This is an HTML version of an attachment to the Official Information request 'staff'.


 
APPENDIX ONE 
                                                                                                                                      
 
 
 
 
 
 
 
 
 
 
 
 
 
DRAFT BOUNDARY REORGANISATION SCHEME 
FOR MANAWATU DISTRICT AND PALMERSTON NORTH CITY 
 
 
 

For the Longburn, Kairanga, Bunnythorpe and Ashhurst Areas 
 
Including amendments approved on 2 November 2011 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

NOVEMBER 2011 
 
 

DM 743453 

-  2  - 
 
DRAFT BOUNDARY REORGANISATION SCHEME 
FOR MANAWATU DISTRICT AND PALMERSTON NORTH CITY 
For the Longburn, Kairanga, Bunnythorpe and Ashhurst Areas 
 
 
Pursuant  to  Clause  12  of  Schedule  3  of  the  Local  Government  Act  2002,  the  Joint  Boundary 
Committee of Manawatu District  Council  and  Palmerston North City Council has jointly prepared the 
following Draft Reorganisation Scheme for a boundary alteration between the Manawatu District and 
Palmerston  North  City  and  has,  pursuant  to  Clause  18  of  the  said  Schedule,  adopted  the  Draft 
Reorganisation  Scheme  with  amendments  on  2  November  2011,  these  amendments  being 
incorporated in this Scheme: 
 
 
1. 

TITLE 
 
This Draft Reorganisation Scheme may be referred to as the Draft Boundary  Reorganisation 
Scheme  for  Manawatu  District  and  Palmerston  North  City  for  the  Longburn,  Kairanga, 
Bunnythorpe and Ashhurst areas. 
 
 
2. 

INTERPRETATION 
 
In this Scheme, unless the context otherwise requires: 
 
(a) 
Councils means the Councils of MDC and PNCC; 
 
MDC means Manawatu District Council;  
 
Manawatu District means the area administered by Manawatu District Council as at 
1 July 2011; 
 
PNCC
 means Palmerston North City Council; 
 
Palmerston  North  City  means  the  area  administered  by  Palmerston  North  City 
Council as at 1 July 2011; 
 
Scheme
  means  Draft  Boundary  Reorganisation  Scheme  for  Manawatu  District  and 
Palmerston North City for the Longburn, Kairanga, Bunnythorpe and Ashhurst areas. 
 
(b) 
Area  A  means  the  area  marked  as  Area  A  on  Map  1  attached  to  this  Scheme, and 
Areas  B,  C,  D  and  E  have  the  corresponding  meaning,  and  also  includes  those 
areas as shown on Maps 2, 3 or 4 as appropriate. 
 
 
3. 
COMMENCEMENT 
 
Subject to Clause 13, this Scheme, if approved, shall come into force on 1 July 2012. 
 
 
4. 

BOUNDARY ALTERATION 
 
(a) 
The  boundaries  of  Manawatu  District  and  Palmerston  North  City  are  altered  by 
excluding  areas  A  to  E  inclusive  from  Manawatu  District  and  including  them  in 
Palmerston North City. 
 

-  3  - 
 
(b)   
Where  the  proposed  boundary  line  follows  roads,  the  boundary  between  Manawatu 
District and Palmerston North City will be the centre-line of the road. 
 
(c)    
The proposed boundary conforms with the boundaries of statistical mesh block areas 
determined  by  Statistics  New  Zealand,  and  used  for  parliamentary  electoral 
purposes, except in the Longburn, Bunnythorpe and Ashhurst areas.  Statistics New 
Zealand has given approval for mesh block boundaries to be adjusted to conform with 
the boundary line shown on the maps. 
 
 
5. 

REPRESENTATION 
 
(a) 
Area A (Longburn and surrounds) is excluded from the Kairanga Ward of Manawatu 
District and included in the Awapuni Ward of Palmerston North City. 
 
(b) 
Area  B  (Kairanga  and  surrounds)  is  excluded  from  the  Kairanga  Ward  of  the 
Manawatu District and included in the Takaro Ward of Palmerston North City. 
 
(c) 
Area  C  (Bunnythorpe  and  surrounds)  is  excluded  from  the  Kairanga  and  Kiwitea-
Pohangina  Wards  of  the  Manawatu  District  and  included  in  the  Papaioea  Ward  of 
Palmerston North City. 
 
