03/2024,Waimakariri District Council,Townsend Road Pipeline Realignment.,To realign 500mm pipe that is adjacent to current Townsend Road culvert.,,In procurement,Fully funded,Open,Construct only,Canterbury,,,Water,< 1 Million,,,2024-Q1,2024-Q1,2024-Q2,2024-Q2,2023-Q3,2024-Q2,,,,,
IP008894,11/03/2024,Waimakariri District Council,Oxford Rural No.1 Back-up well.,Drill new backup well source for Oxford No 1 water supply.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP008952,11/03/2024,Waimakariri District Council,Chalk Hill Pump Station Renewal (and relocation).,Construction of new water headworks for Chalk Hill and pipework to tie into existing.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2033-Q3,2034-Q2,,,,,
IP009818,11/03/2024,Waimakariri District Council,Mandeville Restrictor Upgrades.,Upgrade various restrictors that cannot be tested.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP008953,11/03/2024,Waimakariri District Council,Ohoka Restrictor Upgrades.,Upgrade non-testable restrictors.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009819,11/03/2024,Waimakariri District Council,Oxford Rural No.1 Restrictor Upgrades.,Upgrade of restrictors on Oxford 1 scheme where restrictors not able to be tested.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP008954,11/03/2024,Waimakariri District Council,Oxford Rural No.2 Restrictor Upgrades.,Upgrade of non-testable restrictors on Oxford Rural No.2 scheme.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP008955,11/03/2024,Waimakariri District Council,Summerhill Restrictor Upgrades.,Upgrade of restrictor units on Summerhill scheme.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010654,11/03/2024,Waimakariri District Council,Oxford No 2 Trunk Main Upgrade.,New 150mm PVC main along Ashley Gorge Road from Sommerset Drive to Powells Road and new 125mm PE mains along Sales and Powells Rd between Ashley Gorge Rd and Victoria Street.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2039-Q3,2040-Q2,,,,,
IP008956,11/03/2024,Waimakariri District Council,Stubbs Rd Booster Main Stage 1.,New 63mm main along Stubbs Rd from Powells Rd east.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2027-Q3,2028-Q2,,,,,
IP008750,11/03/2024,Waimakariri District Council,Two Chain Rd 3rd Well.,Drilling of a third well at Two Chain Rd.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP008751,11/03/2024,Waimakariri District Council,Cust Township Source Upgrade.,new 150mm dia. main from Springbank source to Cust headworks to replace existing 80mm main.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2033-Q3,2035-Q2,,,,,
IP008752,11/03/2024,Waimakariri District Council,Cust Road Central Fire Flow Main Mill Rd Fire Flow Main and Cust Rd Fire Flow Main.,New 150mm and 100mm trunk mains throughout Cust to provide fire fighting flows.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2033-Q3,2038-Q2,,,,,
IP008753,11/03/2024,Waimakariri District Council,Darnley Square Source Upgrade.,Develop an additional 70 L/s well and associated pipework at Darnley Square.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP008754,11/03/2024,Waimakariri District Council,Ohoka water supply back-up source.,to provide a second deep well for the Ohoka water supply scheme.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2027-Q3,2029-Q2,,,,,
IP008957,11/03/2024,Waimakariri District Council,Oxford Urban Rural No.2 Reservoir Upgrade (Oxford Urban Share).,A new 500m3 reservoir at either Gammans Creek or Bay Rd headworks to supplement the existing reservoirs.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2031-Q3,2032-Q2,,,,,
IP008958,11/03/2024,Waimakariri District Council,Oxford Urban Rural No.2 Reservoir Upgrade (Oxford Rural No.2 share).,A new 500m3 reservoir at either Gammans Creek or Bay Road headworks to supplement the existing reservois.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2031-Q3,2032-Q2,,,,,
IP008959,11/03/2024,Waimakariri District Council,Oxford Urban and Oxford No 2 Source Upgrade 1.,Develop a new third 45 L/s Domain well source for Oxford Urban and Oxford No 2.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP008960,11/03/2024,Waimakariri District Council,Oxford Road Trunk Main.,New 100mm PVC main east along Oxford Road to the development OX02 area connection point.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2026-Q3,2028-Q2,,,,,
IP008961,11/03/2024,Waimakariri District Council,South High Street Fire Flow Upgrade.,New 150mm PVC fire flow main along High Street approximately 540m south of Oxford Road. Replaces existing 100mm mains.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2026-Q3,2028-Q2,,,,,
IP008962,11/03/2024,Waimakariri District Council,Ayers Street Surface Pump Upgrade 1.,One new surface pump at Ayers Street Headworks capable of 100 L/s at 457 kPa to replace existing diesel pump..,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2029-Q3,2030-Q2,,,,,
IP008755,11/03/2024,Waimakariri District Council,Lehmans and Oxford Road Link Main.,New 150 and 200 PVC mains along Lehmans and Oxford Rd and along the future western bypass road alignment then connecting into Arglington Development.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2024-Q3,2028-Q2,,,,,
IP008963,11/03/2024,Waimakariri District Council,North Rangiora ring main.,new 150 main along River Road and West Belt between Ballarat and existing 150 main on West Belt.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2033-Q3,2034-Q2,,,,,
IP010276,11/03/2024,Waimakariri District Council,Chinnerys Road Surface Pump Upgrade 1.,Upgrade all impellors at Chinnerys Rd to 195 mm and open both reservoir outlets as per report 20220309034241-V2.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2027-Q3,2028-Q2,,,,,
IP008757,11/03/2024,Waimakariri District Council,Rangiora Woodend Road Booster Main Stage 1.,New 250mm and 355mm dia PE booster mains from the intersection of Chinnerys Road and Rangiora Woodend Road south along Rangiora Woodend Road to School Road. Also a new 180mm PE main along School Road to Gibbs Drive.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP008964,11/03/2024,Waimakariri District Council,James Drive Main Upgrade.,New 125mm dia PE main along James Drive to complement the exisitng 50mm dia mains.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2044-Q3,2045-Q2,,,,,
IP010277,11/03/2024,Waimakariri District Council,Pegasus Waikuku Link Main Stage 1.,New 250mm and 180mm dia PE trunk main from Pegasus Blvd then along Main North Road then along future road opposite Prices Road.Extra over 100mm pipe.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2033-Q3,2035-Q2,,,,,
IP008758,11/03/2024,Waimakariri District Council,Woodend Beach Supply Main.,New 180mm dia PE main along Woodend Beach Road from Judsons Road to Woodend Beach. Includes laying internal 125mm dia PE mains through Woodend Beach.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2034-Q3,2036-Q2,,,,,
IP008759,11/03/2024,Waimakariri District Council,Waikuku Township Mains.,new 100mm PVC mains along GRessons MacDonalds and Main North Road.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2033-Q3,2034-Q2,,,,,
IP008760,11/03/2024,Waimakariri District Council,Bay Road and Gammans Creek reservoir replacement.,Construction of two new reservoirs at the Bay Road and Gammans Creek headwork sites.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2034-Q3,2035-Q2,,,,,
IP008966,11/03/2024,Waimakariri District Council,Bay Road and Gammans Creek reservoir replacement.,refer project URW0110 (Rural 2 share).,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2034-Q3,2035-Q2,,,,,
IP008761,11/03/2024,Waimakariri District Council,South Belt Reservoir Upgrade.,New 4300m3 reservoir at South Belt to complement existing 4300m3 reservoir.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2033-Q3,2034-Q2,,,,,
IP008967,11/03/2024,Waimakariri District Council,Ayers Street Supply Main Stage 1.,New 375mm and 300mm PVC main along the Kingsbury Ave from the Ayers St Headworks Site. The main to run parallel to the existingmain from the headworks and replace 150 mm main in the drainage corridor.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2027-Q2,,,,,
IP008968,11/03/2024,Waimakariri District Council,Northbrook Road Booster Main.,New 200mm PVC main replacing existing 150mm main along Northbrook Road from east of Railway crossing to East Belt.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2026-Q2,,,,,
IP008762,11/03/2024,Waimakariri District Council,Southbrook Western Supply Main.,New 200mm PVC ring main from South belt along Townsend Road and Fernside Road connecting to Todds Road through Southbrook Todds Road Business Zone Development.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2035-Q3,2036-Q2,,,,,
IP008763,11/03/2024,Waimakariri District Council,Rangiora Source Upgrade 1.,Construct an additional 75 L/s well and associated pipework at Kaiapoi as part of the Smith Street well field.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP008764,11/03/2024,Waimakariri District Council,Northeast Rangiora Supply Main.,New 375mm and 300mm PVC main from King Street along Blackett Street to East Belt then through future link road in Northeast Rangiora development area (RA33).,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP008969,11/03/2024,Waimakariri District Council,East Belt Booster Main Stage 1.,New 150mm PVC main from Coldstream Road along East Belt south for 215m.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2026-Q2,,,,,
IP008970,11/03/2024,Waimakariri District Council,Ayers Street Surface Pump Upgrade 2.,One new Surface Pump at Ayers Street Headworks capable of 100L/s at 480 kPa to be placed in the 5th pump position.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2039-Q3,2040-Q2,,,,,
IP008971,11/03/2024,Waimakariri District Council,South Belt Surface Pump Upgrade 1.,One new Surface Pump at South Belt Headworks in fifth slot capable of 100L/s at 594kPa.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2039-Q3,2040-Q2,,,,,
IP008765,11/03/2024,Waimakariri District Council,East Belt Booster Main Stage 2.,New 150mm and 200mm PVC main along East Belt from 215m south of Coldstream to Keir Street.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2026-Q2,,,,,
IP008766,11/03/2024,Waimakariri District Council,Rangiora Reservoir Upgrade.,New 4500m3 reservoir at Ayers Street to add to the existing 4500m3 reservoirs.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2070-Q3,2071-Q2,,,,,
IP008767,11/03/2024,Waimakariri District Council,Peraki Street Source Upgrade.,Increase source flow at Peraki Street by 70 L/s.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2034-Q3,2036-Q2,,,,,
IP008972,11/03/2024,Waimakariri District Council,West Kaiapoi Supply Main stage 2.,New 355mm PE main along Peraki Street to Fuller Street. Replaces existing 250mm dia. AC main.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2029-Q3,2030-Q2,,,,,
IP008973,11/03/2024,Waimakariri District Council,Peraki Street Surface Pump Upgrade.,One new Surface Pump at Peraki Street Headworks capable of 85 L/s at 470 kPa replacing existing jockey pump.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2036-Q3,2037-Q2,,,,,
IP008974,11/03/2024,Waimakariri District Council,Darnley Square Surface Pump Upgrade.,One new surface pump at Darnley Square capable of 85 L/s at 490 kPa. Replacing existing Jockey Pump.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2037-Q3,2038-Q2,,,,,
IP008975,11/03/2024,Waimakariri District Council,Additional Equestrian Source Well.,New well to be commissioned in the equestrian well field EQ4.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP008976,11/03/2024,Waimakariri District Council,Rangiora Woodend Road Booster Main Stage 2.,New 250mm dia. PE booster main from School Road to Main North Road.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2032-Q3,2034-Q2,,,,,
IP008977,11/03/2024,Waimakariri District Council,Chinnerys Road Main Upgrade.,New 125mm and 180mm dia. PE mains along Chinnerys and Woodglen Roads.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2045-Q3,2047-Q2,,,,,
IP008978,11/03/2024,Waimakariri District Council,Fixed Generator at EQ1 and EQ2 Wells.,New Generator at the EQ1 and EQ2 bores.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2027-Q2,,,,,
IP008979,11/03/2024,Waimakariri District Council,Chinnerys Road Surface Pump Upgrade 2.,Replace the manifold and add 5th pump at Chinnerys Rd as per 2022030903424-V2.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2032-Q3,2033-Q2,,,,,
IP008980,11/03/2024,Waimakariri District Council,Main North Road Main Upgrade 2.,New 180 mm dia. PE trunk main along main North Road from Woodend to Parsonage Road in 2 locations to replace the existing 100mm main.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2043-Q3,2045-Q2,,,,,
IP008981,11/03/2024,Waimakariri District Council,Pegasus to Woodend Transfer Pumps Upgrade.,Three new transfer pumps to transfer treated water from the Pegasus WTP to the Chinnerys Road headworks.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2049-Q3,2050-Q2,,,,,
IP008768,11/03/2024,Waimakariri District Council,Chinnerys Road Reservoir Upgrade 1.,Two new circular 1350 m3 reservoirs at Chinneyrs Rd to the south of the existing reservoirs plus pipe upgrades including ring main in the suction line as per recommendation in 2022030903424-V1.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2031-Q3,2033-Q2,,,,,
IP008982,11/03/2024,Waimakariri District Council,Pegasus Surface Pump Upgrade 1.,Two new surface pumps at Pegasus each capable of 33 L/s at 480 kPa to replace two existing jockey pumps.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2026-Q2,,,,,
IP008769,11/03/2024,Waimakariri District Council,Woodside Road Supply Main.,New 300mm supply main along Woodside Road from the Gammans Creek Reservoir to the intersection with Depot Road to replace the existing 200mm dia. main.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2033-Q3,2035-Q2,,,,,
IP008983,11/03/2024,Waimakariri District Council,Park Avenue Main Upgrade.,New 150mm supply main along Park Avenue from Main Street to Weka Street to replace the existing 100mm dia. main.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2044-Q3,2045-Q2,,,,,
IP008770,11/03/2024,Waimakariri District Council,Main Street Trunk Main Upgrade.,New 200mm supply main along Main Street from Woodside Road to Rata Street to replace the existing 150mm dia. main.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2027-Q3,2029-Q2,,,,,
IP008984,11/03/2024,Waimakariri District Council,Bay Road Supply Main Upgrade.,New 300mm supply main along Bay Road from just north of Wilsons Road to Church Street to replace the existing 200mm dia. main.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2044-Q3,2046-Q2,,,,,
IP008985,11/03/2024,Waimakariri District Council,Commerical Road Main Upgrade.,New 150mm supply main along Commercial Road connecting into the existing 150mm dia. Main along Commercial Road. To replace the existing 100mm dia. mains.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2035-Q3,2036-Q2,,,,,
IP008988,11/03/2024,Waimakariri District Council,Starvation Hill Upgrade.,New 63mm MDPE main along Horns Road from the end of the existing 63mm main on Horns Road to the existing main feeding Starvation Hill and replacing a section of the main feeding Starvation Hill.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2029-Q3,2030-Q2,,,,,
IP008989,11/03/2024,Waimakariri District Council,Warren / Harewood Road main upgrade.,New 63mm MDPE main along Warren Road and Harewood Road. From Oxford Road to the existing 63mm dia. Main on Harewood Road.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2054-Q3,2056-Q2,,,,,
IP008990,11/03/2024,Waimakariri District Council,Starvation Hill Road Booster Main.,New 125mm PE main along Starvation Hill Road from McJarrows Road to Horns Road. Includes abandoning the section of the 32mm dia main through private property.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2042-Q3,2043-Q2,,,,,
IP008991,11/03/2024,Waimakariri District Council,Stubbs Road Booster Main Stage 2.,New 63mm MDPE main along Stubbs Road from the end of stage 1 to the intersection with the paper road.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2038-Q3,2039-Q2,,,,,
IP008992,11/03/2024,Waimakariri District Council,Two Chain Road Extension.,New 100mm PVC main along Two Chain Road.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2035-Q3,2036-Q2,,,,,
IP008993,11/03/2024,Waimakariri District Council,No 10 Road Northern Link Main.,New 63mm dia MDPE main along No 10 Road between the existing 50mm diameter mains (from 664 to 691 No. 10 road).,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2032-Q3,2033-Q2,,,,,
IP008994,11/03/2024,Waimakariri District Council,Mandeville Headworks Surface Pump Upgrade 2.,Install a fourth surface pump at Mandeville to provide for 3 pumps plus one standby. Pumps to be capable of 18 l/s total each at 653 kPa.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2039-Q3,2040-Q2,,,,,
IP008995,11/03/2024,Waimakariri District Council,Ashworths Road Main.,New 63mm dia. MDPE ring main along Ashworths Road from Dawsons Road to Mill Road.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2047-Q3,2048-Q2,,,,,
IP008771,11/03/2024,Waimakariri District Council,Mandeville Source Upgrade 2.,Develop an additional 25 L/s well and associated pipework.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2033-Q3,2034-Q2,,,,,
IP008996,11/03/2024,Waimakariri District Council,Ohoka Reservoir Upgrade.,Construct new 30m3 reservior at the Ohoka Water Headworks.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2031-Q3,2032-Q2,,,,,
IP008997,11/03/2024,Waimakariri District Council,Harmans Gorge Road Upgrade 1.,New 125mm and 63mm PE mains along Harmans Gorge Road from Ashworths Road to Depot Road and along Depot Road to Watsons Reserve Road.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2029-Q3,2031-Q2,,,,,
IP008998,11/03/2024,Waimakariri District Council,Treatment Redundancy Upgrade.,Install additional treatment measures at the Oxford No 1 water headworks.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2035-Q3,2036-Q2,,,,,
IP009000,11/03/2024,Waimakariri District Council,South Eyre Road Ring Main.,New 63mm PE ring main along South Eyre Road and Burnt Hill Road between the ends of the existing reticulation.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2038-Q3,2040-Q2,,,,,
IP008772,11/03/2024,Waimakariri District Council,View Hill Storage Upgrade.,Additional storage in the Oxford 1 scheme to provide storage for 50 years and make up for lost Chalk hill Storage. Total 50 year requirement is 500 m3.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2027-Q3,2029-Q2,,,,,
IP009001,11/03/2024,Waimakariri District Council,West Eyreton Transfer Pumps Upgrade.,Upgrade 3 transfer pumps at West Eyreton to provide 20 l/s with 2 pumps running.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2045-Q3,2046-Q2,,,,,
IP009002,11/03/2024,Waimakariri District Council,Davis Road Pumpstation Upgrade 1.,Addition of a third surface pump at Davis Road.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2028-Q3,2029-Q2,,,,,
IP009003,11/03/2024,Waimakariri District Council,Davis Road Trunk Main Upgrade 2.,New 150mm PVC main from Davis Road Pumpstation along Davis Road to Catherwoods Road to replace existing 80mm main.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2033-Q3,2034-Q2,,,,,
IP009005,11/03/2024,Waimakariri District Council,Davis / Terrace Road Trunk Main.,New 125mm PE main from Catherwoods Road along Davis Road to Terrace Road then along Terrace Road to Mill Road.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2045-Q3,2046-Q2,,,,,
IP009006,11/03/2024,Waimakariri District Council,West Eyreton Reservoir Upgrade (Summerhill Share).,Summerhill share of URW0277.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2050-Q3,2051-Q2,,,,,
IP009007,11/03/2024,Waimakariri District Council,Treatment Redundancy Upgrade.,Install additional treatment measures at the source.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2064-Q3,2065-Q2,,,,,
IP010278,11/03/2024,Waimakariri District Council,Woodend Ravenswood Eastern Link Main Stage 1.,New 250mm dia PE Pipe to connect the east side of Ravenswood to Woodend. Portion of pipe through stage 5 of Ravenswood.Extra over 150mm pipe.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2027-Q3,2028-Q2,,,,,
IP008773,11/03/2024,Waimakariri District Council,Ohoka UV upgrade.,installation of UV treatment on Ohoka scheme.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP008774,11/03/2024,Waimakariri District Council,West Eyreton UV Installation.,UV installation at West Eyreton headworks.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009010,11/03/2024,Waimakariri District Council,Kaiapoi Well Head Improvements.,upgrades to underground well heads in Kaiapoi either to better seal or raise above ground.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2028-Q3,2029-Q2,,,,,
IP009011,11/03/2024,Waimakariri District Council,Woodend Well Head Improvement.,raise of underground well head above ground or better sealing of chamber and lid.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2028-Q3,2029-Q2,,,,,
IP009012,11/03/2024,Waimakariri District Council,Garrymere Backup Well.,Second well for Garrymere source to provide required level of redundancy to scheme.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP009014,11/03/2024,Waimakariri District Council,South Belt Link Main.,New 300mm PVC main along South Belt between Townsend Road and Pentecost Road.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP008775,11/03/2024,Waimakariri District Council,Ayers Street Supply Main Stage 2.,New 300mm and 200mm PVC main along the drainage corridoor from Ayers Street then along West Belt to Elm Drive. The main to run parallel to the existing main from the headworks and replace the existing 150mm dia main and the 100mm dia main along West Belt.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2036-Q3,2037-Q2,,,,,
IP008776,11/03/2024,Waimakariri District Council,Rangiora Source Upgrade 2.,Construct an additional 70L/s well and associated pipework at Smith Street Kaiapoi.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2049-Q3,2050-Q2,,,,,
IP008777,11/03/2024,Waimakariri District Council,North Northeast Rangiora Supply Main.,New 200mm and 300mm PVC main along the drainage corridoor from the Ayers Street headworks east along Ashley Street and Wales Street across the railway tracks to East Belt.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP009015,11/03/2024,Waimakariri District Council,Johns Road East Supply Main.,New 200mm PVC main along Johns Road from Percival to King Street.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP008778,11/03/2024,Waimakariri District Council,Rangiora Source Upgrade 3.,Construct an additional 70 L/s well and associated pipework at Kaiapoi Smith Street.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2059-Q3,2060-Q2,,,,,
IP009016,11/03/2024,Waimakariri District Council,Johns Road West Supply Main 2.,New 150mm PVC main on Johns Road from Lehmans Road 360m west.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2055-Q3,2056-Q2,,,,,
IP009017,11/03/2024,Waimakariri District Council,Oxford Road West Upgrde.,New 200mm PVC main on Oxford Road from Lehmans Road to 360m west.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2055-Q3,2056-Q2,,,,,
IP009018,11/03/2024,Waimakariri District Council,Welsford Street Upgrade.,New 250mm dia PE main along Welsford Street replacing existing 150mm PVC main.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2035-Q3,2037-Q2,,,,,
IP008779,11/03/2024,Waimakariri District Council,Woodend Pegasus Source Upgrade 2.,Construct an additional well and associated pipework at Equestrian well field.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2049-Q3,2051-Q2,,,,,
IP009019,11/03/2024,Waimakariri District Council,Pegasus Surface Pump Upgrade 2.,New pumpset and manifold at the Pegasus WTP to replace existing pumps and manifold.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2049-Q3,2051-Q2,,,,,
IP008780,11/03/2024,Waimakariri District Council,West Kaiapoi Supply Main Stage 3.,New 355mm PE main along Fuller STreet from Peraki Street to just west of Wesley Street. Replaces existing 200mm dia AC main.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2031-Q3,2032-Q2,,,,,
IP008782,11/03/2024,Waimakariri District Council,Northwest Kaiapoi Ring Main.,New 300mm and 200mm ring main along Ranfurly Street and north of Golf Course Land. Replacing existing AC mains in this area.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2064-Q3,2066-Q2,,,,,
IP009023,11/03/2024,Waimakariri District Council,Harewood Road Main Upgrade.,New 150mm dia supply main along Harewood Road from Main Street to Park Avenue. To replace the existing 20mm and 100mm dia mains.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2044-Q3,2046-Q2,,,,,
IP009024,11/03/2024,Waimakariri District Council,Wilsons Road Main Upgrade.,New 150mm supply main along Wilsons Road from Bay Road to Queen Street.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2038-Q3,2040-Q2,,,,,
IP009025,11/03/2024,Waimakariri District Council,Oxford Future Reservior Upgrade (Oxford No 2 Share).,A new 500mm3 reservoir in the Oxford Urban/No 2 schemes to supplement the existing reserviors.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2038-Q3,2040-Q2,,,,,
IP009026,11/03/2024,Waimakariri District Council,Woodstock Road Main Upgrade.,New 63mm PE main along Woodstock Road between Burnt Hill and Domain Road.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2055-Q3,2056-Q2,,,,,
IP009027,11/03/2024,Waimakariri District Council,View Hill Reservoir Supply Main.,New 200mm PVC supply main from View Hill Reservoir to Rockford Road replacing existing 150mm AC main on eastern side.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2045-Q3,2046-Q2,,,,,
IP008784,11/03/2024,Waimakariri District Council,McPhedrons Road / Kiri Kiri Road / Depot Road Upgrade.,New 125mm MDPE supply mains on McPhedrons Kiri Kiri and Depot Roads replacing existing 80mm and 65mm PVC mains.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2044-Q3,2046-Q2,,,,,
IP009028,11/03/2024,Waimakariri District Council,Ashley Gorge Road Trunk Main Upgrade 2.,New 125mm PE main along Ashley Gorge Road from no 308 to just north of German Road. Includes abandoning section of 50mm pipe in private property.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2055-Q3,2056-Q2,,,,,
IP009029,11/03/2024,Waimakariri District Council,McJarrows Road Main Upgrade.,New 125mm PE main along McJarrows Road from Victoria Street /Powells Road to Starvation Hill Road. Includes replacing existing 50mm PVC main.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2068-Q3,2069-Q2,,,,,
IP009030,11/03/2024,Waimakariri District Council,Mandeville Road Extension.,New 63mm dia PE main along Mandeville Road.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2034-Q3,2035-Q2,,,,,
IP009031,11/03/2024,Waimakariri District Council,North Eyre Road Supply Main.,New 100mm PVC main along Two Chain Road and North Eyre Road.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2041-Q3,2042-Q2,,,,,
IP009032,11/03/2024,Waimakariri District Council,Bradleys Road Extension.,New 63mm dia PE main along Bradleys Road.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2036-Q3,2037-Q2,,,,,
IP009033,11/03/2024,Waimakariri District Council,Mill Road Ring Main.,New 63mm dia PE and 100mm PVC mains along Mill Road McRoberts and Pattersons Road.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2050-Q3,2052-Q2,,,,,
IP009035,11/03/2024,Waimakariri District Council,Terrace Road / Elliots Road Trunk Main Upgrade.,New 125mm PE main along Terrace Road and Elliots Road.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2060-Q3,2062-Q2,,,,,
IP009036,11/03/2024,Waimakariri District Council,Stoke School Road Main.,New 125mm PE main along Stoke School Road.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2037-Q3,2038-Q2,,,,,
IP009037,11/03/2024,Waimakariri District Council,West Eyreton and Summerhill Reservoir Upgrade 1 (West Eyreton Share).,A new 30m3 reservior at the West Eyreton Headworks.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2050-Q3,2051-Q2,,,,,
IP009039,11/03/2024,Waimakariri District Council,Pegasus Water Treatment Plant Sand Upgrade.,Full replacement of sand within Pegasus manganese removal filters.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009040,11/03/2024,Waimakariri District Council,Tunas Street Hakarau Road Connection.,Extend the 250PE pipe coming off Hakarau Road and across Smith Street further north to connect into the 100 PVC pipe on Tunas Street. Approx 75m.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP008785,11/03/2024,Waimakariri District Council,Merton Road and Priors Road Water Servicing.,Installation of water mains booster pumpstation and chlorine dosing system to service the Merton Road and Priors Road area.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2025-Q3,2026-Q2,,,,,
IP010655,11/03/2024,Waimakariri District Council,Marsh Road Supply Main.,200 mm PVC supply main along Marsh Rd to supply possible development of Sparks LandExtra over 150 mm.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2068-Q3,2069-Q2,,,,,
IP010656,11/03/2024,Waimakariri District Council,Rangiora Long Term Surface Pump Upgrade.,Additional Surface pump (or replacement of all pumps with larger ones) at either Rangiora headworks site to allow 50 year flows.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2068-Q3,2069-Q2,,,,,
IP010657,11/03/2024,Waimakariri District Council,East Rangiora Supply Main.,New 200 mm supply main along Man North Rd to supply East RangioraExtra over 150 mm.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2070-Q3,2071-Q2,,,,,
IP010658,11/03/2024,Waimakariri District Council,Chinnerys Rd Surface Pump Upgrade 3.,Add sixth pump to manifold to complete full list of upgrades recommended in 20220309034241-V2.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2042-Q3,2043-Q2,,,,,
IP010659,11/03/2024,Waimakariri District Council,Woodend Ravenswood Eastern Link Main Stage 2.,New 250 mm dia PE pipe to connect the east side of Ravenswood and West side of Pegasus to Woodend. Portion of pipe along State Highway. Part is extra over.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2044-Q3,2046-Q2,,,,,
IP010660,11/03/2024,Waimakariri District Council,Chinnerys Rd 50 Year Headworks Upgrade.,Two new 1350 m3 tanks at existing reservoir site to replace two 450 m3 tanks including rebuilding pumping building with pumps to provide 220 l/s at 40 m.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2056-Q3,2058-Q2,,,,,
IP010661,11/03/2024,Waimakariri District Council,North Ravenswood Supply Main.,Bew 200 mm Main along Rangiora Woodend Rd and into land North of West Ravenswood.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2069-Q3,2070-Q2,,,,,
IP010662,11/03/2024,Waimakariri District Council,South of Kaikanui Supply Main Stage 1.,DN250 PE along Williams St to supply Southwast Kaiapoi and replace old AC main through Blue Skies.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2048-Q3,2050-Q2,,,,,
IP010663,11/03/2024,Waimakariri District Council,South of Kaikanui Supply Main Stage 2.,New 250mm PE through South of Kaikanui development area.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2052-Q3,2053-Q2,,,,,
IP008781,11/03/2024,Waimakariri District Council,Kaiapoi Future Surface Pump Upgrade.,New pumpset required at either Darnley and/or Peraki to replace existing pumps. Total 50 year surface pumping capacity is 444 l/s + N+1.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2068-Q3,2069-Q2,,,,,
IP010664,11/03/2024,Waimakariri District Council,Waikuku Beach Source Upgrade.,Construct an additional well in Waikuku Beach to bring the total capacity above 45 l/s.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2069-Q3,2071-Q2,,,,,
IP008783,11/03/2024,Waimakariri District Council,Chalk Hill Replacement Main 2.,New DN125 PE main along Harmens Gorge Rd river Crossing.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2031-Q3,2032-Q2,,,,,
IP010279,11/03/2024,Waimakariri District Council,Island Road Main Upgrade.,New DN125PE main along Island Rd between Harmens Gorge Rd and Rampaddock Road to replace the existing DN63 mains and provide capacity for growth in Coopers Creek Area.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2036-Q3,2037-Q2,,,,,
IP010665,11/03/2024,Waimakariri District Council,Oxford No 1 Source Upgrade 2.,Additional new secure groundwater source capable of meeting the 50 year N+1 requirements (45 l/s + N+1).,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2038-Q3,2040-Q2,,,,,
IP010666,11/03/2024,Waimakariri District Council,Watsons Reserve Road Upgrade.,New DN125 main along Wastsons Reserve Rd between Mcphedrons Rd and Woodstock Rd.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2044-Q3,2045-Q2,,,,,
IP010667,11/03/2024,Waimakariri District Council,Thongcaster Rd Supply Main.,New DN125 PE main in Thongcaster Rd Replacing DN63 PE.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2047-Q3,2049-Q2,,,,,
IP010668,11/03/2024,Waimakariri District Council,Rampaddock Rd Ring Main.,New DN63 PE main along Rampaddock Rd to provide a ring feed to Coopers Creek.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2048-Q3,2049-Q2,,,,,
IP010669,11/03/2024,Waimakariri District Council,Harmans Gorge Rd Upgrade 2.,New DN125 and DN63 PE along Harmans Gorge Rd from Ashworths Rd to Depot Rd and along Depot Rd to Watsons Reserve Rd.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2056-Q3,2058-Q2,,,,,
IP010670,11/03/2024,Waimakariri District Council,Mandeville Storage Upgrade 2.,Duplicating existing Reservoir in mandeville.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2043-Q3,2044-Q2,,,,,
IP010671,11/03/2024,Waimakariri District Council,Ohoka Reservoir Upgrade 2.,Replace existing tanks withy 2 x 100 m3 tanks.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2041-Q3,2043-Q2,,,,,
IP010672,11/03/2024,Waimakariri District Council,Ohoka Source Upgrade.,Develop additional 12.5 l/s well and associated pipework to bring total source capacity to 25 l/s.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2060-Q3,2062-Q2,,,,,
IP010673,11/03/2024,Waimakariri District Council,West Eyreton Reservoir Upgrade 2 (West Eyreton Share).,A new 30 m3 reservoir at the west Eyreton Headworks for use at Summerhill Poyntzs Rd and West Eyreton.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2060-Q3,2061-Q2,,,,,
IP010674,11/03/2024,Waimakariri District Council,West Eyreton Reservoir Upgrade 1.,Poyntzs Rd share of project URW0277.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2050-Q3,2051-Q2,,,,,
IP010675,11/03/2024,Waimakariri District Council,West Eyreton Reservoir Upgrade 2.,Poyntzs Rd share of Project URW0331.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2060-Q3,2061-Q2,,,,,
IP010676,11/03/2024,Waimakariri District Council,West Eyreton Reservoir Upgrade 2 (Summerhill Share).,Summerhill share of URW0331.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2060-Q3,2061-Q2,,,,,
IP010280,11/03/2024,Waimakariri District Council,Rangiora Backflow - Matawai DCV.,100mm DCV for Matawai Close.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010281,11/03/2024,Waimakariri District Council,Kings Ave WTP Static Mixer.,Installation of static mixer to improve chlorine contact/mixing for compliance.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010293,11/03/2024,Waimakariri District Council,Cust Springbank 2 Electrical Renewals.,Drive and filter replacement at Springbank 2 per Nairn's recommendation.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2026-Q2,,,,,
IP010294,11/03/2024,Waimakariri District Council,Gammans Generator automatic switchover.,Electrical upgrades to enable generator automatic switchover.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010295,11/03/2024,Waimakariri District Council,Waikuku Beach UVT and Cl Dosing pumps.,Replacement UVT meter at Kings Ave and additional Cl dosing pumps for redundancy.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010296,11/03/2024,Waimakariri District Council,Garrymere additional chlorine dosing pump.,Additional chlorine dosing pump for redundancy.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010297,11/03/2024,Waimakariri District Council,Rangiora electrical renewals.,Smith St and Southbelt electrical upgrades.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP010298,11/03/2024,Waimakariri District Council,West Eyreton Additoinal Chlorine dosing pump.,For redundancy.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010299,11/03/2024,Waimakariri District Council,Woodend-Pegasus Electrical renewals.,Various sites per Nairn's recommendations.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2027-Q2,,,,,
IP010300,11/03/2024,Waimakariri District Council,Pegasus WTP additional Chlorine Dosing Pump.,For redundancy.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010301,11/03/2024,Waimakariri District Council,Generator replacement Gammans.,Replacement of generator at Gammans HW.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2028-Q3,2029-Q2,,,,,
IP010302,11/03/2024,Waimakariri District Council,Generator at Garrymere WTP.,Installation of generator at Garrymere WTP.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP009008,11/03/2024,Waimakariri District Council,Generator for West Eyreton WTP.,New fixed generator for West Eyreton.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2027-Q2,,,,,
IP010303,11/03/2024,Waimakariri District Council,Generator at Two Chain Road HW.,New fixed generator at Mandeville.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2027-Q2,,,,,
IP010304,11/03/2024,Waimakariri District Council,Generator install for Ohoka WTP.,Fixed genset for Ohoka WTP.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP010305,11/03/2024,Waimakariri District Council,Land purchase to expand Ohoka HW site.,Purchase of additional land for Ohoka WTP (UV and additional storage).,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010306,11/03/2024,Waimakariri District Council,Cust generator replacement.,Replacement of existing genset at Cust WTP.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2026-Q3,2027-Q2,,,,,
IP010307,11/03/2024,Waimakariri District Council,Poyntzs Flush Point.,End of line flush point.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010308,11/03/2024,Waimakariri District Council,Chinnerys Road WTP Flowmeter + Cl dosing.,New inflow FM & modification to Cl dosing point.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP008788,11/03/2024,Waimakariri District Council,Rangiora - Central Rangiora Capacity Upgrade Stage 9.,Installation of new trunk main through Rangiora.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2024-Q3,2027-Q2,,,,,
IP008790,11/03/2024,Waimakariri District Council,Rangiora - Todds Road Pump Station.,Installation of pump station along Todds Road to serve development in the area.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2028-Q3,2029-Q2,,,,,
IP008791,11/03/2024,Waimakariri District Council,Rangiora - Aeration Basin Upgrade.,Conversion of the aeration basin to a SBR.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2024-Q3,2027-Q2,,,,,
IP008792,11/03/2024,Waimakariri District Council,Rangiora - Central Rangiora Capacity Upgrade Stage 11.,Southbrook Road PS Pumpstation dual rising main.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2050-Q3,2051-Q2,,,,,
IP008793,11/03/2024,Waimakariri District Council,Woodend - New Oxidation Pond.,Construction of new pond.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2029-Q3,2031-Q2,,,,,
IP009058,11/03/2024,Waimakariri District Council,Woodend - Increase UV Capacity.,Install four new UV lamps at Woodend wastewater treatment plant.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP009059,11/03/2024,Waimakariri District Council,Woodend - Wetland Plant Investigations.,Replant existing wetland cells @ Woodend.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009061,11/03/2024,Waimakariri District Council,Rangiora - Central Rangiora Capacity Upgrade Stage 12.,Southbrook Road Pumpstation Upgrades installing additional wetwell pumps to have better pump operation.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2051-Q3,2052-Q2,,,,,
IP008794,11/03/2024,Waimakariri District Council,Kaiapoi - Capacity upgrade.,Various Gravity Wastewater and Pumpstation Upgrades.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 Million,,,,,,,2025-Q3,2031-Q2,,,,,
IP008795,11/03/2024,Waimakariri District Council,Rangiora - East Pumpstation and Rising Main.,Two Pumpstations and rising main to service East Rangiora.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2025-Q3,2027-Q2,,,,,
IP008796,11/03/2024,Waimakariri District Council,Kaiapoi - Cridland Street sewer repairs.,upgrades to the Kaiapoi reticulation system in the Cridland Street area.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2024-Q3,2027-Q2,,,,,
IP010309,11/03/2024,Waimakariri District Council,Woodend - Electrical renewals at various sites.,Electrical upgrades at Gladstone Rd Panckhurst Petries and WWWTP.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP009067,11/03/2024,Waimakariri District Council,Pegasus - Electrical repairs at pump stations.,Program to replace various components of pump stations.2024/25 Mary Ellen2025/26 Infinity Pegasus Main St.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP009068,11/03/2024,Waimakariri District Council,Pines Kairaki - Electrical repairs at pump stations.,Featherston SCADA and Dunns Ave Shop radar.,,In Procurement,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009069,11/03/2024,Waimakariri District Council,Mandeville - Pipeline renewals program.,Annual replacement of pipes in the Mandeville scheme.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2064-Q3,2074-Q2,,,,,
IP008797,11/03/2024,Waimakariri District Council,Pines Kairaki - Pipeline renewals program.,Annual replacement of pipes in the Pines Kairaki scheme.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2034-Q3,2064-Q2,,,,,
IP008798,11/03/2024,Waimakariri District Council,Gladstone Pressure Main Replacement.,Pressuremain is scheduled for replacement after 2030. Includes removal of valves from wetwell.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2035-Q3,2036-Q2,,,,,
IP008799,11/03/2024,Waimakariri District Council,Rangiora - East Development.,Pump Station 3 & 4 and shared rising main. Upgrade to existing Northbrook Road WWPS rising main.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2069-Q3,2070-Q2,,,,,
IP009072,11/03/2024,Waimakariri District Council,West Rangiora Upgrade 1.,Extra Over for 375 mm pipeline through 40 Goldie Dr.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2026-Q3,2027-Q2,,,,,
IP010677,11/03/2024,Waimakariri District Council,West Rangiora Gravity Upgrade 2.,Extra Over cost to upsize gravity main to West of Townsend Fields up to Oxford Rd.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2043-Q3,2044-Q2,,,,,
IP010310,11/03/2024,Waimakariri District Council,Kaiapoi WWTP Planting.,Tree removal and native plating at the Kaiapoi WWTP.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2031-Q2,,,,,
IP008800,11/03/2024,Waimakariri District Council,Waikuku Beach Kings Ave Wastewater Rising Main Replacement.,Replacement of the existing 100mm dia AC rising main from Kings Ave Pumpstation to the gravity manhole in Bridge Street with new 125mm dia (ID) pipe.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2030-Q3,2032-Q2,,,,,
IP009073,11/03/2024,Waimakariri District Council,Oxford - Irrigator Replacement.,Replacement of the older irrigator.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009074,11/03/2024,Waimakariri District Council,Oxford - Step Screen Replacement.,Upgrade of the existing step screen at the inlet to the WWTP.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2024-Q3,2028-Q2,,,,,
IP008801,11/03/2024,Waimakariri District Council,Percival Street - Charles to Matawai.,New 150mm sewer main in Percival Street from Charles Street to the south side fo Mataw3ai Park.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP008802,11/03/2024,Waimakariri District Council,Oxford WWTP Sludge Treatment.,Provide sludge treatment at OWWTP.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2025-Q3,2028-Q2,,,,,
IP008803,11/03/2024,Waimakariri District Council,Oxford WWTP Upgrade.,Main upgrade of OWWTP.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 Million,,,,,,,2024-Q3,2040-Q2,,,,,
IP008804,11/03/2024,Waimakariri District Council,EDSS Treatment Upgrade.,PLACEHOLDER - Physical works for upgrades at the Woodend Kaiapoi and Ragiora WWTPs to achieve compliance with future conseintg requirements.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,50 - 100 Million,,,,,,,2032-Q3,2039-Q2,,,,,
IP008805,11/03/2024,Waimakariri District Council,Merton Road and Priors Road Wastewater Servicing.,Servicing of the Rangiora Airfield and proposed development in the Mertons Road area.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2025-Q3,2026-Q2,,,,,
IP010311,11/03/2024,Waimakariri District Council,Ashley Village Rising Main 1.,DN180 PE main along Fawcetts Rd from Marshmans Rd to Cones Rd sewer manhole.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2033-Q3,2035-Q2,,,,,
IP010678,11/03/2024,Waimakariri District Council,Ashley Village Servicing.,Pumpstation rising main to Ashley Village Rising Main 1 and internal gravity pipework to service Ashley Village including allowance for development area to east to connect.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2039-Q3,2041-Q2,,,,,
IP010679,11/03/2024,Waimakariri District Council,Northeast Kaiapoi Upgrade 1.,Pumpstation and rising main to service development area east of Beachvale Dr.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2044-Q3,2046-Q2,,,,,
IP010312,11/03/2024,Waimakariri District Council,Moorcroft Pumpstation and Rising Main Upgrade.,Upgrade Moorcroft pumpstation and create new DN450 rising main to Kaiapoi WWPS.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 Million,,,,,,,2032-Q3,2034-Q2,,,,,
IP010680,11/03/2024,Waimakariri District Council,Northeast Kaiapoi Upgrade 2.,New pumpstation and rising main from development areas north east of Magnolia Blvd and South East of Beachvale Dr.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2046-Q3,2048-Q2,,,,,
IP010681,11/03/2024,Waimakariri District Council,South of Kaikanui Servicing.,Pumpstation and rising main required to service 50 year projections for South of Kaikanui.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2051-Q3,2053-Q2,,,,,
IP010682,11/03/2024,Waimakariri District Council,Kaiapoi Golf Course Servicing.,New pumpstation and rising main from Kaiapoi Golf course to upgraded Moorcroft WWPS.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2064-Q3,2066-Q2,,,,,
IP010313,11/03/2024,Waimakariri District Council,South Woodend Servicing 1.,New pumping station and rising main to Petires Rd to service residential South Woodend area east of Woodend Beach Rd and West of Copper Beech Rd.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2034-Q3,2036-Q2,,,,,
IP010683,11/03/2024,Waimakariri District Council,South Woodend Servicing 2.,New Pump Station and rising main to south woodend 1 pumpstation to service commericla area beween Woodend Beach Rd and Rangiora Woodend Rd.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2040-Q3,2042-Q2,,,,,
IP010684,11/03/2024,Waimakariri District Council,North of Ravenswood Servicing 1.,New pumpstation and Rising main to service land North of Ravenswood East of Wards Rd.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 Million,,,,,,,2045-Q3,2047-Q2,,,,,
IP010685,11/03/2024,Waimakariri District Council,South of Ravenswood Servicing.,Pumpstation and rising main from land between Ravenswood and Chinnerys Rd to north of Ravenswood rising main.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2048-Q3,2050-Q2,,,,,
IP010686,11/03/2024,Waimakariri District Council,North of Ravenswood Servicing 2.,Pumpstation and rising main from north of Ravenswood/ east of Stackwood Ave to North of Ravenswood pumpstation 1.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2057-Q3,2059-Q2,,,,,
IP010687,11/03/2024,Waimakariri District Council,North of Ravenswood Servicing 3.,New pumpstation at Gatehouse Lane and rising main to North of Woodend pumpstation 2 to service land north of Ravenswood stages 1 and 2.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2063-Q3,2065-Q2,,,,,
IP010688,11/03/2024,Waimakariri District Council,Petries Rd Dedicated rising main.,Dedicated DN280 PE rising main along Gladstone Rd to separate the Petries Rd and Gladstone Rd rising mains.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2067-Q3,2069-Q2,,,,,
IP010314,11/03/2024,Waimakariri District Council,Tuahiwi-Rangiora Rising Main.,Rising main from Tuahiwi to Rangiora WWTP to cater for full 50 year growth in Tuahiwi.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2034-Q3,2036-Q2,,,,,
IP010689,11/03/2024,Waimakariri District Council,Waikuku Township Servicing.,Internal pressure pipework required to service Waikuku Township and rising main to Waikuku Beach WWTP.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2038-Q3,2040-Q2,,,,,
IP010690,11/03/2024,Waimakariri District Council,Sefton Township Servicing.,Internal gravity pipework and pumpstation to service Sefton Township plus rising main connecting into the Waikuku Township rising main.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 Million,,,,,,,2068-Q3,2070-Q2,,,,,
IP010315,11/03/2024,Waimakariri District Council,South of Oxford Servicing.,Pumpstation and rising main from development area South of Oxford to the Oxford WWTP.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2034-Q3,2036-Q2,,,,,
IP009066,11/03/2024,Waimakariri District Council,Oxford WWTP Irrigator SCADA and Flowmeter.,SCADA upgrade and flowmeter installation for Irrigators 1 & 2.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009062,11/03/2024,Waimakariri District Council,Kaiapoi Wetlands Assessment.,Assessment of options for Kaiapoi Wetlands.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2027-Q2,,,,,
IP010316,11/03/2024,Waimakariri District Council,Woodend Beach I&I Improvement.,I&I improvement for Woodend Beach.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010317,11/03/2024,Waimakariri District Council,Oxford I&I improvement.,Improve I&I at Oxford Sewer.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010318,11/03/2024,Waimakariri District Council,Kaiapoi I&I Improvement.,I&I improvement at Kaiapoi.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010319,11/03/2024,Waimakariri District Council,Woodend WWTP Overflow Improvement.,Earthworks to improve overflow from wetlands.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010320,11/03/2024,Waimakariri District Council,Step screen renewal Waikuku Beach WWTP.,Step screen replacement for Waikuku Beach WWTP carry over friom 23/24 as more budgets required.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010321,11/03/2024,Waimakariri District Council,Step Screens Replacement Kaiapoi WWTP.,Replacement of step screens carryover from 23/24 as more budgets required.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010322,11/03/2024,Waimakariri District Council,Step screens replacement - Woodend WWTP.,Step screens replacement at WWWTP carry over from 23/24 as more budgets required.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009065,11/03/2024,Waimakariri District Council,Kaiapoi Electrical Renewals - various sites.,Electrical renewals for Kaiapoi WWPS & WWTP various sites.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2029-Q2,,,,,
IP009064,11/03/2024,Waimakariri District Council,Rangiora electrical renewals.,Electrical renewals at various Rangiora sites.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010323,11/03/2024,Waimakariri District Council,Mandeville electrical renewals.,Electrical renewals.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010324,11/03/2024,Waimakariri District Council,Woodend Beach Electrical Renewals.,Renewal of Stalkers PS SCADA.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2026-Q2,,,,,
IP010325,11/03/2024,Waimakariri District Council,Brick Kiln Lane Sewer Main Repair.,Repair of sewer main at Brick Kiln Lane.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2026-Q2,,,,,
IP010326,11/03/2024,Waimakariri District Council,Kaiapoi WWTP Entranceway Repair.,Concreting of KWWTP entranceway.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010327,11/03/2024,Waimakariri District Council,Rangiora Septage Facility.,Rangiora septage facility - carry over from 283/24.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010328,11/03/2024,Waimakariri District Council,Woodend WWTP Wetlands.,Works required on Wetlands 1 & 2 to ensure the plant operation is achieved.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2027-Q2,,,,,
IP010329,11/03/2024,Waimakariri District Council,Rangiora WWTP Band Screens Renewal.,Bandscreens 5 year renewal.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010330,11/03/2024,Waimakariri District Council,Gladstone WWPS Generator replacement.,Replacement of generator at Gladstone Rd WWPS and automatic switchover at Woodend WWTP.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP010331,11/03/2024,Waimakariri District Council,Reserve Rd generator replacement.,Replacement of generator at Reserve Rd WWPS.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP010332,11/03/2024,Waimakariri District Council,Electrical upgrade at Kings Ave WWPS.,Install radar level sensor.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010333,11/03/2024,Waimakariri District Council,Upgrade WWPS lids.,Upgrade WWPS lids at North Oval WWPS & Reserve Rd WWPS.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010334,11/03/2024,Waimakariri District Council,Upgrade Stalkers Rd WWPS lid at Stalkers WWPS.,Upgrade Stalkers Rd WWPS llid with McBerns Lid.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010335,11/03/2024,Waimakariri District Council,Generators at Southbrook WWPS and Rangiora EDS PS.,New generators at EDS PS and Southbrook WWPS.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP010336,11/03/2024,Waimakariri District Council,Flowmeter on recycled water pumps RWWTP.,Flowmeter on recycled water pumps & relocation of DO probes x2.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010337,11/03/2024,Waimakariri District Council,Northbrook Waters PS lid replacement.,Replacement of WWPS lid at Northbrook Water with McBerns.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2026-Q3,2027-Q2,,,,,
IP010338,11/03/2024,Waimakariri District Council,Generator at Bradleys Rd WWPS.,New geenerator at Bradleys Rd WWPS - 33kVA.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP010339,11/03/2024,Waimakariri District Council,Generators at KWWTP.,Generators at KWWTP.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2027-Q2,,,,,
IP010691,11/03/2024,Waimakariri District Council,Cust Township Wastewater Servicing.,Internal gravity pipework pumpstation and rising main from Cust to Rangiora to service the Cust township with reticulated wastewater. Includes service connections.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 Million,,,,,,,2068-Q3,2070-Q2,,,,,
IP008806,11/03/2024,Waimakariri District Council,Under Channel Piping.,Underchannel drainage pipework installed in conjunction with the kerb and channel replacemnt programme.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2024-Q3,2071-Q2,,,,,
IP008807,11/03/2024,Waimakariri District Council,Stormwater Minor Improvements - Rangiora.,Unspecified repairs/improvements to existing drainage infrastructure.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2024-Q3,2071-Q2,,,,,
IP008808,11/03/2024,Waimakariri District Council,North Drain Treatment.,Investigate and implement SW treatment options for the North Drain catchment. Inlcudes enhancement to landscaping and amenity of the drain.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2027-Q3,2031-Q2,,,,,
IP009075,11/03/2024,Waimakariri District Council,Middle Brook Treatment.,Investigate and implement SW treatment options for the Mibble Brook Catchment.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2027-Q3,2029-Q2,,,,,
IP008809,11/03/2024,Waimakariri District Council,Network Discharge Consent Implementation Works.,Implementation of water quality improvement works identified in the Rangiora Stormwater Management Plan.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 Million,,,,,,,2025-Q3,2035-Q2,,,,,
IP008810,11/03/2024,Waimakariri District Council,Blackett Street Piping.,Pipe upgrade through Ashley Street roundabout.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2024-Q3,2027-Q2,,,,,
IP009076,11/03/2024,Waimakariri District Council,Johns Road Stormwater Main.,New pipe along Johns Road from Townsend Road to east boundary of 163 Johns Road.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009077,11/03/2024,Waimakariri District Council,Wiltshire / Green Pipework Upgrade Stage 2.,Design and construction of pipe upgrade from Parkhouse Drive to Green Street.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2027-Q2,,,,,
IP008811,11/03/2024,Waimakariri District Council,Todds Road SW Pond.,Stormwater Pond to service Todds Road development area.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2027-Q3,2028-Q2,,,,,
IP008812,11/03/2024,Waimakariri District Council,Stormwater Minor Improvements - Coastal Urban.,Minor Stormwater Improvements in the Coastal Urban Drainage Area.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2071-Q2,,,,,
IP009080,11/03/2024,Waimakariri District Council,Pines Kairaki Upgrade.,Drainage upgrades in the Pines / Kairaki villages.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP008813,11/03/2024,Waimakariri District Council,East Woodend Detention Pond 2.5Ha.,Construction of the East Woodend Detention Pond.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2027-Q3,2029-Q2,,,,,
IP008814,11/03/2024,Waimakariri District Council,Global Consent Implemenation Works.,Implementation of works identified under the Coastal Urban comprehensive resource consent.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2027-Q3,2033-Q2,,,,,
IP009081,11/03/2024,Waimakariri District Council,East Woodend Upgrade McIntosh Drain.,Upgrades works along McIntosh Drain for East Woodend ODP.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2028-Q3,2029-Q2,,,,,
IP009082,11/03/2024,Waimakariri District Council,East Woodend Internal reticulation.,Upgrade works to internal stormwater reticulation for East Woodend ODP.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2028-Q3,2029-Q2,,,,,
IP009083,11/03/2024,Waimakariri District Council,Stormwater Minor Improvements - Pegasus.,Minor stormwater improvements in the Pegasus Urban Drainage Area.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2071-Q2,,,,,
IP008815,11/03/2024,Waimakariri District Council,Underchannel piping.,Kaiapoi Underchannel Piping programme.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2071-Q2,,,,,
IP008816,11/03/2024,Waimakariri District Council,Stormwater Minor Improvements - Kaiapoi.,Budget to implement minor stormwater improvements identifed as part of other capital works or throughout the financial year.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2024-Q3,2071-Q2,,,,,
IP008817,11/03/2024,Waimakariri District Council,Network Discharge Consent Implementation Works.,Implementation of water quality improvement works identified in the Kaiapoi Stormwater Management Plan.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 Million,,,,,,,2025-Q3,2037-Q2,,,,,
IP009084,11/03/2024,Waimakariri District Council,Stormwater Minor Improvements - Oxford.,Implementation of minor stormwater improvements identified throughout the financial year.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2071-Q2,,,,,
IP008818,11/03/2024,Waimakariri District Council,Network Discharge Consent Implementation Works.,Implementation of water quality improvements works identified in the Oxford Stormwater Management Plan.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2026-Q3,2033-Q2,,,,,
IP008820,11/03/2024,Waimakariri District Council,Stage 1 - Mandeville Resurgence Channel Diversion / Upgrade.,Long term solution for managing resurgence flows through the Mandeville area.Stage 1 (2023/25) upgrade of existing network.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP008821,11/03/2024,Waimakariri District Council,West Belt Trunk Stormwater Pipeline.,Overflow pipeline on West Belt from North Brook to Townsend Road extension.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2026-Q3,2029-Q2,,,,,
IP009085,11/03/2024,Waimakariri District Council,Lehmans Road Stage 2.,Construction of box culverts and wide swale on east side of Lehmans Road.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2026-Q3,2028-Q2,,,,,
IP008822,11/03/2024,Waimakariri District Council,Dockey Creek Diversion - Lilly Road.,Dockey Creek overflow diversion at Lilly Road to the Cust River.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2025-Q3,2027-Q2,,,,,
IP009091,11/03/2024,Waimakariri District Council,Railway Drain Treatment.,Stormwater treatment improvements at the northern end of Railway Drain.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009093,11/03/2024,Waimakariri District Council,Three Brooks Enhancement Work - North Brook / Geddis Street.,Repair and replacement of timber lined drain - Package 2 and 3. Section of Geddis Street drain between High Street and Geddis Street. Section of North Brook between West Belt and Elisabieth Street.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009094,11/03/2024,Waimakariri District Council,Three Brooks Enhancement Work - Middle Brook Tributary.,Repair and replacement of timber lined drain and vegetation work - Package 7. Section of Middle Brook tributary upstream of Bush Street.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2027-Q2,,,,,
IP009095,11/03/2024,Waimakariri District Council,Three Brooks Enhacement Project - North Brook Victoria to Newnham.,Channel naturalisation and retaining wall replacement - Package 4 (4A & 4B). Section of North Brook between Victoria Street and Newnham Street.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2026-Q3,2028-Q2,,,,,
IP009096,11/03/2024,Waimakariri District Council,Three Brooks Enhancement Work - Middle Brook Martyn to Bush.,Naturalisation and vegetation clearance in the Martyn Street / Bush Street area - Package 6A and 6B.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2028-Q3,2029-Q2,,,,,
IP008823,11/03/2024,Waimakariri District Council,Three Brooks Enhancement - Middle Brook Bush to King.,Replacement of retaining wall and timber lined drain and naturalisation / vegetation clearance works - Package 6C 6D and 8. Section of Middle Brook between Bush Street and King Street.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2029-Q3,2031-Q2,,,,,
IP009097,11/03/2024,Waimakariri District Council,Sunday School Drain Piping.,Piping of open section of Sunday School Drain.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2027-Q2,,,,,
IP008824,11/03/2024,Waimakariri District Council,Mansfield Park Secondary Flow Improvements.,Investigation and implementation of improvements to manage secondary flows within the Mansfield Park area of Kaiapoi.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2027-Q2,,,,,
IP009100,11/03/2024,Waimakariri District Council,Matai Place Stage 2.,Construciton of a secondary overland flow path from Matai Place to Park Avenue (through Ericksons Lane).,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009101,11/03/2024,Waimakariri District Council,Flannigans Drain Downstream Upgrade.,Provision of a secondary flow path from Kowhai Street to High Street and through the cemetry.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2027-Q2,,,,,
IP009102,11/03/2024,Waimakariri District Council,Box Drain Improvements.,Investgation and implementation of improvements for the treatment and attenuation of discharge into Box Drain.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP008825,11/03/2024,Waimakariri District Council,Woodend Capacity Improvements.,Investigation and implementation of capacity improvements in Woodend.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2027-Q2,,,,,
IP008826,11/03/2024,Waimakariri District Council,Kaikanui Diversion.,Diversion of the lower reach of the Kaikanui Stream downstream of the railway line.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2024-Q3,2027-Q2,,,,,
IP008827,11/03/2024,Waimakariri District Council,Kaikanui SMA Upgrade.,Extension of the Kaikanui SMA into the regeneration area.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2026-Q3,2028-Q2,,,,,
IP008828,11/03/2024,Waimakariri District Council,North Brook Retaining Wall - Janelle to White.,Installation of timber retaining walls on both sides of the North Brook between Janelle Placew and White Street.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2027-Q2,,,,,
IP009104,11/03/2024,Waimakariri District Council,Feldwick Drain Naturalisation.,Channel modifications and planting along Feldwick Drain.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2027-Q3,2029-Q2,,,,,
IP008829,11/03/2024,Waimakariri District Council,Feldwick Drain PS Upgrade.,Replacement and upgrade of the Feldwick Drain PS.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2032-Q3,2034-Q2,,,,,
IP008830,11/03/2024,Waimakariri District Council,Dudley Drain PD Upgrade.,Replacement and upgrading of the Dudley Drain PS.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2030-Q3,2032-Q2,,,,,
IP008831,11/03/2024,Waimakariri District Council,Beswick Street PS Upgrade.,Construction of a new stormwater PS at Beswick Street.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2028-Q3,2030-Q2,,,,,
IP008832,11/03/2024,Waimakariri District Council,North Drain Piping - Ashley to Edward.,Pipeing of the North Drain adjacent to the Anglican Cemetery between Ashley Street and Edward Street.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2027-Q2,,,,,
IP009107,11/03/2024,Waimakariri District Council,Cust Road Drainage Upgrades.,Drainage upgrades in Cust Road. Overflow system from new soakpitsd at 1838 Ciust Road.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP008833,11/03/2024,Waimakariri District Council,Rotten Row Drainage Improvements.,Drainage improvements in Rotten Row Waikuku Beach.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2028-Q3,2029-Q2,,,,,
IP008834,11/03/2024,Waimakariri District Council,Cridland Street West Drainage Upgrades.,Drainage upgrades inlcuding new pump station in Cridland Street West Kaiapoi.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2024-Q3,2027-Q2,,,,,
IP009109,11/03/2024,Waimakariri District Council,Belmont Avenue Drainage Upgrades.,Drainage upgrades in Belmont Avenue Rangiora.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2027-Q3,2028-Q2,,,,,
IP009110,11/03/2024,Waimakariri District Council,Bay Road Drainage Upgrades.,Drainage upgradesin Bay Road Oxford.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2027-Q2,,,,,
IP008835,11/03/2024,Waimakariri District Council,Flannigans Drain Capacity Upgrades.,Capacity upgrades in Flannigans Drain Oxford.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2027-Q2,,,,,
IP009111,11/03/2024,Waimakariri District Council,Burnett Street Capacity Upgrades.,Capacity upgrades in Burnett Street Oxford.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP009820,11/03/2024,Waimakariri District Council,Knight Street Upgrades.,Works to connect Kowhai to High Street.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2025-Q3,2027-Q2,,,,,
IP010340,11/03/2024,Waimakariri District Council,Waikuku Taranaki Streami Pumpstation.,Construction of stormwater pumpstation on Taranaki Stream at Waikuku Beach.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 Million,,,,,,,2034-Q3,2036-Q2,,,,,
IP010341,11/03/2024,Waimakariri District Council,Stage 2 - Mandeville Resurgence Channel Diversion / Upgrade.,Stage 2 - Diversion to the Eyre River Cut.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 Million,,,,,,,2026-Q3,2032-Q2,,,,,
IP010342,11/03/2024,Waimakariri District Council,Washington Place Drainage Improvements.,Channel and culvert upgrades. Project identified as part of the Flood Team work.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010343,11/03/2024,Waimakariri District Council,1030 Loburn Whiterock Road.,These works are for remediation and to prevent future erosion damage at 1030 Loburn Whiterock Road.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP009113,11/03/2024,Waimakariri District Council,Stockwater Culvert Replacement.,Renewal of Stockwater Culverts.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 Million,,,,,,,2024-Q3,2048-Q2,,,,,
IP009114,11/03/2024,Waimakariri District Council,Waste Minimisation Future Replacements.,Future renewals.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2029-Q3,2042-Q2,,,,,
IP009821,11/03/2024,Waimakariri District Council,Southbrook New Shop and Education Centre.,Construction of new Shop & education centre upgrade recycling and resource recovery area.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,5 - 25 Million,,,,,,,2024-Q3,2027-Q2,,,,,
IP009115,11/03/2024,Waimakariri District Council,Oxford Transfer Station Infrastructure.,OTS Weighbridge in 25/26.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP009116,11/03/2024,Waimakariri District Council,Weighbridges and Services for Cleanfills.,Construction of weighbridge for reporting to MfE.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2024-Q3,2027-Q2,,,,,
IP009117,11/03/2024,Waimakariri District Council,Cust Loburn Ashley Sefton Oxford West.,Set Up Rural Recycling Sites.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2026-Q3,2036-Q2,,,,,
IP009118,11/03/2024,Waimakariri District Council,Southbrook Transfer Station Fencing Replacements.,Fencing works.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2027-Q3,2028-Q2,,,,,
IP009822,11/03/2024,Waimakariri District Council,Southbrook Transfer Station Inwards Weighbridge Pit Replacement.,Replace pit portion of outwards weighbridge as part of scheduled upgrade.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2027-Q3,2028-Q2,,,,,
IP009120,11/03/2024,Waimakariri District Council,Southbrook Transfer Station Replacement Sundries.,Replacement of sundry items at Southbrook Transfer Station.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2026-Q3,2044-Q2,,,,,
IP009121,11/03/2024,Waimakariri District Council,Southbrook Transfer Station Access Roads.,Replacement and renewal of access roads.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2024-Q3,2048-Q2,,,,,
IP009825,11/03/2024,Waimakariri District Council,Southbrook Transfer Station Disposal Pit Upgrade and Road Realignment.,Disposal pit upgrade and road realignment.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,1 - 5 Million,,,,,,,2024-Q3,2028-Q2,,,,,
IP010344,11/03/2024,Waimakariri District Council,Southbrook Transfer Station Minor Improvements.,Minor Improvements Budget.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2024-Q3,2027-Q2,,,,,
IP009122,11/03/2024,Waimakariri District Council,Southbrook Transfer Station Landscaping and Shelter Belts.,Landscaping and Shelter Belts.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2025-Q3,2032-Q2,,,,,
IP009826,11/03/2024,Waimakariri District Council,Southbrook Transfer Station Land Purchase.,Land purchase for managing shelter plantings and future growth.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2025-Q3,2026-Q2,,,,,
IP009123,11/03/2024,Waimakariri District Council,Oxford Transfer Station Access Roads.,Replacement and renewal of access roads.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2025-Q3,2047-Q2,,,,,
IP009124,11/03/2024,Waimakariri District Council,Oxford Transfer Station Fencing.,Replacement and renewal of fencing.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2025-Q3,2034-Q2,,,,,
IP009126,11/03/2024,Waimakariri District Council,Oxford Transfer Station Replacment Sundries.,Replacement of sundry items at Oxford Transfer Station.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2024-Q3,2042-Q2,,,,,
IP009127,11/03/2024,Waimakariri District Council,Oxford Transfer Station Weighbridge and Civil Works.,Seal gravel area and new building.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2034-Q3,2036-Q2,,,,,
IP009128,11/03/2024,Waimakariri District Council,Oxford Transfer Station Minor Improvements.,Minor Improvements Budget.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2024-Q3,2037-Q2,,,,,
IP009129,11/03/2024,Waimakariri District Council,Closed Landfills Fencing.,Replacement and Renewal of Closed Landfill FencingCust Kaiapoi Mandeville Oxford Rangiora.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2030-Q3,2031-Q2,,,,,
IP009827,11/03/2024,Waimakariri District Council,Flood Protection Rangiora Landfill.,Cost share of flood protection works for Rangiora closed landfill.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2028-Q3,2029-Q2,,,,,
IP009130,11/03/2024,Waimakariri District Council,Cleanfill Site Fencing.,Replacement and renewal of fencing and signage at cleanfill sites.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP009131,11/03/2024,Waimakariri District Council,Cleanfill Site Cameras.,Installation of site cameras at cleanfill sites.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP009132,11/03/2024,Waimakariri District Council,Cleanfill Site Fencing Access Road and Signage Improvements.,Boundary fences for quarry internal fences cleanfill area/access road.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2031-Q3,2046-Q2,,,,,
IP009133,11/03/2024,Waimakariri District Council,Cleanfill Site Monitoring Bores.,Replacement of Monitoring Bores.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2056-Q3,2057-Q2,,,,,
IP008836,11/03/2024,Waimakariri District Council,Future Material Recoveries Facility.,New MRF or increased capacity at Southbrook.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,5 - 25 Million,,,,,,,2039-Q3,2042-Q2,,,,,
IP009135,11/03/2024,Waimakariri District Council,Oxford Transfer Station New Hardstand Area.,New hardstand area for greenwaste.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP009828,11/03/2024,Waimakariri District Council,New Kiosk adjacent to weighbridge.,Construct new kiosk in conjunction with weighbridge installation.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2024-Q3,2026-Q2,,,,,
IP009829,11/03/2024,Waimakariri District Council,Oxford Transfer Station Security Monitoring.,Installation of security cameras at Oxford transfer station.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2024-Q3,2025-Q2,,,,,
IP010692,11/03/2024,Waimakariri District Council,Global Consent for Historic Landfills.,Global Consent for all historic landfills in District.,,Early Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2025-Q3,2028-Q2,,,,,
IP010693,11/03/2024,Waimakariri District Council,Southbrook Transfer Station Pump Station.,Pump Replacement & PS Refurbishment.,,In Planning,Funding Source Confirmed,To be determined,To be determined,Canterbury,,,Waste Management,< 1 Million,,,,,,,2036-Q3,2037-Q2,,,,,
IP002775,7/03/2024,Waimea Water Limited,Waimea Community Dam.,The dam will secure the region’s water supply for the next 100+ years. The Dam will be a concrete-face rock filled dam. The Waimea Community Dam will be approximately 53m high 220m long and 6m wide at the crest with approximately 480 000m3 of rockfill in the embankment. The spilway is 165m long with capacity for 1100 m3/s.,,Under construction,Fully funded,Direct,Other,Tasman,,,Water,100 - 250 million,2018-Q1,2022-Q1,2018-Q1,2022-Q1,2018-Q1,2024-Q2,2018-Q1,2024-Q2,
https://waimeawater.nz/,,,-41.3142305,173.0922233
IP008684,4/03/2024,Waipā District Council,Ohaupo Town Concept and Safety Improvements.,Streetscape safety improvements.,,Under construction,Funding source confirmed,Open,Construct only,Waikato,,,Transport,1 - 5 million,,,2022-Q4,2023-Q1,2023-Q3,2024-Q1,2022-Q4,2024-Q1,,,,,
IP008685,4/03/2024,Waipā District Council,Picquet Hill Plan Change.,New roundabout on Cambridge Rd Te Awamutu.,,In planning,Funding source confirmed,Open,Construct only,Waikato,,,Transport,1 - 5 million,,,2024-Q2,2024-Q2,2024-Q3,,2024-Q1,2025-Q2,,,,,
IP008686,4/03/2024,Waipā District Council,Hamilton Rd/Cambridge Rd Urbanisation.,Urbanisation as new growth cells develop.,,Under construction,Funding source confirmed,Open,Construct only,Waikato,,,Transport,1 - 5 million,,,2022-Q3,2022-Q4,,2024-Q1,2022-Q4,2024-Q1,,,,,
IP008687,4/03/2024,Waipā District Council,Kihikihi Brown Field Roading & Stormwater Works.,Urbanisation in line with developments Haultain Street first project.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Transport,1 - 5 million,,,2023-Q4,2023-Q4,2024-Q1,2024-Q2,2023-Q4,2024-Q2,,,,,
IP008688,4/03/2024,Waipā District Council,Cambridge Growth C2/C3 Roads & Green Belt Connection.,New roundabout Cambridge Rd.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Transport,5 - 25 million,,,2022-Q3,2023-Q1,2023-Q3,2024-Q4,2023-Q3,2024-Q4,,,,,
IP008689,30/11/2023,Waipā District Council,Cambridge Growth Cells Stormwater Development Provision C2 & C3.,Stormwater projects within developments.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Water,5 - 25 million,,,2022-Q4,2023-Q1,2023-Q3,2024-Q3,2023-Q3,2024-Q3,,,,,
IP008690,4/03/2024,Waipā District Council,WW Pipe Upgrades Cambridge Rd to Christie Ave.,New Rising main from growth cell.,,Under construction,Fully funded,Open,Construct only,Waikato,,,Water,1 - 5 million,,,2023-Q4,,2024-Q1,,2023-Q4,2025-Q2,,,,,
IP008691,30/11/2023,Waipā District Council,Te Awamutu Internal CBD Rising Main (fire andf water Level of Service upgrades).,Improvement to water supply network.,,In procurement,Fully funded,Open,Construct only,Waikato,,,Water,1 - 5 million,,,2024-Q1,,2024-Q2,2025-Q1,2023-Q4,2025-Q1,,,,,
IP008693,30/11/2023,Waipā District Council,Cambridge Growth Cell C8 Water Reticulation.,Internal trunk mains - via developers.,,Early planning,Funding source confirmed,Open,Construct only,Waikato,,,Water,1 - 5 million,,,,,,,2022-Q4,2027-Q2,,,,,
IP008694,30/11/2023,Waipā District Council,Cycleway Te Awamutu/Ngā Roto/Pirongia Connection Section 1 Stage 1.,Recreational cycleway from Te Awamutu to Ngā Roto Road Carpark.,,In planning,Fully funded,Open,Construct only,Waikato,,,Community facilities,5 - 25 million,,,,,,,2024-Q3,2025-Q4,,,,,
IP008695,30/11/2023,Waipā District Council,Dog Pound Development.,Construction of a new District Dog Pound.,,In planning,Funding source confirmed,Open,Construct only,Waikato,,,Community facilities,1 - 5 million,,,,,,,2024-Q2,2025-Q1,,,,,
IP008696,30/11/2023,Waipā District Council,New Pensioner Housing.,Contruction of new pensioner units.,,Under construction,Funding source confirmed,Open,Construct only,Waikato,,,Housing,1 - 5 million,,,2023-Q3,2023-Q3,2023-Q3,,2022-Q4,2024-Q2,,,,,
IP008697,30/11/2023,Waipā District Council,Cambridge Wastewater Treatment Plant Main Construction Contract.,Upgrade of Cambridge wastewater treatment plant.,,Under construction,Funding source confirmed,Open,Early contractor involvement,Waikato,,,Water,25 - 50 million,,,,,,,2022-Q4,2026-Q2,,,,,
IP009590,30/11/2023,Waipā District Council,Leamington water pipe upgrades.,Water main renewals and upgrades for LoS and growth.,,Under construction,Funding source confirmed,Open,Construct only,Waikato,,,Water,1 - 5 million,,,,,,2024-Q2,2023-Q3,2024-Q2,,,,,
IP009591,30/11/2023,Waipā District Council,Leamington Stormwater Improvements.,Stormwater pipe upgrades and associted pond construction.,,On hold,Funding source confirmed,Open,Construct only,Waikato,,,Water,1 - 5 million,,,2024-Q1,,,2025-Q1,2023-Q4,2025-Q1,,,,,
IP009592,30/11/2023,Waipā District Council,Taylors Hill Pumpststion Upgrades.,Replacment booster pumpststion and associted control.,,Under construction,Funding source confirmed,Limited,Construct only,Waikato,,,Water,< 1 million,,,,,,2024-Q2,2023-Q3,2024-Q2,,,,,
IP009593,30/11/2023,Waipā District Council,Alpha Water Treatement Plant Upgrade.,Replacement membrane WTP.,,In procurement,Funding source confirmed,Open,Design and construct,Waikato,,,Water,1 - 5 million,,,2024-Q1,,,,2023-Q3,2025-Q2,,,,,
IP009594,30/11/2023,Waipā District Council,Kihikihi pathways project.,Walking and cycling infrastructure.,,Under construction,Funding source confirmed,Selective,Construct only,Waikato,,,Transport,5 - 25 million,,,2023-Q2,2023-Q3,2023-Q3,2024-Q2,2022-Q4,2024-Q3,,,,,
IP009595,30/11/2023,Waipā District Council,Cambridge pathways project.,Walking and cycling infrastructure.,,Under construction,Funding source confirmed,Selective,Construct only,Waikato,,,Transport,5 - 25 million,,,2023-Q2,2023-Q3,2023-Q3,2024-Q3,2022-Q4,2024-Q3,,,,,
IP010362,30/11/2023,Waipā District Council,Wells Place Reservoir Replacment.,Stucture and foundation.,,In planning,Funding source to be confirmed,Selective,Design and construct,Waikato,,,Water,1 - 5 million,,,2024-Q2,,,2025-Q1,2024-Q1,2025-Q1,,,,,
IP010363,30/11/2023,Waipā District Council,Water Pipe Renewals.,Pipe renewal.,,In planning,Funding source to be confirmed,Open,Construct only,Waikato,,,Water,1 - 5 million,,,2024-Q2,,2024-Q3,,2024-Q1,2025-Q2,,,,,
IP010364,30/11/2023,Waipā District Council,Wastewater pipe renewal.,Rising main renewal.,,In planning,Funding source to be confirmed,Open,Construct only,Waikato,,,Water,< 1 million,,,2024-Q2,,2024-Q3,,2024-Q2,2026-Q2,,,,,
IP010699,4/03/2024,Waipā District Council,Te Tahi Intake Upgrade.,Stream Intake upgrade.,,In planning,Funding source to be confirmed,Limited,Construct only,Waikato,,,Water,< 1 million,,,2024-Q3,,2024-Q4,,2024-Q1,2025-Q2,,,,,
NZTA_100022013,25/03/2024,NZ Transport Agency Waka Kotahi,(af) Vic Park Tunnel.,This Vic Park Tunnel project is largely complete and operational but there are some residual property issues being resolved.,,Post implementation,Fully funded,Open,Alliance,Auckland,,,Transport,50 - 100 million,,,,,,,2017-Q1,2025-Q2,,,,,
NZTA_100852013,25/03/2024,NZ Transport Agency Waka Kotahi,(ax) Manukau Hbour. Xing.,This project is part of the Manukau Harbour Crossing aimed to replace the existing Old Mangere Bridge which is in rapid state of deterioration and is now closed to pedestrians and cyclists. The Transport Agency has the consent obligation to maintain the journey time reliability for pedestrian and cyclists between Manukau and Onehunga townships.The project primarily involves the construction of a new pedestrian/cycleway bridge crossing the Manukau Harbour adjacent to the current Old Mangere Bridge and the subsequent removal of the existing bridge. The new structure is 260m in length and features a 60m main span of steel tied arch construction and steel box girder deck. Complex concrete substructures with post-tensioned elements are to be constructed in the harbour. The project also include landscaping works at each abutment approach installation of artwork sculptural elements and retaining certain sections of the existing bridge abutments for urban design and heritage reasons.,,Post implementation,Fully funded,Open,Alliance,Auckland,,,Transport,250 - 500 million,,,,,,,2016-Q3,2024-Q2,,,,,
NZTA_171902013,25/03/2024,NZ Transport Agency Waka Kotahi,(nc) SH1 Corridor Imps - Whangarei.,The six projects along 6km of SH1 through Whangarei will deliver benefits for road users. The Tarewa Road development will provide a 4-lane highway between the intersection of SH1 & SH14 through to Tarewa Road and improve an intersections by removing bottlenecks congestion improving traffic flow and safety. The replacement of the existing bridge is also part of this project..,,Post implementation,Fully funded,Open,Construct only,Northland,,,Transport,50 - 100 million,,,,,,,2012-Q2,2024-Q4,,,,,
NZTA_117702016,25/03/2024,NZ Transport Agency Waka Kotahi,20Connect (Airport Access Imps).,Waka Kotahi (WK) alongside investment partners Auckland Transport (AT) and Auckland International Airport Limited (AIAL) are investigating improvements to customer journey experiences and access to and from Auckland International Airport and the surrounding area.Reliable and timely access for customers and goods to and from the airport and its surrounding area is limited by lack of travel choice leading to a poor journey experience and putting New Zealand’s economic potential at risk. This is significantly exacerbated by growing activity.The primary purpose of this project is to develop a medium to long-term response to increasing airport demand from south and east Auckland. This is a multi stage programme of improvements starting with the Early Improvements package.The Early Improvements package (ETA 2021) includes the SH20B improvements (lead by WK and co-funded by AIAL the project involves widening of SH20B to incorporate new bus lanes Shared User Path and safety improvements to the corridor) Puhinui Station and Puhinui Road improvements (lead by AT).The primary objective for this programme of work is to improve access to jobs and enable more efficient movement of goods contributing towards economic growth and productivity. It will offer better travel choices and deliver an improved journey experience for customers.,,Under Construction,Fully funded,Open,Construct only,Auckland,,,Transport,25 - 50 million,,,,,,,2018-Q1,2024-Q2,,,,,
NZTA_124312017,25/03/2024,NZ Transport Agency Waka Kotahi,Accessing Central New Zealand SH3 Napier.,Refine and develop interventions for the three intersections of Roberts Line James Line and Stoney Creek Road along SH3 (Napier Road) in order to improve safety and efficiency of the transport network. The phase will include workshops with stakeholders and public consultation. This work will deliver on the RED action plan 'Accelerate25'.,,In Planning,Part funded,To be determined,To be determined,Manawatū - Whanganui,,,Transport,1 - 5 million,,,,,,,2017-Q3,2024-Q2,,,,,
NZTA_159732023,25/03/2024,NZ Transport Agency Waka Kotahi,ANO SH1 Bombay Interchange Improvements.,Improvements for general traffic reliability and associated safety issues at the SH1 southbound Bombay interchange.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Transport,< 1 million,,,,,,,2023-Q2,2024-Q1,,,,,
NZTA_159722023,25/03/2024,NZ Transport Agency Waka Kotahi,ANO SH1 NB Princes Street On Ramp.,Extend the second lane on the northbound on-ramp and ramp signal two lanes. Increase queue storage improve management of the merge and improve management of flow onto SH1.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Transport,< 1 million,,,,,,,2023-Q3,2024-Q4,,,,,
NZTA_166112023,25/03/2024,NZ Transport Agency Waka Kotahi,ANO SH1 Onewa Bus Improvements.,Design an extension of the SB bus only lane from its current terminus at Onewa Road SB on-ramp.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Transport,< 1 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_159752023,25/03/2024,NZ Transport Agency Waka Kotahi,ANO SH1 SB Mt Wellington On Ramp.,Widen on ramp to 3 metered lanes to increase queue storage capacity on the on-ramp and improve reliability on Mt Wellington Highway.,,In Planning,Part funded,To be determined,To be determined,Auckland,,,Transport,< 1 million,,,,,,,2022-Q3,2024-Q2,,,,,
NZTA_159742023,25/03/2024,NZ Transport Agency Waka Kotahi,ANO SH16 Royal Road Active Improvements.,Active mode improvements for Royal road SH16 Interchange/overbridge.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Transport,< 1 million,,,,,,,2023-Q1,2025-Q1,,,,,
NZTA_165912023,25/03/2024,NZ Transport Agency Waka Kotahi,ANO SH16 SH1 Grafton Link.,Auckland network optimisation program project for SH16 - SH1 Grafton link special vehicle lane.,,In planning,Part funded,To be determined,To be determined,Auckland,,,Transport,< 1 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_159762023,25/03/2024,NZ Transport Agency Waka Kotahi,ANO SH16 Te Atatu Interchange EB On Ramp.,Widening of the existing Te Atatu EB on ramp to help improve bus service performance and reliability when joining SH16.,,In Planning,Fully funded,Open,Early contractor involvement,Auckland,,,Transport,1 - 5 million,,,,,,,2023-Q3,2024-Q2,,,,,
NZTA_155712022,25/03/2024,NZ Transport Agency Waka Kotahi,ANO SH16 The Strand Upgrades WandC.,Freight/HOV lane along The Strand plus a shared use path (along the western side) of The Strand to improve freight people movement and active mode deficiency (Y1 – Y3) and investigate additional midblock crossings.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Transport,5 - 25 million,,,,,,,2022-Q3,2025-Q2,,,,,
NZTA_155702022,25/03/2024,NZ Transport Agency Waka Kotahi,ANO TIBC Projects.,The TIBC package includes a wide range of technology innovation and behaviour change interventions across four categories that target improving journey reliability on the Strategic Networks through better detection and coverage of the network addressing the impacts of planned and unplanned events as well as the effectiveness of the Strategic Networks to improve safe access. Funding for the TIBC projects has been approved per year for rolling over initiatives.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Transport,5 - 25 million,,,,,,,2022-Q3,2026-Q2,,,,,
NZTA_159772023,25/03/2024,NZ Transport Agency Waka Kotahi,ANO Wellesley Street Connection.,Provide a missing walking / cycle link between the Learning Quarter in the City Centre and Grafton Road along Wellesley Street.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Transport,1 - 5 million,,,,,,,2023-Q3,2025-Q2,,,,,
NZTA_143202020,25/03/2024,NZ Transport Agency Waka Kotahi,Auckland Network Optimisation Programme.,High economic growth has contributed to reduced levels of service for customers using Auckland's transport system. With the city's population projected to increase by 45% to 2.2 million over the next 30 years accompanied by a 40% increase in jobs to over 850 000 the increased demand for travel will further negatively impact customer journeys. Left unaddressed or without alternatives for travel the economic and social opportunities that Auckland's growth can provide will be undermined. Relying on expanded infrastructure to improve service levels is economically inefficient and unsustainable.,,Under construction,Fully funded,To be determined,To be determined,Auckland,,,Transport,5 - 25 million,,,,,,,2020-Q1,2025-Q2,,,,,
NZTA_105862014,25/03/2024,NZ Transport Agency Waka Kotahi,Auckland Noise Mitigation Improvements.,Initiative to look at noise effects on properties adjacent to the Auckland Motorway network.,,On hold,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Transport,5 - 25 million,,,,,,,2014-Q3,2024-Q2,,,,,
NZTA_165362013,25/03/2024,NZ Transport Agency Waka Kotahi,Beaumont Bridge Replacement.,This contract is for the construction of a new bridge over the Clutha River and associated realigned section of State Highway 8 approximately 110 km west of Dunedin between RP 401/6.23 and 401/6.25. The works include the construction of a new two-lane bridge spanning the Clutha River earthworks and embankment construction utility diversions drainage pavement and surfacing construction vehicle barriers signage retaining walls landscaping and the repurposing of the existing single-lane heritage bridge.,,Under Construction,Fully funded,Open,Construct only,Otago,,,Transport,25 - 50 million,,,,,,,2016-Q3,2025-Q2,,,,,
NZTA_143272013,25/03/2024,NZ Transport Agency Waka Kotahi,CHCH Northern Arterial Rural with QE2.,New 4 lane arterial to link Northern motorway with QE2 drive with grade separated interchanges and four laning of QE2 drive between Main North Road and Innes Road.CCC Portion of projectNAU - extension of motorway from QEII to Cranford street across Cranford Basin.CSE- Continuation of 4 lanes from Cranford Basin to Innes Rd along Cranford St.,,Post implementation,Fully funded,Open,Alliance,Canterbury,,,Transport,250 - 500 million,,,,,,,2015-Q3,2024-Q4,,,,,
NZTA_155622012,25/03/2024,NZ Transport Agency Waka Kotahi,CHCH Southern Motorway (Stage 2).,Stage 2 extension of Southern Motorway from Halswell Junction Road to SH1 near Waterholes Road. Part of the Christchurch Southern Corridor RoNS programme.,,Post implementation,Fully funded,Open,Construct only,Canterbury,,,Transport,250 - 500 million,,,,,,,2016-Q3,2024-Q4,,,,,
NZTA_146012020,25/03/2024,NZ Transport Agency Waka Kotahi,CIP SH30 Eastern Corridor Rotorua.,CIP SH30 Rotorua - Funded from the COVID-19 Response and Recovery Fund administered by Crown Infrastructure Partners.SH30 Improvements will respond to an immediate need to improve pedestrian and cyclist safety provide better travel choices and improve the access from local roads to the state highway. Initiative is funded from the COVID-19 Response and Recovery Fund administered by Crown Infrastructure Partners.Improvements along this corridor will be delivered in multiple Phases and Zones. These are summarised as:Stage Two comprising two phases - Immediate improvements addressing existing level of service gaps and the focus of this project.o Phase 1 – This project (Further sub-divided into three zones)- Zone 1: SH30 Iles Road to Basley Road and Intersection at SH30 & Basley Road- Zone 2: SH30 Basley Road to Owhata Road- Zone 3: Intersection at SH30 & Owhata Road SH30 Owhata Road to Wharenui Road and Intersection at SH30 & Wharenui.,,Under Construction,Fully funded,Open,Early contractor involvement,Bay of Plenty,,,Transport,25 - 50 million,,,,,,,2020-Q3,2025-Q4,,,,,
NZTA_114222015,25/03/2024,NZ Transport Agency Waka Kotahi,CIP SH60 Motueka Project.,SH60 through Motueka town centre is also a key access road for the growing local population. These competing interests are compounded by pedestrian behaviour and intersection issues resulting in delays and safety issues.,,Post implementation,Fully funded,Open,Construct only,Tasman,,,Transport,5 - 25 million,,,,,,,2020-Q3,2025-Q2,,,,,
NZTA_146022020,25/03/2024,NZ Transport Agency Waka Kotahi,CIP SH94 Homer Tunnel.,CIP SH94 Homer Tunnel - funded from COVID-19 Response and Recovery Fund administered by Crown Infrastructure Partners.,,Under Construction,Fully funded,Open,Construct only,Southland,,,Transport,25 - 50 million,,,,,,,2020-Q3,2026-Q2,,,,,
NZTA_137002019,25/03/2024,NZ Transport Agency Waka Kotahi,Dunedin City and Hospital.,The development of a New Dunedin Hospital along with other projects (George Street Upgrade Waterfront development University upgrades) is a key catalyst for change. In response to this and other wider contextual opportunities one of the key Connecting Dunedin projects for 2019 and 2020 is the review of the central Dunedin Liveability Transport Programme. The project will consider how to improve the long-term liveability of central Dunedin with a focus on whether it is possible to reduce the impacts of traffic volume and speed around the new hospital so it is more accessible and provides a people focused place through improved integration/interaction with the CBD.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Otago,,,Transport,1 - 5 million,,,,,,,2019-Q3,2024-Q3,,,,,
NZTA_122422016,25/03/2024,NZ Transport Agency Waka Kotahi,ENR Sylvia Flats Resilience Improvement.,The preferred option is to construct a new section of highway 200m long and 30 metres back from the top of the scarp. As indicated this would provide a clear alignment of maintaining a 450 slope from the actual toe of the bank and not be reliant on the talus material for longevity.,,Post implementation,Fully funded,Open,Construct only,Canterbury,,,Transport,1 - 5 million,,,,,,,2016-Q3,2024-Q2,,,,,
NZTA_161572013,25/03/2024,NZ Transport Agency Waka Kotahi,Glen Innes to Tamaki Drive Shared Path.,The Glen Innes to Tamaki Drive Shared Path project will contribute approximately 7 km of shared use path to the Auckland Cycle Network (ACN) providing a link between Auckland's Eastern suburbs to the city centre. GI2TD has four distinct sections based on the environment and treatment options:Section 1 - Merton Road to St Johns Road Section 2 - St Johns road to Meadowbank rail stationSection 3 - Orakei Basin BoardwalkSection 4 - Orakei Road to Tamaki Drive (Fully funded and delivered by Auckland Transport)NZTA will fund the construction costs for Section 1 all of Section 2 and balustrade replacement for Section 3 while AT will fund the design consent and the remaining construction costs of the project. NZTA and AT will manage the construction works and design works respectively. Upon completion of the four sections AT will own and maintain all the sections.,,Under Construction,Fully funded,Open,Construct only,Auckland,,,Transport,25 - 50 million,,,,,,,2015-Q2,2027-Q2,,,,,
NZTA_162702013,25/03/2024,NZ Transport Agency Waka Kotahi,Hairini Link - Stage 4.,The Maungatapu Underpass is a two lane link road underneath the Maungatapu roundabout on SH 29A that will separate state highway and local traffic reduce congestion at peak times on State Highway 29A and make travel safer for pedestrians and cyclists. In addition to improving efficiency of SH29A the local road link into welcome bay will provide a valuable lifeline into Welcome Bay in a seismic event and improve the safety of pedestrians and cyclists through the Maungatapu and Hairini roundabouts. The new Welcome Bay Road will link to the existing Turret Road causeway and include new cycle links and a cycle and pedestrian bridge above the road for pedestrians and cyclists. The old State Highway 2A has now formally been revoked into Council ownership and as such NZTA holds no responsibility for its future development.,,Post implementation,Fully funded,Open,Design and construct,Bay of Plenty,,,Transport,50 - 100 million,,,,,,,2013-Q3,2027-Q1,,,,,
NZTA_129802017,25/03/2024,NZ Transport Agency Waka Kotahi,Hamilton to Cambridge Cycle Connection.,New off-road shared use path between Hamilton and Cambridge to provide a safe route for walkers and cyclists.,,Post implementation,Fully funded,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,,,,,,2016-Q3,2024-Q2,,,,,
NZTA_137452019,25/03/2024,NZ Transport Agency Waka Kotahi,Hamilton Urban Improvements - Bus priori.,Investigation into improvements to the State Highway network to improve levels of service for public transport in line with the operating gaps identified in the Hamilton Network Improvement Plan.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2022-Q1,2028-Q1,,,,,
NZTA_123412016,25/03/2024,NZ Transport Agency Waka Kotahi,Kaikoura Nov 2016 EQ - Lewis Pass Altern.,Kaikoura Nov 2016 EQ - Lewis Pass Alternative Route Upgrade - Marlborough.,,Post implementation ,Fully funded,To be determined,To be determined,Marlborough,,,Transport,< 1 million,,,,,,,2017-Q2,2024-Q2,,,,,
NZTA_128152017,25/03/2024,NZ Transport Agency Waka Kotahi,Katiki Coast Enhanced Resilience Stage 2.,This project is a continuation of the Katiki Coast Enhanced Resilience project.Orientated parallel to the coast the immediate area of concern for the State highway begins at SH1S RS 635/2.41 and extends south to SH1S RS 635/5.62. The horizontal alignment moves towards the coast (high risk) away from the coast (low risk) and vertically with the natural topography. High and low alignments are equally at risk of erosion where they pass near the face of the bank however the likelihood and subsequent consequences of a slope failure increase as the elevation increases.,,Post implementation,Fully funded,To be determined,To be determined,Otago,,,Transport,1 - 5 million,,,,,,,2017-Q3,2024-Q2,,,,,
NZTA_131802018,25/03/2024,NZ Transport Agency Waka Kotahi,LED Street Light Conversion in Gisborne.,LED Conversion for all SH lights in the Tairawhiti Region.,,Under Construction,Fully funded,To be determined,To be determined,Gisborne,,,Transport,< 1 million,,,,,,,2018-Q3,2024-Q2,,,,,
NZTA_137382013,25/03/2024,NZ Transport Agency Waka Kotahi,Loop Rd Nth to Smeatons Hill SI.,A two lane roundabout will be constructed at the intersection of SH15 Loop Road (North) and SH1.As part of constructing a two-lane roundabout a second bridge will be built alongside the existing bridge to accommodate two lanes of southbound traffic. State highway traffic will merge back into a single southbound lane before the upgraded Portland Road intersection.The project will also provide an improved Portland Road intersection with road widening to support safe right turns and a left turn slip lane into Portland Road.The intersection of Otaika Valley Road (SH15) and Loop Road (South) will also be improved to assign intersection priority to SH15 users.Towards the end of construction the intersection of Loop Road (South) and SH1 will be closed to vehicles.A flexible wire barrier will be installed across the SH1/Loop Road (South) intersection with access provided for pedestrians and cyclists only.The barrier design allows for removal in the event the intersection needs to be reopened as a state highway detour route under emergency traffic management.The project includes improved stormwater management including a widened culvert south of Portland Road and a new culvert and sediment retention ponds north of the roundabout.,,Under Construction,Fully funded,Open,Construct only,Northland,,,Transport,25 - 50 million,,,,,,,2016-Q1,2026-Q4,,,,,
NZTA_127302017,25/03/2024,NZ Transport Agency Waka Kotahi,Maitai to Rocks Road Cycle Facility.,Cycle route to connect the existing Maitai shared path near Wildman Ave to the proposed Haven Precinct.,,Post implementation,Fully funded,Open,Construct only,Nelson,,,Transport,< 1 million,,,,,,,2018-Q1,2023-Q2,,,,,
NZTA_154652013,25/03/2024,NZ Transport Agency Waka Kotahi,Manawatu River Bridge SH3 Ashhurst Cycle.,The primary purpose of the Manawatu River Bridge SH3 Ashhurst Cycle/walkway is to provide a walking and cycling connection along Napier Road (SH3) between the Te Ahu a Turanga shared use path and the intersection of Cambridge Avenue in Ashhurst. The project area comprises an 800m section of Napier Road (SH3) between the terminus of the proposed Te Ahu a Turanga shared user path (on the eastern side of the bridge) to the existing access into the Ashhurst Domain on its western extent. A 440m section of existing limestone path within the Ashhurst Domain is also proposed to be upgraded as part of the wider project.,,In Planning,Part funded,To be determined,To be determined,Manawatū - Whanganui,,,Transport,1 - 5 million,,,,,,,2019-Q3,2028-Q4,,,,,
NZTA_149412021,25/03/2024,NZ Transport Agency Waka Kotahi,Milford Rockfall/Avalanche Protection.,Opportunity to improve transport system resilience at this location.,,On hold,Funding source to be confirmed,To be determined,To be determined,Southland,,,Transport,5 - 25 million,,,,,,,2023-Q3,2024-Q2,,,,,
NZTA_102332014,25/03/2024,NZ Transport Agency Waka Kotahi,NCI - Overall Package.,A package of capacity and safety improvement projects on the Northern Motorway between Upper Harbour Highway and Greville Road:• Widening of SH1 between Constellation Drive and Greville Road• Widening and upgrading of SH18 Upper Harbor Highway to motorway between SH1 and Old Albany Highway• New north-facing motorway-to-motorway connection between SH18 and SH1• Upgrade of Greville Road interchange• Extension of the existing Northern Busway from Constellation Station to Albany Station• 7.5km new Shared User Paths on SH1 and SH18 throughout the extent of works.• Enhancement to Constellation Bus Station and new Rosedale Bus Station co-funded by AT• Diversion of TS5/7 upgrade of Pond Link and connection of ECBLM as WSL co-funded betterment works.• Relocation of North Harbour BMX• Merger and relocation of Rosedale Whenuapai and Greenhithe Pony Clubs at Wainoni Park• Relocation of HHCT and new National Hockey CentreConstruction of the NCI project has been procured as a Hybrid Alliance for an award price of $447.4M.,,Post implementation,Fully funded,Open,Alliance,Auckland,,,Transport,500 million - 1 billion,,,,,,,2016-Q1,2028-Q2,,,,,
NZTA_109102014,25/03/2024,NZ Transport Agency Waka Kotahi,New Opaoa River Bridge.,Investigation of a bridge replacement for SH1 Opawa River Bridge immediately north of Blenheim. The project will investigate options for a bridge replacement that will provide better efficiency meet seismic standards and provide High Productivity Motor Vehicle requirements. The new bridge will provide a pedestrian and cycleway facility for vulnerable road users. The project is Crown appropriated under the Accelerated Regional Roads Package.,,Post implementation,Fully funded,To be determined,To be determined,Marlborough,,,Transport,25 - 50 million,,,,,,,2017-Q3,2025-Q2,,,,,
NZTA_126602017,25/03/2024,NZ Transport Agency Waka Kotahi,Ngauranga to Petone Walking and Cycling.,Te Ara Tupua - N2P Implementation Phase.,,Under Construction,Fully funded,Open,Alliance,Wellington,,,Transport,250 - 500 million,,,,,,,2018-Q4,2027-Q2,,,,,
NZTA_109872013,25/03/2024,NZ Transport Agency Waka Kotahi,Normanby Overbridge Realignment.,Improve the geometry and construct a new rail over road crossing as a replacement for a road over rail bridge.,,Post implementation,Fully funded,Open,Construct only,Taranaki,,,Transport,5 - 25 million,,,,,,,2019-Q1,2024-Q2,,,,,
NZTA_141722019,25/03/2024,NZ Transport Agency Waka Kotahi,North West Rapid Transit Improvements.,Rapid transit improvements along the SH16 corridor between the city centre and North West Auckland The purpose of this project is to:•Support substantial growth along the corridor and in the broader northwest part of Auckland•Address the projected decline in employment access in the west•Provide an opportunity for travellers to avoid projected congestion along State Highway 16 and to improve the productivity of this corridor•Improveme the poor public transport in this part of Auckland•Support a more efficient overall public transport system in this part of Auckland.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Transport,5 - 25 million,,,,,,,2019-Q3,2025-Q2,,,,,
NZTA_149272021,25/03/2024,NZ Transport Agency Waka Kotahi,North Western Bus Improvements (ST).,The short term project is progressing and is initially using CIP stimulus package funding. Waka Kotahi is leading the work for the construction of the North West interim bus improvements for the SH16 corridor (SH 16 bus shoulder lanes). This component of the overall programme is funded by CIP. In respect of Phase 1 of the Project AT is responsible for procurement and delivery of the detailed design professional services contracts for Lincoln Rd bus stops Te Atatu bus stops and SH16 bus shoulder lanes (through WSP contract) ‘Milestone 1’ deliverables for Westgate bus station and completion of the Brigham Creek DBC. In respect of Phase 1 of the Project Waka Kotahi is responsible for: * procurement of the physical works contractor for the Lincoln Rd bus stops Te Atatu bus stops and SH16 bus shoulder lanes and entering into the contracts for the delivery of the Phase 1 physical works with the physical works contractor (“Construction Contracts”);.,,Post implementation,Fully funded,Open,Early contractor involvement,Auckland,,,Transport,50 - 100 million,,,,,,,2021-Q2,2024-Q1,,,,,
NZTA_162252023,25/03/2024,NZ Transport Agency Waka Kotahi,NTLD Subsidence Strategy Implementation.,Underslip - Stabilise ongoing subsidence.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Northland,,,Transport,5 - 25 million,,,,,,,2023-Q4,2029-Q2,,,,,
NZTA_108312014,25/03/2024,NZ Transport Agency Waka Kotahi,NZUP Brougham St Corridor Improvements.,Improvements for the transport system in the Brougham Street and Moorhouse Avenue area in Christchurch.,,In planning,Fully funded,To be determined,To be determined,Canterbury,,,Transport,100 - 250 million,,,,,,,2017-Q3,2027-Q3,,,,,
NZTA_163172013,25/03/2024,NZ Transport Agency Waka Kotahi,NZUP Otaki to North of Levin.,A programme of works to improve safety and resilience of the Ōtaki to north of Levin transport corridor as well as planning to increase transport choice for the area’s growing population.,,In procurement,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Transport,1 billion +,,,,,,,2019-Q3,2032-Q2,,,,,
NZTA_142502020,25/03/2024,NZ Transport Agency Waka Kotahi,NZUP Penlink.,O Mahurangi – Penlink will form a vital transport link within the North Auckland region as more people live and work in Silverdale Whangaparāoa and the Hibiscus Coast. The new two-lane road and shared walking and cycling path will provide improved travel times between Whangaparāoa and wider Auckland.,,Under Construction,Fully funded,Open,Alliance,Auckland,,,Transport,500 million - 1 billion,,,,,,,2019-Q3,2029-Q3,,,,,
NZTA_104052014,25/03/2024,NZ Transport Agency Waka Kotahi,NZUP Queenstown Package.,Public Transport and safety Improvements project which complements nearby developments addressing capacity widening urbanization intersections and pedestrian enhancements.,,In Planning,Fully funded,Open,Construct only,Otago,,,Transport,100 - 250 million,,,,,,,2018-Q2,2027-Q4,,,,,
NZTA_144602020,25/03/2024,NZ Transport Agency Waka Kotahi,NZUP Rolleston Access Improvements.,The NZUP project in Rolleston aims to provide safer access and better connections for people. Travel around Rolleston will be more consistent reliable and predictable.,,Early Planning,Fully funded,To be determined,To be determined,Canterbury,,,Transport,100 - 250 million,,,,,,,2020-Q3,2030-Q2,,,,,
NZTA_144522020,25/03/2024,NZ Transport Agency Waka Kotahi,NZUP SH1 Tinwald Corridor Improvements.,Proposed intersection improvement to provide safe access and pedestrian crossing corridor flush median treatment and cycle path connecting to Ashburton River bridge.,,Under construction,Fully funded,Open,Construct only,Canterbury,,,Transport,5 - 25 million,,,,,,,2020-Q2,2025-Q3,,,,,
NZTA_124302017,25/03/2024,NZ Transport Agency Waka Kotahi,NZUP SH1 Whangarei to Port Marsden Highway.,The project inlcudes upgrading between Whanagrei and Port Marsden to improve safety efficiency and resilience.,,In Planning,Fully funded,To be determined,To be determined,Northland,,,Transport,250 - 500 million,,,,,,,2020-Q4,2031-Q3,,,,,
NZTA_145502013,25/03/2024,NZ Transport Agency Waka Kotahi,NZUP SH1-29 Intersection Improvements.,Improvements to the intersection of SH1 and SH29 (both national strategic high volume routes) in order to improve safety and reduce the number of deaths and serious injuries at that location.,,In procurement,Fully funded,Open,Construct only,Waikato,,,Transport,25 - 50 million,,,,,,,2019-Q3,2029-Q2,,,,,
NZTA_171352013,25/03/2024,NZ Transport Agency Waka Kotahi,NZUP SH2 Melling Efficiency & Safety Imp.,The Melling transport improvements provide a new safer grade separated interchange road and pedestrian bridges over Te Awa Kairangi Hutt River relocation of the Melling train station to a new integrated public transport hub plus additional shared pathways.,,In Planning,Fully funded,Open,Alliance,Wellington,,,Transport,250 - 500 million,,,,,,,2016-Q1,2028-Q4,,,,,
NZTA_143802020,25/03/2024,NZ Transport Agency Waka Kotahi,NZUP SH58 Safety Improvements - Stage 2.,State Highway 58 runs between SH2 in the Hutt Valley and the Transmission Gully Interchange in Pauatahanui. This project being delivered in 2 stages aims to improve the safety and access of this road.,,Under Construction,Fully funded,Open,Construct only,Wellington,,,Transport,100 - 250 million,,,,,,,2019-Q3,2027-Q2,,,,,
NZTA_105412014,25/03/2024,NZ Transport Agency Waka Kotahi,NZUP SH73 Weedons-Ross Road Intersection.,SH73 Weedons-Ross Road Intersection From SH73 Corridor Strategy.,,Post implementation ,Fully funded,Open,Construct only,Canterbury,,,Transport,5 - 25 million,,,,,,,2019-Q3,2026-Q3,,,,,
NZTA_104972014,25/03/2024,NZ Transport Agency Waka Kotahi,NZUP SH75 Halswell Rd Imps.,NZUP project looking at providing bus lanes to encourage greater use of public transport into the central city. Project scope includes bus lanes and cycleway facilities along SH75 Halswell Rd safety intersection improvements and solid central median through the corridor.,,In procurement,Fully funded,To be determined,To be determined,Canterbury,,,Transport,25 - 50 million,,,,,,,2020-Q3,2027-Q4,,,,,
NZTA_0009037,25/03/2024,NZ Transport Agency Waka Kotahi,NZUP South Auckland Package.,A few improvement projects in South Auckland including Waihoehoe Road.,,In planning,Fully funded,Open,To be determined,Auckland,,,Transport,500 million - 1 billion,,,,,,,2019-Q4,2031-Q1,,,,,
NZTA_100362012,25/03/2024,NZ Transport Agency Waka Kotahi,NZUP Takitimu North Link Stage 1.,Takitimu North Link Stage One will connect Tauranga and Te Puna with a new four-lane expressway and shared path. It will improve safety ease congestion and provide greater travel choice. Construction is underway.,,Under Construction,Fully funded,Open,Design and construct,Bay of Plenty,,,Transport,500 million - 1 billion,,,,,,,2015-Q4,2030-Q4,,,,,
NZTA_120532016,25/03/2024,NZ Transport Agency Waka Kotahi,NZUP Takitimu North Link Stage 2.,A proposed new 7km long four-lane state highway between Te Puna (near Loop Road) and Ōmokoroa tying into the existing State Highway 2 (SH2) south of the Waipapa Stream bridge. Current scope covers route protection activities only.,,In Planning,Fully funded,To be determined,To be determined,Bay of Plenty,,,Transport,50 - 100 million,,,,,,,2016-Q4,2028-Q2,,,,,
NZTA_140652013,25/03/2024,NZ Transport Agency Waka Kotahi,NZUP Walnut Avenue Intersection Imps.,Installation of traffic signals at the intersections of Walnut Avenue with SH1 and East Street. (to replace roundabout). From Ashburton Transport Study.,,Post implementation ,Fully funded,Open,Construct only,Canterbury,,,Transport,5 - 25 million,,,,,,,2012-Q4,2024-Q1,,,,,
NZTA_166902013,25/03/2024,NZ Transport Agency Waka Kotahi,Pakowhai and Links Rd Intersection Imp.,To combine the two adjacent (traffic signal and priority controlled) intersections with a single 60 metres diameter at grade roundabout which in the longer term can incorporate an overpass for the expressway.,,Post implementation,Fully funded,Open,Construct only,Hawke's Bay,,,Transport,< 1 million,,,,,,,2017-Q4,2024-Q2,,,,,
NZTA_133502018,25/03/2024,NZ Transport Agency Waka Kotahi,Palmerston North Integrated Transport Im.,A suite of optimised strategic network improvements that will improve accessibility in and around Palmerston North.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Transport,< 1 million,,,,,,,2018-Q3,2024-Q2,,,,,
NZTA_132702018,25/03/2024,NZ Transport Agency Waka Kotahi,Peka Peka to Otaki Revocation.,Revocation of the Old SH1 from Peka Peka to Otaki.,,Under Construction,Fully funded,To be determined,To be determined,Wellington,,,Transport,5 - 25 million,,,,,,,2021-Q4,2027-Q2,,,,,
NZTA_126502017,25/03/2024,NZ Transport Agency Waka Kotahi,Petone to Melling Walking Cycling Link.,This is section 3 of the Wellington to Hutt Valley (W2HV) Cycleway/Walkway/Resilience Project. The Project seeks to provide transport infrastructure that will improve safety and connectivity for walking and cycling between Wellington and Hutt Valley. It aims to provide dedicated walking and cycling facilities between the Petone and Melling.,,Post implementation,Fully funded,Open,Design and construct,Wellington,,,Transport,50 - 100 million,,,,,,,2017-Q3,2025-Q2,,,,,
NZTA_152462013,25/03/2024,NZ Transport Agency Waka Kotahi,Prebensen Hyderabad Intersection upgrade.,This project has two high level objectives these are:1. Reduce delays around the Hyderabad Roundabouts as traffic modelling has demonstrated improvements can be achieved without major civil works and2. The Regional Council in 2015 identified the Hyderabad Road as the missing link in the City's cycle plan.In order to satisfy the above objectives the project consists of the following two items of scope:1.Reconfiguration of Hyderabad roundabout approach lanes to improve efficiencies and2.Build a shared pedestrian and cyclist footpath along Hyderabad Road.,,Under Construction,Fully funded,Open,Construct only,Hawke's Bay,,,Transport,1 - 5 million,,,,,,,2021-Q1,2027-Q4,,,,,
NZTA_139912019,25/03/2024,NZ Transport Agency Waka Kotahi,PT Futures MRT.,Mass Rapid Transit for Greater Christchurch - Indicative Business Case. This Business case is part of the package of PT Future Project which includes a total of three business case. Two of the three business cases (Foundations (SSBC) and Rest of Network (IBC) have Environment Canterbury as the problem owner.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,,,,,,2019-Q3,2024-Q4,,,,,
NZTA_164242013,25/03/2024,NZ Transport Agency Waka Kotahi,Puhoi to Wellsford RoNS Development.,Puhoi to Wellsford RoNS Development.,,In Planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Transport,50 - 100 million,,,,,,,2016-Q1,2035-Q2,,,,,
NZTA_142852020,25/03/2024,NZ Transport Agency Waka Kotahi,RIO SH01S Kakanui Rvr Flood Mitigation.,Raising a 200metre section of State Highway 1 within the Kakanui river flood plain.,,Under Construction,Fully funded,To be determined,To be determined,Otago,,,Transport,1 - 5 million,,,,,,,2020-Q3,2025-Q4,,,,,
NZTA_123452013,25/03/2024,NZ Transport Agency Waka Kotahi,RIO SH02 College Rd-Silverstream IMPR.,Within Central Hawkes Bay the existing SH2 section of road between College Road and Silverstream features both horizontal and vertical curves with a record of incidents where vehicles left the road.The economic evaluation report also identified the limited availability of passing lanes on SH2 contributes to an inefficient section state highway network in Central Hawkes Bay.The project will seek to realignment the section of road Between College Rad to Silverstream scope includes: - Realignment of 1.7km of the SH2 within green field site; - Connecting into the existing SH in the North and South locations; - A new South bound passing lane; - Upgrading culverts under the road and downstream KiwiRail tracks - New centre wire rope barrier and - Catering for access for local property owners.,,Post implementation,Fully funded,Open,Construct only,Hawke's Bay,,,Transport,5 - 25 million,,,,,,,2013-Q3,2024-Q4,,,,,
NZTA_142672020,25/03/2024,NZ Transport Agency Waka Kotahi,RIO SH02 Tahaenui Bridge Widening.,Widening of Tahaenui River Bridge to reinstate two-lane travel and maximise the life of the bridge. This will improve the operation and resilience of the Napier to Gisborne transport network particularly for full HPMV. This will also contribute to local / regional growth and development in Hawke's Bay and Gisborne.,,Post implementation,Fully funded,Direct,To be determined,Hawke's Bay,,,Transport,1 - 5 million,,,,,,,2020-Q3,2024-Q1,,,,,
NZTA_142662020,25/03/2024,NZ Transport Agency Waka Kotahi,RIO SH05 and SH36 Ngongotaha IS IMPR.,The Ngongotaha roundabout (SH36/SH5 intersection) frequently experiences congestion and long tailbacks in the morning peak along State Highway 36 through the Ngongotaha township. This reduces the desirability of living and working along this corridor because of the unreliable connection to Rotorua. Improving the existing roundabout will encourage growth in Ngongotaha Tarukenga and surrounding townships by increasing the accessibility of employment opportunities in Rotorua. Productivity gains are expected to be realised through the mitigation of current congestion accessibility and safety issues experienced at the intersection.,,Under Construction,Fully funded,Open,construct only,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2020-Q1,2025-Q1,,,,,
NZTA_142842020,25/03/2024,NZ Transport Agency Waka Kotahi,RIO SH06 and SH08B Cromwell IS SFT IMPR.,This intersection has medium to high safety issues. There has been serious injury crashes and the safety record over the last 2 years has worsened. Added to this the growth of Cromwell increased visitors travelling through to Queenstown and the increased events at the nearby Highland Park international car race track are all putting pressure on this state highway intersection. This project will improve safety and congestion through the construction of a roundabout at this busy state highway intersection.,,Post implementation,Fully funded,Open,Construct only,Otago,,,Transport,5 - 25 million,,,,,,,2020-Q3,2024-Q2,,,,,
NZTA_142822020,25/03/2024,NZ Transport Agency Waka Kotahi,RIO SH06 Tartare Bridge SFT IMPR.,The Tartare River bridge is a 130-metre-long single lane structure with timber handrails and no provision for pedestrian use separate from vehicles. Significant growth in housing and tourist accommodation has occurred north of Tartare resulting in increasing numbers of pedestrians and cyclists now crossing the bridge to reach the village of Franz Josef. The project will include the installation of a guardrail edge protection over the bridge and a “clip-on” pedestrian and cycle walkway. The clip-on will reuse an existing clip-on structure removed from the Taramakau combined bridge when the new separated road bridge was opened in 2018.,,Post implementation,Fully funded,To be determined,To be determined,West Coast,,,Transport,1 - 5 million,,,,,,,2020-Q1,2022-Q2,,,,,
NZTA_142832020,25/03/2024,NZ Transport Agency Waka Kotahi,RIO SH08-SH79-SH80 MacKenzie Basin IMPR.,This project will provide a number of safety and access improvements including providing safe stopping areas increased capacity at existing rest areas and the provision of new rest areas at scenic locations better signage directional arrows edge protection tourist information intersection improvements road widening and passing opportunities. With an increasing number of self-drive tourists there are higher expectations to provide safe places to pull over safe access points and a forgiving road environment to allow these tourists to share the road with local drivers freight and cyclists. International tourists generally also have less knowledge of the road conditions particularly in an alpine environment journey times road rules and the general driving culture.,,Post implementation,Fully funded,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,,,,,,2020-Q1,2024-Q2,,,,,
NZTA_142922020,25/03/2024,NZ Transport Agency Waka Kotahi,RIO SH43 Kahouri Stream Bridge Replaceme.,The objective of this project is to improve route safety and increase resilience. The existing 18m single lane bridge (Section 1 SH43) is sandwiched between 2 x 45km/h Curves including the intersection with Beaconsfield Road. This is the only single lane bridge at the Stratford end of SH43 and was identified as a route constraint especially with forecast logging activity. It is proposed to construct a new 65m bridge constructed off line (east of the existing bridge). This will improve travel efficiency and safety.,,In Planning,Fully funded,Open,Construct only,Taranaki,,,Transport,5 - 25 million,,,,,,,2020-Q3,2024-Q2,,,,,
NZTA_142902020,25/03/2024,NZ Transport Agency Waka Kotahi,RIO SH43 SFT IMPR.,The objective of this project is to improve safety and route resiliance along SH43. Safety Improvements through upgraded road marking edge marker posts and signs smart signage 7.4km of guardrail and associated terminals are proposed. The aim of this project is to implement as many safety benefits up to the project budget.,,Under Construction,Fully funded,To be determined,To be determined,Taranaki,,,Transport,1 - 5 million,,,,,,,2020-Q3,2025-Q2,,,,,
NZTA_126702017,25/03/2024,NZ Transport Agency Waka Kotahi,RIO SH67 Granity Seawall Protection.,The preferred option is to construct a fully lined rock embankment.,,Post implementation,Fully funded,To be determined,To be determined,West Coast,,,Transport,1 - 5 million,,,,,,,2020-Q1,2025-Q4,,,,,
NZTA_142682020,25/03/2024,NZ Transport Agency Waka Kotahi,RIO West Coast SL Bridge SFT IMPR.,The West Coast has the greatest number of single lane bridges in New Zealand on the state highway network with some 50 single lane bridge of which 29 of these have timber rail pipe rail or concrete edge protection often with no approach guardrail. There is significant risk of run off road crashes leading to fatalities at these locations. This project will see compliant guardrail installed on up to 5 (five) single lane bridges (subject to final cost estimates) including installation or upgrade of approach guardrail throughout the West Coast network. The proposed bridges are SH73 Taipo River (timber railing) SH6 Mikonui River (timber railing) SH6 Wanganui River (timber rail only approach guardrail only fatality) SH6 Moeraki River (pipe rail fatality 2018) and SH6 Whakapohai (pipe rail).,,Under Construction,Fully funded,Open,construct only,West Coast,,,Transport,5 - 25 million,,,,,,,2020-Q1,2024-Q4,,,,,
NZTA_129252013,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Additional Waitemata Harbour Connect.,Waka Kotahi Mana Whenua Auckland Transport (AT) and Auckland Council are working in partnership to investigate more resilient reliable and efficient transport options to connect the growing number of people goods and services moving across the Waitemata Harbour between the North Shore Auckland City and beyond.The Additional Waitemata Harbour Connections (AWHC) Programme Business Case (PBC) has been completed and approved by Waka Kotahi Board. Auckland Transport endorsed PBC in late October 2020. This business case is at a programme level.The Project name has been changed from 'SH1 Waitemata Harbour Crossing' to align with the NLTP/RLTP and better reflect the wider outcomes and network wide approach.The Indicative Business Case (IBC) is well underway with option D as the emerging way forward. Work is now progressing to finalising the IBC The final IBC is ontrack to go to tthe Waka Kotahi Board in Feburary/March 2024.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Transport,100 - 250 million,,,,,,,2022-Q1,2027-Q4,,,,,
NZTA_110302013,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Akerama Curves Realign and PL.,Post Imp Covid n/a Improvements Project covers a section of State Highway 1 near Hukerenui 35km north of Whangarei from Barnes Road to Rusk Road.Additional passing lanes are included and tight corners are being removed as part of the safety improvement work.,,Post implementation,Fully funded,Open,Construct only,Northland,,,Transport,< 1 million,,,,,,,2015-Q1,2030-Q3,,,,,
NZTA_148792021,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 and Grey St IS.,Safety project to reduce the crashes at this intersection on SH1 Cobham Drive and Grey street in Hamilton City.,,On hold,Funding source to be confirmed,To be determined,To be determined,Waikato,,,Transport,1 - 5 million,,,,,,,2021-Q3,2024-Q2,,,,,
NZTA_140302019,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Ashley to Belfast Saltwater-William.,Safe Network Program to install Median Barriers to reduce deaths and serious injuries.,,In Planning,Fully funded,To be determined,To be determined,Canterbury,,,Transport,25 - 50 million,,,,,,,2019-Q4,2025-Q2,,,,,
NZTA_139002019,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Ashley to Belfast SSI (William St to.,Safe Network Program to install Median Barriers to reduce deaths and serious injuries.,,Post implementation,Fully funded,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,,,,,,2019-Q4,2024-Q2,,,,,
NZTA_144152020,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Bulls to Sanson CI - Pukenui Rd IS.,The site of the proposed rural roundabout is at the intersection of State Highway 1 and Pukenui Road approximately midway between Bulls and Sanson on a sweeping bend. Pukenui Road is the main road servicing the Royal NZ Air Force’s Ohakea air base resulting in the intersection being used by air force personnel on their commute to and from Bulls Sanson and Palmerston North..,,Under construction,Fully funded,Open,Construct only,Manawatū - Whanganui,,,Transport,5 - 25 million,,,,,,,2020-Q3,2025-Q3,,,,,
NZTA_125902017,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Cambridge to Piarere Long Term.,This project is for long term improvements to address safety & future capacity issues on the stretch of SH1 between the Cambridge Section of the Waikato Expressway & Piarere including the long-term form of the future SH1/29 intersection. .,,In Planning,Part funded,To be determined,To be determined,Waikato,,,Transport,100 - 250 million,,,,,,,2017-Q2,2036-Q2,,,,,
NZTA_140352019,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Cambridge to Piarere safety imp.,The stretch of SH1 between Cambridge and Piarere will be made safer as part of the Road to Zero speed and infrastructure programme.SH1 between Cambridge and Piarere is part of one of the country’s most important transport corridors. The Auckland-Hamilton-Tauranga corridor accounts for a significant proportion of all road freight in New Zealand. A programme of safety improvements is underway to reduce the number of serious crashes along this section of state highway including flexible median barriers six turnaround bays and a new roundabout. The project is being delivered in three stages:• Stage 1: Completed in December 2020 with 2.5km of flexible median safety barrier installed from south of Fergusson Gully Road• Stage 2: Includes the installation of 5.2km of flexible median barrier most of which has been completed with the remaining 2.5km from Keely’s Reserve through to just past Kentucky Road to be installed in 2023/2024• Stage 3: Includes 7.9km of flexible median barrier from the end of the Waikato Expressway through to Fergusson Gully Road. Also includes construction of a number of turnaround bays at intersecting roads and a roundabout at the intersection of SH1 and Karāpiro Road.,,Under Construction,Fully funded,Direct,To be determined,Waikato,,,Transport,25 - 50 million,,,,,,,2020-Q1,2026-Q4,,,,,
NZTA_123442016,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Clarence and Oaro Improvement (NLTF).,"Increasing level of service of desired ""National SH""standard. SH1 between Clarence and Oaro.This section of highway is not meeting the desired standards for ONRC classification for safety resilience reliability access and amenity. This section of the wider Picton to Christchurch programme can now be advanced following the Kaikoura Earthquake (Nov 16) and in parallel with urgent reinstatement work.",,Under Construction,Fully funded,To be determined,To be determined,Canterbury,,,Transport,100 - 250 million,,,,,,,2018-Q3,2024-Q4,,,,,
NZTA_107062014,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Dome Valley Safety Improvements.,The project extent route is a 15.2km length of State Highway corridor between SH1 Wellsford and Warkworth (from RP 346/1.1 to RP 346/16.27) and is identified as a contributor project for safety investment in the NRRS programme business case as the route presents an unacceptable actual and predicted DSI profile.Over the last 10 years there have been 39 fatal and serious crashes which resulted in 17 deaths and 42 serious injuries. Over the last 5 years (data to June 2015) there has been 11 FSI crashes which resulted in 3 deaths and 17 serious injuries. These crashes were primarily due to loss of control and head on type crashes. The 10km of section known as the Dome Valley has been one of the high risk corridors due to out of context curves and challenging topography.The safety risk is:-Personal risk – Medium to Medium/High-Collective Risk – HighThe star rating ranges from 2 to 3 along the length of the route.,,Under Construction,Fully funded,Open,Early contractor involvement,Auckland,,,Transport,25 - 50 million,,,,,,,2016-Q2,2024-Q2,,,,,
NZTA_112802015,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 ETA Corridor Improvements.,Safety improvements to respond to the National Safety Roads and Roadsides Programme (NSRRP) Business Case which has identified the need for short-term (0-3 years) intervention to reduce the high crash rate. The type of intervention is wire rope barrier down the central median.,,Post implementation,Fully funded,Open,Construct only,Waikato,,,Transport,5 - 25 million,,,,,,,2017-Q1,2027-Q3,,,,,
NZTA_143102020,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Levin to Foxton SIP.,The project is to deliver Standard Safety Interventions to the SH1 corridor North of Levin between Roslyn Rd and the Foxton threshold.The project is expected to deliver a DSI reduction of 1.76 DSI per annum through a combination of safety interventions including WCL RAB at Waitarere Beach Road intersection and Median Barrier.,,Under construction,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Transport,5 - 25 million,,,,,,,2020-Q2,2028-Q2,,,,,
NZTA_155722022,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 NB Silverdale Bus Priority.,This project will provide a new northbound bus shoulder lane on SH1 from Wilks Road overbridge to Silverdale off-ramp. The primary objective is to improve reliability and throughput for northbound buses on SH1 catering for Rapid Transit Network services to Silverdale by bypassing PM peak queues generated from the Silverdale northbound off-ramp.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Transport,5 - 25 million,,,,,,,2022-Q3,2026-Q2,,,,,
NZTA_144162020,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Oamaru-Dunedin (Hampden-Palmerston).,The SH1 Oamaru to Dunedin corridor project has been identified as a high-risk corridor with an indicative treatment philosophy of Safer Corridors. Through the investigation and using the SSI toolkit guidance it is considered that wide centreline and roadside barrier at high risk locations safety interventions are the most cost effective and necessary safe system interventions.,,On hold,Funding source to be confirmed,To be determined,To be determined,Otago,,,Transport,1 - 5 million,,,,,,,2020-Q4,2025-Q2,,,,,
NZTA_140362019,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Oamaru-Dunedin (Herbert to Hampden).,The SH1 Oamaru to Dunedin corridor project has been identified as a high-risk corridor with an indicative treatment philosophy of Safer Corridors. Through the investigation and using the SSI toolkit guidance it is considered that wide centreline and roadside barrier at high risk locations safety interventions are the most cost effective and necessary safe system interventions.,,On hold,Funding source to be confirmed,To be determined,To be determined,Otago,,,Transport,< 1 million,,,,,,,2019-Q4,2025-Q2,,,,,
NZTA_124902017,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Papakura to Bombay.,The project is part of a multimodal approach to the longer-term transport network being investigated and delivered to support growth in south Auckland to enable more travel choices such as future bus services improved rail access as well as greater safety resilience and capacity of the highway network.,,Under Construction,Fully funded,Open,Construct only,Auckland,,,Transport,500 million - 1 billion,,,,,,,2017-Q4,2030-Q4,,,,,
NZTA_155732022,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Papakura to Manukau Managed Lane.,Project to re-purpose one existing lane per direction for specific use by higher efficiency transport options* to improve system accessibility travel choice reliability and productivity. The use of SVLs offer an opportunity to optimise existing network infrastructure. The investigation of SVLs is therefore strategically relevant to the Auckland Network Optimisation Programme specifically Investment Objectives 1 and 4: The objective is to increase effectiveness of the current Strategic Networks to improve safe access for people goods and services and improve management capability to improve journey reliability on the Strategic Networks.The focus on design for the section between Papakura and Manukau (Orams Road) tying into the P2B project the scheme would re-purpose existing assets with a relatively light touch. This study will also look at longer term planning with a view to continuing managed lanes through to Mt Wellington and also identifying opportunities for other parts of the Auckland motorway network.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Transport,1 - 5 million,,,,,,,2022-Q3,2024-Q2,,,,,
NZTA_169192013,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Piarere to Tokoroa Corridor Safety.,The SH1 Piarere to Tokoroa corridor project has been identified as a high-risk corridor. The rural SH1 Piarere to Tokoroa corridor extends for approximately 37 km linking Piarere with Tokoroa. This application excludes the urban sections of Tirau and Putaruru which extend for a total of 5km.,,In Planning,Fully funded,To be determined,To be determined,Waikato,,,Transport,5 - 25 million,,,,,,,2020-Q3,2033-Q2,,,,,
NZTA_143702020,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Picton Port Access Improvements.,Undertake transport system improvements to accommodate vehicle growth and longer trains being proposed by KiwiRail as part of the InterIslander Ferry replacements due in 2024.,,Under review,Fully funded,To be determined,To be determined,Marlborough,,,Transport,5 - 25 million,,,,,,,2020-Q1,2024-Q2,,,,,
NZTA_164252013,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Puhoi to Warkworth RoNS.,Provision of a high quality 4 lane motorway from Puhoi to Warkworth. This is the first leg of the Puhoi to Wellsford RoNS programme.,,Post implementation,Fully funded,Open,Public private partnership,Auckland,,,Transport,1 billion +,,,,,,,2014-Q3,2024-Q2,,,,,
NZTA_162242023,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Schiska Rd Underslip.,Underslip - Stabilise ongoing subsidence. Continued maintenance of the bored drains is crucial totheir adequate functioning. As such the following is recommended:• Maintenance of the Bored Drains• Installation of a deep counterfort drain along thenorthbound lane shoulder• Installation of an MSE wall along the southboundlane• Pavement reconstruction.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Northland,,,Transport,1 - 5 million,,,,,,,2023-Q4,2025-Q4,,,,,
NZTA_144082020,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Selwyn River to Ashburton Safety Imp.,This project will make State Highway 1 between Selwyn River and Ashburton safer. Improvements could include widening the centreline or putting in a median barrier to keep traffic apart and prevent head-on crashes. These changes will prevent people from being killed or seriously injured on this road.,,In Planning,Fully funded,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,,,,,,2020-Q3,2030-Q4,,,,,
NZTA_167482013,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 SH62 Spring Creek Intersection RAB.,Improving the safety of SH1/SH62 intersection through installation of a single lane circulating roundabout.,,Post implementation,Fully funded,Open,Construct only,Marlborough,,,Transport,< 1 million,,,,,,,2016-Q2,2023-Q3,,,,,
NZTA_102202014,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Southern Corridor Improvements.,The Southern Corridor Improvements Project covers the stretch of Southern Motorway (SH1) from the SH20/SH1 connection at Manukau to Papakura Interchange. The Project includes additional lanes in both directions over a 9km length upgraded Takanini Interchange and a new 4.5km shared use pedestrian / cycle path along with noise walls and stormwater treatment..,,Post implementation,Fully funded,Open,Design and construct,Auckland,,,Transport,250 - 500 million,,,,,,,2014-Q3,2026-Q2,,,,,
NZTA_144012020,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Taupo Airport to Hatepe.,"The corridor extends from the existing roundabout at intersection of SH1 and Lake Terrace/Anzac Memorial Drive (Taupo Airport) southwards to the southern end of Hatepe Hill before the Hinemaiaia River bridge (from 01N-0713-B/0.000 to 01N-0713-B/16.328) The corridor has the following characteristics: * is an undivided 2-lane level road * has an ONRC classification of National * a 2018 AADT of approx. 6 800 vehicles per day (vpd) (14.7% heavy vehicles) * a posted at 100 km/h An IBC (""SH1 TAUP TO WAIOURU INDICATIVE BUSINESS CASE"") has been drafted by the Inter-Regional Journeys portfolio (see
https://infohub.nzta.govt.nz/otcs/cs.dll/link/45627041). The outcomes of the IBC has been discussed between the Inter Regional Journeys Portfolio and the SNP with agreement to advance the above SSI treatments. The findings and recommendations of the IBC have informed this funding application. The IBC makes a recommendation of a wide centreline treatment for these sections of state highway (Taupo Airport to Waitahanui). These draft findings are under review by the IRJ portfolio in the context of the Safe System Approach. The Safe System Approach suggests that corridors with traffic volumes >6 000 vehicles per day (AADT) and a speed limit > 80 km/hr should be addressed with a median barrier to reduce head on risk. A median barrier treatment is supported by the traffic volumes on the corridor and the speed limits subsequent to the speed review noted above. This application seeks funding to design a median barrier treatment for this section whilst further review of the findings of the draft IBC and any ongoing consultation is undertaken during the design process. A design approach is proposed that makes provision for a final decision on whether to proceed with a median barrier or wide centreline treatment (using the same cross section as for median barrier) to be made prior to an application for implementation funding. The design phase will start with elements that are consistent with both treatments (median barrier or wide centreline).",,In Planning,Fully funded,To be determined,To be determined,Waikato,,,Transport,50 - 100 million,,,,,,,2021-Q2,2028-Q2,,,,,
NZTA_162312023,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Tawa to Johnsonville Surface Floodin.,Flooding and overslips.Along the years a few problems along this corridor had been treated a number of times separately i.e. Pavement repair and rehab slips hydroseeding slip remediation through LCLR subsoil along the surface water channel etc. It seems that problems repeated after treatments and extended to other adjacent locations i.e. more recent slips along Johnsonville area.Due to the combination of issues identified along this corridor there is a need to investigate the root causes of the problems and identify treatment solutions in a systematic and strategic approach.Possible treatments would be preliminarily drainage improvement slope protection/stabilisation and pavement rehab etc. depends on the outcome findings from the investigation/study.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Transport,< 1 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_148742021,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Templeton to Selwyn River.,Canterbury Packaged Projects Delivering safety related improvements.,,In Planning,Fully funded,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,,,,,,2021-Q3,2028-Q2,,,,,
NZTA_148802021,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Timaru to St Andrews.,Canterbury Safety related Intervention.,,In Planning,Fully funded,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,,,,,,2021-Q3,2026-Q2,,,,,
NZTA_144042020,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Tokoroa to Taupo - CI Stage 2.,TBD.,,In Planning,Fully funded,To be determined,To be determined,Waikato,,,Transport,100 - 250 million,,,,,,,2020-Q3,2030-Q4,,,,,
NZTA_138812019,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Tokoroa to Taupo Safer Corridor.,Part of Safe Network Programme. This project seeks to deliver Safer Corridor treatments such as median and side barrier roundabouts or grade separation or speed managed to within Safe System (Harm minimisation) limits. This project is within the 20 Year View Programme which aims to bring corridors up to a standard which is in line with its function and heirarchical (One Network Road) Classification.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Transport,25 - 50 million,,,,,,,2021-Q1,2026-Q2,,,,,
NZTA_162282023,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Tuamarina to Picton Flooding.,Flooding - Surface flooding risk from adjacent catchment runoff.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Marlborough,,,Transport,< 1 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_162712023,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Utiku Landslide.,This project is a regional priority as it involves State Highway 1 near Utiku. There is potential for significant impacts and/or closures of this part of SH1 which will lead to major detour lengths and delays to the traffic network.The Utiku portion of SH1 has an AADT of approximately 6000 vehicles with 18% being heavy vehicles. SH1 provides key connection between the lower North Island and the central/upper North Island for all users and is therefore a critical national freight and tourist route.Closure of SH1 would result in detours being required using SH4 through Whanganui or SH 2 and SH5 through Hastings/Napier.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Transport,< 1 million,,,,,,,2023-Q3,2024-Q2,,,,,
NZTA_162302023,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Weld Pass long term detour route.,Improvements for detour routeStudy to determine if either or both local roads could be used as a detour route for all vehicle types.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Marlborough,,,Transport,< 1 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_113082013,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 WEX Cambridge Section.,The Cambridge section of the Waikato Expressway starts south of the existing Tamahere interchange and runs for 16km ending around 2.5km south of Cambridge where it connects with the existing State Highway 1. It was completed in December 2015.,,Post implementation,Fully funded,Open,Design and construct,Waikato,,,Transport,100 - 250 million,,,,,,,2014-Q2,2026-Q1,,,,,
NZTA_112912013,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 WEx Hamilton Section.,21.8km of four lane expressway with 17 bridge sites on a new alignment to the east of Hamilton. Connects Ngaruawahia Section with the Tamahere Section. Five interchanges. .,,Post implementation,Fully funded,Open,Alliance,Waikato,,,Transport,500 million - 1 billion,,,,,,,2014-Q3,2028-Q1,,,,,
NZTA_112892013,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 WEx Huntly Section.,Part of the Waikato Expressway (Road of National Significance) which includes four laning of existing highway which is currently 2+1 lane. Will result in improved travel times between Auckland & Hamilton and safety improvements on a critical journey. This section is an eastern bypass of Huntly to link the Expressway at Ohinewai to the Proposed Ngaruawahia Bypass section of Expressway.,,Post implementation,Fully funded,Open,Design and construct,Waikato,,,Transport,250 - 500 million,,,,,,,2015-Q1,2025-Q4,,,,,
NZTA_104372013,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 WEx Longswamp Section.,This project is to upgrade the 5.9km section of SH1 between the Rangiriri Section of the Waikato Expressway and Hampton Downs to Expressway standards. This involves widening the existing alignment to two lanes in each direction and inserting a continuous median barrier. The project includes one bridge over the Expressway linking Paddy Road and Summertime Lane and 2.5km of new local road connections.\nThe project involves 940 000m3 of earthworks 350 000m3 of which will be imported fill. The majority of this will occur on the eastern side of the existing alignment.,,Post implementation,Fully funded,Open,Construct only,Waikato,,,Transport,100 - 250 million,,,,,,,2014-Q4,2025-Q2,,,,,
NZTA_109552013,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 WEx Ngaruawahia Section.,The project was to construct a four lane expressway between Gordonton Rd where it will connect to the future Huntly section & the completed Te Rapa section at Horotiu - a distance of 10.5km.\nA key feature is the 140m long Waikato River bridge with a clear span of 70m. During evaluation of tender the pavement design was considered inadequate & a variation was agreed to thicken the subgrade at a cost of $1M. During construction further enhancements were needed in parts to improve the subgrade strength & another variation was agreed to modify the clay subgrade at a cost of $0.4M.\nThe road was opened in Dec 2013 & during the defects liability period signs of pavement distress became apparent. Fletcher were put on notice that the NZTA had concerns & would continue monitoring of the pavement. Fletcher have cooperated fully participated in the discussions with the NZTA. An agreement is to be negotiated with Fletcher to maintain commitment to collaborate with NZTA to resolve pavement issues.\nA further issue became apparent when a vehicle hit the median wire rope barrier causing bases to pull out of the ground. Subsequent testing showed that a significant length of barrier has been installed in ground that does not meet specification. Fletcher are collaborating fully with the NZTA to identify the extent of the problem & are committed to repair. Both issues are ongoing and monitoring will continue.,,Post implementation,Fully funded,Open,Design and construct,Waikato,,,Transport,100 - 250 million,,,,,,,2013-Q4,2028-Q2,,,,,
NZTA_144212013,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 WEx Rangiriri Section.,The 4.8km Rangiriri Section is a key component of the SH1 Waikato Expressway which is a strategic transport corridor recognised by the government as a Road of National Significance.The project starts between Wayside Road and Te Kauwhata Road to the north and ends south of Rangiriri township at the northern end of the completed Rangiriri to South of Ohinewai four-lane expressway.The project is divided 4 lanes designed and constructed to expressway standard and generally in accordance with the RoNs guidelines.The existing SH1 alignment at Rangiriri cuts through the Rangiriri Paa an historic New Zealand land war battle site which is of high cultural and historic significance to Maori and the Crown.The new expressway is being re-aligned to the west of the main paa to allow a symbolic reinterpretation of the Paa in place of the existing highway.The Rangiriri Section will support economic growth and improve safety for all road users including those using the Glen Murray and Te Kauwhata intersections.There is a full diamond interchange at the Te Kauwhata connection and a ¾ diamond interchange at the Rangiriri/Glen Murray connection.,,Post implementation,Fully funded,Open,Early contractor involvement,Waikato,,,Transport,100 - 250 million,,,,,,,2014-Q3,2029-Q3,,,,,
NZTA_128812013,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 WEx Te Rapa Section.,The Te Rapa Bypass will be a 7.6km long 2 lane grade-separated...access-controlled highway beginning at Horotui to the north andfinishing at Avalon Drive at the north west of Hamilton. This projectforms part of the Waikato Expressway package as described in theWaikato Expressway Strategic Evaluation...,,Post implementation,Fully funded,Open,Alliance,Waikato,,,Transport,50 - 100 million,,,,,,,2019-Q1,2026-Q3,,,,,
NZTA_138902019,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Whangarei to Wellsford SSI (Central.,The SH1 Whangarei to Wellsford corridor is part of the strategic state highway corridor connecting Auckland and Northland regions. An average of up to 12 000 vehicles per day use the road which includes 13% heavy vehicles. Currently Northland is the fastest growing region in NZ. With this growth there is increased pressure in terms of safety capacity and maintenance along the state highway network in Northland The Whangarei to Wellsford project has been split into three geographical sections and will focus on short/medium-term interim safety improvements ahead of longer-term solutions which focus on safety access and resilience. The central section is located between SH1/SH15 Port Marsden Highway to the northern base of the Brynderwyn Hills and is approximately 17.5km in lengthSafety improvements for the main W2PM Safety Improvement project will include:•Median Wire Barriers•Wide centreline•Roadside barrier at High Risk locations•Shoulder widening.,,Under Construction,Fully funded,Open,Construct only,Northland,,,Transport,50 - 100 million,,,,,,,2019-Q4,2029-Q2,,,,,
NZTA_138102019,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Whangarei to Wellsford SSI (Northern.,The SH1 Whangarei to Wellsford corridor is part of the strategic state highway corridor connecting Auckland and Northland regions. An average of up to 20 000 vehicles per day use the road which includes 15% heavy vehicles. Currently Northland is the fastest growing region in NZ. With this growth there is increased pressure in terms of safety capacity and maintenance along the state highway network in Northland The Whangarei to Wellsford project will focus on short/medium-term interim safety improvements ahead of longer-term solutions which focus on safety access and resilience. Due to the length of the corridor the project has been split into three geographical sections. This report covers the northern section of the project. The northern section is located between Toetoe Road SH1 Whangarei and SH1/SH15 Port Marsden Highway and is approximately 22.5km in lengthSafety improvements for the main W2PM Safety Improvement project will include:•Median Wire Barriers•Wide centreline•Roadside barrier at High Risk locations•Shoulder wideningSafety improvements for this interim W2PM Safety Improvement project will include:•Flexible Safety Posts•Roadmarking•Safety signs•Isolated vegetation clearance.,,Under construction,Fully funded,To be determined,To be determined,Northland,,,Transport,1 - 5 million,,,,,,,2019-Q3,2026-Q2,,,,,
NZTA_140212019,25/03/2024,NZ Transport Agency Waka Kotahi,SH1 Whangarei to Wellsford SSI (Southern.,The SH1 Whangarei to Wellsford corridor is part of the strategic state highway corridor connecting Auckland and Northland regions. An average of up to 19 000 vehicles per day use the road which includes 15% heavy vehicles. Currently Northland is the fastest growing region in NZ. With this growth there is increased pressure in terms of safety capacity and maintenance along the state highway network in Northland The Whangarei to Wellsford project has been split into three geographical sections and will focus on short/medium-term interim safety improvements ahead of longer-term solutions which focus on safety access and resilience. This report covers the southern section of the project. The northern section is located between SH1/SH12 Brynderwyn Hills and SH1 Wellsford and is approximately 26.5km in lengthSafety improvements will include:•Median Wire Barriers•Wide centreline•Roadside barrier at High Risk locations.,,Under Construction,Fully funded,To be determined,To be determined,Northland,,,Transport,25 - 50 million,,,,,,,2019-Q3,2027-Q2,,,,,
NZTA_140322019,25/03/2024,NZ Transport Agency Waka Kotahi,SH1/SH57 - Otaki to Levin SIP.,The project is to deliver safety treatments to SH1 and SH57 in line with the SSI approval comprising; median barrier for SH1 plus a new roundabout at SH1/SH57 priority intersection. Wide centreline edge protection of significant hazards on SH57 plus a new roundabout at SH57/Queen St.Across the two components of this project it is expected to deliver 3.9 DSI per annum reduction until the opening of the O2NL expressway.,,Under Construction,Fully funded,Open,Construct only,Manawatū - Whanganui,,,Transport,25 - 50 million,,,,,,,2020-Q1,2025-Q3,,,,,
NZTA_118312016,25/03/2024,NZ Transport Agency Waka Kotahi,SH10 Kaeo Bridge Upgrade.,Kaeo Bridge is a 49 meter long one-lane bridge located on SH10 2km north of the Kaeo Township and 20km north of Kerikeri. It is located on a section of SH10 that is prone to flooding in extreme weather. The SH10 corridor is an important link in the regional state highway network and is part of the Twin Coast Discovery Route a key tourist route connecting the Bay of Islands with Doubtless Bay..,,Under Construction,Fully funded,Open,Early contractor involvement,Northland,,,Transport,25 - 50 million,,,,,,,2016-Q3,2026-Q4,,,,,
NZTA_148602021,25/03/2024,NZ Transport Agency Waka Kotahi,SH10 Kaeo to Pakaraka.,SH10 Kaeo to Pakaraka corridor is identified in the Road to Zero Speed and Infrastructure (SIP) programme business case 2021-24 Delivery Programme for safety improvements.The corridor (approximately 37.3 km) extends from Pakaraka through to Kaeo (excluding Waipapa township) in the Northland region. The corridor has had 35 DSI injuries in the 2015-2019 period. ADDT on this corridor is approximately 4 000 -10 000 with HCV approximately 7%.The following safety management interventions were identified along this corridor:• A Safe System Transformation intervention - 10.8km of Median Barrier between SH11 and Waipapa• A Safer Corridors intervention - 27.2km of Wide Centreline between Pakaraka and SH11 (7.3km) Waipapa and Kaeo (19.8km ).,,On hold,Funding source to be confirmed,To be determined,To be determined,Northland,,,Transport,50 - 100 million,,,,,,,2021-Q1,2029-Q1,,,,,
NZTA_118402016,25/03/2024,NZ Transport Agency Waka Kotahi,SH10 Taipa Bridge Upgrade.,Post Imp - Covid N/A Taipa Bridge is a 107m long one-lane bridge located on SH10 immediately east of the Taipa Township.The Taipa Bridge is located on the Twin Coast Discovery Route. It has limited provision for pedestrians and does not provide for cyclists both of which are important components of the tourist economy. During the peak visitor season traffic demand is significantly higher with delays a common occurrence.,,Post implementation,Fully funded,Open,Early contractor involvement,Northland,,,Transport,< 1 million,,,,,,,2016-Q3,2024-Q2,,,,,
NZTA_152292013,25/03/2024,NZ Transport Agency Waka Kotahi,SH10 Waipapa Corridor Improvements.,Intersection improvements to address delays on exit from Waipapa Road and access to Waipapa Commercial Centre.Project funding (PGF) was received in January 2019 for $9M.PLA has been approved bringing the total budget to $24.5M.Inline single-lane roundabout small rural/commercial township. Includes construction of a council link road and small bridge structure. Power to underground and relocation of telecom and water-main.,,Post implementation,Fully funded,Direct,To be determined,Northland,,,Transport,5 - 25 million,,,,,,,2016-Q3,2023-Q4,,,,,
NZTA_105672014,25/03/2024,NZ Transport Agency Waka Kotahi,SH12 Matakohe Bridges.,The Matakohe Bridges on SH12 are on the Twin Coast Discovery Route and near the Kauri Museum. It consists of two one-lane bridges in the vicinity of Matakohe and is positioned halfway between the townships of Ruawai and Maungaturoto approximately 25km west of the SH12 intersection with SH1 (Brynderwyn).,,Post implementation,Fully funded,Open,Early contractor involvement,Northland,,,Transport,1 - 5 million,,,,,,,2016-Q3,2024-Q1,,,,,
NZTA_165312023,25/03/2024,NZ Transport Agency Waka Kotahi,SH14 Whangarei to Maunu Corridor IBC.,To align NLTP investment with Te Whatu Ora investment in the Whangarei Hospital (the precinct is accessed exclusively from SH14). Consents for the stage 1 upgrade are to be lodged in June 2024. An understanding of the necessary staged transport interventions for the adjoining network and agreement of the agencies responsible for their delivery will be required for Waka Kotahi to support the hospital consent application.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Northland,,,Transport,< 1 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_120602016,25/03/2024,NZ Transport Agency Waka Kotahi,SH16 Brigham Creek to Waimauku.,The project route is along SH16 between Brigham Creek Road and Waimauku. It is a key corridor in the Auckland region with a poor safety record existing congestion and facing significant growth.,,Under Construction,Fully funded,Open,Construct only,Auckland,,,Transport,100 - 250 million,,,,,,,2019-Q3,2030-Q1,,,,,
NZTA_149382021,25/03/2024,NZ Transport Agency Waka Kotahi,SH16 Grafton Gully / Port Access Imps.,"This project is about “improved access to Port/Grafton Gully” could include upgrades like Grade separation at Beach Rd intersection etc. A programme business case is commencing for the City Centre to investigate the specific options and actions necessary to implement ""Access for Everyone (A4E)"". This is being led by Auckland Transport with support of Waka Kotahi and Auckland Council.The Auckland Transport Alignment Project (2018) had improvements to Grafton Gully identified as a second decade priority (starting from 2028 to 2038).",,On hold,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Transport,5 - 25 million,,,,,,,2021-Q3,2024-Q2,,,,,
NZTA_125002017,25/03/2024,NZ Transport Agency Waka Kotahi,SH16/18 Connections.,Problems identified by the Strategic Case were:- Inability to respond in a timely way to pace and scale of greenfielddevelopment will restrict access to jobs education and core services around and in growth areas- Inability of regional transport system to cope with growing demand of greenfield expansion will reduce travel choice and efficient movement of people and goodsProblems specific to this sub-programme include:- Lack of more direct connection between SH16 and SH18 is reducing efficient movement of people and goods and impacting on urban outcomes in Whenuapai- Lack of interchange access to Whenuapai/ Westgate/ Hobsonville will restrict access to jobs core services and impact on efficient movement.Activity to be undertaken as a DBC.,,On Hold,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Transport,5 - 25 million,,,,,,,2017-Q2,2021-Q4,,,,,
NZTA_103022014,25/03/2024,NZ Transport Agency Waka Kotahi,SH1B (Taupiri to Gordonton) NSRRP.,This section of SH1B functions as a Regional distributer route. The section is 13.8km in length and is a mix of urban and rural road providing a sub-regional link between Taupiri and Gordonton townships. SH1B will be revoked upon opening of the Hamilton Section of the Waikato Expressway in 2020 however safety improvements will be required to ensure the road is ‘fit for purpose’ at handover. This route also includes the 1.2km section of SH1 between Taupiri and the Ngaruawahia Section of the Waikato Expressway which opened in 2012.,,Post implementation,Fully funded,Open,Construct only,Waikato,,,Transport,< 1 million,,,,,,,2016-Q1,2024-Q2,,,,,
NZTA_105662014,25/03/2024,NZ Transport Agency Waka Kotahi,SH1S Bluff Highway/Elles Road I/S Imp.,Realign highway approaches to existing intersection. Replace priority control with roundabout. Extend Lake Street to become fourth leg of roundabout.,,Under Construction,Fully funded,Open,Construct only,Southland,,,Transport,5 - 25 million,,,,,,,2016-Q3,2024-Q3,,,,,
NZTA_148942021,25/03/2024,NZ Transport Agency Waka Kotahi,SH2 and SH27 IS.,SIP Rural Roundabout in Feasibility Stage.,,In Planning,Fully funded,To be determined,To be determined,Waikato,,,Transport,5 - 25 million,,,,,,,2021-Q3,2024-Q2,,,,,
NZTA_149142021,25/03/2024,NZ Transport Agency Waka Kotahi,SH2 Hewletts Road Sub area Access.,SH2/Hewletts Rd is a nationally strategic corridor and is one of three current journeys between the two sides of the Tauranga Harbour. The corridor has multiple and often competing functions including:1.Providing access to Mount Maunganui Pāpāmoa and eastern communities within Western Bay of Plenty (WBOP)2.Providing access to several community facilities such as sport and recreational facilities3.Providing freight access to the Mount Maunganui side of the Port of Tauranga and the Mount Maunganui industrial area which also includes the airport and other key commercial activities such as building supply sites.The purpose of this project is to deliver firstly an Indicative Business Case and secondly a Detailed Business Case which will outline a plan to deliver on the aspirations and outcomes for the SH2/Hewletts Rd corridor and sub area as set out by the Western Bay of Plenty Urban Form + Transport Initiative (UFTI). This project is a first priority project for the Western Bay or Plenty Transport System Plan Governance Group (TSP).With significant existing travel volumes in each direction using SH2/Hewletts Rd and further growth expected in the eastern corridor (the SmartGrowth endorsed UFTI Connected Centres programme estimates a further 40 000 plus dwellings) the project aims to identify and deliver interventions to support a reliable and multi-modal journey experience and to improve and maintain the effective operation of SH2/Hewletts Rd and the local transport system. The outcomes sought for SH2/Hewletts Rd and the transport system within the project scope are:1.Reduce road deaths and serious injuries for all users2.Increase PT and active travel mode shift for journeys between the two sides of the harbour3.Maintain freight and commercial vehicles accessibility during off-peak periods4.Provide accessibility between Mt Maunganui and the eastern side of the harbour and Te Papa peninsular5.Reduce the transport related environmental effects and emissionsThe partners of this project are:1.Ngāti Kuku and Ngāi Tukairangi 2.Bay of Plenty Regional Council 3.Tauranga City Council 4.Waka Kotahi It is noted that the consequence of not achieving the project outcomes is that additional demand will be applied to Turret Rd/15th Ave and SH29A (which also provide access between the two sides of the Tauranga Harbour).,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,,,,,,,2021-Q3,2024-Q2,,,,,
NZTA_148752021,25/03/2024,NZ Transport Agency Waka Kotahi,SH2 Hutt Valley.,Wellington Packaged Projects Delivering safety related improvements.,,Under construction,Fully funded,Open,Construct only,Wellington,,,Transport,5 - 25 million,,,,,,,2021-Q1,2027-Q4,,,,,
NZTA_136102018,25/03/2024,NZ Transport Agency Waka Kotahi,SH2 Inter-Reg connections: Passing Opps.,Passing Opportunities and mobile phone areas to improve regional access and journey reliability to realise community and economic opportunities on the following routes:- SH2 between Gisborne and Napier - SH2 between Gisborne and Ōpōtiki- SH35 between Gisborne and PotakaIncludes reporting for SH35 and connecting routes: Passing Opportunities (initiative 135442018).,,Under Construction,Fully funded,Direct,To be determined,Hawke's Bay,,,Transport,5 - 25 million,,,,,,,2018-Q3,2024-Q4,,,,,
NZTA_126742017,25/03/2024,NZ Transport Agency Waka Kotahi,SH2 Inter-Regional Connections - Waioeka.,This project was identified within the Connecting Tairawhiti Programme Business Case as a key contributing factor to the resilience problems on the journey between Gisborne and Optotiki.The project is considered critical to meeting the objectives of the Tairawhiti Provincial Growth package being the pinch point on the journey between Gisborne and the upper north island export markets. If addressed will contribute to the PBC investment objectives associated with resilience safety and access.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Gisborne,,,Transport,< 1 million,,,,,,,2019-Q2,2025-Q2,,,,,
NZTA_143502020,25/03/2024,NZ Transport Agency Waka Kotahi,SH2 Masterton to Carterton (CI).,23/11/22 - Masterton to Carterton Ngaumutawa and Norfolk Intersection SSI projects merged with this initiative Corridor overview The SH2 Masterton to Carterton corridor extends for approximately 9 km linking Masterton (just north of the Ngaumutawa Road intersection) with Clareville (just north of Carterton) This corridor is generally an undivided 2 lane state highway with an ONRC of Regional Strategic that carries an AADT ranging from 13 216 (at the Clareville end) to 16 095 (at the Masterton end) vehicles per day (Based on 2019 readings at TMS sites ID:00200886 and ID:00200895 respectively). Note traffic counts from a week in November 2017 showed volumes at over 20 000 a day across the Waingawa Bridge. The SH2 Masterton to Carterton corridor project has been identified as a high-risk corridor with an indicative treatment philosophy of Safer Corridors (medium-high collective risk low-medium to medium personal risk). Through investigation and using the SSI toolkit guidance it is considered that median protection and roadside hazard protection safety interventions are the most cost effective and necessary safe system interventions. Key corridor characteristics for the SH2 Masterton to Carterton:.,,Under Construction,Fully funded,Open,Construct only,Wellington,,,Transport,25 - 50 million,,,,,,,2020-Q3,2025-Q3,,,,,
NZTA_140512019,25/03/2024,NZ Transport Agency Waka Kotahi,SH2 Omokoroa to Te Puna safety imp.,Minor online safety works (widening barriers wide-cenre line ISZs).,,Under construction,Fully funded,To be determined,To be determined,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2022-Q3,2025-Q2,,,,,
NZTA_101212014,25/03/2024,NZ Transport Agency Waka Kotahi,SH2 Pakipaki to Waipukurau.,Stage 1: Pakipaki is situated 7km south of Hastings central. The route between Pakipaki and Waipukurau is approximately 42km in length with the average surfacing width of about 10m along the route. This corridor is a predominantly high speed rural road environment with the majority of the route as 100km speed area. This section had been identified within the NSRR PBC as a contributor project to the safer journeys strategy. (Work complete and now in defects period) Stage 2: Shared cycleway between Waipawa and Waipukurau. The objective of this path is to provide multimodal conductivity between the towns of Waipawa and Waipukurau in Central Hawkes Bay.,,Post implementation,Fully funded,Open,Construct only,Hawke's Bay,,,Transport,1 - 5 million,,,,,,,2014-Q2,2023-Q4,,,,,
NZTA_119502016,25/03/2024,NZ Transport Agency Waka Kotahi,SH2 Raupunga Bluff Enhanched Reslience.,Partial Retreat: Relocate the centre line to a maximum of 3.5m over a total length of 280m. Earthworks will affect some existing banks 2m-15m high and will encroach a further 7m into Kiwirail reserve. Extensive new subsoil drainage and special attention of intercepting the many very\nactive springs will be required plus re-establishment of lined surface water channels. In addition the existing guardrail will need to be dismantled and relocated alongside the new road alignment.,,Post implementation,Fully funded,To be determined,To be determined,Hawke's Bay,,,Transport,1 - 5 million,,,,,,,2016-Q3,2024-Q2,,,,,
NZTA_148672021,25/03/2024,NZ Transport Agency Waka Kotahi,SH2 Remutaka.,Wellington Packaged Projects Delivering safety related improvements.,,Under construction,Fully funded,To be determined,To be determined,Wellington,,,Transport,5 - 25 million,,,,,,,2021-Q1,2026-Q4,,,,,
NZTA_172802013,25/03/2024,NZ Transport Agency Waka Kotahi,SH2 Wairoa to Bay View.,The route is approximately 107km in length and is predominantly rural. The route has a relatively low annual average daily traffic (AADT) of between 1649 (18% heavy) to 7992 (16% heavy). At the Esk River Bridge there is a high proportion of heavy vehicles with AADT 4396 of which 22% is heavy vehicles. The route has the typical mixed use you would expect of the sole direct road link between Wairoa and Napier. While useage is expected to grow in line with regional growth there are no known initiative or extraordinary events likely to accelerate useage growth on the route.,,Post implementation,Fully funded,Open,Construct only,Hawke's Bay,,,Transport,< 1 million,,,,,,,2015-Q4,2023-Q2,,,,,
NZTA_133702013,25/03/2024,NZ Transport Agency Waka Kotahi,SH2: Baypark to Bayfair Link Upgrade.,The upgrade to the Baypark to Bayfair Link will provide improvements to the SH2/SH29A Te Maunga intersection and to the SH2 Maunganui Road/Girven Road intersection and complete the eastern corridor for the Bay of Plenty.CPB Contractors and Beca are working to deliver the Bay Link project which will reduce congestion improve safety support the Bay of Plenty’s economic growth and protect efficient freight access to the Port of Tauranga.Construction of two flyovers at MGI and TeMaunga intersections form the main elements. Enabling work saw relocation of railway. A signalised roundabout will be constructed Maunganui-Girven Roads intersection with a flyover above providing SH grade separation from local roads and a grade separated interchange at TeMaunga (next to Bayparkl) including grade separation of existing rail crossing. The main works are expected to take three years to complete with target opening date late 2023.,,Under Construction,Fully funded,Open,Design and construct,Bay of Plenty,,,Transport,250 - 500 million,,,,,,,2015-Q1,2026-Q2,,,,,
NZTA_103662014,25/03/2024,NZ Transport Agency Waka Kotahi,SH2: Wainui Rd to Opotiki NSRRP.,The route is a 36km length of local road (Wainui Rd) and State Highway 2 between Ohope and Opotiki in the Bay of Plenty region and is identified as a contributor project for safety investment in the NSRR programme business case as the route presents an unacceptable actual and predicted DSI profile. Over the last 10 years (to 2015) there have been 7 deaths and 31 serious injury crashes along the SH2 section and 1 death and 7 serious injury crashes along Wainui Road. These crashes were predominately due to loss of control.,,Under Construction,Fully funded,Open,Construct only,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2016-Q1,2027-Q2,,,,,
NZTA_164502013,25/03/2024,NZ Transport Agency Waka Kotahi,SH20A to Airport.,The specific scope of the SH20A to Auckland Airport Project includes:• The grade separation of the SH20A/Kirkbride Road intersection (motorway trenched under Kirkrbride Road);• The upgrading of SH20A to motorway standards (SH20A is currently expressway standard) providing two lanes of traffic in each direction and dedicated bus priority lanes (3.5m shoulders);• Closure of the Bader Drive off-ramp and Montgomerie Road intersection as a result of short weave distances between on and off-ramps causing serious safety concerns;• Reprioritisation of Ascot Road/Kirkbride Road intersection to improve the flows of traffic into the Ascot Industrial Estate;• Installation of truck priority lanes and ramp signalling to on-ramps to help and control traffic flows onto the Auckland State Highway Network• Relocation of cycle lanes to the local road network; and• The non-preclusion of a future Rapid Transport Network(RTN) in the region.Initial Project Go Live Date: 29/08/2017.,,Post implementation,Fully funded,To be determined,To be determined,Auckland,,,Transport,100 - 250 million,,,,,,,2017-Q1,2024-Q2,,,,,
NZTA_140392019,25/03/2024,NZ Transport Agency Waka Kotahi,SH22: SH1 Drury to Paerata (corridor).,The SH22 corridor has significant safety issues with 22 deaths and serious injuries (DSIs) recorded over the 5-year period between 2014-18. 59% of these are head-on type DSI which reflects the high traffic volumes and the existing form of the corridor. Due to the high risk high severity outcomes of head-on type crashes a combination of median and side barrier roundabouts and turn around bays are considered the most effective treatment option. The previous design stage has struggled to define scope that meets the SSI requirements and budget expectations. Confidence in the accuracy of the current preliminary design estimate is low. The project scope is being adjusted to make best use of the available funds to improve safety while making progress.,,In Planning,Part funded,To be determined,To be determined,Auckland,,,Transport,1 - 5 million,,,,,,,2019-Q4,2025-Q2,,,,,
NZTA_140382019,25/03/2024,NZ Transport Agency Waka Kotahi,SH22: SH1 Drury to Paerata (Glenbrook).,Glenbrook Road and the intersection with SH22 is a give-way controlled intersection with left turn slip lanes both in and out of Glenbrook Road. A right turn bay is provided on SH22 to turn into Glenbrook Road. The intersection has recorded 9 fatal and 39 serious injuries over 10 years from 2007 to 2016 (inclusive). Public consultation to upgrade the intersection to a rural roundabout was identified in the Drury to Paerata Business Case undertaken by Waka Kotahi in 2018. Current scope is a smaller subset of what was consulted on hence ongoing community disappointment. Project scope consists of the construction of a new rural roundabout at the intersection with Glenbrook Road. It will consist of a four leg roundabout and include vehicle access into the new property development Paerata Rise. Works include two stormwater ponds and pedestrian footpaths. Along with changes to road approaches and the removal of a passing bay. The works are complete and were delivered under the ASM Alliance Contract. Work were undertaken from February 2021 and practical completion being obtained in June 2022.,,Post implementation,Fully funded,To be determined,To be determined,Auckland,,,Transport,5 - 25 million,,,,,,,2019-Q3,2023-Q4,,,,,
NZTA_148932021,25/03/2024,NZ Transport Agency Waka Kotahi,SH23 and SH39 IS.,SIP Programme Rural Roundabout - Feasibility Design Phase.,,In Planning,Fully funded,To be determined,To be determined,Waikato,,,Transport,5 - 25 million,,,,,,,2021-Q3,2024-Q2,,,,,
NZTA_165812023,25/03/2024,NZ Transport Agency Waka Kotahi,SH25 Boundary Creek Bridge.,Maintenance of reliable access for freight and general traffic. End of life bridge replacement programme.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_145602020,25/03/2024,NZ Transport Agency Waka Kotahi,SH25 Pepe Stream Bridge replacement.,The Project is to develop the Single Stage Business Case (SSBC) for the replacement of the SH25 Pepe Stream Bridge. The SSBC is to be developed according to Waka Kotahi Investment Decision Making Framework. The SH25 Pepe Stream bridge is a 3.66m wide single lane bridge located in Tairua Coromandel and crosses a narrow tidal estuary. The bridge has reached the end of its life and needs replacement. Replacing the bridge on a safe alignment will improve the safety and resilience of SH25 as a regional route.,,In Planning,Part funded,To be determined,To be determined,Waikato,,,Transport,1 - 5 million,,,,,,,2020-Q4,2028-Q3,,,,,
NZTA_149742021,25/03/2024,NZ Transport Agency Waka Kotahi,SH25 RAMARAMA STREAM BRIDGE.,Bridge condition is worsening to the extent that it is more economic to replace than continue to repair it. If it is not replaced weight and speed limits may be applied.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_165622023,25/03/2024,NZ Transport Agency Waka Kotahi,SH25A rebuild improvements.,Programme of work to be completed along the section of SH25a currently closed between Kopu and Hikuai to take advantage of the closure of SH25A while the Taparahi Bridge is being constructed.,,Under construction,Fully funded,To be determined,To be determined,Waikato,,,Transport,25 - 50 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_107352014,25/03/2024,NZ Transport Agency Waka Kotahi,SH26 (Onetai Stream) Bridge Replacement.,The bridge needs to be replaced as it has been identified in the 2014/2015 Life Cycle Management Plan as a structure that requires intervention and has also been further investigated through a PVEOL report which has recommended a replacement bridge.,,Under construction,Fully funded,To be determined,To be determined,Waikato,,,Transport,1 - 5 million,,,,,,,2020-Q3,2025-Q1,,,,,
NZTA_162002013,25/03/2024,NZ Transport Agency Waka Kotahi,SH26 Kirikiri Stream Bridge Replacement.,Replacing bridge structure to reduce flooding issues associated with a central pier and inadequate waterway under the bridge.,,In Planning,Funding source to be confirmed,To be determined,To be determined,Waikato,,,Transport,25 - 50 million,,,,,,,2015-Q3,2031-Q3,,,,,
NZTA_114102013,25/03/2024,NZ Transport Agency Waka Kotahi,SH27 Mangawhero Bridge NSRRP.,Bridge over Mangawhero Stream south of Matamata on SH27.,,Post implementation,Fully funded,Open,Construct only,Waikato,,,Transport,5 - 25 million,,,,,,,2015-Q3,2027-Q4,,,,,
NZTA_149692021,25/03/2024,NZ Transport Agency Waka Kotahi,SH27 Ohinekaua Stream Bridge.,To replace a bridge which can no longer economically and safely fulfil its multi modal access role.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_149302021,25/03/2024,NZ Transport Agency Waka Kotahi,SH29 Omanawa River Bridge.,End of life bridge replacement programme Bridge condition is worsening to the extent that it is more economic to replace than continue to repair it. If it is not replaced weight and speed limits may be applied.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,< 1 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_148622021,25/03/2024,NZ Transport Agency Waka Kotahi,SH29 Piarere to SH28.,Standard safety interventions including continuous median barrier (20.4km) and five roundabouts along SH29 between Piarere and SH28 (total corridor length 24.4km).,,In Planning,Fully funded,To be determined,To be determined,Waikato,,,Transport,50 - 100 million,,,,,,,2021-Q3,2027-Q2,,,,,
NZTA_149392021,25/03/2024,NZ Transport Agency Waka Kotahi,SH29 Tauriko Cambridge Early works.,Implementing mode shift and enabling regional growth. Deliver enabling works that have been identified with a high level of confidence as required prior to completion of the DBC.This will be achieved through: 1. A roundabout installed at Redwood Lane which links into Tauranga Business Estate 2. A new intersection at Link road into the Urban Growth Area (2000housing units) 3. Signalisation of Cambridge road / SH29 intersection and various bus priorities and shared paths. 4. PT and Other sharing the improvements will take place on the TCC network(Whiore Ave & Taurikura drive).,,In Planning,Fully funded,To be determined,To be determined,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2022-Q1,2027-Q3,,,,,
NZTA_149312021,25/03/2024,NZ Transport Agency Waka Kotahi,SH29A and optimisation package.,Route optimisation and mode shiftImplementing mode shift and enabling regional growth.,,On hold,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,,,,,,,2021-Q3,2024-Q2,,,,,
NZTA_143602020,25/03/2024,NZ Transport Agency Waka Kotahi,SH3 - New Plymouth to Egmont Village.,Safety Improvements - SH3 Hawera to New Plymouth (New Plymouth to Egmont Village) approximately 9.7 km length corridor linking New Plymouth with Egmont Village.• SSI 1 – Rural roundabout at Mangorei Intersection• SSI 2 – 8.35km of Median Barrier along the corridor• SSI 3 – Rural Intersection Activated Warning System (RIAWS) at Junction SProject Outcomes - Improved Safety via Target DSI reduction by 12 per annum.,,Under construction,Fully funded,To be determined,To be determined,Taranaki,,,Transport,5 - 25 million,,,,,,,2020-Q3,2027-Q4,,,,,
NZTA_148972021,25/03/2024,NZ Transport Agency Waka Kotahi,SH3 and Raynes Rd IS.,Waikato Safety related intervention.,,In Planning,Fully funded,To be determined,To be determined,Waikato,,,Transport,5 - 25 million,,,,,,,2021-Q1,2027-Q2,,,,,
NZTA_148952021,25/03/2024,NZ Transport Agency Waka Kotahi,SH3 and SH4 IS.,Waikato Safety related intervention.,,On Hold,Funding source to be confirmed,To be determined,To be determined,Waikato,,,Transport,5 - 25 million,,,,,,,2021-Q1,2026-Q4,,,,,
NZTA_121812016,25/03/2024,NZ Transport Agency Waka Kotahi,SH3 Awakino Gorge to Mt Messenger Corrid.,The route is approximately a 58.1km section of State Highway 3 from approximately 5km north of Awakino Tunnel to 5km south of Mt Messenger Tunnel.,,Post implementation,Fully funded,To be determined,To be determined,Waikato,,,Transport,5 - 25 million,,,,,,,2016-Q4,2025-Q3,,,,,
NZTA_118002016,25/03/2024,NZ Transport Agency Waka Kotahi,SH3 Awakino Tunnel Bypass.,Improvements at Awakino Gorge comprise a two-lane undivided 1.1km long realignment to the north of the existing SH3 and realignment of Hammonds Curve. The realignment includes two new bridge crossings over the Awakino River. It bypasses the existing single lane tunnel which will be closed.,,Under Construction,Fully funded,Open,Design and construct,Waikato,,,Transport,25 - 50 million,,,,,,,2017-Q2,2025-Q3,,,,,
NZTA_165822023,25/03/2024,NZ Transport Agency Waka Kotahi,SH3 Mangapepeki No. 2 Culvert.,Bridge condition is worsening to the extent that it is more economic to replace than continue to repair it.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Taranaki,,,Transport,< 1 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_118102016,25/03/2024,NZ Transport Agency Waka Kotahi,SH3 Mt Messenger Bypass.,"""The project objectives are to: •reduce the number of deaths and serious injuries from crashes •reduce the number and duration of road closures •improve journey time predictability •improve drivers’ experience along the corridor"".",,Under Construction,Fully funded,Open,Alliance,Taranaki,,,Transport,250 - 500 million,,,,,,,2016-Q1,2029-Q1,,,,,
NZTA_160252013,25/03/2024,NZ Transport Agency Waka Kotahi,SH3 Vickers Road to City Upgrade.,The corridor is already identified and mostly lies within an existing designation. The investigation needs to be completed to ascertain sufficient concept design detail to secure any remaining designation & associated property purchase - esp. near I/S's.,,Post implementation,Fully funded,To be determined,To be determined,Taranaki,,,Transport,25 - 50 million,,,,,,,2013-Q3,2023-Q2,,,,,
NZTA_148992021,25/03/2024,NZ Transport Agency Waka Kotahi,SH3 Whanganui to Bulls.,Manawatu-Whanganui Safety related intervention.,,In Planning,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Transport,5 - 25 million,,,,,,,2021-Q1,2030-Q3,,,,,
NZTA_159382013,25/03/2024,NZ Transport Agency Waka Kotahi,SH3/21 Intersection Improvement.,Safety improvements to respond to the National Safety Roads and Roadsides Programme (NSRRP) Business Case to reduce the high severity crashes along this corridor. Indicative intervention from the NSRRP PBC is a rural roundabout however details of the activity will need to be finalised through the business case development which will consider all problems along this stretch.,,Post implementation,Fully funded,Open,Construct only,Waikato,,,Transport,< 1 million,,,,,,,2016-Q2,2026-Q4,,,,,
NZTA_148732021,25/03/2024,NZ Transport Agency Waka Kotahi,SH3/3A New Plymouth to Hawera.,The entire New Plymouth to Hāwera project will improve safety over more than 65km of Taranaki highway through the installation of flexible median barriers and turnaround facilities on SH3 and widening of the centreline on SH3A.,,In Planning,Part funded,To be determined,To be determined,Taranaki,,,Transport,50 - 100 million,,,,,,,2021-Q3,2028-Q2,,,,,
NZTA_121212016,25/03/2024,NZ Transport Agency Waka Kotahi,SH3/3A Waitara to Bell Block.,High traffic volumes and a large number of intersections and accesses are increasing conflicting demands to State Highway 3 between Waitara and Bell Block causing fatal and serious crashes.,,Under Construction,Fully funded,Open,Construct only,Taranaki,,,Transport,50 - 100 million,,,,,,,2019-Q2,2027-Q4,,,,,
NZTA_148632021,25/03/2024,NZ Transport Agency Waka Kotahi,SH30 Awakeri to Whakatane.,Bay of Plenty Packaged Projects Delivering safety related improvements.,,In Planning,Fully funded,To be determined,To be determined,Bay of Plenty,,,Transport,50 - 100 million,,,,,,,2021-Q1,2030-Q3,,,,,
NZTA_120552016,25/03/2024,NZ Transport Agency Waka Kotahi,SH30 Eastern Corridor Connect Rotorua.,SH30 Te Ngae Rd between Sala St and the Airport. Enhancements to road corridor to support local growth function and connectivity in conjunction with Rotorua Council strategic land use planning. The project will also deliver pedestrian cycle and public transport connectivity use and sustainability.1. Stage 1 currently in construction; this project will deliver a 4 lane median divided corridor between Sala St and Ilse Rd as well as intersection improvements at the Sala Street and Tarawera Road interfaces with Te Ngae Road.2. Stage 2 section 1 (Ilse Rd to Basley Rd) has been funded for construction (CIP) & is in the pre-implementation design phase. The remaining sections are still in the DBC phase (Basley Rd to Rotorua Airport).,,In Planning,Fully funded,Open,Construct only,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2016-Q4,2025-Q2,,,,,
NZTA_132102018,25/03/2024,NZ Transport Agency Waka Kotahi,SH30 Kopaki Bridge Replacement.,Kopaki bridge is at the end of its life. Replacement now Urgent.Bridge replacement will also enable HPMV movements.,,Under Construction,Fully funded,Open,Construct only,Waikato,,,Transport,5 - 25 million,,,,,,,2018-Q3,2028-Q2,,,,,
NZTA_144902020,25/03/2024,NZ Transport Agency Waka Kotahi,SH33 (Te Ngae Junction-Paengaroa) TNJ IS.,The SH30/SH33 intersection is located to the north of Rotorua at the turn off to Whakatane. The primary safety problem being addressed is deficient sight distances for right turning vehicles in a high-speed environment and geometric deficiencies which are contributing to a high number of DSI crashes.,,Under Construction,Fully funded,Open,Construct only,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2020-Q4,2024-Q4,,,,,
NZTA_103722014,25/03/2024,NZ Transport Agency Waka Kotahi,SH33 Te Ngae Junction to Paengaroa NSRRP.,Road and roadside safety improvements are proposed from the outskirts of Rotorua near SH30 Te Ngae Junction along SH33 to Paengaroa. This road has been identified as a high-risk rural road and these safety improvements are part of the Safe Network Programme.,,Under Construction,Fully funded,Open,Construct only,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2016-Q2,2025-Q3,,,,,
NZTA_135442018,25/03/2024,NZ Transport Agency Waka Kotahi,SH35 and connecting routes: Passing Oppo.,Passing Opportunities and mobile phone areas to improve regional access and journey reliability to realise community and economic opportunities on the following routes:- SH2 between Gisborne and Napier - SH2 between Gisborne and Ōpōtiki- SH35 between Gisborne and PotakaIncludes reporting for SH35 and connecting routes: Passing Opportunities (initiative 135442018).,,Under Construction,Fully funded,To be determined,To be determined,Gisborne,,,Transport,5 - 25 million,,,,,,,2018-Q3,2024-Q4,,,,,
NZTA_135412018,25/03/2024,NZ Transport Agency Waka Kotahi,SH35 and connecting routes: Resilience.,Resilience improvements targeted at route security and network availability issues on SH35.,,Under Construction,Fully funded,To be determined,To be determined,Gisborne,,,Transport,5 - 25 million,,,,,,,2018-Q3,2024-Q4,,,,,
NZTA_135422018,25/03/2024,NZ Transport Agency Waka Kotahi,SH35 Makokomuka Realignment.,Responding to the ongoing maintenance resilience and inefficiencies associated with two single lane bridges and one dual lane bridge.,,On Hold,Funding source to be confirmed,To be determined,To be determined,Gisborne,,,Transport,< 1 million,,,,,,,2018-Q4,2023-Q3,,,,,