(d) 
Area D (northern Ashhurst) is excluded from the Kairanga Ward of Manawatu District 
and included in the Ashhurst-Fitzherbert Ward of Palmerston North City. 
 
(e) 
Area  E  (northern  Ashhurst)  is  excluded  from  the  Kiwitea-Pohangina  Ward  of 
Manawatu District and included in the Ashhurst-Fitzherbert Ward of Palmerston North 
City. 
 
(f) 
Except  in  the  circumstances  specified  in  Clauses  1-4  inclusive  of  Schedule  7  to  the 
Local Government Act 2002, the members of MDC and PNCC continue to be elected 
members  of  those  Councils,  as  if  there  had  been  no  boundary  alteration.    This  is  in 
accordance with Clause 67(j) of Schedule 3 of the Local Government Act 2002. 
 
(g) 
The representation arrangements stated in this Clause apply for the  present term of 
the Councils which concludes with the next Local Government Elections to be held on 
12  October  2013.  The  representation  arrangements  for  those  elections  will  be 
determined  by  the  separate  representation  reviews  to  be  carried  out  by  MDC  and 
PNCC. 
 
 
6. 
TRANSITIONARY PAYMENT 
 
(a)  
A  transitionary  payment  will  be  paid  by  PNCC  to  MDC  under  the  arrangements  set 
out in this clause. 
 
(b) 
The  transitionary  payment  will  be  made  in  acknowledgement  of  the  expectation  that 
the  boundary  alteration  will  result,  for  a  number  of  years,  in  a  net  annual  revenue 
reduction  for  MDC  and  a  net annual  revenue  increase  for  PNCC.    The  transitionary 
payment will be made by PNCC to MDC each year for ten years. 
 
(c) 
For the purposes of this clause: 
 
 
All calculations shall be based on the operating budget of MDC and the rates set by 
MDC for the year immediately preceding the implementation of this Scheme. 
 
The estimated annual net revenue reduction for MDC represents the amount (GST 
exclusive)  of  the  MDC  rates  assessed  on  those  properties  to  be  transferred  to 
Palmerston  North  City  (Areas  A  to  E  inclusive),  plus  other  estimated  operating 
revenue  receivable  by  MDC  in  relation  to  Areas  A  to  E  inclusive,  to  be  transferred, 
less any operating expenses (GST exclusive) it is estimated will no longer be incurred 
by MDC when the areas are transferred to PNCC. 
 

-  4  - 
 
(d) 
The amount of the payment in each of the first five years shall (subject to Clause 6(g) 
below) remain constant and equate to the estimated annual net revenue reduction for 
MDC.  GST, if applicable, will be added to the amount of each payment. 
 
(e) 
The amount of the payment in each of the following five years shall (subject to Clause 
6(g)  below)  remain  constant  and  equate  to  one  half  of  the  estimated  net  revenue 
reduction for MDC.  GST, if applicable, will be added to the amount of each payment. 
 
(f) 
Payments to be made under this agreement will be paid as quarterly sums at the end 
of each quarter. 
 
(g) 
Notwithstanding anything in this Clause 6, all payments required to be made shall be 
adjusted  automatically  to  reflect  changes  to  the  Local  Government  Cost  Index  for 
New Zealand applicable to operating expenditure. 
 
 
7. 
RATING 
 
(a) 
PNCC will set and assess rates on those properties transferred to Palmerston North 
City (Areas A to E inclusive) in the same manner as like properties within the current 
City  boundary,  except  for  any  targeted  rate  to  cover  the  costs  of  upgrade  to  the 
industrial wastewater system in Longburn. 
 
(b) 
PNCC  and  MDC  currently  have  different  dates  of  valuation  so  it  will  be  necessary 
either  to  revalue  the  properties  transferred  or  equalise  the  rateable  values  through 
another mechanism such as amendments to the rating systems. 
 
 
8. 

RESOURCE MANAGEMENT 
 
(a) 
In accordance with section 81 of the Resource Management Act 1991, on the date this 
Scheme  comes  into  effect  the  operative  Manawatu  District  Plan  shall  be  deemed  to 
be  part  of  the  operative  Palmerston  North City  District  Plan,  in  so  far  as  it  applies  to 
Areas A to E inclusive.  Within a period of 2 years from the date this Scheme comes 
into  effect, PNCC  will  promote a  Plan Change to include provisions for  Areas  A to E 
inclusive. 
 