NZTA_165832023,25/03/2024,NZ Transport Agency Waka Kotahi,SH35 Mangahauini No. 1 Bridge.,Bridge condition is worsening to the extent that it is more economic to replace than continue to repair it.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Gisborne,,,Transport,< 1 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_158202022,25/03/2024,NZ Transport Agency Waka Kotahi,SH35 Resilience Improvements.,Resilience was identified as one of the key challenges on SH35 impacting both the communities and freight movements to and from the Tair whiti region. The recommended programme included resilience improvements targeted at route security and network availability issues on SH35.,,On Hold,Funding source to be confirmed,To be determined,To be determined,Gisborne,,,Transport,< 1 million,,,,,,,2022-Q3,2024-Q2,,,,,
NZTA_149132021,25/03/2024,NZ Transport Agency Waka Kotahi,SH36 Hauraki Stream Culvert.,Bridge condition is worsening to the extent that it is more economic to replace than continue to repair it. If it is not replaced weight and speed limits may be applied.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,< 1 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_165842023,25/03/2024,NZ Transport Agency Waka Kotahi,SH38 Frasertown Bridge.,Bridge condition is worsening to the extent that it is more economic to replace than continue to repair it.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Hawke's Bay,,,Transport,< 1 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_141102019,25/03/2024,NZ Transport Agency Waka Kotahi,SH38 Wairoa to Murupara Business Case.,This project as outlined in the April 2022 SH38 Project Initiation Document has two seperate workstreams:1. An extended trial of tall oil pitch on the Waka Kotahi managed section of between Frasertown and Aniwaniwa.2: Define the sustainable long-term approach to the road.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Hawke's Bay,,,Transport,5 - 25 million,,,,,,,2019-Q4,2029-Q4,,,,,
NZTA_135342018,25/03/2024,NZ Transport Agency Waka Kotahi,SH43 Forgotten World Highway-Tangarakau.,The objective of this project is to seal the remaining gravel section of the Tangarakau Gorge. Seal Extension of works include 12km of unsealed road and other minor safety improvements along SH43.,,Under Construction,Fully funded,Open,Construct only,Taranaki,,,Transport,5 - 25 million,,,,,,,2018-Q4,2026-Q1,,,,,
NZTA_165802023,25/03/2024,NZ Transport Agency Waka Kotahi,SH43 Kururau Stream water Drive.,Bridge condition is worsening to the extent that it is more economic to replace than continue to repair it.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Manawatū - Whanganui,,,Transport,< 1 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_118802016,25/03/2024,NZ Transport Agency Waka Kotahi,SH5 Napier To Taupo.,Project to improve SH5 from Napier to Taupo.,,On hold,Funding source to be confirmed,To be determined,To be determined,Hawke's Bay,,,Transport,< 1 million,,,,,,,2022-Q4,2026-Q2,,,,,
NZTA_148962021,25/03/2024,NZ Transport Agency Waka Kotahi,SH5 Taupo to Matea Road S IMPR.,The safety improvements identified for this section of state highway are Safety Management interventions for the length of this corridor with a primary (main) treatment of “Signs and marking delineation upgrades” and a secondary (supporting) treatment of “wide centreline”.Renamed from SH5 Taupo to Hawkes Bay RB 22-Mar-23 (PJ).,,On hold,Funding source to be confirmed,To be determined,To be determined,Waikato,,,Transport,1 - 5 million,,,,,,,2021-Q3,2024-Q2,,,,,
NZTA_148642021,25/03/2024,NZ Transport Agency Waka Kotahi,SH5 Tirau to Tarukenga Marae Rd.,Waikato Packaged Projects Delivering safety related improvements.,,In Planning,Fully funded,To be determined,To be determined,Waikato,,,Transport,25 - 50 million,,,,,,,2021-Q1,2029-Q4,,,,,
NZTA_124032016,25/03/2024,NZ Transport Agency Waka Kotahi,SH5: Tarukenga to Ngongotaha NSRRP.,The route is a 8km length of State Highway corridor between SH5 Tarukenga and Ngongotaha and is identified as a contributor project for safety investment in the NRRS programme business case as the route presents an unacceptable actual and predicted DSI profile.,,On hold,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,,,,,,,2016-Q4,2024-Q2,,,,,
NZTA_120812016,25/03/2024,NZ Transport Agency Waka Kotahi,SH50 HB Expressway Safety Treatments.,SH2B SH50 & SH50A – Starting at the Watchman Road intersection (RS 02B – 0000 – B/0.000) through to the Paki Paki roundabout (RS50A – 0000 – B/16.425) but excluding the Pakowhai/Links Road intersection as this is being progressed as part of a separate project. Being a total corridor length of 27 132 metres.The project consists of installing median and side barriers along with seal widening where appropriate. Median barriers are excluded on very narrow sections such as bridges.,,Post implementation,Fully funded,Open,Construct only,Hawke's Bay,,,Transport,< 1 million,,,,,,,2017-Q1,2024-Q2,,,,,
NZTA_148652021,25/03/2024,NZ Transport Agency Waka Kotahi,SH51 Napier to Hastings.,The SH51 Napier to Hastings project comprises a number of standard safety interventions at either intersections or mid-block between Napier (near Ellison Street) and Waipatu (Hastings).,,Under construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Transport,25 - 50 million,,,,,,,2021-Q3,2025-Q2,,,,,
NZTA_167052013,25/03/2024,NZ Transport Agency Waka Kotahi,SH58 Safe Systems.,Safety works to whole rural corridor 10km section to include improvements to three out of context curves on SH58 on the Haywards Hill with a corridor safety treatment including; roadside guardrails delineation improvements median wire rope barriers and seal widening.,,Post implementation,Fully funded,Open,Construct only,Wellington,,,Transport,5 - 25 million,,,,,,,2019-Q3,2024-Q4,,,,,
NZTA_140502019,25/03/2024,NZ Transport Agency Waka Kotahi,SH6 Blenheim to Nelson - SH6/SH62.,Design and implement a rural roundabout at the intersection of SH6 and SH62. This intersection is identified as a high risk intersection with an AADT on SH6 at this intersection of approximately 7 500 veh/day with the AADT on SH62 estimated at 3 700 veh/day.,,Post implementation,Fully funded,Open,Construct only,Marlborough,,,Transport,< 1 million,,,,,,,2019-Q4,2024-Q2,,,,,
NZTA_125802017,25/03/2024,NZ Transport Agency Waka Kotahi,SH6 Blenheim to Woodbourne Safety Improv.,This Project will consider resilience freight and safety issues between Blenheim and Nelson. This deviation route for this section of State Highway is via St Arnaud adding significant travel time to vehicles travelling between Blenheim and Nelson.,,Under construction,Fully funded,To be determined,To be determined,Marlborough,,,Transport,5 - 25 million,,,,,,,2020-Q2,2027-Q2,,,,,
NZTA_149162021,25/03/2024,NZ Transport Agency Waka Kotahi,SH6 Coal Creek Overbridge.,Bridge condition is worsening to the extent that it is more economic to replace than continue to repair it.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,West Coast,,,Transport,< 1 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_149202021,25/03/2024,NZ Transport Agency Waka Kotahi,SH6 Cromwell to Frankton Resilience.,Opportunity to improve transport system resilience at this location. This project is an integral part of a package to resolve all extreme risk sites from a resilience perspective between Cromwell and Frankton.,,On hold,Funding source to be confirmed,To be determined,To be determined,Otago,,,Transport,1 - 5 million,,,,,,,2021-Q3,2024-Q2,,,,,
NZTA_158212022,25/03/2024,NZ Transport Agency Waka Kotahi,SH6 Dallows Bluff andothers rockfall prvnt.,This business case is derived from the National Resilience Programme Business Case.It is an opportunity to improve transport system resilience on SH6 at Dallows Bluff where there are rock fall and landslide risks along this section of corridor.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Tasman,,,Transport,< 1 million,,,,,,,2023-Q2,2026-Q3,,,,,
NZTA_149232021,25/03/2024,NZ Transport Agency Waka Kotahi,SH6 Frankton to Kingston Resilience.,Opportunity to improve transport system resilience at this location. This project is an integral part of a package to resolve all extreme risk sites from a resilience perspective between Frankton & Kingston.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Otago,,,Transport,< 1 million,,,,,,,2023-Q2,2027-Q3,,,,,
NZTA_162292023,25/03/2024,NZ Transport Agency Waka Kotahi,SH6 Gates of Haast River Erosion.,River Erosion - Erosion Protection.The Gates of Haast Pass refers to the bridge and surrounding area over the Haast River on SH6. SH6 was constructed through the area in about 1958. Damage has occurred to the riverbank and/or protection on average every 6 years over the last 65 years. In addition downcutting of the river channel appears to have occurred over this time (likely in response to large infrequent flood events)..,,In planning,Fully funded,To be determined,To be determined,West Coast,,,Transport,5 - 25 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_148782021,25/03/2024,NZ Transport Agency Waka Kotahi,SH6 Hardware Ln to McDowell Dr.,SH6 Hardware Ln to McDowell Dr.,,On hold,Funding source to be confirmed,To be determined,To be determined,Otago,,,Transport,5 - 25 million,,,,,,,2021-Q1,2025-Q4,,,,,
NZTA_149242021,25/03/2024,NZ Transport Agency Waka Kotahi,SH6 OTA Haast to Hawea RESIL IMPR.,SH6 OTA Haast to Hawea RESIL IMPR.,,On hold,Funding source to be confirmed,To be determined,To be determined,Otago,,,Transport,< 1 million,,,,,,,2023-Q2,2027-Q1,,,,,
NZTA_151872013,25/03/2024,NZ Transport Agency Waka Kotahi,SH6 Rai Saddle Second Curve Realignment.,SH6 1.5km realignment of five low speed curves on steep gradients with a high number of crashes between the end of the passing lane over the Rai Saddle summit (SH6) on down onto the Marlborough side of the hill.,,Post implementation,Fully funded,Open,Construct only,Nelson,,,Transport,< 1 million,,,,,,,2013-Q3,2024-Q2,,,,,
NZTA_149002021,25/03/2024,NZ Transport Agency Waka Kotahi,SH6 SH69 to Charleston.,Roadside barrier wide median signage ATP to improve safety and reduce DSIs.,,In Planning,Fully funded,To be determined,To be determined,West Coast,,,Transport,5 - 25 million,,,,,,,2021-Q3,2027-Q2,,,,,
NZTA_104342014,25/03/2024,NZ Transport Agency Waka Kotahi,SH6 SH8B SH8 Gibbston to Clyde.,This project is an amalgamation of both safety and resilience activities that have overlapping geographical locations along this corridor..,,In Planning,Fully funded,To be determined,To be determined,Otago,,,Transport,1 - 5 million,,,,,,,2014-Q3,2026-Q2,,,,,
NZTA_144112020,25/03/2024,NZ Transport Agency Waka Kotahi,SH6 Wanaka to Luggate SC - SH84 IS.,The Standard Safety Intervention Toolkit specifies that an urban roundabout is suitable in a speed environment of 60 km / hr or less. The existing speed environment at this intersection (and all four approaches) is 80 km / hr. The transition point from 50 km / hr to 80 km / hr is located approximately 1.5 km to the west of the intersection (towards Wanaka). The Safe and Appropriate Speed for the approaches (midblock) is assessed as 80 km / hr with a Mean Operating Speed of 70-74 km / hr. The existing 80 km / hr posted speed limit is within a rural environment A speed review for the main approaches to the intersection is not planned. Furthermore a rural roundabout structure (form size) supports heavy vehicle (freight) turning movements from Riverbank Road. As noted in the Wanaka Network Operating Framework (2018) Riverbank Road is identified as Primary Freight Route (refer Appendix C Figure 6 page 69 of the NOF report).,,Under Construction,Fully funded,Open,Construct only,Otago,,,Transport,5 - 25 million,,,,,,,2021-Q1,2025-Q4,,,,,
NZTA_149322021,25/03/2024,NZ Transport Agency Waka Kotahi,SH6 WTCT Haast to Hawea RESIL IMPR.,SH6 WTCT Haast to Hawea RESIL IMPR.,,On hold,Funding source to be confirmed,To be determined,To be determined,West Coast,,,Transport,< 1 million,,,,,,,2021-Q3,2024-Q2,,,,,
NZTA_162262023,25/03/2024,NZ Transport Agency Waka Kotahi,SH60 Birds Hill Overslip.,The overslip is understood to be a partial reactivation of an historical landslide feature. Localised slope failures happened at the site immediately after a major road realignment that took place in early 2014 that cut the toe of the slope of concern. The slope failure is resulting in road pavement deformation which started to be problematic in early 2017.Currently the carriageway has been realigned around the shove as the toe of the slip is acting as a buttress to the material above. The current realignment is temporary with poor geometry and speed restriction and not likely to be enduring.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Tasman,,,Transport,1 - 5 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_162112023,25/03/2024,NZ Transport Agency Waka Kotahi,SH60 Ruby Bay Bypass.,Median Barrier Acceleration.,,Under construction,Fully funded,To be determined,To be determined,Tasman,,,Transport,5 - 25 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_148832021,25/03/2024,NZ Transport Agency Waka Kotahi,SH60 Takaka Hill Resilience Improvements.,Business case derived from the National Resilience Programme Business Case focused on resilience improvements SH60 Takaka Hill.,,Post implementation,Fully funded,To be determined,To be determined,Tasman,,,Transport,< 1 million,,,,,,,2021-Q3,2029-Q2,,,,,
NZTA_107252014,25/03/2024,NZ Transport Agency Waka Kotahi,SH7 Ahaura River Bridge Replacement.,The purpose of this project is to replace the existing one lane bridge with a new 2 lane bridge and approaches.,,Post implementation,Fully funded,Open,Construct only,West Coast,,,Transport,25 - 50 million,,,,,,,2018-Q1,2024-Q2,,,,,
NZTA_107242014,25/03/2024,NZ Transport Agency Waka Kotahi,SH7 Stoney Creek Bridge.,This project is for the replacement of the Stoney Creek Bridge the remaining single lane Bridge on SH7 between Reefton and Greymouth.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,West Coast,,,Transport,< 1 million,,,,,,,2020-Q2,2026-Q1,,,,,
NZTA_148762021,25/03/2024,NZ Transport Agency Waka Kotahi,SH71 Rangiora to SH1.,SH71 Rangiora to SH1.,,On Hold,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Transport,1 - 5 million,,,,,,,2021-Q1,2027-Q2,,,,,
NZTA_149492021,25/03/2024,NZ Transport Agency Waka Kotahi,SH73 Paddys Bend (Pt 2).,Rockfall Protection on SH73. Due to previous budgetary constraints only the protection work at Waimakariri Bluffs was completed so this is to carry out the remaining Resilience works in this area with most of the outstanding work being at Paddy's Bend.,,On hold,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Transport,< 1 million,,,,,,,2021-Q3,2024-Q2,,,,,
NZTA_148902021,25/03/2024,NZ Transport Agency Waka Kotahi,SH73 West Melton to Yaldhurst.,Canterbury Safety related Intervention.,,In Planning,Fully funded,To be determined,To be determined,Canterbury,,,Transport,25 - 50 million,,,,,,,2021-Q1,2028-Q1,,,,,
NZTA_149582021,25/03/2024,NZ Transport Agency Waka Kotahi,SH82 Waihao North Bridge.,Bridge condition is worsening to the extent that it is more economic to replace than continue to repair it.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Transport,< 1 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_103972014,25/03/2024,NZ Transport Agency Waka Kotahi,SH88 Dunedin -Port Chalmers Safety Impt.,This project is to complete the final 5km section of the State Highway 88 shared walking and cycling path which will provide a safe direct walking and cycling route away from the busy highway between Port Chalmers and Dunedin. Safety upgrades on the existing highway are a critical part of this job. SH88 has been identified as a route where real safety gains can be made by installing roadside barriers carrying out intersection upgrades and using road markings that are easier to see at night and during wet weather.,,Under Construction,Fully funded,Open,Construct only,Otago,,,Transport,50 - 100 million,,,,,,,2019-Q3,2024-Q4,,,,,
NZTA_140702019,25/03/2024,NZ Transport Agency Waka Kotahi,SH94 Homer Tunnel Rockfall/Avalanche Pro.,Single stage business case to explore options for improved safety and resilience at SH94 Homer Tunnel and its approaches.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Southland,,,Transport,< 1 million,,,,,,,2022-Q4,2024-Q2,,,,,
NZTA_149262021,25/03/2024,NZ Transport Agency Waka Kotahi,SH94 Milford Road to Te Anau Downs RESIL.,This project is an integral part of a package to resolve all extreme risk sites from a resilience perspective between Te Anau and Te Anau Downs. It's an opportunity to improve transport system resilience at this location.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Southland,,,Transport,1 - 5 million,,,,,,,2023-Q2,2028-Q4,,,,,
NZTA_124922017,25/03/2024,NZ Transport Agency Waka Kotahi,Supporting Growth Alliance.,An AT/NZTA Alliance has been recently set up to look at route protection for the preferred network in the North west North and Southern growth areas of Supporting Growth Programme. This also includes looking specific NZTA activities like Alternative corridor to existing SH16 SH22 and capacity improvements North of Albany. These have been previously included as separate activities but now been combined as part of the Supporting Growth Alliance programme for the delivery of DBCs.,,In planning,Part funded,To be determined,To be determined,Auckland,,,Transport,50 - 100 million,,,,,,,2019-Q1,2030-Q2,,,,,
NZTA_159712023,25/03/2024,NZ Transport Agency Waka Kotahi,Tairawhiti and Wairoa Resiliance PBC.,There are significant resilience issues on SH2 (Wairoa to Opotiki section) SH35 SH38 and the wider local road network in the Tairāwhiti region and Wairoa district and Opotiki including storm damage following Ex Cyclones Gabrielle and Hale which have closed sections of road. There is an opportunity to build a more resilient transport network for customers while also addressing existing safety issues. Specific projects within this programme business case are now being progressed and more information will be included next quarter.,,Post implementation,Fully funded,To be determined,To be determined,Gisborne,,,Transport,< 1 million,,,,,,,2023-Q1,2023-Q3,,,,,
NZTA_135002018,25/03/2024,NZ Transport Agency Waka Kotahi,Te Ahu a Turanga Manawatu Tararua Highw.,Previous name: SH3 Manawatū Gorge alternative routeAt approximately 11.5km the project has an overall length similar to that of the existing (closed) Gorge route. From west to east the alignment commences at the eastern abutment of the existing SH3 bridge over the Manawatū River and heads east then north generally along the existing SH3 alignment to the mouth of the Manawatū Gorge. The highway crosses the Manawatū River via a long bridge to the east of the island which is located at the confluence of the Pohangina River and Manawatū River. The highway heads north then east to the plateau occupied by the southern extent of the Te Apiti Windfarm following an alignment generally parallel to the Gorge and largely minimising potential impacts on the windfarm. Once beyond the Te Apiti Windfarm the highway heads southeast on an alignment optimised to minimise earthworks before intersecting with the existing SH3 at its intersection with Woodlands Road in Woodville.,,Under Construction,Fully funded,Open,Alliance,Manawatū - Whanganui,,,Transport,500 million - 1 billion,,,,,,,2018-Q3,2025-Q2,,,,,
NZTA_121622016,25/03/2024,NZ Transport Agency Waka Kotahi,TNP SH29 Tauriko West Network Connection.,The aim is to provide a transport network (public transport walking cycling state highway and local road networks for local journeys) in the Tauriko area (including SH29 SH29A. SH36 ) which enables and facilitates local growth and liveability as part of a 30 year vision for the western Bay of Plenty; without compromising through-traffic particularly given SH29’s function as a national freight corridor servicing the Port of Tauranga.This is supported by an initial piece of work namely SH29 Tauriko Cambridge Early Works.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2016-Q3,2028-Q3,,,,,
NZTA_120412016,25/03/2024,NZ Transport Agency Waka Kotahi,W2T Waihi to Omokoroa.,40km Safety Project to reduce DSIs on SH2. The provision of a 1.5m wide centreline 3.5m lanes and 2.0m shoulder with side barrier where required and the provision of right turn lanes as a minimum treatment at all intersections for the full corridor.The corridor has been split into 11 sections for delivery.Median Barrier (additional scope Dec21)6x roundabouts to facilitate 17km of median barrier between Katikati and Omokoroa. Works are amalgamated into existing contract. Adds 1yr to total corridor delivery (complete 2025).Programme is to construct 2x roundabouts per year alongside current widening work.NOTE: Median barrier cannot be installed until consecutive roundabouts are constructed to facilitate right turns however consenting property purchase and construction is not a N to S sequence.,,Under Construction,Fully funded,Open,Construct only,Bay of Plenty,,,Transport,100 - 250 million,,,,,,,2016-Q1,2025-Q4,,,,,
NZTA_135912018,25/03/2024,NZ Transport Agency Waka Kotahi,Waikare Gorge.,The Waikare Gorge realignment project is part of Tairawhiti Roading Package programme managed byWaka Kotahi under the Provincial Growth Fund to address existing resilience access and safety issuesassociated with the Waikare Gorge section of State Highway 2 (SH2).Project has funding for Pre-Imp no fiundning has been allocated for Imp.,,Under construction,Fully funded,To be determined,To be determined,Hawke's Bay,,,Transport,5 - 25 million,,,,,,,2018-Q3,2024-Q3,,,,,
NZTA_166012013,25/03/2024,NZ Transport Agency Waka Kotahi,Waikato SEDF.,"Provision of ""in-transit"" stock effluent dump sites at strategic locations throughout the region.The Waikato Regional Stock effluent Strategy and North island Stock Truck Strategy have identified that safety and environmental protection are the overriding objectives.",,On Hold,Funding source to be confirmed,Open,Construct only,Waikato,,,Transport,1 - 5 million,,,,,,,2016-Q4,2025-Q2,,,,,
NZTA_138402019,25/03/2024,NZ Transport Agency Waka Kotahi,Waikato SH Speed Management Guide Implem.,The project seeks to deliver safety treatments such as speed management delineation improvements and threshold/channelisation treatments to reinforce the safe and appropriate speed of the state highway.,,Under Construction,Fully funded,To be determined,To be determined,Waikato,,,Transport,25 - 50 million,,,,,,,2019-Q3,2025-Q2,,,,,
NZTA_128302017,25/03/2024,NZ Transport Agency Waka Kotahi,Waimakariri Bridge safety and reliabilit.,Proposed reliability and safety improvements on Waimakariri Bridge including construction of a 3rd southbound motorway lane a cycleway on the eastern side of the bridge connecting to the Northern Arterial cycleway and a High Occupancy Vehicle (HOV) Lane facility. Construction of the HOV lane has now been completed.However the behaviour change activity have been carried through to this Post-Implementation phase. This include:* SVL Enforcement* Supporting TDM Programme* PT Support Services and Facilities* SVL Operational Monitoring.,,Post implementation,Fully funded,Open,Alliance,Canterbury,,,Transport,25 - 50 million,,,,,,,2016-Q1,2024-Q3,,,,,
NZTA_137792019,25/03/2024,NZ Transport Agency Waka Kotahi,Wakatipu Walking/Cycling Network Improve.,Walking and cycling facilities adjacent to SH6 including improvements to connections for residental areas of Shotover country/Lake Hayes estate Jacks Point/Henley Downs and the Wakatipu trails. Upgrading of the existing Frankton track connecting Frankton to Queenstown as a safe alternative to SH6A on road cycling.,,Under Construction,Fully funded,Direct,To be determined,Otago,,,Transport,5 - 25 million,,,,,,,2019-Q3,2026-Q2,,,,,
NZTA_164262013,25/03/2024,NZ Transport Agency Waka Kotahi,Warkworth to Wellsford RoNS.,"Warkworth to Wellsford RoNS - Route Protection. See ""Puhoi to Wellsford RoNS Development"" for all reporting on this.",,Early Planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Transport,25 - 50 million,,,,,,,2016-Q4,2036-Q2,,,,,
NZTA_161312023,25/03/2024,NZ Transport Agency Waka Kotahi,Weigh Right Albany.,Weight Right Facilities Northshore.,,Early Planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Transport,1 - 5 million,,,,,,,2023-Q4,2024-Q4,,,,,
NZTA_128712017,25/03/2024,NZ Transport Agency Waka Kotahi,Weigh Right Bombay.,Weight Right Facilities - Auckland Bombay.,,In Planning,Fully funded,To be determined,To be determined,Auckland,,,Transport,5 - 25 million,,,,,,,2017-Q3,2026-Q2,,,,,
NZTA_107392014,25/03/2024,NZ Transport Agency Waka Kotahi,Weigh Right Glasnevin.,Delivery of the Glasnevin Commercial Vehicle Safety Centre.,,Under Construction,Fully funded,Open,Construct only,Canterbury,,,Transport,25 - 50 million,,,,,,,2018-Q2,2024-Q2,,,,,
NZTA_129512017,25/03/2024,NZ Transport Agency Waka Kotahi,Weigh Right MacKays.,Weight Right Facilities - Wellington.,,In Planning,Fully funded,To be determined,To be determined,Wellington,,,Transport,5 - 25 million,,,,,,,2017-Q3,2026-Q2,,,,,
NZTA_108902014,25/03/2024,NZ Transport Agency Waka Kotahi,Weigh Right Napier Port.,Weight Right Facilities Napier Port.,,In Planning,Fully funded,To be determined,To be determined,Hawke's Bay,,,Transport,< 1 million,,,,,,,2019-Q4,2024-Q4,,,,,
NZTA_108622014,25/03/2024,NZ Transport Agency Waka Kotahi,Weigh Right Ohakea.,Weight Right Facilities - Manawatu/ Whanganui.,,In Planning,Fully funded,Open,Construct only,Manawatū - Whanganui,,,Transport,5 - 25 million,,,,,,,2019-Q1,2025-Q1,,,,,
NZTA_129502017,25/03/2024,NZ Transport Agency Waka Kotahi,Weigh Right Paengaroa.,Delivery of the Paengaroa weight enforcement site.,,In Planning,Fully funded,Open,construct only,Bay of Plenty,,,Transport,5 - 25 million,,,,,,,2017-Q3,2024-Q2,,,,,
NZTA_125202017,25/03/2024,NZ Transport Agency Waka Kotahi,Weigh Right Rakaia.,Illegal overloading creates both a safety risk and disproportionally higher wear and tear on the road network. Our drive for increased value for money from our road maintenance investment means we have less\ntolerance for illegally overloaded vehicles. Additionally crash assessors point to overloading being a major factor in truck rollovers which account for one-third of all truck crashes.\nImproved RUC recovery reduction in rollover and other crashes reduced road wear and reduction in freight supply chain disruption are all benefits to be gained from more effective detection and enforcement.,,In Planning,Fully funded,Open,Construct only,Canterbury,,,Transport,5 - 25 million,,,,,,,2019-Q1,2025-Q1,,,,,
NZTA_128702017,25/03/2024,NZ Transport Agency Waka Kotahi,Weigh Right Stanley Street.,Delivery of the Stanley St (Auckland) Commercial Vehicle Safety Centre.,,Under Construction,Fully funded,To be determined,To be determined,Auckland,,,Transport,5 - 25 million,,,,,,,2017-Q3,2025-Q2,,,,,
NZTA_125522017,25/03/2024,NZ Transport Agency Waka Kotahi,Weigh Right Taupo.,Illegal overloading creates both a safety risk and disproportionally higher wear and tear on the road network. Our drive for increased value for money from our road maintenance investment means we have less tolerance for illegally overloaded vehicles. Additionally crash\nassessors point to overloading being a major factor in truck rollovers which account for one-third of all truck crashes.\n.,,In Planning,Fully funded,To be determined,To be determined,Waikato,,,Transport,5 - 25 million,,,,,,,2017-Q3,2026-Q2,,,,,
NZTA_125512017,25/03/2024,NZ Transport Agency Waka Kotahi,Weigh Right Tauranga Port.,Weigh Right Tauranga Port: Illegal overloading creates both a safety risk and disproportionally higher wear and tear on the road network. Our drive for increased value for money from our road maintenance investment means we have less tolerance for illegally overloaded vehicles. Additionally crash assessors point to overloading being a major factor in truck rollovers which account for one-third of all truck crashes.\n.,,In Planning,Fully funded,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,,,,,,,2017-Q3,2024-Q2,,,,,
NZTA_102522014,25/03/2024,NZ Transport Agency Waka Kotahi,Wellington Port Access Improvements.,A strategic assessment of access to the Port of Wellington.,,Under review,Part funded,To be determined,To be determined,Wellington,,,Transport,100 - 250 million,,,,,,,2014-Q3,2024-Q2,,,,,
NZTA_144042013,25/03/2024,NZ Transport Agency Waka Kotahi,Western Belfast By-Pass.,New bypass west of Belfast providing a four lane divided route from the Northern motorway to Johns Road near The Groynes. Part of Christchurch Western Corridor RoNS programme.,,Post implementation,Fully funded,Open,Construct only,Canterbury,,,Transport,50 - 100 million,,,,,,,2015-Q2,2024-Q2,,,,,
NZTA_164172013,25/03/2024,NZ Transport Agency Waka Kotahi,Western Ring Route - RONS.,Complete WRR by constructing the Waterview Connection of SH 20 from Maioro Street to Waterview and widening SH 16 from St Lukes to Westgate including raising the causeway. Improvements to interchanges at Te Atatu Lincoln Road Royal Road Maioro Street and Great North Road.The upgrade of the remaining 2.9km long section between Lincoln Road to SH18 Westgate/Hobsonville Deviation on State Highway 16 is the final part of the Western Ring Route (WRR) suite of projects. The following benefits will be expecting once project completed.• Additional motorway lane.• Raising of both Huruhuru and Royal bridges.• Bus shoulder lanes.• Opportunity to integrate walking and cycle way – Shared Use Path• Opportunity to integrate some Iwi artwork.• Improvements to the performance and safety of on and off ramps.• Improvements to storm water runoff treatment and control.• Improvements to noise mitigation.This section of project had been awarded to Hawkins Infrastructure Ltd at 2016 under the Traditional Lump Sum Contract Arrangement with a value of $87.5m and the completion date at 08 March 2018.In March 2017 the contract had been fully novate to Downer NZ Ltd.,,Post implementation,Fully funded,Open,Other,Auckland,,,Transport,1 billion +,,,,,,,2014-Q2,2030-Q3,,,,,
NZTA_150642013,25/03/2024,NZ Transport Agency Waka Kotahi,Wgtn RoNS (5) - Transmission Gully.,A new 27km long motorway between Mackays crossing (Paekākāriki) and Linden with grade separated interchanges at Mackays Paekākāriki SH58 Waitangirua Kenepuru and Linden.,,Under construction,Fully funded,Open,Public private partnership,Wellington,,,Transport,500 million - 1 billion,,,,,,,2006-Q4,2024-Q2,,,,,
NZTA_164892013,25/03/2024,NZ Transport Agency Waka Kotahi,Wgtn RoNS (6) - Mackays - Peka Peka Expr.,A new expressway between Mackays Crossing and Peka Peka Road . Programme business case/Package: Wellington Northern CorridorComprises 2 separate contracts 1 of which is outside the Alliance.,,Under construction,Fully funded,Open,Alliance,Wellington,,,Transport,500 million - 1 billion,,,,,,,2013-Q1,2025-Q2,,,,,
NZTA_164902013,25/03/2024,NZ Transport Agency Waka Kotahi,Wgtn RoNS (7) - Peka Peka to Otaki Expr.,A new expressway between Peka Peka Road and north of Otaki.,,Under construction,Fully funded,Open,Design and construct,Wellington,,,Transport,500 million - 1 billion,,,,,,,2016-Q4,2027-Q2,,,,,
NZTA_102542013,25/03/2024,NZ Transport Agency Waka Kotahi,Whakaruatapu Bridge Realignment.,Replace bridge with culvert and fill. Improve alignment particularly on SB approach.,,Post implementation,Fully funded,To be determined,To be determined,Manawatū - Whanganui,,,Transport,< 1 million,,,,,,,2013-Q3,2023-Q2,,,,,
NZTA_161862013,25/03/2024,NZ Transport Agency Waka Kotahi,Whirokino Trestle Bridge Replacement.,"""The Whirokino Trestle and Manawatu River Bridge are located on SH1 approximately 3km south of Foxton and 14km north of Levin. This section of SH1 is classified as a National Strategic state highway being a state highway that makes a significant contribution to social and economic wellbeing by connecting major population centres international ports or major airports. \n""\n.",,Post implementation,Fully funded,Selective,Design and construct,Manawatū - Whanganui,,,Transport,1 - 5 million,,,,,,,2017-Q1,2024-Q2,,,,,
NZTA_136442013,25/03/2024,NZ Transport Agency Waka Kotahi,Woodend SH1 Bypass.,Traffic bypass to the east of Woodend that reduces traffic through the township. Will need review of Pegasus roundabout for safe ped/cycle crossing.,,On hold,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Transport,5 - 25 million,,,,,,,2013-Q3,2024-Q2,,,,,
NZTA_139372019,25/03/2024,NZ Transport Agency Waka Kotahi,Wellington Strategic Highway Improvements.,Improvements at the Basin Reserve and an extra Mt Victoria Tunnel to move more people with less congestion.,,In planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Transport,1 billion +,2019-Q4,2024-Q4,2025-Q3,2026-Q4,2027-Q3,2035-Q2,2019-Q4,2035-Q2,,,,,
NZTA_123242016,20/11/2023,NZ Transport Agency Waka Kotahi,SH2 Remutaka Hill Underslip Prevention.,The Rimutaka Hill Road is highly unstable and susceptible to slips. \n\nMany slope and pavement failures developed on this corridor which is primarily caused by stormwater getting onto the slope face or behind it resulting in the ingress forming cracks/slips due to saturation or erosion as the water tries to flows towards the downward slopes.\n.,,Under review,Fully funded,To be determined,To be determined,Wellington,,,Transport,1 - 5 million,,,,,,,2016-Q3,2024-Q2,,,,,
NZTA_142712020,20/11/2023,NZ Transport Agency Waka Kotahi,RIO SH01N & SH11 Kawakawa RND.,Enhance Kawakawa's traffic flow safety and accessibility with a roundabout at SH1/SH11 and a new pedestrian connection benefiting locals tourists and the North's economy.,,Under review,Fully funded,Direct,To be determined,Northland,,,Transport,5 - 25 million,,,,,,,2020-Q3,2024-Q2,,,,,
NZTA_148912021,20/11/2023,NZ Transport Agency Waka Kotahi,SH15 Kaikohe to Whangarei.,Reduction in 40% DSI Over 10 Years Project Investment Story The SH15 Kaikohe - Whangarei corridor is identified in the Road to Zero Speed and Infrastructure (SIP) PBC Delivery Programme for safety improvements. The following safety improvements are identified for this section of state highway: A Safety Management intervention (Roadside barrier at high risk locations) at the corridor mid-block length of SH15 Kaikohe - Whangarei This safety improvement will be delivered as one safety project - 'SH15 Kaikohe - Whangarei' over the estimated time period 2021/22 - 2025/26. There is a speed review happening along this corridor SH15 Kaikohe to Mangatapere. This corridor is an inland freight route.,,Under review,Funding source to be confirmed,To be determined,To be determined,Northland,,,Transport,25 - 50 million,,,,,,,2021-Q3,2024-Q2,,,,,
NZTA_148982021,13/09/2023,NZ Transport Agency Waka Kotahi,SH1 Porirua City to East Porirua Severan.,Improve active transportation access in Porirua's eastern suburbs through the Eastern Porirua Regeneration Project. Promote mode shift healthier communities and reduced carbon emissions.,,On hold,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Transport,1 - 5 million,,,,,,,2023-Q3,2023-Q2,,,,,
NZTA_149012021,20/11/2023,NZ Transport Agency Waka Kotahi,Ngauranga Gorge Shared Paths Improvement.,Modal shift and vulnerable user safety. Ngauranga Gorge forms part of regional cycling network as well as National Cycling Network north to Kapiti and beyond.Low level of service for a key connection between Wellington and the northern suburbs. Currently unfunded.,,On hold,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Transport,< 1 million,,,,,,,2022-Q3,2024-Q2,,,,,
NZTA_149082021,13/09/2023,NZ Transport Agency Waka Kotahi,SH1 - Bullies Point.,National Resilience risk on SH1 at Bully Point Lake Taupo - Implementation.,,On hold,Funding source to be confirmed,To be determined,To be determined,Waikato,,,Transport,< 1 million,,,,,,,2024-Q3,2024-Q2,,,,,
NZTA_149372021,20/11/2023,NZ Transport Agency Waka Kotahi,SH2 To City Centre NZUP TNL.,Aligns with WBoP Transport Plan UFTI and Tauranga Mode Shift PlanThe GPS prioritised modes shift to reduce GHG emissions and enable improved liveability of urban areas.,,On hold,Funding source to be confirmed,To be determined,To be determined,Bay of Plenty,,,Transport,1 - 5 million,,,,,,,2021-Q3,2024-Q2,,,,,
NZTA_149532021,20/11/2023,NZ Transport Agency Waka Kotahi,SH1 Lake Karapiro Section.,Opportunity to improve transport system resilience at this location.,,On hold,Funding source to be confirmed,To be determined,To be determined,Waikato,,,Transport,1 - 5 million,,,,,,,2022-Q3,2024-Q2,,,,,
NZTA_150642021,20/11/2023,NZ Transport Agency Waka Kotahi,SH1/SH2 East-West Access.,Investigating a multi-modal west-east link between SH1 (Grenada) and SH2 Petone to enhance regional access housing and resilience alongside other transport solutions.,,On hold,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Transport,1 - 5 million,,,,,,,2022-Q3,2024-Q2,,,,,
NZTA_156802022,20/11/2023,NZ Transport Agency Waka Kotahi,Dunedin Walking and Cycling Network.,This aligns with the GPS focus on Better Travel Options and the DCCs Integrated Transport Strategy. Third party contribution to the Dunedin City Council project.,,Under review,Funding source to be confirmed,To be determined,To be determined,Otago,,,Transport,< 1 million,,,,,,,2022-Q3,2025-Q2,,,,,
IP006627,5/03/2024,Wellington City Council,Transitional Cycleway: Newtown to City.,Tactical and iterative delivery of a high-quality interim cycleway between Newton and Waitangi Park.,,Under construction,Fully funded,To be determined,To be determined,Wellington,,,Transport,1 - 5 million,,,,,,,2021-Q3,2024-Q2,,,,,
IP006628,5/03/2024,Wellington City Council,Transitional Cycleway: Botanic Gardens to Waterfront.,Tactical and iterative delivery of a high-quality interim cycleway between Wellington Botanic Gardens (Tinakroi Road) and Wellington waterfront.,,Under construction,Fully funded,To be determined,To be determined,Wellington,,,Transport,1 - 5 million,,,,,,,2021-Q3,2024-Q3,,,,,
IP006629,5/03/2024,Wellington City Council,Te Matapihi ki te Ao Nui (Central Library).,Structural remediation and refurbishment of the existing building to enhance resilience NBS rating and library services.,,Under construction,Fully funded,To be determined,To be determined,Wellington,,,Community facilities,100 - 250 million,,,,,,,2021-Q3,2026-Q2,,,,,
IP006630,5/03/2024,Wellington City Council,Frank Kitts Park Playground.,Playground development with enhanced accessibility and safety.,,Under construction,Fully funded,To be determined,To be determined,Wellington,,,Community facilities,5 - 25 million,,,,,,,2020-Q4,2024-Q2,,,,,
IP006632,5/03/2024,Wellington City Council,Wellington Town Hall Redevelopment.,Earthquake strengthening and upgrading.,,Under construction,Fully funded,To be determined,To be determined,Wellington,,,Community facilities,250 - 500 million,,,,,,,2019-Q1,2028-Q1,,,,,
IP006633,5/03/2024,Wellington City Council,Island Bay Parade Upgrade.,Road and cycleway layout changes to improve safety and accessibility.,,Under construction,Fully funded,To be determined,To be determined,Wellington,,,Transport,5 - 25 million,,,,,,,2021-Q3,2025-Q2,,,,,
IP006638,5/03/2024,Wellington City Council,Sludge Minimisation Facility.,Establish a new Sludge Minimisation Facility to enable de-coupling from the existing disposal to the Southern Landfill.,,In procurement,Fully funded,To be determined,Early contractor involvement,Wellington,,,Waste management,250 - 500 million,,,,,,,2021-Q3,2026-Q3,,,,,
IP006639,5/03/2024,Wellington City Council,Begonia House and Café.,Develop the Begonia House Café and Visitor Facilities at the Wellington Botanic Garden ki Pākāka.,,In planning,Funding source confirmed,To be determined,To be determined,Wellington,,,Community facilities,5 - 25 million,,,,,,,2022-Q3,2027-Q3,,,,,
IP006640,5/03/2024,Wellington City Council,Frederick Street pocket park.,Develop small inner city park in line with Green Network Plan.,,In planning,Funding source confirmed,To be determined,To be determined,Wellington,,,Community facilities,1 - 5 million,,,,,,,2022-Q3,2026-Q3,,,,,
IP006641,5/03/2024,Wellington City Council,Southern Landfill Improvement - Stage 4 Landfill Ext.,Extension of Southern Landfill post 2026 to ensure continued disposal of residual waste for Wellington City.,,In planning,Funding source confirmed,To be determined,To be determined,Wellington,,,Waste management,25 - 50 million,,,,,,,2022-Q3,2026-Q2,,,,,
IP006642,5/03/2024,Wellington City Council,Southern Landfill Infrastructure Renewals.,Upgrade stormwater tunnel beneath Southern Landfill (not a Wellington Water project).,,Early planning,Funding source confirmed,To be determined,To be determined,Wellington,,,Waste management,1 - 5 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP006643,5/03/2024,Wellington City Council,Mark Ave to Grenada North.,New road to connect north and south parts of Lincolnshire Farm suburb development.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Transport,5 - 25 million,,,,,,,2024-Q3,2026-Q2,,,,,
IP006644,5/03/2024,Wellington City Council,Build Wellington - FKP Garden Development.,Frank Kitts Park development including Chinese Garden and Fale Malae.,,Early planning,Funding source confirmed,To be determined,To be determined,Wellington,,,Community facilities,5 - 25 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP006645,5/03/2024,Wellington City Council,Makara Cemetery Expansion.,Expand and develop Makara Cemetery to meet future growth and demand for interment.,,Early planning,Funding source confirmed,To be determined,To be determined,Wellington,,,Community facilities,5 - 25 million,,,,,,,2023-Q3,2026-Q2,,,,,
IP006646,5/03/2024,Wellington City Council,Grenada North Community Sports Hub.,Develop Grenada North Park into a Community Sports Hub including investment in Synthetic Turf.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Community facilities,5 - 25 million,,,,,,,2023-Q3,2028-Q4,,,,,
IP006647,5/03/2024,Wellington City Council,Khandallah Swimming Pool Upgrade.,Replacement of Khandallah Pool.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Community facilities,5 - 25 million,,,,,,,2023-Q3,2025-Q4,,,,,
IP006648,5/03/2024,Wellington City Council,Bond Store Upgrade.,Seismic strengthening the Bond Store which is the home of the Wellington Museum.,,Early planning,Funding source confirmed,To be determined,To be determined,Wellington,,,Community facilities,5 - 25 million,,,,,,,2022-Q3,2025-Q2,,,,,
IP008127,5/03/2024,Wellington City Council,Destination Skate Park - Kilbirnie Park.,Skate park facility at Kilbirnie Park.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Community facilities,5 - 25 million,,,,,,,2023-Q3,2025-Q2,,,,,
IP000508,20/03/2024,Wellington Water Limited,Bulk Water Pipe Upgrade - Silverstream.,This project is the replacement of the bulk water pipe that crosses the Hutt River to improve reliability and resilience of the network and completion of a shared path for active mode transport.,,Under construction,Fully funded,Open,Early contractor involvement,Wellington,,,Water,50 - 100 million,,,2021-Q4,2022-Q3,2022-Q1,2025-Q2,2021-Q2,2025-Q3,
https://www.wellingtonwater.co.nz/projects/silverstream-pipe-bridge-project/,,,,
IP000511,20/03/2024,Wellington Water Limited,Reservoir Construction - Aotea Porirua.,This project is the construction of a reservoir in Aotea to accommodate future growth and provide seismic and operational resilience. Completion date provided is an estimate and may change in time.,,On hold,Funding source to be confirmed,Limited,Design and construct,Wellington,,,Water,25 - 50 million,,,2023-Q1,2023-Q4,,,2018-Q1,2026-Q4,
https://www.wellingtonwater.co.nz/projects/new-aotea-drinking-water-reservoir/,,,,
IP000515,20/03/2024,Wellington Water Limited,Stream Improvements for Flood Protection - Pinehaven Upper Hutt Phase 2.,Stage 1 is complete. Stage 2 stream work downstream end of Sunbrae Culvert down to Blue Mountains Rd to commence. Purpose is to make improvements to the Pinehaven stream to protect flood prone properties in the area.,,Under construction,Fully funded,Selective,Early contractor involvement,Wellington,,,Water,5 - 25 million,,,2022-Q2,2023-Q3,2023-Q3,2024-Q2,2019-Q3,2024-Q4,
https://www.wellingtonwater.co.nz/projects/pinehaven-stream-improvements/,,,,
IP002795,20/03/2024,Wellington Water Limited,Central city Wastewater Storage Tank - Porirua.,This project is the construction of wastewater storage tank to improve waterway health and reduce risks to public health.,,Under construction,Fully funded,Selective,Construct only,Wellington,,,Water,50 - 100 million,,,2022-Q4,2022-Q4,2023-Q2,2026-Q2,2019-Q3,2026-Q3,
https://www.wellingtonwater.co.nz/projects/porirua-central-wastewater-storage-tank/,,,,
IP005551,20/03/2024,Wellington Water Limited,Pipe Bridge Kaitoke Flume.,Construction of seismically resilient pipe bridge to safeguard the water supply to the Wellington Region.,,Under construction,Fully funded,Direct,Early contractor involvement,Wellington,,,Water,25 - 50 million,,,2021-Q3,2021-Q4,2022-Q1,2025-Q1,2019-Q2,2025-Q1,
https://www.wellingtonwater.co.nz/projects/kaitoke-pipe-bridge-replacement/,,,,
IP005552,20/03/2024,Wellington Water Limited,Te Marua Water Treatment Plant upgrade.,Multi-phased programme to upgrade the Te Marua Water Treatment plant to improve capacity and to provide for future growth.,,Under construction,Fully funded,Selective,Early contractor involvement,Wellington,,,Water,50 - 100 million,,,2022-Q2,2023-Q3,2022-Q4,2025-Q2,2020-Q3,2025-Q2,
https://www.wellingtonwater.co.nz/projects/te-marua/,,,,
IP005554,20/03/2024,Wellington Water Limited,Reservoir Construction - Lower Hutt (Eastern Hills Reservoir).,Development and delivery of the new reservoir in Hutt City to address the current and future water storage shortfall by ensuring sufficient capacity in Hutt City CBD and accommodate growth. Completion date provided is an estimate and may change in time.,,Under review,Funding source to be confirmed,Selective,Design and construct,Wellington,,,Water,50 - 100 million,,,2024-Q1,2024-Q2,,,2020-Q4,2027-Q3,,,,,
IP005556,20/03/2024,Wellington Water Limited,CBD WW Pump Stations and Rising main renewals and upgrades - Wellington City.,Multi-phased programme to improve the capacity and resilience of the wastewater network and facilitate new development in the Wellington CBD.,,Under construction,Funding source confirmed,To be determined,Early contractor involvement,Wellington,,,Water,50 - 100 million,,,2022-Q1,2026-Q4,2022-Q3,2032-Q1,2021-Q1,2032-Q2,,,,,
IP006587,20/03/2024,Wellington Water Limited,Stormwater Upgrades - Karehana catchment.,Multi-phase programme to reduce the impact of frequent flooding in the Karehana catchmentCompletion date provided is an estimated and may change in time.,,On hold,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Water,25 - 50 million,,,2024-Q1,2025-Q3,,,2021-Q4,2026-Q4,
https://www.wellingtonwater.co.nz/projects/karehana-catchment-stormwater-improvements/,,,,
IP008156,20/03/2024,Wellington Water Limited,Main Collecting Sewer Upgrade - Petone Esplanade (Stage 1).,Construct and/or rehabilitate the wastewater pipeline on the Petone Esplanade that is seismically resilient.,,In planning,Funding source confirmed,Selective,Early contractor involvement,Wellington,,,Water,50 - 100 million,,,2024-Q4,2025-Q1,2025-Q3,2026-Q3,2019-Q4,2026-Q4,,,,,
IP008157,20/03/2024,Wellington Water Limited,Paremata Wastewater Trunk Upgrade Stage 2.,Multi-phase programme to renew and increase capacity of the wastewater trunk main from Paremata to Porirua CBD.,,Under review,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Water,50 - 100 million,,,2024-Q3,2027-Q3,,,2022-Q2,2029-Q3,,,,,
IP008161,19/03/2024,Whangarei District Council,New Airport for Whangārei District.,Whangārei District requires a new airport in a new location. Further investigations business case designation planning and funding confirmation required before a further council decision is made. Design and construction phases would follow.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Northland,,,Transport,100 - 250 million,,,,,,,2014-Q2,2032-Q2,
https://www.wdc.govt.nz/Council/Projects/Airport-Location-Study,,,,
IP008162,19/03/2024,Whangarei District Council,Porotī Water Treatment Plant Upgrade.,Significant expansion of capacity of Poroti Water Treatment Plant.,,In planning,Fully funded,Open,Construct only,Northland,,,Water,25 - 50 million,,,,,,,2020-Q4,2027-Q2,,,,,
IP008163,19/03/2024,Whangarei District Council,Waterfront to City Centre Connection Shared Space.,Part of the City Centre Revitalisation Programme. Upgrades based on the Whangārei Complete Streets Masterplan to create a high quality urban design shared spaces on John Street.,,In planning,Fully funded,Open,Construct only,Northland,,,Transport,5 - 25 million,,,,,,,2021-Q1,2028-Q2,
https://www.wdc.govt.nz/Council/Projects/Central-City-Projects,,,,
IP008164,19/03/2024,Whangarei District Council,New Whangārei Civic Centre & Adjacent Public Realm.,New civic centre for Whangarei District Council.,,Under construction,Fully funded,Open,Construct only,Northland,,,Community facilities,50 - 100 million,,,,,,,2018-Q1,2024-Q4,
https://www.wdc.govt.nz/Council/Projects/Civic-Centre,,,,
IP008165,19/03/2024,Whangarei District Council,Old Municipal Building Restoration and Upgrades.,Restoration of the heritage building after significant fire damage various upgrades and seismic strengthening.,,Under construction,Fully funded,Selective,Construct only,Northland,,,Community facilities,1 - 5 million,,,,,,,2019-Q1,2025-Q1,
https://www.wdc.govt.nz/Council/Projects/Old-Municipal-Building,,,,
IP008166,19/03/2024,Whangarei District Council,Blue Green Network Programme.,Lower Waiarohia River Loop Path project commencing design work in 2023 is the first major project within the Blue Green Network Programme. BGN is a multi-faceted project aimed as environmental restoration flood mitigation climate change responses and economic development opportunities.,,In planning,Fully funded,Open,Construct only,Northland,,,Environmental,5 - 25 million,,,,,,,2022-Q1,2031-Q2,
https://www.wdc.govt.nz/Council/Projects/Blue-Green-Network,,,,
IP008167,19/03/2024,Whangarei District Council,Northland Events Centre Roof Replacement.,Redesign and upgrade of entire roof structure of the stadium. Early contractor involvement required. Events bookings blackout period for construction activity between November 2025 and June 2026.,,In planning,Fully funded,Open,Early contractor involvement,Northland,,,Community facilities,5 - 25 million,,,,,,,2021-Q1,2026-Q2,,,,,
IP008168,19/03/2024,Whangarei District Council,New Animal Shelter.,New Animal Shelter on a new site at Kioreroa Road Whangārei.,,Under construction,Fully funded,Open,Construct only,Northland,,,Community facilities,5 - 25 million,,,,,,,2020-Q1,2024-Q3,
https://www.wdc.govt.nz/Council/Projects/Animal-Shelter,,,,
IP008169,19/03/2024,Whangarei District Council,Whangārei Wastewater Treatment Plant Augmentation & New Administration Building.,Upgrades to the plant including works to UV disinfection rotating disc filters aeration basin inlet works and odour control for compliance with consent conditions. New administration building for seismic compliance and due to asbestos comtamination in old building.,,In planning,Fully funded,Open,Design and construct,Northland,,,Waste management,5 - 25 million,,,,,,,2022-Q3,2026-Q4,,,,,
IP008171,19/03/2024,Whangarei District Council,Water Trunk Main Upgrades Otaika and Onerahi.,Upgrades to trunk water mains between Otaika Valley and city and Onerahi.,,In planning,Fully funded,Open,Construct only,Northland,,,Water,5 - 25 million,,,,,,,2022-Q3,2027-Q2,,,,,
IP008172,19/03/2024,Whangarei District Council,Whangārei Heads Wastewater Network Upgrades.,Provision of a new emergency wastewater storage and overflow facility at Parua Bay on the Whangārei Heads wastewater network.,,On hold,Fully funded,Open,Construct only,Northland,,,Waste management,5 - 25 million,,,,,,,2021-Q3,2025-Q2,,,,,
IP009811,19/03/2024,Whangarei District Council,Kamo Shared Path Stage 5.,Extending the existing shared path network from Fisher Terrace to Station Road Kamo.,,Under construction,Funding source confirmed,Open,Construct only,Northland,,,Transport,5 - 25 million,,,,,,,2023-Q3,2024-Q2,,,,,
IP009812,19/03/2024,Whangarei District Council,Springs Flat Roundabout.,New roundabout on SH1 at the intersection of Springs Flat Road in Whangarei including new bridge on Gillingham Rd.,,In planning,Fully funded,Open,Construct only,Northland,,,Transport,5 - 25 million,,,,,,,2024-Q1,2026-Q4,,,,,
IP010742,19/03/2024,Whangarei District Council,Whangārei Wastewater Treatment Plant Odour Control.,Upgrades to control odour at the treatment plant.,,Under construction,Fully funded,Open,Construct only,Northland,,,Water,5 - 25 million,,,,,,,2019-Q3,2025-Q1,,,,,
IP010743,19/03/2024,Whangarei District Council,Kamo Dip Rd New Reservoir.,New potable water reservoir to provide additional capacity.,,Under construction,Fully funded,Open,Construct only,Northland,,,Water,5 - 25 million,,,,,,,2022-Q3,2025-Q2,,,,,
IP010744,19/03/2024,Whangarei District Council,Forum North Conference Expo Theatre Redevelopment.,Major redevelopment of existing existing events centre with addition of a new theatre.,,Early planning,Part funded,To be determined,To be determined,Northland,,,Community facilities,25 - 50 million,,,,,,,2024-Q1,2028-Q2,,,,,
IP006334,20/12/2023,Auckland Airport Limited,Airfield Resilience Work Package 2.,Replacement and renewal of airfield pavements.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Transport,25 - 50 million,,,,,,,2022-Q1,2024-Q2,,,,,
IP006337,20/12/2023,Auckland Airport Limited,Domestic Processor.,New domestic processor connected to International Terminal.,,In procurement,Funding source to be confirmed,Selective,Construct only,Auckland,,,Transport,1 billion +,,,,,,,2021-Q4,2028-Q4,,,,,
IP006709,20/12/2023,Auckland Airport Limited,Core Roading Network: Eastern Ring Route & South-eastern Access early works.,Early upgrade of eastern and southern roading network to increase capacity safety and resilience and to facilitate public transport.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Transport,25 - 50 million,,,,,,,2022-Q1,2024-Q4,,,,,
IP006710,20/12/2023,Auckland Airport Limited,Baggage Enabling.,Works to international baggage system to incease capacity and resilience and to prepare for future capital works.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Transport,25 - 50 million,,,,,,,2021-Q3,2024-Q2,,,,,
IP006711,20/12/2023,Auckland Airport Limited,Terminal Integration Enabling: Forecourt Roading and Utilities.,Works to expand international forecourt capacity and to install key utilties across campus.,,Under construction,Fully funded,Direct,Early contractor involvement,Auckland,,,Transport,50 - 100 million,,,,,,,2021-Q3,2025-Q4,,,,,
IP006712,20/12/2023,Auckland Airport Limited,Terminal Integration Enabling: West Enabling.,Works to the western international terminal building to expand capacity and prepare for integration of the new Domestic Processor.,,Under construction,Fully funded,Limited,Early contractor involvement,Auckland,,,Transport,100 - 250 million,,,,,,,2021-Q3,2026-Q4,,,,,
IP006713,20/12/2023,Auckland Airport Limited,Terminal Integration Enabling: East Enabling.,Works to the eastern international terminal building to expand capacity and prepare for integration of the new Domestic Processor.,,Under construction,Fully funded,Direct,Early contractor involvement,Auckland,,,Transport,100 - 250 million,,,,,,,2021-Q3,2027-Q3,,,,,
IP008635,20/12/2023,Auckland Airport Limited,Remote Stands Stage 2.,Expansion of Airfield and major stormwater upgrades.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Transport,250 - 500 million,,,,,,,2023-Q2,2025-Q3,,,,,
IP008889,20/12/2023,Auckland Airport Limited,Terminal Integration Enabling: Check-in Expansion.,Expansion of international check-in to integrate domestic passengers.,,In planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Transport,100 - 250 million,,,,,,,2023-Q1,2027-Q2,,,,,
IP008890,20/12/2023,Auckland Airport Limited,Park and Ride South.,Completion of airport Park and Ride facility at Puhinui Road previously suspended due to Covid 19.,,Under construction,Fully funded,Direct,Construct only,Auckland,,,Transport,25 - 50 million,,,,,,,2022-Q4,2023-Q1,,,,,
IP000854,5/12/2023,Auckland Council,Botanic Gardens - replace covered events area in courtyard.,Replace and upgrade the courtyard structure at the Botanic Gardens.FY20/21 to FY21/22 investigation and designFY22/23 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2017-Q3,2022-Q1,2023-Q3,2023-Q4,2023-Q4,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
IP000939,5/12/2023,Auckland Council,Howick Library - comprehensive renewal.,Comprehensive renewal to the exterior of the building. Interior renewal works have been completed in prior years.FY20/21 - investigation and designFY21/22 to FY24/25 - physical works (exterior renewals)Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2019-Q4,2019-Q4,2025-Q3,2025-Q4,2026-Q3,2026-Q4,2019-Q4,2026-Q4,,,[email address],,
IP000949,5/12/2023,Auckland Council,Martins Bay Holiday Park - replace rear amenities block.,Replace rear amenities block at Martins Bay Holiday Park.FY18/19 to FY22/23 - investigation and designFY23/24 - complete designFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) Project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q2,2021-Q4,2024-Q1,2024-Q3,2024-Q3,2024-Q4,2021-Q4,2024-Q4,,,[email address],,
IP000954,5/12/2023,Auckland Council,Orewa Holiday Park – renew northern amenities block.,Renew northern amenities block at Orewa Holiday Park. Investigation to determine whether the renewal requires full replacement of asset.FY17/18 to FY21/22 - investigation and designFY25/26 to FY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q3,2021-Q4,2024-Q1,,2024-Q3,2024-Q4,2021-Q4,2024-Q4,,,[email address],,
IP001455,5/12/2023,Auckland Council,Heath Reserve - upgrade playground and park amenities.,Renew and upgrade the playground at Heath Reserve. The Kaipātiki Play and Sunsmart Provision report recommends improvements to provision for junior age group with inclusion of more collaborative balance / jumping and spinning / rocking provision with additional creative or interactive elements incorporated including addition of landscape amenity and character.FY24/25 - investigation and design.FY25/26 – physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2020-Q3,2021-Q2,2024-Q3,2024-Q4,2024-Q4,2025-Q1,2021-Q2,2025-Q1,,,[email address],,
IP001815,5/12/2023,Auckland Council,Sunkist Bay Reserve – seawall and park assets renewals.,Investigate and delivery of Sunkist Bay Reserve Esplanade enhancements beside rock seawall in conjunction with the sea wall renewal work.FY19/20 - FY22/23 investigation and design FY22/23 - FY25/26 physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2020-Q2,2021-Q2,2024-Q3,2024-Q4,2024-Q4,2025-Q2,2021-Q2,2025-Q2,,,[email address],,
IP002057,5/12/2023,Auckland Council,Whangateau Wastewater Treatment Plant.,The objective of this project is to design and build proper engineered wastewater solution for the reserve.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q1,2023-Q3,2024-Q3,2024-Q3,2025-Q3,2026-Q2,2023-Q3,2024-Q4,,,[email address],,
IP002088,5/12/2023,Auckland Council,Tahuna Torea - renew tracks and pathways - stage one.,Renew tracks and pathways at Tahuna Torea in alignment with the concept plan.Tahuna Torea is an important recreational site for the local community connecting through to Wai O Taiki Nature Reserve. Scope of works includes for track resurfacing (88.5 mtrs) track reformation (951 mtrs) concrete pathways (423 mtrs) timber boardwalks (403 mtrs) renewed drainage culverts and signage. This project will be delivered across financial years in two stages.Stage one works include for renewal of the lower bush track coastal walkway and beach access.FY21/22 to FY22/23 - investigation design (obtain necessary consents)FY23/24 - physical works (stage one).,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2019-Q3,2019-Q4,2023-Q3,2023-Q3,2023-Q4,2025-Q3,2019-Q4,2025-Q3,,,[email address],,
IP002113,5/12/2023,Auckland Council,Martins Bay Holiday Park Water Supply and Reticulation Renewal.,Remedial options needs to be developed to reduce the expenses due to the loss of water and the potential for contamination to entre the drinking water network.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q2,2020-Q1,2023-Q3,2024-Q1,2024-Q3,2024-Q4,2020-Q1,2024-Q3,,,[email address],,
IP002270,5/12/2023,Auckland Council,Tawharanui Regional Park - renew workshop.,Renew workshop at Tawharanui Regional Park.FY24/25 - investigation and designFY25/26 to FY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2020-Q4,2024-Q2,2025-Q3,2025-Q4,2025-Q4,2026-Q3,2024-Q2,2026-Q3,,,[email address],,
IP002336,5/12/2023,Auckland Council,Parnell Baths - install rock fall protection.,Investigate methods to protect the Parnell Baths site and access from rock fall and install appropriate mitigation methods to prevent future slips.FY20/21 to FY22/23 - investigation and design FY22/23 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2020-Q3,2020-Q4,2024-Q1,2024-Q1,2024-Q1,2024-Q3,2020-Q4,2024-Q3,,,[email address],,
IP002858,5/12/2023,Auckland Council,Avondale - develop new community centre and library - Te Hono.,Develop a new integrated community centre and library in Avondale.FY18/19 - FY21/22 - investigation and designFY22/23 - FY24/25 - physical works Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,To be determined,To be determined,Auckland,,,Community facilities,25 - 50 million,2020-Q3,2020-Q3,2024-Q3,2024-Q4,2025-Q1,2027-Q3,2020-Q3,2027-Q3,,,[email address],,
IP002897,5/12/2023,Auckland Council,CPT HWBOB: Edith Hopper [2704].,To increase the ecological and amenity value of 520 m of Edith Hopper Reserve stream to offset the loss of ecological values from development and/or the provision of infrastructure elsewhere in the region.To recover the cost of this project from those projects or developments that are required to provide offset mitigation.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2018-Q4,2019-Q1,2025-Q1,2025-Q2,2025-Q4,2027-Q1,2019-Q1,2027-Q1,,,[email address],,
IP002907,5/12/2023,Auckland Council,East View Reserve - upgrade neighbourhood park.,Upgrade the neighbourhood park to meet the needs of new and future residents within the Tamaki Regeneration area. Works may include nature play and playground elements flat flexible open space pathways and improved connectivity.FY18/19 - investigation and designFY19/20 to FY21/22 - complete planningFY22/23 to FY25/26 - physical worksRisk Adjusted Programme (RAP) projectThis project is dependent upon the input and readiness of various stakeholders and partners including Kainga Ora and the Tamaki Regeneration Company. This project may be deferred to a future year if stakeholders are not able proceed within the anticipated timeframe.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2018-Q3,2018-Q4,2023-Q2,,2023-Q4,2024-Q3,2018-Q4,2024-Q3,,,[email address],,
IP002913,5/12/2023,Auckland Council,Fergusson Domain - renew park assets.,The Fergusson Domain Concept Plan provides an investment blueprint for improvements to the park and accessways including the renewal of the existing play space and minor assets at the site. Renewal funding has been allocated to deliver the investigation and design phase and further funding may be required to deliver the desired outcomes at the local board's discretion.FY19/20 - investigation and designFY20/21 - continued investigation design and planningFY21/22 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2020-Q1,2021-Q1,2023-Q3,,2024-Q1,2024-Q3,2021-Q1,2024-Q3,,,[email address],,
IP002932,5/12/2023,Auckland Council,Hayman Park Pond [2697].,To transform the Hayman Park ponds into a naturalised wetland to reduce flooding and provide enhanced water quality biodiversity and public amenity outcomes.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2019-Q1,2019-Q4,2024-Q3,2024-Q4,2025-Q1,2026-Q2,2019-Q4,2026-Q2,,,[email address],,
IP002959,5/12/2023,Auckland Council,Jubilee Bridge - renew and upgrade bridge.,Renew and upgrade the Jubilee Bridge. The desired outcome is to increase the greenway/cycleway provision in the area and incorporate an arts feature as agreed by the local board.FY19/20 and prior - investigation and preliminary design.FY20/21 - detailed design and further consultation.FY21/22 to FY24/25 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,To be determined,To be determined,Auckland,,,Community facilities,5 - 25 million,2014-Q4,2020-Q4,2022-Q4,,2024-Q1,2025-Q2,2020-Q4,2025-Q2,,,[email address],,
IP002967,5/12/2023,Auckland Council,Kennedy Park - renew carpark and site drainage.,Renew carpark and alleviate drainage issues.FY22/23 - investigation and complete concept design.FY23/24 to FY24/25 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2020-Q3,2021-Q1,2024-Q2,2024-Q3,2024-Q3,2024-Q4,2021-Q1,2024-Q4,,,[email address],,
IP003036,5/12/2023,Auckland Council,Orewa Library - comprehensive renewal incl. roof.,Renew the library roof and interior including the furniture fixtures and equipment. FY19/20 to FY22/23 - investigation and high level designFY23/24 - detailed design and consentingFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q3,2023-Q2,2023-Q4,2023-Q4,2024-Q1,2024-Q3,2023-Q2,2024-Q3,,,[email address],,
IP003114,5/12/2023,Auckland Council,Chalmers Reserve - park development.,Develop park following consultation with local residents. Consider additional park furniture and shelter upgrading the playground and providing youth play/activity opportunities also additional planting.Auckland Transport contributedo the renewal of the playground.Auckland Transport are installing a shared path through the park.FY20/21 - FY21/22 - investigation and designFY22/23 - FY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2020-Q3,2021-Q4,2023-Q4,,2023-Q4,2024-Q1,2021-Q4,2024-Q1,,,[email address],,
IP003141,5/12/2023,Auckland Council,Glen Innes Pool and Leisure Centre - develop carpark extension.,Development of new carpark extension to the south of the aquatic centre with drainage storm-water filtrations systems connecting footpath and boardwalk. As well as renewal of the existing carpark rain gardens blue gum tree removal and the installation of new bike stands to support the cycleway network.FY20/21 - investigation and design FY22/23 - detailed design and consentingFY23/24 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2020-Q4,2020-Q4,2023-Q2,2023-Q3,2023-Q3,2024-Q2,2020-Q4,2024-Q2,,,[email address],,
IP004999,5/12/2023,Auckland Council,City Centre Nelson Street Laneway Project.,Within the Long-Term-Plan 2018/2028 an ongoing project has been established to enhance Hobson and Nelson Streets with funding provided by the City Centre Targeted Rate. The specific focus of this project is to bring to life the vision outlined in the City Centre Masterplan for Nelson Street. The project centres around a localised upgrade of the Nelson Street Slip Lane situated at the southernmost section of Nelson Street.,,On hold,Funding source confirmed,Selective,To be determined,Auckland,,,Other not specified,5 - 25 million,2018-Q4,2021-Q1,2024-Q2,2024-Q3,2024-Q3,2025-Q4,2021-Q1,2025-Q4,,,[email address],,
IP005018,5/12/2023,Auckland Council,Osman Street Flood Mitigation [969].,To mitigate flooding issues caused by the limited capacity of the existing network and to facilitate growth by reducing the floodplain extent to allow development intensification in 31ha of residential areas.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2018-Q1,2018-Q1,2024-Q3,2024-Q4,2025-Q3,2026-Q2,2018-Q1,2025-Q3,,,[email address],,
IP005024,5/12/2023,Auckland Council,47 Teal Crescent Beach Haven SW Renewal [2636].,Repair and upgrade existing stormwater pipes.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2018-Q3,2024-Q1,2024-Q3,2024-Q4,2025-Q2,2018-Q3,2025-Q2,,,[email address],,
IP005028,5/12/2023,Auckland Council,Belfast Reserve Urgent Pipe Renewal [2703].,The project seeks to replace and upgrade the failing pipe and inlet structure which a recent CCTV survey has revealed to be in poor condition. The network upgrade will provide safe communities objectives by mitigating the flooding risk presented by the at-risk pipe.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Water,1 - 5 million,2019-Q2,2019-Q2,2023-Q3,2023-Q3,2025-Q3,2026-Q2,2019-Q2,2024-Q2,,,[email address],,
IP005032,5/12/2023,Auckland Council,Anzac St Precinct SW Extension Flood Mitigation and Environ Improvement [2525].,Reduce flooding to private properties and the road reserve within the Hillcrest and Shoal Bay Catchment. Provide treatment to the stormwater within the Hillcrest and Shoal Bay Catchments discharging to Patuone Reserve Enable growth in the Anzac Street West Precinct by providing developers with stormwater infrastructure to connect and discharge too.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2016-Q4,2018-Q2,2023-Q4,2025-Q2,2025-Q3,2026-Q2,2018-Q2,2026-Q1,,,[email address],,
IP005035,5/12/2023,Auckland Council,Becroft Drive Stormwater Upgrade [2627 2700 2727].,Objectives of this project are as follows:• To extend the existing public stormwater reticulation to support future development• To reduce flow to the existing under capacity pipes • To reduce flooding and erosion at the existing outfall• To alleviate nuisance flooding to the road from kerb outfalls and from overflow from Trevone Place.• To avoid potential failure of a critical culvert and alleviate flooding to properties caused by the culvert being under capacity.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q2,2019-Q2,2024-Q2,2024-Q3,2024-Q3,2024-Q4,2019-Q2,2025-Q1,,,[email address],,
IP005036,5/12/2023,Auckland Council,Omaha Drive and Boat Ramp.,To undertake upgrade and renewals works in adjacent to the Omaha Boat Ramp that currently experiences flooding that creates serious health and safety hazards due to road and reserve flooding.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2017-Q3,2017-Q3,2023-Q2,2024-Q4,2024-Q4,2025-Q2,2017-Q3,2025-Q2,,,[email address],,
IP005044,5/12/2023,Auckland Council,Baltimore Place Conveyance and Inlet Upgrade [2506].,To provide the required future capacity to:- improve flow upstream who are heavily impacted - alleviate upstream flooding- re-grade the berm of Kennedy and Baltimore to define the existing swale - improve inletting in the vicinity of the overland flow path- upgrade existing single catch pits to single splay catchpits.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2016-Q3,2016-Q3,2023-Q4,2024-Q3,2024-Q4,2025-Q1,2016-Q3,2025-Q2,,,[email address],,
IP005045,5/12/2023,Auckland Council,Eastbourne Road Remuera Pipe Diversion [2621].,To provide a public stormwater system to reduce flood risk on Eastbourne Road Remuera.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2016-Q4,2018-Q2,2024-Q2,2024-Q3,2024-Q4,2025-Q4,2018-Q2,2025-Q2,,,[email address],,
IP005048,5/12/2023,Auckland Council,Great North Road & Cartwright Road Flood Conveyance Pipe Renewal and Enviro Improvement Stage 2.,To mitigate the flood risk of several private properties by upgrading the stormwater network in this area.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2017-Q4,2019-Q2,2025-Q1,2025-Q2,2025-Q4,2026-Q4,2019-Q2,2026-Q4,,,[email address],,
IP005049,5/12/2023,Auckland Council,Blenheim Street Glenfield SW Renewals and Improvements [2618].,To resolve frequent flooding and to extend the network to support growth.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2018-Q1,2018-Q1,2023-Q4,2024-Q3,2024-Q4,2025-Q1,2018-Q1,2025-Q2,,,[email address],,
IP005050,5/12/2023,Auckland Council,Highwic Ave to 295 Great South Rd Greenlane [2519 3067].,To restore structural integrity of stormwater pipes and manholes.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2017-Q3,2017-Q3,2023-Q4,2024-Q4,2025-Q3,2026-Q2,2017-Q3,2025-Q2,,,[email address],,
IP005051,5/12/2023,Auckland Council,Longwood Place and Springfield Street SW Improvements [2524].,This project will enable resident growth construct new stormwater infrastructure capture overland flow path flow into the proposed piped network and help with blockages to existing catch-pit blockage.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2017-Q4,2017-Q4,2023-Q4,2024-Q3,2024-Q4,2025-Q2,2017-Q4,2025-Q2,,,[email address],,
IP005052,5/12/2023,Auckland Council,Marlborough Avenue SW Improvements [497].,To resolve the frequent flooding and reduce surcharging manholes by increasing capacity and additional public stormwater.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2017-Q3,2017-Q3,2023-Q4,2024-Q3,2024-Q4,2025-Q2,2017-Q3,2025-Q2,,,[email address],,
IP005053,5/12/2023,Auckland Council,Rosalind Road and Diana Drive SW Improvements [2588].,To capture overland flow path flow into the piped network to mitigate overland flow path regime issues and reduce surface flow peak rates and volume.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2017-Q4,2017-Q4,2023-Q4,2024-Q3,2024-Q4,2025-Q2,2017-Q4,2025-Q2,,,[email address],,
IP005054,5/12/2023,Auckland Council,102 Pah Road Papatoetoe [188].,To renew the asset to improve capacity to provide adequate service to residents and to alleviate flooding in the area.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2017-Q2,2024-Q3,2024-Q3,2025-Q3,2026-Q2,2017-Q2,2025-Q2,,,[email address],,
IP005055,5/12/2023,Auckland Council,Mayfair Crescent SW Renewal [2587].,Renew and upgrade the pipe to an adequate level of service.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2014-Q3,2019-Q3,2024-Q2,2024-Q3,2024-Q4,2025-Q2,2019-Q3,2025-Q2,,,[email address],,
IP005056,5/12/2023,Auckland Council,29 & 41 Argo Drive [195].,To renew the stormwater systems to improve condition of existing lines to solve problems with flooding and damaged drainage lines.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2015-Q2,2024-Q3,2024-Q3,2024-Q4,2025-Q2,2015-Q2,2025-Q2,,,[email address],,
IP005058,5/12/2023,Auckland Council,Normanton Reserve Pipeline Renewal and Flood Mitigation [385].,To renew existing asset by lining the existing pipe running through private properties then remove the pipe through the reserve and create an open waterway to increase downstream capacity and remove a seriously deteriorated pipe in the reserve.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2016-Q3,2016-Q3,2024-Q3,2024-Q3,2024-Q4,2025-Q2,2016-Q3,2025-Q2,,,[email address],,
IP005061,5/12/2023,Auckland Council,Bairds Rd & Sean Fitzpatrick Pl Papatoetoe [175].,To renew aging stormwater network infrastructure and increase capacity to reduce localised flooding.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2009-Q3,2023-Q3,2024-Q3,2024-Q3,2025-Q1,2009-Q3,2025-Q2,,,[email address],,
IP005062,5/12/2023,Auckland Council,Kimpton Road Stormwater culvert upgrade Stage 3.,To design the motorway culvert to cater 100 year storm events.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q3,2019-Q3,2025-Q3,2025-Q3,2025-Q4,2026-Q2,2016-Q4,2026-Q2,,,[email address],,
IP005064,5/12/2023,Auckland Council,Oruarangi (Airport Oaks) Stormwater Treatment Wetpond [491].,To construct a wetpond and associated structure to treat stormwater which will improve the downstream ecosystem including the receiving environment.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2012-Q2,2018-Q1,2024-Q1,2024-Q3,2024-Q4,2025-Q2,2018-Q1,2025-Q2,,,[email address],,
IP005065,5/12/2023,Auckland Council,Wattle Farm Stormwater Pond (Tington Wetlands) Improvements [2651].,To renew the pond for improving water quality and quantity performance through desilting upgrading infra structures such as maintenance track devices to prevent tidal ingress and bank protection works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q2,2019-Q2,2023-Q4,2024-Q3,2024-Q4,2025-Q3,2019-Q2,2025-Q3,,,[email address],,
IP005069,5/12/2023,Auckland Council,PRP: Akoranga SW Pond Renewal [2643].,To remove the sediment from the pond to bring the pond back to full operational status. Install bund/device to prevent seawater ingress and subsequent deposition of sediment.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2018-Q2,2018-Q3,2025-Q3,2025-Q4,2025-Q4,2026-Q3,2018-Q3,2026-Q3,,,[email address],,
IP005070,5/12/2023,Auckland Council,PRP: Lions Stormwater Pond Improvements [2649].,• Provide an improved water quality treatment function;• Improve public safety; and • Enhance pond ecology by creating ecological connection from the Manukau Harbour to the Waiuku Stream through the creation of fish passage structures.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2018-Q3,2019-Q2,,,2025-Q3,2026-Q2,2019-Q2,2026-Q2,,,[email address],,
IP005071,5/12/2023,Auckland Council,PRP: Point England Reserve Online SW Pond Renewal [2483].,To renew the stormwater pond to restore water quality treatment functions and create a higher amenity wetland.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2016-Q1,2016-Q2,2024-Q1,2024-Q2,2024-Q3,2024-Q4,2016-Q2,2025-Q2,,,[email address],,
IP005074,5/12/2023,Auckland Council,Reynolds Place Torbay SW Retic and Flood Mitigation [2589].,To extend the existing public stormwater reticulation to support future development and reduce flooding.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2016-Q4,2017-Q4,2023-Q3,2024-Q1,2024-Q3,2024-Q3,2017-Q4,2024-Q3,,,[email address],,
IP005075,5/12/2023,Auckland Council,Outfalls Package 4 - Cockle Bay Mangere Inlet Slippery Creek and Whangapouri Creek [2576].,To improve stormwater conveyance at inlets and outlets currently restricting flows and/or causing blockages during flood events and to reduce stormwater flow velocity to reduce erosion.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2018-Q1,2018-Q1,2024-Q4,2024-Q4,2025-Q3,2026-Q2,2018-Q1,2025-Q2,,,[email address],,
IP005076,5/12/2023,Auckland Council,Rosebank Road to Whau River Avondale [2160].,To improve pipe performance extend the life of the pipes and to reduce operating expenditure on the pipes.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2017-Q3,2017-Q3,2024-Q2,2024-Q3,2024-Q3,2024-Q4,2017-Q3,2024-Q4,,,[email address],,
IP005077,5/12/2023,Auckland Council,Rosedale East Pond Upgrade [398].,• Fully restored treatment and attenuation functionality of pond• Increased asset life of pond and associated assets• Improved access for pond maintenance and operations.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2024-Q2,2024-Q2,,,2025-Q4,2027-Q1,2024-Q2,2027-Q1,,,[email address],,
IP005078,5/12/2023,Auckland Council,Outfalls Package 5 - Hingaia Ngakoroa Oira and Tutaenui [2576].,To improve stormwater conveyance at inlets and outlets currently restricting flows and/or causing blockages during flood events and to reduce stormwater flow velocity to reduce erosion.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q2,2020-Q1,2024-Q4,2024-Q4,2025-Q1,2025-Q2,2020-Q1,2025-Q2,,,[email address],,
IP005079,5/12/2023,Auckland Council,Stanley Bay Reserve SW Outlet Renewal [2448].,To reduce odour arising from the open channel (which borders three sides of Stanley Bay Reserve) to reduce flooding issues and to improve amenity.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2015-Q3,2015-Q3,2023-Q4,2024-Q4,2024-Q4,2025-Q2,2015-Q3,2025-Q2,,,[email address],,
IP005080,5/12/2023,Auckland Council,Stanmore Road to Fife Street Stormwater Upgrade [41] - Larchwood section.,To renew existing 750mm pipe by CIPP lining. Install new inlet to pipe.,,In planning,Funding source confirmed,Selective,To be determined,Auckland,,,Water,5 - 25 million,2011-Q3,2018-Q1,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2018-Q1,2024-Q1,,,[email address],,
IP005082,5/12/2023,Auckland Council,Sunnyfield Crescent SW Network Upgrade [2591].,To provide appropriate storm water services for an area designated for impending development as a Terraced Housing and Apartment Buildings zone where there is currently limited storm water infrastructure and large overland flows; also to reduce the frequency of flooding in the study area.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2018-Q3,2024-Q3,2024-Q4,2024-Q4,2025-Q4,2018-Q3,2025-Q4,,,[email address],,
IP005084,5/12/2023,Auckland Council,Te Atatu Peninsula Town Centre Area 1 Stormwater Reticulation [2603].,Two key strategic objectives are associated with this project i.e. 1.Supporting Growth and 2.Safe Communities.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2017-Q2,2019-Q2,2024-Q3,2024-Q4,2024-Q4,2025-Q4,2019-Q2,2025-Q4,,,[email address],,
IP005085,5/12/2023,Auckland Council,Te Atatu Peninsula Town Centre Area 2 Stormwater Reticulation [2603].,Two key strategic objectives are associated with this project i.e. 1.Supporting Growth and 2.Safe Communities.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2017-Q2,2019-Q2,2024-Q2,2024-Q3,2025-Q3,2026-Q2,2019-Q2,2026-Q2,,,[email address],,
IP005086,5/12/2023,Auckland Council,Te Atatu Peninsula Town Centre Area 3 Stormwater Reticulation [2603].,Two key strategic objectives are associated with this project i.e. 1.Supporting Growth and 2.Safe Communities.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2017-Q2,2019-Q2,2024-Q2,2024-Q3,2026-Q3,2027-Q2,2019-Q2,2027-Q2,,,[email address],,
IP005087,5/12/2023,Auckland Council,Te Kanawa Crescent - Abel Tasman Avenue New Stormwater Reticulation Henderson [2553].,To enable new development in the area and reduce the frequency of overland flows along roads and through private properties thereby mitigating health and safety issues and properties damages associated with overland flows.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2017-Q3,2017-Q3,,,2025-Q3,2026-Q2,2017-Q3,2024-Q2,,,[email address],,
IP005088,5/12/2023,Auckland Council,Outfalls Package 6 - Pahurehure Inlet and Outlet [2576].,To improve stormwater conveyance at inlets and outlets currently restricting flows and/or causing blockages during flood events and to reduce stormwater flow velocity to reduce erosion.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2019-Q2,2020-Q1,2024-Q4,2024-Q4,2025-Q1,2025-Q2,2020-Q1,2025-Q2,,,[email address],,
IP005089,5/12/2023,Auckland Council,Victor Street Waterview Stormwater Renewal [2159].,To renew approximately 2.1 kilometres of critical stormwater pipe between Victor Street and Oakley Creek.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2016-Q2,2018-Q1,2023-Q3,2024-Q2,2024-Q3,2025-Q4,2018-Q1,2025-Q4,,,[email address],,
IP005090,5/12/2023,Auckland Council,Outfalls Package 7 - Puhinui and Waimahia [2576].,To improve stormwater conveyance at inlets and outlets currently restricting flows and/or causing blockages during flood events and to reduce stormwater flow velocity to reduce erosion.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q2,2020-Q1,2024-Q4,2024-Q4,2025-Q1,2025-Q2,2020-Q1,2025-Q2,,,[email address],,
IP005091,5/12/2023,Auckland Council,Outfalls Package 8 - Okura [2576].,To improve stormwater conveyance at inlets and outlets currently restricting flows and/or causing blockages during flood events and to reduce stormwater flow velocity to reduce erosion.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2020-Q1,2020-Q1,2024-Q4,2024-Q4,2025-Q1,2025-Q2,2020-Q1,2025-Q2,,,[email address],,
IP005092,5/12/2023,Auckland Council,Outfalls Package 9 - Warkworth [2576].,To improve stormwater conveyance at inlets and outlets currently restricting flows and/or causing blockages during flood events and to reduce stormwater flow velocity to reduce erosion.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2019-Q2,2020-Q1,2024-Q4,2024-Q4,2025-Q1,2025-Q2,2020-Q1,2025-Q2,,,[email address],,
IP005094,5/12/2023,Auckland Council,PRP: Alnwick Stormwater Pond Renewal.,• improve the health and safety of the pond• provide an improved water quality performance• provide better maintenance access• retain or improve the stormwater detention provided by the pond• improve amenity features and enhance the overall aesthetics to the pond and surrounding areas.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q2,2020-Q4,2025-Q2,2025-Q3,2025-Q4,2026-Q3,2020-Q4,2025-Q3,,,[email address],,
IP005095,5/12/2023,Auckland Council,PRP: Riverleigh Stormwater Pond Renewal [2712].,• Meet requirements of the Stormwater Network Discharge consent to maintain existing water quality treatment devices by ensuring the wetland can function to treat stormwater.• Ensure that the wetland can be operated and maintained safely and effectively.• Improve water quality treatment capability of the wetland if practicable.• Address structural weaknesses of the spillway and the wetland upper bank.• Realise the potential aesthetic value of the wetland and its proximity to residential properties by ensuring that design incorporates aesthetic improvements.• Maximise the recreational potential of the wetland by improving current recreation features such picnicking areas.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q2,2022-Q3,,,2025-Q3,2026-Q2,2022-Q3,2023-Q2,,,[email address],,
IP005103,5/12/2023,Auckland Council,Becroft Reserve - renew toilets and changing rooms.,Renew the toilet block and changing rooms at Becroft Reserve. FY22/23 - scoping and design.FY23/24 - complete concept design and consent.FY24/25 to FY26/27 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2017-Q4,2023-Q3,2024-Q3,2024-Q4,2024-Q4,2025-Q2,2023-Q3,2025-Q2,,,[email address],,
IP005118,5/12/2023,Auckland Council,Rosedale Park - road renewal (Jack Hinton Drive to Paul Matthews Road).,Renew the road through Rosedale Park (Jack Hinton Drive to Paul Matthews Drive).Investigate options for reducing heavy vehicles and making the road more pedestrian friendly. FY22/23 to FY23/24 - investigation and designFY24/25 planning and physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q1,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2024-Q2,2023-Q3,2024-Q2,,,[email address],,
IP005120,5/12/2023,Auckland Council,Whangateau Holiday Park - replace caravans.,Replace six caravans with cabins including decking at Whangateau Holiday Park.FY21/22 to FY22/23 - investigationFY23/24 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2021-Q3,,2023-Q3,2023-Q4,2025-Q3,2021-Q3,2025-Q3,,,[email address],,
IP005146,5/12/2023,Auckland Council,Stanmore Bay Pools & Leisure Centre - boiler phase out.,Greenhouse gas reduction initiative.FY22/23 - options analysisFY23/24 - investigation design and physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q2,2022-Q3,2023-Q3,,2023-Q3,2023-Q4,2022-Q3,2023-Q4,,,[email address],,
IP005161,5/12/2023,Auckland Council,86 Harvest Avenue Ōrewa - develop new neighbourhood park.,Develop a neighbourhood park to meet the needs of new and future residents in the community. The park may include play options connecting pathways landscaping/fencing a flat open space for an informal kick around area park furniture and rest area and signage.FY21/22 - initial investigation and develop project scopeFY22/23 - consultation and consentingFY23/24 to FY24/25 - deliver physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2023-Q3,2023-Q4,2023-Q3,2024-Q1,2024-Q1,2023-Q3,2024-Q1,,,[email address],,
IP005278,5/12/2023,Auckland Council,Murrays Bay and Crow's Nest Rise Walkway - renew pathways.,Renew various areas of the pathway including steps handrails and drainage.FY21/22 - investigate design and physical works for handrail near remediated slipFY23/24 - investigate design and physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2021-Q4,2023-Q3,2023-Q3,2023-Q4,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
IP005279,5/12/2023,Auckland Council,Freyberg Park - renew sports field # 3.,Renew sports field 3 including the drainage.FY21/22 - investigation and designFY23/24 - commence physical worksFY24/25 - complete physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2022-Q1,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2022-Q1,2024-Q1,,,[email address],,
IP005281,5/12/2023,Auckland Council,Centennial Park Campbells Bay - renew road.,Renew areas of the thoroughfare road that are damaged including road surface and guard rails.FY22/23 - investigation and designFY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2021-Q4,2023-Q2,2023-Q3,2023-Q4,2023-Q4,2021-Q4,2023-Q4,,,[email address],,
IP005283,5/12/2023,Auckland Council,Allan Brewster Leisure Centre - renew roof and gutters.,Renew the roof and gutters of the South Auckland Woodturners Daycare Admin Gym Spotlight Theatre and Physically Disabled and Able Bodied (PHAB) Association Incorporated.FY21/22 - investigation and design FY22/23 to FY 23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q1,2022-Q2,2024-Q4,2025-Q1,2025-Q2,2026-Q1,2022-Q2,2026-Q1,,,[email address],,
IP005327,5/12/2023,Auckland Council,Barry Curtis Park - renew play facilities.,Renew the play facilities at the park to meet the service requirements as identified in the Barry Curtis Master Plan. As part of the investigation phase in collaboration with the Parks and Places Specialist community consultation will include for shade sail and accessible play items. FY23/24 - investigation design consenting.FY24/25 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q3,2022-Q2,2024-Q1,,2024-Q3,2025-Q1,2022-Q2,2025-Q1,,,[email address],,
IP005330,5/12/2023,Auckland Council,Helensville A & P Showgrounds - full facility renewal.,Renew assets on site as identified in the recent site assessment including the drainage electrical services building infrastructure all accessibility to the toilet block and open space areas.FY21/22 - investigation and assessments.FY22/23 - design and scoping.FY23/24 to FY27/28 - deliver physical works.Risk Adjusted Programme (RAP) projectFuture budget allocation is subject to the local board approving the delivery option.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q3,2022-Q1,2023-Q4,2023-Q4,2024-Q1,2026-Q2,2022-Q1,2026-Q2,,,[email address],,
IP005356,5/12/2023,Auckland Council,Meola Reef - renew fencing and pathways (stage one).,Stage one works consist of the renewal of fencing and pathways aligning to the Meola Reef Development Plan.FY22/23 - investigate and designFY23/24 - detailed design obtain consents (pathways fencing)FY23/24 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2022-Q4,2023-Q4,2024-Q1,2024-Q3,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
IP005381,5/12/2023,Auckland Council,Kimpton Park - playground investigation.,Investigate options for possible relocation to the playground and/or development of a walking and cycling path. Investigate nearby options for specialised play provision opportunities.FY23/24 - investigation and designFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,2024-Q3,2024-Q3,2024-Q4,2025-Q2,2023-Q4,2025-Q2,,,[email address],,
IP005386,5/12/2023,Auckland Council,Ōtāhuhu Softball Club [Sturges Park] - renew club facilities.,Renew roof interior and exterior of the amenity block including hall kitchen store room changing room shower and toilets as identified in the building condition assessment report. FY23/24 - investigation design and physical worksFY24/25 - continue physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q1,2024-Q1,2024-Q2,2024-Q2,2024-Q2,2024-Q3,2024-Q1,2024-Q3,,,[email address],,
IP005394,5/12/2023,Auckland Council,Botanic Gardens - renew electrical transformer.,Renew electrical transformer at Botanic Gardens.FY21/22 - investigation and designFY22/23 to FY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2018-Q3,2018-Q3,2022-Q3,2022-Q4,2022-Q4,2023-Q3,2018-Q3,2023-Q3,,,[email address],,
IP005420,5/12/2023,Auckland Council,Pukekohe War Memorial Town Hall - renew heritage assets.,Renew assets in conjunction with the heritage team to ensure - Seismic upgrade of the building to 67% NBS Removal of asbestos and corroding galvanised steel roofing products and re-roof (all roofs); Retention of interior asbestos ceiling to main hall; Refurbishment of window and door joinery (timber and metal across site); Exterior building re-decoration (repairs and repaint to rendered masonry walls); Interior redecoration to “revitalise and bring up to standard”. All of the above to reflect the heritage values of the building and site; Fire compliance brought up to standard (alarm systems means of escape etc.) – as advised by the Fire Engineer; Site infrastructure brought up to standard (if required).FY19/20 - investigation and design (renewals work)FY20/21 - FY21/22 physical works (renewals work)FY22/23 - design and consent seismic workFY23/24 - FY26/27 physical works (seismic work)Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2018-Q3,2020-Q2,2023-Q3,2024-Q1,2024-Q2,2026-Q1,2020-Q2,2026-Q1,,,[email address],,
IP005621,5/12/2023,Auckland Council,Ray Faussett Reserve - develop new neighbourhood park.,Develop park facilities as approved by the local board to support the new subdivisions in the Belmont block area.FY21/22 - investigation and designFY22/23 - community consultationFY23/24 to FY24/25 - consenting and deliver physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2016-Q3,2016-Q3,2023-Q4,2024-Q1,2024-Q1,2024-Q2,2016-Q3,2024-Q2,,,[email address],,
IP005623,5/12/2023,Auckland Council,Umupuia Coastal Reserve - upgrade park assets.,Upgrade park assets including the driveway amenity block and playground.FY19/20 - FY23/24 investigation and designFY24/25 - FY26/27 physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q1,2023-Q1,2023-Q4,2023-Q4,2023-Q4,2023-Q4,2023-Q1,2023-Q4,,,[email address],,
IP005631,5/12/2023,Auckland Council,Clarks Beach Recreation Reserve and Golf Club - upgrade skate park playground and land fixtures.,Following the approval of the park's concept plan utilise the document to upgrade park amenities such as the skate park the playground and park fixtures and furniture in a staged approached.FY21/22 - consultation investigation and designFY22/23 - FY26/27 physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2020-Q3,2023-Q4,2023-Q4,2024-Q1,2024-Q1,2024-Q2,2023-Q4,2024-Q2,,,[email address],,
IP005632,5/12/2023,Auckland Council,Claystore Heritage building - full facility renewal.,Comprehensive renewal of the heritage building scope in collaboration with the heritage team. Building currently leased by the Devonport Community Workshop Trust.FY18/19 - investigate design and scope the works required. FY19/20 - complete concept design.FY20/21 to FY25/26 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2019-Q3,2020-Q4,2025-Q2,2025-Q2,2025-Q2,2025-Q4,2020-Q4,2025-Q4,,,[email address],,
IP005641,5/12/2023,Auckland Council,Māngere Town Centre - provision of all-weather canopy.,Provision of new extended all weather canopy over the central square of the Māngere Town Centre.FY18/19 to FY19/20 - investigation and designFY21/22 to FY22/23 - detailed design and consentsFY25/26 to FY26/27 - finalise outcome and deliver physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q1,2022-Q2,2025-Q1,,2025-Q4,2026-Q4,2022-Q2,2026-Q4,,,[email address],,