(b) 
All  proceedings  or  appeals  in  relation  to  provisions  of  the  Manawatu  District  Plan 
affecting  Areas  A  to  E  inclusive  that  have  been  commenced1  prior  to  the  date  this 
Scheme  comes  into  effect  will  continue  to  be  the  responsibility  of  the  MDC  until 
resolved.  All proceedings or appeals in relation to provisions of the Manawatu District 
Plan deemed to be part of the Palmerston North City District Plan affecting Areas A to 
E  inclusive  that  are  commenced2  on  or  after  the  date  that  this  Scheme  comes  into 
effect  will  be  the  responsibility  of  PNCC.    The  status  of  the  operative  Palmerston 
North  City  District  Plan  shall  not  be  compromised  by  any  proceedings  or  appeals  in 
relation  to  provisions  of  the  Manawatu  District  Plan  deemed  to  be  part  of  the 
Palmerston North City District Plan. 
 
(c) 
All resource consents pertaining to Areas A to E inclusive for which applications have 
been submitted prior to the date this Scheme comes into effect will continue to be the 
responsibility of MDC until: 
 
(i) 
For subdivision consents section 224(c) certificates are issued; or 
(ii) 
For land use consents the resource consent is deemed to have commenced 
under section 116; or 
(iii) 
The resource consent is otherwise terminated. 
 
 All resource consents for which applications are submitted in relation to Areas A to E 
inclusive  on  or  after  the  date  that  this  Scheme  comes  into  effect  will  be  the 
responsibility of PNCC. 
 
 
                                                      
1 Publicly notified under clause 5(1), Schedule 1, RMA 1991 
2 See footnote 1.  

-  5  - 
 
9. 
DEVELOPMENT CONTRIBUTIONS 
 
(a) 
All developments in Areas A to E inclusive, for which applications are lodged prior to 
the  date  this  Scheme  comes  into  effect,  will  be  assessed  under  the  MDC 
Development  Contributions  Policy.    If  applicable,  development  contributions  will  be 
payable  to  the  Manawatu  District  Council,  in  accordance  with  the  rates  and 
methodology set out in the MDC Development Contributions Policy. 
 
(b) 
All  developments  in  Areas  A  to  E  inclusive,  for  which  applications  are  lodged  on  or 
after  the  date  this  Scheme  comes  into  effect,  will  be  assessed  under  the  PNCC 
Development  Contributions  Policy.    If  applicable,  development  contributions  will  be 
payable  to  the  PNCC,  in  accordance  with  the  rates  and  methodology  set  out  in  the 
PNCC Development Contributions Policy. 
 
(c) 
Two-thirds of all development contributions received by MDC on or after the date this 
Scheme comes into effect for developments located within Areas A to E inclusive will 
be transferred to PNCC. 
 
 
10. 
BUILDING CONSENTS 
 
(a) 
All  building  consents  for  works  in  Areas  A  to E  inclusive  for  which  applications  have 
been submitted prior to the date this Scheme comes into effect, will continue to be the 
responsibility of MDC until  the final  inspection is completed  and,  where applicable, a 
Code  Compliance  Certificate  issued.  Notwithstanding  this,  it  is  acknowledged  that 
since  1  December  2007  PNCC  has  been  providing  to  MDC  certain  building  related 
services pursuant to the following Contracts: 
 
(i) 
Contract for Provision of Services: Building Control Authority (BCA) Functions 
dated 12 April 2011; and  
 
(ii) 
Contract for Provision of Building Services dated 12 April 2011; 
 
(“the Contracts”). 
 
(b) 
All  building  consents  for  works  in  Areas  A  to  E  inclusive  for  which  applications  are 
submitted on or after the date this Scheme comes into effect will be the responsibility 
of PNCC. 
 
(c) 
Subject  to  Clauses  10(d)  and  10(e)  below,  MDC  shall  be  responsible  for  and 
indemnify PNCC in full for any liability incurred by PNCC relating to: 
 
(i) 
Any  leaky  building  (as  defined  within  the  Weathertight  Homes  Resolution 
Services Act 2006); and  
 
(ii) 
Any  other  claims  involving  a  building  (as  defined  within  the  Building  Act 
2004); 
 
within Areas A to E inclusive. 
 