IP005645,5/12/2023,Auckland Council,Windmill Park - renew - park building.,Buildings destroyed by fire provided an opportunity for rebuilding of a facility suitable for providing storage and spectator seating.Reference documents.Albert/Eden shade/shelter provision assessment (November 2020)Albert-Eden Open Space Network PlanFY18/19 - investigate and design.FY19/20 - complete concept design (detailed seismic assessment stakeholder consultation)FY20/21 - complete detailed design and consentsFY20/21 to FY23/24 - physical works.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2017-Q4,2020-Q3,2022-Q4,2023-Q3,2023-Q3,2023-Q4,2020-Q3,2023-Q4,,,[email address],,
IP005654,5/12/2023,Auckland Council,Northcote War Memorial Hall - renew heritage facility.,Refurbish the heritage facility including the kitchen and downstairs area of the Northcote War Memorial Hall in conjunction with the heritage team.FY18/19 - investigation and design. FY19/20 - complete concept designs.FY21/22 to FY24/25 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2018-Q3,2021-Q4,2024-Q1,,2024-Q2,2024-Q4,2021-Q4,2024-Q4,,,[email address],,
IP005655,5/12/2023,Auckland Council,Ōrākei Basin - automate sluice gates.,Automation of the sluice gates at Orakei Basin.FY19/20 to FY20/21 - investigation and design physical works (renewal of gates)FY21/22 to FY22/23 - investigation and design of automation technologyFY23/24 - physical works (automation of the gates).,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2018-Q3,2019-Q1,2021-Q1,2023-Q3,2023-Q4,2023-Q4,2019-Q1,2023-Q4,,,[email address],,
IP005657,5/12/2023,Auckland Council,Rakino Hall relocation - Rakino Island.,Relocation of the community hall on Rakino Island due to increasing coastal inundation challenges. Continued investigation of options in consultation with the Rakino residents will continue in FY21/22.FY18/19 - FY23/24 - Investigation and design FY23/24 - FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2018-Q4,2022-Q3,2024-Q2,,2025-Q1,2025-Q2,2022-Q3,2025-Q2,,,[email address],,
IP005658,5/12/2023,Auckland Council,Shelly Beach Reserve - renew play spaces & minor assets.,Renew both play spaces and minor assets at the reserve to ensure the assets remain fit for purpose in alignment with the recent playspace provision study undertaken throughout the Rodney Local Board area.FY21/22 - investigation and consultationFY22/23 to FY25/26 - consenting and physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2018-Q3,2021-Q2,2023-Q3,,2023-Q3,2024-Q1,2021-Q2,2024-Q1,,,[email address],,
IP005670,5/12/2023,Auckland Council,Blockhouse Bay Recreational Reserve - renew amenity block on Rathlin Road.,Renew the old block with a two pan modern building with changing benches.FY22/23 - investigation and designFY23/24 - FY24/25 physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q4,2023-Q3,2024-Q1,2024-Q3,2024-Q4,2024-Q4,2023-Q3,2024-Q4,,,[email address],,
IP005671,5/12/2023,Auckland Council,Orewa Holiday Park - renew cabins.,Renew existing 14 units/cabins at Orewa Holiday Park.FY22/23 - investigationFY23/24 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2024-Q1,2024-Q2,,2024-Q2,2024-Q4,2024-Q1,2024-Q4,,,[email address],,
IP005673,5/12/2023,Auckland Council,Michaels Avenue Reserve - stage two - renew connections and playspace.,Upon the completion of stage one in 2022/2023 (Refer ID#15434 - Michaels Avenue Reserve - stage one and the completion of the FIFA Woman's World Cup football tournament) stage two works can commence. Stage two proposed works include for renewal of the playspace refurbish the fencing and shade structure alongside the playspace renew pathway connections outside of the recreation centre ensuring safer pedestrian and vehicle movement.Stages three and four of the concept plan will be delivered in future years.FY21/22 - investigation and designFY22/23 - detailed design stakeholder consultation and consentsFY23/24 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2020-Q1,2022-Q3,,2023-Q4,2024-Q1,2024-Q2,2022-Q3,2024-Q2,,,[email address],,
IP005674,5/12/2023,Auckland Council,Epsom Community Library Manukau Road - comprehensive renewal.,Comprehensive building renewal including roof and drainage furniture fixtures and equipment renewals.FY21/22 - investigation and designFY22/23 - complete concept design (stakeholder consultation obtain any necessary consents)FY23/24 to FY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2021-Q3,2023-Q3,2023-Q4,2023-Q4,2023-Q4,2021-Q3,2023-Q4,,,[email address],,
IP005676,5/12/2023,Auckland Council,Sanders Reserve - track renewal.,Renew and implement the Sanders Reserve Bike Facility Analysis and Development Strategy for the bike tracks.FY22/23 - investigation and designFY23/24 to FY24/25 - physical works Risk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q2,2023-Q1,2023-Q3,,2024-Q1,2025-Q2,2023-Q1,2025-Q2,,,[email address],,
IP005678,5/12/2023,Auckland Council,Orewa Community Centre - renew roof.,Renew roof on the main hall and the verandah and renew wooden joinery around main hall doors and windows.FY23/24 - investigation and designFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q4,2023-Q2,2023-Q3,,2023-Q4,2024-Q2,2023-Q2,2024-Q2,,,[email address],,
IP005682,5/12/2023,Auckland Council,Johnson Reserve - upgrade neighbourhood park.,Upgrade the neighbourhood park to meet the needs of new and future residents within the Tamaki Regeneration area. Works may include a playground greenways priority paths and lighting bridge stream crossings and improved connections between Tripoli and Dunkirk Roads.FY21/22 to FY23/24 - investigation and designFY24/25 to FY25/26 - physical worksThis project is dependent upon the input and readiness of various stakeholders and partners including Kainga Ora and the Tamaki Regeneration Company. This project may be deferred to a future year if stakeholders are not able proceed within the anticipated timeframe.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2022-Q2,2023-Q4,2024-Q4,,2025-Q4,2026-Q2,2023-Q4,2026-Q2,,,[email address],,
IP005697,5/12/2023,Auckland Council,Clevedon Village Heart Programme - improve public open space and amenities.,Undertake a concept plan for public spaces in Clevedon Village which includes an upgrade of the North Road play-space and park amenities refurbishment of Clevedon Hall (noting receiving project for Ardmore Hall optimisation) renewal of the village public toilets and investigation and removal of the residential dwelling at 6 North road. Development and implementation plan and phase delivery of several years.FY21/22 - FY22/23 investigation and designFY23/24 - FY26/27 physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q4,2021-Q4,2024-Q4,2024-Q4,2025-Q1,2025-Q2,2021-Q4,2025-Q2,,,[email address],,
IP005705,5/12/2023,Auckland Council,Mount Eden War Memorial Hall - renew - interior and exterior.,Comprehensive renewal including repainting of the exterior of the building roof and associated drainage renewal works interior refurbishment including windows air conditioner floor coverings and signage.FY18/19 - investigation and designFY19/20 to FY20/21 - completion of concept design (stakeholder consultation obtain any necessary consents)FY21/22 to FY24/25 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2019-Q3,2021-Q1,2023-Q4,2024-Q1,2024-Q1,2024-Q1,2021-Q1,2024-Q1,,,[email address],,
IP005707,5/12/2023,Auckland Council,Manukau Memorial Gardens - upgrade Bob White Function Lounge and administration building.,Upgrade the administration building at Manukau Memorial Gardens to improve security and staff safety and front of house functionality and minor renewal of Bob White function lounge.FY21/22 to FY22/23 - investigate and designFY22/23 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2019-Q3,2019-Q4,2023-Q3,,2023-Q4,2025-Q4,2019-Q4,2025-Q4,,,[email address],,
IP005712,5/12/2023,Auckland Council,Whitford Community Hall - refurbish roof drainage interior and improve heating.,Renew parts of the roof and refurbish as required. Refurbish drainage and interior. Install suitable heating in main hall and supper room. (10903-B001 – 1 Whitford-Maraetai Road Whitford) FY21/22 - FY22/23 investigate and design FY23/24 - FY24/25 physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q1,2022-Q1,2023-Q3,,2023-Q4,2024-Q1,2022-Q1,2024-Q1,,,[email address],,
IP005713,5/12/2023,Auckland Council,Bombay War Memorial Hall - renew roof building exterior and interior.,Renew roof undertake structural repairs (including piles) and refurbish the exterior and interior of the Bombay War Memorial Hall.FY21/22 - FY22/23 investigation and designFY24/25 - FY26/27 physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q4,2022-Q2,2023-Q4,2023-Q4,2024-Q2,2025-Q2,2022-Q2,2025-Q2,,,[email address],,
IP005716,5/12/2023,Auckland Council,Mount Albert Recreation Centre - renew - roof.,Comprehensive roof renewal of the building including downpipes and flashingsFY21/22 - investigation and designFY22/23 - design and consentingFY23/24 to FY25/26 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2022-Q1,2023-Q4,,2024-Q1,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
IP005720,5/12/2023,Auckland Council,Panmure Wharf - optimisation - stage two.,Stage two of the programme of works at the Mt Wellington War Memorial/Panmure Wharf as agreed in the concept plan. The works include the renewal of the carpark and roading adjacent to the Panmure Yacht and Boating Club.FY20/21 - investigation and designFY22/23 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2018-Q3,2021-Q2,2022-Q4,,2023-Q4,2024-Q3,2021-Q2,2024-Q3,,,[email address],,
IP005721,5/12/2023,Auckland Council,Ngāti Ōtara Park - renew playground.,Develop a nature-based playground as approved in the 2021/2022 concept plan.FY21/22 - investigation and design including concept designFY22/23 to FY23/24 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q4,2021-Q4,2023-Q3,2024-Q3,2025-Q1,2025-Q3,2021-Q4,2025-Q3,,,[email address],,
IP005742,5/12/2023,Auckland Council,Waikumete Cemetery - develop burial areas and associated infrastructure.,Develop burial areas and associated infrastructure at Waikumete Cemetery.FY21/22 to FY25/26 - investigation and designFY22/23 to FY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q3,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2024-Q1,2023-Q3,2024-Q1,,,[email address],,
IP005744,5/12/2023,Auckland Council,Upper Harbour - renew park buildings.,Renew toilet blocks at Rame Reserve Wainoni Park Greenhithe War Memorial Park Rosedale Park (concrete block near playground) and Albany Domain 'The Hut'. FY22/23 - investigation and designFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2021-Q3,2023-Q3,2023-Q3,2023-Q3,2023-Q3,2021-Q3,2023-Q3,,,[email address],,
IP005749,5/12/2023,Auckland Council,Blockhouse Bay Community Centre - renew roof and exterior of the building.,Refurbish building including roof and guttering.FY22/23 - investigation and designFY23/24 - FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q4,2024-Q1,2024-Q1,2024-Q1,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
IP005750,5/12/2023,Auckland Council,Open space buildings - renew - 2023/2024 - Ōrākei.,Renewal of open space buildings including for refurbishment of facilities across the Ōrākei Local Board area. 2023/2024 scope of works includes for the refurbishment of the brick storage building in Thomas Bloodworth Park. External refurbishment of Leicester Community Hall (address fascia) internal refurbishment of Ellerslie War Memorial Community Hall Colin Maiden Park depot Auckland Sailing Club & Pokanoa Pt toilet and Orakei Community Centre. Further buildings may be added as the investigation stage progresses.FY23/24 - detailed design obtain any necessary consentsFY23/24 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2023-Q1,2024-Q2,2024-Q2,2024-Q4,2026-Q2,2023-Q1,2026-Q2,,,[email address],,
IP005755,5/12/2023,Auckland Council,Manukau Sports Bowl - upgrade of sports field lighting carpark & accessway lights & automatic gates.,Upgrade sports field training lights and renew automatic gates.FY21/22 - investigation and design FY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q1,2022-Q2,2024-Q3,,2025-Q1,2025-Q2,2022-Q2,2025-Q2,,,[email address],,
IP005760,5/12/2023,Auckland Council,Kaipātiki - renew car parks paths and structures 2023 - 2025.,Renew park footpaths and structures such as handrails retaining walls and pedestrian bridges:- Oruamo Reserve - renew pedestrian pathways- Monarch Park - renew pathway from Monarch Park to McDowell Crescent - Lenihan Reserve - renew 13.2m² of damage footpath- Cadness Reserve - renew 15.50m² of damage footpath- Stancich Reserve - renew boardwalk near 42 Uppingham Crescent- Heath Reserve – renew pathway between Exmouth Road and Heath Avenue- Powrie Reserve paths and car park- Link Crescent car park- Birkenhead War Memorial Park stormwater renewal(More sites to be confirmed).FY21/22 to FY22/24 - investigation and design.FY24/25 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q3,2021-Q4,2023-Q3,2023-Q3,2024-Q1,2024-Q1,2021-Q4,2024-Q1,,,[email address],,
IP005766,5/12/2023,Auckland Council,Myers Park - renew amenity lighting.,Renewal of amenity lighting in Myers Park.To align with the 2002 Myers Park Conservation Plan and 2012 Myers Park Development Plan.FY22/23 - investigation and design purchase of lightingFY22/23 to 23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q2,2021-Q3,2023-Q2,2023-Q3,2023-Q3,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
IP005771,5/12/2023,Auckland Council,Open space play spaces - renew 2023/2024 - Waitematā.,Renewal of play space equipment in open spaces cross the Waitematā local board area. Scope of works include for the completion of physical works at Gladstone Park Arch Hill Park and Pt Erin pools play spaces. Sites for investigation include for Heard Park swings Victoria Park safe fall and Grey Lynn Park senior playspace. Further sites may be included during the investigation stage with sites to be prioritised for delivery.FY22/23 - investigation and design. FY23/24 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q3,,2024-Q1,2024-Q1,2024-Q2,2023-Q3,2024-Q2,,,[email address],,
IP005772,5/12/2023,Auckland Council,Waimauku Memorial Hall - renew heritage facility - stage 2.,Deliver the remaining works identified to complete the renewal of this heritage facility.FY22/23 - investigation design and commence physical worksFY23/24 to FY26/27 - continue physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2022-Q1,2023-Q4,2023-Q4,2024-Q1,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
IP005777,5/12/2023,Auckland Council,Wolverton 244 Blockhouse Bay Road [18].,To reduce the flood risk associated with the failure of a poor conditioned pipe.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2018-Q4,2018-Q4,2024-Q1,2024-Q2,2024-Q3,2024-Q4,2006-Q4,2025-Q1,,,[email address],,
IP005778,5/12/2023,Auckland Council,Waterview Catchment Separation Package 1 [2670].,The objectives of the wider Waterview Separation project are to create a separate wastewater and stormwater network which will support growth mitigate flooding and improve the environment and water quality of Oakley Creek and the Waterview inlet. Gross pollutant traps will also be installed (in other package areas) to trap solid waste and reduce the amount of waste entering the Waterview Inlet.,,In planning,Funding source confirmed,Selective,To be determined,Auckland,,,Water,5 - 25 million,2015-Q1,2020-Q4,2023-Q3,2024-Q1,2024-Q1,2025-Q4,2020-Q4,2025-Q4,,,[email address],,
IP005779,5/12/2023,Auckland Council,108-152 Fanshawe St Stormwater Upgrade Lighter Quay Basin outfall [2147].,The project mitigates exisitng and future flooding in a highly trafficked area of Fanshawe Street and alleviates the potential exacerbation of the flooding issues due to the proposed development of the City Rail Link and additional public transport plan for Fanshawe Street. The upgrades provides an increased level of flooding protection for 108-152 Fanshawe Street from approximately every 2 to every 20 years of considering the current climate and every 10 years considering the predicted future climate (increased of rainfall and sea level rise).,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2012-Q2,2023-Q4,2024-Q2,2024-Q3,2025-Q1,2012-Q2,2025-Q1,,,[email address],,
IP005781,5/12/2023,Auckland Council,88 Harris Road East Tamaki [2514].,To restore the structural integrity of critical stormwater pipes.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2017-Q3,2017-Q3,2024-Q3,2024-Q3,2025-Q3,2026-Q2,2017-Q2,2025-Q2,,,[email address],,
IP005782,5/12/2023,Auckland Council,21 St Georges Road Avondale [2522].,To restore the structural condition of deteriorated portion of a critical stormwater pipe maintaining the existing capacity whilst removing the pipe crossing beneath the house.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2017-Q3,2017-Q3,2023-Q2,2024-Q3,2025-Q3,2026-Q2,2017-Q3,2024-Q4,,,[email address],,
IP005784,5/12/2023,Auckland Council,Korotaha Terrace Rothesay Pipe Renewal and Flood Mitigation [2552].,The main objectives for this project is to renew and upgrade a critical asset with identified structural condition grade five in Rothesay Bay stormwater catchment.This project will reduces frequency of flooding to private sections and improved level of service with reduced overland flow through the private properties of 1/20 22 and 24 Korotaha Terrace and 38 Sandown Road Rothesay Bay.This flooding is reported to occur around four to five times per annum due to insufficient capacity of the culvert.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2016-Q3,2017-Q2,2023-Q3,2023-Q3,2023-Q4,2024-Q2,2017-Q2,2024-Q2,,,[email address],,
IP005785,5/12/2023,Auckland Council,95D Hinemoa Street Stormwater Outfall Renewal.,To prevent further erosion to the stream banks and improve bank stability while reducing surface flooding to the associated properties.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2017-Q4,2024-Q3,2024-Q4,2025-Q3,2026-Q2,2017-Q4,2024-Q2,,,[email address],,
IP005787,5/12/2023,Auckland Council,3-8 Robert Street Ellerslie Pipeline Renewal [1300].,To provide the required future capacity to alleviate upstream habitable floor flooding. The remaining pipes in good condition upstream will be upgraded in the future as required. This project will involve:- restoring the structural condition of all pipes- upgrading pipe capacity to support identified future improvement works in upstream catchment- diverting pipes from under buildings.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2017-Q4,2017-Q4,,2024-Q2,2025-Q3,2026-Q2,2017-Q4,2025-Q1,,,[email address],,
IP005788,5/12/2023,Auckland Council,38-72 Hellyers Street Birkdale SW upgrade [2481].,To renew and upgrade the pipe network that is old and in very poor condition under capacity and collapsed in sections.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2017-Q3,2023-Q2,2023-Q3,2024-Q3,2025-Q2,2017-Q3,2024-Q3,,,[email address],,
IP005789,5/12/2023,Auckland Council,30-32 Levesque Street and Lauderdale Road SW Renewal [2528] [2681].,The objectives of this project are to:- Reduce flooding to properties within the Eskdale Catchment by providing new stormwater infrastructure and increasing the level of service of stormwater reticulation. - Rehabilitate deteriorating assets to reduce risk of flooding to properties.- Support and enable growth to occur within the catchment.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2018-Q2,2023-Q3,2024-Q1,2025-Q3,2026-Q2,2018-Q2,2024-Q3,,,[email address],,
IP005790,5/12/2023,Auckland Council,9 to 23 Holly Street Avondale SW Renewal [2523].,Renewal of approximately 143m of critical stormwater pipe in poor condition crossing beneath residential dwellings and servicing a large over land flow path to restore structural condition and reduce risk of flooding that would be caused if pipes were to fail.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2018-Q2,2018-Q2,2023-Q2,2024-Q3,2025-Q3,2026-Q2,2018-Q2,2024-Q4,,,[email address],,
IP005791,5/12/2023,Auckland Council,6-10 Altona Road Forrest Hill Flood Mitigation [2529].,• To mitigate frequent ponding on Altona Road and property flooding.• To resolve concerns with the open channel along the boundary of Westlake Boys High School.• To achieve appropriate levels of service for the stormwater network in this area under existing development and maximum probable development conditions.• To facilitate growth in this area – currently zoned mixed housing suburban/urban.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2017-Q4,2017-Q4,2023-Q4,2024-Q4,2024-Q4,2025-Q2,2017-Q4,2025-Q2,,,[email address],,
IP005793,5/12/2023,Auckland Council,Bracken and Tennyson Avenue Network Options [2640].,Install enough Stormwater infrastructure to allow for future development. Complete catchment reticulation system. Opportunities for end of catchment treatment also exists.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2018-Q3,2018-Q3,,,2025-Q3,2026-Q2,2018-Q3,2026-Q2,,,[email address],,
IP005794,5/12/2023,Auckland Council,Orchard Road Browns Bay Flood Mitigation [483].,Improve the level of service provided by the piped storm water reticulation and reduce the frequency of overland flows through the affected properties.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2018-Q3,,2025-Q1,2025-Q1,2025-Q4,2018-Q3,2025-Q4,,,[email address],,
IP005795,5/12/2023,Auckland Council,57A Godley Road Stream Bank Stabilisation [2677].,The objective of this project is to support and protect the stream bank through erosion remediation and stabilisation of 30 square metres of stream bank at 57A Godley road.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,2018-Q4,2024-Q4,2025-Q1,2025-Q1,2025-Q2,2018-Q4,2025-Q2,,,[email address],,
IP005797,5/12/2023,Auckland Council,3 Orne Street Torbay - Stormwater Renewal [2638].,To renew and upgrade the existing network for the concerned extend up to 10 year ARI.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2019-Q2,2024-Q1,2024-Q2,2024-Q3,2025-Q1,2019-Q2,2025-Q1,,,[email address],,
IP005799,5/12/2023,Auckland Council,Meadowood Reserve Stormwater Improvements [492].,Network extension into Meadowood Reserve and inletting works to intercept overland flows to reduce overland flows and mitigate flooding around the creche and community centre.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2019-Q2,,,2025-Q3,2026-Q2,2019-Q2,2026-Q3,,,[email address],,
IP005800,5/12/2023,Auckland Council,Ocean View Rd Pipe Renewal Northcote [2646].,Renew by upgrading the stormwater pipes to mitigate the identified risks.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q2,2021-Q2,2024-Q1,2024-Q2,2025-Q3,2026-Q2,2021-Q2,2024-Q4,,,[email address],,
IP005801,5/12/2023,Auckland Council,Roberta Pond Renewal [2711].,• Improve safety by ensuring the device meets the NZ Dam Safety Criteria.• Meet requirements of the Stormwater Network Discharge consent to maintain existing water quality treatment devices by ensuring the pond can function to treat stormwater.• Ensure that the pond can be operated and maintained safely and effectively.• Improve water quality treatment capability of the pond if practicable.• Provide improved amenity features and enhanced aesthetics• Provide a stable embankment to the west of the pond.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q2,2020-Q3,2024-Q4,,2025-Q3,2026-Q2,2020-Q3,2026-Q2,,,[email address],,
IP005802,5/12/2023,Auckland Council,Rising Parade Pond Renewal [2647].,• Improve water quality treatment performance.• Improve ease of maintenance.• Reduce long term OPEX costs by allowing inspections/maintenance to be undertaken without temporary access structures.• Reduce health and safety risks associated with outlet maintenance.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2019-Q2,2019-Q4,,,2025-Q3,2026-Q2,2019-Q4,2023-Q2,,,[email address],,
IP005803,5/12/2023,Auckland Council,View Ridge Drive Pond Renewal [2650].,Improve water quality treatment functionProvide a suitable pond forebayImprove maintenance accessReduce health and safety risk whilst conducting maintenanceEnhance overall pond aesthetics.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2019-Q2,2022-Q3,,,2025-Q3,2026-Q2,2022-Q3,2026-Q2,,,[email address],,
IP005804,5/12/2023,Auckland Council,Kitchener Pond North Renewal [2648].,• Provide maintenance access;• Provide water quality treatment function;• Enhance pond integrity;• Improve amenity and overall aesthetics; and• Improve ecological function.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2019-Q2,,,,2025-Q3,2026-Q2,2020-Q2,2026-Q2,,,[email address],,
IP005806,5/12/2023,Auckland Council,34 Eskdale Rd Pipe Renewal Birkdale [2701].,The project seeks to install new stormwater infrastructure to replace an existing stormwater pipe which was found in poor condition during a recent CCTV survey. The network upgrade will provide safe community objectives by mitigating the health and safety risks presented by potential failure of the existing pipe and will enable future growth to an area where there is high potential for future development.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q2,2019-Q2,2024-Q1,2024-Q2,2025-Q3,2026-Q2,2019-Q2,2024-Q4,,,[email address],,
IP005808,5/12/2023,Auckland Council,Kristin Lane Pond Renewal [2717].,· Restore pond WQV by desilting the pond;· Improve the water quality treatment performance of the pond; and · Improve ease of maintenance.· Improved water quality treatment performance.· Improved ease of access to pond; and · Improved pond aesthetics.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2019-Q2,2022-Q2,,,2025-Q3,2026-Q2,2022-Q2,2026-Q2,,,[email address],,
IP005809,5/12/2023,Auckland Council,Blueridge East Stormwater Pond Renewal [2713].,Improve ease of maintenance.Reduce longterm opex costs by creating a robust stormwater asset.Improve aesthetics and ecological value.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2019-Q2,2022-Q3,,,2025-Q3,2026-Q2,2022-Q3,2026-Q2,,,[email address],,
IP005811,5/12/2023,Auckland Council,Pavilion Drive Pond 2 Renewal [2718].,•Providing and maintaining water quality management function;•Provide a robust stormwater asset with a long design life that is easily maintained;•Provide management of the surrounding aggressive soils that could be replicated across the other Pavilion ponds (with identified presence of aggressive soils) to improve the mortality rates of vegetation;•Improved amenity features and overall enhanced aesthetics which blend with the natural environment; and •Allow diverse habitats (riparian and aquatic) to be created.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q2,2022-Q3,,,2025-Q3,2026-Q2,2022-Q3,2026-Q2,,,[email address],,
IP005816,5/12/2023,Auckland Council,Birkenhead Ave/Waratah Street SW Network Extension [1291].,Extending the stormwater network to provide connections to 30 lots in Birkenhead which are not reticulated.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q2,2021-Q2,2024-Q2,2024-Q3,2024-Q3,2025-Q1,2021-Q2,2025-Q1,,,[email address],,
IP005817,5/12/2023,Auckland Council,CPT: 770 Great South Road Stormwater Pond Renewal [2737].,Improve water quality treatment performance Improve the maintenance access to pond and enhancing amenity and aesthetics value of the pond and surroundings.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2019-Q2,2019-Q4,2023-Q4,2024-Q4,2024-Q4,2025-Q1,2019-Q4,2025-Q2,,,[email address],,
IP005818,5/12/2023,Auckland Council,Albionvale Pond Renewal.,Desilting the pond addressing the poor condition of the inlet/outlet removing the pest vegetation and assessing solutions around meeting it’s required water quality purpose.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q2,,,,2025-Q3,2026-Q2,2020-Q2,2026-Q2,,,[email address],,
IP005819,5/12/2023,Auckland Council,Paremuka Stream Bank Stabilisation [2709].,The objective of this initiative is to reduce the risk of erosion by applying geomorphically management solutions (GEMS) along the stream reach.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2019-Q2,,,2025-Q3,2026-Q2,2019-Q2,2025-Q3,,,[email address],,
IP005821,5/12/2023,Auckland Council,10 Parlane Drive Wetland Pond Renewal [2742].,Improving the water quality of the existing wetlandImprove hydraulic function Improve embankment stability and mitigate erosionPotentially look at the other ponds/wet lands within 400-1000m; Robert Might Road Tapu Road.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q3,2023-Q3,,,2025-Q3,2026-Q2,2023-Q3,2025-Q2,,,[email address],,
IP005822,5/12/2023,Auckland Council,Pitoitoi West & East Stormwater Pond Renewals [2744].,To desilt pond and upgrade wetland.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q3,2022-Q2,,,2025-Q3,2026-Q2,2022-Q2,2025-Q2,,,[email address],,
IP005823,5/12/2023,Auckland Council,Semillon Pond Renewal [2745].,• Provide water treatment appropriate for the upstream catchment and downstream receiving environment• Provide a robust and long-lasting stormwater asset for a catchment that is near maximum probable development• Add value to the local community by increasing the amenity and the ecological value of the pond and reserve• Provide a safe area for public enjoyment given that the pond is located next to a playground.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q3,2022-Q2,,,2025-Q3,2026-Q2,2022-Q2,2025-Q2,,,[email address],,
IP005824,5/12/2023,Auckland Council,Centreway Wetland Pond Renewal [2747].,To remove sediment repair minor inlet provide better maintenance access provision and moderate aquatic pest flora presence.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q3,2022-Q2,2025-Q2,,2025-Q3,2026-Q2,2022-Q2,2026-Q2,,,[email address],,
IP005825,5/12/2023,Auckland Council,Orwell Pond Renewal [2743].,• Improve water quality treatment performance to meet current upstream catchment demand• Provide a robust and long-lasting stormwater asset• Add value to the local community by increasing the amenity and aesthetics value of the pond and surrounding area.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q3,2022-Q2,2025-Q1,2025-Q2,2025-Q4,2026-Q4,2022-Q2,2026-Q4,,,[email address],,
IP005826,5/12/2023,Auckland Council,Earnie Clarke Stormwater Pond Renewal [2746].,Remedy the issues above and assess the solutions to meet the water quality requirements.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q3,2023-Q4,2024-Q3,2024-Q3,2024-Q4,2025-Q1,2023-Q4,2025-Q1,,,[email address],,
IP005828,5/12/2023,Auckland Council,Holy Cross School Pipe Renewal [2707].,To reline 71m of 600m diametre pipe with CIPP lining or equivalent.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,2019-Q3,,,2025-Q3,2026-Q2,2019-Q3,2025-Q2,,,[email address],,
IP005829,5/12/2023,Auckland Council,Nereus Pl Pipe Renewal [2695].,To reline 76m of pipe and install a manhole.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,2019-Q3,,,2025-Q3,2026-Q2,2019-Q3,2025-Q2,,,[email address],,
IP005833,5/12/2023,Auckland Council,Sunnybrae Rd Pipe Renewal [2730].,The original scope of pipe renewal by relining is changed to Option 3: Upgrading the length of pipe to maximise asset life and mitigate flooding risks.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q4,2022-Q4,2024-Q1,2024-Q2,2024-Q3,2025-Q2,2022-Q4,2025-Q2,,,[email address],,
IP005834,5/12/2023,Auckland Council,Huron St and Auburn St Pipe Renewal [2694].,To replace 171m of pipe and increase diameter.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,2019-Q4,,,2025-Q3,2026-Q2,2019-Q4,2024-Q2,,,[email address],,
IP005837,5/12/2023,Auckland Council,Victoria Road Devonport Pipe Renewals.,Pipe renewal to ensure pipe network is in good operational condition extend the service life of the pipe and pipe upgrade at the same time to raise pipe capacity to 10-yr ARI MPD CC.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2020-Q4,,2026-Q1,2026-Q2,2026-Q4,2020-Q4,2028-Q2,,,[email address],,
IP005838,5/12/2023,Auckland Council,Blockhouse Bay Separation.,The objectives of this project is to reduce engineered overflows from a specific manhole from 37 times per year to less than two.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2021-Q1,2021-Q4,2024-Q2,2024-Q4,2024-Q4,2025-Q1,2021-Q4,2025-Q2,,,[email address],,
IP005839,5/12/2023,Auckland Council,Carrington Road SW extension (Unitec).,To improve the water quality by reducing wastewater overflows to the receiving environment.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2021-Q1,2021-Q1,,,2025-Q3,2026-Q2,2021-Q1,2024-Q3,,,[email address],,
IP005840,5/12/2023,Auckland Council,Morningside Drive - 580 New North Road SW Extension [2557].,Network extension to mitigate frequent flooding at and around the Morningside Cres Railway Crossing. This is intended to be a colloborative project with AT and KiwiRail. Another objective is improving network capacities to support future development in both the SW and WW networks by separating the systems and reduce overflows at EOP's.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,,2022-Q4,,,2024-Q3,2024-Q3,2022-Q4,2024-Q1,,,[email address],,
IP005848,5/12/2023,Auckland Council,Castor Bay SW Pipe Renewals and Improvements.,• To renew Council’s critical infrastructure by replacing the pipes in poor condition which are part of a twin pipe configuration with a single 2000x1500mm box culvert.• To minimise health and safety risks by reducing road ponding frequent road flooding and property flooding in a 5-year storm.• Support growth for approximately 2ha of Mixed Housing Suburban zone adjacent to the proposed pipe upgrades.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2021-Q1,2024-Q4,2025-Q1,2025-Q3,2026-Q2,2021-Q1,2026-Q1,,,[email address],,
IP005851,5/12/2023,Auckland Council,2 Galway St Onehunga SW Upgrade.,To minimise stormwater pipe's structural failure risk convey stormwater to the outfall safely minimising stormwater contamination risk as the pipe is passing through a closed landfill.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2021-Q1,2021-Q1,2024-Q3,2024-Q3,2024-Q4,2024-Q4,2021-Q1,2024-Q4,,,[email address],,
IP005853,5/12/2023,Auckland Council,Mihini Rd Wetland Pond Renewal and Upgrade.,Renewal of wetland expansion of the wetland into the current forebay and installing separate GPTs in two subcatchments to replace the existing forebay's function.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2018-Q4,2025-Q4,,2025-Q3,2026-Q2,2018-Q4,2025-Q2,,,[email address],,
IP005856,5/12/2023,Auckland Council,17-40 Tomo St New Lynn flood mitigation - Stage 2 [2608].,To increase the number of inlets to the existing stormwater networks to minimise overland flow thereby reducing nuisance flooding.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2017-Q4,2023-Q3,2024-Q1,2024-Q2,2024-Q2,2017-Q4,2024-Q2,,,[email address],,
IP005869,5/12/2023,Auckland Council,City Centre Service Lane Improvements.,The purpose of this project is to address the issues and unlock the potential opportunities within Mills Lane and Exchange Lane two key areas in the City Centre. The strategic assessment was endorsed by the City Centre Advisory Board in 2019 recognising the need to address the challenges faced by these locations and capitalise on the possibilities for improvement.In March 2023 the business case and concept design for the redevelopment of Mills Lane and Exchange Lane was successfully completed. The project will now proceed by splitting its focus on design development and implementation for each location individually. To ensure efficient management Sub-WBS codes will be established for both projects.By undertaking this project the aim is to enhance the functionality aesthetics and overall experience of Mills Lane and Exchange Lane contributing to the City Centre's overall development. It will address the identified problems optimise the utilisation of the spaces and leverage the potential opportunities for economic growth and community engagement.,,On hold,Funding source confirmed,Limited,To be determined,Auckland,,,Other not specified,5 - 25 million,2020-Q2,2023-Q2,2024-Q2,2024-Q3,2024-Q4,2025-Q4,2023-Q2,2025-Q4,,,[email address],,
IP006395,5/12/2023,Auckland Council,AEM Relocate and Fitout.,Relocate and fitout AEM from Bledisloe House (BH to be sold).,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Other not specified,1 - 5 million,,,,,,,2022-Q3,2024-Q1,,,[email address],,
IP006406,5/12/2023,Auckland Council,City Centre Emily Place Improvements.,Development of the business case to look at the problems and opportunities in Emily Place proposed at high level in City Centre Masterplan 2012 and supported by City Centre Advisory Board.,,On hold,Funding source confirmed,Limited,To be determined,Auckland,,,Other not specified,5 - 25 million,,2023-Q4,2025-Q1,2025-Q2,2025-Q3,2026-Q3,2023-Q4,2026-Q3,,,[email address],,
IP006410,5/12/2023,Auckland Council,Community Houses - investigate renewal work needed at all community houses and deliver minor capex.,Investigate renewal work needed at all Community Houses in Kaipātiki e.g. Bayview Community Centre Birkdale Community House and Highbury Community House. Including renewal of the rotting cedar weatherboards framing and flooring at Beach Haven Community House and Creche.FY21/22 - investigation and design.FY22/23 to FY25/26 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2022-Q4,2024-Q1,2024-Q4,2024-Q4,2026-Q1,2022-Q4,2026-Q1,,,[email address],,
IP006418,5/12/2023,Auckland Council,Hibiscus Bays LB - Relocate LB Office & Fitout.,Part of
WorkSmart@AC Programme.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2022-Q3,2024-Q4,,,[email address],,
IP006433,5/12/2023,Auckland Council,Manurewa LB - Relocate LB Office & Fitout.,Part of
WorkSmart@AC Programme.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2022-Q2,2024-Q2,,,[email address],,
IP006442,5/12/2023,Auckland Council,MC - Egress Compliance.,MC - Egress ComplianceDuring a survey of the building it was discovered that the building's emergency stairs does not comply with the building code A proposal was submitted by the architects to rectify the problem. Auckland Council consenting department was approached for consenting advice and we were directed to submit an exemption application. GHD design was appointed on behalf of Auckland Council to submit the exemption a application.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2023-Q3,2023-Q3,,2023-Q4,,,2023-Q3,2024-Q2,,,[email address],,
IP006451,5/12/2023,Auckland Council,Onehunga Pool - Phase Out Gas Boiler.,Installation of electric heat pumps to replace or reduce use of gas-powered boilers at Onehunga & energy efficiency opportunities identified through the design process.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q3,2020-Q4,2023-Q2,2023-Q2,2023-Q2,2023-Q3,2020-Q4,2023-Q3,,,[email address],,
IP006470,5/12/2023,Auckland Council,Rodney Town Centre Revitalisation - implement concept plan - stage 2 - Helensville.,Revitalisation of the Helensville town centre area. This is continuing delivery of the Helensville Town Centre Upgrade Plan. The local board initiative includes tree planting furniture installation. This project has been designed in collaboration with the local iwi and community to ensure the town's culture has been taken into consideration within the design.FY21/22 to FY24/25 - continued delivery of town centre worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2021-Q3,2022-Q2,,2023-Q2,2024-Q1,2021-Q3,2024-Q1,,,[email address],,
IP006473,5/12/2023,Auckland Council,Shepherds Park - investigate and prioritise actions to upgrade areas into a nature play park.,Upgrade the Shepherds Park playground at the time of renewal. The Nature Spaces and Trails report recommends Shepherds Park as third priority in assessment for future nature play park. FY23/24 - investigation and design.FY24/25 - physical works.FY25/26 - complete physical works.Risk Adjusted Programme Project (RAP).,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q4,2022-Q2,2022-Q4,2023-Q1,2023-Q1,2023-Q2,2022-Q2,2023-Q2,,,[email address],,
IP006482,5/12/2023,Auckland Council,Waenganui/Allenby Park - renew skate bowl and playground.,Renew the playground volleyball court and skate bowl.FY23/24 - investigation and concept design for skate bowl and playgroundFY24/25 - physical works skate parkFY26/27 - physical works playgroundRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q3,2024-Q2,2024-Q2,2024-Q2,2026-Q2,2023-Q3,2026-Q2,,,[email address],,
IP006486,5/12/2023,Auckland Council,Whau LB - Relocate LB Office & Fitout.,Part of
WorkSmart@AC Programme.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2022-Q2,2024-Q2,,,[email address],,
IP006491,5/12/2023,Auckland Council,Darroch Reserve Pump Installation.,To Design and Install small pump station to pump water out of the Darroch Slope Reserve into the existing stormwater pipe up the hill.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2017-Q3,,,2023-Q3,2023-Q4,2017-Q3,2023-Q4,,,[email address],,
IP006795,5/12/2023,Auckland Council,Mangarata Stage 2 [193].,To construct a new reticulation system with higher capacity in order to reduce flooding in a staged approach. Construction is already completed for Stage 1 at Kimpton Road.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2016-Q3,2024-Q2,2024-Q3,2024-Q4,2025-Q2,2016-Q3,2025-Q2,,,[email address],,
IP006798,5/12/2023,Auckland Council,Mahurangi Community Building - comprehensive renewal.,Reconfigure the library mezzanine floor to enable storage access from the library and renew the heating system.Renew the toilet facilities to ensure they are compliant with current building standards.Investigate and remediate water-tightness issues identified.Deliver recommendations identified in the seismic assessment.FY19/20 - detailed design planning and consentingFY20/21 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2018-Q3,2020-Q3,2023-Q3,2023-Q4,2024-Q1,2024-Q2,2020-Q3,2024-Q2,,,[email address],,
IP006803,5/12/2023,Auckland Council,Prince Edward Park - renewal of softball diamond field one.,Renewal of softball fields. Initially field one followed by field two. The scope of work includes the renewal of the outfield (leveled and sown with Kikuyu grass) infield (with hoggin) ball stop fencing and spectator fencing. New drainage and irrigation are also part of the scope of work however this will be funded as a separate project (ID 28572) via a level of service increase. Excluded from the scope of work is sports field lighting an artificial surface for the infield and warm up cages which were lower priorities for the softball club. FY21/22 to 22/23 - investigation and designFY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q3,2024-Q1,,2024-Q2,2024-Q2,2022-Q3,2024-Q2,,,[email address],,
IP006804,5/12/2023,Auckland Council,Pukekawa / Auckland Domain - develop pathway connections.,Development of four priority pathway connections as approved by the Auckland Domain Committee and Waitemata Local Board.- Titoki St carpark to Football Rd path- Football Road End to the Crescent- Centennial Path to Grafton Mews- Parnell Station to Lovers Lane FY19/20 - investigation and design (to be presented to the governing bodies here in for approval prior to seeking resource consent)FY19/20 to FY21/22 - detailed design (consenting and planning)FY22/23 to FY24/25 - commence physical works.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2019-Q1,2019-Q3,2023-Q3,2023-Q4,2023-Q4,2026-Q2,2019-Q3,2026-Q2,,,[email address],,
IP006810,5/12/2023,Auckland Council,Victor Eaves Park - renew premium cricket ground.,Renew premium cricket ground surface drainage and irrigation.FY22/23 to FY23/24 - investigation and designFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2022-Q1,2024-Q2,2024-Q2,2024-Q4,2025-Q1,2022-Q1,2025-Q1,,,[email address],,
IP006812,5/12/2023,Auckland Council,Piha Stream Improvements Erosion and Flow Conveyance [2958].,Protect public infrastructure from being damaged by erosion of the streambank including the West Coast Art Gallery Education Facility land and schoolhouse Piha Mill Camp and Glenesk Road and to reduce sedimentation from bank erosion which is causing degradation of instream habitat and accumulation of fine sediment downstream at Piha Lagoon.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q1,2024-Q3,2026-Q4,2027-Q2,2027-Q3,2028-Q3,2024-Q3,2028-Q3,,,[email address],,
IP006819,5/12/2023,Auckland Council,Tui Glen Reserve / Inanga / Chilcott Brae - upgrade shared path.,Upgrade the existing shared path from the yellow pedestrian bridge to Central Park Drive to 3 metres wide and install LED amenity lighting. FY22/23 to FY23/24 - investigation and designFY23/24 to FY24/25 - physical works.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2022-Q2,2023-Q2,2024-Q1,2024-Q2,2024-Q2,2025-Q1,2023-Q2,2025-Q1,,,[email address],,
IP008244,5/12/2023,Auckland Council,(OLI) Ponsonby Park - develop civic park space.,Staged development of a civic park space Ponsonby Park at 254 Ponsonby Road.FY19/20 - initiate business caseFY22/23 - complete business case progress concept and detailed design stakeholder consultation required consentsFY23/24 to FY24/25 - progress physical works (stage one)Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,To be determined,To be determined,Auckland,,,Community facilities,5 - 25 million,2019-Q3,2023-Q1,2024-Q1,2024-Q2,2024-Q1,2024-Q4,2023-Q1,2024-Q4,,,[email address],,
IP008245,5/12/2023,Auckland Council,1/53 Newington Road Henderson Pipe Renewal.,1. Reduce the risk of critical asset failure2. Extend the life of critical assets.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q3,2023-Q4,,,2024-Q3,2024-Q4,2023-Q4,2024-Q4,,,[email address],,
IP008246,5/12/2023,Auckland Council,109-111 Bell Road Remuera Stormwater Renewal and Upgrade.,To restore the structural integrity of the asset increase the asset life resolve flooding reduce erosion and enable the potential for growth.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Water,1 - 5 million,2022-Q1,2022-Q1,,,2024-Q1,2024-Q4,2022-Q1,2024-Q4,,,[email address],,
IP008247,5/12/2023,Auckland Council,109-115 St Georges Bay Road Parnell Pipe Renewal.,To repair or replace identified critical assets to increase asset life.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q1,,,,2025-Q4,2025-Q4,2022-Q1,2025-Q4,,,[email address],,
IP008248,5/12/2023,Auckland Council,113 Mt Wellington Highway.,To repair or replace identified critical assets to increase asset life.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q3,2022-Q3,,,2025-Q3,2026-Q2,2022-Q3,2028-Q2,,,[email address],,
IP008249,5/12/2023,Auckland Council,117 Beach Haven Road Beach Haven.,To repair or replace identified critical assets to increase asset life.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Water,1 - 5 million,2022-Q1,2023-Q2,2024-Q2,,2025-Q3,2026-Q2,2023-Q2,2023-Q3,,,[email address],,
IP008251,5/12/2023,Auckland Council,13 Nikau Road Otahuhu Pipe Renewal.,To repair or replace identified critical assets to increase asset life.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2021-Q3,2023-Q1,2023-Q4,2024-Q1,2024-Q2,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
IP008252,5/12/2023,Auckland Council,139 Beach Road Castor Bay - Old Barracks - investigate options for the building.,Remove asbestos and refurbish the interior and exterior of a heritage building considering all options prior to commencement of works. FY23/24 - investigation and design.FY24/25 to FY25/26 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2019-Q3,2022-Q2,2024-Q1,2024-Q1,2024-Q1,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
IP008253,5/12/2023,Auckland Council,15 Weymouth Road Manurewa Pipe Renewal.,To renew a poor condition critical asset to restore its functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q1,2023-Q3,,,2024-Q3,2025-Q4,2023-Q3,2025-Q4,,,[email address],,
IP008255,5/12/2023,Auckland Council,155 Edinburgh Street Pukekohe Pipe Renewals.,To renew poor condition critical assets to restore their functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q1,2023-Q4,,,2025-Q3,2025-Q3,2023-Q4,2025-Q3,,,[email address],,
IP008256,5/12/2023,Auckland Council,16 Constable Road Waiuku Pipe Renewals.,To renew poor condition critical assets to restore their functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q1,2024-Q4,,,2025-Q3,2025-Q3,2024-Q4,2025-Q3,,,[email address],,
IP008257,5/12/2023,Auckland Council,17 Reynella Drive Massey pipe renewal.,To renew a poor condition critical asset to restore its functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q2,2023-Q3,,,2024-Q3,2024-Q4,2023-Q3,2024-Q4,,,[email address],,
IP008258,5/12/2023,Auckland Council,2 Vernon Street Papakura Pipe Renewal.,To repair or replace identified critical assets to increase asset life.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q1,2023-Q1,,,2024-Q3,2024-Q4,2023-Q1,2024-Q4,,,[email address],,
IP008259,5/12/2023,Auckland Council,226 Hibiscus Coast Highway and Milton Road Pipe Renewal and Upgrade.,Reduce flooding risk at Milton Rd and Pine Rd renew pipe at 226 Hibiscus Coast Highway improve water quality.,,Early planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2021-Q4,2023-Q3,2024-Q1,2024-Q3,2024-Q3,2024-Q4,2023-Q3,2024-Q4,,,[email address],,
IP008260,5/12/2023,Auckland Council,24 Pleasant St and 113 Queenstown Rd Onehunga Pipe Renewal.,This project involves renewing poor condition critical assets to restore its functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q2,2024-Q4,,,2024-Q3,2024-Q4,2024-Q4,2024-Q4,,,[email address],,
IP008262,5/12/2023,Auckland Council,25 Railway Street West Papakura Pipe Renewals.,To renew poor condition critical assets to restore their functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q1,2023-Q3,,,2024-Q4,2025-Q1,2023-Q3,2025-Q1,,,[email address],,
IP008263,5/12/2023,Auckland Council,278-310 Manukau Rd Epsom Newmarket.,To renew poor condition critical assets to restore their functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q2,,,,2024-Q4,2024-Q4,2025-Q3,2024-Q4,,,[email address],,
IP008265,5/12/2023,Auckland Council,32 Kaitawa Street Otara Pipe Renewal.,To repair or replace identified critical assets to increase asset life.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q1,,,,2025-Q3,2025-Q3,2022-Q1,2025-Q3,,,[email address],,
IP008266,5/12/2023,Auckland Council,33 Luke Street Otahuhu Pipe Renewals.,To renew poor condition critical assets to restore their functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q1,2024-Q4,,,2025-Q3,2025-Q3,2024-Q4,2025-Q3,,,[email address],,
IP008267,5/12/2023,Auckland Council,4 Lavas Place Mt Wellington.,To renew poor condition critical assets to restore their functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q2,2023-Q3,,,2024-Q4,2025-Q1,2023-Q3,2025-Q1,,,[email address],,
IP008268,5/12/2023,Auckland Council,472 Beach Rd Murrays Bay SW Pipe renewal.,To renew poor condition critical assets to restore their functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2021-Q3,2023-Q3,,,2025-Q3,2025-Q3,2023-Q3,2025-Q3,,,[email address],,
IP008269,5/12/2023,Auckland Council,52 Armadale Road Greenlane.,To repair or replace identified critical assets to increase asset life.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q2,2023-Q3,2024-Q3,,2024-Q3,2024-Q4,2023-Q3,2024-Q4,,,[email address],,
IP008271,5/12/2023,Auckland Council,57-61 Parnell Rise Parnell Pipe Renewal.,To repair or replace identified critical assets to increase asset life.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q3,,,,2024-Q3,2024-Q4,2022-Q3,2024-Q4,,,[email address],,
IP008272,5/12/2023,Auckland Council,58 Station Road Pukekohe Pipe Renewal.,To repair or replace identified critical assets to increase asset life.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q1,2023-Q1,2023-Q2,,2024-Q3,2024-Q4,2023-Q1,2024-Q4,,,[email address],,
IP008273,5/12/2023,Auckland Council,6 Freeland Ave Mt Roskill Pipe Renewal.,To renew poor condition critical assets to restore their functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,2024-Q4,,,2025-Q3,2025-Q3,2024-Q4,2025-Q3,,,[email address],,
IP008275,5/12/2023,Auckland Council,61 Bright Street Eden Terrace Pipe Renewal.,To renew a poor condition critical asset to restore its functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q1,,,,2024-Q3,2024-Q4,2025-Q3,2024-Q4,,,[email address],,
IP008276,5/12/2023,Auckland Council,62 Greville Rd Albany Emergency Pipe Renewal.,1. To repair or replace identified critical assets to increase asset life.2. Improve operational performance and Level of Service where practical and/or cost-effective.,,In planning,Funding source confirmed,Selective,To be determined,Auckland,,,Water,5 - 25 million,2021-Q3,2023-Q1,2023-Q4,2023-Q4,2023-Q4,2024-Q1,2023-Q1,2024-Q1,,,[email address],,
IP008277,5/12/2023,Auckland Council,6-72 Valentine Street Pipe Renewal.,To repair or renew the pipe so as to restore its functionality over a length of approximately 640m so as to minimise habitable floor flooding in the vicinity of Wing Crescent Sheehan Ave and Eastburn Street..,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q2,2023-Q3,2024-Q2,2024-Q4,2024-Q4,2025-Q1,2023-Q3,2025-Q1,,,[email address],,
IP008278,5/12/2023,Auckland Council,68 St Michaels Avenue Pt Chevalier Pipe Renewal.,To renew poor condition critical assets to restore their functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q1,2023-Q4,,,2025-Q4,2025-Q4,2023-Q4,2025-Q4,,,[email address],,
IP008279,5/12/2023,Auckland Council,78 Line Road Glen Innes Pipe Renewal.,To repair or replace identified critical assets to increase asset life.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q1,2023-Q2,2023-Q4,2024-Q1,2024-Q2,2024-Q2,2023-Q2,2024-Q2,,,[email address],,
IP008280,5/12/2023,Auckland Council,8 Flexman Place Silverdale Pipe Renewal.,To renew poor condition critical assets to restore its functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q2,,,,2024-Q3,2024-Q4,2025-Q3,2024-Q4,,,[email address],,
IP008281,5/12/2023,Auckland Council,8 Howe Street Freemans Bay Pipe Renewal.,To renew poor condition critical assets to restore their functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q1,2024-Q1,,,2025-Q3,2025-Q3,2024-Q1,2025-Q3,,,[email address],,
IP008282,5/12/2023,Auckland Council,82 Ranfurly Road Alfriston Pipe Renewal.,To renew poor condition critical assets to restore their functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q2,2023-Q3,2024-Q3,2024-Q4,2025-Q3,2026-Q2,2023-Q3,2025-Q2,,,[email address],,
IP008283,5/12/2023,Auckland Council,89 Nuffield Street Newmarket Pipe Renewal.,To renew poor condition critical assets to restore their functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q1,2023-Q3,,,2025-Q4,2025-Q4,2023-Q3,2025-Q4,,,[email address],,
IP008284,5/12/2023,Auckland Council,Aberfoyle Street - new - link pedestrian path.,Investigation design and construction of a pedestrian link between Balmoral Road and Aberfoyle Road via Aberfoyle Reserve.FY22/23 - investigation and designFY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q3,2024-Q1,2024-Q2,2024-Q2,2024-Q3,2022-Q3,2024-Q3,,,[email address],,
IP008287,5/12/2023,Auckland Council,Alberon Reserve - install retaining wall.,Install soil nails (in-situ technique used to reinforce and strengthen an existing embankment) including drainage improvements to address slope stability issues adjacent to the Parnell kindergarten.FY19/20 to FY22/23 - investigation and designFY23/24 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2018-Q4,2021-Q1,,2023-Q4,2023-Q4,2024-Q2,2021-Q1,2024-Q2,,,[email address],,
IP008290,5/12/2023,Auckland Council,Ambrico Historical Reserve - refurbish kiln roof.,Refurbish the kiln roof.FY22/23 - FY23/24 investigation and designFY26/27 - FY27/28 physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2023-Q4,2027-Q3,2027-Q3,2027-Q4,2028-Q2,2023-Q4,2028-Q2,,,[email address],,
IP008291,5/12/2023,Auckland Council,Angelo Stream Remediation and Upgrade Howick.,To reduce surface flooding during storm events and associated damages and economic losses.,,Early planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,25 - 50 million,2021-Q3,2023-Q3,2024-Q3,2024-Q3,2024-Q4,2027-Q2,2023-Q3,2027-Q2,,,[email address],,
IP008292,5/12/2023,Auckland Council,Pukekawa / Auckland Domain - address sports field drainage.,Improve the drainage of the sports fields on the Auckland Domain.FY22/23 - investigation and design FY23/24 to FY24/25 - physical works Risk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2022-Q4,2023-Q3,2023-Q3,2023-Q3,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
IP008293,5/12/2023,Auckland Council,Pukekawa / Auckland Domain - renew Centennial and Watson Bequest walkways.,Renew the Centennial and Watson Bequest walkways at Auckland Domain.FY22/23 to FY23/24 - investigation and design FY23/24 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2022-Q4,2023-Q3,,2024-Q1,2024-Q4,2026-Q2,2023-Q3,2026-Q2,,,[email address],,
IP008294,5/12/2023,Auckland Council,Pukekawa / Auckland Domain - refurbish nursery glasshouses.,Refurbish heritage glasshouses at Domain nursery.FY22/23 to FY23/24 - investigation and design FY24/25 to FY26/27 - physical works Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2023-Q3,,2024-Q2,2024-Q1,2024-Q2,2023-Q3,2024-Q2,,,[email address],,
IP008295,5/12/2023,Auckland Council,Pukekawa / Auckland Domain - renew wastewater pipes - phase 1.,Renew wastewater pipe network in the Auckland Domain.FY21/22 to FY22/23 - investigation and design FY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q2,2022-Q2,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2022-Q2,2024-Q1,,,[email address],,
IP008296,5/12/2023,Auckland Council,Auckland Region Cemetery Acquisition.,TBC.,,Early planning,Funding source confirmed,To be determined,To be determined,Auckland,,,Community facilities,5 - 25 million,2023-Q3,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2024-Q1,2023-Q3,2024-Q1,,,[email address],,
IP008298,5/12/2023,Auckland Council,Awataha Greenway Plan - contribution to development.,Contribution to major greenway development as part of the larger 'Unlock Northcote' development led by Eke Panuku. This development includes contributions from the Hobsonville Land Company Healthy Waters Eke Panuku and Auckland Council. This development is planned to be delivered over a 4-6 year period and the budget has been allocated in the financial years Eke Panuku requires contribution to be made.FY24/25 to FY26/27 - contribute funding to Eke Panuku.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2022-Q4,2023-Q3,2023-Q3,,2023-Q4,2027-Q2,2023-Q3,2027-Q2,,,[email address],,
IP008299,5/12/2023,Auckland Council,Barry Curtis Park - renew Chapel Road carpark.,Renew the carpark which is accessible via Chapel Road to todays level of service. FY23/24 - investigation and scope.FY24/25 to FY26/27 - detailed design and physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2023-Q1,2023-Q1,2025-Q3,,2026-Q1,2026-Q2,2023-Q1,2026-Q2,,,[email address],,
IP008301,5/12/2023,Auckland Council,Bayswater Park - renew toilets and changing rooms.,Renew the toilet and changing rooms leased to North Shore United Football club including water fountain and bike parking.FY23/24 - investigation and design.FY24/25 to FY25/26 - physical works.Risk Adjusted Programme (RA) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2023-Q1,2024-Q4,2025-Q1,2025-Q2,2025-Q4,2023-Q1,2025-Q4,,,[email address],,
IP008306,5/12/2023,Auckland Council,Blockhouse Bay Recreational Reserve - renew sports field.,Renew sports field #1 football field. Change sports lighting to LED technology.FY23/24 - investigation and designFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q1,2023-Q3,2024-Q1,2024-Q2,2024-Q4,2025-Q1,2023-Q3,2025-Q1,,,[email address],,
IP008308,5/12/2023,Auckland Council,CPT: Boundary Reserve East Instream and Wastewater Re-alignment (KO funded).,1. This project will unlock the development for Megalot 1.1c which is due to start by November 2022 as well as upstream catchment.2. To offset onsite hydrology mitigation requirements.3. Align the project with WW requirements4. Upgrade the WW network.,,In planning,Funding source confirmed,Selective,To be determined,Auckland,,,Water,5 - 25 million,2022-Q1,2022-Q1,2024-Q1,2024-Q1,2024-Q1,2024-Q4,2022-Q1,2024-Q4,,,[email address],,
IP008309,5/12/2023,Auckland Council,Bridgehouse Weir Warkworth stream improvement (Elizabeth St).,To removal and/or fish pass retrofit the Bridgehouse Weir to allow whitebait and other migratory native fish species to access the extensive amount of upstream available habitat.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q1,,2023-Q1,,2025-Q3,2026-Q2,2022-Q1,2026-Q2,,,[email address],,
IP008312,5/12/2023,Auckland Council,Carpark and Roading - Renewals - Waiheke.,Renewal of car parks and road access ways. Sites identified are as follows: Anzac Reserve Onetangi Sports Park and Wharf Road Esplanade Reserve. Further sites may be identified during the investigation stage.FY23/24 - investigation and designFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q3,2023-Q4,,2023-Q4,2023-Q4,2022-Q3,2023-Q4,,,[email address],,
IP008314,5/12/2023,Auckland Council,Churchill Reserve - renew walkways and gardens.,Renew walkways in the reserve and connecting to the reserve as approved in the Greenways Plan. Renew gardens in the reserve including the garden edging.FY23/24 - investigation design and physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q4,2022-Q4,2023-Q3,2024-Q3,2023-Q4,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
IP008315,5/12/2023,Auckland Council,City Road Auckland Central Pipe Renewal.,To renew poor condition critical assets to restore its functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q1,2023-Q4,,,2025-Q3,2025-Q3,2023-Q4,2025-Q3,,,[email address],,
IP008320,5/12/2023,Auckland Council,Community leased buildings - renew - building and fittings Albert Eden.,Renew minor building issues and fixtures and fittings to our community leased buildings including Edendale Hall Epsom Eden Kindergarten (200-206 Gillies Ave and the Epsom Creche)FY21/22 to FY22/23 - scoping and physical worksFY23/24 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2024-Q1,2023-Q3,2024-Q1,,,[email address],,
IP008324,5/12/2023,Auckland Council,CPT HWBOB: Chamberlain Park [2611].,The objective of this project is to remove 350 metres of concrete lining and enhance the surrounding riparian corridor as an offset requirement when Healthy Waters or private developers have degraded existing stream environments.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2017-Q4,2025-Q3,2025-Q4,2026-Q1,2026-Q4,2017-Q4,2026-Q4,,,[email address],,
IP008325,5/12/2023,Auckland Council,CPT HWBOB: Half Moon Bay Reserve.,To increase the ecological and amenity value of Half Moon Bay to offset the loss of ecological values from development and/or the provision of infrastructure elsewhere in the region.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2019-Q1,2019-Q1,,,2024-Q3,2024-Q3,2018-Q4,2024-Q3,,,[email address],,
IP008326,5/12/2023,Auckland Council,CPT HWBOB: Patauoa Creek Enhancement at Te Rau Puriri Regional Park.,To increase the ecological and amenity value of 170m of the PatauoaCreek through Te Rau Puriri Regional Park to compensate for the loss ofecological values from development and/or the provision of infrastructureelsewhere in the region.To recover the cost of this project from those projects or developments thatare required to provide offset and/or environmental compensation.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,2021-Q1,,,2025-Q3,2026-Q2,2021-Q1,2026-Q2,,,[email address],,
IP008328,5/12/2023,Auckland Council,CPT HWBOB: Keith Hay Park.,Develop a stream restoration project in War Memorial Park Keith Hay Park and Molley Green Reserve that provides an opportunity increase in the ecological value of the stream corridor.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q2,2021-Q2,2025-Q1,2025-Q2,2025-Q4,2027-Q1,2021-Q2,2027-Q1,,,[email address],,
IP008334,5/12/2023,Auckland Council,East Coast Bays Community Centre - refurbish buildings.,Refurbish the interior and exterior of the buildings including remediation of the ACM roof on level 2. FY19/20 to FY20/21 - investigation and assessment FY23/24 - design and planningFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2022-Q3,2023-Q3,2023-Q4,2024-Q2,2024-Q2,2025-Q1,2023-Q3,2025-Q1,,,[email address],,
IP008338,5/12/2023,Auckland Council,Freemans Bay Community Centre – full refurbishment.,Refurbishment of the roof at Freemans Bay Community Centre.FY23/24 - investigation and designFY23/24 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q2,2023-Q3,,2024-Q1,2024-Q2,2024-Q2,2023-Q3,2024-Q2,,,[email address],,
IP008341,5/12/2023,Auckland Council,Gills Reserve - install concrete path and renew tracks.,Install new section of concrete walkway in the reserve between Dairy Flat Highway to Gills Road. Renew tracks and retaining wall from Gills Road to Mills Lane and the track leading up to the road through 63 Gills Road.FY22/23 - investigation and designFY23/24 - obtain consents and commence physical worksFY24/25 - complete physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2021-Q4,2023-Q2,2023-Q3,2023-Q4,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
IP008344,5/12/2023,Auckland Council,Glenveagh Reserve - develop new neighbourhood park.,Develop a new neighbourhood playspace that caters to the play needs of specifically junior children aged 4-8 years and older children aged 9-12 years incorporating natural and landscaped features such as trees including an accessible pathway from Loughinisland Place through to Mahia Road for ease of access seating and an accessible table provision of half basketball court and Crime Prevention Through Environmental Design (CPTED) principles should be given high priority in the design.FY24/25 - investigation and designFY25/26 - physical worksRisk Adjusted Programme (RAP) project specifically focusing on the investigation and design phase.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2025-Q1,2025-Q2,2026-Q1,,2026-Q2,2026-Q2,2025-Q2,2026-Q2,,,[email address],,
IP008345,5/12/2023,Auckland Council,Green Bay Domain - renew amenity block.,Renew the Whenua Karaka/Green Bay Domain amenity block in a new position with one pan and a changing bench. Including park improvement and drainage works.FY23/24 - investigation and design FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q4,2023-Q3,2023-Q3,2023-Q4,2023-Q4,2022-Q4,2023-Q4,,,[email address],,
IP008346,5/12/2023,Auckland Council,Green Bay Domain - renew playground and associated park furniture.,Renew Whenua Karaka/Green Bay Domain playground and associated park furniture.FY21/22 - investigation and designFY22/23 - FY 23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2022-Q2,2022-Q3,,2023-Q4,2023-Q4,2022-Q2,2023-Q4,,,[email address],,
IP008347,5/12/2023,Auckland Council,Grey Lynn Catchment Upgrades - Branch 6 Separation.,To separate combined stormwater and wastewater network to reduce overflows and improve water quality.,,Early planning,Funding source to be confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,,,,,2025-Q3,2026-Q2,2025-Q3,2026-Q1,,,[email address],,
IP008348,5/12/2023,Auckland Council,Grey Lynn Library and Community Hall - general refurbishment.,General refurbishment of the Grey Lynn Library and Community Hall ensuring these buildings remain fit for purpose.FY23/24 - investigate and designFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q2,2023-Q4,,2024-Q3,2024-Q4,2024-Q2,2023-Q4,2024-Q2,,,[email address],,
IP008349,5/12/2023,Auckland Council,Grey Lynn public toilets - general renewals.,Undertake general interior and exterior renewals for public toilets within Grey Lynn area.Works include for seismic strengthening replacement of roof plumbing fixtures cubicle partitions floor recoating wall tiles etc. at the toilet 594 Great North Road toilet. Renewal of plumbing fixtures grilles doors internal fittings and interior painting at the toilet adjacent to the paddling pool within Grey Lynn Park.FY21/22 - design physical works (Grey Lynn Park paddling pool) design and consent (594 Gt North Road toilet)FY23/24 to FY24/25 - physical works (594 Great North Road toilet)Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q2,2021-Q3,2023-Q2,2023-Q3,2023-Q4,2024-Q1,2021-Q3,2024-Q1,,,[email address],,
IP008350,5/12/2023,Auckland Council,Hamilton Estate Recreation Reserve - refurbish community halls and grounds.,Hamilton Estate Recreation Reserve - Community halls and ground refurbishment following the updated Sports and Active Recreation Plan report and needs assessmentsFY24/25 - investigation and designFY25/26 - FY26/27 physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q4,2023-Q4,2024-Q1,2024-Q1,2024-Q2,2025-Q1,2023-Q3,2025-Q1,,,[email address],,
IP008351,5/12/2023,Auckland Council,Hanford Place stormwater improvement.,The objective of the project is to improve hydraulic performance of the stormwater trunk line by providing a complete piped network. With the new 1500mm dia pipe connecting the existing 1425mm dia outlet pipe and the 1200mm/1050mm dia inlet pipes currently discharging to the open channel flooding risks caused by inlet blockage will also be minimised.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2021-Q2,2024-Q4,2025-Q1,2025-Q2,2025-Q2,2021-Q2,2025-Q3,,,[email address],,
IP008352,5/12/2023,Auckland Council,Harbourview-Orangihina - construct vehicle access to marae boundary.,Design and construct vehicular access to the boundary of the Te Atatū Marae land at Harbourview/Orangihina.FY21/22-FY22/23 - investigation and designFY25/26 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2021-Q3,2024-Q2,2024-Q3,2024-Q3,2025-Q2,2021-Q3,2025-Q2,,,[email address],,
IP008353,5/12/2023,Auckland Council,Harbourview-Orangihina - install shared path connection.,Install a shared path connection from southern end of park to the Te Atatu Road shared path.FY22/23 - investigation and designFY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2023-Q1,2023-Q3,2023-Q4,2023-Q4,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
IP008358,5/12/2023,Auckland Council,Hibiscus and Bays - develop dog parks.,Develop a new dog park in each subdivision. Western Reserve in the Hibiscus Coast subdivision and a location for the East Coast Bays subdivision is to be confirmed.FY21/22 - investigation and design for Western ReserveFY22/23 - consultation for Western Reserve and confirmation of East Coast Bays subdivision park location FY23/24 - planning and consents for Western ReserveFY24/25 to FY25/26 - stage one physical works for Western ReserveRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2019-Q3,2023-Q4,2024-Q3,,2025-Q1,2025-Q2,2023-Q4,2025-Q2,,,[email address],,
IP008359,5/12/2023,Auckland Council,Hibiscus and Bays - renew park play spaces 2023/2024+.,Renew play spaces at Manly Park Brunton Park Hardley Reserve Cairnbrae Reserve Sherwood Reserve and Orewa Reserve.FY23/24 - investigation and designFY24/25 - planning and physical worksFY26/27 - complete physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q3,,,2024-Q1,2024-Q2,2022-Q3,2024-Q2,,,[email address],,
IP008362,5/12/2023,Auckland Council,Highwic House - renew surrounding pathways.,Renew the pathways surrounding Highwic House.FY22/23 to FY23/24 - design obtain resource consentFY24/25 to FY25/26 - physical worksRisk adjusted programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2023-Q1,2024-Q1,2024-Q2,2024-Q3,2025-Q1,2023-Q1,2025-Q1,,,[email address],,
IP008366,5/12/2023,Auckland Council,Howick - renew built spaces 2023/2024 to 2025/2026.,Renew built space assets within the Local Board as identified by the Operational Team and asset data. Assets include but are not limited to: - Te Whare Taonga Museum (Uxbridge)- Glen House Hall - windows and joinery- Howick War Memorial - switch board- Paparoa Park - spouting windows joineryFY23/24 - investigation and designFY24/25 to FY25/26 - deliver physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2023-Q1,2023-Q3,2023-Q4,2024-Q1,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
IP008370,5/12/2023,Auckland Council,Howick - renew sport field and related assets 2023/2024 to 2025/2026.,Renew priority sports fields assets in the Howick Local Board area as identified by the asset condition data as well as the Operations Team. Assets include but are not limited to:- Meadowlands softball nets - procurement is currently underway for the physical works - Lloyd Elsmore Park Athletics Track - investigations are currently underway to determine scope of works. Once scoping is completed start tender process. FY23/24 - investigation and physical worksFY24/25 to 25/26 - continued physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q1,2023-Q1,2024-Q1,2024-Q1,2024-Q1,2024-Q2,2023-Q1,2024-Q2,,,[email address],,
IP008371,5/12/2023,Auckland Council,Howick - renew toilets and changing rooms 2023/2024 to 2025/2026.,Renew various toilets and changing rooms across the Howick Local Board area as identified as a high priority by the asset condition data and the Operations team. Sites include:- Elm Park toilet and changing rooms- Lloyd Elsmore Park Cricket- Lloyd Elsmore park RugbyFY23/24 - Investigation and designFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2023-Q1,2023-Q3,2023-Q4,2024-Q1,2026-Q2,2023-Q1,2026-Q2,,,[email address],,
IP008372,5/12/2023,Auckland Council,Howick - renew walkways and pathways 2023/2024 to 2025/2026.,Renew various walkways and pathway across the Howick Local Board area as identified by condition data and the Operations Team. Additional pathways identified and listed below by the operations team. - Macleans Park - Maclay Reserve - Murvale Reserve- Barry Curtis Park - Murvale Reserve- Fencible Drive Reserve - Frank Mibilo Reserve- Glenmore Road Tennis- Himilaya Park- Voltaire Park- 103R Prince Regent- Halfmoon Bay FY23/24 - investigation and designFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q1,2023-Q1,2023-Q4,2023-Q4,2023-Q4,2026-Q2,2023-Q1,2026-Q2,,,[email address],,
IP008373,5/12/2023,Auckland Council,Hurstmere Road Pipe Diversion to Shoal Bay.,To plan and implement an upgraded SW pipeline all the way from 40 Anzac Street to the Northcroft treatment pond and ultimately to Upper Shoal Bay.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2021-Q2,2023-Q3,,,2025-Q3,2026-Q2,2023-Q3,2026-Q2,,,[email address],,
IP008381,5/12/2023,Auckland Council,Kaipātiki - renew walking tracks 2023 - 2026.,Renew walking tracks at parks and open spaces within Kaipātiki:- Birkenhead War Memorial - kauri dieback track upgrade- Beach Haven connections (Hellyers Creek)- renewal fund top up to complete (no change in scope)- Smith Bush Scenic Reserve - renew bush tracks and boardwalk- Kauri Point Centennial Park - renew track length of the Domain to clifftopFY22/23 - investigate and designFY22/23 to FY25/26 - physical worksRisk Adjusted Programme Project (RAP).,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2022-Q4,2022-Q2,2023-Q4,2023-Q4,2023-Q1,2025-Q2,2022-Q2,2025-Q2,,,[email address],,
IP008384,5/12/2023,Auckland Council,Kai-pāwhara/ Kirikiri Reserve - develop new neighbourhood park.,Develop a neighbourhood park to meet the needs of new and future residents in the community. The park include a play space with path access seating and landscapingFY22/23 - investigation and designFY23/24 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q4,2022-Q2,2023-Q4,2023-Q4,2024-Q1,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
IP008386,5/12/2023,Auckland Council,Karangahape Road - toilet installation.,Installation of a temporary new toilet on Karangahape Road until the new toilet facility opens as part of the new train station.FY22/23 - investigation and design consultationFY23/24 - physical works.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q3,2023-Q4,2024-Q1,2024-Q1,2024-Q1,2022-Q3,2024-Q1,,,[email address],,
IP008390,5/12/2023,Auckland Council,Ken Maunder Park - renew sports fields 1 & 2.,Renew football sports field #1 and #2.FY22/23 - investigation and designFY23/24 - physical works sports field #1FY24/25 - physical works sports field #2Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q4,2023-Q2,2023-Q4,2023-Q4,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
IP008392,5/12/2023,Auckland Council,Kitchener Road Box Conduit Relining work.,To renew the existing pipe network in poor condition to prevent potential catastrophic failure of a critical asset along the Kitchener Road.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2021-Q1,2021-Q2,2024-Q1,2024-Q3,2024-Q4,2025-Q1,2021-Q2,2025-Q1,,,[email address],,
IP008393,5/12/2023,Auckland Council,Kiwi Esplanade – upgrade playground and park furniture.,Upgrade playground and park furniture at Kiwi Esplanade as per Play Network Gap Analysis recommendations.FY23/24 - investigation design and physical worksFY24/25 - continue physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,2024-Q2,2024-Q3,2024-Q4,2026-Q2,2023-Q4,2026-Q2,,,[email address],,
IP008396,5/12/2023,Auckland Council,Kohuora Park – renew playground and associated park furniture.,Renew playspace at Kohuora Park (Station Road) and include seating and accessible pathways areas. FY24/25 - investigation and designFY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q4,2024-Q3,2025-Q2,2025-Q3,2025-Q4,2026-Q2,2024-Q3,2026-Q2,,,[email address],,
IP008397,5/12/2023,Auckland Council,Koroī / Clayburn Reserve - develop neighbourhood park.,Develop Koroī / Clayburn Reserve in consultation with the community.The Waitākere Ranges Play Network Provision Study (May 2021) recommends consideration for features such as courts or wheeled play in addition to a more standard playspace for children.FY22/23 to FY23/24 - investigation and designFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,2024-Q4,,2025-Q1,2025-Q2,2023-Q4,2025-Q2,,,[email address],,
IP008400,5/12/2023,Auckland Council,Leys Institute - seismic strengthening and restoration.,Undertake the restoration modernisation and seismic upgrading of the Leys Institute in stages.FY22/23 to FY23/24 - concept design planning engagement with partners / stakeholders completion of detailed business case detailed design obtain required consentsFY24/25 to FY25/26 - physical works progress (stage one)Risk adjusted programme (RAP) project.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Community facilities,5 - 25 million,2022-Q4,2023-Q1,2024-Q2,2024-Q2,2024-Q3,2025-Q2,2023-Q1,2025-Q2,,,[email address],,
IP008401,5/12/2023,Auckland Council,Linley Reserve - renew and enhance playspace.,Renew playspace and pathways at Linley Reserve. Investigate play and basketball provision within the network specifically basketball provision at Stanaway Reserve and a possible relocation to Linley Reserve.FY 21/22 to FY 22/23- investigation and design.FY 23/24 to FY 24/25 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2020-Q3,2023-Q3,2024-Q1,2024-Q2,2024-Q3,2024-Q4,2023-Q3,2024-Q4,,,[email address],,
IP008403,5/12/2023,Auckland Council,Lloyd Elsmore Park - renew skate park.,Renewal of skatepark to ensure the facility is fit for purpose.FY22/23 - investigate scope and design works.FY23/24 to FY24/25 - deliver physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2023-Q2,2024-Q4,,2025-Q1,2025-Q3,2023-Q2,2025-Q3,,,[email address],,
IP008406,5/12/2023,Auckland Council,Long Bay Regional Park - renew mains water supply through park.,Renew mains water supply at Long Bay Regional Park.FY21/22 to FY22/23 - investigation and design FY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2021-Q4,2023-Q4,2024-Q1,2024-Q1,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
IP008407,5/12/2023,Auckland Council,Macleans Park Stream Protection (Stream A).,Improve public safety ecosystem health and amenity/aesthetics adjacent to the stream by renewing the walk path (C&F). Reduces sediment loads maintenance expenditure and requirements and the risk of structural collapse.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q3,2023-Q3,2024-Q2,2024-Q3,2024-Q3,2025-Q2,2023-Q3,2025-Q2,,,[email address],,
IP008412,5/12/2023,Auckland Council,Māngere East Community Buildings - refurbish facilities.,Full exterior and interior refurbishment of the Māngere East Community Building [Ex Library] and Māngere Peoples Centre. FY23/24 - investigation and designFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q4,2023-Q4,2024-Q2,2024-Q2,2024-Q2,2025-Q3,2023-Q4,2025-Q3,,,[email address],,
IP008415,5/12/2023,Auckland Council,Manukau Sports Bowl - comprehensive renewal of the velodrome grandstand and toilet and changing room.,Comprehensive renewal of the grandstand and associated amenities located in the basement of the grandstand.FY22/23 - investigation and scopingFY23/24 - detailed design and consentingFY24/25 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2023-Q2,2024-Q4,2024-Q4,2025-Q1,2025-Q1,2023-Q2,2025-Q1,,,[email address],,
IP008417,5/12/2023,Auckland Council,Manurewa Aquatic Centre - Boiler Phase Out.,Installation of electric heat pumps to replace or reduce use of gas-powered boilers and energy efficiency opportunities identified through the design process. FY22/23 - Investigation and designFY23/24 - physical Works.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q1,2023-Q1,2024-Q1,,2024-Q3,2024-Q4,2023-Q1,2024-Q4,,,[email address],,
IP008418,5/12/2023,Auckland Council,Manurewa Community Centre development.,Develop a new community centre in Manurewa to improve the existing network and address provision requirements (pending the outcome of the service provision investigation and development of the business case being undertaken by Regional Services and Strategy).FY22/23 - investigation phaseFY23/24 - progress concept and detailed design and obtain required consentsFY24/25 - physical works Risk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2023-Q4,2024-Q2,2024-Q3,,2024-Q4,2025-Q2,2024-Q2,2025-Q2,,,[email address],,
IP008420,5/12/2023,Auckland Council,Maraetai Beach Boating Club - install retaining wall.,Install retaining wall to ensure the area remains stable and fit for purpose during storm events. This project is to be delivered with geotechnical subject matter expert input and oversight.FY19/20 to FY22/23 investigation and designFY22/23 to FY24/25 physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q1,2022-Q1,2023-Q4,2023-Q4,2024-Q1,2024-Q2,2022-Q1,2024-Q2,,,[email address],,
IP008426,5/12/2023,Auckland Council,McNicol Homestead Museum - refurbish building.,Refurbish the McNicol Homestead Museum assets identified as priority as per asset assessment report.FY22/23 - FY23/24 investigation and designFY23/24 - FY24/25 physical workRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2023-Q3,2024-Q1,2024-Q1,2024-Q1,2024-Q2,2023-Q3,2024-Q2,,,[email address],,
IP008429,5/12/2023,Auckland Council,Moa Reserve & De Luen Street Point Chevalier.,To repair or replace identified critical assets to increase asset life.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q3,,,,2024-Q3,2024-Q4,2022-Q3,2024-Q4,,,[email address],,
IP008430,5/12/2023,Auckland Council,Mt Roskill War Memorial Park Hall - renew - exterior and interior.,Exterior and interior refurbishments.FY20/21 - investigation and design (seismic assessment heritage resource consent)FY23/24 to FY24/25 - physical works Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2020-Q3,2020-Q4,2023-Q4,2023-Q4,2024-Q1,2024-Q1,2020-Q4,2024-Q1,,,[email address],,
IP008431,5/12/2023,Auckland Council,Muriwai Village Green - renew open space assets & improve wheel play assets.,In collaboration with the community upgrade the skate facility renew the courts carpark and associated landscaping. Investigate the open space assets and develop a scope of works to renew the identified assets requiring remediation to ensure the site is a more functional community space for all ages. FY22/23 - investigation consultation and design.FY23/24 to FY25/26 - deliver physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2024-Q1,2023-Q4,2023-Q4,2024-Q2,2024-Q3,2024-Q1,2024-Q3,,,[email address],,
IP008432,5/12/2023,Auckland Council,Murphy Park - rebuild toilet block.,Rebuild the 4 pan toilet block to include sustainable efficiencies. FY23/24 - investigation design and physical worksFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q3,2024-Q4,,2026-Q1,2026-Q3,,2024-Q4,2024-Q2,,,[email address],,
IP008433,5/12/2023,Auckland Council,Nathan Homestead - undertake seismic strengthening.,The investigation detailed retrofit design (DRD) design and remedial work for seismic strengthening of Nathan Homestead. FY22/23 to FY23/24 - investigation and designFY23/24 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,To be determined,To be determined,Auckland,,,Community facilities,5 - 25 million,2022-Q3,2022-Q3,2024-Q1,2024-Q2,2024-Q2,2025-Q2,2022-Q3,2025-Q2,,,[email address],,
IP008434,5/12/2023,Auckland Council,Ngā Hau Māngere / Māngere Centre Park - construction of new ablution block.,Construction of a standalone three to four pan accessible public toilet block to service the playground as well as the cricket grounds football fields and youth zone and reserve users to meet a growing demand from population growth.FY24/25 to FY25/26 - investigation and design and physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2023-Q2,2026-Q2,2026-Q2,2026-Q3,2026-Q4,2023-Q2,2026-Q4,,,[email address],,
IP008435,5/12/2023,Auckland Council,Ngā Hau Māngere / Mangere Centre Park - renew toilet and changing room facilities.,Renew toilet and changing room facilities as identified in the asset assessment report.FY23/24 - investigation and designFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q2,2023-Q2,2024-Q1,2024-Q2,2024-Q3,2024-Q4,2023-Q2,2024-Q4,,,[email address],,
IP008436,5/12/2023,Auckland Council,Ngataringa Park - investigate the skatepark use and relocation.,Investigate the future use and location of the skate park at Ngataringa Park.FY22/23 to FY23/24 - investigation and design.FY24/25 to FY25/26 - deliver physical works.Risk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2023-Q4,2024-Q4,2024-Q4,2025-Q1,2025-Q4,2023-Q4,2025-Q4,,,[email address],,
IP008437,5/12/2023,Auckland Council,Ngāti Ōtara Park - renew toilet block depot and boxing gym.,Comprehensive renewal of the toilet block renewal of the interior and exterior depot and boxing gym at Ngāti Ōtara Park (not connected to the multi sport facility) and investigate options for future of the carpark.FY23/24 - investigation and designFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q3,2024-Q3,,2025-Q1,,,2024-Q3,2025-Q2,,,[email address],,
IP008438,5/12/2023,Auckland Council,Ngāti Ōtara Park - upgrade netball facilities.,Resurface all 4 netball courts [rubberise court surfacing] install drainage improvements fencing lighting and extending edge of the court. Upgrade facilities and infrastructure to meet user demand and to increase capacity in the network.FY23/24 - investigation and design FY24/25 toFY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q2,2023-Q2,2024-Q3,2024-Q4,2024-Q4,2025-Q1,2023-Q2,2025-Q1,,,[email address],,
IP008440,5/12/2023,Auckland Council,North Shore Memorial Park - develop berms and walls - Southern Area.,Develop berms and walls in the southern area of Northshore Memorial Park.FY22/23 to FY23/24 - investigation and designFY22/23 to FY24/25 - physical works Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2024-Q2,2024-Q2,2024-Q2,2024-Q2,2024-Q2,2024-Q2,2024-Q2,2024-Q2,,,[email address],,
IP008444,5/12/2023,Auckland Council,Onehunga Library - facility renewal.,Renewing the roof of the library and the supporting structures of the facility to stop water ingress. FY23/24 - investigation and designFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2023-Q1,2024-Q2,2024-Q3,2024-Q4,2025-Q4,2023-Q1,2025-Q4,,,[email address],,
IP008445,5/12/2023,Auckland Council,Open space buildings - renew - 2024/2025 - Ōrākei.,Renewal of open space buildings including for refurbishment of facilties across the Ōrākei local board area. 2024/2025 scope of works includes for the renewal of Glendowie Community Centre (Crossfield Reserve) Colin Maiden cricket club (dependent upon level of services required for the future use of the Park) ground floor building and Waiatarua Wetland Reserve barn and depot.FY24/25 - concept design detailed design obtain any necessary consentsFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project - investigation and design.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q1,2024-Q4,,2025-Q3,2025-Q3,2025-Q2,2024-Q4,2025-Q2,,,[email address],,
IP008446,5/12/2023,Auckland Council,Open space buildings - renew - 2024/2025 - Waitematā.,Renewal of open space buildings including for public amenities in the Waitematā local board area. Sites for investigation include for Thomas Bloodworth Park (brick storage building) Jacobs Ladder access Kinder House Western Springs Outer Fields toilet Western Springs Lakeside toilets Lumsden Green toilet Dove Myer Robinson Park buildings and Western Park - Freemans Bay toilets. Upon completion of scoping prioritised works will be staged for delivery in 2024/2025 as renewals budget allows. Priority works may be delivered sooner in 2023/2024. Further locations to be identified during the scoping phase. FY23/24 - investigation and designFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2023-Q2,,2023-Q3,2023-Q4,2024-Q2,2023-Q2,2024-Q2,,,[email address],,
IP008448,5/12/2023,Auckland Council,Open space furniture fixtures and utilities - renew - 2024/2025 - Waitematā.,Renewal of park furniture fixtures BBQs and equipment in open spaces across the Waitematā local board area.Sites identified for renewal are under investigation.FY24/25- investigation and designFY24/25 to FY25/26 - physical worksRisk adjusted programme (RAP) - investigation and design.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2023-Q4,,2023-Q4,2024-Q2,2024-Q2,2023-Q4,2024-Q2,,,[email address],,
IP008449,5/12/2023,Auckland Council,Open space furniture fixtures fencing and structures - renew - 2022/2023 - Ōrākei.,Renewal of park furniture fixtures BBQs fences and structures across open spaces in the Ōrākei local board area. 2023/2024 includes for the renewal of furniture fixtures fencing and structures at such sites as Bonnie Brae Reserve Churchill Park Cliff Road Reserve Colin Maiden Park Crossfield Reserve Ellerslie Domain Glendowie Park Glover Park Hobson Bay Walkway 1 Karaka Bay Kohimarama Reserve Madhills Farm Recreation Reserve Maskell Reserve Merton Reserve Michaels Avenue Reserve Okahu Bay Reserve Orakei Basin Paritai Reserve Portland Reserve Roberta Reserve Springcombe Reserve Swainston Reserve Tahuna Torea Nature Reserve Vellenoweth Green Waiata Reserve Waiatarua Reserve Wharua Reserve. FY21/22 to FY22/23 - investigation and design.FY22/23 - complete investigation procure materials FY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q2,2021-Q3,2023-Q1,2023-Q2,2023-Q3,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
IP008453,5/12/2023,Auckland Council,Open space paths walkways and car parks - renew - 2024/2025 - Ōrākei.,Renewal of paths walkways and car parks in open spaces across the Ōrākei local board area. Sites to be defined during the investigation stage planned for 2023/2024.Physical works are planned for Glen Atkinson Reserve A Martyn Wilson Fields & Sonia Reserve Ngapuhi Reserve Rukutai Walkway Thomas Bloodworth Park Wairua Reserve and Wharua Reserve.FY23/24 - investigation and design (obtain any required consents)FY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project - investigation and design.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q2,2023-Q3,,2023-Q4,2023-Q4,2024-Q2,2023-Q3,2024-Q2,,,[email address],,
IP008455,5/12/2023,Auckland Council,Waiheke - renew and improve play spaces.,Renew playgrounds and play equipment at various sites across Waiheke based on the play gap analysis undertaken by parks and places specialist. FY24/25 - investigation and design FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q3,2024-Q2,,2024-Q3,2024-Q4,2023-Q3,2024-Q4,,,[email address],,
IP008457,5/12/2023,Auckland Council,Open space roading and car parks in parks - renew - FY22/23 to FY25/26 Albert Eden.,Renewal of car parks and road access ways incorporating pedestrian accessibility improvements within council land and reserves. Ferndale Reserve Mount Albert Library.Reference documentsAlbert-Eden Open Space Network PlanFY22/23 - scopingFY23/24 to FY25/26 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2023-Q3,2023-Q4,2023-Q4,2023-Q4,2024-Q1,2023-Q3,2024-Q1,,,[email address],,
IP008459,5/12/2023,Auckland Council,Open space structures - renew 2023/2024 - Waitematā.,Renew park structures and fencing across Waitematā local board area open spaces.Sites identified for investigation include for Alberon Reserve (including boardwalks) Harry Dansey Park Wairangi Road Reserve Costley Reserve Dacre Reserve A Salisbury Reserve Herne Bay Beach Jaggers Bush Constitution Hill Tole Reserve Westmere Park Seddon Fields Hakanui Reserve Dove Myer Robinson Grey Lynn Park Western Park Coxs Bay Esplanade Brown Reserve Renall Reserve Outhwaite Reserve Albert Park Takutai Reserve Ayr Reserve and Herne Bay stairs. Prioritisation to be confirmed upon completion of the investigation and design stage.FY23/24 - investigation and designFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2022-Q4,,2023-Q4,2024-Q1,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
IP008462,5/12/2023,Auckland Council,Oranga Community Centre - refurbish facility.,Refurbish the facility components. Items of renewal include the accessible front doors and shade sails.FY23/24 - investigation design minor physical worksFY25/26 to FY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2018-Q3,2023-Q3,2025-Q1,2025-Q2,2025-Q4,2026-Q2,2023-Q3,2026-Q2,,,[email address],,
IP008464,5/12/2023,Auckland Council,Ōtara Creek Reserve South – renew sections of footpath.,Renewing existing footpaths and installation of new footpathFY22/23 to FY23/24 - investigation and designFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2023-Q2,2024-Q4,2024-Q4,2025-Q1,2025-Q1,2023-Q2,2025-Q1,,,[email address],,
IP008465,5/12/2023,Auckland Council,46 Fair Mall - renew buildings - stage 2.,Renew toilet block kitchen and refurbish steel structure along the exterior of the building and remediate roof components. Renew staff room. Investigate options for adding a storage room.FY23/24 - investigation design and physical worksFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,2024-Q2,2024-Q2,2024-Q2,2025-Q2,2023-Q4,2025-Q2,,,[email address],,
IP008467,5/12/2023,Auckland Council,Pahurehure Esplanade (Young's Beach Reserve) - renew car park.,Renew roading and car park at Pahurehure Esplanade (Young's Beach Reserve).FY22/23 - investigation and designFY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q1,2022-Q4,2024-Q1,,2024-Q1,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
IP008468,5/12/2023,Auckland Council,Papakura Leisure Centre - undertake seismic strengthening and general renewal of the building.,Investigation Detailed Retrofit Design (DRD) design and remedial work for seismic strengthening and general renewals to include but not limited to repair sections of the carpark and renew roof cladding and gutters / internal gutters install compliant rainwater head and overflow to internal gutters on west and east elevation paint the interior lining of the storerooms and the exterior cladding of the stairwell on the east elevation and any defects to be remediated repair decayed timber window joinery and surrounds and fix window glass sheets and the re-securing displaced edge of the window glass pane (apply glazing putty) and repaint install a handrail designed to provide stability support and a continuous graspable surface on both sides of the internal stairs to the gym on the mezzanine floor and install colour contrast nosing on stairs thread in compliance with the Building Code NZBC/D1 and NZ Standards.FY22/23 to FY23/24 – investigation and designFY25/26 to FY26/27 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q3,2025-Q3,2025-Q4,2025-Q4,2026-Q2,2022-Q3,2026-Q2,,,[email address],,
IP008469,5/12/2023,Auckland Council,Papatoetoe Library - renew facility.,Renew roof gutters drainage replace air-conditioning and paint interior and exterior of the building.FY24/25 - investigation and designFY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2025-Q1,2025-Q1,2025-Q2,2025-Q2,2025-Q2,2025-Q4,2025-Q1,2025-Q4,,,[email address],,
IP008470,5/12/2023,Auckland Council,Papatoetoe Town Hall - undertake seismic strengthening and refurbish building (interior & exterior).,Undertake seismic strengthening and refurbish building exterior and interior (upper and lower rooms at the front of building). Scope of works include roof and flashings repaint the external walls and ceilings at front and the rear part of the building repair and repaint all timber window and frames and door and frames in all elevation repaint the internal walls ceilings doors windows and cupboards (front room) investigate heating ventilation and air conditioning (HVAC) to the ground floor and upper floor rooms front of the Town Hall ground moisture barrier (polythene sheet) to the enclosed sub-floor area and landing to exterior of the exit door in west elevation.FY22/23 to FY23/24 - investigation and design.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q3,2025-Q3,2025-Q4,2025-Q4,2026-Q2,2022-Q3,2026-Q2,,,[email address],,
IP008471,5/12/2023,Auckland Council,Parnell Baths - general renewals - 2023/2024.,General renewals of interior and exterior building assets at Parnell Baths.Works include for replace corroded section steel beam in balance tank replace rotten timber frame in storage building replace main building walkway drainage / timber cladding replacement of cafe building timber joinery renew lighting to LED replace end of life HVAC (heating / ventilation) ducts main outdoor pool (full retile) renew pool plant equipment as required replace end of life umbrella shelters life guard room refurbishment.FY23/24 - investigation and designFY23/24 to FY25/26 - physical worksRisk adjusted programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2022-Q4,2022-Q4,2022-Q4,2022-Q4,2025-Q2,2022-Q4,2025-Q2,,,[email address],,
IP008472,5/12/2023,Auckland Council,Parrs Park - renew artificial sports field surface.,Renew the artificial sports field surface.FY22/23 - investigation and designFY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2023-Q1,2023-Q2,2023-Q3,2023-Q4,2023-Q4,2023-Q1,2023-Q4,,,[email address],,
IP008476,5/12/2023,Auckland Council,Port Albert Recreation Reserve – refurbish toilet and renew open space assets incl. grandstand.,Renew the open space assets including carpark & toilet block. Reinstate the tennis courts with multi line marking and include a basketball hoop. Remove the old hockey shed which has come to the end of the assets life.Scope the remedial works for the grandstand. FY22/23 - investigation design and scopingFY23/24 to FY25/26 - deliver physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2022-Q4,2023-Q2,2023-Q3,2023-Q4,2023-Q4,2022-Q4,2023-Q4,,,[email address],,
IP008477,5/12/2023,Auckland Council,Pt Chevalier Library - BOH Workspace Refresh.,Enhancing Workspace.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2022-Q3,2024-Q2,,,[email address],,
IP008478,5/12/2023,Auckland Council,Pt Chevalier Library - renew - roof joinery and supporting structure.,To investigate options to reconfigure the building.Comprehensive renewal of the roof and supporting structure and interior and painting works.FY22/23 to FY26/27 - investigation and design (scoping of options)Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2023-Q3,2024-Q2,2024-Q2,2024-Q2,2024-Q3,2023-Q3,2024-Q3,,,[email address],,
IP008481,5/12/2023,Auckland Council,Pukekohe-Paerata Paths - develop Route 4 - Pukekohe Stadium Ernies Res Reynolds Road Cape Hill.,Consultation investigation design and construction of a pathway within Pukekohe paths plan connecting Pukekohe Stadium Reynolds Road Ernies Reserve and Cape Hill Reserve Hickeys Recreational Reserve with Ray Fausett Reserve.FY24/25 - FY25/26 investigation consultation and designFY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q2,2024-Q3,2026-Q2,2026-Q3,2026-Q4,2027-Q2,2024-Q3,2027-Q2,,,[email address],,
IP008482,5/12/2023,Auckland Council,Pukekohe-Paerata Paths - develop Route 5 - Hickeys Rec Reserve to Ray Fausett Reserve.,Consultation investigation design and construction of a pathway within Pukekohe paths plan connecting Hickeys Recreational Reserve with Ray Fausett Reserve. (Potential to deliver as a community partnership project).FY24/25 - investigation consultation and designFY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q2,2024-Q3,2026-Q2,2026-Q3,2026-Q4,2027-Q2,2024-Q3,2027-Q2,,,[email address],,
IP008485,5/12/2023,Auckland Council,Ranui Domain - upgrade playground park furniture and footpath connections.,Upgrade playground with a focus on all inclusive play associated park furniture making improvements to accessibility from surrounding streets and park footpaths plant trees for shade improve footpath connections to the amenity block and across the carpark.Undertake consultation with local residents to determine required outcome.Play Network Gap Analysis reports recommends that the current age focus is maintained and to consider inclusion of spinning jumping and all abilities experiences to complement the nearby school and Marinich Reserve.FY22/23 to FY23/24 - consultation and concept designFY23/24 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2023-Q2,2023-Q4,2024-Q1,2024-Q1,2024-Q1,2023-Q2,2024-Q1,,,[email address],,
IP008487,5/12/2023,Auckland Council,Otaawhati - Ray Small Park - upgrade playground.,Upgrade playspace and consider additional experience and / or age improvements to ensure appropriate provision relative to typology (suburb level) and to increase play value as identified in the adopted play network gap analysis. FY25/26 - investigation and designFY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q2,2024-Q3,2025-Q1,,2025-Q2,2025-Q2,2025-Q3,2027-Q2,,,[email address],,
IP008490,5/12/2023,Auckland Council,Rodney - renew signage.,Renew or remove the signage throughout the Rodney Local Board area consolidating where possible and removing where not applicable to address the signage inundation and ensuring the information is current. Compliance signage will be addressed in conjunction with the regulatory team.FY22/23 to FY26/27 - investigate design and deliver physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2023-Q2,2023-Q3,2023-Q3,2023-Q3,2026-Q1,2023-Q2,2026-Q1,,,[email address],,
IP008493,5/12/2023,Auckland Council,Rogers Park - renew playground.,Renew play provision at the park including consideration for a high degree of accessibility and shade components. The design will include options for installation of appropriate play items and supporting infrastructure for consideration of funding through the local boards discretionary capital budget.FY19/20 to FY22/23 - concept plan stakeholder consultation Iwi engagement obtain necessary consents FY23/24 to FY24/25 physical works. Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2019-Q3,2019-Q3,2024-Q2,,2025-Q3,2025-Q1,2019-Q3,2025-Q1,,,[email address],,
IP008494,5/12/2023,Auckland Council,Te Kori Scott Point - develop sustainable sports park (Stage 1b).,Develop a sustainable sports park to meet the needs of new and future residents. These works include sport field one four and five baseball diamond one sports field lighting and remaining elements in the master plan. FY22/23 - planningFY23/24 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,To be determined,To be determined,Auckland,,,Community facilities,5 - 25 million,2023-Q2,2023-Q3,2023-Q3,2023-Q4,2023-Q4,2025-Q2,2023-Q3,2025-Q2,,,[email address],,
IP008497,5/12/2023,Auckland Council,Sister Rene Shadbolt Park - renew sports field 1.,Renew the Tiakina/Sister Rene Shadbolt Park rugby sports field #1FY22/23 - investigation and designFY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q3,2023-Q3,,2023-Q4,2024-Q1,2022-Q3,2024-Q1,,,[email address],,
IP008498,5/12/2023,Auckland Council,Sports and cricket fields lighting and equipment - renew 2024/2025 - Waitematā.,Renewal of open space Sports and cricket fields lighting and equipment across the local board area.Works include for Grey Lynn Park (renew sports lighting) Cox's Bay Reserve (renew sports lighting car park cricket nets and fitness path equipment).FY24/25 - investigation and designFY24/25 to FY25/26 - physical worksRisk adjusted programme (RAP) - investigation and design.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2023-Q2,,2023-Q4,2024-Q1,2024-Q2,2023-Q2,2024-Q2,,,[email address],,
IP008500,5/12/2023,Auckland Council,Stanley Bay Park - renew storage shed/pavilion and pedestrian paths.,Renew the storage shed/pavilion and pedestrian paths. Improve access to the toilet facility in the building. Work is to be completed in phases:- Phase 1: re-instate the services to get the toilets functional- Phase 2: reconfigure the bathroom layout to ensure full accessibility refurbish the building renew paths by the tennis club playground and bus stop.FY22/23 - investigate and design.FY23/24 to FY25/26 - physical works.Risk Adjusted Programme Project (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2022-Q4,2024-Q2,2024-Q2,2024-Q3,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
IP008503,5/12/2023,Auckland Council,Sunnynook Park - develop and renew skate facilities.,Renew the Sunnynook Park skate park at the preferred location at Sunnynook Square.FY22/23 - investigate and designFY23/24 - consultation and consentingFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2019-Q3,2021-Q2,2024-Q1,2024-Q1,2024-Q2,2024-Q3,2021-Q2,2024-Q3,,,[email address],,
IP008509,5/12/2023,Auckland Council,Tamaki Path - Stage two.,Create the continuous connection along the edge of the Tamaki Estuary between Panmure Wharf Point England Reserve Wai O Taiki Bay and neighborhoods in and around Fernwood Place.FY23/24 - planning design consultation and consentingFY23/24 to FY24/25 - physical worksFunded through the Infrastructure Funding Framework Agreement (IFFA)Risk Adjusted Project (RAP) project.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2022-Q4,2023-Q2,2024-Q2,,2024-Q2,2025-Q4,2023-Q2,2025-Q4,,,[email address],,
IP008510,5/12/2023,Auckland Council,Tapapakanga Regional Park - renew foreshore and car park toilet block and associated infrastructure.,Renew the foreshore and car park toilet block and associated infrastructure at Tapapakanga Regional Park.FY22/23 - investigation and design FY23/24 to FY24/25 - physical works Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2022-Q1,2022-Q4,2024-Q1,2024-Q1,2024-Q2,2025-Q2,2022-Q4,2025-Q2,,,[email address],,
IP008511,5/12/2023,Auckland Council,Tapora - renew open space assets.,Renew the tennis courts and other open space assets as identified.FY22/23 - investigation and designFY23/24 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2023-Q2,2023-Q3,2023-Q4,2024-Q1,2024-Q4,2023-Q2,2024-Q4,,,[email address],,
IP008513,5/12/2023,Auckland Council,Taurus Crescent Reserve - upgrade playground and park amenities.,Upgrade the playground. The Kaipātiki Play and Sunsmart Provision report recommends improvements with provision of additional collaborative play (eg: spinning / rocking equipment in consultation with community) and painted games such as four square hopscotch within the paved area including provision of shade.FY22/23 - investigation and design.FY23/24 to FY24/25 - complete physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2022-Q2,2024-Q1,2024-Q2,2024-Q3,2024-Q4,2022-Q2,2024-Q4,,,[email address],,
IP008514,5/12/2023,Auckland Council,Te Ara Tāwhana / Moyle Park - upgrade playground.,Upgrade playground and associated furniture.FY24/25 - investigation and designFY25/26 to FY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q4,2024-Q1,2024-Q4,2025-Q1,2025-Q1,2026-Q2,2024-Q1,2026-Q2,,,[email address],,
IP008515,5/12/2023,Auckland Council,Te Atatū ki te Tonga / Te Atatū South Park - renew southern driveway.,Renew driveway maximising area for parking.FY22/23 - investigation and designFY23/24 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q3,2024-Q1,2024-Q1,2024-Q1,2024-Q2,2022-Q3,2024-Q2,,,[email address],,
IP008517,5/12/2023,Auckland Council,Te Hana Reserve – rebuild playground and renew open space assets.,Develop a concept plan with delivery options for the play assets in Te Hana which recommends relocating the existing playground into Te Hana Reserve in close proximity to the Te Hana Hall and toilets. Reinstate the playground site and install a half pipe skate ramp and furniture including remarking the basketball court providing an active recreation area for older kids to enjoy.To complement the new playground in the Te Hana Reserve furniture connector paths and a shade sail will be delivered providing a safe active recreation area for younger kids to enjoy next to the playing field. The physical works stage of this project is subject to local board approving the concept design and recommendations.FY22/23 - investigation and designFY23/24 - consultation and consentingFY24/25 to FY25/26 - deliver physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q2,2024-Q1,2024-Q1,2024-Q2,2024-Q2,2024-Q3,2024-Q1,2024-Q3,,,[email address],,
IP008519,5/12/2023,Auckland Council,Te Rangi Hiroa/Birdwood Winery - refurbish winery building.,Undertake seismic strengthening work and refurbish the winery building exterior for water tightness.FY20/21 to FY23/24 - investigation and designFY23/24 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2020-Q3,2021-Q1,2024-Q2,2024-Q2,2024-Q3,2025-Q4,2021-Q1,2025-Q4,,,[email address],,
IP008523,5/12/2023,Auckland Council,Titirangi War Memorial Hall & Library - refurbish exterior of building.,Replace cladding structural timbers windows and roofs on the War Memorial Hall as outlined in the November 2021 destructive investigation report. Replace library exterior cladding and structural timbers where necessary. FY21/22 to FY22/23 - investigation and designFY23/24 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q3,2022-Q3,2023-Q4,2023-Q4,2024-Q1,2024-Q2,2022-Q3,2025-Q1,,,[email address],,
IP008527,5/12/2023,Auckland Council,Tracks and pathways - renew - 2022/2023 - Waiheke.,Renewal of park walkways and paths across Waiheke as per the adopted five-year Waiheke Island track renewal plan (February 2020). Local Board priority include the following tracks:Priority 8: Wharetana Bay (Rothschild Terrace to the Bay)Priority 9: Omiha Beach Reserve (Beach to Upland Road Rocky Bay)Priority 10: Island Bay (Fossil Bay to Owhanake Bay)Priority 12: Church Bay from Matiatia to Church Bay Road (From Matiatia Bay around the coast past Church Bay and up to Church Bay Road.)FY22/23 - investigation and design (public consultation resource consents)FY24/25 - FY25/26 - physical works.Risk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,2024-Q4,2024-Q4,2025-Q1,2025-Q1,2023-Q4,2025-Q1,,,[email address],,
IP008528,5/12/2023,Auckland Council,Tracks and pathways - renew - 2023/2024 - Waiheke.,Renewal of park walkways and paths across Waiheke as per the adopted five-year Waiheke Island track renewal plan (February 2020). Local Board priority include the following tracks:Priority 18: Okoka Bay - Wharetana BayPriority 19: Onetangi Golf Course (From Onetangi Road near the cemetery to Onetangi Sports Park through the Golf Course.)Priority 20: Wharf Road Extension (track to a rocky beach)Priority 21: Garratt Road Onetangi Accessway ReservePriority 22: Stanimoroff Walkway (This walkway starts off O'Brien Road (just down from Te Whau Drive) and ends at the junction of Gordons Road and Airfield Road.)Priority 23: Kaukarua Bay (Wairua Road Sth to O'Briens Rd)Priority 24: Onetangi Sports Park - Azolla PondPriority 25: Miro Road to Cory Road Walkway Palm BeachFY23/24 - investigation and design (public consultation resource consents)FY23/24 - FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q2,2023-Q3,,2024-Q1,2024-Q3,2025-Q2,2023-Q3,2025-Q2,,,[email address],,
IP008529,5/12/2023,Auckland Council,Upper Harbour - renew reserve roads and carparks.,Renew reserve roads and carparks including but not limited to Sanders Reserve driveway Collins Park driveway and carpark and Luckens Reserve carpark.FY24/25 - investigation and designFY25/26 to FY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q1,2022-Q2,2023-Q3,2023-Q4,2024-Q1,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
IP008531,5/12/2023,Auckland Council,Victory Road Papatoetoe - Network Extension Renewal and Upgrade.,To reduce flood risks within Victory Road and surrounding properties.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q2,2023-Q2,2024-Q1,2024-Q3,2024-Q3,2025-Q1,2023-Q2,2025-Q1,,,[email address],,
IP008532,5/12/2023,Auckland Council,Wairau Catchment Water Quality Improvements.,1. Improve water quality in the Wairau Stream and Milford Beach2. Treat water quality issues from Wairau industrial area3. Treat water quality issues from Milford Town Centre4. Identify water quality improvement opportunities and leverage off other existing projects where applicable.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2022-Q1,2022-Q3,2024-Q2,,2025-Q3,2026-Q2,2022-Q3,2025-Q1,,,[email address],,
IP008535,5/12/2023,Auckland Council,Waitākere Ranges Greenways Plan - investigate and construct Route G8 c/d.,Investigate and design Greenways Route G8 c/d to connect Verdale Circle with Glendale Road. Undertake community engagement with local residents.Install shared path following concept design approval.FY20/21 to FY21/22 - investigation and feasibility studyFY21/22 to FY24/25 - consenting detailed design and physical work.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2020-Q3,2020-Q4,2024-Q2,2024-Q3,2024-Q4,2025-Q2,2020-Q4,2025-Q2,,,[email address],,
IP008536,5/12/2023,Auckland Council,Waitakere Ranges Regional Park - Huia - replace six automatic gates.,Replace six automatic gates at Huia.FY23/24 investigate and designFY23/24 to FY24/25 physical worksRisk Adjusted Programme (RAP) Project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,2023-Q4,2023-Q4,2024-Q1,2025-Q4,2023-Q4,2025-Q4,,,[email address],,
IP008537,5/12/2023,Auckland Council,Waitakere Ranges Regional Park - install Taitomo Island track.,Develop a new track at Taitomo Island Piha.FY22/23 - investigation and designFY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2018-Q2,2018-Q2,2025-Q2,2025-Q3,2025-Q3,2025-Q4,2018-Q2,2025-Q4,,,[email address],,
IP008541,5/12/2023,Auckland Council,Warkworth Library Complex - remediate structural components.,Obtain a structural engineer report advising the buildings options for development in the near future - complete.Remediate identified roof components and seismic remediation works.FY21/22 - obtain report and submit to the local board for future decision making and deliver physical works on the structural componentsFY22/23 - scope and designFY23/24 to FY26/27 - deliver physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q3,2021-Q4,2023-Q3,2023-Q4,2024-Q1,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
IP008542,5/12/2023,Auckland Council,Warkworth Showgrounds - renew sand fields 1 2 & 3.,Renew sand fields 1 2 & 3 including irrigation and drainage.FY23/24 - investigation and designFY24/25 to FY25/26 - deliver physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q4,2023-Q3,2023-Q4,2023-Q4,2025-Q1,2022-Q4,2025-Q1,,,[email address],,
IP008543,5/12/2023,Auckland Council,Water features - renew 2023/2024 - Waitematā.,Water features minor assets renewal across the Waitemata Local Board area. Works include for Myers Park splash pad play features renewal Lumsden green pumps / fabric and Symonds street Cemetery.FY23/24 - investigation and designFY23/24 to FY25/26 - physical worksRisk adjusted programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q3,2024-Q3,,2024-Q3,,2025-Q2,2024-Q3,2025-Q2,,,[email address],,
IP008544,5/12/2023,Auckland Council,Wesley Community Centre - renew - playground.,Planned full renewal of the playground. The local board to engage with the community to determine the scope of the playground.Reference DocumentsPlay Provision Assessment 2021FY22/23 - investigation and consultationFY23/24 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2024-Q1,2023-Q3,2024-Q1,,,[email address],,
IP008548,5/12/2023,Auckland Council,Westmere Catchment Upgrades.,Westmere Catchment Upgrades As part of WIWQIP (see Maree for more details).,,Early planning,Funding source to be confirmed,Limited,To be determined,Auckland,,,Water,50 - 100 million,,,,,2025-Q3,2026-Q2,2025-Q3,2028-Q2,,,[email address],,
IP008549,5/12/2023,Auckland Council,Weymouth Community Hall - upgrade the interior and exterior of the facility.,Exterior brick veneer cladding - replace corroding steel/brick lintel above the entrance exterior joinery - reinstate the missing raking window head flashing on the south elevation seal the window head and jamb to provide weather tightness replace cracked glazing panel to the exterior doors interior wall and floor finishes - replace worn particle board flooring in the storage room provide sub-floor access door through the particle floorboard and repaint the interior as identified in the condition report.FY23/24 - investigation and design FY24/25 - physical worksRisk-Adjusted Programme (RAP) Project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2024-Q1,2024-Q3,,2024-Q4,2025-Q1,2024-Q1,2025-Q1,,,[email address],,
IP008550,5/12/2023,Auckland Council,Weymouth Park (Joshua Place Reserve) - renew playspace and develop connecting footpath.,Renew play space and consider the development of a footpath connected to these adjoining Weymouth Road and Joshua Place (Becker Drive). as identified in the provisional concept.Local Board to consider the provision of LDI Capex or Local Board Transport Capital Fund to develop a new footpath connection.FY24/25 - investigation and design FY25/26 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2024-Q4,2023-Q3,2023-Q3,2024-Q1,2024-Q2,2024-Q3,2026-Q2,,,[email address],,
IP008558,5/12/2023,Auckland Council,Witheford Scenic Reserve & Kaipātiki Esplanade Reserve- renew track.,Renew the walking track at Witheford Scenic Reserve & Kaipātiki Esplanade Reserve.FY22/23 - investigate and design.FY23/24 to FY25/26 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q3,2023-Q4,2023-Q4,2023-Q4,2024-Q1,2022-Q3,2024-Q1,,,[email address],,
IP008559,5/12/2023,Auckland Council,WIWQIP Grey Lynn Cox’s Bay Targeted Stormwater Separation.,To improve water quality in the Cox's Bay Grey Lynn area by separating combined stormwater and waste water networks.,,Early planning,Funding source to be confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2022-Q2,2024-Q1,2024-Q2,2024-Q2,2025-Q3,2026-Q2,2024-Q1,2024-Q1,,,[email address],,
IP008560,5/12/2023,Auckland Council,WIWQIP Oakley Bollard Methuen Stormwater Separation.,The main objective of this project is to improve the water quality in Oakley Ave by reducing the frequency of uncontrolled overflow from the EoP 440. This is expected to be achieved by separating the properties’ stormwater from discharging into the wastewater network and connecting to a proposed public stormwater network at Bollard Avenue.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2022-Q1,2022-Q4,2024-Q2,2024-Q2,2024-Q2,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
IP009631,5/12/2023,Auckland Council,Allenby Reserve - renew playground.,Full renewal of the playground at Allenby Reserve including path rubbish bins and signage. The playspace is to be renewed in a new location in the reserve to avoid the underground services and the sloped terrain. FY21/22 – investigation and design.FY22/23 to FY23/24 – physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2021-Q3,2022-Q4,2023-Q1,2023-Q4,2024-Q1,2021-Q3,2024-Q1,,,[email address],,
IP009633,5/12/2023,Auckland Council,David Lange Park - renew netball facilities.,The upgrade includes resurfacing [rubberise court surfacing] of all 10 netball courts drainage improvements and lighting upgrade. Upgrade facilities and infrastructure to meet user demand and to increase capacity in the network.FY22/23 - investigation and design FY23/24 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2023-Q1,2022-Q4,2024-Q4,,2025-Q4,2025-Q1,2022-Q4,2025-Q1,,,[email address],,
IP009634,5/12/2023,Auckland Council,Ewelme Cottage - renew heritage facility.,Undertake minor interior and exterior renewals at the historic Ewelme Cottage (built 1863) in partnership with the Auckland Council Heritage team. Works include for replacement of flashings on chimney three re-pointing of chimneys replacement of rotten barge boards replace all plastic spouting and downpipes with metal spouting new fascia / eaves / spouting and downpipe to the kitchen roof (connecting into the stormwater drainage system) renew piles / joists / jack studs of the dining room sub floor where required refurbishment of the window sills / frames of the study bay window undertake full redecoration of external joinery items including windows and verandah. FY20/21 - investigate and concept designFY21/22 to FY22/23 - detailed design (undertake consultation progress detailed seismic assessment obtain required consents. Progress physical works (stage one)FY22/23 - complete detailed design and consentsFY22/23 to FY24/25 - progress physical works (stage two)FY26/27 - complete stage three worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2020-Q4,2021-Q1,,,,,2021-Q1,2023-Q2,,,[email address],,
IP009635,5/12/2023,Auckland Council,Glenfern Regional Park - renew vehicle and pedestrian ford.,Renew vehicle and pedestrian ford.FY21/22 to FY22/23 - investigation and designFY22/23 to FY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q4,2021-Q4,2024-Q1,2024-Q2,2024-Q2,2024-Q3,2021-Q4,2024-Q3,,,[email address],,
IP009636,5/12/2023,Auckland Council,Goodall Reserve - renew skate park and minor assets.,Renew the skate ramp with concrete to ensure the asset meets the improved service standards. Replace fencing seating and access paths to the skate area.FY19/20 to FY20/21 - investigation and redesignFY23/24 to FY25/26 - deliver physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2022-Q1,2023-Q3,2024-Q1,2024-Q2,2025-Q1,2022-Q1,2025-Q1,,,[email address],,
IP009637,5/12/2023,Auckland Council,Huapai Recreation Reserve - develop a full site plan including the redevelopment of play network.,Stage One: Collaborate with park user groups Auckland Transport and associated subject matter experts to develop a full site plan including the redevelopment of play network. Stage Two: Develop concept plan options for the play redevelopment including wheel play facilities for community consultation and submission to the local board for their review and approval. Stage Three: Implement the approved play network redevelopment plan including all associated drainage landscaping and other miscellaneous remediation works as required. FY22/23 - investigation and preparation of full site plan.FY23/24 to FY26/27 – deliver the approved redevelopment plan.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2022-Q3,2023-Q1,2025-Q1,2025-Q1,2025-Q4,2026-Q2,2023-Q1,2026-Q2,,,[email address],,
IP009638,5/12/2023,Auckland Council,Karaka War Memorial Hall - renew carpark.,Renew carpark surface.FY22/23 - FY23/24 investigation and designFY24/25 - FY25/26 physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,2024-Q1,2024-Q1,2024-Q1,2025-Q2,2023-Q4,2025-Q2,,,[email address],,
IP009640,5/12/2023,Auckland Council,Māngere-Ōtāhuhu - renew furniture fixtures and minor assets.,Renew furniture fixtures and minor assets like seats bins bollards drinking fountain and gates. FY22/23 - investigate and scope worksFY23/24 to FY28/29 - deliver physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q4,2023-Q4,2024-Q1,2023-Q4,2024-Q1,2024-Q2,2023-Q4,2024-Q2,,,[email address],,
IP009641,5/12/2023,Auckland Council,Mangere-Otahuhu - renew park roading and carparks.,Renew carparks and park roading across the Māngere-Ōtāhuhu areaFY19/20 - investigation and concept designsFY20/21 - FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2018-Q3,2022-Q3,2023-Q3,2023-Q4,2023-Q4,2024-Q2,2022-Q3,2024-Q2,,,[email address],,
IP009642,5/12/2023,Auckland Council,Mount Albert Senior Citizens Community Hall - renew - exterior and interior.,Renew the roof cladding and downpipes. Renew the ceilings that have been water damaged.FY21/22 - scoping and physical worksFY22/23 to FY24/25 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q2,2021-Q2,2022-Q3,2023-Q4,2023-Q4,2024-Q1,2021-Q2,2024-Q1,,,[email address],,
IP009643,5/12/2023,Auckland Council,Mount Albert War Memorial Hall - renew - interior and exterior.,Renewal of exterior items including roof guttering flashingsFY21/22 - scoping and physical worksFY22/23 to FY24/25 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2021-Q3,2022-Q2,2023-Q4,2023-Q4,2024-Q1,2021-Q3,2024-Q1,,,[email address],,
IP009645,5/12/2023,Auckland Council,Open space walkways and paths - renew - FY22/23 to FY25/26 Puketāpapa.,Renew soft and hard surface paths and walkways. Sites include 560 Mount Albert Road Mount Roskill War Memorial Park Three Kings Reserve Waikowhai Park West Reserve and other sites following scoping.Reference documentsAccessibility in Parks Assessment 2018FY22/23 - scoping investigation and design (public consultation resource consents) FY23/24 to FY24/25 - physical works Risk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2024-Q1,2024-Q2,2023-Q4,2024-Q2,,,[email address],,
IP009646,5/12/2023,Auckland Council,Papatoetoe Centennial Pools - renew carpark.,Renew carpark located at the Papatoetoe Centennial Pools.FY22/23 - investigate and designFY23/24 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q2,2023-Q2,2023-Q3,2023-Q4,2023-Q4,2025-Q2,2023-Q2,2025-Q2,,,[email address],,
IP009647,5/12/2023,Auckland Council,Port Albert Wharf - renew open space assets.,Renew the open space assets including carpark associated landscaping signage toilet block furniture fencing drainage and play components where required.FY22/23 - investigation design and scopingFY23/24 to FY24/25 - deliver physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2022-Q1,2023-Q2,2023-Q3,2023-Q4,2023-Q4,2022-Q1,2023-Q4,,,[email address],,
IP009649,5/12/2023,Auckland Council,Remuera Library - seismic strengthening.,Seismic strengthening works to align with all accessibility and heritage requirements. FY22/23 - investigation and design detailed seismic assessment FY23/24 - detailed design obtain necessary consentsFY23/24 to FY24/25 - deliver planned renewals and seismic strengthening worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2022-Q3,2023-Q1,2024-Q1,2024-Q2,2024-Q2,2025-Q2,2023-Q1,2025-Q2,,,[email address],,
IP009650,5/12/2023,Auckland Council,Rodney - renew sports asset components.,Renew sports assets that have been identified as poor condition and requiring replacement. Works planned for delivery are:- Riverhead War Memorial Park - tennis courts & LED lighting renewal- Shoesmith Reserve - LED lighting renewal- Rodney wide - LED lighting renewal- Puhoi - soil field renewalFY21/22 to FY26/27 - investigation design and physical worksThis is an annual project to be delivered each financial year.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q3,2021-Q4,2023-Q2,2023-Q3,2023-Q4,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
IP009653,5/12/2023,Auckland Council,Te Auaunga/Oakley Creek - renew - pathways and connections.,Improvement of the Te Auaunga/Oakley Creek path network and associated facilities ensuring all signage includes approved Te Reo Māori and Tohu brand symbol.FY17/18 to FY18/19 - investigation and designFY19/20 - concept design (public consultation obtain resource consent)FY/20/21 to FY26/27 - physical works for a chosen stage.Noting this area has suffered considerable damage during the January/ February 2023 storm events.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2019-Q1,2019-Q2,2025-Q1,2025-Q3,2025-Q4,2027-Q2,2019-Q2,2027-Q2,,,[email address],,
IP009654,5/12/2023,Auckland Council,Victoria Park pavilion roof changing rooms and toilet - general renewals.,Undertake general interior and exterior renewals at Victoria Park pavilion and toilet. 2022/2023 completed works were the renewal of the pavilion roof (addressing corrosion of the exposed structural steel replacement of polycarbonate cladding of the annexed roof replacement the roof cladding of the upper roof and replacement of skylights). 2024/2025 works include for the renewal of the changing rooms and toilets. FY21/22 to FY22/23 - detailed design obtain consents physical works (roof renewal)FY24/25 to FY25/26 - physical works (toilets and changing rooms)Risk adjusted programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q2,2021-Q2,2024-Q1,2024-Q1,2024-Q4,2025-Q4,2021-Q2,2025-Q4,,,[email address],,
IP009656,5/12/2023,Auckland Council,Waitakere Ranges Regional Park - Kakamatua Inlet & Upper Nihotupu - car park and arrival area.,Renew and expand car park and arrival area at Kakamatua Inlet & Upper Nihotupu.FY19/20 to FY23/24 - investigation and designFY23/24 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2017-Q1,2017-Q1,2023-Q4,2024-Q1,2024-Q4,2025-Q1,2017-Q1,2025-Q1,,,[email address],,
IP009657,5/12/2023,Auckland Council,Elizabeth Street Reserve - renew open space assets.,Renew the open space assets within Elizabeth Street Reserve. This renewal component has been unbundled from the Warkworth Town Centre Revitalisation project which is pending adoption by the local board.FY22/23 - investigation and designFY23/24 to FY26/27 - deliver physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2022-Q4,2023-Q3,2024-Q1,2024-Q1,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
IP009658,5/12/2023,Auckland Council,Whangateau Reserve - rebuild toilet blocks renew waste water system & renew hall roof.,Rebuild the hall and reserve toilet blocks to ensure the provision is sufficient within the area.Renew the fencing on site.Renew the hall roof.In collaboration with the Healthy Waters department renew the waste water system in the reserve.FY19/20 - investigation & scoping.FY20/21 to FY24/25 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2019-Q4,2021-Q2,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2021-Q2,2024-Q1,,,[email address],,
IP009660,5/12/2023,Auckland Council,New Spoke .- Spoke Interior Fitout (Proxy).,Interior soft fitout for bookable workspace and meeting room(s) as per Workplace Strategy and delivered through our WorkSmart programme.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2023-Q3,2025-Q2,,,[email address],,
IP009690,5/12/2023,Auckland Council,170-174 Queen Street Northcote Point [424].,Mitigate the risk of habitable floor flooding to multiple properties potentially by increasing the capacity of the inlet and downstream pipe and to relocate system surcharge to low risk point.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2014-Q1,2014-Q1,2024-Q1,2024-Q3,2024-Q4,2026-Q2,2012-Q2,2026-Q2,,,[email address],,
IP009691,5/12/2023,Auckland Council,Awakeri Stage 4 [297].,Undertake residual works in McLennan Park for the Artillery tunnel and wetland to function properly. Fulfill the design intent of Awakeri Wetlands Stage 1 Scope that were removed due to budget restrictions.,,In planning,Funding source confirmed,Selective,To be determined,Auckland,,,Water,5 - 25 million,2019-Q3,2023-Q2,2026-Q1,2026-Q3,2026-Q4,2027-Q1,2023-Q2,2027-Q1,,,[email address],,
IP009905,5/12/2023,Auckland Council,Project Toru: Barry's Point Landfill Remedial Works.,Barry's Point closed landfill is located in the Devonport-Takapuna Local Board area and is bounded by Esmonde Road to the south Barry's Point Road and commercial properties to the east Rosmini College to the north and Hillcrest Creek to the west (refer Appendix 1). The landfill was operated by the North Shore Borough Council and received a mixture of domestic commercial and industrial waste until its closure in 1980. The site is unlined with waste deposited directly onto the marine muds. The site continues to discharge landfill gas and leachate.Current site uses include; - Barry's Point Reserve passive recreational area (managed by Community Facilities)- Golf Warehouse driving range occupying the southern section (lease managed by Panuku Development Auckland). - Water Care Services 10 Fred Thomas drive- Private ownership 2 4 and 37 Fred Thomas drive - The Lake House Trust 37 Fred Thomas drive (lease managed by Community Facilities)- Auckland Transport Fred Thomas Drive and Takapuna Landing. Community Facilities and the Devonport-Takapuna Local Board have had long term plans to upgrade the reserve in conjunction with community groups however it is understood these are now on hold pending further consultation with the New Zealand Transport Agency (NZTA) and construction of the Additional Waitemata Harbour Crossing Project.Based on consultation to date it is understood that NZTA currently plans to commence construction of the additional harbour crossing project circa 2025. It is understood the current lease between Auckland Council and the Golf Warehouse for the golf driving range area expires in 2025.The Healthy Waters Department was progressing a project for the establishment of an overland flow path through the former swale that runs west along the northern boundary of the reserve just south of the Lake House Arts Centre and Rosmini College to Hillcrest Creek to relieve upstream catchments. However this project was shelved as cos.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Other not specified,1 - 5 million,2015-Q1,2015-Q2,2018-Q1,2018-Q2,2021-Q1,2021-Q2,2015-Q2,2021-Q2,,,[email address],,
IP009906,5/12/2023,Auckland Council,Flat Bush - develop playspace.,Develop new playgrounds in the Flat Bush area to meet demand arising from population growth.FY19/20 - investigation and design.FY19/20 - investigation and design.FY25/26 - consultation detailed design obtain necessary consents and physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2025-Q3,2025-Q3,2025-Q1,,2026-Q1,2026-Q2,2025-Q3,2026-Q2,,,[email address],,
IP009907,5/12/2023,Auckland Council,Glenbrook Beach Beachfront - renew coastal assets.,Renew the seawall to ensure the asset remains fit.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2019-Q2,2022-Q1,2024-Q3,2024-Q4,2024-Q4,2025-Q2,2022-Q1,2025-Q2,,,[email address],,
IP009908,5/12/2023,Auckland Council,Massey Homestead - refurbish heritage facility.,Refurbish the interior of the heritage facility including garden shed upgrading kitchen and bathroom upgrading lighting repaint interior and renew floor coverings in collaboration with the Heritage team. FY18/19 to FY20/21 - investigation and complete concept designFY24/25 to FY25/26 - physical works.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2017-Q1,2018-Q3,2024-Q4,2025-Q1,2025-Q2,2025-Q4,2018-Q3,2024-Q2,,,[email address],,
IP009909,5/12/2023,Auckland Council,Crown Lynn Park development.,Development of a local park in conjunction with the stormwater pond construction at the old Crown Lynn Pottery site. FY15/16 - FY24/25 - investigation and designFY25/26 - FY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,To be determined,Auckland,,,Community facilities,5 - 25 million,2016-Q4,2016-Q4,2022-Q1,2022-Q2,2022-Q2,2023-Q2,2025-Q3,2027-Q2,,,[email address],,
IP009910,5/12/2023,Auckland Council,Martins Bay Holiday Park - rebuild main amenities block.,Rebuild the main amenities block at Martins Bay Holiday Park.FY16/17 to FY21/22 - investigationFY26/27 to FY27/28 - designFY27/28 to FY28/29 - physical work.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,1 - 5 million,2017-Q3,2023-Q3,2024-Q3,2024-Q4,2025-Q2,2025-Q4,2025-Q3,2028-Q2,,,[email address],,
IP009911,5/12/2023,Auckland Council,City Centre High Street.,Targeted rate budget approved for spend on High Street upgrades across FY2021 to FY2024. Opex has been made available to commence business case development and the process to run in parallel with the later stages of the #26406 Access for Everyone Concept Pilot that is taking place on High Street throughout FY2022-23.,,On hold,Funding source confirmed,Selective,To be determined,Auckland,,,Other not specified,5 - 25 million,2020-Q1,2021-Q4,,2023-Q3,,,2021-Q4,2025-Q2,,,[email address],,
IP009912,5/12/2023,Auckland Council,Ti Rakau Park - renew park assets.,Renew the toilets and change roomsFY23/24 - investigation and designFY24/25 to FY25/26- physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q3,2023-Q4,,2024-Q1,2026-Q2,2023-Q3,2026-Q2,,,[email address],,
IP009913,5/12/2023,Auckland Council,Waitakere Ranges Regional Park - Arataki Visitor Centre - develop nature trail.,Develop nature trail at Arataki Visitors Centre.FY18/19-FY19/20 - investigation and concept designFY25/26 to FY26/27 - detailed design and consentingFY26/27 to FY27/28 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,1 - 5 million,2023-Q3,2023-Q4,2024-Q4,2025-Q1,2025-Q1,2025-Q2,2025-Q3,2028-Q2,,,[email address],,
IP009914,5/12/2023,Auckland Council,Waitakere Ranges Regional Park - Arataki Visitor Centre - renew carpark area.,Renew external loop seal and surface at the Arataki Visitor Centre carpark.FY25/26 - investigation and designFY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2018-Q4,2019-Q3,2024-Q3,2024-Q3,2025-Q1,2025-Q4,2025-Q3,2027-Q2,,,[email address],,
IP009915,5/12/2023,Auckland Council,Te Rau Puriri Regional Park - Prawn Farm - develop toilet facilities.,Develop toilet facilities at Prawn Farm.FY24/25 - investigation and designFY25/26 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2020-Q3,2020-Q3,2020-Q3,,2020-Q4,2021-Q1,2024-Q3,2026-Q2,,,[email address],,
IP009916,5/12/2023,Auckland Council,19 View Road Mt Eden - renew - building and surrounding area.,Refurbish facility and renew wall. Remove shed. Also includes renewal of the fencing and scoping only of the tennis courts renewal FY22/23 to FY23/24 - physical works excluding the tennis courts.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2019-Q1,2019-Q2,2023-Q3,2023-Q3,2023-Q4,2023-Q4,2019-Q2,2023-Q4,,,[email address],,
IP009917,5/12/2023,Auckland Council,Big Bay Reserve - renew coastal assets.,The renewal of the seawall and ramp is due to storm event damage no longer being sustainable under R&M for OMM.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2019-Q1,2019-Q2,2024-Q1,2024-Q1,2024-Q2,2024-Q4,2019-Q2,2023-Q3,,,[email address],,
IP009918,5/12/2023,Auckland Council,Brains Park - upgrade park amenities.,Consult design and undertake the Onewherowhero/Brains Park upgrade utilising the 2018 concept plan.Consider extending the playground with youth in mind provision of shade picnic areas and park furniture and the installation of a perimeter footpath.FY24/25 - investigation and designFY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q3,,2023-Q4,,,2022-Q3,2026-Q4,,,[email address],,
IP009919,5/12/2023,Auckland Council,Clarks Beach and adjoining accesses - renew steps and fences.,The accesses are to the beach which deems this a coastal renewal .,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2018-Q2,2019-Q2,2023-Q4,2024-Q1,2024-Q1,2024-Q2,2019-Q2,2024-Q2,,,[email address],,
IP009920,5/12/2023,Auckland Council,Waitakere Ranges Regional Park - Kitekite Falls - reroute access track.,Reroute access track to Kitekite Falls.FY25/26 - investigation and designFY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2019-Q2,2019-Q4,2026-Q2,2026-Q2,2026-Q2,2026-Q3,2025-Q3,2027-Q2,,,[email address],,
IP009921,5/12/2023,Auckland Council,Long Bay Regional Park - implement recreation plan in Heritage Protection Zone area.,Develop prioritised programme of work to meet recreation plan outcomes. Implement the plan delivering the work in stages including installation of tracks and interpretive signage. FY25/26 - planning and investigationFY26/27 - design and consentingFY27/28 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2019-Q3,2019-Q3,,2019-Q4,2020-Q1,2020-Q2,2025-Q3,2028-Q2,,,[email address],,
IP009922,5/12/2023,Auckland Council,Maraetai Park - upgrade junior play space.,Upgrade and relocate the junior playground at Maraetai.FY19/20 - FY22/23 investigation and design FY23/24 - FY26/27 physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2020-Q2,2020-Q3,2024-Q2,2024-Q3,2025-Q1,2025-Q2,2020-Q3,2025-Q2,,,[email address],,
IP009923,5/12/2023,Auckland Council,Te Uru Tapu / Sacred Grove Takapuna Beach Development Plan - develop concept design.,Te Uru Tapu / Sacred Grove - Takapuna Beach Development Plan - develop concept design and implement physical works.FY18/19 - engagement and consultation.FY19/20 - develop concept design with cost estimates.FY20/21 - detailed design and scoping based on local board preference.FY23/24 - detailed design and consent.FY23/24 to FY24/25 - ecological restoration works.FY24/25 to FY25/26 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2018-Q3,2024-Q1,2024-Q4,2025-Q2,2025-Q3,2026-Q3,2024-Q1,2026-Q3,,,[email address],,
IP009924,5/12/2023,Auckland Council,Singer Park - upgrade sports lighting sports field and carpark.,Upgrade sports field lighting and carpark facilities at Singer Park to meet the needs of new and future residents and increase the capacity in the network. Works will include two field upgrades to sand carpet fields including lighting and irrigation. This project also includes upgrading the carpark. FY18/19 to FY21/22 - investigation and design FY22/23 to FY24/25 - physical works.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2018-Q1,2019-Q1,2022-Q3,2022-Q4,2022-Q4,2024-Q2,2019-Q1,2024-Q2,,,[email address],,
IP009925,5/12/2023,Auckland Council,Tamaki Transformation Project - Tamaki Regeneration Company.,Budget being transferred from Panuku into IF&DS cost centre - details for the projects and costs involved in yet to be identified and scoped.,,In planning,Funding source confirmed,Selective,To be determined,Auckland,,,Other not specified,5 - 25 million,,,,,,2028-Q1,2012-Q1,2028-Q1,,,[email address],,
IP009926,5/12/2023,Auckland Council,Sunkist Bay Reserve - renew seawall.,Sunkist Bay Reserve - renew seawall.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Other not specified,1 - 5 million,2018-Q3,2019-Q1,2024-Q3,2024-Q4,2024-Q4,2025-Q2,2019-Q1,2024-Q1,,,[email address],,
IP009927,5/12/2023,Auckland Council,Harry James Reserve - renew playspace pathways carpark and drainage.,Renew playground pathway carpark (including the driveway to the pony club area) and drainage including modification to the pavement to reduce maintenance and flooding during wet weather.FY19/20 - investigation and design.FY23/24 - develop detailed design scope and planning.FY24/25 to FY25/26 - deliver physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2018-Q3,2018-Q4,2020-Q1,2023-Q3,2024-Q1,2024-Q3,2018-Q4,2024-Q3,,,[email address],,
IP009928,5/12/2023,Auckland Council,Totara Park - renew tracks and bridle trail.,Renew bush walking tracks bridle trails and pedestrian access tracks taking into account the damage caused by the storm in January/February 2023. The proposed approach involves a more targeted renewals project focusing on minor track repairs to ensure track accessibility and address problem areas and another targeting larger infrastructure renewals for specific track sections. This approach will be particularly beneficial for future storm responses considering the tracks are not insured.FY22/23 - investigation and design FY23/24 - commence physical worksFY24/25 - continue physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2019-Q3,2019-Q4,2024-Q1,2024-Q1,,,2019-Q4,2024-Q2,,,[email address],,
IP009929,5/12/2023,Auckland Council,Ahuroa Hall - refurbish facility.,Investigate the septic system drainage and the pedestrian connection to the local school. Renew pathways the building's subfloor bracing exterior cladding and minor assets. FY23/24 - investigation and consultationFY24/25 - design and planningFY25/26 to FY26/27 - deliver physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q2,2023-Q4,,,2024-Q4,2025-Q1,2023-Q4,2025-Q1,,,[email address],,
IP009930,5/12/2023,Auckland Council,Bottle Top Bay Esplanade - investigate the redevelopment of the coastal site.,This project has been merged (carpark taken from the local board bundled carpark project) for efficient delivery. This is to look at the entire site as a whole and ensure it is providing the provision required in both the coastal and local asset types.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2022-Q4,2022-Q4,,,2023-Q3,2023-Q3,2022-Q4,2023-Q4,,,[email address],,
IP009931,5/12/2023,Auckland Council,Orewa Holiday Park - refurbish southern amenities block (Stewart Is block).,Refurbish southern amenities block (Stewart Is block) at Orewa Holiday Park.FY24/25 - investigation and designFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q4,,,2024-Q2,2024-Q2,2022-Q4,2024-Q2,,,[email address],,
IP009932,5/12/2023,Auckland Council,Martins Bay Holiday Park - renew fixed accommodation.,Replace existing caravans/cabins at Martins Bay Holiday Park.FY25/26 - investigation and designFY26/27 to FY27/28 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q3,,,2023-Q2,2024-Q2,2025-Q3,2028-Q2,,,[email address],,
IP009933,5/12/2023,Auckland Council,Devonshire Reserve Playspace - renew and upgrade playground.,Renew the play space and increase play provisions as identified in the UH Strategic Play Provision Assessment report.FY21/22 - investigation and designFY22/23 - commence physical worksFY23/24 - complete physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2022-Q3,2023-Q2,2023-Q3,2023-Q4,2024-Q1,2022-Q3,2024-Q1,,,[email address],,
IP009934,5/12/2023,Auckland Council,Ruapotaka Reserve - develop greenway connection.,Development of a greenway connection through the reserve as part of the Tamaki Regeneration projects.This connection will compliment the works in Maybury Reserve that are occurring at the same time and complete the greenway connection to Line Road. FY25/26 - investigation design and physical worksThis project is dependent upon the input and readiness of various stakeholders and partners including Kainga Ora and the Tamaki Regeneration Company. This project may be deferred to a future year if stakeholders are not able proceed within the anticipated timeframe.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2021-Q4,,,2022-Q1,2022-Q2,2025-Q3,2026-Q2,,,[email address],,
IP009935,5/12/2023,Auckland Council,Parrs Park - upgrade skate park.,Upgrade skate park to provide a wheeled play facility which caters for a wide age and ability range in this brown fields growth area. FY24/25 - investigation and consultationFY25/26 - consenting and commence physical worksFY26/27 to FY27/28 - complete physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,1 - 5 million,2022-Q3,2022-Q3,,2023-Q3,2023-Q4,2024-Q1,2024-Q3,2028-Q2,,,[email address],,
IP009936,5/12/2023,Auckland Council,Elstree North Reserve - develop general park.,Develop neighbourhood park as part of the Tamaki Regeneration priority projects. FY24/25 - investigation and designFY25/26 - deliver physical worksThis project is dependent upon the input and readiness of various stakeholders and partners including Kainga Ora and the Tamaki Regeneration Company. This project may be deferred to a future year if stakeholders are not able proceed within the anticipated timeframe.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2024-Q3,2026-Q2,,,[email address],,
IP009937,5/12/2023,Auckland Council,Holmes Road Depot - replace roof.,According to the condition report the scope of work required is significant. Specifically the roof has surpassed its economically feasible lifespan and necessitates replacement with appropriate long-run coated steel. The presence of conspicuous rusting on the roofing sheets particularly in close proximity to the gutter line. Examination of the roof sheets has revealed the occurrence of localised corrosion resulting in significant perforations in the roofing cavity/ building interior. Due to the extent of damage repairing the affected areas is not a feasible option and replacement is the only viable course of action. Additionally corrosion has been observed beneath most of the penetration flashings. The upper pop-through roof's gutter and dropper have deteriorated to an extent that necessitates replacement. FY22/23 - investigation and design FY23/24 - physical works.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2023-Q4,2024-Q1,,2024-Q2,2024-Q2,2023-Q4,2024-Q2,,,[email address],,
IP009938,5/12/2023,Auckland Council,Sandringham Community Centre - renew - interior and exterior.,Exterior and interior renewal roof renewal works (not full replacement) painting works and installation of insulation where possible.FY21/22 - investigation and design (stakeholder consultation obtain necessary consents)FY22/23 to FY24/25 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2021-Q4,2023-Q3,2023-Q4,2023-Q4,2023-Q4,2021-Q4,2023-Q4,,,[email address],,
IP009939,5/12/2023,Auckland Council,Mangere-Otahuhu - renew sport field assets.,Renew sport field assets across the Māngere-Ōtāhuhu region.FY19/20 - investigation and design FY20/21 to FY24/25 - physical worksRisk Adjusted Project (RAP) programme.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2019-Q2,2019-Q3,2025-Q2,2025-Q2,2026-Q4,2026-Q4,2019-Q3,2026-Q4,,,[email address],,
IP009940,5/12/2023,Auckland Council,Tawharanui Regional Park - renew potable and farm water lines.,Renew potable and farm water lines at Tawharanui Regional Park. FY21/22 to FY22/23 - investigation and designFY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2022-Q1,2023-Q2,2023-Q3,2023-Q3,2024-Q1,2022-Q1,2024-Q1,,,[email address],,
IP009941,5/12/2023,Auckland Council,Motukorea Regional Park - develop concept plan and implement priorities.,Develop concept plan for improvements at the Motukorea Regional Park. Implement priorities such as improved toilet provision signage and volunteer shelter.FY25/26 - concept planFY26/27 - design and consentingFY27/28 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,1 - 5 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP009942,5/12/2023,Auckland Council,Taurima Reserve - redevelop park playspace.,Redevelop the playground to meet the needs of new and future residents within the Tamaki Regeneration area.FY23/24 - investigation and design FY24/25 - physical worksThis project is dependent upon the input and readiness of various stakeholders and partners including Kainga Ora and the Tamaki Regeneration Company. This project may be deferred to a future year if stakeholders are not able proceed within the anticipated timeframe.Risk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q4,2024-Q1,2024-Q4,,2025-Q1,2025-Q3,2022-Q4,2024-Q2,,,[email address],,
IP009943,5/12/2023,Auckland Council,Kiwi Esplanade - renew western and eastern seawalls.,Both Western and Eastern seawalls have been reported as in need of renewal.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2022-Q1,,2024-Q1,2024-Q2,2024-Q2,2024-Q3,2021-Q4,2024-Q3,,,[email address],,
IP009944,5/12/2023,Auckland Council,Open space buildings - renew - FY22/23 to FY24/25 Puketāpapa.,Renewal of buildings in open spaces. Sites include for: Hillsborough Park toilets; Seymour Park changing rooms; Mount Roskill War Memorial Park Mount Roskill Library toilet block.FY20/21 - physical works for Mount Eden Road toilet completed. Investigation and design for remaining three sites FY22/23 to FY24/25 - progress physical works Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2019-Q3,2023-Q4,2023-Q4,,2024-Q1,2025-Q1,2023-Q4,2025-Q1,,,[email address],,
IP009945,5/12/2023,Auckland Council,Open space carparks and park roads - renew - FY24/25 to FY26/27 Puketāpapa.,Renew roading and car park - Keith Hay Park/ Rainsford Street 560 Mount Albert Road (front carpark). Monte Cecilia Korma Road carpark.Reference documentsBe.accessible report 2018FY24/25 to FY26/27 - scoping and physical worksRisk Adjusted Programme (RAP) project..,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2019-Q3,2020-Q4,,,2021-Q2,2021-Q3,2020-Q4,2021-Q3,,,[email address],,
IP009946,5/12/2023,Auckland Council,Open space structures in parks - renew - FY23/24 to FY24/25 Puketāpapa.,To scope and renew park structures (bridges fences retaining walls bollards rock barriers lighting structure handrails).Sites are under investigation. FY23/24 - investigation and design complete concept design (consultation and consenting)FY24/25 - physical works Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2023-Q3,2023-Q4,2023-Q4,2023-Q4,2025-Q1,2023-Q3,2025-Q1,,,[email address],,
IP009947,5/12/2023,Auckland Council,Stanley Bay Park - renew walkway and lamp posts.,Renew park walkways and lamp posts to be delivered in conjunction with pavilion renewal project.FY21/22 to FY23/24 - investigate and design.FY23/24 - consenting and planning.FY24/25 to FY25/26 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2022-Q3,2023-Q3,2023-Q3,2024-Q1,2024-Q2,2022-Q3,2024-Q2,,,[email address],,
IP009948,5/12/2023,Auckland Council,Sylvan Park - renew pathways.,Renew paths through the bush around the toilet block and from Pierce Road to the New Dawn building and Pierce Road to Dobson Avenue.FY22/23 - investigation and scope the required works.FY23/24 - designFY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2023-Q1,2024-Q1,2024-Q2,2024-Q3,2025-Q1,2023-Q1,2025-Q1,,,[email address],,
IP009949,5/12/2023,Auckland Council,Parrs Park - renew sports field irrigation system.,Renew old hydraulic irrigation system a solenoid system. FY24/25 - investigation and designFY25/26 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q3,,2023-Q3,2023-Q3,2024-Q2,2024-Q3,2026-Q2,,,[email address],,
IP009950,5/12/2023,Auckland Council,Auckland Cemeteries - develop new cemetery land.,Develop new cemetery land. Provisional sum for development in anticipation of land being acquired for cemetery purposes.FY23/24 to FY25/26 - investigation and designFY25/26 to FY26/28 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Auckland,,,Community facilities,5 - 25 million,2023-Q3,2023-Q4,,,2024-Q3,2028-Q2,2023-Q4,2028-Q2,,,[email address],,
IP009951,5/12/2023,Auckland Council,Daffodil Street / Waerenga Place Flooding Mitigation.,The purpose of this project is to reduce ponding levels and frequency at the intersection of Daffodil Street / Waerenga Street.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q2,,,,,,2021-Q1,2027-Q2,,,[email address],,
IP009952,5/12/2023,Auckland Council,Tamakae Reserve - renew wharf structure.,Tamakae Reserve wharf renewals (Stages 2 and 3). This project is for stages 2 and 3. Previous project SPID2224 / Sentient 16195 delivered Stage 1.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2022-Q1,2023-Q4,2024-Q3,2024-Q3,2024-Q4,2025-Q2,2022-Q4,2025-Q2,,,[email address],,
IP009953,5/12/2023,Auckland Council,Ngā Puna / Cyclamen Park – upgrade playground.,Upgrade of the play space at Cyclamen Park (neighbourhood park) as according to the Play Network Gap Analysis recommendations.FY23/24 - investigation and design including concept design.FY25/26 to FY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2019-Q3,2023-Q4,2024-Q2,2024-Q3,2024-Q4,2026-Q2,2023-Q4,2026-Q2,,,[email address],,
IP009954,5/12/2023,Auckland Council,Rainbows End Reserve - repair jetty and piles.,Originally bundled into Rodney - renew coastal assets but unbundled for physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2022-Q1,,2023-Q1,2023-Q1,2023-Q2,2023-Q2,2022-Q3,2024-Q2,,,[email address],,
IP009955,5/12/2023,Auckland Council,Te Arai Regional Park – install toilets on Pacific Parade.,Develop toilets and related infrastructure at Pacific Road carpark Te Arai Regional Park.FY23/24 - investigation and designFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q4,2023-Q4,2024-Q2,,2024-Q3,2024-Q4,2023-Q4,2024-Q4,,,[email address],,
IP009956,5/12/2023,Auckland Council,Pollok Wharf Road Reserve - renew timber seawall.,Identified by the subject matter expert in the region.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2021-Q4,,,,2023-Q4,2024-Q2,2021-Q4,2024-Q2,,,[email address],,
IP009957,5/12/2023,Auckland Council,Moire Park - construct walkway linkages to new subdivision.,Design and construct new walkway linkages between Moire Park and the new adjoining subdivision.FY19/20 to FY25/26 - investigation and designFY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2019-Q3,2020-Q1,2023-Q3,2023-Q4,2024-Q3,2024-Q1,2025-Q3,2027-Q2,,,[email address],,
IP009958,5/12/2023,Auckland Council,Waitakere Ranges Regional Park - Te Henga - install toilet block (Lake Wainamu entrance).,Design and install a new toilet block at the entrance to the Lake Wainamu.FY23/24 to FY24/25 - investigation and designFY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,2025-Q3,2025-Q4,2025-Q4,2026-Q2,2023-Q4,2026-Q2,,,[email address],,
IP009959,5/12/2023,Auckland Council,Puhinui Reserve Water Supply.,The objective of this project is to provide a permanent and healthy water supply to the park users.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q2,2019-Q2,,,,,2019-Q2,2020-Q4,,,[email address],,
IP009960,5/12/2023,Auckland Council,Little Shoal Bay - implement priority coastal asset options.,At its 8 May 2019 workshop the board indicated its interest in funding a coastal assessment of Little Shoal Bay. At the time of writing this report the scope of this assessment was still being investigated by staff. As such the formal allocation of funding towards this coastal assessment has not been sought through this report. Instead the proposed scope for this assessment will be presented to the local board for its endorsement at its 12 June 2019 workshop regarding Little Shoal Bay. Formal approval of the required budget to undertake the assessment will be sought at the next available business meeting.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2019-Q3,2020-Q4,2023-Q3,,2023-Q4,2024-Q2,2020-Q4,2024-Q2,,,[email address],,
IP009961,5/12/2023,Auckland Council,North Shore Memorial Park - upgrade customer facing kitchen and administration area.,Upgrade the customer facing kitchen and the administration area to a modern standard and to address security concerns. FY20/21 to FY24/25 - investigation and designFY24/25 to FY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2019-Q4,2019-Q4,2024-Q2,,2025-Q1,2026-Q1,2019-Q4,2026-Q1,,,[email address],,
IP009962,5/12/2023,Auckland Council,Albany Storage & Logistics Centre.,Council has a legislative requirement under the Public Records Act 2005 to systematically create and preserve records that are relevant to the historical and cultural heritage of New Zealand safeguard public records and archives and provide suitable access to the public. Following amalgamation in late 2010 council inherited a fragmented sub-standard portfolio of protected Records and Archives storage facilities across the region located in a number of leased and owned storage buildings. Along with sub-standard operational facilities including mail print events storage general storage and containerised storage locations across CCO organisations. As part of the overall WorkSmart programme there will be a single dedicated centrally managed operationally efficient storage facility.,,In planning,Funding source confirmed,To be determined,To be determined,Auckland,,,Other not specified,5 - 25 million,2018-Q1,2020-Q2,,2024-Q1,,,2022-Q3,2024-Q4,,,[email address],,
IP009963,5/12/2023,Auckland Council,Boundary Reserve West – develop suburb park.,Develop the park to meet the needs of new and future residents in the Tamaki Regeneration Area and growth across the local network. Works include the balance of the reserve from Tripoli Road and may include new playground flat flexible open space landscaping and recontouring the park pathways and improved connectivity to Tripoli Road Torino Street Oran Road and Sanda Road. FY23/24 - detailed design and consultationFY24/25 - consenting planning and procurementFY25/26 to FY26/27 - physical worksRisk Adjusted Programme (RAP) projectThis project is dependent upon the input and readiness of various stakeholders and partners including Kainga Ora and the Tamaki Regeneration Company. This project may be deferred to a future year if stakeholders are not able proceed within the anticipated timeframe.,,Early planning,Funding source confirmed,To be determined,To be determined,Auckland,,,Community facilities,5 - 25 million,2023-Q3,2023-Q4,,,2025-Q4,2026-Q2,2023-Q4,2026-Q2,,,[email address],,
IP009964,5/12/2023,Auckland Council,Pump House Three Kings Reserve - renew - roof cladding and timber joinery.,Comprehensive renewal of the pump house including for the replacement of the cladding to south extension where required and the remediation of all timber joinery.FY20/21 - investigation and design (stakeholder consultation obtain any necessary consents)FY21/22 to FY23/24 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2020-Q3,2020-Q4,2024-Q1,,2024-Q1,2024-Q2,2020-Q4,2024-Q2,,,[email address],,
IP009965,5/12/2023,Auckland Council,Taipari Strand - renew coastal assets.,23/06/20: Project has been deferred and placed on hold for FY22 for Delivery.This project has been unbundled from the 18064 Henderson-Massey - renew park structures FY2017/2018+ project due to the mix of asset type and realignment to the SPU team.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2022-Q1,,2023-Q1,2023-Q2,2023-Q3,2023-Q4,2021-Q3,2023-Q4,,,[email address],,
IP009966,5/12/2023,Auckland Council,Mt Wellington Highway Stormwater Improvements [2539].,New Stormwater pipes to provide connections for growth.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,,,,,,2018-Q2,2025-Q2,,,[email address],,
IP009967,5/12/2023,Auckland Council,Waitakere War Memorial Remedial Works.,Waitakere War Memorial is an Auckland Council closed landfill located in Waitakere village in rural north west of Auckland. The 2ha landfill was operated as a bale fill landfill between March 1981 to February 1982. The landfill site is used primarily as a recreational park with limited and informal sports facilities and there is also a small community hall playground and skate park on the site. The site is considered as a high-risk site by the Auckland Council Closed Landfill and Contaminated Land Response team (CLCLR) and has the highest annual expenditure per landfill size within CLCLR’s portfolio. This is due to the cartage and trade waste disposal costs associated with high leachate generation from the site. The site also contains landfill gas which has the potential to migrate toward nearby receptors such as the adjacent community hall.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Other not specified,1 - 5 million,,2020-Q3,,2021-Q1,,2024-Q2,2020-Q3,2024-Q2,,,[email address],,
IP009968,5/12/2023,Auckland Council,2 Grove Road Narrow Neck - Stormwater Pipe Renewal & Network improvements [2678].,To extend approximately 30m and 77m of existing stormwater network.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,2019-Q3,,,2024-Q3,2025-Q2,2019-Q3,2025-Q2,,,[email address],,
IP009969,5/12/2023,Auckland Council,Third Ave & Waiheke Rd Flooding - Waiheke Island.,• Upgrade the inlet structures and culvert under Waiheke Road to cope with the 10% AEP peak flows and reduce the risk of flooding• Reduce the risk of blockage of the culvert under Waiheke Road• Upgrade roadside drains to 10% AEP and intercept overland flow away from flood prone area• Reduce the health and safety risks to residents road users and operations staff• Intercept flows from opposite driveways.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,,,2026-Q2,2027-Q2,2026-Q2,2027-Q2,,,[email address],,
IP009970,5/12/2023,Auckland Council,Claris Landfill Rehabilitation and Closure Works.,The Claris Landfill on Great Barrier Island provides essential services to the local community. The landfill receives household commercial waste and septic tank wastes for permanent disposal to ground at the site. It is the only waste disposal facility on the island and existing consents allow for this until 2027. The site is also currently used for waste related activities to consolidate and temporarily store materials such as glass metal and plastics prior to their transport off the island. Consents require council to prepare a landfill closure plan to identify the works needed for final landfill closure and to provide for future landfill aftercare arrangements.Waste has been placed outside the consented boundary and in some areas waste has been filled outside consented design elevation and the 4H:1V outside batter profiles. Outside batter slopes are approaching 1H:1V in some areas. This means that the landfill is not compliant with consent conditions. Council is required to rehabilitate the landfill to achieve compliance with consents. The landfill closure plan and final designs will also be developed as part of the rehabilitation project. The final scope and staging for the rehabilitation and closure works will be confirmed following the investigation phase and development of preliminary design options.The scope and timing for the landfill rehabilitation and closure works will affect the ability of council to carry out landfill operations and waste related activities on the landfill site. Where possible landfill rehabilitation designs will maximise the potential future uses of the site after initial rehabilitation works and following final landfill closure.The Engineering & Technical Services department is responsible for landfill delivery and closed landfill maintenance and monitoring. The Waste Solutions department is responsible for managing the landfill operations and waste related activities on the site. These departments hav.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2021-Q4,2021-Q4,2027-Q3,2027-Q4,2028-Q1,2028-Q2,2021-Q4,2028-Q2,,,[email address],,
IP009971,5/12/2023,Auckland Council,Spokes Cx Sub Programme - Professional Fees.,Interior soft fitout for bookable workspace and meeting room(s). Workstream-wide design and professional fees.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2018-Q3,2025-Q2,,,[email address],,
IP009972,5/12/2023,Auckland Council,Turner Reserve - develop toilet facilities.,Develop a new public toilet on the reserve to meet the needs of new and future residents in the Auckland Housing Programme area of Mount Roskill.FY23/24 - investigation and designFY24/25 to FY25/26 - physical works.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,,,2024-Q4,2025-Q2,2023-Q4,2025-Q2,,,[email address],,
IP009973,5/12/2023,Auckland Council,Regional - investigate and renew timber wharf structures.,Raised by ETS as a priority long term piece of work to identify unconsented and aging assets that require renewal to meet legal requirements and maintain service levels.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Other not specified,1 - 5 million,2020-Q3,2020-Q3,2021-Q2,2021-Q4,2021-Q4,2024-Q2,2020-Q3,2026-Q2,,,[email address],,
IP009974,5/12/2023,Auckland Council,Hinemoa Park - repair pontoon.,A wharf pontoon has failed and needs repair additionally investigation is needed to establish the health of the other pontoons and renew these where required.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Other not specified,1 - 5 million,2020-Q4,2021-Q2,2023-Q2,2023-Q2,2023-Q4,2024-Q1,2021-Q2,2024-Q4,,,[email address],,
IP009975,5/12/2023,Auckland Council,Carr_Clinker Roads Flood Mitigation [2759].,To provide Carr/Clinker roundabout with a 10-year storm level of service and support growth in the upstream catchment.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q3,,,,,,2019-Q4,2026-Q3,,,[email address],,
IP009976,5/12/2023,Auckland Council,Long Bay Regional Park - renew footbridge at southern entrance.,Generally this bridge presents as being in a poor condition and will require replacement in the medium term if not sooner. The nature of the construction of the concrete abutment’s to each end of the bridge and the use of only painted steel structural members in a sea spray zone has shortened the service life of this structure.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2022-Q2,2022-Q4,2024-Q1,2024-Q2,2024-Q2,2024-Q4,2022-Q4,2024-Q4,,,[email address],,
IP009977,5/12/2023,Auckland Council,Purewa Stormwater Network Extensions [2687].,To extend existing stormwater network and separate the cross-connections of 59 properties.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,,,,,,2019-Q4,2027-Q2,,,[email address],,
IP009978,5/12/2023,Auckland Council,Stanaway Reserve - renew playspace.,Renew playspace and basketball court at Stanaway Reserve.FY22/23 - investigation and design.FY23/24 to FY25/26 - physical works.Risk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2024-Q2,2024-Q3,2024-Q3,2024-Q3,2024-Q4,2024-Q2,2024-Q4,,,[email address],,
IP009979,5/12/2023,Auckland Council,Cadness Reserve - renew playspace.,Renew and upgrade the playground at Cadness Reserve.FY24/25 - investigation and design.FY25/26 - physical work.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2024-Q3,2026-Q2,,,[email address],,
IP009980,5/12/2023,Auckland Council,Ellice Road Flood Mitigation [2530].,To create a new overland flowpath and community amenities.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,,,,,,2019-Q4,2027-Q2,,,[email address],,
IP009981,5/12/2023,Auckland Council,Vickers Park - renew playground.,Renewal of play space as per Play Network Gap Analysis recommendations. Renew basketball court and investigate options for a volleyball court.FY26/27 - investigation design and physical worksFY27/28 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q3,2023-Q4,,2024-Q1,2024-Q2,2025-Q3,2027-Q2,,,[email address],,
IP009982,5/12/2023,Auckland Council,Sturges Park - demolish and upgrade the toilet and changing room facilities.,Demolish and upgrade the toilet and changing room facilities at Sturges Park to meet the needs of the growing community.FY24/25 - investigation and design including consenting FY25/26 to FY27/28 - deliver physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,1 - 5 million,2022-Q3,2022-Q4,2023-Q3,,2023-Q4,2024-Q2,2024-Q3,2028-Q2,,,[email address],,
IP009983,5/12/2023,Auckland Council,Farley And Latimer Reserve - renew playground and park amenities.,Renew the playground and park furniture including the gate. FY25/26 - investigation and designFY27/28 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP009984,5/12/2023,Auckland Council,Corban Estate Arts Centre - undertake minor building refurbishment work - phase 2.,Undertake a second phase of minor refurbishment works at the Still Building Barrel Store and Corban Family Homestead. Homestead and The Garage to improve accessibility for all facility users to the upper and lower areas of Homestead and The Garage. Focus on the lower carparking access and toilet facilities.FY23/24 - investigation and designFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q4,2023-Q4,2024-Q1,2024-Q1,2024-Q2,2026-Q2,2023-Q4,2026-Q2,,,[email address],,
IP009985,5/12/2023,Auckland Council,Papakura - Relocate LB office (fitout).,Forms part of
WorkSmart@AC programme.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2021-Q2,2022-Q2,,2023-Q1,,,2022-Q3,2025-Q2,,,[email address],,
IP009986,5/12/2023,Auckland Council,Kelly Tarltons - rock fall protection.,Investigate methods to protect the Kelly Tarltons site from rock fall installing appropriate mitigation methods to prevent future slips.This project will only proceed once agreed with Ngati Whatua Orakei and Auckland Council as co-governors of the Tamaki Drive site.FY23/24 to FY24/25 - investigation and design (geotechnical investigation obtain required consents)FY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2024-Q1,,,2025-Q3,2025-Q4,2024-Q1,2025-Q4,,,[email address],,
IP009987,5/12/2023,Auckland Council,West Wave Aquatic Centre - replace boilers with electrically heated systems.,Replace existing gas boilers with electrically heated boilers to heat water and air in the Pools and Leisure Centers in West Wave.FY19/20-FY21/22 - investigation and designFY22/23-FY23/24 - physical works.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2020-Q1,2020-Q1,2022-Q4,2021-Q4,2023-Q3,2023-Q4,2020-Q1,2023-Q4,,,[email address],,
IP009988,5/12/2023,Auckland Council,AH - Replace Canopy (Federal).,AH - Replace Canopy (Federal).,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Other not specified,1 - 5 million,,,,,,,2023-Q3,2024-Q2,,,[email address],,
IP009989,5/12/2023,Auckland Council,Waiake Beach Reserve – remediate boardwalk and storage shed.,Remediate access along footpath boardwalk and investigate storage shed options in collaboration with the Torbay Sailing Club Heritage team Parks Sport and Recreation team and specialist input from the Coastal and Arboriculture teams.FY21/22 - investigation and removal of pohutukawa branchFY22/23 - investigate storage shed optionsFY23/24 to FY24/25 - design planning and physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2020-Q4,2021-Q2,2023-Q4,,2024-Q1,2025-Q2,2021-Q2,2025-Q2,,,[email address],,
IP009990,5/12/2023,Auckland Council,Hillcrest Creek waterfall and stream channel erosion management.,Stabilise the waterfall face to minimise the risk of further upstream retreat.Stabilise the stream channel above the waterfall to reduce the risk of stream bed incision cutting through the overlying hard tuff layer and exposing the soft underlying alluvium material which could lead to significant erosion and stream bed destabilisation.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q1,2023-Q4,2025-Q3,2025-Q4,2026-Q1,2026-Q2,2023-Q4,2026-Q2,,,[email address],,
IP009991,5/12/2023,Auckland Council,Alfriston Rd to Halver Rd Manurewa pipe renewal.,To restore structural integrity of a 900m diameter pipe.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,2022-Q2,,,,,2022-Q2,2028-Q2,,,[email address],,
IP009992,5/12/2023,Auckland Council,24 Lady Ruby Dr East Tamaki Pipe Renewal.,To renew poor condition critical assets to restore their functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2023-Q2,2023-Q3,,,,,2023-Q3,2024-Q2,,,[email address],,
IP009993,5/12/2023,Auckland Council,279 Shirley Road Papatoetoe Critical Pipe Renewal.,To renew poor condition critical assets to restore their functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2023-Q2,2023-Q2,,,,,2021-Q2,2024-Q2,,,[email address],,
IP009994,5/12/2023,Auckland Council,Campbell Road Takapuna Network Extension and Improvements.,Flood mitigation support growth and to reduce maintenance cost resulting from frequent call out.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q1,2023-Q3,,,,,2023-Q3,2028-Q2,,,[email address],,
IP009995,5/12/2023,Auckland Council,Grey Lynn Park Targeted Stormwater Separation.,To separate combined stormwater and wastewater network to reduce overflows and improve water quality.,,Early planning,Funding source to be confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP009996,5/12/2023,Auckland Council,Howard Hunter Tributary Erosion management [2542].,#NAME?,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q4,2023-Q3,2024-Q1,2024-Q3,2024-Q4,2025-Q1,2023-Q3,2025-Q1,,,[email address],,
IP009997,5/12/2023,Auckland Council,Matakana Wharf Reserve - renew carpark & refurbish pergola.,Renew the carpark and investigate the renewal requirement at the pergola at the wharf. The carpark is to be sealed as the current loose metal is not safe or accessible for all ages.FY22/23 - design and scopingFY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2022-Q4,2023-Q3,2023-Q3,2023-Q3,2023-Q4,2022-Q4,2023-Q4,,,[email address],,
IP009998,5/12/2023,Auckland Council,Old School Reserve - develop a new park road and paths.,Develop a new park road and path at Old School Reserve.FY25/26 - investigation and designFY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2021-Q3,,,2022-Q1,2022-Q2,2025-Q3,2027-Q2,,,[email address],,
IP009999,5/12/2023,Auckland Council,Waiatarua Reserve - action the Enhancement Plan renewals.,Renewal of the park pathways signage fencing and furniture in Waiatarua Reserve to align with recommendations from the Waiatarua Reserve Enhancement Plan.2021/2022 - tracks identified for maintenance were progressed. FY20/21 - investigation and design physical works (renew pedestrian bridge furniture and gate)FY22/23 - detailed design obtain resource consentFY23/24 to FY25/26 - physical works (minor and remaining pathways requiring consent)Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,,2021-Q1,,,2023-Q3,,2021-Q1,2022-Q4,,,[email address],,
IP010000,5/12/2023,Auckland Council,Island Bay - renew swimming pontoon.,The swimming pontoon has been reported by OMM as damaged/degraded and in need of renewal This project has originated via wider budgets Te Tahua Pūtea Tau 2021-2031 (10-year Budget 2021-2031). Auckland Council has a role to support strong and diverse Auckland communities by providing a wide range of arts sports recreation library and community services.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2020-Q3,2021-Q1,2022-Q4,,2023-Q1,2023-Q1,2021-Q1,2024-Q2,,,[email address],,
IP010001,5/12/2023,Auckland Council,Kiwi Esplanade - renew the wharf and jetty.,The condition of the wharf is condition 5 with urgent works required to assess and repair the piles and other minor fittings (bolts caps and non-slip mesh).,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2022-Q1,2023-Q4,2024-Q1,2024-Q2,2024-Q2,2024-Q3,2021-Q4,2024-Q3,,,[email address],,
IP010002,5/12/2023,Auckland Council,99 to 113 St Georges Road Avondale SW Extension.,To extend approximately 33m and 77m of existing stormwater network.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,,,,,2020-Q1,2027-Q2,,,[email address],,
IP010003,5/12/2023,Auckland Council,Willjames Avenue Esplanade Algies Bay - renew seawall.,The seawall at Willjames Avenue Esplanade was constructed in the early 1980’s the structures has been poorly engineered with failing structural integrity. An inspection of the seawall was undertaken and identified an overall condition rating of 4 (poor) with a targeted condition rating of 5 (very poor).,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2022-Q1,2022-Q4,,2024-Q1,2024-Q2,2024-Q2,2022-Q2,2024-Q2,,,[email address],,
IP010004,5/12/2023,Auckland Council,35 Barron Drive Flood Mitigation.,To investigate the cause of flooding and identify a suitable engineering solution for resolving habitable floor flooding and health and safety issues caused by surcharge from the public stormwater system.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2023-Q2,2023-Q3,2024-Q2,2024-Q2,2024-Q3,2025-Q1,2023-Q3,2025-Q1,,,[email address],,
IP010005,5/12/2023,Auckland Council,East Tamaki Reserve - upgrade sports fields.,Upgrade the sports fields to include sand carpets irrigation and ancillary works to meet the needs of new and future residents and increase the capacity in the network.FY24/25 - investigation and designFY25/26 to FY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,1 - 5 million,2024-Q3,2024-Q4,,,2026-Q4,2027-Q2,2024-Q3,2027-Q2,,,[email address],,
IP010006,5/12/2023,Auckland Council,Longford Park Link Reserve - renew playground.,Renew the playground. A constituent has submitted a letter and drawing to the local board and mayor for consideration in the new design taking into account the identified gaps in the play network analysis and include improvements for the senior (9-12 yrs) and/or youth (13+ yrs) age groups.FY25/26 - investigation and designFY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q4,2024-Q1,2024-Q3,,2024-Q4,2025-Q1,2025-Q3,2027-Q2,,,[email address],,
IP010007,5/12/2023,Auckland Council,Otara Town Centre (Bairds Road Reserve) - renew playground and associated park furniture.,Upgrade the playground and park furniture.FY24/25 - investigation and design FY25/26 to FY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q4,2024-Q1,,2024-Q3,2025-Q4,2027-Q2,2024-Q1,2027-Q2,,,[email address],,
IP010008,5/12/2023,Auckland Council,Clive Howe Rd Recreation Reserve - renew playground.,Renew playground.FY22/23 - FY23/24 investigation and designFY23/24 - FY24/25 physical workRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2023-Q1,2024-Q1,2024-Q1,2024-Q2,,2023-Q1,2024-Q2,,,[email address],,
IP010009,5/12/2023,Auckland Council,Colin Lawrie Reserve - renew playground.,Renew playground.FY22/23 - FY23/24 investigation and designFY24/25 - FY25/26 physical works Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2022-Q4,2024-Q2,2024-Q2,2024-Q3,,2022-Q4,2024-Q2,,,[email address],,
IP010010,5/12/2023,Auckland Council,Hudsons Beach Recreation Reserve - renew playground and associated park furniture.,Renew playground and associated park furniture.FY22/23 - FY23/24 investigation and design FY24/25 - FY25/26 physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q4,2023-Q2,2024-Q4,2024-Q4,2023-Q4,2024-Q4,2023-Q2,2024-Q4,,,[email address],,
IP010011,5/12/2023,Auckland Council,Fergusson Oaks Reserve - renew playground and investigate options develop a volleyball court.,Renew playground stage basketball and other amenities. Due to the 2023 storm investigation for drainage is also needed. Investigate options to develop a volleyball court.FY25/26 - investigation and design FY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q3,2024-Q3,2025-Q3,2026-Q1,2026-Q2,2026-Q2,2025-Q3,2027-Q2,,,[email address],,
IP010012,5/12/2023,Auckland Council,Bombay War Memorial Hall - renew carpark.,Renew carpark. Consider condition of adjacent footpath and work with Auckland Transport to improve assets as a whole.FY21/22 - FY22/23 investigation and design FY24/25 - FY26/27 physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q4,2021-Q4,2024-Q2,2024-Q2,2024-Q2,2025-Q2,2021-Q4,2025-Q2,,,[email address],,
IP010013,5/12/2023,Auckland Council,House Park - rebuild toilet block and changing rooms.,Rebuild toilet block and changing rooms at House Park.FY25/26 - investigation and concept designFY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2025-Q3,2025-Q1,,2026-Q2,,,2025-Q3,2027-Q2,,,[email address],,
IP010014,5/12/2023,Auckland Council,Wairau Estuary Reserve (Milford Marina) - repair timber seawall.,Milford Marina timber seawall has collapsed into the marina causing washout of material and health and safety issues for users using the esplanade. Currently this is affecting access ramps into the marina to moorings for users as well as potential undermining of the adjacent Inga road carpark. Further failures are expected along the timber seawall.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Other not specified,1 - 5 million,2020-Q3,2020-Q4,2022-Q3,2022-Q4,2023-Q1,2024-Q1,2020-Q4,2024-Q3,,,[email address],,
IP010015,5/12/2023,Auckland Council,Taipari Strand Closed Landfill Stormwater Outfalls Remedial Works.,To prevent/minimise the leachate release into the coastal marine area.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2023-Q1,2023-Q4,,,,,2023-Q4,2024-Q2,,,[email address],,
IP010016,5/12/2023,Auckland Council,Leigh Village Reserve - develop local park.,Develop a local park by renewing the play assets and skate facility from the Leigh School site to Leigh Village Reserve. This project scope will also include installation of furniture pathways and landscaping.FY22/23 - develop concept planFY23/24 - design consultation and consentingFY24/25 to FY26/27 - deliver physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q2,2024-Q1,2024-Q1,2024-Q2,2024-Q2,2024-Q2,2024-Q1,2024-Q2,,,[email address],,
IP010017,5/12/2023,Auckland Council,Beach Rd Northcote Point Pipe Renewal [2699].,To replace 118m of 300m diametre pipe and upstream manhole.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,2020-Q3,,,,,2020-Q3,2024-Q2,,,[email address],,
IP010018,5/12/2023,Auckland Council,Pamir Road Network [1932].,Upgrade inlet capacity and network to allow 10-year design flows to be captured and conveyed downstream.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,,,,,2020-Q3,2024-Q2,,,[email address],,
IP010019,5/12/2023,Auckland Council,Meola Reef - renew structures (stage two).,Stage two works consist of the renewal of structures aligning to the Meola Reef Development Plan. FY25/26 - design obtain necessary consentsFY25/26 to FY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010020,5/12/2023,Auckland Council,Open space paths and walkways - renew - 2023/2024 - Waitematā.,Renew paths and walkways across the Waitematā local board open spaces.Sites recommended for renewal works include the following: Ayr Reserve Albert Park Grey Lynn Park St Matthews In The City Moira Reserve Mountain Reserve Scarborough Reserve Brown Reserve Newmarket Park Seddon Fields/Jaggers Bush Judges Bay Reserve Western Park Renall Reserve and Te Taou Reserve Railway Gardens. Further sites to be identified during the investigation stage which will then be prioritised for delivery. FY23/24 - investigation and design any required consents detailed designFY23/24 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q3,,,,,2023-Q3,2024-Q2,,,[email address],,
IP010021,5/12/2023,Auckland Council,Warkworth 14 Baxter Street - remediate carpark - stage 2.,Continue replacing the waterproof surface membrane roof and other associated asset renewals in the council owned levels of the multi storey carpark in the town centre. The works will be delivered in stages to ensure the carpark remains open for public use. FY21/22 to FY22/23 - minor remedial works FY23/24 - investigation and designFY24/25 - planning and commence physical worksFY25/26 to FY26/27 - continue physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q4,2023-Q4,2024-Q1,2024-Q3,2024-Q3,2027-Q2,2023-Q4,2027-Q2,,,[email address],,
IP010022,5/12/2023,Auckland Council,Māngere Central Community Hall - refurbish facility.,Refurbish interior of the building. Remediate the basement which was flood damaged in the early 2023 storm events. This project includes a structural seismic assessment of building and roof renewal.FY23/24 - investigation and designFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q4,2023-Q4,2024-Q2,2024-Q2,2024-Q2,2025-Q4,2023-Q4,2025-Q4,,,[email address],,
IP010023,5/12/2023,Auckland Council,Celtic Crescent to Abbotts Way Network Extension and Flood Mitigation.,Extend a pipe network which would have a 10-year ARI capacity based on future landuse and future rainfall.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,,,,,,2020-Q4,2027-Q2,,,[email address],,
IP010024,5/12/2023,Auckland Council,Glenfield Library - renew guttering roof and exterior wall for weather tightness.,Renew guttering downpipes and exterior wall on the west side of the building to ensure the library is protected from weather.FY23/24 - investigation and design.FY24/25 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2021-Q3,2024-Q1,2024-Q1,2023-Q4,2024-Q1,2021-Q3,2024-Q1,,,[email address],,
IP010025,5/12/2023,Auckland Council,Manukau Sports Bowl - replace velodrome lighting.,Replace velodrome lighting with LED sports floodlights.FY24/25 - investigation and design FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q3,2024-Q4,2025-Q3,,2026-Q1,2026-Q2,2024-Q4,2026-Q2,,,[email address],,
IP010026,5/12/2023,Auckland Council,Henderson-Massey - renew paths and structures FY24-FY26.,Renew park footpaths and structures such as handrails retaining walls and pedestrian bridges.FY23/24 to FY24/25 - investigation and designFY23/24 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,,2024-Q2,2024-Q2,2026-Q2,2023-Q4,2026-Q2,,,[email address],,
IP010027,5/12/2023,Auckland Council,Ranui Domain - refurbish public toilets.,Refurbish the public toilets within the park amenity block to provide good accessibility and safe modern standards.FY22/23 - investigation and designFY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2023-Q1,2023-Q4,2023-Q4,2024-Q1,2024-Q1,2023-Q1,2023-Q4,,,[email address],,
IP010028,5/12/2023,Auckland Council,Tai Mate / McLeod Park - renew sports fields.,Renew the sports fields 1 2 and 3.FY25/26 - investigation and designFY26/27 to FY27/28 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,1 - 5 million,2022-Q3,2022-Q3,,2023-Q3,2023-Q4,2024-Q2,2025-Q3,2028-Q2,,,[email address],,
IP010029,5/12/2023,Auckland Council,Auckland Cemeteries - develop regional berms and walls - stage 3.,Develop berms walls and associated infrastructure across the cemeteries network. FY23/24 - investigation and designFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2023-Q3,2023-Q3,,,2023-Q4,2024-Q2,2023-Q3,2024-Q2,,,[email address],,
IP010030,5/12/2023,Auckland Council,Dunkirk Reserve - develop neighbourhood park.,Develop a new neighbourhood park within the Tamaki Regeneration area. Works may include implementing Greenways priority links and shared paths landscaping a new fitness trail looping around Riverside and Dunkirk Reserves and along the coast.FY23/24 - investigation and designFY24/25 to FY25/26 - physical works.The timing of this project is dependent upon the input and readiness of various stakeholders and partners including Kainga Ora and the Tamaki Regeneration Company. Delivery dates may change.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,,,2024-Q3,2025-Q1,2023-Q4,2025-Q1,,,[email address],,
IP010031,5/12/2023,Auckland Council,Okura Hall - refurbish building.,Renew the interior of the building including but not limited to the kitchen floor coverings window frames and painting of walls and ceilings.FY24/25 - investigation and designFY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2022-Q2,2023-Q2,,,[email address],,
IP010032,5/12/2023,Auckland Council,Te Poi / Starling Park - renew sports field #3.,Renew the sports field 3.FY25/26 - investigation and designFY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,,2024-Q2,2024-Q4,2025-Q2,2025-Q3,2027-Q2,,,[email address],,
IP010033,5/12/2023,Auckland Council,Corban Estate Arts Centre - renew footpaths driveways & carparking.,Investigate condition of footpaths and driveways including the cycleway. Undertake priority works.FY23/24 - investigation and designFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,2024-Q4,2024-Q4,2025-Q1,2025-Q2,2023-Q4,2025-Q2,,,[email address],,
IP010034,5/12/2023,Auckland Council,Glenbrook beach - Investigate renewal of wave barrier and boat ramp.,Raised by ETS.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2021-Q3,2022-Q2,2024-Q1,2024-Q2,2024-Q2,2024-Q4,2022-Q2,2023-Q2,,,[email address],,
IP010035,5/12/2023,Auckland Council,Kawakawa Bay Boat Ramp - resurfacing.,Raised by ETS.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2021-Q3,2021-Q3,2023-Q2,2023-Q4,2024-Q2,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
IP010036,5/12/2023,Auckland Council,Sulfur Beach jetty - replace piles and handrails.,Raised by ETS.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2022-Q1,,,2023-Q1,2023-Q1,2023-Q2,2021-Q4,2024-Q3,,,[email address],,
IP010037,5/12/2023,Auckland Council,Wade River Road Reserve - renew timber wharf.,Raised by ETS.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2021-Q3,2021-Q3,,2023-Q1,2023-Q1,2023-Q2,2021-Q3,2024-Q4,,,[email address],,
IP010038,5/12/2023,Auckland Council,Howick Beach - renew seawall.,Raised by ETS; asset is a 10-15m long seawall piece that needs renewals. It was. damaged by storms in 2018 and in need of replacement. Wall is situated near the boat club.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2022-Q1,,,2023-Q1,2023-Q2,2023-Q2,2021-Q4,2024-Q3,,,[email address],,
IP010039,5/12/2023,Auckland Council,Foster Bay Huia - seawall and groyne renewal.,Raised by ETS.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2022-Q1,,2023-Q3,2023-Q3,2023-Q4,2024-Q2,2022-Q1,2025-Q2,,,[email address],,
IP010040,5/12/2023,Auckland Council,Mulberry Grove - seawall renewal.,The subject Mulberry Grove shoreline is armoured by a rock masonry seawall that is overtopped frequently by waves. This has resulted in scour of the adjacent reserve surface and loss of grass. Continued wave overtopping will impact upon seawall integrity with backfill material also scouring out from under the toe of the seawall in places. The existing seawall provides protection to the adjacent reserve and road from coastal processes. The proposal involves undertaking maintenance works on the structure to extend the seawalls functional life for the short to medium term.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2021-Q4,2022-Q4,,2023-Q1,2023-Q4,,2022-Q3,2024-Q4,,,[email address],,
IP010041,5/12/2023,Auckland Council,Cliff Road St Heliers - coastal protection.,Raised by ETS. Investigate options for appropriate coastal protection between the existing seawall and the stormwater outfall at Cliff Road St Heliers. Works will also need to include consenting for the seawall.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2021-Q3,2022-Q2,2023-Q3,2024-Q3,2024-Q4,2024-Q4,2022-Q2,2025-Q1,,,[email address],,
IP010042,5/12/2023,Auckland Council,Patuone Place Hasting Parade NZDF SW Improvements.,To mitigate the flood risk covering NZDF and Patuone Place in the geographic centre of Devonport.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2019-Q3,,,2026-Q1,,,2025-Q3,2028-Q2,,,[email address],,
IP010043,5/12/2023,Auckland Council,223 Birkdale Road SW Network Improvements.,Extend and upgrade stormwater network to mitigate flooding and support growth.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2020-Q1,2023-Q4,2024-Q4,2025-Q1,2025-Q1,2025-Q3,2023-Q4,2025-Q3,,,[email address],,
IP010044,5/12/2023,Auckland Council,Anne St Clarence St Garden Tce Kapai Rd Flood Mitigation.,To reduced number of habitable and non-habitable floor flooding reduced flood risk / classification of road flooding improving public health and safety by reducing nuisance flooding and renew pipes in poor condition.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2021-Q3,,,2026-Q1,,,2025-Q3,2028-Q2,,,[email address],,
IP010045,5/12/2023,Auckland Council,Waiatarua Wetland Renewal.,The project aims to clean the x2 inlet channels of sediment and will investigate the opportunity to do the same for the surrounding streams.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2023-Q3,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010046,5/12/2023,Auckland Council,Hugh Green 95 Pond Renewal.,The following requires investigation:• Whether the capacity is sufficient to serve the catchment• Bulking factor impact on volume of sediment once dredged/removed from the pond• Downstream flooding presence/extent/risk• Link to any other redevelopment in area e.g. footpaths/cycle ways linking• Area available around pond for drying sediment • Legacy Zoning for recreational and conservation land show an __% impervious surface current zoning for Residential zones 1 to 8 max building cover.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2021-Q4,2023-Q4,2024-Q2,,,,2023-Q4,2028-Q2,,,[email address],,
IP010047,5/12/2023,Auckland Council,Ngahau Pond Renewal.,The following requires investigation:• Whether the capacity is sufficient to serve the catchment• Bulking factor impact on volume of sediment once dredged/removed from the pond• Downstream flooding presence/extent/risk• Link to any other redevelopment in area e.g. footpaths/cycle ways linking• Area available around pond for drying sediment • Legacy Zoning for recreational and conservation land show an __% impervious surface current zoning for Residential zones 1 to 8 max building cover.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010048,5/12/2023,Auckland Council,Lucy Moore Pond Renewal Program.,The following requires investigation:• Whether the capacity is sufficient to serve the catchment• Bulking factor impact on volume of sediment once dredged/removed from the pond• Downstream flooding presence/extent/risk• Link to any other redevelopment in area e.g. footpaths/cycle ways linking• Area available around pond for drying sediment.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010049,5/12/2023,Auckland Council,Glenmore Pond Renewal.,The following requires investigation:• Whether the capacity is sufficient to serve the catchment• Bulking factor impact on volume of sediment once dredged/removed from the pond• Downstream flooding presence/extent/risk• Link to any other redevelopment in area e.g. footpaths/cycle ways linking• Area available around pond for drying sediment.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010050,5/12/2023,Auckland Council,Bonair Crescent Pond Renewal.,The following requires investigation:• Whether the capacity is sufficient to serve the catchment• Bulking factor impact on volume of sediment once dredged/removed from the pond• Downstream flooding presence/extent/risk• Link to any other redevelopment in area e.g. footpaths/cycle ways linking• Area available around pond for drying sediment.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010051,5/12/2023,Auckland Council,Rush Creek 1 Pond Renewal Program.,To remove the sediment from the pond to bring the pond back to full operational status.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010052,5/12/2023,Auckland Council,Woodbank Pond Renewal.,To remove the sediment from the pond to bring the pond back to full operational status.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010053,5/12/2023,Auckland Council,Gendo Pond Renewal Program.,• Asset Renewal: Renewal of Healthy waters assets in poor condition and at risk of failure.• Increasing asset life: area of asset renewed• Improving public safety: area of infrastructure where public safety risk is reduced by reducing the risk of bank failure• Improving ecosystem health: area of water body improved restored or created (m).,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010054,5/12/2023,Auckland Council,Long Bush Pond Renewal.,The following requires investigation:• Whether the capacity is sufficient to serve the catchment• Bulking factor impact on volume of sediment once dredged/removed from the pond• Any capacity issues in the adjacent reticulation network• Link to any other redevelopment in area e.g. footpaths/cycle ways linking• The coordination with nearby urban development schemes • Area available around pond for drying sediment • High value receiving environment.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010055,5/12/2023,Auckland Council,Paremuka Lake A Pond Renewal.,The following requires investigation:• Whether the capacity is sufficient to serve the catchment• Bulking factor impact on volume of sediment once dredged/removed from the pond• Any capacity issues in the adjacent reticulation network• Link to any other redevelopment in area e.g. footpaths/cycle ways linking• The coordination with nearby urban development schemes • Area available around pond for drying sediment • High value receiving environment.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010056,5/12/2023,Auckland Council,Paremuka Lake B Pond Renewal.,To remove the sediment from the pond to bring the pond back to full operational status.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010057,5/12/2023,Auckland Council,Spinnaker Pond Renewal Program.,The following requires investigation:• Whether the capacity is sufficient to serve the catchment• Bulking factor impact on volume of sediment once dredged/removed from the pond• Any capacity issues in the adjacent reticulation network• Link to any other redevelopment in area e.g. footpaths/cycle ways linking• The coordination with nearby urban development schemes • Area available around pond for drying sediment • High value receiving environment.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010058,5/12/2023,Auckland Council,Van Dammes Lagoon Pond Renewal.,The following requires investigation:• Whether the capacity is sufficient to serve the catchment• Bulking factor impact on volume of sediment once dredged/removed from the pond• Any capacity issues in the adjacent reticulation network• Link to any other redevelopment in area e.g. footpaths/cycle ways linking• The coordination with nearby urban development schemes • Area available around pond for drying sediment • High value receiving environment.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010059,5/12/2023,Auckland Council,Ranui Station Road Pond renewal.,The following requires investigation:• Whether the capacity is sufficient to serve the catchment• Bulking factor impact on volume of sediment once dredged/removed from the pond• Any capacity issues in the adjacent reticulation network• Link to any other redevelopment in area e.g. footpaths/cycle ways linking• The coordination with nearby urban development schemes • Area available around pond for drying sediment • High value receiving environment.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010060,5/12/2023,Auckland Council,Orua Bay Reserve - renew playground.,Renew the playground.FY22/23 - FY23/24 investigation and designFY23/24 - FY25/26 physical works Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q3,2024-Q1,2024-Q1,2024-Q2,,2023-Q3,2024-Q3,,,[email address],,
IP010061,5/12/2023,Auckland Council,Karaka Sports Park-renew & relocate toilet block (Linwood Rd).,Renew and relocate amenity block to enable easy access for the users utilising the site. FY24/25 - investigation and designFY25/26 - FY26/27 physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2026-Q2,2026-Q2,2026-Q1,2026-Q1,2026-Q3,,2026-Q2,2025-Q4,,,[email address],,
IP010062,5/12/2023,Auckland Council,Gittos Domain - renew park tracks (stage 2).,Renew structures footpaths and park tracks including steps boardwalks pedestrian bridges and footpathsFY22/23 - investigate and designFY23/24 - FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q4,2024-Q1,2024-Q1,2024-Q2,2024-Q3,2022-Q4,2024-Q3,,,[email address],,
IP010063,5/12/2023,Auckland Council,New Lynn Community Centre - renew toilets kitchen and ventilation.,Renew the toilets kitchen and ventilation in the community centre.FY22/23 - investigation and designFY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q3,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2022-Q3,2024-Q1,,,[email address],,
IP010064,5/12/2023,Auckland Council,Open space play space equipment - renew - 2023/2024 - Ōrākei.,Renew play space equipment in open spaces across the Ōrākei local board area. Sites to be investigated and prioritised during the scoping stage which includes for Waiatarua Reserve Swainston Reserve Kupe North and Okahu Bay. Further locations will be identified and scoped for delivery.FY23/24 - investigation and design (consultation obtain any required consents)FY23/24 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q2,2023-Q2,,2023-Q4,2024-Q1,,2023-Q2,2023-Q2,,,[email address],,
IP010065,5/12/2023,Auckland Council,Tupu Youth Library - renew lighting cameras and HVAC.,Install and renew closed-circuit television cameras and lighting at Tupu Youth Library. Include HVAC destroyed during the previous storms.FY23/24 to FY24/25 - investigation design and physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q4,2023-Q4,2024-Q1,2024-Q1,2024-Q1,2024-Q3,2023-Q4,2024-Q3,,,[email address],,
IP010066,5/12/2023,Auckland Council,Ngā Hau Māngere / Māngere Centre Park Depot - renew boxing facility.,Renew building so it is up to health and safety standards. Renew roof refurbish exterior and interior of the New Arising Trust boxing facility and Mr T workshop (bike hub).FY23/24 - investigation design and commence physical worksFY24/25 - continue physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q2,2024-Q3,,2025-Q2,,,2024-Q3,2024-Q2,,,[email address],,
IP010067,5/12/2023,Auckland Council,Matakatia Parade Beachfront Reserve - renew seawall.,The resource consent has expired for this seawall they need to be refreshed and the wall renewed.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2021-Q3,2021-Q3,,2023-Q2,2023-Q2,2023-Q3,2021-Q3,2023-Q3,,,[email address],,
IP010068,5/12/2023,Auckland Council,Auckland Cemeteries - renew plant and equipment FY24-FY26.,Renew plant and equipment across the cemetery network potentially in conjunction with purchase requirements for other Regional Operations units.FY23/24 to FY25/26 - investigation and physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q3,,,2023-Q4,2024-Q2,2023-Q3,2024-Q2,,,[email address],,
IP010069,5/12/2023,Auckland Council,Snells Beach Area - investigate toilet provision.,Investigate the toilet provision requirement in the Snells Beach area and report to the local board the recommendations for delivery.If the provision assessment recommends renewing a toilet block in a different location within the Snells Beach area this project will deliver the rebuild at the recommended location and reinstate the existing site as per the local board approval.FY22/23 - provision assessmentFY23/24 - investigation and consultationFY24/25 to FY26/27 - deliver physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2024-Q1,2025-Q3,2025-Q3,2026-Q2,2026-Q2,2024-Q1,2026-Q2,,,[email address],,
IP010070,5/12/2023,Auckland Council,Riverhead War Memorial Park - renew pavilion.,Renew the pavilion building within the park including addressing the asbestos which has been identified to ensure the facility is a safe and healthy environment for the user groups.FY21/22 - investigation and designFY22/23 to FY25/26 - deliver physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q2,2021-Q3,2023-Q4,,2024-Q1,2024-Q2,2021-Q3,2024-Q2,,,[email address],,
IP010071,5/12/2023,Auckland Council,Rodney Library Network - renew furniture fixtures and fittings.,Renew furniture fixtures and fittings as identified repurposing where possible.Sites to be scoped are as follows:- Puhoi Library- Leigh Library- Wellsford Library- Helensville Library- Kumeu Library (in conjunction with the local board office refit)- Mahurangi Library- Warkworth LibraryFY21/22 - investigate scope and commence physical worksFY22/23 to FY25/26 - complete physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2022-Q1,2022-Q4,,2023-Q2,2023-Q2,2022-Q1,2023-Q2,,,[email address],,
IP010072,5/12/2023,Auckland Council,Fergusson Hall - renew full facility.,Full facility renewal of the hall. Scope of works includes the roof interior ceiling panels joinery and flooring.FY25/26 - investigation and designFY25/26 to FY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q3,,,2024-Q1,2024-Q2,2025-Q3,2027-Q2,,,[email address],,
IP010073,5/12/2023,Auckland Council,Upper Harbour - renew tracks and footpaths 2024/2025+.,Renew tracks and footpaths including but not limited to Luckens Reserve Centorian Reserve Albany Lakes Unsworth Reserve Hooten Reserve.FY24/25 - investigation and designFY25/26 to FY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q3,2025-Q1,,,,2027-Q1,2025-Q1,2027-Q1,,,[email address],,
IP010074,5/12/2023,Auckland Council,Open space furniture fixings equipment BBQs and signage - renew - 2024/2025 - Waiheke.,Renewal of furniture fixings equipment BBQs and signage across open spaces.FY24/25 - investigation and designFY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q3,2024-Q3,2024-Q4,2024-Q4,2025-Q2,2026-Q2,2024-Q3,2026-Q2,,,[email address],,
IP010075,5/12/2023,Auckland Council,Open space furniture fixtures and utilities - renew - 2022/2023 - Waitematā.,Renewal of park furniture fixtures bollards BBQs and equipment in open spaces across the Waitematā local board area. Sites identified for renewal include Albert Park Basque Road Reserve Bella Vista Reserve Constitution Hill Coxs Bay Reserve Dove Myer Robinson Park Gladstone Park Grey Lynn Park2 Meola Reef Reserve Myers Park Ngaoho Reserve Olympic Reserve Symonds Street Cemetery East Symonds Street Cemetery West Tole Reserve Wakefield Reserve and Western Park.FY22/23 - investigation and design purchasing of materialsFY23/24 - physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q2,2022-Q3,2022-Q3,2023-Q2,2023-Q3,2024-Q4,2022-Q3,2024-Q4,,,[email address],,
IP010076,5/12/2023,Auckland Council,Raglan Street Mangere East Stormwater Extension [2535].,Construct an additional 900mm dia pipe of approximately 200m long within the Aorere Park.Construct a new discharge outlet within Aorere Park.Construct a new branch pipeline on Kairanga Street of 375 mm and 300 mm diameters.Construct a new branch pipeline on Cheviot Street of 450 mm 375 mm and 300 mm diameters.Construct a new branch pipeline on Hokianga Street of 450 mm 375 mm and 300 mm diameters.Construct two new 450 mm diameter pipes on Raglan Street.Construct 13 new manholes to connect new pipework.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,,,,,,2021-Q1,2027-Q2,,,[email address],,
IP010077,5/12/2023,Auckland Council,Waiwera Beach - renew seawall.,This project has originated via wider budgets Te Tahua Pūtea Tau 2021-2031 (10-year Budget 2021-2031). General renewal budgets/development budgets [[outline specific budget]].Auckland Council has a role to support strong and diverse Auckland communities by providing a wide range of arts sports recreation library and community services.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2022-Q3,2022-Q4,,,2024-Q1,,2022-Q4,2024-Q2,,,[email address],,
IP010078,5/12/2023,Auckland Council,Imrie Park - upgrade playground and install perimeter path.,Upgrade the park playground and amenities and install a perimeter path to connect Imrie Avenue to Chingford Close to improve overall park access and connectivity. This project supports the needs of new and future residents in the Auckland Housing Programme area of Mangere.FY24/25 - investigation design and consentingFY25/26 to FY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,1 - 5 million,2024-Q3,2025-Q4,,,2026-Q4,2027-Q2,2024-Q3,2027-Q2,,,[email address],,
IP010079,5/12/2023,Auckland Council,Totara Park - renew playspace.,Renew the play space at Totara Park.FY24/25 - investigation and designFY25/26 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q3,2024-Q1,,2024-Q1,2024-Q4,2024-Q3,2026-Q2,,,[email address],,
IP010080,5/12/2023,Auckland Council,Papakura - renew park structures and footpaths 2021/2022 - 2024/2025.,Renew park infrastructure and hard surfaces such as footpaths bridges handrails bollards retaining walls fences and gates. It also includes repairing assets that were damaged by the recent storm and cyclone in January/February 2023 with a specific focus on the walkway at Hingaia Esplanade. Children's Forest fence is to be renewed and/or extended and the footpaths identified in the asset condition data will be prioritised for renewal once the investigation is completed. Additionally renew footpaths identified in the asset condition data priority will be given once the investigation is finished. The following areas will be investigated: Central Park Reserve Pahurehure Esplanade Reserve Liddesdale Stormwater Reserve Drury Sports Complex Sheralee Accessway Prince Edward Park Smiths Reserve and Mclennan Park.FY21/22-FY22/23 - investigation and design FY23/24 - investigation and design and physical worksFY24/25 - investigation and design and physical worksRisk Adjusted Programme (RAP) projects.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q3,2021-Q4,,2024-Q1,2024-Q2,,2021-Q4,2023-Q2,,,[email address],,
IP010081,5/12/2023,Auckland Council,AH - Replace Butynol Roofing (L4 Canopy).,Planned Lifecycle Renewals.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2023-Q3,2024-Q2,,,[email address],,
IP010082,5/12/2023,Auckland Council,Grey Lynn Library - BOH Workspace Refresh.,Enhancing Workspace.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2022-Q3,2024-Q2,,,[email address],,
IP010083,5/12/2023,Auckland Council,Warkworth Library - BOH Workspace Refresh.,Enhancing Workspace.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2023-Q3,2024-Q2,,,[email address],,
IP010084,5/12/2023,Auckland Council,Waitakere Central Library - BOH Workspace Refresh.,Enhancing Workspace.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2023-Q3,2024-Q2,,,[email address],,
IP010085,5/12/2023,Auckland Council,Glenfield Pool & Leisure Centre - BOH Workspace Refresh.,Enhancing Workspace.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2023-Q3,2024-Q2,,,[email address],,
IP010086,5/12/2023,Auckland Council,Animal Shelter BOH Refresh - BOH Workspace Refresh.,Enhancing Workspace.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2023-Q3,2024-Q2,,,[email address],,
IP010087,5/12/2023,Auckland Council,Manukau Memorial Garden - BOH Workspace Refresh.,Enhancing Workspace.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2023-Q3,2024-Q2,,,[email address],,
IP010088,5/12/2023,Auckland Council,Takapuna Pools - BOH Workspace Refresh.,Enhancing Workspace.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2023-Q3,2024-Q2,,,[email address],,
IP010089,5/12/2023,Auckland Council,Putaki Bay and Ostend Domain - renew coastal assets.,The staircase by the sea scout hall has failed and needs renewal.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2021-Q3,2021-Q3,2023-Q4,2023-Q4,2023-Q4,2024-Q1,2021-Q3,2024-Q1,,,[email address],,
IP010090,5/12/2023,Auckland Council,Piha Wetland Improvements [2959].,To provide a solution to the: - Lack of wetland function due to inflows having been diverted around instead of into the wetland.- Lack of wetland storage to encourage dominance by aquatic indigenous species instead of exotic weeds. - Incomplete amenity path access for walking.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q1,,,,2026-Q2,2027-Q2,2022-Q1,2027-Q2,,,[email address],,
IP010091,5/12/2023,Auckland Council,CPT: Stream Restoration 203 and 211 Richardson Rd.,The re-alignment of the stream at 203-211 Richardson Rd funded by the Healthy Waters Biodiversity Offset Bank to improve ecosystem health and to improved public amenity.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2020-Q1,,,,,,2022-Q1,2024-Q4,,,[email address],,
IP010092,5/12/2023,Auckland Council,Rosedale Closed Landfill Stability and Leachate System Remedial Works.,Remedial works to address identified stability and landfill leachate issues at the site following investigations undertaken since 2019 at the Rosedale Closed Landfill.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Other not specified,1 - 5 million,2021-Q4,2023-Q2,,2024-Q3,,2027-Q2,2022-Q4,2027-Q2,,,[email address],,
IP010093,5/12/2023,Auckland Council,Rongomai Park - upgrade sportsfields 4 and 5.,Upgrade fields four and five with sand carpets irrigation and lighting.FY25/26 - investigation and design FY26/27 to FY28/29 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,1 - 5 million,,,,,,,2025-Q3,2029-Q2,,,[email address],,
IP010094,5/12/2023,Auckland Council,Henderson-Massey - renew sports field minor assets FY24-FY26.,Renew sports assets i.e. field lighting goals posts and cricket wickets sites to be confirmed.FY23/24 to FY25/26 - investigation and physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q3,2023-Q4,2024-Q1,2024-Q1,2027-Q2,2023-Q4,2027-Q2,,,[email address],,
IP010095,5/12/2023,Auckland Council,Maungakiekie-Tamaki - renew carparks 2025/2026 to 2026/2027.,Renew carparks within the local board area as prioritised by asset condition data and input from the operations team. Sites include for Johnson Reserve further sites are to be investigated.FY25/26 - investigation and designFY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010096,5/12/2023,Auckland Council,Maungakiekie-Tāmaki - renew play spaces 2025/2026 to 2026/2027.,Renew play space equipment in open space as identified in the asset assessments. Locations for renewal include for Talbot Reserve further sites may be included upon completion of the investigation stage.FY25/26 - investigation and designFY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010097,5/12/2023,Auckland Council,Howick LB - Relocate LB Office & Fitout.,Part of
WorkSmart@AC Programme.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2022-Q2,2024-Q2,,,[email address],,
IP010098,5/12/2023,Auckland Council,Northboro Reserve - renew playground and hoggin path.,Renew the playground and hoggin path at Northboro Reserve. FY22/23 – investigation and design.FY23/24 to FY24/25 – physical works.Risk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q2,2023-Q3,2023-Q4,,2024-Q1,2024-Q2,2023-Q3,2024-Q2,,,[email address],,
IP010099,5/12/2023,Auckland Council,David Lange Park - upgrade suburb park.,Upgrade David Lange Park to meet the needs of new and future residents in the Auckland Housing Programme area of Māngere. Works may include a pump track flexible open space practice fields bicycle circuit shared path improved connectivity within and outside the park and entrance upgrades as set out in the masterplan for the park.FY23/24 - detailed designFY24/25 - consenting and tender processFY25/26 to FY26/27 - deliver physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2023-Q3,2023-Q4,,,2025-Q4,2026-Q2,2023-Q4,2026-Q2,,,[email address],,
IP010100,5/12/2023,Auckland Council,Walter Massey Park - upgrade sports fields and lighting.,Upgrade sports field and lighting at Walter Massey Park to increase capacity in the network and meet the needs of new and future residents in the Auckland Housing Programme area of Māngere. Works will include two field upgrades to sand carpet fields and the installation of lights on three fields.FY23/24 - investigation and design FY24/25 to FY25/26 - deliver physical works.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2024-Q2,2024-Q4,,,2025-Q4,,2024-Q4,2026-Q2,,,[email address],,
IP010101,5/12/2023,Auckland Council,Northcote War Memorial Hall - renew upper level of the hall.,Renew the upper level of the Northcote War Memorial Hall.FY24/25 - investigate and design.FY25/26 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2024-Q3,2026-Q2,,,[email address],,
IP010102,5/12/2023,Auckland Council,Ngāti Ōtara Park – develop circular recreational pathway.,Ngāti Ōtara Park - develop a walking and cycling corridor. Enhance existing pathway to provide a park wide circuit to encourage walking cycling & jogging and all-weather pathway to encourage bike & scooter use with raised mounds.FY21/22 - FY22/23 - investigation and designFY23/24 - physical works section D.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q1,2023-Q2,2025-Q4,,2026-Q1,2026-Q2,2023-Q2,2026-Q2,,,[email address],,
IP010103,5/12/2023,Auckland Council,Uru / Westview Reserve - undertake park development.,Develop park in consultation with local residents.FY25/26 - investigation and consultationFY26/27 - design and consentingFY27/28 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010104,5/12/2023,Auckland Council,Portage Canal Foreshore Reserve - renew footbridge.,Renew footbridge at Portage Canal Foreshow Reserve.FY23/24 - investigation design and physical works FY24/25 - continue physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q1,2024-Q1,2024-Q2,2024-Q2,2024-Q2,2024-Q3,2024-Q1,2024-Q3,,,[email address],,
IP010105,5/12/2023,Auckland Council,Gilshennan Reserve - renew play space and footpaths.,Renew play space and sections of cracked and uneven footpath in the reserve.FY23/24 to FY24/25 - investigation and designFY25/26 - physical worksRisk Adjusted Programme (RAP) Project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q1,2024-Q2,,2024-Q3,2024-Q4,2025-Q1,2024-Q2,2025-Q1,,,[email address],,
IP010106,5/12/2023,Auckland Council,Barry Curtis Park - implement cultural pathway.,Implement the delivery of the cultural pathway at Barry Curtis Park as part of the master plan. FY24/25 - investigation design and consentFY25/26 to FY26/27 - consent and physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2024-Q3,2027-Q2,,,[email address],,
IP010107,5/12/2023,Auckland Council,Mangemangeroa - deliver physical works of master plan.,Deliver the various element of the Master Plan with consideration to the Friends of Mangemangeroa and their top priorities as well as the priorities identified by the Parks Services Team. Elements may include but are not limited to:- pathways- toilet facilityFY24/25 - investigation and designFY25/26 - physical worksFunded solely by the local board's discretionary fund.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2024-Q3,2026-Q2,,,[email address],,
IP010108,5/12/2023,Auckland Council,Allan Brewster Leisure Centre - renew interior of the building.,Renew facilities including the security system and interior components in the Spotlight Theatre. Replace ceiling tiles in leased areas (Blue Light Wood Turners Pasifika).Renew the staff kitchens in the leisure centre Kauri Kids and Spotlight Theatre including carpet replacement in the theatre.FY23/24 - investigation and design FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q2,2023-Q2,,2025-Q1,2025-Q2,,2023-Q2,2024-Q3,,,[email address],,
IP010109,5/12/2023,Auckland Council,Stredwick Reserve - renew walkways.,Renew sections of walkways in the reserve.FY23/24 - investigation and designFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q2,2022-Q3,2023-Q1,2023-Q2,2023-Q3,2024-Q2,2022-Q3,2024-Q2,,,[email address],,
IP010110,5/12/2023,Auckland Council,Auckland Cemeteries - develop regional berms and walls - stage 4.,Develop berms walls and associated infrastructure across the cemeteries network. FY24/25 - investigation and designFY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2025-Q2,,,[email address],,
IP010111,5/12/2023,Auckland Council,Mahurangi East Regional Park - develop new park land.,Development at Mahurangi East Regional Park. This is a provisional allocation anticipating the need for investment. Priorities to be determined based on provision of service information.FY23/24 to FY25/26 - investigation and designFY25/26 to FY26/27 - physical works.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2023-Q3,2023-Q4,,2024-Q2,2024-Q3,2026-Q3,2023-Q4,2026-Q3,,,[email address],,
IP010112,5/12/2023,Auckland Council,Te Arai Regional Park - develop regional park land.,Development at Te Arai Regional Park. This is a provisional allocation anticipating the need for investment. Early priorities are: manage access points to the beach and develop tracks at mouth of Te Arai and Poutawa Streams to minimise the impact of human activity on shorebirds installation of a parking area close to beach with visitor information.FY23/24 to FY24/25 - investigation and design FY24/25 to FY27/28 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2023-Q3,2023-Q4,,,2025-Q1,2028-Q3,2023-Q4,2028-Q3,,,[email address],,
IP010113,5/12/2023,Auckland Council,Muriwai Regional Park - develop access improvements and park infrastructure.,Development at Muriwai Regional Park to improve access and develop park infrastructure. This is a provisional allocation anticipating the need for investment. Priorities to be determined based on provision of service information.FY24/25 - investigation and design FY25/26 - detailed design FY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,1 - 5 million,,,,,,,2024-Q3,2027-Q2,,,[email address],,
IP010114,5/12/2023,Auckland Council,Fernhill Reserve - landslide prevention.,Investigate soil conditions surrounding the existing retaining wall and either strengthen the wall or install a new wall to prevent future landslips.FY24/25 - investigation and designFY25/26 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,,,2024-Q4,2025-Q2,2024-Q3,2026-Q2,,,[email address],,
IP010115,5/12/2023,Auckland Council,Long Bay Regional Park - rock scaling.,Remove loose rock that is at risk of falling and install netting or soil pins (as needed) to protect against future rockfall.FY24/25 - investigation and designFY25/26 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q3,2024-Q4,,,2025-Q4,2026-Q2,2024-Q3,2026-Q2,,,[email address],,
IP010116,5/12/2023,Auckland Council,Muriwai Beach boat ramp - rockfall stabilisation.,Install appropriate rockfall protection for the boat ramp. Works will include geotechnical investigation and topographical survey of the site detailed design and consenting and installation of appropriate mitigation to prevent future slips.FY23/24 to FY24/25 - investigation and designFY24/25 to FY25/26 - consenting physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,,,2025-Q4,2026-Q2,2023-Q4,2026-Q2,,,[email address],,
IP010117,5/12/2023,Auckland Council,Regional landslide mapping.,Compile data and create a map of existing landslides and landslide prone areas of Auckland Council owned land throughout the region in order to inform future investment decisions regarding slip mitigation and prevention.FY24/25 - physical worksProject value is provisional and subject to further investigation and refinement.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q3,2024-Q4,,,2025-Q1,2025-Q2,2024-Q4,2025-Q2,,,[email address],,
IP010118,5/12/2023,Auckland Council,Muriwai Regional Park - rockfall stabilisation (Waitea Road).,Install rockfall protection for public toilets and car park at Waitea Road on Muriwai Regional Park. Works will include geotechnical investigation and topographical survey of the site detail design and consenting installation of appropriate mitigation to prevent future slips.FY23/24 to FY24/25 - investigation and designFY24/25 to FY25/26 - consenting physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,,,2025-Q4,2026-Q2,2023-Q4,2026-Q2,,,[email address],,
IP010119,5/12/2023,Auckland Council,Aorere Park - develop circular pathway and footbridge.,Construct 1200m circular pathway and footbridge over stream Woburn Street end.FY25/26 - investigation and design (obtain any required resource consent)FY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010120,5/12/2023,Auckland Council,Mayfield Park - develop circular pathway.,Construct 600m circular pathway to improve connection to amenity blockFY25/26 - investigation and designFY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010121,5/12/2023,Auckland Council,Gaye Crescent/ Eccles Place Esplanade Reserve - develop new pathway.,Construct an 850m concrete pathway from Ngāti Otara Park through to Kaitawa Street.Funding proposal: Potential for provision of Local Board Transport Capital Fund.FY25/26 - investigation design and consentingFY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010122,5/12/2023,Auckland Council,Sandbrook Park - develop circular pathway.,Construct 700m circular pathway to improve connectivity increase the level of service for the community.FY25/26 - investigation design and consentingFY26/27 - physical worksThe timing of this project is dependent upon the input and readiness of Healthy Waters. Delivery dates are subject to change.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010123,5/12/2023,Auckland Council,Waitākere Ranges - renew park driveways and carparks.,Renew park driveways and carparks.FY23/24 to FY24/25 - investigation and designFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,2025-Q4,2025-Q4,2026-Q1,2026-Q2,2023-Q4,2026-Q2,,,[email address],,
IP010124,5/12/2023,Auckland Council,Hayman Park - renew depot facility and skatepark.,Internal and external refurbishment of the depot and garage at Hayman Park and renew skatepark nearby.FY24/25 - investigation and designFY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2025-Q1,2025-Q1,2025-Q2,2025-Q2,2025-Q2,2025-Q4,2025-Q1,2025-Q4,,,[email address],,
IP010125,5/12/2023,Auckland Council,Hooton Reserve - renew play space.,Renew play space equipment.FY25/26 - investigation and designFY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2024-Q2,2024-Q4,,2025-Q1,2026-Q2,2024-Q2,2026-Q2,,,[email address],,
IP010126,5/12/2023,Auckland Council,Whau - implement wheeled recreation/play.,Implementation of the priority actions as identified by the Parks and Places Specialist in the wheeled recreation/play provision assessment.FY23/24 - investigation and designFY24/25 - FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q3,2024-Q2,,2024-Q3,2024-Q4,2023-Q3,2024-Q4,,,[email address],,
IP010127,5/12/2023,Auckland Council,Knightsbridge Reserve - renew playground.,Renew the playground at Knightsbridge Reserve with an Asian inspired theme and assess the decommissioning of nearby Selwyn Reserve playground.FY22/23 - investigation and design.FY23/24 - complete concept design.FY24/25 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2023-Q4,2024-Q1,,2024-Q3,2025-Q2,2023-Q4,2025-Q2,,,[email address],,
IP010128,5/12/2023,Auckland Council,Regional Parks Management Plan Implementation.,Development of regional parks throughout the region with projects to be prioritised following adoption of the Regional Park Management Plan 2022. This is a provisional allocation anticipating the need for investment. Priorities to be determined based on provision of service information.FY24/25 to FY26/27 - investigation and design and physical worksFY25/26+ - physical works.,,Early planning,Funding source to be confirmed,Direct,To be determined,Auckland,,,Community facilities,5 - 25 million,,,,,,,2024-Q3,2028-Q2,,,[email address],,
IP010129,5/12/2023,Auckland Council,Walkways and paths - Renewal - Waiheke.,Renew walkways and paths at Cory Road to Miro Road Little Oneroa Reserve Mawhitipana Reserve Putiki Reserve Ostend Domain (move footpath) Newton Reserve. Further sites to be identified. FY23/24 - investigation and designFY24/25 - FY25/26 physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2023-Q3,2023-Q4,2024-Q4,2025-Q1,2025-Q1,2026-Q2,2023-Q4,2026-Q2,,,[email address],,
IP010130,5/12/2023,Auckland Council,Pt Erin Pools - general renewals - 2025/2026.,Renewal of assets within the pool facilities ensuring alignment with the Pt Erin Development Plan. These works include for renewal of the plant room building polycarbonate cladding local DB’s main switch board steel fence umbrellas shade sail and dive well tile renewal.FY25/26 - investigation and designFY25/26 to FY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010131,5/12/2023,Auckland Council,Hibiscus and Bays - develop permanent pump track.,Locate preferred site then design and implement a permanent pump track.FY26/27 - Investigate and designFY27/28 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010132,5/12/2023,Auckland Council,CPT: Boundary Reserve West Wetland and Daylighting (IFFA funded).,To improve water quality discharging to the Tamaki Estuary including the daylighting of the existing stormwater pipe through the Boundary Reserve.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2022-Q1,2023-Q2,2024-Q2,2024-Q3,2024-Q4,2025-Q4,2023-Q2,2025-Q4,,,[email address],,
IP010133,5/12/2023,Auckland Council,Sports and cricket fields lighting and equipment - renew 2024/2025 - Ōrākei.,Renewal of open space sports and cricket fields nets lighting and other sports related assets across the local board area.Works include for Michaels Avenue (renew artificial playing surfaces) renew Thomas Bloodworth grass turf drainage.FY23/24 - investigation and designFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP).,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2023-Q4,2023-Q4,,2024-Q2,2024-Q3,2025-Q2,2023-Q4,2025-Q2,,,[email address],,
IP010134,5/12/2023,Auckland Council,Wai Huruhuru Mānawa / Lowtherhurst Reserve - upgrade park amenities.,Develop park amenities such as widening the existing concrete footpath with amenity lighting between Huruhuru Road and Redwood Drive to 2 metres. Plant suitable specimen trees along the footpath for shade and amenity. Design and install play or recreational activities in consultation with local residents and install park seating.FY25/26 - investigation and consultationFY26/27 - design and consentingFY27/28 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010135,5/12/2023,Auckland Council,Marlborough Park - renew storm water drainage.,Renew the storm water drainage at Marlborough Park.FY22/23 - investigation and design.FY23/24 to FY24/25 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q2,2022-Q3,2022-Q4,2023-Q3,2023-Q4,2024-Q1,2022-Q3,2024-Q1,,,[email address],,
IP010136,5/12/2023,Auckland Council,Open space furniture fixtures fencing and structures - renew - 2024/2025 - Ōrākei.,Renewal of park furniture fixtures BBQs fences and structures across open spaces in the Ōrākei local board area. Locations for inclusion include for Kohimarama Reserve Madills Farm Recreation Reserve Merton Reserve Okahu Bay Reserve Orakei Basin Paritai Reserve Portland Reserve Roberta Reserve Springcombe Road Vellenoweth Green Waiata Reserve Wharua Reserve.FY24/25 - investigation and design.FY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project - investigation and design.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q4,2023-Q4,,2024-Q2,2024-Q3,2025-Q2,2023-Q4,2025-Q2,,,[email address],,
IP010137,5/12/2023,Auckland Council,Aronia Way - renew carpark.,Renew carpark at Aronia Way.FY25/26 - investigation and design FY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010138,5/12/2023,Auckland Council,Howick - install new toilet facilities.,Install new toilet facilities as identified by the service assessment team.FY24/25 - investigation designFY25/26 to FY26/27 - physical worksFunded solely by the local boards discretionary fund.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2024-Q3,2027-Q2,,,[email address],,
IP010139,5/12/2023,Auckland Council,Orakei Wharf - Remediation.,Raised by ETS as a priority long term piece of work to identify unconsented and aging assets that require renewal to meet legal requirements and maintain service levels.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2022-Q2,2022-Q2,,2023-Q3,,2023-Q2,2022-Q2,2024-Q2,,,[email address],,
IP010140,5/12/2023,Auckland Council,Maraetai Wharf - Remediation.,Raised by ETS as a priority long term piece of work to identify unconsented and aging assets that require renewal to meet legal requirements and maintain service levels.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2022-Q1,2022-Q1,2023-Q4,2023-Q4,2023-Q4,2024-Q1,2022-Q1,2024-Q1,,,[email address],,
IP010141,5/12/2023,Auckland Council,Jutland Road Recreation Reserve - renew play items.,Renew the play items as identified in the asset condition data.FY22/23 - FY23/24 investigation and designFY24/25 - FY25/26 physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2023-Q3,2024-Q1,2024-Q2,2024-Q2,,2023-Q3,2024-Q1,,,[email address],,
IP010142,5/12/2023,Auckland Council,CPT: Pilkington Road - SW Upgrades.,• To provide for Growth in the spatial priority area (SPA)• Upgrade/replace existing Stormwater asset with high criticality value.,,Early planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,2022-Q1,2022-Q2,,,,,2022-Q2,2028-Q2,,,[email address],,
IP010143,5/12/2023,Auckland Council,Waikumete Cemetery Pipe renewal.,To Reduce the risk of critical asset failure and extend the life of critical assets.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q3,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010144,5/12/2023,Auckland Council,32 Pinedale Place Henderson.,To repair or replace identified critical assets to increase asset life.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q3,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010145,5/12/2023,Auckland Council,Lloyd Elsmore Park Boiler Phase Out.,Phase out the boiler at Lloyd Elsmore Park.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2024-Q3,2025-Q2,,,[email address],,
IP010146,5/12/2023,Auckland Council,Purchas Hill/Te Tauoma reserve - development of green open space.,Development of a green open space at Purchas Hill/Te Tauoma reserve (Morrin Road Stonefields). As part of the housing redevelopment site approximately 11.9 hectares of land with 1 500+ apartments for 5 000 people.FY24/25 - investigation and design obtain required consentsFY25/26 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,1 - 5 million,,,,,,,2024-Q3,2026-Q2,,,[email address],,
IP010147,5/12/2023,Auckland Council,Little Shoal Bay Renewals - Shoreline Adaptation Plan local park renewals.,Investigate and prioritise short term actions from the Shoreline Adaptation plan including cricket area planting and foreshore.FY22/23 - investigate and design.FY23/24 to FY25/26 - implementation.Risk Adjusted Programme (RAP) Project.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2022-Q3,2022-Q3,2024-Q2,2024-Q2,2024-Q2,2024-Q2,2022-Q3,2024-Q2,,,[email address],,
IP010148,5/12/2023,Auckland Council,Botanic Gardens - Renew Pest Plant and Biocontrol Shadehouse Facility.,Renew the pest plant and biocontrol shade house facility to meet the requirements of the Biosecurity Act 1993.FY22/23 to FY23/24 - investigation design and physical works.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q3,2023-Q2,2023-Q2,2023-Q4,2023-Q2,2022-Q3,2023-Q2,,,[email address],,
IP010149,5/12/2023,Auckland Council,Waiuku War Memorial Town Hall - undertake seismic strengthening.,Investigation Detailed Retrofit Design (DRD) design and remedial work for seismic strengthening of Waiuku War Memorial Town Hall.FY22/23 to FY23/24 - investigation and design.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2022-Q3,2024-Q3,2024-Q4,2024-Q4,2025-Q2,2022-Q3,2025-Q2,,,[email address],,
IP010150,5/12/2023,Auckland Council,Ambury Regional Park - upgrade toilets & changing rooms (main block).,Upgrade toilets and changing rooms at the park utilising the existing workshop building.FY21/22 to FY22/23 - investigation and designFY25/26 to FY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,1 - 5 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010151,5/12/2023,Auckland Council,Star of the Sea - comprehensive renewal.,Comprehensive renewal of the Star of the Sea.FY25/26 - investigation and designFY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010152,5/12/2023,Auckland Council,Hunua Ranges Regional Park - upgrade Mangatawhiri amenity block.,Renew and upgrade the amenity block at Mangatawhiri to a modern standard including infrastructure.FY23/24 to FY25/26 - investigation design and consentingFY26/27 - physical workRisk Adjusted Programme (RAP) Project.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2023-Q4,2023-Q4,2024-Q2,,2025-Q3,2027-Q3,2023-Q4,2027-Q3,,,[email address],,
IP010153,5/12/2023,Auckland Council,957 State Highway 16 Wetland Renewal.,Renew the wetland and address the above issues to improve water quality treatment.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q4,2024-Q2,2025-Q2,,,,2024-Q2,2026-Q2,,,[email address],,
IP010154,5/12/2023,Auckland Council,Helvetia stormwater wetland renewal.,The project will aim to remedy these issues including looking at the potential for including extended detention in the renewal.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q3,2024-Q1,2024-Q4,2025-Q3,2025-Q4,2026-Q4,2024-Q1,2026-Q4,,,[email address],,
IP010155,5/12/2023,Auckland Council,Te Koiwi pond desilting Papakura.,Desilting and pest fish eradication of Te Koiwi ponds to support Papakura Marae’s request and wider mahi in enhancing the mauri of the water and area.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q4,2023-Q3,2024-Q2,2024-Q3,2024-Q3,2024-Q4,2023-Q3,2024-Q4,,,[email address],,
IP010156,5/12/2023,Auckland Council,P04: Coastal cliff & asset LiDAR and analysis.,Auckland has 3 200 km of highly variable and evolving coastline. Auckland Council is directly responsible for many parts of this coastline and for many assets (such as sea walls boat ramps outfalls etc.) along the coast. We also have a responsibility to understand natural hazards along the whole coastline including current erosion rates of cliffs and changes in beach levels. We need topographical photographic or similar data to be collected along our coastline to inform our asset management to understand our hazard exposure and to provide a baseline for future erosion studies. We anticipate that this will comprise high-resolution oblique LiDAR with RGB photography flown at low altitude from a helicopter or similar but are open to alternative methods that can meet our objectives. We require the LiDAR (or similar) data to be classified according to reflector type and processed to create as-built data for coastal assets giving data such as crest heights. We also require the LiDAR data to be compared against previous LiDAR data collected in 2019 for cliffs on the North Shore to identify changes and give an assessment of the rate of coastal erosion.,,In planning,Funding source confirmed,Selective,Construct only,Auckland,,,Other not specified,1 - 5 million,2021-Q2,2022-Q4,,2022-Q4,,,2023-Q2,2023-Q4,,,[email address],,
IP010157,5/12/2023,Auckland Council,Attwood reserve - investigate design and repair wharf and boat ramp.,The boat ramp located in Attwood reserve failed from June 2022. Wharf stairs are damaged with some missing treads. The timber wharf and boat ramp have significant marine borer damage. A marine inspection by boat/divers is required to clean and inspect beneath the structures. Once the marine inspection has identified the extent of damage a qualified engineer can then advise on required repairs/renewal/removal (subject to CF input). Design and construction of repairs will be carried out within this project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2022-Q4,2022-Q4,,2024-Q2,,,2022-Q4,2024-Q3,,,[email address],,
IP010158,5/12/2023,Auckland Council,Wairangi wharf - Investigation design and repair of wharf stairs.,TBC.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2023-Q1,2024-Q2,,,[email address],,
IP010159,5/12/2023,Auckland Council,3 Miami Avenue Waiheke Island - Pipe Renewal.,To renew poor condition critical assets to restore their functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q3,,,,2024-Q3,2024-Q4,2022-Q3,2024-Q4,,,[email address],,
IP010160,5/12/2023,Auckland Council,CPT HWBOB: Otara Creek Restoration.,To naturalise concrete lined channels plant along both side of the stream and daylight sections of the pipe network through the reserve.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,,2022-Q4,2024-Q3,2024-Q4,2024-Q4,2025-Q4,2022-Q4,2025-Q4,,,[email address],,
IP010161,5/12/2023,Auckland Council,Waitaro Stream Corban Reserve Culvert Upgrade [2403] Stage 2.,The objectives of the project are described below. • To increase capacity of the downstream network• To address inlet and pipe blockage leading to flooding of 21 residential properties (addressed under Stage 1)• To remedy tomo at invert of existing brick section crossing Henderson Valley Road. • Decommissioning stormwater pipe under landfill which has evidence of infiltration and joint displacement. Health and safety• Reduce the exposure to potentially explosive methane or asphyxiation due to methane/CO2• Construction will remove ingress of gasses from landfill into stormwater network but methane gas will still be present in the landfill.• Address poor maintenance access at inlet and outlet.Leachate• Reduce health and safety risks associated with exposure to leachate.• Eliminate discharge of leachate to the environment exceeding ANZECC guidelines and degradation of Opanuku Stream.,,In planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,,2021-Q3,2024-Q4,2025-Q1,2025-Q1,2026-Q1,2021-Q3,2026-Q1,,,[email address],,
IP010162,5/12/2023,Auckland Council,Henderson Bowling Club Cranwell Park - replace exterior cladding.,Replace exterior cladding on building.FY23/24 - investigation and designFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,2024-Q4,2024-Q4,2025-Q1,2025-Q2,2023-Q4,2025-Q2,,,[email address],,
IP010163,5/12/2023,Auckland Council,Henderson-Massey - renew park / facility fixtures and furniture FY26-FY28.,Renew park / facility fixtures and furniture - sites to be confirmed. FY25/26 to FY27/28 - investigation and physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2028-Q2,,,[email address],,
IP010164,5/12/2023,Auckland Council,Te Rangi Hiroa/Birdwood Winery - renew Birdwood Road access carpark.,Renew the carpark at the Birdwood Road entrance of the park.FY23/24 - investigation and designFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q3,2024-Q4,2024-Q4,2025-Q1,2025-Q2,2023-Q3,2025-Q2,,,[email address],,
IP010165,5/12/2023,Auckland Council,26 Wellpark Avenue Westmere Pipe Renewal.,To repair or replace identified critical assets to increase asset life.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q1,2023-Q3,2024-Q2,,2025-Q4,2025-Q4,2023-Q3,2025-Q4,,,[email address],,
IP010166,5/12/2023,Auckland Council,19 Glenwood Ave Birkenhead Outfall renewal.,To repair the outfall.,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Water,1 - 5 million,2022-Q4,2023-Q4,,,2024-Q1,2024-Q2,2023-Q4,2024-Q2,,,[email address],,
IP010167,5/12/2023,Auckland Council,Hapua Stream Enhancements.,To remove stagnant wastewater from the public reserve and allow conveyance of water from network to receiving environment.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q4,2023-Q3,,,,,2023-Q3,2024-Q4,,,[email address],,
IP010168,5/12/2023,Auckland Council,Devonport Takapuna - car park renewals.,Renewal of car parks in Devonport Takapuna including Barry's Point Reserve. Sunnynook Community CentreWoodall Park - squash club carparkDacre Park(more sites to be confirmed)FY23/24 - investigation and Design.FY24/25 to FY26/27 - physical Works.Risk Adjusted Programme (RAP).,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2025-Q1,,2024-Q4,2025-Q1,2027-Q2,2025-Q1,2027-Q2,,,[email address],,
IP010169,5/12/2023,Auckland Council,Mount Cambria Reserve - renewal of park assets.,Renew the park assets including paths steps planters seats and pergola at Mount Cambria Reserve.FY24/25 - investigation and design.FY25/26 to FY26/27 - physical works.Risk Adjusted Programme (RAP).,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2023-Q2,2026-Q2,,,[email address],,
IP010170,5/12/2023,Auckland Council,Waiari Reserve - develop a new neighbourhood playspace.,Develop a new neighbourhood playspace at Waiari Reserve (Conifer Grove) to include all abilities experience senior and youth improvements and a half basketball court. It is recommended to decommission Roundtree Reserve playspace (relocate play equipment if in good condition) and establish at Waiari Reserve to better service the residential catchment as identified in the play network gap analysis (refer to pg. 39). FY25/26 - investigation and designFY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010171,5/12/2023,Auckland Council,West Wave Aquatic Centre - renew boiler 1 & 2.,Renew boilers 1 and 2.FY23/24 - investigation and designFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,2023-Q3,2023-Q4,2024-Q1,2024-Q2,2023-Q4,2024-Q2,,,[email address],,
IP010172,5/12/2023,Auckland Council,Takapuna Pool & Leisure Centre - renew assets as identified in building assessment.,Renew assets in facility as identified in comprehensive building condition assessment including roof electrical services CO2 detection pool plant boilers AHU's and pumps.FY23/24 - investigation and design.FY 24/25 to FY25/26 - physical works.Risk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2023-Q4,2024-Q1,,2024-Q3,2024-Q4,2027-Q2,2024-Q1,2027-Q2,,,[email address],,
IP010173,5/12/2023,Auckland Council,13 Norman Rd Hauraki Flood Mitigation.,Mitigate or if not feasible reduce the frequency and intensity of flooding at 13 Norman Rd and the adjacent properties.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q4,2023-Q3,2024-Q2,2024-Q2,2024-Q2,2024-Q3,2023-Q3,2024-Q3,,,[email address],,
IP010174,5/12/2023,Auckland Council,General open space and building assets - renew - 2024/2025 - Aotea Great Barrier.,Renew play spaces structures buildings toilet amenities shade amenities footpaths roading fixtures and furniture signage etc. in open spaces across Aotea Great Barrier.FY24/25 - investigation and designFY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2025-Q3,2025-Q3,2025-Q3,2025-Q3,2025-Q3,2025-Q3,2025-Q3,2025-Q3,,,[email address],,
IP010175,5/12/2023,Auckland Council,Mountfort Park - develop toilet facility (Sykes Road).,Develop a new public toilet facility located on the southern side of Sykes Road with the aim of accommodating a wider range of users. The proposed design will encompass sustainability and accessibility features.FY24/25 - investigation and designFY25/26 - consenting and commence physical worksFY26/27 - continue physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2024-Q3,2027-Q2,,,[email address],,
IP010176,5/12/2023,Auckland Council,Maungakiekie-Tamaki - renew built space assets 2025/2026 to 2026/2027.,Renew built space asset components as identified by the asset condition data as well the operations team.FY25/26 - investigation and designFY26/27- physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010177,5/12/2023,Auckland Council,Maungakiekie-Tamaki - renew pathways 2025/2026 to 2026/2027.,Renew the priority pathways within the Local Board area as identified by the asset condition data as well as input from the operations team. FY25/26 - investigation and physical worksFY26/27 - continued physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010178,5/12/2023,Auckland Council,Maungakiekie-Tamaki - renew lease facilities 2025/2026 to 2026/2027.,Renew built space asset components as identified by the asset condition data as well as the operations team.- Swifte foot community hall- Shanti Newas- Tamaki Model ClubFY25/26 - investigation and designFY26/27- physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010179,5/12/2023,Auckland Council,Hibiscus & Bays - renew reserve roads and carparks 2023/2024+.,Renew reserve roads and carparks as required at various sites.FY24/25 - investigation and designFY25/26 to FY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2024-Q1,,,2026-Q1,2026-Q2,2024-Q1,2026-Q2,,,[email address],,
IP010180,5/12/2023,Auckland Council,Upper Harbour - renew furniture and fixtures 2024/2025+.,Renew furniture and fixtures in various parks and reserves.FY24/25 to FY26/27 - investigation design and physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2024-Q1,,,,2026-Q1,2024-Q1,2026-Q1,,,[email address],,
IP010181,5/12/2023,Auckland Council,Pukekawa / Auckland Domain - refurbish water features.,Refurbish water features (6).FY23/24 to FY25/26 - investigation and physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q4,2023-Q4,2024-Q1,,2024-Q1,2024-Q2,2023-Q4,2024-Q2,,,[email address],,
IP010182,5/12/2023,Auckland Council,Hibiscus and Bays - renew tracks and footpaths 2024/2025+.,Renew footpaths tracks and stairs as required at various sites.FY23/24 - investigate and designFY24/25 - planning and commence physical worksFY25/26 - complete physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2024-Q1,,,2026-Q1,2026-Q2,2024-Q1,2026-Q2,,,[email address],,
IP010183,5/12/2023,Auckland Council,Hibiscus and Bays - renew park buildings 2024/2025+.,Renewal of toilet blocks at various location.FY24/25 - investigate and designFY25/26 to FY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2024-Q3,2025-Q1,,,2027-Q1,2027-Q2,2025-Q1,2027-Q2,,,[email address],,
IP010184,5/12/2023,Auckland Council,Hibiscus and Bays - renew playground components and drainage 2024/2025+.,Renew playground components and drainage as required at various sites.FY24/25 - investigate and designFY25/26 - planning and commence physical worksFY26/27 - complete physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q3,2025-Q1,,,2027-Q1,2027-Q2,2025-Q1,2027-Q2,,,[email address],,
IP010185,5/12/2023,Auckland Council,38 Alexis Avenue Mount Albert Pipe Renewal.,To renew poor condition critical assets to restore their functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2023-Q1,2023-Q4,,,,,2023-Q4,2025-Q1,,,[email address],,
IP010186,5/12/2023,Auckland Council,40 Ranui Road Remuera Pipe Renewals.,To renew poor condition critical assets to restore their functionality.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2023-Q1,,,,2024-Q4,2025-Q1,2023-Q1,2025-Q1,,,[email address],,
IP010187,5/12/2023,Auckland Council,41 The Drive Epsom Pipe Renewals.,To repair or replace identified critical assets to increase asset life.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2023-Q1,2023-Q4,,,,,2023-Q4,2025-Q1,,,[email address],,
IP010188,5/12/2023,Auckland Council,158 Railside Avenue Henderson Pipe Renewals.,To repair or replace identified critical assets to increase asset life.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2023-Q1,2023-Q4,,,,,2023-Q4,2025-Q1,,,[email address],,
IP010189,5/12/2023,Auckland Council,10 Blease Street New Lynn Pipe Renewals.,To repair a A 225 mm public stormwater pipe that has failed. The pipe has been returned to service; however a permanent solution is required to remediate the failing asset.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2023-Q1,2023-Q1,2023-Q3,,2023-Q4,2024-Q1,2023-Q1,2024-Q1,,,[email address],,
IP010190,5/12/2023,Auckland Council,Auckland Cemeteries - develop regional berms and walls - stage 5.,Develop cemetery berms walls and associated infrastructure across the network. FY25/26 - investigation and designFY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010191,5/12/2023,Auckland Council,Auckland Cemeteries - renew security systems.,Renew security systems to a modern standard at Waikumete Cemetery Manukau Memorial Gardens and North Shore Memorial Park Include screen support from 135 Albert Street.FY23/24 - investigation and designFY23/24 to FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q3,,,2023-Q4,2024-Q2,2023-Q3,2024-Q2,,,[email address],,
IP010192,5/12/2023,Auckland Council,16 Godley Road Green Bay Pipe Renewal.,To repair or replace identified critical assets to increase asset life.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2023-Q1,2023-Q3,,,2025-Q1,2025-Q2,2023-Q3,2025-Q2,,,[email address],,
IP010193,5/12/2023,Auckland Council,105 & 106 Ruawai Road Mt Wellington.,To repair or replace identified critical assets to increase asset life.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2023-Q1,2023-Q4,,,,,2023-Q4,2025-Q2,,,[email address],,
IP010194,5/12/2023,Auckland Council,22 Ramelton Road Waikowhai Pipe Renewal.,To repair or replace identified critical assets to increase asset life.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2023-Q1,,,,2025-Q2,2025-Q2,2023-Q1,2025-Q2,,,[email address],,
IP010195,5/12/2023,Auckland Council,Pukekawa / Auckland Domain - replace Kiosk carpark amenity block.,Replace the four pan toilet block at the Kiosk carpark. FY23/24 to FY24/25 - investigation and designFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2024-Q2,2024-Q2,,2025-Q2,2025-Q2,2026-Q2,2024-Q2,2026-Q2,,,[email address],,
IP010196,5/12/2023,Auckland Council,Muriwai Regional Park - install gate at Coast Road entrance.,Install a gate at the Coast Road entrance to the park for the safety of users.FY23/24 to FY24/25 - investigation and physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2023-Q3,2023-Q4,,2024-Q1,2024-Q1,2025-Q2,2023-Q4,2025-Q2,,,[email address],,
IP010197,5/12/2023,Auckland Council,Pukekawa / Auckland Domain - renew wastewater pipes - stage 2.,Second stage of work to renew wastewater pipes in Auckland Domain.FY25/26 - investigation and designFY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010198,5/12/2023,Auckland Council,Manurewa Aquatic Centre - comprehensive renewal phase 3.,Renewal of critical assets in the facility as identified in the comprehensive building condition assessment is required. This includes but is not limited to renewal of roof cladding air conditioning units and balance tank.FY25/26 - investigation and designFY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,1 - 5 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010199,5/12/2023,Auckland Council,32 Niccol Avenue and 34 Seabreeze Road flood mitigation.,To resolve the frequent overland flow path activation and manage and reducing flood risk.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2023-Q1,,,,2024-Q3,2024-Q4,2023-Q1,2024-Q4,,,[email address],,
IP010200,5/12/2023,Auckland Council,Snells Beach seawall renewal.,Remediation and renewal of a section of failed seawall near Sunburst reserve Snells Beach.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2023-Q1,2023-Q4,,2023-Q4,,,2023-Q3,2024-Q1,,,[email address],,
IP010201,5/12/2023,Auckland Council,Kaipātiki - remediate storm effected assets.,Identify and remediate assets damaged in storm damage.FY23/24 - investigation and design.FY24/25 to FY25/26 - physical works.Risk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2024-Q2,,2025-Q1,2025-Q3,2026-Q2,2024-Q2,2026-Q2,,,[email address],,
IP010202,5/12/2023,Auckland Council,Waitakere Ranges Regional Park - install toilet block at North Piha.,Design and install a new toilet block at the North Piha carpark entrance.FY23/24 to FY24/25 - investigation and designFY25/26 - physical works.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,2025-Q4,2025-Q4,2026-Q1,2026-Q2,2023-Q4,2026-Q2,,,[email address],,
IP010203,5/12/2023,Auckland Council,Upper Harbour - remediate storm and cyclone affected assets.,Identify and remediate assets damaged in storm and cyclone.FY23/24 - investigation design and physical worksFY24/25 - investigation design and physical worksFY25/26 to FY26/27 - investigation design and physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q4,2024-Q1,,,,2026-Q1,2024-Q1,2026-Q1,,,[email address],,
IP010204,5/12/2023,Auckland Council,Hibiscus and Bays - remediate storm and cyclone affected assets.,Identify and remediate assets damaged in storm and cyclone.FY23/24 - investigation design and physical worksFY24/25 - investigation design and physical worksFY25/26 - investigation design and physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2024-Q1,,2025-Q3,2026-Q1,2026-Q2,2024-Q1,2026-Q2,,,[email address],,
IP010205,5/12/2023,Auckland Council,Cox's Creek Emergency Assessment and Repair.,to restore the tidal flushing and bank stability of the creek as well as address the H&S issue of having wastewater stagnant in a stream.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2023-Q1,2023-Q3,2023-Q4,2024-Q2,2024-Q3,2024-Q3,2023-Q3,2024-Q3,,,[email address],,
IP010206,5/12/2023,Auckland Council,Massey Park - upgrade of lighting system to light emitting diode (LED) technology.,The scope of work entails installing a modern LED lighting system on both the eastern and western towers of the track and new electrical infrastructure to support the upgraded lighting system in order to improve energy efficiency reduce operating costs and enhance the quality of illumination for park visitors. Note: staff are currently exploring sustainability funding.FY25/26 - investigation and design FY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010207,5/12/2023,Auckland Council,Waitākere Ranges - remediate storm damaged assets.,Remediate assets which have been affected by storm and cyclone damage. FY23/24 to FY25/26 - investigation and physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,,,2025-Q4,2025-Q4,2026-Q1,2026-Q2,2025-Q4,2026-Q2,,,[email address],,
IP010208,5/12/2023,Auckland Council,Colin Maiden Park - develop sports infrastructure - stage 2.,This development project is the stage 2 works for the sports infrastructure provision gaps identified in Orakei. This is a continuation of the stage 1 scope of works which includes:- Sand top dressing on fields 3 4 & 5- Upgrade fields 6 7 8 and 9FY25/26 - Investigation and design progress consents requiredFY26/27 to FY28/29 - deliver physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,1 - 5 million,,,,,,,2025-Q3,2029-Q2,,,[email address],,
IP010209,5/12/2023,Auckland Council,Harbourview-Orangihina - upgrade park amenities.,Upgrade park amenities at the Gloria Road entrance / southern carpark area. Include design and installation of a new toilet block footpath connections shelters and park furniture.FY23/24 to FY24/25 - investigation and designFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,2025-Q4,2025-Q4,2026-Q1,2026-Q2,2023-Q4,2026-Q2,,,[email address],,
IP010210,5/12/2023,Auckland Council,Henderson-Massey - remediate storm damaged assets.,Remediate damage to assets that have been affected by storm and cyclone damage. FY23/24 to FY25/26 - investigation and physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2023-Q3,2023-Q4,2025-Q4,2025-Q4,2026-Q1,2026-Q2,2023-Q4,2026-Q2,,,[email address],,
IP010211,5/12/2023,Auckland Council,West Wave Aquatic Centre - renew Leisure Pool Hall filtration systems.,Renew the Leisure Pool Hall filtration systems.FY23/24 to FY24/25 - investigation and designFY24/25 to FY25/26 - physical works.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2023-Q3,2023-Q4,,2024-Q2,2024-Q3,2026-Q2,2023-Q4,2026-Q2,,,[email address],,
IP010212,5/12/2023,Auckland Council,West Wave Aquatic Centre - renew Earth Bonding System.,Renew the Earth Bonding System PFC and Cable Tray.FY23/24 to FY25/26 - investigation and physical works.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,,2024-Q2,2024-Q2,2026-Q2,2023-Q4,2026-Q2,,,[email address],,
IP010213,5/12/2023,Auckland Council,Te Pātaka Kōrero o Te Kōpua / Waitākere Central Library - renew Building Management System Controls.,Renew the Building Management System and the process cooler.FY23/24 - investigation and physical works.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,,2024-Q1,2024-Q1,2024-Q2,2023-Q4,2024-Q2,,,[email address],,
IP010214,5/12/2023,Auckland Council,Manurewa Netball Complex - comprehensive building renewal.,The proposed scope of work to include the renewal of the curved section of roofline over the main stadium refurbishment of the court flooring on the main court including line marking removal of asbestos from outer columns execution of structural works installation of electrical works in the old squash court repair of acoustic panelling painting of the exterior of the building as well as the introduction of a new waterproof membrane to the exterior block work of the old squash court. In addition plaster work is to be carried out around the old squash court. Collectively these measures are aimed at improving the structural integrity and aesthetic appeal of the stadium while ensuring compliance with regulatory and safety standards.FY24/25 - investigation and design FY25/26 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,1 - 5 million,,,,,,,2024-Q3,2026-Q2,,,[email address],,
IP010215,5/12/2023,Auckland Council,Waitemata - remediate 2023 storm and cyclone damaged assets.,To scope and remediate assets which have been affected by the 2023 storm and cyclone damage. FY23/24 - investigation and physical worksFY24/25 - investigation and physical worksFY25/26 - investigation and physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q3,,2023-Q4,2024-Q1,2024-Q2,2023-Q3,2024-Q2,,,[email address],,
IP010216,5/12/2023,Auckland Council,Ōrākei - remediate 2023 storm and cyclone damaged assets.,To scope and remediate assets which have been affected by the 2023 storm and cyclone damage. FY23/24 - investigation and physical worksFY24/25 - investigation and physical worksFY25/26 - investigation and physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q3,,2023-Q4,2024-Q1,2024-Q2,2023-Q3,2024-Q2,,,[email address],,
IP010217,5/12/2023,Auckland Council,Hunters Corner Community Office refresh.,Full renewal of building interior and exterior including roof.FY25/26 - investigation and designFY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010218,5/12/2023,Auckland Council,Kohuora Park - renew depot.,Investigate options and renew old depot at Kohuora park so that it can be used as a venue for hireFY24/25 - investigation and designFY25/26 – physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2025-Q1,2025-Q1,2025-Q2,2025-Q2,2025-Q2,2025-Q4,2025-Q1,2025-Q4,,,[email address],,
IP010219,5/12/2023,Auckland Council,Ōtara Creek Reserve South - bridge renewal.,Investigate options and renew Otara Creek South bridge as per the condition assessmentFY25/26 - investigation design and commence physical worksFY26/27 - complete physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010220,5/12/2023,Auckland Council,Puhinui Reserve - investigate old barn.,Investigate options to renew the barn into a usable spaceFY24/25 - investigation and concept design FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2025-Q1,2025-Q1,2025-Q2,2025-Q2,2025-Q3,2025-Q4,2025-Q1,2025-Q4,,,[email address],,
IP010221,5/12/2023,Auckland Council,Ōtara-Papatoetoe - renew storm damage assets.,Renew minor assets with flooding issues and those that were damaged during the early 2023 storm eventsFY25/26 - investigation design and physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2026-Q2,,,[email address],,
IP010222,5/12/2023,Auckland Council,Māngere Wardens Centre - full refurbishment.,Full refurbishment of the interior and exterior of the building as according to the conditions assessment. FY23/24 - investigation and design FY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q1,2024-Q1,2024-Q2,2024-Q2,2024-Q2,2024-Q3,2024-Q1,2024-Q3,,,[email address],,
IP010223,5/12/2023,Auckland Council,Olympic Pools - general renewals - 2025/2026.,General renewals of interior building assets at the Olympic Pools building. Works include for the renewal of sofit windows change rooms ducting bridge and tiles change rooms/toilets and pool plant. These works are part of an ongoing scheduled renewals programme.FY25/26 - investigation and designFY25/26 to FY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,< 1 million,,,,,,,2025-Q3,2027-Q2,,,[email address],,
IP010224,5/12/2023,Auckland Council,Open space toilets - renew - 2023/2024 - Ōrākei.,Renewal of open space toilet amenities across the Ōrākei Local Board area. Scope of works includes for the renewal of public amenities at the following heritage sites: Kohimarama toilets and St Heliers toilets.FY22/23 to FY23/24 - specialist reports detailed design obtain any necessary consentsFY24/25 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2024-Q1,2024-Q3,2025-Q3,2025-Q3,2025-Q3,2026-Q3,2024-Q3,2026-Q3,,,[email address],,
IP010225,5/12/2023,Auckland Council,Tahuna Torea - renew tracks and pathways - stage two.,Renew tracks and pathways at Tahuna Torea in alignment with the concept plan. Stage two works include for renewal of the lookout access and carpark.FY21/22 to FY22/23 - investigation design (obtain necessary consents)FY23/24 - physical works (stage one)FY24/25 to FY25/26 - physical works (stage two)Risk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q1,2024-Q3,2025-Q3,2025-Q3,2025-Q3,2026-Q3,2024-Q3,2026-Q3,,,[email address],,
IP010226,5/12/2023,Auckland Council,Lagoon Pool & Leisure Centre - renewals 2024/2025 to 2026/2027.,Renewal of the main air handling unit plant room and roof ductwork. FY23/24 - investigation and design.FY24/25 to FY26/27 - physical works.Risk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q3,2023-Q3,,2024-Q1,2027-Q2,2023-Q3,2027-Q2,,,[email address],,
IP010227,5/12/2023,Auckland Council,Regional Parks - remediate storm damaged assets.,Remediate assets which have been affected by storm and cyclone damage. FY23/24 - investigation and physical worksFY24/25 - investigation and physical worksFY25/26 - investigation and physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2023-Q3,2023-Q4,2025-Q4,2025-Q4,2026-Q1,2026-Q2,2023-Q4,2026-Q2,,,[email address],,
IP010228,5/12/2023,Auckland Council,Green Road - develop pathway connections.,Develop the pathway connections in accordance to the approved Green Road masterplan. This connection is being funded by the Rodney Local Board Transport Targeted Rate.FY23/24 - detailed design consenting and deliver physical works.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,,,2024-Q3,,2024-Q3,2025-Q2,2024-Q3,2025-Q2,,,[email address],,
IP010229,5/12/2023,Auckland Council,Blockhouse Bay Community Centre - interior renewal.,Interior renewal of Blockhouse Bay Community Centre. Works include internal painting replacement of carpets floors and blinds/drapes all lights to LED as well as repair all windows and doors. Further works under investigation. FY23/24 - investigation and designFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q3,2023-Q4,2024-Q2,2024-Q3,2024-Q3,2025-Q1,2023-Q4,2025-Q1,,,[email address],,
IP010230,5/12/2023,Auckland Council,Te Muri Regional Park Stream Enhancement.,1. Mitigate severe stream bank erosion2. The improvement of in-stream and riparian habitat3. Improvement of stream water quality4. Enhancement of local biodiversity.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,2023-Q2,2023-Q4,2023-Q4,2023-Q4,2024-Q1,2023-Q2,2024-Q1,,,[email address],,
IP010231,5/12/2023,Auckland Council,Puketaha Road outlet renewal.,To replace an outlet that was damaged by landslips in the January / Feberuary storm events.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2023-Q2,2023-Q4,2024-Q1,2024-Q3,2024-Q3,2024-Q4,2023-Q4,2024-Q4,,,[email address],,
IP010232,5/12/2023,Auckland Council,Queen Street Accessway - replace bridge and walkway.,This project will deliver the remediation works required to reinstate the Queen Street accessway down to the Warkworth River walkway including the bridge structure which is currently closed to mitigate any health and safety risks. This work has been identified after storm damage assessments were undertaken.FY23/24 - investigation and designFY24/25 to FY26/27 - physical worksRisk Adjusted Programme (RAP) project.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,,,2024-Q2,,2024-Q3,2024-Q4,2024-Q2,2024-Q4,,,[email address],,
IP010233,5/12/2023,Auckland Council,Orewa North End Seawall Renewal.,Consent and repair the existing seawalls of Northern End of Orewa beach between Kohu street and Arundel Reserve.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,2023-Q3,2023-Q3,,2024-Q3,,,2023-Q2,2025-Q4,,,[email address],,
IP010234,5/12/2023,Auckland Council,Manurewa - renew sports asset components - 2025/2026.,Renew the sports asset components that have been identified as being in poor condition and requiring replacement. The scope of the renewal work encompasses various components such as sports and amenity (i.e. carpark) Manurewa War Memorial Park LED lighting infrastructure upgrade (including poles) on fields 2 and 3 Randwick Park drainage and LED lighting infrastructure upgrade on fields 1 and 2 Mountfort Park (field located at Sykes Road) lighting upgrade with further sites to be determined during the investigation and design phase.FY24/25 - investigation and design FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q3,2024-Q4,,2025-Q2,2025-Q2,2025-Q3,2024-Q4,2025-Q3,,,[email address],,
IP010235,5/12/2023,Auckland Council,Pt Chevalier Stormwater Separation - stage 3.,1. Contribute to the reduction of wet weather overflows to Meola Creek from EOP 349 in Walmer Road.2. To reduce the risk of the combined network surcharging into private properties for 10yr ARI rainfall events by providing a separated stormwater network.3. In the long term reduce volume of stormwater conveyed to the CI.,,Early planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,25 - 50 million,2022-Q3,2023-Q3,2024-Q4,2025-Q2,2025-Q3,2029-Q2,2023-Q3,2029-Q2,,,[email address],,
IP010236,5/12/2023,Auckland Council,Myers Park Kindergarten - refurbishment.,Refurbishment of the kindergarten building in Myers Park. Scope of works includes for heating and ventilation system replacement roof and window renewals. FY23/24 - investigation and designFY23/24 to FY25/26 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Community facilities,1 - 5 million,2024-Q1,2024-Q3,2025-Q3,2025-Q3,2025-Q3,2026-Q3,2024-Q3,2026-Q3,,,[email address],,
IP010237,5/12/2023,Auckland Council,Prince Edward Park - renewal of softball diamond field two.,Renewal of softball field two. The scope of work includes the renewal of the outfield (leveled and sown with Kikuyu grass) infield (with hoggin) ball stop fencing and spectator fencing. New drainage and irrigation are also part of the scope of work however this will be funded as a separate project (ID 28571) via a level of service increase. Excluded from the scope of work is sports field lighting an artificial surface for the infield and warm up cages which were lower priorities for the softball club. FY23/24 - investigation and designFY24/25 - physical worksRisk-Adjusted Programme (RAP) Project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2023-Q4,2024-Q2,2024-Q4,,2025-Q1,2025-Q2,2024-Q2,2025-Q2,,,[email address],,
IP010238,5/12/2023,Auckland Council,Waterview Catchment Separation Package 2.1.,The objectives of the wider Waterview Separation project are to create separate wastewater and stormwater networks which will support growth mitigate flooding and improve the environment and water quality of Oakley Creek and the Waterview inlet. Gross pollutant traps will also be installed to capture solid waste and reduce the amount of waste entering the Waterview Inlet.,,Early planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,25 - 50 million,,2023-Q3,2025-Q2,2026-Q2,2026-Q3,2029-Q2,2023-Q3,2029-Q2,,,[email address],,
IP010239,5/12/2023,Auckland Council,Waterview Catchment Separation Package 2.3.,The objectives of the wider Waterview Separation project are to create separate wastewater and stormwater networks which will support growth mitigate flooding and improve the environment and water quality of Oakley Creek and the Waterview inlet. Gross pollutant traps will also be installed to capture solid waste and reduce the amount of waste entering the Waterview Inlet.,,Early planning,Funding source confirmed,Limited,To be determined,Auckland,,,Water,5 - 25 million,,2023-Q3,2024-Q4,2025-Q2,2025-Q3,2026-Q2,2023-Q3,2026-Q2,,,[email address],,
IP010240,5/12/2023,Auckland Council,Little Shoal Bay - Renew Coastal Structure.,To be completed.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,2024-Q2,,,2022-Q3,2024-Q3,,,[email address],,
IP010241,5/12/2023,Auckland Council,Aerovista footbridge structural renewal.,Renew the Aerovista footbridge that was damaged and destroyed by the 2023 Auckland floodsFY23/24 to FY24/25 - investigation design and physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2024-Q2,2024-Q2,2024-Q3,2024-Q3,2024-Q3,2024-Q4,2024-Q2,2024-Q4,,,[email address],,
IP010242,5/12/2023,Auckland Council,Mahurangi Regional Park - develop roading parking & campground.,Develop roading parking and campground at Mahurangi Regional Park - Sullivans Bay.FY24/25 to FY25/26 - investigation and designFY25/26 to FY26/27 - physical works.,,Early planning,Funding source to be confirmed,Direct,Construct only,Auckland,,,Community facilities,1 - 5 million,,,,,,,2024-Q3,2027-Q2,,,[email address],,
IP010243,5/12/2023,Auckland Council,AH - Relocate Dedicated Security Ops Room.,AH - Relocate Dedicated Security Ops RoomEvents over recent years (Ashburton the Christchurch Mosque attack the New Lynn supermarket stabbings violent protest action and increased gang tensions) have significantly changed the approach public and other institutions need to take to provide an effective and agile security response capability.• The Auckland Council Security team can remotely view 1632 facility CCTV cameras across the region but has no space to view more than a handful at any one time. The consequence of this is that we are limited in the number of locations and cameras that can be viewed at any one time reducing the visibility of sites and staff and our overview of critical incidents.• This team manages access control for 197 separate buildings and 282 building alarm systems but have no sitemaps displayed to identify door locations or alarms. This inhibits the quick identification of the actual location of alarm activations.• They have the capability to remotely lock down 181 council sites but no planning or operational space to deploy to. As a result it is difficult to assemble members of the security team together in one space in the event of a significant event to coordinate a response.• On average the security team is responding to 80-100 security incidents a month of varying degrees of severity while dealing with over 70 CCTV requests from Police and council business units.• The Security Specialists often deal with sensitive and confidential which is currently being managed in an unrestricted open plan office environment.• The building management system (BMS) controls and monitors the HVAC controls lighting and security systems it ensures that the building is operating efficiently and effectively it can also detect various alarms including fire alarms and security alarms. Despite this demand the Auckland Council security team does not have a separate secure space to coordinate emergency response manage security inci.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,2023-Q3,,2023-Q3,,,2024-Q1,2024-Q2,,,[email address],,
IP010244,5/12/2023,Auckland Council,AH - Replace L29 Media Room.,AH - Replace L29 Media RoomWith the move of Auckland Emergency Management (AEM) into Auckland House the requirement for a dedicated Media room was identified. The Media room requirements was identified and specified by AEM. Subsequent to that a decision was made to establish a centralized Media room which could be used by the rest of the building occupants as and when required. The rationale was that the area identified will only be used as a media room for a very small percentage of time and that it can be used as meeting rooms by the rest of the building tenants as and when required. The basis of utilization would be that it is first and foremost a media room and that media requirements will take precedence over normal meetings. The meeting rooms will be equipped with the standard MS Teams and AV equipment.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2023-Q3,2024-Q2,,,[email address],,
IP010245,5/12/2023,Auckland Council,AH - Replace Central Stack (Waste).,AH - Replace Central Stack (Waste).,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Other not specified,1 - 5 million,,,,,,,2023-Q3,2025-Q2,,,[email address],,
IP010246,5/12/2023,Auckland Council,AH - Replace Chilled Water Riser (HVAC).,AH - Replace Chilled Water Riser (HVAC).,,Early planning,Funding source confirmed,Selective,Construct only,Auckland,,,Other not specified,1 - 5 million,,,,,,,2023-Q3,2025-Q2,,,[email address],,
IP010247,5/12/2023,Auckland Council,HC - Replace HVAC Chiller Valves.,HC - Replace HVAC Chiller Valves.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2023-Q3,2024-Q2,,,[email address],,
IP010248,5/12/2023,Auckland Council,HC - Replace LEDS/Blinds Chambers.,HC - Replace LEDS/Blinds Chambers.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2023-Q3,2024-Q2,,,[email address],,
IP010249,5/12/2023,Auckland Council,AH - Replace Federal Street Basement Security Gates.,AH - Replace Federal Street Basement Security Gates.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2023-Q3,2024-Q2,,,[email address],,
IP010250,5/12/2023,Auckland Council,AH - Replace Fire Doors.,AH - Replace Fire Doors.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2023-Q3,2024-Q2,,,[email address],,
IP010251,5/12/2023,Auckland Council,REG - Replace Video Management Platform.,REG - Replace Video Management Platform.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2023-Q3,2024-Q2,,,[email address],,
IP010252,5/12/2023,Auckland Council,Barry Curtis Park - renewal of the Wetlands Building.,Renewal of the Wetlands Building in Barry Curtis Park.FY23/24 - investigation and design detailed design obtain any required consentsFY24/25 - physical worksRisk Adjusted Programme (RAP) project.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,,2023-Q4,,,,2026-Q2,2023-Q4,2025-Q2,,,[email address],,
IP010253,5/12/2023,Auckland Council,Waitematā - Relocate LB Office & Fitout.,Part of
WorkSmart@AC Programme.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Other not specified,< 1 million,,,,,,,2023-Q3,2025-Q2,,,[email address],,
IP010254,5/12/2023,Auckland Council,Baildon Rd/ Browning St Grey Lynn – SP2.,1. Make good temporary works that were undertaken at pace in response to an emergency situation2. Extend the public network to provide a free flowing primary drainage system that caters for existing and future urban development3. Undertake the works in a manner that protects the integrity of a number of scheduled street trees.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,2024-Q1,2024-Q3,2024-Q3,2024-Q4,2024-Q1,2024-Q4,,,[email address],,
IP002540,19/12/2023,Waka Kotahi NZ Transport Agency,Wellington Strategic Highway Improvements.,Improvements at the Basin Reserve and an extra Mt Victoria Tunnel to move more people with less congestion.,,In planning,Funding source confirmed,To be determined,To be determined,Wellington,,,Transport,1 billion +,2019-Q4,2024-Q4,2025-Q3,2026-Q4,2027-Q3,2035-Q2,2019-Q4,2035-Q2,
https://lgwm.nz/all-projects/mass-rapid-transit/,,[email address],-41.286461,174.77623
IP006534,19/12/2023,Wellington City Council,Wellington Golden Mile Improvements.,Streetscape and associated physical works to provide walking cycling and PT improvements along Wellington's Golden Mile.,,In procurement,Fully funded,Open,Early contractor involvement,Wellington,,,Transport,100 - 250 million,2019-Q4,2021-Q4,2021-Q4,2023-Q4,2023-Q3,2025-Q4,2019-Q4,2025-Q4,
https://lgwm.nz/all-projects/golden-mile-improvements/,,[email address],-41.2918,174.77321
IP006535,19/12/2023,Wellington City Council,Wellington Thorndon Quay Hutt Road Improvements.,Streetscape and associated physical works to provide walking cycling and PT improvements along Hutt Road and Thorndon Quay.,,Under construction,Fully funded,Open,Early contractor involvement,Wellington,,,Transport,50 - 100 million,2019-Q4,2021-Q4,2021-Q4,2023-Q1,2023-Q2,2025-Q4,2019-Q4,2025-Q4,
https://lgwm.nz/all-projects/thorndon-quay-and-hutt-road/,,[email address],-41.27255,174.78245
IP006536,19/12/2023,Wellington City Council,Wellington City Streets.,Better walking cycling and bus journeys creating better connections between Wellington city and suburbs.,,On hold,Funding source to be confirmed,Open,Early contractor involvement,Wellington,,,Transport,250 - 500 million,2022-Q1,2022-Q4,2023-Q1,2027-Q2,2023-Q4,2028-Q4,2022-Q1,2028-Q4,
https://lgwm.nz/all-projects/city-streets/,,[email address],-41.286461,174.77623
IP006538,19/12/2023,Wellington City Council,Wellington Targeted Improvements.,Public transport walking cycling safety and amenity improvements.,,On hold,Funding source to be confirmed,Limited,Construct only,Wellington,,,Transport,5 - 25 million,2021-Q4,2022-Q2,2022-Q2,2023-Q2,2022-Q3,2024-Q2,2021-Q4,2024-Q2,"
https://lgwm.nz/all-projects/cobham-drive-crossing-and-sh1-safer-speeds/https://lgwm.nz/all-projects/central-city-walking-improvements/https://lgwm.nz/all-projects/central-city-safer-speeds/",,[email address],-41.286461,174.77623
IP008901,19/12/2023,Wellington Regional Council,Wellington Travel Demand Management.,Motivate people to use fewer vehicles to reduce road congestion and associated emissions.,,On hold,Funding source to be confirmed,To be determined,Other,Wellington,,,Transport,50 - 100 million,2020-Q1,2024-Q4,2025-Q3,2026-Q4,2027-Q3,2035-Q2,2020-Q1,2035-Q2,
https://lgwm.nz/all-projects/mass-rapid-transit/,,[email address],-41.286461,174.77623
IP006495,5/12/2023,Eke Panuku Development Auckland Limited,Oratia Link Cycleway and Bridge Construction.,- 5915 m2 of new or upgraded cycleway/footpath by July 2023- new walking and cycling bridge over Oratia Stream - trees & landscaping - 80 m2 of upgraded public realm (2 x small public realm plaza) by December 2023- 1 x bridge cantilevering or strengthening - small section of path cantilevered over park- 2 x pedestrian - kerb and street edge improvements- new lighting.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,5 - 25 million,2019-Q2,2023-Q4,2024-Q3,2024-Q4,2024-Q4,2025-Q4,2019-Q2,2025-Q4,,,[email address],,
IP006496,5/12/2023,Eke Panuku Development Auckland Limited,Huron and Northcroft Streetscapes.,#NAME?,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,1 - 5 million,2019-Q3,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2024-Q2,2019-Q3,2024-Q2,,,[email address],,
IP006506,5/12/2023,Eke Panuku Development Auckland Limited,Northcote Community Facility and Cadness Reserve upgrade.,- A new multipurpose community hub approximately 2200 sqm- Upgrade of Cadness reserve- Refurbishment of existing library.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,5 - 25 million,2020-Q3,2024-Q4,2024-Q4,2025-Q1,2025-Q4,2027-Q4,2020-Q3,2027-Q4,,,[email address],,
IP006507,5/12/2023,Eke Panuku Development Auckland Limited,Northcote Town Centre – Streets enhancements.,- Upgrade to Lake Road- Upgrade to College Road- Extension of Ernie Mays Street- Extension of Kilham Avenue- Awataha Greenway - Town Centre Edge detail design and construction- Planting and earthworks to establish overland flowpath / continuation of walking and cycling way (Countdown edge).,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,5 - 25 million,2022-Q1,2024-Q1,2024-Q1,2024-Q4,2025-Q1,2027-Q4,2022-Q1,2027-Q4,,,[email address],,
IP006508,5/12/2023,Eke Panuku Development Auckland Limited,(WQ) Site 1 Vos Shed Slipway (Wynyard Point).,Percy Vos Boatshed working slipway internal and external operational maintenance and reinstatement including historical paving stones refurbishment mechanical equipment gantry and external ancillary shed.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,1 - 5 million,2022-Q1,2025-Q2,2025-Q3,2025-Q4,2026-Q1,2026-Q3,2022-Q1,2026-Q3,,,[email address],,
IP006509,5/12/2023,Eke Panuku Development Auckland Limited,Manukau Puhinui Stage 2: CMDHB Walkway Works.,A new c.600m Walkway and cycleway along the Puhinui Stream between Kerrs Road and Manukau Station Road.Deliverables - Construction Works:Subject to clarification of the route and physical nature of the walkway the following scope may be included in the construction phase of this project:- Footpath/cycleway works - either surfacing of a walkway and/or construction of boardwalk sections- Footpath/cycleway interfaces with existing footpaths terminating at Great South Road and Kerrs Road - this may include pedestrian crossings and/or underpasses- Footpath/cycleway interfaces with future development areas within the broader CM DHB site- Subject to route identified bridge crossing/s over the Puhinui Stream- Subject to route identified interface areas with the Puhinui Stream- Provision of new public realm infrastructure along the walkway route e.g. seating litter bins etc.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,5 - 25 million,2018-Q4,2024-Q1,2024-Q4,2025-Q1,2025-Q1,2026-Q3,2018-Q4,2026-Q3,,,[email address],,
IP006513,5/12/2023,Eke Panuku Development Auckland Limited,(WQ) Wynyard Point - Open Space North East.,Open space 21 500m2 site clearance including remove existing services and contamination remediation road removal landscaping including large trees pavement furniture public art WC facilities utilities lighting stormwater including raingardens water sewer power including for large events raise seawall 0.6m for length 268m.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,50 - 100 million,2022-Q3,2023-Q4,2024-Q2,2024-Q4,2025-Q1,2030-Q2,2022-Q3,2030-Q2,,,[email address],,
IP006514,5/12/2023,Eke Panuku Development Auckland Limited,(VCW) East West Connection / Public Space Upgrade.,The approach taken to the delivery of upgrades to EV & TW reflects the operational limitations of this working marina which has peak use time over the summer months.2022/23*Developed design consenting works and construction documentationSTAGE 1 - 23/24*New drainage minor utilities paving to existing carriageway on EV including Quay St entrance vehicle turnaround and Te Wero car park. Raingardens raised planters and street furniture.STAGE 2 – 24/25*New paving to the northern part of Te Wero and the southern part of EV to allowed for continued access to Quay St. New bespoke light columns street furniture raingardens and garden beds.STAGE 3 – 25/26* New bespoke structures to provide connection to the water including the lookout terraces wharf cut out ‘Kupenga’ net bridge and sea terraces.Deliverables include:*Ground surface paving upgrade* New stormwater drainage and raingardens* New garden beds and street furniture aligned to the waterfront palette*Kit of moveable parts including raised planters seating and shade sails* New bespoke light columns* wharf cut out to the west of the heritage bascule bridge*terraces down to the water on the inner corner of Hobson wharf and eastern viaduct* ’Kupenga’ net bridge*sea terraces* Tirohanga / lookout.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,5 - 25 million,2021-Q3,2025-Q2,2025-Q3,2025-Q4,2026-Q2,2030-Q2,2021-Q3,2028-Q2,,,[email address],,
IP006518,5/12/2023,Eke Panuku Development Auckland Limited,Manukau - Osterley Way at Civic Streetscape Works.,Streetscape and road corridor upgrade with soft landscaping new surfacing lighting wayfindingNew separated cycleway Upgrade of 2 intersections (Manukau Station Road / Osterley Way and Putney Way / Osterley Way) to include continuation of cycleways.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,1 - 5 million,2020-Q3,2024-Q1,2024-Q3,2025-Q2,2025-Q3,2026-Q2,2020-Q3,2026-Q2,,,[email address],,
IP006519,5/12/2023,Eke Panuku Development Auckland Limited,Manukau - Puhinui Stage 1: Ratavine Reserve Works.,Upgraded public realm at Ratavine Reserve total of 3.9633 hectares of open space3km of share pathway to connect Manukau Naturalise the stream and daylight the connecting pipes.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,5 - 25 million,2021-Q3,2024-Q1,2024-Q4,2025-Q1,2025-Q1,2026-Q3,2021-Q3,2026-Q3,,,[email address],,
IP006520,5/12/2023,Eke Panuku Development Auckland Limited,Cambridge Terrace Extension+carpark.,Deliverables will include: - 160m Cambridge Terrace road extension - 27 St George Street development site unlocked- 130m Stadium Lane upgraded- 240m of new cycleway/shared user path- 160m of new network infrastructure and underground services extension.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q3,2023-Q3,2024-Q1,2024-Q2,2024-Q3,2025-Q2,2021-Q3,2025-Q2,,,[email address],,
IP006523,5/12/2023,Eke Panuku Development Auckland Limited,Maungarei Connection Panmure.,1170m2 of high amenity footpath including Cycling Facilities (potentially incorporating a section of Tamaki Loop cycleway) wayfinding and cultural interpretation for the Maunga.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q4,2023-Q4,2024-Q1,2024-Q2,2024-Q3,2025-Q2,2021-Q4,2025-Q2,,,[email address],,
IP006525,5/12/2023,Eke Panuku Development Auckland Limited,(WH) AC Pier.,The design and construction of a 51 serviced-marina finger berths of between 16m and 30m length for construction at Westhaven Marina.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2021-Q4,2023-Q3,2024-Q2,2024-Q3,2024-Q4,2030-Q2,2021-Q4,2030-Q2,,,[email address],,
IP006526,5/12/2023,Eke Panuku Development Auckland Limited,Catherine Plaza.,- refreshing/improvement of 950m2 of public open space in the heart of Henderson Town Centre.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q3,2023-Q2,2023-Q3,2024-Q2,2025-Q1,2025-Q4,2021-Q3,2025-Q4,,,[email address],,
IP006527,5/12/2023,Eke Panuku Development Auckland Limited,Lagoon Edge Reserve Enhancement Panmure.,- Expanded and enhanced publicly accessible park space at Panmure Domain- 115m of 3m (or wider) enhanced high amenity pathway from Basin View Lane junction with Lagoon Drive to Panmure Domain reserve- Approx. 150m of 3m or wider enhanced high amenity waterside pathway or boardwalk adjacent Panmure Basin- new public toilet facility.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q4,2022-Q4,2024-Q3,2024-Q4,2024-Q4,2026-Q1,2021-Q4,2026-Q1,,,[email address],,
IP006528,5/12/2023,Eke Panuku Development Auckland Limited,Chambers Laneway - Capital works upgrade to streetscapes.,-127m² of upgraded public realm with new surfacing planting landscaping bus shelter and wayfinding -Removal of the canopy attached to Chambers Building and make façade good (painting render etc.)-1 061m² of upgraded pedestrian connection.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,< 1 million,2022-Q3,2023-Q4,2024-Q1,2024-Q2,2024-Q2,2024-Q4,2022-Q3,2024-Q4,,,[email address],,
IP006825,5/12/2023,Eke Panuku Development Auckland Limited,Roulston Park – Capital works upgrade of public amenities.,-4600m2 Roulston Park upgrade::•Soft landscaping with native planting•Playground upgrade•Upgraded entry points to the park•New all-weather path to provide access across the park•New Park furniture•Retain existing toilet facility with potential refurbishment to canopy•Retain Pioneer Cottage and relocation of existing memorials•Introduction of fencing around the perimeter of the park•New vehicular access off Stadium Drive for deliveries to the Pioneer Cottage and for CF contractor to park for maintenance•Removal of non-native poorly thriving small trees following independent arborist report and Tree Owner Approval (TOA)-Cultural elements within the design if / as agreed with Ngāti Tamaoho-Liaising with Auckland Transport on the delivery programme for the signalised intersection on Stadium Drive and East Street.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q3,2023-Q2,2024-Q1,2024-Q3,2024-Q4,2025-Q2,2021-Q3,2025-Q2,,,[email address],,
IP006829,5/12/2023,Eke Panuku Development Auckland Limited,Papatoetoe Stadium Reserve capital works upgrade.,- 14 000sqm of park upgraded with playground footpath seating shade planting and gardens. - 170m of connect new cycle lane/ shared user pathcommunity and council group collaboration to deliver upgraded open space - 230m of upgraded laneway to cycleway (Tavern Lane rear access).,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,5 - 25 million,2022-Q3,2023-Q4,2024-Q3,2024-Q4,2024-Q4,2025-Q3,2022-Q3,2025-Q3,,,[email address],,
IP006830,5/12/2023,Eke Panuku Development Auckland Limited,North Wharf West - Structure Wetlands Foul Odour & Contamination investigations and remediation.,#NAME?,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Community facilities,1 - 5 million,2022-Q1,2023-Q2,2024-Q1,2024-Q2,2024-Q2,2024-Q4,2022-Q1,2024-Q4,,,[email address],,
IP006832,5/12/2023,Eke Panuku Development Auckland Limited,Onehunga Town Centre to Wharf Link.,- 5000m2 of Separate Walking and Cycling Facilities (with either an interim or permanent design life)- Associated lighting street furniture and artwork identity (incl Onehunga Wharf historic Rail Tunnel)- Safe Crossings over or under Neilson Street Onehunga Harbour Road and/or SH20.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q3,2023-Q4,2023-Q4,2024-Q2,2024-Q3,2025-Q4,2021-Q3,2025-Q4,,,[email address],,
IP006834,5/12/2023,Eke Panuku Development Auckland Limited,Karina Williams Way Extension Capital Works.,- 130m of upgraded streetscape- 33 new pay and display on-street parking spaces.- Enable 36 existing pay and display on-street parking spaces to be rate/revenue captured.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,1 - 5 million,2021-Q4,2023-Q4,2024-Q4,2025-Q2,2025-Q3,2026-Q2,2021-Q4,2026-Q2,,,[email address],,
IP008155,5/12/2023,Eke Panuku Development Auckland Limited,Cavendish Drive & Sharkey Street AUT Link - Capital Works for Streetscape Upgrade.,- 11 336m2 of upgraded streetscape- 390m2 of new cycleways.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,5 - 25 million,2022-Q3,2025-Q2,2025-Q4,2026-Q2,2026-Q4,2028-Q2,2022-Q3,2028-Q2,,,[email address],,
IP009628,5/12/2023,Eke Panuku Development Auckland Limited,Market Precinct - Town Square Roulston Lane Roulston Street Market Hall.,-1 Roulston Street 450m2- adaptive use-Roulston Street South 2 200m2- street reconfiguration and public realm upgrade to increase footpath on western side and change the road layout to priorties pedestrian and market use-Devon Lane upgrade 1200m2- street reconfiguration and public realm upgrade to introduce footpath to the south and pedestrian prioritised environment for future development on Edinburgh Block and privates sites to the north-Town square 2 000m2- minor improvements to ensure the town square accommodate the needs and requirement for the future use/activities of the townA 10 year project FY24-34: Stage 1 to be completed by EOY FY26 (ETA June 2026).,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,5 - 25 million,2020-Q2,2024-Q1,2024-Q3,2024-Q3,2024-Q4,2026-Q3,2020-Q2,2026-Q3,,,[email address],,
IP009629,5/12/2023,Eke Panuku Development Auckland Limited,Osterley and Amersham Way Streescape Works.,200m (or 4 000m2) of streetscape upgrade – long term vision.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,5 - 25 million,2023-Q3,2027-Q2,2027-Q2,2027-Q4,2028-Q1,2029-Q1,2023-Q3,2029-Q1,,,[email address],,
IP009630,5/12/2023,Eke Panuku Development Auckland Limited,21 Princes Street Auckland City - External refurbishments and internal fitout.,- Seismic upgrades in basement from 34% to 67% NBS (option2)- Eastern Veranda upgrades - Southern pathways upgrade- Fire alarm Emergency and Exit lighting- Compliance with Fire report - ANARP- Additional fire exit towards southern side - Electrical upgrades - Potentially interior fit tenant’s change.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Housing,1 - 5 million,2022-Q2,2023-Q2,2024-Q1,2024-Q2,2024-Q2,2024-Q4,2022-Q2,2024-Q3,,,[email address],,
IP009903,5/12/2023,Eke Panuku Development Auckland Limited,Onehunga Wharf Public Realm.,At a high-level elements of the scope are broken into two areas.Area A – 10m wide Walking and Cycling access including through the existing tunnelArea B – Regenerative Coastal Edge hardscape activation and shelter area. (includes testing of shed re-use or small kiosk).,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Community facilities,1 - 5 million,2023-Q2,2024-Q1,2024-Q4,2025-Q1,2025-Q3,2026-Q3,2023-Q2,2026-Q3,,,[email address],,
IP009769,27/06/2023,Hawke's Bay Regional Council,HBRC Water Security Programme – Heretaunga Flow Enhancement Scheme.,Long term water supply security for region.,,In planning,Funding source to be confirmed,To be determined,To be determined,Hawke's Bay,,,Water,5 - 25 million,,,,,,,2020-Q1,2023-Q1,,,Ken Mitchell / Sue Baillie,-39.63,176.74
IP009770,27/06/2023,Hawke's Bay Regional Council,Ahuriri Regional Park.,Development of the park (with other stakeholders) NCC lead.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Hawke's Bay,,,Water,5 - 25 million,,,,,,,2021-Q1,2031-Q1,,,Ken Mitchell / Sue Baillie,-39.49,176.86
IP009771,27/06/2023,Hawke's Bay Regional Council,HBRC Water Security Programme –Tukituki Water Security Projects.,Regional water security (IRG).,,In planning,Funding source to be confirmed,To be determined,To be determined,Hawke's Bay,,,Water,1 - 5 million,,,,,,,2020-Q1,2023-Q1,,,Ken Mitchell / Sue Baillie,-39.95,176.51
IP009772,27/06/2023,Hawke's Bay Regional Council,Hawea Park - Stage 3.,3 Further development of Hawea Historical Park consistent with original approved 2017 plan.,,In planning,Funding source confirmed,Selective,To be determined,Hawke's Bay,,,Community facilities,< 1 million,,,,,,,2021-Q1,2024-Q1,,,Ken Mitchell / Sue Baillie,-39.6,176.87
IP009773,27/06/2023,Hawke's Bay Regional Council,Waitangi Regional Park - Stage 3.,Final stage of the Waitangi Regional Park.,,In planning,Funding source confirmed,To be determined,To be determined,Hawke's Bay,,,Community facilities,< 1 million,,,,,,,2021-Q1,2024-Q1,,,Ken Mitchell / Sue Baillie,-39.56,176.92
IP009774,27/06/2023,Hawke's Bay Regional Council,Karamū enhancement.,Enhancement of the Karamū stream.,,Under construction,Funding source confirmed,Selective,Design and construct,Hawke's Bay,,,Community facilities,1 - 5 million,,,,,,,2021-Q1,2031-Q1,,,Ken Mitchell / Sue Baillie,-39.63,176.89
IP009775,27/06/2023,Hawke's Bay Regional Council,Ngaruroro Cycleway Explorer.,Link cycleway from Taradale to Hastings winery ride. (joint venture with HBRC / NZTA).,,In planning,Funding source to be confirmed,Selective,Design and construct,Hawke's Bay,,,Community facilities,< 1 million,,,,,,,2023-Q1,2024-Q2,,,Ken Mitchell / Sue Baillie,-39.87,176.82
IP009776,27/06/2023,Hawke's Bay Regional Council,Karumu Cycleway extension.,Link cycleway from Havelock North to winery ride; Stock Road (joint venture with NZTA / HDC / HBRC).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Hawke's Bay,,,Community facilities,1 - 5 million,,,,,,,2024-Q3,2025-Q2,,,Ken Mitchell / Sue Baillie,-39.66,176.88
IP009777,27/06/2023,Hawke's Bay Regional Council,Wairoa Regional Park development.,Park development along Wairoa River as per consent plan completed in 2017.,,Early planning,Funding source confirmed,To be determined,To be determined,Hawke's Bay,,,Community facilities,< 1 million,,,,,,,2023-Q1,2025-Q1,,,Ken Mitchell / Sue Baillie,-39.04,177.42
IP009778,27/06/2023,Hawke's Bay Regional Council,Opoho - new pump station.,Upgrade and build of new pump station subject to scheme review.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Hawke's Bay,,,Water,< 1 million,,,,,,,2022-Q1,2023-Q1,,,Ken Mitchell / Sue Baillie,-39.04,177.58
IP009779,27/06/2023,Hawke's Bay Regional Council,Ohuia - Whakakī - new pump station.,Upgrade and build of new pump station subject to scheme review.,,In planning,Funding source to be confirmed,To be determined,To be determined,Hawke's Bay,,,Water,< 1 million,,,,,,,2021-Q1,2022-Q1,,,Ken Mitchell / Sue Baillie,-39.04,177.48
IP009780,27/06/2023,Hawke's Bay Regional Council,Flood Control / Drainage scheme - Heretaunga Flood Control Scheme delivery.,Upgrades from drainage scheme reviews.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Hawke's Bay,,,Water,250 - 500 million,,,,,,,2024-Q3,2034-Q2,,,Ken Mitchell / Sue Baillie,-39.61,176.85
IP009781,27/06/2023,Hawke's Bay Regional Council,Flood Control / Drainage scheme - Upper Tukituki Flood Control Scheme delivery.,Upgrades from drainage scheme reviews.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Hawke's Bay,,,Water,100 - 250 million,,,,,,,2024-Q3,2034-Q2,,,Ken Mitchell / Sue Baillie,-39.94,176.94
IP009782,27/06/2023,Hawke's Bay Regional Council,Flood Control / Drainage scheme - Warioa Flood Control Scheme delivery.,Upgrades from drainage scheme reviews.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Hawke's Bay,,,Water,100 - 250 million,,,,,,,2024-Q3,2034-Q2,,,Ken Mitchell / Sue Baillie,-39.04,177.42
IP009783,27/06/2023,Hawke's Bay Regional Council,Development / Coastal Hazards.,Setting up coastal AM scheme and implement coastal management strategy.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Hawke's Bay,,,Water,1 - 5 million,,,,,,,2023-Q3,2032-Q3,,,Ken Mitchell / Sue Baillie,-39.58,176.84
IP009784,27/06/2023,Hawke's Bay Regional Council,Catchment Management.,BAU catchment management activities.,,In planning,Fully funded,Selective,Other,Hawke's Bay,,,Water,1 - 5 million,,,,,,,2022-Q3,2032-Q3,,,Ken Mitchell / Sue Baillie,-39.58,176.84
IP009785,27/06/2023,Hawke's Bay Regional Council,Flood Protection and Control Works.,BAU - annual maintenance programme along with capital replacement programme.,,In planning,Fully funded,Selective,Other,Hawke's Bay,,,Water,50 - 100 million,,,,,,,2023-Q3,2031-Q2,,,Ken Mitchell / Sue Baillie,-39.58,176.84
IP009786,27/06/2023,Hawke's Bay Regional Council,Clive River Dredging - land to dispose.,Land to dispose material.,,Under construction,Funding source to be confirmed,To be determined,Other,Hawke's Bay,,,Waste management,1 - 5 million,,,,,,,2021-Q3,2025-Q2,,,Ken Mitchell / Sue Baillie,-39.58,176.92
IP009787,27/06/2023,Hawke's Bay Regional Council,Forestry.,Replanting of harvested forests.,,Early planning,Funding source to be confirmed,Selective,Design and construct,Hawke's Bay,,,Environmental,< 1 million,,,,,,,2023-Q3,2024-Q2,,,Stevie Smidt,-39.58,176.84
IP009788,27/06/2023,Hawke's Bay Regional Council,Flood Models - regular exciting updating (software datum catchment change).,Regular maintenance update of exciting flood models.,,Early planning,Funding source to be confirmed,Selective,Other,Hawke's Bay,,,Water,< 1 million,,,,,,,2023-Q3,2031-Q2,,,Craig Goodier,-39.58,176.84
IP009789,27/06/2023,Hawke's Bay Regional Council,Wairoa playground riverside sheet pile wall replacement.,Replacement of WDC playground riverside sheet pile wall.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Hawke's Bay,,,Water,1 - 5 million,,,,,,,2023-Q3,2025-Q2,,,Ken Mitchell / Sue Baillie,-39.04,177.42
IP009790,27/06/2023,Hawke's Bay Regional Council,Open Spaces_Park beautification programme.,Planting and facilities.,,In planning,Funding source confirmed,Selective,Design and construct,Hawke's Bay,,,Community facilities,< 1 million,,,,,,,2023-Q1,2024-Q2,,,Ken Mitchell / Sue Baillie,-39.6,176.87
IP009791,27/06/2023,Hawke's Bay Regional Council,Westshore gravel bund increased resilience to storm events.,Substantially strengthen the gravel bund at Westshore.,,Early planning,Funding source to be confirmed,Selective,Design and construct,Hawke's Bay,,,Water,< 1 million,,,,,,,2024-Q3,2026-Q2,,,Jose Beya,-39.47,176.88
IP009792,27/06/2023,Hawke's Bay Regional Council,Westshore south corner coastal erosion protection.,Design and Build coastal erosion protection at the Westshore south corner.,,Early planning,Funding source to be confirmed,Selective,Design and construct,Hawke's Bay,,,Water,1 - 5 million,,,,,,,2024-Q3,2026-Q2,,,Jose Beya,-39.47,176.88
IP009793,27/06/2023,Hawke's Bay Regional Council,East Clive and Haumoana groynes re-design and maintenance.,Carry out a review of the current designs and performance of the groynes develop a new design standard and carry out maintenance according to those new standards.,,Early planning,Funding source to be confirmed,Selective,Design and construct,Hawke's Bay,,,Water,< 1 million,,,,,,,2024-Q3,2026-Q2,,,Jose Beya,-39.6,176.93
IP009794,27/06/2023,Hawke's Bay Regional Council,Westshore Coastal Protection.,Annual Renourishment/construction of erosion protection.,,In procurement,Fully funded,Selective,Other,Hawke's Bay,,,Water,< 1 million,,,,,,,2023-Q3,2023-Q4,,,Jon Kingsford,-39.48,176.88
IP009795,27/06/2023,Hawke's Bay Regional Council,Plantation Pumpstation.,Pumpstation Structural Rebuild.,,In planning,Fully funded,Selective,Design and construct,Hawke's Bay,,,Water,1 - 5 million,,,,,,,2023-Q3,2024-Q2,,,Jon Kingsford,-39.5,176.89
IP009796,27/06/2023,Hawke's Bay Regional Council,Waitangi Regional Park Reserve Access.,improve public access to river.,,In planning,Fully funded,To be determined,Other,Hawke's Bay,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q2,,,Jon Kingsford,-39.57,176.92
IP009797,27/06/2023,Hawke's Bay Regional Council,Waitangi Regional Park Toilet Block.,Installation of toilet block water supply and solar power.,,In planning,Fully funded,Selective,Design and construct,Hawke's Bay,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q2,,,Jon Kingsford,-39.57,176.92
IP009798,27/06/2023,Hawke's Bay Regional Council,Clive River Fico Removal.,Removal of aquatic pest from SH bridge abutments.,,In planning,Fully funded,Selective,Other,Hawke's Bay,,,Community facilities,< 1 million,,,,,,,2024-Q3,2025-Q2,,,Jon Kingsford,-39.58,176.92
IP009799,27/06/2023,Hawke's Bay Regional Council,Whakaki Weir.,Install weir for lagoon level control.,,Under construction,Fully funded,Selective,Other,Hawke's Bay,,,Water,< 1 million,,,,,,,2024-Q1,2024-Q2,,,Jon Kingsford,-39.04,177.53
IP009800,27/06/2023,Hawke's Bay Regional Council,Makara Dam Desiltation.,Remove silt buildup from detention dam basin improve access repair weir.,,Early planning,Funding source confirmed,Selective,Other,Hawke's Bay,,,Water,< 1 million,,,,,,,2024-Q1,2024-Q4,,,Jon Kingsford,-39.91,176.87
IP009801,27/06/2023,Hawke's Bay Regional Council,Karamu Enhancement Project.,Pathway erosion protection and planting next to Karamu Stream.,,In planning,Funding source to be confirmed,Selective,Other,Hawke's Bay,,,Water,< 1 million,,,,,,,2024-Q1,2024-Q4,,,Jon Kingsford,-38.62,176.88
IP009802,27/06/2023,Hawke's Bay Regional Council,Taradale Carpark PUR.,Reinstate the car park after the stopbank upgrade.,,In planning,Funding source confirmed,Selective,Other,Hawke's Bay,,,Community facilities,< 1 million,,,,,,,2023-Q3,2024-Q2,,,Jon Kingsford,-39.55,176.86
IP009803,27/06/2023,Hawke's Bay Regional Council,Ahuriri Regional Park Cycleway future enhancement.,Proposed Ahuriri Regional Park cycleway enhancement (Study).,,Early planning,Funding source to be confirmed,Selective,To be determined,Hawke's Bay,,,Community facilities,< 1 million,,,,,,,2024-Q3,2024-Q4,,,Ken Mitchell / Sue Baillie,-39.49,176.86
IP009804,27/06/2023,Hawke's Bay Regional Council,Esk Valley Feasibility Cycleway study.,Future green space (feasibility study).,,Early planning,Funding source to be confirmed,To be determined,To be determined,Hawke's Bay,,,Community facilities,< 1 million,,,,,,,2025-Q3,2026-Q2,,,Ken Mitchell / Sue Baillie,-39.39,176.85
IP009805,27/06/2023,Hawke's Bay Regional Council,Whakakī Lower Catchment Pilot Project deal.,Working with local iwi groups to manage land use and flood control options in the Whakaki Lagoon area.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Hawke's Bay,,,Environmental,< 1 million,,,,,,,2020-Q1,2023-Q1,,,Ken Mitchell / Sue Baillie,-39.04,177.53
IP008649,29/11/2023,Horowhenua District Council,Flurodation - Levin Water Treatment Plant.,Flurodation to Levin's water supply.,,In procurement,Funding source confirmed,Selective,Design and construct,Manawatū - Whanganui,,,Water,1 - 5 million,2022-Q4,2022-Q4,2023-Q2,2023-Q3,2024-Q1,2024-Q2,2022-Q4,2024-Q2,,,,,
IP008746,29/11/2023,Horowhenua District Council,Waste Water Reticulation Renewals - Kings Dr Levin.,Removal and replacement of existing waste water pipe.,,Under construction,Funding source confirmed,Limited,Construct only,Manawatū - Whanganui,,,Water,1 - 5 million,2022-Q3,2022-Q3,2022-Q4,2023-Q1,2023-Q2,2024-Q1,2022-Q3,2024-Q1,,,,,
IP008747,29/11/2023,Horowhenua District Council,Foxton Pool Facility Upgrade.,Removal and replacement of old roof structure as well as general building upgrades including adequate ventilation. Construction of additional reception and spa pool areas.,,Under construction,Funding source confirmed,Direct,Design and construct,Manawatū - Whanganui,,,Community facilities,5 - 25 million,2021-Q1,2022-Q3,2022-Q3,2022-Q4,2023-Q1,2024-Q1,2021-Q1,2024-Q1,,,,,
IP010346,29/11/2023,Horowhenua District Council,Stafford St Shannon Water Renewal.,Removal and replacement of existing water supply pipe.,,In procurement,Funding source confirmed,Direct,Construct only,Manawatū - Whanganui,,,Water,1 - 5 million,2023-Q2,2023-Q3,2023-Q3,2023-Q3,2023-Q4,2024-Q1,2023-Q2,2024-Q1,,,,,
IP010347,29/11/2023,Horowhenua District Council,York St Wastewater and Water Renewal.,Removal and replacement of existing water supply and wastewater pipe.,,In procurement,Funding source confirmed,Direct,Construct only,Manawatū - Whanganui,,,Water,1 - 5 million,2023-Q2,2023-Q3,2023-Q3,2023-Q3,2023-Q4,2024-Q1,2023-Q2,2024-Q1,,,,,
IP010348,29/11/2023,Horowhenua District Council,Queen One Stormwater Pond.,Construction of new stormwater storage.,,In procurement,Funding source confirmed,Direct,Public private partnership,Manawatū - Whanganui,,,Water,1 - 5 million,2023-Q2,2023-Q3,2023-Q3,2023-Q3,2024-Q1,2024-Q2,2023-Q2,2024-Q2,,,,,
IP010349,29/11/2023,Horowhenua District Council,Tararua Rd East Wastewater Stage 3 Ext.,New Wastewater pipe.,,Under construction,Funding source confirmed,Direct,Construct only,Manawatū - Whanganui,,,Water,< 1 million,2023-Q3,2023-Q4,2023-Q4,2023-Q4,2023-Q4,2024-Q1,2023-Q3,2024-Q1,,,,,
IP010350,29/11/2023,Horowhenua District Council,Levin Domain & Salisbury St Stormwater.,New stormwater pipe.,,Under construction,Funding source confirmed,Open,Construct only,Manawatū - Whanganui,,,Water,< 1 million,2023-Q3,2023-Q4,2023-Q4,2024-Q1,2024-Q2,2024-Q3,2023-Q3,2024-Q3,,,,,
IP010351,29/11/2023,Horowhenua District Council,LWWTP – Inlet Pipe Upgrade & Renewal.,Upgrade and renewal on pipe inlet.,,In procurement,Funding source confirmed,Open,Construct only,Manawatū - Whanganui,,,Water,1 - 5 million,2023-Q3,2023-Q4,2023-Q4,2024-Q2,2024-Q2,2024-Q3,2023-Q3,2024-Q3,,,,,
IP010352,29/11/2023,Horowhenua District Council,Shannon Water Treat Plant inlet/outlet renewal.,Upgrade and renewal on pipe inlet.,,In procurement,Funding source confirmed,Open,Construct only,Manawatū - Whanganui,,,Water,1 - 5 million,2023-Q3,2023-Q4,2023-Q4,2023-Q4,2023-Q4,2024-Q1,2023-Q3,2024-Q1,,,,,
IP010353,29/11/2023,Horowhenua District Council,Tararua RAB Service Relocation.,Services relocation to accommodate new road layout.,,In procurement,Funding source confirmed,Open,Construct only,Manawatū - Whanganui,,,Transport,< 1 million,2023-Q3,2023-Q4,2023-Q4,2024-Q4,2024-Q1,2024-Q2,2023-Q3,2024-Q2,,,,,
IP010354,29/11/2023,Horowhenua District Council,Districtwide Water Metering.,Installation of water meters to remainder of district.,,In planning,Funding source to be confirmed,Selective,Other,Manawatū - Whanganui,,,Water,5 - 25 million,2023-Q3,2023-Q4,2023-Q4,2024-Q2,2024-Q2,2026-Q2,2023-Q3,2026-Q2,,,,,
IP010355,29/11/2023,Horowhenua District Council,POT Irrigation upgrade - Schedule 4B.,Erect new irrigation capability as an extention to current irrigation system.,,In procurement,Funding source confirmed,Selective,Construct only,Manawatū - Whanganui,,,Water,< 1 million,2023-Q3,2023-Q3,2023-Q4,2024-Q1,2024-Q2,2024-Q3,2023-Q3,2024-Q3,,,,,
IP010356,29/11/2023,Horowhenua District Council,Downstream Defender - Makomako Rd.,Install device in stormwater network.,,In planning,Funding source to be confirmed,Selective,Construct only,Manawatū - Whanganui,,,Water,< 1 million,2023-Q3,2024-Q1,2024-Q1,2024-Q2,2024-Q2,2024-Q3,2023-Q3,2024-Q3,,,,,
IP008902,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Carlo Tuhakaraina.,To support Carlo Tuhakaraina establish infrastructure for his whare 84c Central Road part of [Mangorewa Kaharoa 6E3 2E 2A 2] Land Block No. 35174.,,Under construction,Fully funded,Direct,Design and construct,Bay of Plenty,,,Housing,< 1 million,,,2022-Q2,,,2023-Q2,2022-Q2,2023-Q2,,,,,
IP008903,31/05/2023,Te Puni Kōkiri (Ministry of Māori Development),George and Hēni Henderson Whānau Trust.,To support the George and Heni Henderson Whanau Family Trust to develop their papakainga with infrastructure to support for seven homes and the development of two collectively owned rentals on their whanau whenua known as Pakowhai 5B2 located on Farndon Road in Pakowhai 5mins east of Clive.,,Under construction,Fully funded,Direct,Design and construct,Hawke's Bay,,,Housing,1 - 5 million,,,2020-Q4,,,2022-Q3,2020-Q4,2022-Q3,,,,,
IP008905,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),John David Keepa/Kupa Whānau Trust.,To support the John David Keepa Kupa Whānau Trust to develop a 9 home papakāinga at Rotopuhoe Road Taharoa known as Taharoa A7J8B. Support will enable the development and infrastructure for 6 affordable collectively owned rentals and 3 build-ready sites for future home ownership whare to be built in the next 2-3 years.,,Under construction,Fully funded,Direct,Design and construct,Manawatū - Whanganui,,,Housing,< 1 million,,,2022-Q2,,,2024-Q1,2021-Q3,2022-Q3,,,,,
IP008906,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Kim Whaanga Whānau Trust.,To support the Kim Whaanga Whanau Trust to provide four 3-bedroom collectively owned rental homes and related infrastructure (including future capacity) on its papakinga site just out of Gisborne (24 Wheatstone Road Lot 1 DP 3863). Feasibility concluded under the name Mauria Te Pono (MHN 44882).,,Under construction,Fully funded,Direct,Design and construct,Waikato,,,Housing,1 - 5 million,,,2021-Q4,,,2023-Q2,2022-Q2,2024-Q1,,,,,
IP008907,31/05/2023,Te Puni Kōkiri (Ministry of Māori Development),Matauri X Incorporation.,To support Matauri X Incorporation with to develop and complete their papakāinga development at 1573A Matauri bay Road Matauri Bay Kaeo. Investment support will enable the development and infrastructure for eight affordable collectively owned rentals.,,Under construction,Fully funded,Direct,Design and construct,Northland,,,Housing,1 - 5 million,,,2022-Q2,,,2022-Q4,2022-Q2,2022-Q4,,,,,
IP008908,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Ngatitahinga and Davika Wilson.,To support Ngatitahinga and Davika Wilson with an infrastructure grant to enable them to build their own home and a smaller home for their sister (paid for with approved bank finance) on their whenua at 526 Oruarangi Road Ihumatao.,,Under construction,Fully funded,Direct,Design and construct,Canterbury,,,Housing,< 1 million,,,2021-Q3,,,2022-Q2,2022-Q1,2022-Q3,,,,,
IP008909,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Oraruwharo Block 2A Ahu Whenua Trust.,To support Oraruwharo Block 2A Ahu Whenua Trust to build an 8 rental home papakainga at 5395 State Highway 12 Kaikohe.[note: MHN-49070 adds a further 2 houses to this papakianga bringing it up to 10 rentals].,,Under construction,Fully funded,Direct,Design and construct,Hawke's Bay,,,Housing,< 1 million,,,2020-Q4,,,2022-Q2,2022-Q4,2024-Q2,,,,,
IP008910,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Pentar Whānau Trust.,To support Pentar Whanau Trust to add two rental homes on infrastructure already established on its papakāinga at Pentar Lane Waiohiki. Links to MHN-46305.,,Under construction,Fully funded,Direct,Design and construct,Gisborne,,,Housing,< 1 million,,,2022-Q2,,,2023-Q1,2022-Q4,2023-Q3,,,,,
IP008911,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Pingao Estate Trust.,To support the Pingao Estate Trust to develop a mixed tenure papakainga on their whenua at 1029 East Coast Road Whakatiwai (near Kaiaua) known as Wharekawa 9. Investment support will enable the development and infrastructure for seven affordable collectively owned rentals as well as infrastructure for seven infrastructure only sites.,,Under construction,Fully funded,Direct,Design and construct,Auckland,,,Housing,< 1 million,,,2022-Q3,,,2024-Q1,2021-Q3,2022-Q2,,,,,
IP008912,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Rakaunui 1B Ahu Whenua Trust.,To support Rakaunui 1 B Ahu Whenua Trust with infrastructure for 22 sites to establish 4 affordable rental whare before June 2022 and to support 4 owner-occupied properties in stage one. The investment also allows for Sorted Kainga Ora to be deliverd to whanau looking at the home ownership options. The site is ancestral whenua [MLC Block ID: 5330] at 117 Wainui Road Whāingaroa (Raglan) in the Waikato region. There will be further houses developed in the future 5-7 year period.,,Under construction,Fully funded,Direct,Design and construct,Hawke's Bay,,,Housing,< 1 million,,,2021-Q2,,,2022-Q2,2021-Q2,2022-Q2,,,,,
IP008913,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Retimana Leef.,To support Retimana and Mathew Leef with their individual infrastructure to their new whanau homestead located 2146 Westcoast Road Panguru. Maori Freehold Block Panguru A21A.,,Under construction,Fully funded,Direct,Design and construct,Waikato,,,Housing,< 1 million,,,2022-Q3,,,2023-Q2,2021-Q3,2022-Q3,,,,,
IP008914,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Tamangaro Ahu Whenua Trust.,To support Tamangaro Ahu Whenua Trust with the development of infrastructure to support 4 homes (2x homeownerships 2x collectively owned rental) on their ancestral whanau whenua at 67 State Highway 51 Waipatu (known as Karamu H3E2A) - a small rural Māori community 5 mins north of Hastings.,,Under construction,Fully funded,Direct,Design and construct,Hawke's Bay,,,Housing,< 1 million,,,2021-Q2,,,2022-Q3,2022-Q2,2023-Q1,,,,,
IP008915,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Tauhara North Kainga Limited.,To support Tauhara North Kāinga Limited to deliver a papakāinga of four rental homes to be owned by Mita & Whiu Whānau Trust on the Trust’s whenua located at 586 Te Toke Road Reporoa.,,Under construction,Fully funded,Direct,Design and construct,Waikato,,,Housing,1 - 5 million,,,2021-Q3,,,2022-Q2,2022-Q3,2024-Q1,,,,,
IP008916,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Te Āwhina Marae o Motueka Society Incorporated.,To support Te Awhina Marae o Motueka Society Incorporated to develop the infrastructure and housing for a papakāinga of 20 social housing units (affordable rentals) (10 2-bedroom 7 3-bedroom and 3 4-bedroom) at Queen Victoria Street Motueka on whenua leased long term by the Marae society to complete this papakāinga adjacent to the Marae in an area of housing affordability and supply constraints. Te Puni Kōkiri understands that from within the funding commitments of this agreement you will allocate a 33% contribution to the cost of a communal space on the papakāinga. Resource Consent was granted in March 2021. The site is defined as: part Lots 3 and 4 DP 1506 and is located approximately 1.2 km south-west of the Motueka township. This new development will replace the six existing older and no longer 'fit for purpose' kaumātua homes adjacent to the Marae.,,Under construction,Fully funded,Direct,Design and construct,Northland,,,Housing,< 1 million,,,2021-Q2,,,2023-Q2,2022-Q3,2023-Q2,,,,,
IP008917,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Te Kohanga Reo o Te Namu Society Incorporated.,To support Te Kōhanga Reo o Te Namu Society Incorporated to develop the infrastructure and housing for a papakāinga comprising of five affordable rental homes (three 3 bedroom and two 4 bedroom) for Kōhanga kaiako and whānau on whenua owned by the Society at 169 Tasman Street Opunake which is an area of housing affordability and supply constraints.,,Under construction,Fully funded,Direct,Design and construct,Hawke's Bay,,,Housing,< 1 million,,,2022-Q1,,,2023-Q2,2021-Q2,2022-Q3,,,,,
IP008918,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Te Maungarongo Whenua Trust.,To support Te Maungarongo Whenua Trust to put in infrastructure for 6 whare and and complete stage 1 which will see the building of 3 whare at Ngatāhuna papakainga development project on their whenua at 82 Waima Valley Road (known as Waima C34A).,,Under construction,Fully funded,Direct,Design and construct,Waikato,,,Housing,< 1 million,,,2022-Q3,,,2023-Q1,2021-Q3,2022-Q2,,,,,
IP008919,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Te Whiti South Lands Trust.,To support Te Whiti South Trust to develop nine collectively owned homes that will house beneficiaries of the Trust in healthy warm and affordable homes. Housing will also support whānau on pathways to homeownership. The section intended for development is known as PT Te Whiti South 1B2 Block located on the Masterton-Martinborough Road 10 mins south of Masterton in the rural area known as Te Whiti.,,Under construction,Fully funded,Direct,Design and construct,Tasman,,,Housing,5 - 25 million,,,2021-Q2,,,2023-Q2,2021-Q2,2023-Q2,,,,,
IP008920,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),The Mahue and Iranui Kokiri Family Trust.,To support Mahue and Iranui Kokiri Whanau Trust to develop their papakainga whare (equivalent to 8 one bedroom kaumatua units) and infrastructure for a future 2 whare on whanau whenua known as Pouawa A6 located on the main East Coast Road 25 kms north of Gisborne.,,Under construction,Fully funded,Direct,Design and construct,Taranaki,,,Housing,< 1 million,,,2021-Q2,,,2022-Q3,2022-Q1,2023-Q2,,,,,
IP008921,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Waimahana Lands Trust.,To support Waimahana Ahu Whenua Trust under the umbrella of Tauhara North Kāinga Ltd to develop the stage 1 papakāinga at Waimahana Marae 2548 State Highway 5 Ohaki. The papakāinga will consist of 7 affordable rental houses (to be owned by Waimahana Ahu Whenua Trust) and 3 sites for homes to be built and owned by whānau.,,Under construction,Fully funded,Direct,Design and construct,Waikato,,,Housing,1 - 5 million,,,2021-Q3,,,2023-Q2,2021-Q3,2022-Q3,,,,,
IP008923,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Whenuakura Whānau Trust.,To support Whenuakura Whānau Trust to develop three collectively owned rental homes on their ancestral whenua at 83 State Highway 51 Waipatu (known as Karamu F1B) - a small rural Māori community 5mins north of Hastings.,,Under construction,Fully funded,Direct,Design and construct,Gisborne,,,Housing,< 1 million,,,2021-Q2,,,2022-Q2,2021-Q2,2022-Q3,,,,,
IP008929,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Anitamay Oriwa Apatu.,To support Anitamay Oriwa Apatu and her whānau with infrastructure that will enable the whānau to build on their ancestral whānau whenua located at 2 Apatu Road (Lot 1 Deposited Plan 1171) in the semi-rural community of Waipatu in Hastings.,,Under construction,Fully funded,Direct,Design and construct,Hawke's Bay,,,Housing,< 1 million,,,2022-Q1,,,2022-Q4,2022-Q1,2022-Q4,,,,,
IP009608,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Awhina Wickens.,To support Awhina Wickens with an individual infrastructure grant to allow for one home on Te Horo 2B2B2B at 3586 Pipiwai Road Pipiwai.,,Under construction,Fully funded,Direct,Design and construct,Northland,,,Housing,< 1 million,,,2022-Q4,,,2024-Q2,2022-Q4,2024-Q2,,,,,
IP009609,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Individual Whānau.,To assist Helen Turei (land owner) Misty Newton and Sema Mataora with infrastructure on their whenua (11 Waipouri Road) in Ihumaatao so they can build their inter generational home for the extended whanau to replace overcrowded and temporary accommodation - (1x standalone mega-whare with 6 bedrooms 2x bathrooms 1x laundry 2x living spaces 2x kitchens and a shared outdoor space included. The infrastructure also supports the existing whare on the site therefore is supporting the equivalence of three houses.This mega-whare will be co-owned by the two whanau who will occupy them. They are the children of the current owner of the land and they have permission to build on the whenua. The mega whare will be financed by a home loan/mortgage.The site is General Title but is considered customary Maori land in continued Maori ownership within the Ihumaatao Maori village and is in the Auckland Council 'Maori Purpose' zone (H27).,,Under construction,Fully funded,Direct,Design and construct,Hawke's Bay,,,Housing,1 - 5 million,,,2021-Q3,,,2022-Q2,2020-Q4,2022-Q3,,,,,
IP009610,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Individual Whānau.,To support Sharon Harrison-Mason and her whānau with infrastructure support for 1x homeownership and 1x future whāre to be built on their māori whānau whenua at State Highway 2 Dannevirke 78024 known as Tahoraiti 2A11B.,,Under construction,Fully funded,Direct,Design and construct,Auckland,,,Housing,< 1 million,,,2021-Q3,,,2022-Q3,2021-Q3,2022-Q2,,,,,
IP009611,31/05/2023,Te Puni Kōkiri (Ministry of Māori Development),Individual Whānau.,To support Haane Kingi & Chantez connor kingi' aspiration to live on their whenua Maori in Ngararatunua. This infrastructure will support two relocatable whare to be built at 84 Church Road Ngararatunua Whangarei.,,Under construction,Fully funded,Direct,Design and construct,Northland,,,Housing,< 1 million,,,2022-Q1,,,2022-Q4,2022-Q1,2022-Q4,,,,,
IP009612,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Joseph Sio.,To support Sio Whānau with an individual infrastructure grant to allow for one home on Te Kao 66 Block at 6600 Far North Road Te Kao.,,Under construction,Fully funded,Direct,Design and construct,Northland,,,Housing,< 1 million,,,2022-Q4,,,2024-Q2,2022-Q1,2022-Q4,,,,,
IP009613,31/05/2023,Te Puni Kōkiri (Ministry of Māori Development),Koha Ora Whanau Trust.,To support Koha Ora Whanau Trust in developing their papakainga comprising of 10 new collectively owned whare and the construction of infrastructure to support 18 whare at 58 Convent Road Otaki.,,Under construction,Fully funded,Direct,Design and construct,Wellington,,,Housing,1 - 5 million,,,2022-Q3,,,2023-Q2,2022-Q3,2023-Q2,,,,,
IP009614,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Korako Family Trust.,To support the Korako Family Trust with infrastructure costs for two new whare to be built on an existing 3 home papakianga at 16 Rapaki Drive (known as Rapaki No 27 & Rapaki No 28) within Rapaki MR 875. The new infrastructure has high environmental value and includes being able to scrub the grey water for recycling purposes and the ability to remove silt from storm water before it is returned to an existing purpose built swales system to allow aeration of the water before it reaches the moana.,,Under construction,Fully funded,Direct,Design and construct,Northland,,,Housing,< 1 million,,,2022-Q1,,,2022-Q3,2022-Q4,2024-Q2,,,,,
IP009615,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Mahue Pera Ahu Whenua Trust.,To support Mahue Pera Ahu Whenua Trust with stage 2 of their papakainga development - adding five affordable rental homes to the papakainga at 64 Colin White Road Te Hauke.,,Under construction,Fully funded,Direct,Design and construct,Gisborne,,,Housing,1 - 5 million,,,2021-Q3,,,2022-Q4,2021-Q4,2023-Q2,,,,,
IP009616,31/05/2023,Te Puni Kōkiri (Ministry of Māori Development),Mark Tamihana Robin Trust.,To support the Mark Tamihana Robin Whānau Trust to develop their whānau papakāinga on their whānau whenua ancestral land located at 15 Kohupatiki Road RD 2 Hastings. The project will include 4 collectively owned rentals (1x duplex 2x 3 bedroom home) and 1x healthy homes repair and infrastructure.,,Under construction,Fully funded,Direct,Design and construct,Hawke's Bay,,,Housing,< 1 million,,,2022-Q4,,,2024-Q2,2022-Q4,2024-Q2,,,,,
IP009617,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Max and Sandy Matenga.,To support Max and Sandy Matenga with Infrastructure assistance for their home at 382 Lavenham Road Waituhi Gisborne.,,Under construction,Fully funded,Direct,Design and construct,Wellington,,,Housing,1 - 5 million,,,2022-Q4,,,2023-Q3,2022-Q3,2023-Q2,,,,,
IP009618,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Northcroft-Robin Whānau Trust.,To support Northcroft-Robin to develop four collectively owned three-bedroom rentals on their ancestral whanau whenua (Kohupatiki Road) located in the small Maori rural pa community of Kohupatiki.,,Under construction,Fully funded,Direct,Design and construct,Hawke's Bay,,,Housing,< 1 million,,,2021-Q2,,,2022-Q2,2021-Q3,2022-Q4,,,,,
IP009619,31/05/2023,Te Puni Kōkiri (Ministry of Māori Development),Pareaute - Epaapara Ahu Whenua Trust.,To support the Pareaute Epaapara Ahu Whenua Trust complete their papakāinga of four kaumatua and whanau affordable rentals (rebuilding one existing 3-bedroom home to Healthy Homes standard and three new 2-bedroom homes) at 34 River Road Ngāruawāhia (Whenua Maori - 'Allot 169 SBRS of Newcastle North SO 2465' Land Block number 1009879). The required infrastructure supports at least three additional future homes which the whanau intend to allow as whanau owned homes.,,Under construction,Fully funded,Direct,Design and construct,Waikato,,,Housing,< 1 million,,,2021-Q3,,,2022-Q3,2021-Q3,2022-Q3,,,,,
IP009620,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Renata Shortland.,To support Renata Shortland's aspiration to live on their whenua Maori. Renata has a New build home on his Whenua Maori and now just needs funding for infrastructure for him to move in.Infrastructure will be built on:48 Patutahi Rd PipiwaiRD6Whangarei.Block: Te Horo 3 1-31.,,Under construction,Fully funded,Direct,Design and construct,Northland,,,Housing,1 - 5 million,,,2022-Q2,,,2023-Q1,2020-Q4,2022-Q2,,,,,
IP009621,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Tauhara North Kainga Limited.,To support Tauhara North Kainga Limited to develop 16 collectively owned rental homes across four marae: 1) Te Toke Marae (460 Te Toke Road Tahorakuri Forest Reporoa) 2) Ohaaki Marae (161-249 Piripiri Road Waikato) 3) Mataarae Marae (3619 State Highway 5 Reporoa) and 4). Waimahana Marae (State Highway 5 Mihi).,,Under construction,Fully funded,Direct,Design and construct,Waikato,,,Housing,1 - 5 million,,,2021-Q3,,,2023-Q1,2021-Q2,2022-Q2,,,,,
IP009622,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Tauhara North Kainga Limited.,To support Tauhara North Kainga Limited with the development of an urban intentional Māori community (urban papakāinga like) at 57A Hamlin Road Mt Wellington Auckland. The development comprises 30 apartments (5 x 3-bedroom 9 x 1-bedroom and 16 x 2-bedroom) of which 25 will be retained in the ownership of Tauhara North Kāinga Ltd as affordable rental homes for whanau Māori in need. The reminaing five 3-bedroom units (not included in this funding application) will either be held as rentals or made available for progressive home ownership. The development is shovel ready fully consented and ready to commence with the housing completed by June 2023.,,Under construction,Fully funded,Direct,Design and construct,Northland,,,Housing,< 1 million,,,2022-Q2,,,,2022-Q2,2023-Q1,,,,,
IP009623,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Te Oru and Ripeka Mikaere Whānau Trust.,To support Te Oru and Ripeka Mikaere Whanau Trust to develop their papakainga to support 6 home ownership homes at 848 Manaia Road State Highway 25 Manaia Coromandel. Resource and building consents are approved from TCDC and two whanau have pre-approval loans for the first two builds.,,Under construction,Fully funded,Direct,Design and construct,Waikato,,,Housing,< 1 million,,,2021-Q3,,,2022-Q3,2021-Q3,2023-Q1,,,,,
IP009624,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Te Rangimarie Whānau Trust.,To support the Te Rangimarie Whanau (namely Heemi Biddle and his whanau) to develop their 9 whare off grid solar power papakainga at 78 Rihia Road Turangi 3382. Development occurs in three phases: 1) 4 home ownership whare and 1 communal building completed2) 4 rental homes completed3) 1 home ownership final home completed.,,Under construction,Fully funded,Direct,Design and construct,Auckland,,,Housing,< 1 million,,,2021-Q3,,,2022-Q4,2022-Q2,2024-Q2,,,,,
IP009625,31/05/2023,Te Puni Kōkiri (Ministry of Māori Development),Tirita Cherrington Whānau Trust.,To support the Tirita Cherrington Whanau Trust to develop a papakainga on their whenua in Kawakawa. The Whenua is known as: Motatau 2 Section 21B2A Located at 5001 State Highway 1 RD 1 Waiomio 0281. This investment will support eight infrastructure sites and four affordables rentals.,,Under construction,Fully funded,Direct,Design and construct,Northland,,,Housing,1 - 5 million,,,2022-Q3,,,2024-Q2,2022-Q3,2024-Q2,,,,,
IP009626,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Tomohawk Ahu Whenua Trust.,To support Tomohawk Ahu Whenua Trust to develop one collectively owned home that will house a beneficiary of the Trust into a healthy warm and affordable home. Housing will also support two whānau homeownerships. The section intended for development is at 260 Stock Road Paki Paki (known as Whenuakura 7A Block) a small rural Māori community located 10mins south of Hastings. Linked to MHN-49522.,,Under construction,Fully funded,Direct,Design and construct,Northland,,,Housing,1 - 5 million,,,2021-Q3,,,2022-Q3,2022-Q3,2023-Q1,,,,,
IP009627,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Warren Te Kahika.,To support Warren Te Kahika with infrastructure that will enable the development of two new builds (1x immediately and 1x future - roading and power supports a future whanau home) on their whānau whenua at 13 Rohepotai Road (known as Mohaka B3) located in the small rural māori community of Raupunga 20mins south of Wairoa.,,Under construction,Fully funded,Direct,Design and construct,Waikato,,,Housing,1 - 5 million,,,2021-Q3,,,2022-Q2,2021-Q3,2022-Q4,,,,,
IP009901,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Oraruwharo Block 2A Ahu Whenua Trust.,To support Oraruwharo 2A Ahu Whenua Trust to extend their current Papakainga project to provide an additional two (2) whare. To be monitored with MHN 47654 and managed as one papakainga project.,,Under construction,Fully funded,Direct,Design and construct,Northland,,,Housing,1 - 5 million,,,2021-Q4,,,2022-Q4,2022-Q2,2022-Q4,,,,,
IP009902,21/09/2023,Te Puni Kōkiri (Ministry of Māori Development),Wharemoana-Ferguson Trust.,To support Wharemoana-Ferguson Trust to progress the development of their papakainga with infrastructure for four homes and two collectively owned rentals on their whānau whenua at 56 Wharemoana Road Te Hauke (known as Lot 1 DP 13311 Blk IX Te Mata SD) a small rural community 15 minutes south of Hastings. Whanau are currently living in an old Department of Maori Affairs trade training hostel on the site which will be dismantled and parts recycled into the new homes. The site is also adjacent to a historic Ngati Kahungunu pa where warriors and chiefs were trained. Whanau self-funded their own feasibility and are now shovel-ready. Linked to MHN-49521.,,Under construction,Fully funded,Direct,Design and construct,Wellington,,,Housing,1 - 5 million,,,2020-Q4,,,2022-Q3,2021-Q2,2023-Q2,,,,,
IP000691,17/03/2020,Ports of Auckland Limited,Straddle Workshop.,This project is to deliver an engineering workshop for heavy plant and equipment.,,Early planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Transport,5 - 25 million,,,,,,,2021-Q4,2022-Q4,
http://www.masterplan.poal.co.nz,,Alistair Kirk,,
IP000692,17/03/2020,Ports of Auckland Limited,Channel Deepening.,This project is the dredging of shipping channel at Ports of Auckland.,,In planning,Funding source to be confirmed,Selective,Construct only,Auckland,,,Transport,50 - 100 million,,,,,,,2021-Q2,2029-Q2,
http://www.masterplan.poal.co.nz,,Alistair Kirk,,
IP000693,17/03/2020,Ports of Auckland Limited,Marsden Wharf Removal and Basin Deepening.,This project is the removal of wharf structure and deepening of basin at Ports of Auckland.,,Early planning,Funding source to be confirmed,To be determined,Construct only,Auckland,,,Transport,5 - 25 million,,,,,,,2025-Q3,2026-Q3,
http://www.masterplan.poal.co.nz,,Alistair Kirk,,
IP000694,17/03/2020,Ports of Auckland Limited,Kings Low Wharf Upgrade.,This project is to replace the wharf structure at Kings Low Wharf.,,Early planning,Funding source to be confirmed,To be determined,Construct only,Auckland,,,Transport,50 - 100 million,,,,,,,2023-Q3,2025-Q3,
http://www.masterplan.poal.co.nz,,Alistair Kirk,,
IP000695,17/03/2020,Ports of Auckland Limited,Bledisloe North Berth Wharf Structure.,This project is the construction of wharf structure at the Bledisloe North Berth.,,Early planning,Funding source to be confirmed,To be determined,Construct only,Auckland,,,Transport,50 - 100 million,,,,,,,2022-Q3,2023-Q3,
http://www.masterplan.poal.co.nz,,Alistair Kirk,,
IP000696,17/03/2020,Ports of Auckland Limited,Northgate Rail Slidings.,This project is the installation of rail sidings.,,In planning,Funding source to be confirmed,Selective,Construct only,Waikato,,,Transport,5 - 25 million,,,,,,,2020-Q4,2021-Q4,
http://www.masterplan.poal.co.nz,,Alistair Kirk,,
IP000697,17/03/2020,Ports of Auckland Limited,Northgate Stage 2 Warehouse.,This project is to construct a warehouse.,,Early planning,Funding source to be confirmed,Selective,Design and construct,Waikato,,,Transport,5 - 25 million,,,,,,,2021-Q3,2022-Q3,
http://www.masterplan.poal.co.nz,,Alistair Kirk,,
IP000698,17/03/2020,Ports of Auckland Limited,Northgate Stage 3 Warehouse.,This project is the second stage of the Ports of Auckland warehouse construction.,,Early planning,Funding source to be confirmed,Selective,Design and construct,Waikato,,,Transport,5 - 25 million,,,,,,,2022-Q3,2023-Q3,
http://www.masterplan.poal.co.nz,,Alistair Kirk,,
IP000392,5/12/2023,Watercare Service Limited,Biogas and Co-generation Expansion - Mangere.,This project will upgrade the biogas and co-generation facilities at Mangere Wastewater Treatment Plant.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,2024-Q3,2025-Q2,2025-Q3,2026-Q4,2027-Q1,2030-Q3,2024-Q3,2030-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000396,5/12/2023,Watercare Service Limited,Central Interceptor Programme - Western Springs to Mangere.,This programme consists of 13 kilometres of 4.5 metre diameter wastewater conveyance and storage tunnel between Western Springs and the Mangere Wastewater Treatment Plant. The tunnel will be at a depth of between 22 and 110 metres. The programme also incl.,,Under construction,Fully funded,Selective,Construct only,Auckland,,,Water,500 million - 1 billion,,,,,2019-Q1,2026-Q2,2019-Q1,2026-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000397,5/12/2023,Watercare Service Limited,Centrate Treatment at Wastewater Treatment Plant - Mangere.,This project is to deliver an annamox pilot plant at the Mangere Wastewater Treatment Plant.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2027-Q2,2028-Q1,2028-Q2,2029-Q3,2029-Q3,2031-Q2,2027-Q2,2031-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000399,5/12/2023,Watercare Service Limited,Constitution Hill Pump Station and Rising Main Upgrade - Auckland CBD.,This project will address existing capacity constraints and provide additional capacity to service future growth in the lower Auckland CBD area. The project includes infiltration and inflow reduction. It also includes upgrading the existing pump station t.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2024-Q3,2024-Q4,2025-Q1,2025-Q4,2025-Q4,2026-Q4,2024-Q3,2026-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000400,5/12/2023,Watercare Service Limited,Construction of New Gravity Tunnel - Whenuapai and Redhills.,This programme addresses the growth in demand for wastewater collection and treatment which increases as north-west Auckland expands. The programme consists of 2.8 kilometres of 2100 millimetre diameter gravity tunnel new interim 320 litre per second pum.,,In procurement,Funding source confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2018-Q2,2018-Q4,2021-Q3,2024-Q1,2024-Q2,2026-Q1,2018-Q2,2026-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000403,5/12/2023,Watercare Service Limited,Construction of Pipe Tunnel - Newmarket.,This project is to construct a pipe tunnel between Hells Gate and Hobson Bay Tunnel to reduce wet weather overflows. The project consists of 1.2 kilometres of 3700 millimetre diameter storage tunnel.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,2023-Q3,2026-Q1,2026-Q1,2027-Q3,2027-Q3,2031-Q2,2023-Q3,2031-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000404,5/12/2023,Watercare Service Limited,Construction of Reservoir Storage - Woodlands Park Reservoir.,This project is to construct 25 megalitre reservoir storage associated with the proposed Huia Water Treatment Plant.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,2026-Q1,2026-Q3,2027-Q2,2028-Q3,2028-Q4,2031-Q2,2026-Q1,2031-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000405,5/12/2023,Watercare Service Limited,Construction of Watermain - Waiwera.,This project is to cater for long term growth in Waiwera. It includes a 3.5 kilometre (200 millimetre diameter) watermain between Hatfields Beach and Waiwera.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2020-Q3,2022-Q3,2022-Q4,2024-Q4,2025-Q1,2026-Q4,2020-Q3,2026-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000411,5/12/2023,Watercare Service Limited,Gravity Pipeline Construction From Jutland Pump Station.,This project is to construct 2.5 kilometres of 225 millimetre diameter gravity pipeline from Jutland Pump Station to the Pukekohe Pump Station.,,Under construction,Funding source confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,,,2021-Q3,2023-Q2,2025-Q4,2026-Q2,2021-Q3,2026-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000412,5/12/2023,Watercare Service Limited,Hingaia Watermain Enhancement – Southern Auckland.,This project is to enhance the Hingaia Watermain to service development and security of supply to Drury. This project consists of a new bulk supply point on the Waikato No.1 watermain at Sutton Road plus 2.4 kilometres of 450 millimetre diameter watermai.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2023-Q3,2024-Q4,2024-Q4,2025-Q4,2025-Q4,2027-Q2,2023-Q3,2027-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000413,5/12/2023,Watercare Service Limited,Huia 1 and Nihotupu 1 Watermain Replacement.,This project will provide improved security of supply and levels of service to approximately 19000 customers within the western and central Auckland region. It will also provide improved ability to meet growth in central Auckland. The project consists of.,,Under construction,Fully funded,Selective,Construct only,Auckland,,,Water,50 - 100 million,2016-Q4,2017-Q2,2017-Q3,2022-Q4,2019-Q2,2024-Q3,2016-Q4,2024-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000414,5/12/2023,Watercare Service Limited,Hunua 1 Transmission Watermain Replacement.,This project is to replace the Hunua 1 transmission watermain. This includes 16 kilometres of 760 millimetre diameter pipe between Ardmore and the Redoubt Inlet tunnel.,,In procurement,Funding source confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2022-Q3,2022-Q4,2022-Q3,2023-Q4,2024-Q1,2025-Q4,2022-Q3,2025-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000415,5/12/2023,Watercare Service Limited,Hunua 2 Watermain Relocation to Ti Rakau Bridge.,This project is to relocate the Hunua Number Two pipe onto the Ti Rakau bridge in conjunction with the Auckland Transport works. This will include the installation of approximately 650 metres of 1067 millimetre diameter transmission water main.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q4,2023-Q1,2023-Q2,2023-Q4,2023-Q4,2024-Q4,2022-Q4,2024-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000416,5/12/2023,Watercare Service Limited,Installation of New Conveyance Sewer - Warkworth to Snells.,This project is for the installation of a new conveyance sewer to transfer wastewater from Warkworth to Snells Wastewater Treatment Plant including an intermediate pump station.,,Under construction,Fully funded,Selective,Design and construct,Auckland,,,Water,100 - 250 million,,,2021-Q3,2022-Q2,2021-Q3,2025-Q2,2021-Q3,2025-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000420,5/12/2023,Watercare Service Limited,Local Pump Station and Network Upgrades - Mission Bay.,This project includes local network and local pump station upgrades feeding into the Mission Bay Branch Sewer. This consists of upgrading 2 kilometres of local network sewers.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2029-Q2,2030-Q1,2030-Q2,2031-Q3,2031-Q3,2033-Q2,2029-Q2,2033-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000424,5/12/2023,Watercare Service Limited,Network Upgrade to Address Capacity Constraints - St Heliers.,This project addresses existing capacity constraints and will provide additional capacity to service future growth. It includes construction of a new 20 litre per second pump station. It also includes a new 0.346 kilometres of 315 millimetre diameter risi.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2027-Q2,2028-Q1,2028-Q2,2029-Q3,2029-Q3,2031-Q2,2027-Q2,2031-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000425,5/12/2023,Watercare Service Limited,New Fifty Megalitre Reservoir Expansion - Redoubt Road Reservoir Complex.,This project is the construction of a new 50 megalitre reservoir at the Redoubt Road reservoir complex.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,50 - 100 million,2017-Q4,2018-Q1,2018-Q1,2023-Q2,2021-Q4,2024-Q2,2017-Q4,2024-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000426,5/12/2023,Watercare Service Limited,New Gravity Sewer for Increased Capacity - Torbay.,This project is to increase capacity in the Torbay catchment. The current option consists of eleven separate network upgrades.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2027-Q3,2028-Q2,2028-Q3,2038-Q2,2029-Q4,2040-Q2,2027-Q3,2040-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000427,5/12/2023,Watercare Service Limited,New Khyber Pass Reservoir.,This project is to construct a new 12 megalitre reservoir in the Khyber Pass Reservoir complex.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2027-Q3,2028-Q1,2028-Q4,2030-Q1,2030-Q2,2032-Q4,2027-Q3,2032-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000428,5/12/2023,Watercare Service Limited,New Micro-Tunnelled Pipeline for Wastewater Diversion - Queen Street.,This project will provide 800 metres of 450 millimetre diameter micro-tunnelled pipeline to provide for growth and divert wastewater flows from a suspended sewer.,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2023-Q1,2023-Q4,2022-Q1,2024-Q4,2024-Q1,2026-Q4,2022-Q1,2026-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000429,5/12/2023,Watercare Service Limited,New North Harbour Number Two Watermain.,This project is to construct the new North Harbour Number 2 watermain to service approximately 200 000 people which will connect Greenhithe Bridge and Albany Reservoirs. This project includes approximately 10 kilometres of 1200 millimetre diameter concre.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,250 - 500 million,2022-Q2,2023-Q3,2023-Q4,2025-Q2,2025-Q2,2029-Q1,2022-Q2,2029-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000430,5/12/2023,Watercare Service Limited,New Pipeline for Sunnybrae Branch Diversion - Hillcrest.,This project is to divert part of the Sunnybrae Branch Sewer and includes approximately 1.5 kilometres of 525 millimetre diameter pipeline.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2028-Q2,2029-Q1,2029-Q2,2030-Q3,2030-Q3,2032-Q2,2028-Q2,2032-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000433,5/12/2023,Watercare Service Limited,New Pump Station and Trunk Sewer Upgrade - Pukekohe.,This project is the construction of a new 200 litres per second pump station. It also includes 1.6 kilometre of 450 millimetre diameter rising main and 1.8 kilometre of 475 millimetre diameter gravity pipeline.,,Under construction,Funding source confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,,,2021-Q3,2023-Q2,2023-Q2,2025-Q2,2021-Q3,2025-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000434,5/12/2023,Watercare Service Limited,New Sludge Conditioning Process Construction - Mangere.,This project is to construct a new sludge conditioning process prior to digesters such as thermal hydrolysis. This will increase generated power from 55 per cent to 80 per cent along with improved dewatering of biosolids producing a Class A product.,,In planning,Funding source to be confirmed,Limited,Design and construct,Auckland,,,Water,250 - 500 million,2023-Q3,2025-Q4,2025-Q4,2027-Q2,2027-Q2,2031-Q1,2023-Q3,2031-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000435,5/12/2023,Watercare Service Limited,New Water Infrastructure to Service Tamaki - Kāinga Ora Development.,This project will cater for population growth in the Tamaki regeneration area. It includes three watermain pipes the first 5.2 kilometres of 250 millimetre diameter. The remaining two are 900 metres of 350 millimetre diameter watermain and 800 metres of 2.,,Under construction,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,,,2022-Q3,2022-Q3,2022-Q3,2040-Q2,2022-Q3,2040-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000437,5/12/2023,Watercare Service Limited,New Watermain Connecting Woodlands Park Reservoirs to Greenhithe Bridge.,This project will see the construction of a new watermain to service approximately 200 000 people connecting the proposed Woodlands Park reservoirs to Greenhithe Bridge. It includes approximately 22 kilometres of 1200 millimetre diameter concrete lines st.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,250 - 500 million,2022-Q2,2023-Q3,2023-Q4,2025-Q2,2025-Q2,2029-Q1,2022-Q2,2029-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000441,5/12/2023,Watercare Service Limited,Pipeline Installation for Growth Servicing - Warkworth.,This project is to provide for greenfield growth in Warkworth. It consists of 2.5 kilometres of 750 millimetre diameter gravity sewer from the Warkworth Showgrounds to the new Warkworth to Snells Beach pump station.,,In procurement,Funding source confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2022-Q3,2022-Q4,2023-Q1,2023-Q4,2023-Q4,2025-Q1,2022-Q3,2025-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000442,5/12/2023,Watercare Service Limited,Pump Station 14 and Associated Infrastructure Upgrade - Tamaki.,This project is to cater for growth in Tamaki. The project includes the upgrade of the Pump Station from 100 litres per second to 180 litres per second. The project also includes upgrading gravity pipelines feeding Pump Station 14 which includes 45 metres.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2023-Q3,2025-Q3,2025-Q3,2026-Q2,2026-Q2,2027-Q2,2023-Q3,2027-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000443,5/12/2023,Watercare Service Limited,Pump Station and Rising Main Upgrade - Stanmore.,This project is to construct a new Stanmore pump station to provide pump capacity of 1.35 cubic metres per second and 8.7 kilometres of 1000 millimetre diameter PE rising main between Stanmore pump station and Army Bay Waste Water Treatment Plant. Also c.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,2023-Q3,2024-Q3,2024-Q3,2026-Q1,2026-Q1,2029-Q3,2023-Q3,2029-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000446,5/12/2023,Watercare Service Limited,Raw Water Pump Station Upgrade - Lower Nihotupu.,This project is to increase the pump station capacity from 34 million litres per day to 60 million litres per day between Lower Nihotupu Dam and Mackies Rest which feeds onto the Huia Water Treatment Plant.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2023-Q3,2023-Q4,2024-Q1,2025-Q1,2025-Q1,2026-Q3,2023-Q3,2026-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000447,5/12/2023,Watercare Service Limited,Raw Water Transmission Main Capacity Upgrade - Huia.,This project is to improve the capacity of the raw water transmission watermain to 140 million litres per day between Mackies Rest and the new Huia Water Treatment Plant.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2023-Q1,2025-Q4,2026-Q2,2027-Q4,2027-Q4,2031-Q3,2023-Q1,2031-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000448,5/12/2023,Watercare Service Limited,Replacement of East Coast Bays 2 Watermain.,This project will replace 1.2 kilometres of 390 millimetre diameter concrete lined steel transmission watermain.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2025-Q1,2025-Q3,2025-Q4,2026-Q2,2026-Q2,2027-Q2,2025-Q1,2027-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000451,5/12/2023,Watercare Service Limited,Rising Main Replacement - Kahika Pump Station.,This project is for the replacement of the Kahika Pump Station rising main.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,5 - 25 million,,,2021-Q3,2022-Q4,2023-Q1,2024-Q3,2021-Q3,2024-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000453,5/12/2023,Watercare Service Limited,Sidmouth Wastewater Pump Station Upgrade - Mairangi Bay.,This project is to upgrade the Sidmouth Wastewater Pump Station and storage tank. It includes a 625 litres per second pump station with an additional 200 cubic metres of integrated storage and a 160 metre (300 millimetre diameter) pipeline.,,Under construction,Fully funded,Selective,Design and construct,Auckland,,,Water,5 - 25 million,2020-Q3,2020-Q3,2020-Q3,2020-Q3,2021-Q1,2023-Q4,2020-Q3,2023-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000455,5/12/2023,Watercare Service Limited,Transmission Watermain Pipeline - Northcote Reservoir to Glenfield.,This project focuses on the transmission water pipeline between Northcote reservoir and Glenfield and includes approximately 1.4 kilometres of 470 millimetre diameter concrete lined steel pipeline.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2027-Q3,2029-Q3,2029-Q3,2031-Q1,2031-Q1,2034-Q4,2027-Q3,2034-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000457,5/12/2023,Watercare Service Limited,Upgrade of Existing Wastewater Network - Kāinga Ora Mt Roskill / Owairaka.,This project is to upgrade the existing local wastewater network. It includes a 1.5 kilometre (900 millimetre diameter) sewer pipeline and a 600 metre (600 millimetre diameter) sewer pipeline. A third 2.2 kilometre sewer pipeline from 300 to 475 and 525 m.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,50 - 100 million,,,2022-Q3,2022-Q3,2022-Q3,2040-Q2,2022-Q3,2040-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000458,5/12/2023,Watercare Service Limited,Upgrade of Hingaia Wastewater Pump Station - Southern Auckland.,This project will upgrade the Hingaia Wastewater Pump Station from a capacity of 100 litres per second to 270 litres per second. It will also provide an additional 450 cubic metre modular storage tank and construction of a 8.3 kilometre (630 millimetre di.,,Under construction,Funding source confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,,,2021-Q2,2023-Q2,2023-Q3,2024-Q4,2021-Q2,2024-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000461,5/12/2023,Watercare Service Limited,Upgrade of Pipework to Increase Capacity - Newton Road.,This project will increase the capacity between Khyber Reservoirs and Ponsonby. It consists of upgrading one kilometre of 810 millimetre diameter concrete lined steel pipework in Newton Road Auckland.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2024-Q3,2024-Q4,2025-Q1,2025-Q3,2025-Q3,2026-Q3,2024-Q3,2026-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000462,5/12/2023,Watercare Service Limited,Upgrade of Pump Station and Associated Network Upgrades - Orewa West.,This project is to allow for population growth in Orewa West for the next 30 years. The project includes upgrading the Orewa West Pump Station from 25 to 107 litres per second and associated network upgrades.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2028-Q2,2029-Q1,2029-Q2,2030-Q3,2030-Q3,2032-Q2,2028-Q2,2032-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000463,5/12/2023,Watercare Service Limited,Upgrade of the Waiuku Wastewater Treatment Plant and Wastewater Servicing to Clarks Beach.,This project is to enable wastewater conveyance for 5000 people from Kingseat to Clarks Beach and 15000 people from Clarks Beach to the Waiuku Wastewater Treatment Plant. It includes the upgrade of the Waiuku Wastewater Treatment Plant for 20000 people (e.,,Under construction,Funding source confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2021-Q2,2022-Q1,2022-Q1,2023-Q1,2023-Q2,2024-Q4,2021-Q2,2024-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000464,5/12/2023,Watercare Service Limited,Upgrades of Separation and Wastewater Pipes to Reduce Wet Weather Overflows - Avondale to Whau River.,This programme of work is to enable growth and reduce wet weather overflows. The programme will involve a mix of sewer separation and wastewater pipe upgrades. It will also include collector pipes and inflow and infiltration works. This project is part of.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2023-Q3,2024-Q4,2024-Q4,2026-Q2,2026-Q2,2028-Q4,2023-Q3,2028-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000465,5/12/2023,Watercare Service Limited,Upgrades of Separation and Wastewater Pipes to Reduce Wet Weather Overflows - Grey Lynn.,This programme of work is to enable growth and reduce wet weather overflows. The programme will involve a mix of sewer separation and wastewater pipe upgrades. The programme also includes collector pipes and inflow and infiltration works. This project is.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2025-Q3,2027-Q1,2027-Q1,2028-Q3,2028-Q3,2032-Q2,2025-Q3,2032-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000466,5/12/2023,Watercare Service Limited,Upgrades of Separation and Wastewater Pipes to Reduce Wet Weather Overflows - Herne Bay.,This programme of work is to enable growth and reduce wet weather overflows. This programme area consists of a new branch sewer approximately 2.2 kilometres with diameter size ranging 450-750 millimetres a new pump station and rising main. This project.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2021-Q1,2022-Q4,2023-Q2,2024-Q4,2024-Q4,2027-Q3,2021-Q1,2027-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000467,5/12/2023,Watercare Service Limited,Upgrades of Separation and Wastewater Pipes to Reduce Wet Weather Overflows - Meola.,This programme of work is to enable growth and reduce wet weather overflows. The programme will involve a mix of sewer separation and wastewater pipe upgrades. The programme also includes collector pipes and inflow and infiltration works. This project is.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2026-Q3,2027-Q1,2027-Q2,2028-Q2,2028-Q3,2030-Q1,2026-Q3,2030-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000468,5/12/2023,Watercare Service Limited,Upgrades of Separation and Wastewater Pipes to Reduce Wet Weather Overflows - Motions.,This programme of work is to enable growth and reduce wet weather overflows. The programme will involve a mix of sewer separation and wastewater pipe upgrades. The programme also includes collector pipes and inflow and infiltration works. This project is.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,2023-Q3,2026-Q2,2026-Q2,2027-Q4,2028-Q1,2031-Q3,2023-Q3,2031-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000469,5/12/2023,Watercare Service Limited,Upgrades of Separation and Wastewater Pipes to Reduce Wet Weather Overflows - Oakley Waterview.,This programme of work is to enable growth and reduce wet weather overflows. The programme will involve a mix of sewer separation and wastewater pipe upgrades. It also includes collector pipes and inflow and infiltration works. This project is part of Wat.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2025-Q4,2026-Q3,2026-Q3,2027-Q4,2027-Q4,2029-Q3,2025-Q4,2029-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000470,5/12/2023,Watercare Service Limited,Upgrades of Separation and Wastewater Pipes to Reduce Wet Weather Overflows - Point Chevalier.,This programme of work is to enable growth and reduce wet weather overflows. The programme will involve a mix of sewer separation and wastewater pipe upgrades. It will also include collector pipes and inflow and infiltration works. This project is part of.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,2023-Q4,2024-Q4,2025-Q1,2026-Q2,2026-Q3,2029-Q1,2023-Q4,2029-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000471,5/12/2023,Watercare Service Limited,Upgrades of Separation and Wastewater Pipes to Reduce Wet Weather Overflows - St Marys Bay.,This programme of work is to enable growth and reduce wet weather overflows. The programme will involve a mix of sewer separation and wastewater pipe upgrades. It also includes collector pipes and inflow and infiltration works. This project is part of Wat.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2027-Q3,2028-Q2,2028-Q3,2029-Q1,2029-Q1,2031-Q2,2027-Q3,2031-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000472,5/12/2023,Watercare Service Limited,Upgrades of Separation and Wastewater Pipes to Reduce Wet Weather Overflows - Westmere.,This programme of work is to enable growth and reduce wet weather overflows. The programme will involve a mix of sewer separation and wastewater pipe upgrades. The programme also includes collector pipes and inflow and infiltration works. This project is.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2023-Q3,2026-Q2,2026-Q2,2027-Q3,2027-Q4,2030-Q2,2023-Q3,2030-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000473,5/12/2023,Watercare Service Limited,Upgrading Wastewater Pipes for Future Wastewater Servicing - Gulf Harbour.,This project is to allow for population growth for the next 30 years. The project includes building a new 55 litre per second pump station and 0.4 kilometres of 200 millimetre rising main to resolve overflows.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2023-Q3,2024-Q4,2024-Q4,2025-Q3,2025-Q4,2026-Q3,2023-Q3,2026-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000475,5/12/2023,Watercare Service Limited,Waiwera Diversion to Hatsfield Beach.,This project is to provide a pump station that handles 20 litres per second. It also includes a 2.1 kilometre (180 millimetre diameter) rising main and a 2.5 kilometre (250 millimetre diameter) gravity sewer.,,In procurement,Funding source confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2020-Q3,2022-Q3,2022-Q4,2024-Q4,2025-Q1,2026-Q4,2020-Q3,2026-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000477,5/12/2023,Watercare Service Limited,Wastewater Capacity Upgrades - Otara Catchment.,This project will deliver a new 400 litres per second pump station which will provide 500 cubic metres of tank storage. The project also includes a new 2500 cubic metre storage tank and 2.5 kilometres of 625 millimetre diameter relining and 1.8 kilometres.,,In procurement,Fully funded,Limited,Construct only,Auckland,,,Water,50 - 100 million,,,2018-Q3,2023-Q3,2023-Q4,2026-Q1,2018-Q3,2026-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000478,5/12/2023,Watercare Service Limited,Wastewater Catchment Diversion - Forrest Hill.,This project is to upgrade the Forrest Hill network. It consists of 1.1 kilometre of 310 millimetre diameter rising main and a 60 litres per second pump station. It also includes 350 metres of 250/335 millimetre diameter rising main and 600 metres of 300/.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2022-Q4,2023-Q4,2023-Q4,2026-Q1,2026-Q1,2028-Q1,2022-Q4,2028-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000479,5/12/2023,Watercare Service Limited,Wastewater Catchment Improvement Works - Waterview.,This programme of work is to enable growth and reduce wet weather overflows. The programme will involve a mix of sewer separation and wastewater pipe upgrades. The programme also includes collector pipes and inflow and infiltration works.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2023-Q3,2025-Q4,2025-Q4,2027-Q2,2027-Q3,2030-Q1,2023-Q3,2030-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000480,5/12/2023,Watercare Service Limited,Wastewater Catchment System Upgrades for Growth and Mitigation of Sewer Overflows- Howick.,This project is to deliver new pump stations and associated network upgrades in Aviemore and Millhouse Parks to provide for growth and mitigate sewer overflows. Two 200 litre per second pump stations will be constructed along with 3.1 kilometres of 450 mi.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2023-Q4,2025-Q4,2025-Q4,2027-Q2,2027-Q3,2029-Q4,2023-Q4,2029-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000481,5/12/2023,Watercare Service Limited,Wastewater Diversion - Unsworth Heights.,This project will divert wastewater from the gravity main in Rosedale Park that drains from Unsworth Heights directly to the Rosedale Wastewater Treatment Plant inlet works. The project consists of 585 metres of 225 millimetre diameter rising main.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2023-Q3,2024-Q2,2024-Q2,2025-Q2,2025-Q3,2027-Q1,2023-Q3,2027-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000483,5/12/2023,Watercare Service Limited,Wastewater Network Upgrades - Northcote to Chatswood.,This project is to provide a new 60 litres per second pump station to service Northcote to Chatswood. The project also includes a 900 metre (315 millimetre diameter) rising main and a 700 metre (450 millimetre diameter) gravity pipeline.,,In procurement,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2020-Q2,2021-Q3,2022-Q3,2024-Q3,2024-Q3,2026-Q3,2020-Q2,2026-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000484,5/12/2023,Watercare Service Limited,Wastewater Odour Treatment Plant Expansion - Rosedale.,This project will increase odour treatment capacity. It includes catering for the connection of the Northern Interceptor to service a peak population of 160 000.,,In procurement,Funding source confirmed,Direct,Construct only,Auckland,,,Water,5 - 25 million,2022-Q4,2023-Q1,2023-Q1,,,2026-Q1,2022-Q4,2026-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000485,5/12/2023,Watercare Service Limited,Wastewater Treatment Plant Biogas and Co-generation Expansion - Rosedale.,This project is to construct upgrades to the biogas and co-generation facilities at Rosedale Wastewater Treatment Plant. This project will increase generated power from 65 per cent to 90 per cent.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2023-Q4,2024-Q4,2024-Q4,2026-Q1,2026-Q2,2028-Q1,2023-Q4,2028-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000489,5/12/2023,Watercare Service Limited,Wastewater Treatment Plant Reactor/Clarifiers and Ultra Violet Expansion - Rosedale.,This project includes upgrades to the reactor/clarifiers and ultra violet treatment at Rosedale.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2026-Q2,2027-Q1,2027-Q4,2029-Q1,2029-Q2,2033-Q2,2026-Q2,2033-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000490,5/12/2023,Watercare Service Limited,Wastewater Treatment Plant Screens Replacement - Army Bay.,This project is the replacement of ageing under-performing step screens with current technology.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q4,2023-Q1,2023-Q2,2024-Q1,2024-Q1,2025-Q1,2022-Q4,2025-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000492,5/12/2023,Watercare Service Limited,Wastewater Treatment Plant Upgrade - Army Bay.,This project is to increase capacity of the wastewater treatment plant to meet a population growth from approximately 50 000 to 180 000 over the next 35 years.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,2023-Q3,2024-Q4,2025-Q1,2026-Q2,2026-Q3,2030-Q1,2023-Q3,2030-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000494,5/12/2023,Watercare Service Limited,Wastewater Treatment Plant Upgrade - Snells Beach.,This project is to upgrade Snells Wastewater Treatment Plant to service growth in Warkworth to Snells Beach and Algies Bay.,,Under construction,Fully funded,Selective,Construct only,Auckland,,,Water,100 - 250 million,,,,,2022-Q1,2025-Q3,2022-Q1,2025-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000495,5/12/2023,Watercare Service Limited,Wastewater Treatment Plant Upgrade - Wellsford.,This project is to upgrade the treatment plant to accommodate a population of approximately 4 200 people over 30 years.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2022-Q3,2023-Q4,2023-Q4,2023-Q4,2023-Q1,2025-Q2,2022-Q3,2025-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000496,5/12/2023,Watercare Service Limited,Water Servicing - Kāinga Ora Oranga.,This project will enable water trunk network upgrades to cater for population growth in Oranga.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2025-Q1,2025-Q2,2025-Q3,2026-Q2,2026-Q2,2029-Q2,2025-Q1,2029-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000497,5/12/2023,Watercare Service Limited,Water Servicing Improvements - Kāinga Ora Mt Roskill to Owairaka.,This project is to improve water servicing from the Kāinga Ora development in Mt Roskill to Owairaka to support growth in the area.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2023-Q4,2025-Q4,2025-Q4,2027-Q2,2027-Q3,2030-Q1,2023-Q4,2030-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000501,5/12/2023,Watercare Service Limited,Water Treatment Plant Capacity Upgrade - Wellsford.,This project is to upgrade the capacity of the existing Wellsford Water Treatment Plant to accommodate a population of approximately 4200 people over 30 years.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2023-Q3,2024-Q3,2024-Q3,2025-Q3,2025-Q3,2027-Q3,2023-Q3,2027-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000502,5/12/2023,Watercare Service Limited,Water Treatment Plant Interim Upgrade - Waitakere.,This project will replace various parts of the Waitakere Water Treatment Plant which are in poor condition and require replacement ahead of a major plant upgrade.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2023-Q3,2024-Q3,2024-Q3,2025-Q4,2025-Q4,2027-Q3,2023-Q3,2027-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000503,5/12/2023,Watercare Service Limited,Water Treatment Plant Process Improvements - Onehunga.,This project is for the installation of an additional process unit or units (granulated activated carbon and or advanced oxidation) to address the removal of organic pollutants.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2023-Q3,2024-Q4,2024-Q4,2025-Q4,2025-Q4,2026-Q4,2023-Q3,2026-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000504,5/12/2023,Watercare Service Limited,Water Treatment Plant Upgrade for Increased Capacity - Waiuku.,This project is to upgrade the Waiuku Water Treatment Plant to increase capacity to 2.5 million litres per day and associated connectivity to the existing network.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2022-Q4,2023-Q4,2024-Q1,2025-Q2,2025-Q3,2028-Q1,2022-Q4,2028-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000505,5/12/2023,Watercare Service Limited,Watermain Boost Pumping - West Auckland.,This project will increase water conveyance from southern sources via Huia Watermain 2 to North Harbour 1 Watermain Water pump station. The project consists of a new transmission boost pump station with a maximum capacity of 90 megalitres a day providing.,,Under construction,Funding source confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2021-Q3,2022-Q2,2022-Q3,2023-Q3,2023-Q3,2025-Q1,2021-Q3,2025-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000506,5/12/2023,Watercare Service Limited,Watermains Boost Pumping for Increased Capacity - Westhaven.,This project is to boost pumping of the North Shore 1 and 2 watermains increasing capacity from 40 million litres per day to 90 million litres per day.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q4,2023-Q4,2023-Q4,2024-Q3,2024-Q4,2026-Q2,2022-Q4,2026-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000702,5/12/2023,Watercare Service Limited,Wastewater Treatment Plant Membrane Bio-Reactor Upgrade - Waiuku.,This project is to upgrade of the Waiuku Wastewater Treatment Plant for 20 000 people (expandable to 30 000).,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2021-Q2,2025-Q1,,,,,2021-Q2,2025-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005914,5/12/2023,Watercare Service Limited,Kāinga Ora - Wesley Stage 2 Watermain & Bulk Supply Point.,This project will provide 4.2 kilometres of new water main with sections ranging between 200 millimetre and 500 millimetre in diameter for the Mount Roskill area. This project is part of the Kāinga Ora Shovel ready programme.,,Under construction,Funding source confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2020-Q3,2021-Q1,2021-Q1,2023-Q1,2023-Q1,2025-Q1,2020-Q3,2025-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005915,5/12/2023,Watercare Service Limited,Dunkirk Pump Station Upgrade & Eastern Interceptor Connection.,This project provides for growth in the southern catchment of Tamaki by constructing a 225 litres per second pump station with a 650m3 offline storage tank and 120 metre of 450 millimetre diameter gravity diversion to the pump station from Riverside Driv.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,25 - 50 million,2020-Q3,2020-Q4,2020-Q4,2022-Q2,2022-Q2,2024-Q4,2020-Q3,2024-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005916,5/12/2023,Watercare Service Limited,Archboyd Avenue Pump Station and Associated Pipelines.,This project will provide 1.8 kilometres of gravity wastewater pipe between 225 millimetre and 1600 millimetre diameter and a pump station with 550m3 of storage. This project is part of Mangere Kāinga Ora Shovel ready programme.,,In procurement,Funding source confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,,,2023-Q3,2023-Q4,2023-Q4,2025-Q4,2023-Q3,2025-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005917,5/12/2023,Watercare Service Limited,Kāinga Ora - Waikowhai Pump Station & Water Main.,This project will provide 6.6 kilometres of water main between 300 millimetre and 450 millimetre diameter a new bulk supply point 450 millimetre diameter and booster pump station. This project is part of the Kāinga Ora Shovel ready programme.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,50 - 100 million,2020-Q3,2021-Q1,2021-Q2,2022-Q3,2022-Q3,2024-Q4,2020-Q3,2024-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005919,5/12/2023,Watercare Service Limited,Puketutu Island Rehabilitation Project Phase 5.,This project is Phase 5 of the Puketutu Island Rehabilitation which covers the Phase 5 construction including design and monitoring. The purpose of this project is to rehabilitate quarried maunga of the island using biosolids and provide landscaped landfo.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,25 - 50 million,2020-Q3,2020-Q3,2020-Q3,2021-Q3,2020-Q3,2024-Q2,2020-Q3,2024-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005921,5/12/2023,Watercare Service Limited,Clarks Beach New Waste Water Treatment Plant.,This project will deliver a new wastewater treatment plant for 20 000 people (expandable to 30 000 people).,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,2021-Q2,2023-Q1,2023-Q2,2024-Q4,2025-Q1,2026-Q4,2021-Q2,2026-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005923,5/12/2023,Watercare Service Limited,Rosedale Sludge Conditioning.,This project is for the installation of sludge processing equipment which will include; dewatering storage boilers and thermal treatment.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,2023-Q3,2024-Q3,2024-Q3,2026-Q1,2026-Q1,2029-Q4,2023-Q3,2029-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005924,5/12/2023,Watercare Service Limited,Mangere Wastewater Treatment Plant Aeration Reconfiguration (Pilot Upgrades).,This project is for the process upgrades to existing equipment for optimum performance at Mangere Wastewater Treatment Plant. This project includes modification of zones changes in aeration pumping and controls.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2023-Q3,2024-Q4,2024-Q4,2026-Q2,2026-Q2,2029-Q1,2023-Q3,2029-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005925,5/12/2023,Watercare Service Limited,Wastewater Treatment Plant Upgrades stage 1 - Beachlands.,This project will upgrade the existing treatment plant to comply with renewed tightening consent conditions and increase capacity to accommodate a population of 10 000 people.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,2023-Q3,2025-Q3,2025-Q3,2026-Q3,2026-Q3,2029-Q3,2023-Q3,2029-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005926,5/12/2023,Watercare Service Limited,Huia Water Treatment Plant Upgrade (Planning).,Replacement of the existing Huia Water Treatment Plant with a new 140 megalitre a day plant. This plant will serve two new reservoirs one located on the other side of Woodlands Park Road and one on the site of the existing water treatment plant when it.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,500 million - 1 billion,2022-Q4,2025-Q3,2025-Q3,2027-Q1,2027-Q1,2032-Q3,2022-Q4,2032-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005927,5/12/2023,Watercare Service Limited,Mangere Wastewater Treatment Plant Biofilter Media Replacement.,This project is to replace the odour bed biofilter media at the Mangere Wastewater Treatment Plant.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,,,,,2024-Q3,2026-Q2,2024-Q3,2026-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005928,5/12/2023,Watercare Service Limited,Mangere Wastewater Treatment Plant Inlet Works Upgrade.,This project is to improve and upgrade the solids inlet screen and conveyance at Mangere Wastewater Treatment Plant.,,In procurement,Funding source confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2021-Q2,2022-Q4,2022-Q4,2023-Q4,2023-Q4,2025-Q2,2021-Q2,2025-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005929,5/12/2023,Watercare Service Limited,Waikato Water Treatment Plant A Raw Water Intake.,This project is to construct the raw water intake structure for the new Waikato A Water Treatment Plant. The project includes a raw water pipe pumps station and associated works.,,In procurement,Funding source confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,2022-Q3,2022-Q4,2022-Q4,2023-Q3,2023-Q4,2025-Q2,2022-Q3,2025-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005930,5/12/2023,Watercare Service Limited,Mangere Wastewater Treatment Plant Replace Biogas H2S Scrubber.,This project is to replace hydrogen sulphide biogas scrubber at the Mangere Wastewater Treatment Plant.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2024-Q3,2025-Q2,2025-Q3,2025-Q4,2026-Q1,2027-Q2,2024-Q3,2027-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005931,5/12/2023,Watercare Service Limited,Orewa Number 3.,This project provides for growth in the Hibiscus Coast area. It consists of a 16 kilometre watermain ranging from 700 to 900 millimetre diameter from Albany to Milldale via Dairy Flat highway.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,2023-Q3,2026-Q3,2026-Q3,2028-Q1,2028-Q1,2031-Q4,2023-Q3,2031-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005932,5/12/2023,Watercare Service Limited,Puketutu Biosolids Facility Cell Wall.,This project is part of the Puketutu Island Rehabilitation and requires cells to be constructed to enable biosolids placement these are created by construction of cell walls using excavated rock material that has been stockpiled on site.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,50 - 100 million,,,,,2022-Q3,2035-Q2,2022-Q3,2035-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005933,5/12/2023,Watercare Service Limited,Control System Replacement.,This is a programme for the replacement of end-of-life automation and control systems hardware and software the equipment that controls treatment plants pump stations and all other production assets.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,50 - 100 million,,,,,2022-Q3,2050-Q4,2022-Q3,2050-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005934,5/12/2023,Watercare Service Limited,Rosedale Medium Pressure Biogas Piping.,This project is to replace blowers and underground piping to engine for the medium pressure biogas. Includes replacement of carbon steel piping and installation of new blowers and flare.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q1,2023-Q3,2023-Q4,2024-Q2,2024-Q2,2025-Q3,2022-Q1,2025-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005935,5/12/2023,Watercare Service Limited,Mangere Wastewater Treatment Plant Switchboard Replacements.,This project is to upgrade old switchboards and power distribution centres at Mangere Wastewater Treatment Plant. The existing switchboards are over 40 years old and overdue for an upgrade.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2022-Q4,2024-Q1,2024-Q1,2025-Q2,2025-Q2,2026-Q2,2022-Q4,2026-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005938,5/12/2023,Watercare Service Limited,Northern Networks Control Upgrade.,This project is to upgrade five sites that have been identified in the Northern region that have been redesignated as transmission sites and require control system upgrades.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2023-Q1,2023-Q4,2024-Q1,2025-Q2,2025-Q2,2026-Q2,2023-Q1,2026-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005939,5/12/2023,Watercare Service Limited,Ardmore B2 Treated Water Tank Roof Upgrade.,This project is to replace the 6 000 square metre treated water tank roof.,,In procurement,Funding source confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2022-Q2,2022-Q4,2022-Q4,2024-Q2,2024-Q2,2026-Q1,2022-Q2,2026-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005942,5/12/2023,Watercare Service Limited,Targeted Asset Renewal Programme (TARP) at Mangere Wastewater Treatment Plant.,This project will refurbish digesters 7 & 1 primary sedimentation tanks 7 & 8 and gravity thickeners for the Mangere Wastewater Treatment Plant.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,5 - 25 million,2020-Q3,2021-Q2,2021-Q3,2022-Q2,2022-Q3,2024-Q2,2020-Q3,2024-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005943,5/12/2023,Watercare Service Limited,East Coast Bays Link Sewer Upgrade.,This project is to construct 2.2 kilometres of 800 millimetre diameter pressure main and 380 metres of 1200 millimetre diameter gravity sewer to the Rosedale Wastewater Treatment Plant from Mairangi Bay.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,25 - 50 million,,,2021-Q3,2022-Q2,2022-Q3,2025-Q1,2021-Q3,2025-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005945,5/12/2023,Watercare Service Limited,Queen Street Diversion Stage 2.,This project is to divert 600 metres of 600 to 900 millimetre diameter gravity sewer along Queen Street from Mayoral Drive South to Victoria Street including connection into the Orakei Main Sewer.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2022-Q3,2023-Q1,2023-Q4,2025-Q1,2025-Q2,2027-Q4,2022-Q3,2027-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005948,5/12/2023,Watercare Service Limited,Paerata Wastewater Servicing.,This project is to cater for growth in the Paerata area. It consists of a new 300-400 litres per second pump station and 5 kilometres of 600 millimetre diameter rising main.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2023-Q2,2024-Q3,2024-Q3,2025-Q4,2026-Q1,2029-Q3,2023-Q2,2029-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005949,5/12/2023,Watercare Service Limited,Devenport 1 and 2 Watermains Replacement.,This project will cater from growth and also the renewal of the Devonport 1 and 2 watermains from Takapuna to Devonport. The project consists of 12 kilometres (2 x 6km) of 450 millimetre diameter watermains.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2022-Q1,2023-Q2,2023-Q4,2025-Q2,2025-Q2,2028-Q1,2022-Q1,2028-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005951,5/12/2023,Watercare Service Limited,Warkworth Western Zone - Local trunk watermain.,This projects is to construct 2.8 kilometres of 400 millimetre diameter local trunk water main .,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2027-Q3,2027-Q4,2028-Q2,2029-Q1,2029-Q2,2030-Q4,2027-Q3,2030-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005953,5/12/2023,Watercare Service Limited,Unitec Servicing Water Servicing.,This project is to upgrade of a bulk supply point on Sutherland Road.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q4,2023-Q3,2023-Q3,2024-Q3,2024-Q3,2025-Q3,2022-Q4,2025-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005954,5/12/2023,Watercare Service Limited,Warkworth Water Hudson Road to Matakana Link Road.,This project consists of 500 metres of 315 millimetre diameter watermain from Hudson Road to Matakana Link Road.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2022-Q4,2023-Q4,2023-Q4,2025-Q2,2025-Q3,2026-Q4,2022-Q4,2026-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005955,5/12/2023,Watercare Service Limited,Fairview Pump Station.,Renewal of the Fairview Water Pump Station.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2022-Q4,2023-Q4,2023-Q4,2025-Q3,2025-Q3,2027-Q3,2022-Q4,2027-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005958,5/12/2023,Watercare Service Limited,Grey Lynn Wastewater Tunnel.,This project will divert wastewater and stormwater from the Grey Lynn catchment into the Central Interceptor wastewater pipeline/tunnel. The project consists of a 1.6 kilometre tunnel 4500 millimetres diameter.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,50 - 100 million,,,,,2019-Q1,2026-Q2,2019-Q1,2026-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005960,5/12/2023,Watercare Service Limited,New Totara Pump Station.,This project is to provide a new pump stations at Totara. Investigation is required to identify the final size and capacity.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2023-Q3,2023-Q4,2024-Q1,2024-Q4,2024-Q3,2028-Q4,2023-Q3,2028-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005961,5/12/2023,Watercare Service Limited,Linwood Avenue Pipe Upgrades.,This project will install 540 metres of 375 millimetre diameter PVC wastewater pipe and 4 wastewater manholes.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2025-Q3,2025-Q4,2026-Q2,2027-Q2,2027-Q3,2029-Q1,2025-Q3,2029-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005964,5/12/2023,Watercare Service Limited,Mairangi Bay Gravity Wastewater Sewer Upgrade.,This project so to reduce overflows. It consist of 700 metres of 300 millimetre pipeline.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2023-Q3,2024-Q2,2024-Q2,2025-Q2,2025-Q2,2026-Q2,2023-Q3,2026-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005965,5/12/2023,Watercare Service Limited,Atkinson Road Pump Station.,This project is to construct a new 40 - 60 litres per second pump station. Plus 600 - 700 metres of local network connection watermains connecting to the pump station off both Huia 2 and Huia 1 watermains.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2023-Q3,2025-Q1,2025-Q1,2026-Q1,2026-Q1,2027-Q2,2023-Q3,2027-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005966,5/12/2023,Watercare Service Limited,Boost Pump Howick Watermain.,This project is to boost pump Howick water main.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q3,2023-Q2,2023-Q3,2023-Q4,2023-Q4,2025-Q2,2022-Q3,2025-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005967,5/12/2023,Watercare Service Limited,Boost pump Papakura 3 Watermain.,This project is to boost pump Papakura 3 water main.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2023-Q1,2023-Q2,2023-Q4,2024-Q3,2024-Q3,2025-Q4,2023-Q1,2025-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005968,5/12/2023,Watercare Service Limited,Penlink Wastewater Pipeline.,This project is for the design of a 1.8 kilometres of 800 millimetre diameter wastewater rising main across the Penlink Bridge (future provision).,,In planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2023-Q3,2023-Q4,2024-Q1,2024-Q4,2025-Q3,2029-Q2,2023-Q3,2029-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005969,5/12/2023,Watercare Service Limited,Penlink Water Pipeline.,This project is for the design of a 1.8 kilometres of 600 millimetre diameter water main across the Penlink Bridge (future provision).,,Under construction,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2021-Q3,2021-Q4,2021-Q1,2023-Q2,2025-Q3,2029-Q2,2021-Q1,2029-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP005970,5/12/2023,Watercare Service Limited,Targeted Asset Renewal Programme.,This programme of work combines four wastewater asset renewal activities into a targeted renewal programme of work. The programme consists of pump stations biofilter media replacement transmission pipelines and rising mains.,,In procurement,Fully funded,Limited,Design and construct,Auckland,,,Water,25 - 50 million,,,,,,,2020-Q3,2025-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP008924,5/12/2023,Watercare Service Limited,Whenuapai & Redhills Wastewater Scheme - Package 1.,This project is part of the Whenuapai & Redhills Programme to addresses the growth in demand for wastewater collection and treatment which increases as north-west Auckland expands. The programme consists of 2.8 kilometres of 2100 millimetre diameter gravi.,,In procurement,Fully funded,Limited,Construct only,Auckland,,,Water,25 - 50 million,2018-Q2,2018-Q4,2021-Q3,2024-Q1,2024-Q2,2026-Q1,2018-Q2,2026-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_CN0000041,5/12/2023,Watercare Service Limited,Waikato Water Treatment Plant Membrane Train Replacement Programme.,This programme is to replacing spent membranes that are at the end of life as part of the Waikato Water Treatment Plant renewals is required to meet regulatory drinking water quality (protozoa) standards.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,,,,,2024-Q3,2025-Q2,2024-Q3,2025-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_CN0000042,5/12/2023,Watercare Service Limited,Waikato Water Treatment Plant Biological Activated Carbon Replacement Programme.,This programme is to replacing spent Biological Activated Carbon media and reducing residual organics from the membrane permeate as part of the Waikato Water Treatment Plant renewals. It is required to ensure high quality odourless and tasteless drinkin.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,,,,,2033-Q3,2034-Q2,2033-Q3,2034-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_SS0001118,5/12/2023,Watercare Service Limited,Network Performance Monitoring Wastewater.,This is a six year Network Performance Monitoring and Modelling (NP2M) programme. It involves developing a digital twin of the wastewater network to monitor and model current interim and future demands.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,5 - 25 million,2021-Q3,2021-Q4,2021-Q4,2021-Q4,2021-Q4,2028-Q2,2021-Q3,2028-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_SS0001119,5/12/2023,Watercare Service Limited,Network Performance Monitoring Water.,This is a six year Network Performance Monitoring and Modelling (NP2M) programme. It involves developing a digital twin of the water network to monitor and model current interim and future demands.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,5 - 25 million,2021-Q3,2021-Q4,2021-Q4,2022-Q2,2022-Q3,2028-Q2,2021-Q3,2028-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_SS0001212,5/12/2023,Watercare Service Limited,Flood Recovery Works.,Urgent works for flood recovery initial site investigations and scoping underway.,,Early planning,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,,,,2024-Q3,2025-Q2,2024-Q3,2025-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_SS0001222,5/12/2023,Watercare Service Limited,FY24 Flood Recovery Insurance Work.,Works for flood recovery in FY24.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,,,,,2024-Q3,2025-Q2,2024-Q3,2025-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001022,5/12/2023,Watercare Service Limited,Fire Alarm System Upgrade Ardmore Water Treatment Plant.,The project is to upgrade the fire alarm system at Ardmore WTP to reduce firerisk to the plant property and people. The project also includes adding firesuppression to high criticality areas.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,1 - 5 million,2020-Q3,2021-Q2,2021-Q3,2021-Q4,2023-Q4,2024-Q4,2020-Q3,2024-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001035,5/12/2023,Watercare Service Limited,Northcote - Pump Station.,This project is to upgrade the existing Northcote Pump Station to add capacity to meet predicted population growth and dry year demands. This project will increase pump capacity and renew the pumps which are nearing end of life.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2023-Q3,2024-Q2,2024-Q2,2025-Q1,2025-Q1,2026-Q2,2023-Q3,2026-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001039,5/12/2023,Watercare Service Limited,Glenfield Road Watermain Upgrade.,This project will upgrade/renew the asbestos cement pipe plus increase the capacity of the pipe to meet growth demands. It consists to 4.7 kilometres of 700 millimetre diameter water main.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2027-Q3,2029-Q1,2029-Q3,2031-Q1,2031-Q1,2034-Q4,2027-Q3,2034-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001070,5/12/2023,Watercare Service Limited,Firefighting Water Supply Ardmore Water Treatment Plant.,Existing fire fighting water tanks have very limited capacity. Project to upgrade the firefighting capacity at Ardmore WTP.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2027-Q3,2028-Q2,2028-Q3,2029-Q1,2029-Q1,2030-Q2,2027-Q3,2030-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001097,5/12/2023,Watercare Service Limited,Huia 2 Watermain Replacement.,This project upgrade air valves air valve chambers and key line valves to ensure the critical asset can perform hydraulically.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2026-Q3,2027-Q4,2028-Q2,2029-Q4,2029-Q4,2032-Q2,2026-Q3,2032-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001099,5/12/2023,Watercare Service Limited,New Lynn Pump Station Upgrade.,The project is to upgrade the capacity of the New Lynn water pump station byinstallation of an additional pump (a 4th pump); upgrade of the power supplytransformer building modifications replacement of switchboard and pumpcontrols and the relocation.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,1 - 5 million,2020-Q3,2021-Q2,2021-Q3,2021-Q4,2022-Q2,2023-Q4,2020-Q3,2023-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001101,5/12/2023,Watercare Service Limited,North West Reservoir Storage.,This project is to provide resilience to planned network interruptions by providing additional storage in the North-western area while allowing adding buffering of flows through the transmission water mains NH1 and future 2.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2026-Q1,2027-Q3,2028-Q1,2029-Q3,2029-Q3,2032-Q3,2026-Q1,2032-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001103,5/12/2023,Watercare Service Limited,Domain Reservoir Rehabilitation.,This project is required to renew the highly critical 18 mega litre reservoir to build network resilience and bring the reservoir to the new standards of the building code (initial design and construction was prior to the implementation of the code).,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2024-Q3,2025-Q4,2026-Q2,2027-Q4,2027-Q4,2030-Q2,2024-Q3,2030-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001104,5/12/2023,Watercare Service Limited,Pukekohe Water Servicing.,This project covers the study costs associated with the development of the Pukekohe Servicing Strategy and includes an allocation for an upgrade to the local water network in the region to provide for project growth levels and ensure compliant levels of.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2023-Q1,2023-Q3,2023-Q4,2024-Q4,2024-Q4,2026-Q3,2023-Q1,2026-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001111,5/12/2023,Watercare Service Limited,Boost Pumping Mangere.,This project provides resilience to the Mangere system and allows for maintenance in other parts of the network.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2022-Q4,2024-Q2,2024-Q3,2025-Q2,2025-Q3,2026-Q2,2022-Q4,2026-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001117,5/12/2023,Watercare Service Limited,Onehunga Water Treatment Plant Building Structure Improvements.,This project is required to provide seismic strengthening to the Western end of the heritage pump station building at the Onehunga WTP. Watercare seeks to upgrade the building so it can resist 100% of the seismic loading assesses in terms of the current L.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2025-Q1,2025-Q3,2025-Q4,2026-Q2,2026-Q2,2027-Q2,2025-Q1,2027-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001123,5/12/2023,Watercare Service Limited,WWS Upper Nihotupu Raw Watermain Replacement.,This project is to renew the Nihotopu Raw Watermain as it approaches end of useful life by 2037 and to ensure it can continue to supply the Huia Water Treatment Plant.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,2024-Q3,2025-Q4,2026-Q2,2027-Q4,2027-Q4,2031-Q3,2024-Q3,2031-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001142,5/12/2023,Watercare Service Limited,Headworks Electrical Upgrades.,This project is too replace the switchboards Cossey and Mangatangi dams.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q3,2023-Q3,2023-Q3,2024-Q3,2024-Q3,2025-Q3,2022-Q3,2025-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001147,5/12/2023,Watercare Service Limited,Onehunga Filters Replacement.,This project consists of replacing the aging Kahika Pump Station rising main decommissioning of an upstream section of the Kahika Branch Sewer including the four siphons and diversion of local sewers.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q4,2024-Q2,2024-Q3,2025-Q2,2025-Q3,2026-Q2,2022-Q4,2026-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001162,5/12/2023,Watercare Service Limited,Waikato 175MLD Expansion Stage Ultimate.,Upgrade to the chemical systems for hypochlorite and lime (storage and dosing) including electrical.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,5 - 25 million,2020-Q3,2021-Q2,2021-Q3,2022-Q1,2022-Q1,2023-Q4,2020-Q3,2023-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001248,5/12/2023,Watercare Service Limited,Waitakere - Drought Response Project.,Improve WTP capacity to 24MLD.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,1 - 5 million,2020-Q3,2020-Q3,2020-Q3,2020-Q3,2023-Q3,2024-Q1,2020-Q3,2024-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001323,5/12/2023,Watercare Service Limited,Waikato Water Treatment Plant Waste Management Upgrade.,To achieve compliance of the off-spec discharge stream to the Waikato river.,,In procurement,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2021-Q1,2022-Q3,2023-Q2,2024-Q4,2024-Q1,2024-Q4,2021-Q1,2024-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001328,5/12/2023,Watercare Service Limited,Silverdale West Water Servicing Phase 3.,This project forms part of the larger Orewa 3 watermain project and provides early works for a short section 0.6 kilometres of 600 millimetre diameter watermain connecting to the recently installed Orewa 1 replacement watermain before connecting to the so.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2022-Q2,2023-Q3,2023-Q3,2024-Q3,2024-Q3,2025-Q3,2022-Q2,2025-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001335,5/12/2023,Watercare Service Limited,Western Springs/Pt Chevalier Watermain.,The Western Springs and Point Chevalier area has historically experienced intermittent flow and pressure fluctuations. This project provides capacity enhancements to directly address these issues and to account for expected growth in the area as a result.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2024-Q3,2024-Q4,2025-Q2,2026-Q1,2026-Q2,2027-Q4,2024-Q3,2027-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001337,5/12/2023,Watercare Service Limited,Patumahoe Pump Station.,To fulfil future growth demands in the Southwest the Patumahoe pump station has been identified to be in need of additional emergency storage. This project will renew the pump station and upsize the attached reservoir from 0.3 mega litres to 1.0 mega li.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2024-Q3,2024-Q4,2025-Q1,2025-Q4,2026-Q1,2027-Q2,2024-Q3,2027-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001340,5/12/2023,Watercare Service Limited,Snells Algies Water Treatment Plant Filters Replacement.,This project is to replace two gravity sand filters and add a clarifier PACL plant mixing tank and related pipework to effectively mitigate any turbidity event in the aquifer during installation of the Snells Wastewater Transfer Pipeline.,,In procurement,Fully funded,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q1,2023-Q1,2023-Q1,2023-Q3,2023-Q4,2023-Q4,2022-Q1,2023-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001343,5/12/2023,Watercare Service Limited,Wesley/Paerata Watermain.,This project will provide the additional water conveyance needed to service growth in the Paeratae (Wesley College) area over the next 20 years.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2023-Q3,2024-Q3,2024-Q3,2026-Q1,2026-Q2,2028-Q3,2023-Q3,2028-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001350,5/12/2023,Watercare Service Limited,Solar PV at Ardmore WTP.,Design and build of a 698kW solar PV system at Ardmore WTP to offset on-site electricity consumption.,,In procurement,Funding source to be confirmed,Limited,Design and construct,Auckland,,,Water,1 - 5 million,2023-Q2,2023-Q2,2023-Q3,2024-Q4,2024-Q1,2024-Q4,2023-Q2,2024-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001376,5/12/2023,Watercare Service Limited,Scott Road Reservoir.,This project is to cater for growth and maintain resilience. This consist of building a new 7.5 mega litre a day reservoir.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2022-Q4,2023-Q3,2023-Q3,2025-Q3,2025-Q3,2027-Q3,2022-Q4,2027-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001385,5/12/2023,Watercare Service Limited,Warkworth Western Zone - Boost Pump Station.,This project involves procuring land design development construction of a boost pump station and water pipeline to service Warkworth Western Pumped Zone.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2027-Q3,2027-Q4,2028-Q2,2029-Q1,2029-Q2,2030-Q4,2027-Q3,2030-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001390,5/12/2023,Watercare Service Limited,Waikato Water Treatment Plant Membrane Train 1.,This project is to replace spent membranes that are at the end of life as part of the Waikato WTP Renewals.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,,,,2030-Q3,2031-Q2,2030-Q3,2031-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001392,5/12/2023,Watercare Service Limited,Waikato Water Treatment Plant Membrane Building Roof.,This project is to reduce the risk of equipment failure and contamination. It consists of replacing the cladding roof which is subject to chlorine degradation.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2025-Q3,2025-Q4,2025-Q4,2026-Q2,2026-Q2,2027-Q3,2025-Q3,2027-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001398,5/12/2023,Watercare Service Limited,Warkworth Northern Reservoir Boost Pump Station & Trunk Mains.,This project will cater for growth and involves the construction of a northern reservoir local network boost pump station and water supply trunk mains.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2022-Q4,2023-Q3,2023-Q4,2024-Q1,2024-Q2,2026-Q2,2022-Q4,2026-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001399,5/12/2023,Watercare Service Limited,Warkworth Western Zone - Reservoir.,This project involves procuring land design development and construction of the 5 megalitre Warkworth Western Reservoir feed main to the reservoir local network boost pump station.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2027-Q3,2027-Q4,2028-Q2,2029-Q2,2029-Q3,2031-Q2,2027-Q3,2031-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001400,5/12/2023,Watercare Service Limited,Warkworth Southern Zone - Reservoir.,This project involves procuring land design development and construction of a 2.5 megalitre southern reservoir and local network boost pump station.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2027-Q2,2028-Q1,2028-Q2,2029-Q3,2029-Q3,2031-Q2,2027-Q2,2031-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001401,5/12/2023,Watercare Service Limited,Hunua Raw Water System Renewals.,This is a renewals programme to allow operational like for like replacement of assets (such as pumps valves and pressure management assets) on the Hunua raw water systems to sustain levels of service.,,Under construction,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,,,,,2023-Q3,2034-Q2,2023-Q3,2034-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001411,5/12/2023,Watercare Service Limited,Ardmore WTP Filter Media Top-Up.,Sand filters are critical removal of solids and providing a protozol barrier to meet the drinking water quality standards. The entire media (p-gravel sand under drain system needs to be replaced including valve replacement.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q3,2024-Q2,,,2024-Q3,2025-Q4,2022-Q3,2025-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001412,5/12/2023,Watercare Service Limited,Huia Water Treatment Plant Flow Meter Replacement.,This project is to replace the flow metre at Huia Water treatment Plant.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2023-Q3,2024-Q2,2024-Q2,2025-Q3,2025-Q4,2026-Q3,2023-Q3,2026-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001414,5/12/2023,Watercare Service Limited,Middlemore Hospital Supply Zone Upgrade.,This project provides resilience to Middlemore Hospital. It consists of replacing/relining the line to extend useful life improve construction integrity and double the transmission capacity potential to the hospital and neighbouring community.,,Under construction,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q4,2023-Q1,2023-Q1,2023-Q3,2023-Q3,2024-Q3,2022-Q4,2024-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001417,5/12/2023,Watercare Service Limited,Pleasant Road Pump Station - Replacement.,This project is to replace the Pleasant Road pump station has reached end of its rated useful life (30 years). This investment is needed to renew the asset to maintain levels of service to the 15 000 residents in the area.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2027-Q3,2027-Q4,2028-Q2,2029-Q2,2029-Q3,2031-Q2,2027-Q3,2031-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001420,5/12/2023,Watercare Service Limited,Filters 6-10 Media & Nozzles - Filter Refurbish.,This project is to replace the media & nozzles which are a critical part of the filtration system and must run efficiently to ensure compliance with Drinking Water Standards.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2023-Q1,2023-Q3,2023-Q4,2024-Q2,2024-Q3,2026-Q2,2023-Q1,2026-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001422,5/12/2023,Watercare Service Limited,Snells/Algies Water Treatment Plant Switchboard and Control Cabinet Replacement.,Snells/Algies Water Treatment Plant Switchboard and Control Cabinet Replacement.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2023-Q3,2024-Q2,2024-Q2,2025-Q1,2025-Q1,2026-Q1,2023-Q3,2026-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001439,5/12/2023,Watercare Service Limited,Waitakere Water Treatment Plant Full Upgrade.,The new plant will have a maximum capacity of 24 mega litres per day to treat water from the Waitakere Dam. The operating range of the current Water Treatment Plant is approximately 5-20 mega litres per day.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2027-Q2,2028-Q4,2029-Q2,2030-Q4,2030-Q4,2034-Q2,2027-Q2,2034-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001440,5/12/2023,Watercare Service Limited,Waitakere Dam Raw Watermain Renewal.,This project will renew the Waitakere Raw Watermain as it approaches end of useful life (around 2030) to ensure it can continue to supply the Waikato WTP (25 mega litres per day).,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2029-Q3,2030-Q4,2031-Q2,2032-Q4,2032-Q4,2035-Q2,2029-Q3,2035-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001443,5/12/2023,Watercare Service Limited,Replace Lower Nihotupu abstraction pipeline.,decommissioning of an upstream section of the Kahika Branch Sewer (DSKHK).,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2024-Q1,2024-Q2,2024-Q3,2025-Q1,2025-Q1,2026-Q1,2024-Q1,2026-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001454,5/12/2023,Watercare Service Limited,Ardmore Water Treatment Plant Alum Storage Tanks.,This project is to replace and relocate the alum tanks.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2024-Q3,2025-Q2,2025-Q3,2026-Q1,2026-Q1,2027-Q3,2024-Q3,2027-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001455,5/12/2023,Watercare Service Limited,Ardmore Water Treatment Plant Lime Silos And Batching.,This project is to replace the existing lime silos balancing tanks dosing pumps and line delivery system.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2023-Q2,2024-Q2,2024-Q3,2025-Q2,2025-Q2,2026-Q3,2023-Q2,2026-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001478,5/12/2023,Watercare Service Limited,Bombay Water Treatment Plant - land purchase and plant upgrade.,This project will replace/upgrade the existing Bombay Water Treatment Plant.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2024-Q4,2025-Q3,2025-Q4,2026-Q2,2026-Q2,2027-Q3,2024-Q4,2027-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001480,5/12/2023,Watercare Service Limited,PAC plant software - water quality dependent.,This project will integrate the existing Powder Activated Carbon system into the Distributed Control System to ensure greater control monitoring and resilience to system failure to ensure the ability to dose Powder Activated Carbon is maintained.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2024-Q3,2024-Q4,2025-Q1,2025-Q3,2025-Q3,2026-Q3,2024-Q3,2026-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001482,5/12/2023,Watercare Service Limited,Construct Water Reservoirs At Te Hana.,A reservoir is required to provide network resilience to the existing Te Hana community and accommodate growth in the area. There is no reservoir supply in Te Hana and limited resilience in the event of a watermain break or shutdown from Wellsford.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2023-Q3,2025-Q2,2025-Q2,2026-Q1,2026-Q1,2027-Q2,2023-Q3,2027-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001486,5/12/2023,Watercare Service Limited,Helensville Water Treatment Plant Capacity Upgrade.,This project will increase the capacity of Helensville WTP from 1 440 m3/day to cater for growth. The council predicts a population of 8000 (equating to a demand of 2700 m3/day) by 2050.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2024-Q3,2025-Q4,2026-Q2,2027-Q4,2027-Q4,2030-Q2,2024-Q3,2030-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001487,5/12/2023,Watercare Service Limited,Warkworth Water Treatment Plant Capacity Upgrade - Stage 1.,This project will increase the capacity of the Warkworth Water Treatment Plant by an additional 1 225 m3/day.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2026-Q2,2027-Q1,2027-Q2,2028-Q3,2028-Q3,2030-Q2,2026-Q2,2030-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001492,5/12/2023,Watercare Service Limited,Kitchener Road Pump Station Pukekohe.,This project will replace the existing pump stations.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2024-Q3,2024-Q4,2025-Q1,2025-Q4,2026-Q1,2027-Q2,2024-Q3,2027-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001495,5/12/2023,Watercare Service Limited,Mt Hobson Reservoir.,The Mount Hobson Pump Station requires upgrades in order to meet demand requirements and to provide renewal to ageing components.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2024-Q3,2025-Q4,2026-Q2,2027-Q2,2027-Q3,2029-Q2,2024-Q3,2029-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001498,5/12/2023,Watercare Service Limited,Forrest Hill (Pump Station 216) Water Pump Station.,This project will replace the existing pump stations.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2024-Q4,2025-Q2,2025-Q3,2026-Q2,2026-Q2,2027-Q2,2024-Q4,2027-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001503,5/12/2023,Watercare Service Limited,West Coast Road Cross Connection - NH2 to NH1.,This project provides resilience and the ability to balance flows. It consists of a new cross connection between the North Harbour 1 and North Harbour 2 watermains and West Coast Road.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2023-Q3,2024-Q2,2024-Q4,2026-Q1,2026-Q2,2029-Q4,2023-Q3,2029-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001505,5/12/2023,Watercare Service Limited,Reservoir Trig Road.,This project is to cater for growth. Is consists of the construction of a new 10 mega litre a day water reservoir located at the junction of Trig Road and Hobsonville Road.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2025-Q1,2025-Q4,2026-Q1,2027-Q2,2027-Q2,2029-Q1,2025-Q1,2029-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001509,5/12/2023,Watercare Service Limited,Waiuku Reservoir Upgrades.,This project will cater for growth and resilience in the Waiuku area. It consist of a new 1.5 mega litre reservoir.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2024-Q3,2024-Q4,2025-Q2,2026-Q2,2026-Q3,2028-Q2,2024-Q3,2028-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001516,5/12/2023,Watercare Service Limited,Redoubt 5 Water Reservoir.,This project improves resilience in the Redoudt an Ardmore area. It consist of a new 50 000 m3 reservoir.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2024-Q3,2025-Q1,2025-Q4,2027-Q1,2027-Q2,2029-Q4,2024-Q3,2029-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001524,5/12/2023,Watercare Service Limited,Ponsonby Reservoir Upgrade - Replace 1 and 2.,This project involves increasing the storage volume of the Ponsonby Reservoir by 13.5 mega litres to service anticipated growth/demand in the Auckland area and renewal of the current reservoir.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2027-Q3,2028-Q4,2029-Q2,2030-Q4,2030-Q4,2033-Q2,2027-Q3,2033-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001598,5/12/2023,Watercare Service Limited,Waikato A Stage 1 - to 225 MLD.,This project will enable growth across the region and will provide some resilience against outages of the existing Waikato WTP. Stage 1 involves the construction of a new 75 mega litre per day Water Treatment Plant.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,2027-Q1,2028-Q3,2029-Q1,2030-Q3,2030-Q3,2034-Q1,2027-Q1,2034-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001599,5/12/2023,Watercare Service Limited,Waikato A Stage 2 - plus 75 MLD.,This project will enable growth across the region and will provide some resilience against outages of the existing Waikato WTP. Stage 2 will take the new 75 mega litres per day Water Treatment Plant delivered in Stage 1 to 150 mega litres per da capacity.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,2030-Q2,2031-Q4,2032-Q2,2033-Q4,2033-Q4,2037-Q2,2030-Q2,2037-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001603,5/12/2023,Watercare Service Limited,Western Headworks Landslips Repairs.,Adverse weather conditions in 2021 had caused 20 landslips within the Western Headworks Area this investment is the remedial works to stabilize 7 of the slips.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,1 - 5 million,2021-Q3,2021-Q4,2021-Q4,2023-Q2,2023-Q2,2024-Q2,2021-Q3,2024-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001604,5/12/2023,Watercare Service Limited,Waikato No. 2 Watermain Early Works.,This investment is needed to conduct key consenting feasibility and design to support the detailed scoping and development of the Waikato 2 watermain project.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2024-Q1,2026-Q3,2026-Q3,2027-Q1,2027-Q1,2028-Q3,2024-Q1,2028-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001613,5/12/2023,Watercare Service Limited,Turbidity Instrument Replacements Huia Water Treatment Plant.,This project is to replace the filter outlet turbidity instruments.,,Under construction,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q3,2023-Q1,2023-Q1,2023-Q1,2023-Q1,2023-Q4,2022-Q3,2024-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001614,5/12/2023,Watercare Service Limited,Pukekohe East Bulk Supply Point.,This project is to construct a new bulk supply point on the Pukekohe 1 watermain to enable new developments north of Pukekohe East Road in the Kitchener water supply zone.,,In procurement,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q1,2023-Q1,2023-Q1,2024-Q1,2024-Q1,2024-Q3,2022-Q1,2024-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001633,5/12/2023,Watercare Service Limited,Northcote Southern Bulk Supl Point Upgrade & Watermain.,This project is to cater for growth within the Northcote Water Supply zone. It consists of upgrading the current bulk supply point and local watermains.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2024-Q4,2025-Q2,2025-Q4,2026-Q3,2026-Q4,2028-Q2,2024-Q4,2028-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001635,5/12/2023,Watercare Service Limited,TRC and KO Water Network Upgrades.,Network upgrades for development works in support of the Kāinga Ora programme for growth precincts Mt Roskill Tamaki and Mangere servicing future growth of 200 000 people.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2024-Q3,2025-Q1,2025-Q1,2025-Q2,2025-Q3,2040-Q2,2024-Q3,2040-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001644,5/12/2023,Watercare Service Limited,WA Seismic and Safety Upgrades.,Renew water network facilities assets mainly transmission assets at various locations around the Watercare Auckland region which are either in poor condition do not meet compliance or where health and safety improvements are required.,,Under construction,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q3,2022-Q4,2022-Q4,2023-Q2,2023-Q1,2023-Q4,2022-Q3,2024-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001656,5/12/2023,Watercare Service Limited,Howick Main Upgrade (Loop Main).,This is a combined project with Auckland Transport. This consists of 0.7 kilometres of 915 millimetre diameter watermain.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,5 - 25 million,2022-Q3,2022-Q3,2022-Q3,2022-Q4,2023-Q1,2025-Q3,2022-Q3,2025-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001670,5/12/2023,Watercare Service Limited,Muriwai Replacement Water Treatment Plant.,Replacement water treatment plant project.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2023-Q3,2024-Q2,,,,,2023-Q3,2024-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001674,5/12/2023,Watercare Service Limited,Pipe Bridges Renewals - Flood Response.,Priority works to repair pipe bridges affected by flood damage.,,Under construction,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,2023-Q1,2023-Q3,2023-Q1,2023-Q4,2023-Q1,2024-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001675,5/12/2023,Watercare Service Limited,Western Headworks Slip Remediation - Flood Resp.,Design for the remediation of the 2023 flood event slips in the western headworks.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,2023-Q2,2024-Q1,2023-Q3,2024-Q3,2023-Q2,2024-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WA0001676,5/12/2023,Watercare Service Limited,Quinns Bridge & Upper Nihotupu Raw Watermain.,Delivery of Quinns Bridge Stage 1 (Quinns bridge damaged pier replacements) & Stage 2 (Temporary pipe supports to the adjacent Upper Nihotupu RWM).,,Under construction,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,,2023-Q1,2023-Q2,2023-Q2,2023-Q4,2023-Q1,2023-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001028,5/12/2023,Watercare Service Limited,Mangere Wastewater Treatment Plant Emergency Shut Off Valves.,This project is to enable full isolation of the low and medium pressure biogas collection system.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2022-Q4,2023-Q3,2023-Q3,2024-Q3,2024-Q3,2026-Q3,2022-Q4,2026-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001060,5/12/2023,Watercare Service Limited,Omaha/Point Wells Wastewater Treatment Plant Upgrade.,This project is to cater for growth in Omaha Point Wells and Matakana from 4900 PE to 640 PE. This project increases the capacity of the Omaha/Point Wells Wastewater Treatment Plant by replacing the existing and adding additional tertiary filters.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2025-Q1,2025-Q3,2025-Q4,2026-Q2,2026-Q2,2027-Q3,2025-Q1,2027-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001067,5/12/2023,Watercare Service Limited,Rosedale Wastewater Treatment Plant Control Upgrade Phase 2 - Design.,This project is required for improved resilience of the control system at Rosedale. It will provide a standardised approach to software and process control a platform for growth and plant optimisation and alignment with the principles of data driven de.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,5 - 25 million,,,2022-Q3,2023-Q2,2023-Q3,2024-Q4,2022-Q3,2024-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001151,5/12/2023,Watercare Service Limited,Owhanake Wastewater Treatment Plant Upgrade (Stage 2).,This project caters for growth in the Owhanake area. It consists of doubling the process capacity of the Owhanake Wastewater Treatment Plant.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2025-Q2,2025-Q2,2025-Q3,2026-Q1,2026-Q1,2027-Q1,2025-Q2,2027-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001159,5/12/2023,Watercare Service Limited,Unitec Wastewater Pipe Bridge Upgrade.,This project consists of a new 480 litres per second wastewater pump station with 3.4 kilometres of 800 millimetre rising main and 0.5 kilometres of 375 millimetres of gravity pipeline.,,Under construction,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2021-Q3,2022-Q2,2022-Q3,2022-Q4,2025-Q3,2027-Q2,2021-Q3,2027-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001161,5/12/2023,Watercare Service Limited,Kāinga Ora Mangere Wastewater Treatment Plant Improvements Programme.,Upgrading of assets to enable Kāinga Ora planned growth & developments in 8 neighbourhoods and to maintain level of service and support growth in the wider catchment.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2023-Q3,2024-Q3,2024-Q3,2026-Q1,2026-Q1,2028-Q3,2023-Q3,2028-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001168,5/12/2023,Watercare Service Limited,Wendover Road & Bryant Place Upgrade Tamaki.,This project will improve the current level of service through a gravity sewer duplication reducing existing uncontrolled overflows within the catchment and as such enabling future growth. The existing population served is 5 500 which is expected to in.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2024-Q3,2025-Q3,2025-Q3,2027-Q3,2027-Q4,2029-Q3,2024-Q3,2029-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001176,5/12/2023,Watercare Service Limited,Weiti Pump station upgrade.,This project will cater for growth and improve the current level of service as the population increases from 1400 PE to 14 000PE. It consists of replacing the existing Weiti Pump Station (DPWEI) to provide increased pump capacity up to 145 litres per seco.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2026-Q4,2028-Q1,2028-Q3,2029-Q4,2029-Q4,2032-Q2,2026-Q4,2032-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001201,5/12/2023,Watercare Service Limited,Pukekohe Wastewater Treatment Plant Pond 1 Overflow.,This project will ensure compliance with the Pukekohe discharge consent and enable pond 1 to continue to operate safety. It consists of the installation of a new overflow structure in pond 1 which discharges into pond 3 to increase the overflow capacity.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2024-Q3,2025-Q2,2025-Q3,2026-Q1,2026-Q1,2027-Q2,2024-Q3,2027-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001204,5/12/2023,Watercare Service Limited,Helensville Wastewater Servicing Strategy.,This project is to cater for growth in Helensville and Parakai area. Growth is predicted increase from 4 000PE to be 8000 PE by 2050. The existing Wastewater Treatment Plant will be affected by approximately 0.25 m of sea level rise and will thus need t.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,2026-Q4,2028-Q2,2028-Q4,2030-Q2,2030-Q2,2034-Q1,2026-Q4,2034-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001211,5/12/2023,Watercare Service Limited,Kāinga Ora Oranga Wastewater Servicing.,This project will maintain the required level of service and support a large scale Kāinga Ora development for the Oranga neighbourhood.,,Under construction,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2022-Q3,2022-Q4,2023-Q1,2023-Q3,2023-Q3,2023-Q4,2022-Q3,2023-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001212,5/12/2023,Watercare Service Limited,Wairau Valley Diversion.,The Wairau branch sewer is currently capacity constrained and will need to be upgraded to continue servicing existing communities and accommodate for future demand. Providing conveyance through a storage tunnel directly to the Rosedale Wastewater Treatme.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,2023-Q3,2025-Q4,2025-Q4,2027-Q1,2027-Q2,2030-Q4,2023-Q3,2030-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001214,5/12/2023,Watercare Service Limited,Kahika Pump Station Upgrades.,This project is to raise the level of service within the Kahika catchment. This consists of increase the peak pump rate of Kahika Pump Station from 320 litres per second to 500 litres per second.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2023-Q3,2024-Q3,2024-Q3,2025-Q4,2025-Q4,2027-Q3,2023-Q3,2027-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001215,5/12/2023,Watercare Service Limited,Beach Haven Diversion.,This project will increase capacity in the local sewer from Gatman Street to Birkdale West branch sewer MH01.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2024-Q3,2025-Q1,2025-Q4,2027-Q1,2027-Q2,2029-Q4,2024-Q3,2029-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001272,5/12/2023,Watercare Service Limited,Pump Station 20 Backup Power Supply.,This project is to provide resilience at pump station 20 by installing a battery back-up. The alternative was additional storage or on-site diesel generation.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2023-Q3,2024-Q4,2024-Q4,2026-Q1,2026-Q1,2027-Q1,2023-Q3,2027-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001302,5/12/2023,Watercare Service Limited,Pukekohe Power Supply Resilience.,The Pukekohe Wastewater Treatment Plant currently experiences a number of power outages annually driven by bird-strikes on the overhead lines. While the main site has back-up power generation (diesel) these outages impact the transfer pump stations lead.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2023-Q3,2024-Q4,2024-Q4,2026-Q1,2026-Q1,2027-Q1,2023-Q3,2027-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001303,5/12/2023,Watercare Service Limited,Mangere and Rosedale Water Treatment Plant Blower Control Panel Replace.,This project is to replace the control panels for the RC blowers at Mangere and Rosedale Wastewater Treatment Plant's.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q3,2023-Q1,2023-Q2,2024-Q1,2024-Q2,2025-Q2,2022-Q3,2025-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001305,5/12/2023,Watercare Service Limited,Western Isthmus CI Interfaces - Shaft Reconfiguration.,This project involves modifying control chambers and shafts on the Central Interceptor project. The Western Isthmus area is expected to undergo significant growth and while additional flows can be accommodated within the CI tunnel there is a need to mod.,,Under construction,Fully funded,Limited,Construct only,Auckland,,,Water,5 - 25 million,,,,,2022-Q1,2025-Q2,2022-Q1,2025-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001328,5/12/2023,Watercare Service Limited,Whenuapai & Redhills Wastewater Scheme - Package 2.,This project is part of the Whenuapai & Redhills Programme to addresses the growth in demand for wastewater collection and treatment which increases as north-west Auckland expands. The programme consists of 2.8 kilometres of 2100 millimetre diameter gravi.,,In procurement,Funding source confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2018-Q4,2020-Q3,2021-Q3,2024-Q1,2024-Q1,2026-Q3,2018-Q4,2026-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001329,5/12/2023,Watercare Service Limited,Whenuapai & Redhills Wastewater Scheme - Package 3.,This project is part of the Whenuapai & Redhills Programme to addresses the growth in demand for wastewater collection and treatment which increases as north-west Auckland expands. The programme consists of 2.8 kilometres of 2100 millimetre diameter gravi.,,In procurement,Funding source confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2018-Q2,2018-Q3,2022-Q4,2024-Q1,2023-Q4,2025-Q1,2018-Q2,2025-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001353,5/12/2023,Watercare Service Limited,Rehua Place Stage 2 and Aorere Park Wastewater Pipeline.,This project is caters for growth and the Kainga Ore redevelopment in Aorere Park and Rehua Mangere. It consists of 1.35 kilometres of sewer replacement 28 sewer repairs and rehabilitation of 39 manholes.,,Under construction,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2022-Q1,2023-Q1,2023-Q1,2023-Q3,2023-Q3,2024-Q3,2022-Q1,2024-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001389,5/12/2023,Watercare Service Limited,Takapu Street Wastewater Upgrade.,This project is to increase capacity and increase the current level of service. It consists of upsizing 0.16 kilometres of 225 millimetre diameter wastewater pipe to 300 millimetre diameter pipe and replace 34 metres of 150 millimetre wastewater pipe.,,In procurement,Funding source confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q2,2023-Q1,2023-Q2,2024-Q2,2024-Q2,2024-Q4,2022-Q2,2024-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001392,5/12/2023,Watercare Service Limited,Clevedon Wastewater - Pit Procurement.,This project will provide vacuum connection pits for the servicing of wastewater connections.,,Under construction,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2021-Q3,2022-Q2,2022-Q3,2023-Q3,2023-Q3,2027-Q2,2021-Q3,2027-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001433,5/12/2023,Watercare Service Limited,KHR Servicing - Huapai Pump Station Rising Main to Brigham Creek Pump Station.,This investment forms part of the North West Growth corridor servicing strategy specifically by providing for growth in the Kumeu and Huapai region.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2025-Q3,2026-Q2,2026-Q3,2027-Q2,2027-Q3,2030-Q2,2025-Q3,2030-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001438,5/12/2023,Watercare Service Limited,Rosedale Wastewater Treatment Plant PST Enhancement (fat collection).,Currently the Rosedale Wastewater Treatment Plant periodically experiences fat carryover into the utility water driving increased need for cleaning of utility water filters. This project will reduce the filter cleaning interval from weekly to monthly.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2025-Q1,2025-Q2,2025-Q3,2026-Q1,2026-Q1,2027-Q2,2025-Q1,2027-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001440,5/12/2023,Watercare Service Limited,Rosedale Wastewater Treatment Plant Anammox Side Stream.,This investment is part of the programme of works to enable Rosedale Wastewater Treatment Plant to service 500k PE following NI integration. Implementing the anammox side stream solution reduces ammonia and the treatment load on the plant.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2025-Q2,2026-Q1,2026-Q2,2027-Q3,2027-Q3,2029-Q2,2025-Q2,2029-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001441,5/12/2023,Watercare Service Limited,Rosedale Wastewater Treatment Plant New Admin/Control building.,The current admin and control building sit on land required to support the planned growth of the Rosedale Wastewater Treatment Plant - relocation is required by FY26 to avoid impact on planned expansions.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2023-Q3,2024-Q2,2024-Q2,2025-Q2,2025-Q2,2026-Q3,2023-Q3,2026-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001442,5/12/2023,Watercare Service Limited,Rosedale SVI Improvements.,Rosedale Wastewater Treatment Plant clarifier capacity approaches peak demand flow in FY28 following regional growth and Northern Interceptor implementation. This investment doubles the capacity of the clarifier system necessary for FY28 demand levels an.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2024-Q3,2025-Q2,2025-Q3,2026-Q1,2026-Q1,2027-Q3,2024-Q3,2027-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001445,5/12/2023,Watercare Service Limited,Whenuapai Wastewater Servicing.,This investment forms part of the North West Growth corridor servicing strategy specifically by providing for growth in the Whenuapai region.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2025-Q3,2026-Q1,2026-Q4,2028-Q1,2028-Q2,2030-Q4,2025-Q3,2030-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001450,5/12/2023,Watercare Service Limited,Local Wastewater Network Renewals.,A large portion of our existing wastewater networks are approaching end of life and to mitigate the risk of customer impacts overflows and other environmental and health impacts we will assess and proactively renew key assets.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,,,,,2024-Q3,2050-Q4,2024-Q3,2050-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001454,5/12/2023,Watercare Service Limited,Mangere Wastewater Treatment Plant Potable water pipework replacement.,To replace ageing potable water pipework to various process areas at Mangere Wastewater Treatment plant. As the asset ages the number of potable water leak increases and add stress to the network that has stretched over the multiple upgrades to the site.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2025-Q2,2025-Q2,2025-Q3,2025-Q3,2025-Q3,2026-Q2,2025-Q2,2026-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001460,5/12/2023,Watercare Service Limited,Otara Local Network Upgrade.,The purpose of this network upgrade is to provide improved level of service and to cater for growth in the Otara and Papatoetoe catchment.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2023-Q3,2025-Q2,2025-Q2,2026-Q1,2026-Q1,2027-Q1,2023-Q3,2027-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001465,5/12/2023,Watercare Service Limited,Biogas Drier replacement and standby unit.,including the four siphons and diversion of local sewers away from the.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2024-Q3,2025-Q2,2025-Q3,2025-Q4,2026-Q1,2027-Q2,2024-Q3,2027-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001467,5/12/2023,Watercare Service Limited,Siphon Replacement Programme.,decommissioned section of the branch sewer.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2023-Q3,2025-Q2,2024-Q2,2025-Q2,2025-Q3,2026-Q2,2023-Q3,2026-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001473,5/12/2023,Watercare Service Limited,Rosedale Wastewater Treatment Plant Primary Tank Renewals.,This investment reflects an allowance to renew each of the 7 Rosedale Wastewater Treatment Plant primary tanks on an 8 yearly basis to avoid risk of mechanical failure and ultimately impacting discharge compliance.,,Under construction,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,,,,2023-Q3,2050-Q2,2023-Q3,2050-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001474,5/12/2023,Watercare Service Limited,Mangere Wastewater Treatment Plant distributed blowers.,The distributed blowers will provide resilience to the air distributed system and better control and automation to save energy. It will ease the operation and maintenance of the plant and will resolve the single point of failure risk.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2026-Q1,2026-Q4,2027-Q1,2028-Q2,2028-Q2,2031-Q1,2026-Q1,2031-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001483,5/12/2023,Watercare Service Limited,Rosedale Wastewater Treatment Plant Inlet Works (Screens/Conveyors).,Rosedale Wastewater Treatment Plant intake capacity approaches peak demand flow in FY28 following regional growth to 300kPE. This project doubles the capacity of the intake system to 500k PE.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2023-Q3,2025-Q1,2025-Q1,2026-Q3,2026-Q4,2029-Q2,2023-Q3,2029-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001484,5/12/2023,Watercare Service Limited,New Maintenance Services Building (Rosedale).,The current maintenance blocks sit on land required to support the planned growth of the Rosedale Wastewater Treatment Plant - relocation is required by FY26 to avoid impact on planned expansions.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2022-Q4,2023-Q1,2023-Q2,2023-Q4,2023-Q4,2025-Q1,2022-Q4,2025-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001485,5/12/2023,Watercare Service Limited,Rosedale Wastewater Treatment Plant CAS Tank Renewal.,This project is to increase resilience during peak flows and cater for growth. This consists of renewing the convectional activated sludge tank.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2023-Q4,2025-Q2,2025-Q2,2025-Q4,2025-Q4,2027-Q1,2023-Q4,2027-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001486,5/12/2023,Watercare Service Limited,Mangere Small Biofilter Media Replacement.,This investment is a renewals allocation for small biofilter media across the Mangere Wastewater Treatment Plant. Maintaining these is critical for odour control to ensure the site conforms with air discharge consent.,,Under construction,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,,,,,2022-Q3,2050-Q2,2022-Q3,2050-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001492,5/12/2023,Watercare Service Limited,Rosedale Wastewater Treatment Plant Electrical Resilience MLE/PST.,This project provides additional resilience at Rosedale Wastewater Treatment Plant. It consists of relocating a significant amount of the MLE and PST electrical infrastructure to new switch rooms.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2023-Q3,2024-Q2,2024-Q2,2025-Q3,2025-Q4,2026-Q4,2023-Q3,2026-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001494,5/12/2023,Watercare Service Limited,Rosedale Wastewater Treatment Plant Biofilter Media replacement.,Replacing biofilter media that are at the end of life is required to manage odour in discharged effluent and is needed to meet requirements of air discharge. The biofilter media has a 10 year life and this investment reflects an allocation design to capt.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,,,2029-Q3,2030-Q2,2029-Q3,2030-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001500,5/12/2023,Watercare Service Limited,Rosedale Wastewater Treatment Plant Centrifuge 3 Upgrade.,This project will increases the capacity of the centrifuge 3 from 8m3/hr to 17m3/hr increasing total plant processing from 50m3/hr to 59m3/hr. This is to provide for growth out until implementation of thermal hydrolysis ~2028.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2023-Q3,2024-Q4,2024-Q4,2025-Q3,2025-Q3,2027-Q4,2023-Q3,2027-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001505,5/12/2023,Watercare Service Limited,Waiwera - Aerators And Waveband Upgrade.,The purpose of this investment is to add an aerator to the existing oxidation pond to reduce erosion.,,Under construction,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,,,2023-Q3,2044-Q2,2023-Q3,2044-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001521,5/12/2023,Watercare Service Limited,Branch 1 capacity Upgrade Hobson Catchment.,This project will cater for growth and improve current levels of service in the Hobson catchment. The project scope includes upgrading 5.5 kilometres of varying sized pipes in the Branch 1.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2025-Q3,2026-Q4,2027-Q2,2028-Q3,2028-Q4,2031-Q2,2025-Q3,2031-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001530,5/12/2023,Watercare Service Limited,Kumeu - Huapai Wastewater Servicing.,This investment forms part of the North West Growth corridor servicing strategy specifically by providing for growth in the Kumeu and Huapai region.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2025-Q3,2026-Q4,2027-Q2,2028-Q4,2028-Q4,2031-Q2,2025-Q3,2031-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001534,5/12/2023,Watercare Service Limited,Otara Rising Main ( Pump Station 31).,This project is to enable growth and also the renewal of existing assets. It consists of replacing 1.7 kilometres of 700 millimetre rising main.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2029-Q3,2030-Q4,2031-Q2,2032-Q3,2032-Q4,2035-Q2,2029-Q3,2035-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001547,5/12/2023,Watercare Service Limited,Glen Eden Local Network Upgrade.,This project is required to relieve capacity constraints and cater to the high growth in the Glen Eden network. Future demand will increase the flow from 200 litres per second to 280 litres per second.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2025-Q3,2026-Q4,2027-Q2,2028-Q3,2028-Q4,2031-Q2,2025-Q3,2031-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001549,5/12/2023,Watercare Service Limited,Tamaki Regeneration Point England Pump Station & Rising Main Upgrade.,This project is to replacement of existing 450 millimetre rising main with a 600 millimetre main and increase of pump station capacity from 330 litres per second to 500 litres per second to meet expected future demand as growth occurs and maintain servi.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2026-Q2,2027-Q1,2027-Q2,2028-Q3,2028-Q3,2030-Q2,2026-Q2,2030-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001553,5/12/2023,Watercare Service Limited,Hingaia Pump Station upgrade and Rising Main to Manurewa.,This project will cater for growth. It consists of the construction of a future Hingaia Pump Station with a peak flow 1230 litres per second capacity and a new 1000 millimetre rising main connecting to Manurewa South Pump Station.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,250 - 500 million,2025-Q3,2026-Q2,2023-Q3,2025-Q2,2025-Q3,2030-Q2,2023-Q3,2030-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001554,5/12/2023,Watercare Service Limited,Southwestern Int Duplication Manurewa To Mangere.,This project is required to provide capacity downstream from the Hingaia pump station (1230 litres per second capacity) after it is upgraded and the ultimate capacity is achieved. This project is a part of the Ultimate S. Auckland WW Servicing scheme.Re.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2025-Q3,2027-Q1,2027-Q3,2029-Q1,2029-Q1,2032-Q4,2025-Q3,2032-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001555,5/12/2023,Watercare Service Limited,Opaheke Wastewater Servicing.,Projected population growth in Opaheke North (north of Waihoehoe Road) will require wastewater servicing. This project includes new wastewater infrastructure including transmission gravity sewers and a pump station.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2024-Q3,2026-Q1,2026-Q3,2028-Q1,2028-Q1,2031-Q4,2024-Q3,2031-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001557,5/12/2023,Watercare Service Limited,Rosedale Wastewater Treatment Plant PLC/Control Renewal.,Allowance for procurement of replacement control hardware as needed.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,,,2024-Q3,2025-Q2,2024-Q3,2025-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001558,5/12/2023,Watercare Service Limited,Rosedale Wastewater Treatment Plant Fire Main Installation.,The investment extends the coverage of the current Rosedale Wastewater Treatment Plant fire main and hydrant system to ensure we continue to meet insurer and fire service requirements.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2024-Q3,2025-Q1,2025-Q2,2025-Q4,2025-Q4,2026-Q4,2024-Q3,2026-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001562,5/12/2023,Watercare Service Limited,Mangere Wastewater Treatment Plant Air Compressor Replacement.,Replacement of 1 of the 3 air compressors that services Mangere Wastewater Treatment Plant and has reached end of life.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,,,2024-Q3,2025-Q2,2024-Q3,2025-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001565,5/12/2023,Watercare Service Limited,Mangere Wastewater Treatment Plant SVI Improvement Upgrade.,The RC SVI improvement upgrade will improve the clarifier performance allowing to increase its solids loading rate. The RC infrastructure will therefore be utilised to its maximum output providing additional capacity to accommodate for growth.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2024-Q3,2025-Q2,2025-Q3,2026-Q1,2026-Q1,2027-Q3,2024-Q3,2027-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001569,5/12/2023,Watercare Service Limited,Pukekohe Wastewater Treatment Plant Renewals.,This project will ensure continued reliable wastewater treatment services in a safe and efficient way and that are compliant with the NDC (discharge consent).,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,,,,,2033-Q3,2034-Q2,2033-Q3,2034-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001573,5/12/2023,Watercare Service Limited,Pukekohe Upgrade Stage 3.,The current Pukekohe Wastewater Treatment Plant (inclusive of Stage 1 and 2 upgrades in progress) is due to reach capacity in 2030. This investment is needed to expand processing capacity to 90 000 PE (from 60 000 PE) providing for growth out to 2045.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,2025-Q2,2026-Q4,2027-Q2,2028-Q4,2028-Q4,2032-Q3,2025-Q2,2032-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001576,5/12/2023,Watercare Service Limited,Helensville Wastewater Treatment Plant Consent renewal.,The consent for the Helensville Wastewater Treatment Plant is due to expire in FY26. This investment seeks to renew the current consent while making provision for future regional growth as the population of Helensville is forecast to grow from 4200 PE (c.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,1 - 5 million,2024-Q4,2025-Q2,2025-Q3,2026-Q2,2026-Q2,2027-Q2,2024-Q4,2027-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001584,5/12/2023,Watercare Service Limited,Mangere Wastewater Treatment Plant enhanced Primary conversion.,This investment seeks to increase the primary tank processing capacity to support demand on the Mangere Wastewater Treatment Plant following CI implementation (due to complete April 2026).,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2026-Q3,2027-Q3,2028-Q1,2029-Q3,2029-Q4,2032-Q2,2026-Q3,2032-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001586,5/12/2023,Watercare Service Limited,Rosedale Wastewater Treatment Plant Digester 5 Phase B.,As the Northern Interceptor comes online with Te Atatu flows in 2034 demand on the Rosedale Wastewater Treatment Plant is expected to increase to 450k PE. This investment is needed to handle the sludge production from the expansion of the Rosedale Wastew.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2025-Q3,2026-Q4,2027-Q2,2028-Q4,2028-Q4,2031-Q2,2025-Q3,2031-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001599,5/12/2023,Watercare Service Limited,Drury South Pump Station Upgrade.,The current pump station is temporary and operates at 135 litres per second half of the required capacity for the future Drury South developments. The project is to upgrade the Drury South (Flanagan Road) pump station to 270 litres per second to service.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2025-Q4,2027-Q1,2027-Q3,2028-Q4,2028-Q4,2031-Q2,2025-Q4,2031-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001600,5/12/2023,Watercare Service Limited,Bremner Road Pump Station Upgrade.,The scope is upgrading the Bremner Road Pump Station from 188 litres per second to 800 litres per second to service a predicted population of 68 010 PE based upon 22 670 HUE.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2024-Q4,2026-Q1,2026-Q3,2027-Q4,2027-Q4,2030-Q2,2024-Q4,2030-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001662,5/12/2023,Watercare Service Limited,Western Isthmus Grey Lynn Catchment.,The improvements are needed to comply with service standards (target of <2 overflows p.a. and 80% reduction in stormwater overflow volume based on existing levels.,,In procurement,Fully funded,Limited,Construct only,Auckland,,,Water,5 - 25 million,2022-Q2,2023-Q1,2023-Q2,2024-Q3,2024-Q3,2026-Q2,2022-Q2,2026-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001663,5/12/2023,Watercare Service Limited,Drury West Transmission Sewer Design.,The Drury West area is expected to have substantial future growth providing approximately 14 000 new houses. The 2 part Drury West Transmission Sewer project will provide new wastewater transmission lines to support this growth. Part 1 is currently in the.,,In procurement,Funding source confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2021-Q3,2022-Q3,2022-Q1,2023-Q4,2023-Q4,2024-Q4,2021-Q3,2024-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001667,5/12/2023,Watercare Service Limited,Rosedale Reception Process Odour.,This project is to enable maintenance access to the existing reception chamber and minimise impacts from flow surges and process emissions.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2022-Q4,2023-Q1,2023-Q1,2024-Q3,2024-Q3,2026-Q1,2022-Q4,2026-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001668,5/12/2023,Watercare Service Limited,Wairau Valley Pump Station Drives.,The project will install new variable speed drives and improve access for maintenance to the pumps at the Wairau Valley pump station.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q2,2022-Q4,2023-Q1,2023-Q4,2023-Q4,2024-Q4,2022-Q2,2024-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001673,5/12/2023,Watercare Service Limited,Rosedale Digester Renewal.,This project is for the refurbishment of Digesters 1 2 and 4 at Rosedale Wastewater Treatment Plant.,,In procurement,Funding source confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,,,2023-Q2,2024-Q3,2024-Q1,2026-Q4,2023-Q2,2026-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001678,5/12/2023,Watercare Service Limited,Western Isthmus Avondale Whau CC7A CC7A1 to Miranda Shaft.,The improvements are needed to comply with service standards (target of <2 overflows p.a. and 80% reduction in stormwater overflow volume based on existing levels) in addition to 2028 mandates issued by Auckland Council and mayor for HW+WC. 2028 mandates.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2024-Q1,2024-Q4,2024-Q4,2025-Q3,2025-Q4,2026-Q3,2024-Q1,2026-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001680,5/12/2023,Watercare Service Limited,Western Isthmus Avondale Lynfield Branch To Haycock Shaft.,The improvements are needed to comply with service standards (target of <2 overflows p.a. and 80% reduction in stormwater overflow volume based on existing levels.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2024-Q1,2024-Q4,2024-Q4,2026-Q2,2026-Q2,2029-Q1,2024-Q1,2029-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001681,5/12/2023,Watercare Service Limited,Western Isthmus Grey Lynn Park Stage 1 & Branch 6 Collector.,The improvements are needed to comply with service standards (target of <2 overflows p.a. and 80% reduction in stormwater overflow volume based on existing levels.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,50 - 100 million,2023-Q4,2026-Q1,2026-Q1,2027-Q3,2027-Q4,2030-Q2,2023-Q4,2030-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001682,5/12/2023,Watercare Service Limited,Western IsthmusGrey Lynn Edgars Creek Wastewater Upgrades.,The improvements are needed to comply with service standards (target of <2 overflows p.a. and 80% reduction in stormwater overflow volume based on existing levels.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2025-Q4,2026-Q3,2026-Q3,2027-Q4,2027-Q4,2029-Q3,2025-Q4,2029-Q3,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001684,5/12/2023,Watercare Service Limited,Western Isthmus Oakley Alan Wood Branch Sewer CC5.,The improvements are needed to comply with service standards (target of <2 overflows p.a. and 80% reduction in stormwater overflow volume based on existing levels.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2026-Q2,2027-Q2,2027-Q2,2028-Q3,2029-Q2,2030-Q2,2026-Q2,2030-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001685,5/12/2023,Watercare Service Limited,Drury West Wastewater Transmission T1 2 3 and 13.,This project creates new wastewater transmission infrastructure including transmission pipes and a pump station to service future greenfields development in Drury West. The project will service 15208 new dwellings (equating to 45924 PE).,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2024-Q3,2025-Q4,2026-Q2,2027-Q4,2027-Q4,2030-Q2,2024-Q3,2030-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001686,5/12/2023,Watercare Service Limited,Dunkirk Stage 2 Rising Main.,The new rising main connecting the Dunkirk Pump Station to the Eastern Interceptor is needed in response to Growth.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2021-Q3,2022-Q2,2022-Q3,2023-Q4,2023-Q4,2025-Q2,2021-Q3,2025-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001687,5/12/2023,Watercare Service Limited,Dunkirk Stage 3 Gravity Main Extension.,This project is to cater for growth. It consists of 0.95 kilometres of 600 millimetre diameter gravity main connecting Panmure Primary School to Johnsons Reserve.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,5 - 25 million,2026-Q4,2027-Q3,2027-Q4,2029-Q1,2029-Q1,2030-Q4,2026-Q4,2030-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001691,5/12/2023,Watercare Service Limited,Wastewater Network Upgrades (TRC and KO).,Network upgrades for development works in support of the Kāinga Ora programme for growth precincts Mt Roskill Tamaki and Mangere servicing future growth of 200 000 people.,,Early planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,25 - 50 million,2024-Q3,2025-Q1,2025-Q1,2025-Q2,2025-Q3,2040-Q2,2024-Q3,2040-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001693,5/12/2023,Watercare Service Limited,Western Isthmus Point Erin Tunnel.,An extension of the Central Interceptor to the Point Erin tunnel is required due to the complexity of the stormwater separation project in Herne Bay and St Mary's Bay catchments.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,,,2022-Q3,2024-Q1,2024-Q1,2027-Q4,2022-Q3,2027-Q4,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001694,5/12/2023,Watercare Service Limited,Castledine Catchment Diversion to the Eastern Interceptor.,This project resolves local network capacity issues by diverting flows upstream to the eastern interceptor. It consists of construction 0.12 kilometre of 225 millimetre diameter gravity sewer.,,In planning,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,< 1 million,2022-Q4,2024-Q1,2024-Q1,2025-Q2,2025-Q2,2026-Q1,2022-Q4,2026-Q1,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
WCA_WW0001702,5/12/2023,Watercare Service Limited,Southwest Conveyance Phase 2b.,Deliver the conveyance elements required for for the Southwest wastewater servicing scheme.,,In procurement,Funding source to be confirmed,Limited,Construct only,Auckland,,,Water,100 - 250 million,2022-Q3,2023-Q2,2023-Q3,2024-Q4,2025-Q1,2026-Q2,2022-Q3,2026-Q2,
https://www.watercare.co.nz/About-us/Projects-around-Auckland,,,,
IP000742,17/03/2020,Wellington International Airport Limited,New Domestic and International Jet Terminal.,This project is the development of an 8 million passenger per annum terminal to meet forecast passenger growth.,,In planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Transport,250 - 500 million,,,,,,,2023-Q1,2027-Q1,
https://www.wellingtonairport.co.nz/,,,,
IP000743,17/03/2020,Wellington International Airport Limited,New Aircraft Apron.,This project is staged development of the apron to 8 million passengers per annum to meet forecast growth in passenger numbers and aircraft movements.,,In planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Transport,100 - 250 million,,,,,,,2021-Q3,2027-Q1,
https://www.wellingtonairport.co.nz/,,,,
IP000744,17/03/2020,Wellington International Airport Limited,Marine Defences and Seawall Reconstruction.,This project is the reconstruction of marine defence systems and infrastructure at Wellington Airport.,,Early planning,Funding source to be confirmed,To be determined,To be determined,Wellington,,,Transport,100 - 250 million,,,,,,,2023-Q2,2025-Q1,
https://www.wellingtonairport.co.nz/,,,,
IP011156,27/03/2024,Waimate District Council,411075513 - Capital - Roading - resealing 481.,Resealing.,,In planning,Funding source confirmed,Procurement not required,Procurement not required,Canterbury,,,Transport,5 - 25 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011157,27/03/2024,Waimate District Council,411075514 - Capital - Roading - drainage construction 48201.,Drainage Construction.,,In planning,Funding source confirmed,Procurement not required,Procurement not required,Canterbury,,,Transport,1 - 5 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011158,27/03/2024,Waimate District Council,411075515 - Capital - Roading - culvert replacement 48202.,Culvert Replacement.,,In planning,Funding source confirmed,Procurement not required,Procurement not required,Canterbury,,,Transport,1 - 5 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011159,27/03/2024,Waimate District Council,411075516 - Capital - Roading - kerb and channel renewal 48203.,Kerb and Channel Renewal.,,In planning,Funding source confirmed,Procurement not required,Procurement not required,Canterbury,,,Transport,1 - 5 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011160,27/03/2024,Waimate District Council,411075517 - Capital - Roading - concrete ford renewal 48204.,Concrete Ford Renewal.,,In planning,Funding source confirmed,Procurement not required,Procurement not required,Canterbury,,,Transport,< 1 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011161,27/03/2024,Waimate District Council,411075518 - Capital - Roading - pavement rehabilitation 483.,Pavement Rehabilitation.,,In planning,Funding source confirmed,Procurement not required,Procurement not required,Canterbury,,,Transport,5 - 25 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011162,27/03/2024,Waimate District Council,411075519 - Capital - Roading - structures component rep. 484.,Structures Components.,,In planning,Funding source confirmed,Procurement not required,Procurement not required,Canterbury,,,Transport,1 - 5 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011163,27/03/2024,Waimate District Council,411075520 - Capital - Roading - sign renewal 48501.,Sign Renewal.,,In planning,Funding source confirmed,Procurement not required,Procurement not required,Canterbury,,,Transport,< 1 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011164,27/03/2024,Waimate District Council,411075523 - Capital - Roading - minor improvements 48701.,Minor Improvements.,,In planning,Funding source confirmed,Procurement not required,Procurement not required,Canterbury,,,Transport,5 - 25 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011165,27/03/2024,Waimate District Council,411075524 - Capital - Roading - footpath renewal 491.,Footpath Renewal.,,In planning,Funding source confirmed,Procurement not required,Procurement not required,Canterbury,,,Transport,1 - 5 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011166,27/03/2024,Waimate District Council,411075525 - Capital - Roading - minor improv. (non-sub) 49204.,Minor Improvements.,,In planning,Funding source confirmed,Procurement not required,Procurement not required,Canterbury,,,Transport,< 1 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011167,27/03/2024,Waimate District Council,411075526 - Capital - Roading - Seal Extensions 49203.,Seal Extension.,,In planning,Funding source confirmed,Procurement not required,Procurement not required,Canterbury,,,Transport,< 1 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011168,27/03/2024,Waimate District Council,411075527 - Capital - Roading - development 49202.,Development.,,In planning,Funding source confirmed,Procurement not required,Procurement not required,Canterbury,,,Transport,< 1 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011169,27/03/2024,Waimate District Council,511076001 - Cannington - Renewals.,Renewals.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Transport,< 1 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011170,27/03/2024,Waimate District Council,511076002 - Cannington - Drinking Water Compliance Upgrade.,Drinking Water Compliance Upgrade.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP011171,27/03/2024,Waimate District Council,511076004 - Cannington - Pratts Pumphouse - Pump 1 Renewal.,Pratts Pumphouse - Pump 1 Renewal.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2026-Q3,2027-Q2,,,,,
IP011172,27/03/2024,Waimate District Council,511076006 - Cannington - Renewal Maintenace of weir.,Renewal Maintenace of weir.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP011173,27/03/2024,Waimate District Council,511076007 - Cannington - Pratts pumphouse power supply.,Pratts pumphouse power supply.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP011174,27/03/2024,Waimate District Council,"511076009 - Cannington - 80mm Line ""Slip Line"" (700m x 125mm PE).","80mm Line ""Slip Line"" (700m x 125mm PE).",,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2032-Q3,2024-Q2,,,,,
IP011175,27/03/2024,Waimate District Council,511076011 - Cannington - Pratts Turbidity meter.,Pratts Turbidity meter.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP011176,27/03/2024,Waimate District Council,511076012 - Cannington - Dwyer 63OD 1494m 40OD 929m and PRV.,Dwyer 63OD 1494m 40OD 929m and PRV.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2028-Q3,2029-Q2,,,,,
IP011177,27/03/2024,Waimate District Council,513076001 - Hook / Waituna - Renewals.,Renewals.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011178,27/03/2024,Waimate District Council,513076005 - Hook / Waituna - Drinking Water Intake/Plant Compliance Upgr.,Drinking Water Intake/Plant Compliance Upgr.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,,,,,,2024-Q3,2026-Q2,,,,,
IP011179,27/03/2024,Waimate District Council,513076012 - Hook / Waituna - Simmons Pumphouse Pump 1 Renewal.,Simmons Pumphouse Pump 1 Renewal.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2026-Q3,2027-Q2,,,,,
IP011180,27/03/2024,Waimate District Council,513076014 - Hook / Waituna - Flow Meter Replacement.,Flow Meter Replacement.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2026-Q2,,,,,
IP011181,27/03/2024,Waimate District Council,513076016 - Hook / Waituna - Line renewal Intake to O'Donnells.,Line renewal Intake to O'Donnells.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2028-Q3,2024-Q2,,,,,
IP011182,27/03/2024,Waimate District Council,513076018 - Hook / Waituna - Line renewal upper Nortons Reserve Rd.,Line renewal upper Nortons Reserve Rd.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2027-Q2,,,,,
IP011183,27/03/2024,Waimate District Council,513076019 - Hook / Waituna - Line renewal Manchesters and Molloys Rd.,Line renewal Manchesters and Molloys Rd.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2027-Q2,,,,,
IP011184,27/03/2024,Waimate District Council,513076020 - Hook / Waituna - pH Online analysers.,pH Online analysers.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP011185,27/03/2024,Waimate District Council,513076021 - Hook / Waituna - Source / WTP generator.,Source / WTP generator.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2026-Q2,,,,,
IP011186,27/03/2024,Waimate District Council,514076001 - Lower Waihao - Renewals.,Renewals.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011187,27/03/2024,Waimate District Council,514076004 - Lower Waihao - Glenavy Township Mains Renewal.,Glenavy Township Mains Renewal.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2034-Q2,,,,,
IP011188,27/03/2024,Waimate District Council,514076005 - Lower Waihao - Glenavy Township Restrictor Renewal.,Glenavy Township Restrictor Renewal.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2034-Q2,,,,,
IP011189,27/03/2024,Waimate District Council,514076007 - Lower Waihao - Lower Waihao Reservoir Telemetry Renewal.,Lower Waihao Reservoir Telemetry Renewal.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2029-Q2,,,,,
IP011190,27/03/2024,Waimate District Council,514076008 - Lower Waihao - Lower Waihao Boost Pump 3 Renewal.,Lower Waihao - Lower Waihao Boost Pump 3 Renewal.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP011191,27/03/2024,Waimate District Council,514076009 - Lower Waihao - Telemetry - Lower Waihao Boost Renewal.,Telemetry - Lower Waihao Boost Renewal.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP011192,27/03/2024,Waimate District Council,514076010 - Lower Waihao - Flow Meter Renewal.,Flow Meter Renewal.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2034-Q2,,,,,
IP011193,27/03/2024,Waimate District Council,514076012 - Lower Waihao - Glenavy line renewal.,Glenavy line renewal.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP011194,27/03/2024,Waimate District Council,514076014 - Lower Waihao - Source / WTP generator.,Source / WTP generator.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP011195,27/03/2024,Waimate District Council,514076015 - Lower Waihao - pH Online Analysers.,pH Online Analysers.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP011196,27/03/2024,Waimate District Council,515076002 - Otaio / Makikihi - Renewals.,Renewals.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011197,27/03/2024,Waimate District Council,515076005 - Otaio / Makikihi - Makikihi Township Mains Renewal.,Makikihi Township Mains Renewal.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2032-Q2,,,,,
IP011198,27/03/2024,Waimate District Council,515076006 - Otaio / Makikihi - Makikihi Township Restrictor Renewal.,Makikihi Township Restrictor Renewal.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2032-Q2,,,,,
IP011199,27/03/2024,Waimate District Council,515076009 - Otaio / Makikihi - Flow Meter Replacement.,Flow Meter Replacement.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2026-Q2,,,,,
IP011200,27/03/2024,Waimate District Council,515076011 - Otaio / Makikihi - Consent Volume Review.,Consent Volume Review.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP011201,27/03/2024,Waimate District Council,515076013 - Otaio / Makikihi - pH Online Analysers.,pH Online Analysers.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP011202,27/03/2024,Waimate District Council,515076014 - Otaio / Makikihi - Source / WTP generator.,Source / WTP generator.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2026-Q2,,,,,
IP011203,27/03/2024,Waimate District Council,516076001 - Waihaorunga - Renewals.,Renewals.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011204,27/03/2024,Waimate District Council,516076002 - Waihaorunga - Pump replacements.,Pump replacements.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2034-Q2,,,,,
IP011205,27/03/2024,Waimate District Council,516076003 - Waihaorunga - Drink Water Intake/Plant Compliance Upgrade.,Drink Water Intake/Plant Compliance Upgrade.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP011206,27/03/2024,Waimate District Council,516076005 - Waihaorunga - New Board and Telemetry.,Waihaorunga - New Board and Telemetry.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2026-Q3,2027-Q2,,,,,
IP011207,27/03/2024,Waimate District Council,516076006 - Waihaorunga - Chlorine and turbidity analyser.,Chlorine and turbidity analyser.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2026-Q3,2027-Q2,,,,,
IP011208,27/03/2024,Waimate District Council,516076007 - Waihaorunga - Source / WTP generator.,Source / WTP generator.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP011209,27/03/2024,Waimate District Council,516076008 - Waihaorunga - Melford reservoir telemetry.,Melford reservoir telemetry.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP011210,27/03/2024,Waimate District Council,517076001 - Waikakahi - Renewals.,Renewals.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011211,27/03/2024,Waimate District Council,517076003 - Waikakahi - Drinking Water Intake/Plant Compliance Upgrade.,Drinking Water Intake/Plant Compliance Upgrade.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP011212,27/03/2024,Waimate District Council,517076015 - Waikakahi - Telemetry - Waikakahi Reservoir.,Telemetry - Waikakahi Reservoir.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2027-Q3,2028-Q2,,,,,
IP011213,27/03/2024,Waimate District Council,517076016 - Waikakahi - Pump renewals.,Pump renewals.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2027-Q2,,,,,
IP011214,27/03/2024,Waimate District Council,517076017 - Waikakahi - Flow meter renewals.,Flow meter renewals.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP011215,27/03/2024,Waimate District Council,517076019 - Waikakahi - Source / WTP generator.,Source / WTP generator.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP011216,27/03/2024,Waimate District Council,517076020 - Waikakahi - pH Online analysers.,pH Online analysers.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP011217,27/03/2024,Waimate District Council,521076001 - Water Supply Schemes - Capital.,Water Supply Schemes - Capital.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011218,27/03/2024,Waimate District Council,531076001 - Urban Water - Rising Main Renewals.,Rising Main Renewals.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011219,27/03/2024,Waimate District Council,531076003 - Urban Water - AC Water Main Renewals.,AC Water Main Renewals.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011220,27/03/2024,Waimate District Council,531076008 - Urban Water - Timaru Road pump renewals.,Timaru Road pump renewals.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP011221,27/03/2024,Waimate District Council,531076021 - Urban Water - Waimate Reservoir Cover Replacement.,Waimate Reservoir Cover Replacement.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP011222,27/03/2024,Waimate District Council,531076025 - Urban Water - Extension Bakers/Court/Hunts/Fitzmaurice Roads.,Extension Bakers/Court/Hunts/Fitzmaurice Roads.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP011223,27/03/2024,Waimate District Council,531076026 - Urban Water - Booster Manchesters Standby Pump 2.,Booster Manchesters Standby Pump 2.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,,,,,,2027-Q3,2028-Q2,,,,,
IP011224,27/03/2024,Waimate District Council,531076028 - Urban Water - Te Kiteroa Main Booster and Reservoir.,Te Kiteroa Main Booster and Reservoir.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,1 - 5 million,,,,,,,2024-Q3,2026-Q2,,,,,
IP011225,27/03/2024,Waimate District Council,531076031 - Urban Water - Manchester's treatment plant generator.,Manchester's treatment plant generator.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2025-Q2,,,,,
IP011226,27/03/2024,Waimate District Council,531078002 - Urban Water - Software and code upgrades.,Software and code upgrades.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2026-Q2,,,,,
IP011227,27/03/2024,Waimate District Council,552074501 - Sewer - Waimate Urban Renewals.,Waimate Urban Renewals.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,5 - 25 million,,,,,,,2024-Q3,2034-Q2,,,,,
IP011228,27/03/2024,Waimate District Council,552074518 - Sewer - WWTP Out flow Meter Renewal.,WWTP Out flow Meter Renewal.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2026-Q3,2027-Q2,,,,,
IP011229,27/03/2024,Waimate District Council,552074525 - Sewer - Milford Pump Renewal.,Sewer - Milford Pump Renewal.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2029-Q3,2034-Q2,,,,,
IP011230,27/03/2024,Waimate District Council,552074526 - Sewer - WWTP Electical/control Renewal.,WWTP Electical/control Renewal.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2034-Q2,,,,,
IP011231,27/03/2024,Waimate District Council,552074527 - Sewer - WWTP various equipment.,WWTP various equipment.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2025-Q3,2034-Q2,,,,,
IP011232,27/03/2024,Waimate District Council,552074529 - Sewer - Septic Waste Receival Unit.,Septic Waste Receival Unit.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2026-Q3,2027-Q2,,,,,
IP011233,27/03/2024,Waimate District Council,552074534 - Sewer - Edinburgh Victoria & Nelson Streets infill.,Edinburgh Victoria & Nelson Streets infill.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2027-Q3,2028-Q2,,,,,
IP011234,27/03/2024,Waimate District Council,552074535 - Sewer - Allan Street extension.,Allan Street extension.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2029-Q3,2030-Q2,,,,,
IP011235,27/03/2024,Waimate District Council,552074536 - Sewer - Manchester Street extension.,Manchester Street extension.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2031-Q3,2032-Q2,,,,,
IP011236,27/03/2024,Waimate District Council,552074537 - Sewer - Hunts Road extension.,Hunts Road extension.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2023-Q3,2034-Q2,,,,,
IP011237,27/03/2024,Waimate District Council,553075001 - Stormwater - Various renewals.,Various renewals.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2027-Q2,,,,,
IP011238,27/03/2024,Waimate District Council,553075009 - Stormwater - Manhole replacements.,Manhole replacements.,,In planning,Funding source to be confirmed,To be determined,To be determined,Canterbury,,,Water,< 1 million,,,,,,,2024-Q3,2034-Q2,,,,,