 
(d) 
MDC shall be liable under Clause 10(c) above: 
 
(i) 
During any period from when a building consent has issued by MDC prior to 
the date this Scheme comes into effect until: 
 
 
 
 
(iii) 
During any period when MDC is responsible under Clause 10(a) above; 
 
until the date: 
 
(A) 
Ten (10)  years subsequent to the  issue of a Code Compliance Certificate in 
relation to the building; or 
 

-  6  - 
 
(B) 
Ten (10) years subsequent to the date of the issue of the building consent for 
that building; 
 
whichever date shall be the later. 
 
(e) 
Notwithstanding  Clauses  10(c)  and  (d)  above,  in  the  event  MDC  is  responsible  to 
indemnify PNCC in accordance with Clause 10(c) above and the claim against PNCC 
arises  in  relation  to  any  building  services  which  PNCC  has  provided  under  the 
Contracts (“the services”) then the extent of such indemnity shall be reduced to take 
into  account  any  negligence  by  PNCC  in  performing  the  services  or  any  breach  by 
PNCC of the Contracts. 
 
 
11. 

BYLAWS 
 
In accordance with Clause 67(e) of Schedule 3 to the Local Government Act 2002, all bylaws 
made by MDC that are in force on the date this Scheme comes into effect will, in relation to 
the areas being transferred to Palmerston North City, be deemed to be bylaws of PNCC and 
will apply to those areas until altered or revoked by PNCC. 
 
 
12. 
SEPARATE  AGREEMENT  FOR  APPORTIONMENT  OF  ASSETS  AND  LIABILITIES,  AND 
FOR OTHER SPECIAL ARRANGEMENTS 

 
(a) 
Except  for  those  matters  set  out  in  this  Scheme,  MDC  and  PNCC  will  enter  into 
separate  arrangements  for  the  apportionment  of  assets  and  liabilities,  including  any 
arrangements that may need to be made for the Longburn and Bunnythorpe areas. 
 
(b) 
These  agreements  will  be  negotiated  separately,  but  if  no  agreement  is  reached 
within  three  months  of  this  reorganisation  order  coming  into  force,  either  MDC  or 
PNCC will be able to apply to the Local Government Commission for a determination 
under Clause 69 of Schedule 3 to the Local Government Act 2002. 
 
 
13. 
ARBITRATION AND MEDIATION 
 
(a) 
In  the  event  that  any  matter  is  not  included  in  this  Scheme  or  in  Schedule  3  to  the 
Local  Government  Act  2002,  or  some  other  question  or  dispute  arises,  MDC  and 
PNCC  will  endeavour  to  settle  such  matter  by  agreement,  or  failing  agreement,  by 
arbitration.  
 
(b) 
Any such arbitration will be undertaken in accordance with New Zealand law and the 
current Arbitration Protocol of the Arbitrators’ and Mediators’ Institute of New Zealand 
Inc.    The  arbitration  will  be  conducted  by  one  arbitrator  agreed  upon  by  MDC  and 
PNCC  and  should  those  Councils  fail  to  agree  within  21  days  from  the  date  upon 
which the matter is referred to arbitration, then the arbitrator will be appointed by the 
President  of  the  Manawatu  District  Lawyers  Standards  Committee  or  their  nominee.  
The decision of the arbitrator shall be final and not subject to review by either court or 
the Local Government Commission. 
 
(c) 
In addition to the above procedure, the Councils may, if they determine, first refer the 
matter to non-binding mediation. 
 
 
14. 
TRANSITIONAL PROVISIONS 
 
For the purposes of the following matters, this Scheme comes into force on the day after the 
day of the publication of the Order in Council in the New Zealand Gazette:  
 
(a) 
The review of representation arrangements under Part 1A  of the  Local Electoral Act 
2001; and 
 
(b) 
The preparation and adoption of Long Term Plans and Annual Plans under sections 
93 and 95 of the Local Government Act 2002 for the period commencing 1 July 2012; 
and 

-  7  - 
 
 
(c) 
The  setting  of  rates  under  the  Local  Government  (Rating)  Act  2002  for  the  financial 
year commencing 1 July 2012 including, if necessary, amendments to valuation rolls 
either by a revaluation or another mechanism to equalise values. 
 
 
15. 
INCLUDED PROVISIONS 
 
In  this  Scheme  the  provisions  of  Schedule  3  to  the  Local  Government  Act  2002,  with  the 
exception  of  Clause  67,  shall  apply.    In  relation  to  Clause  67  of  Schedule  3  to  the  Local 
Government Act 2002, it shall apply to the extent recorded in Attachment B. 
 

-  8  - 
 
 
ATTACHMENT A 
 
 
 
 
 
 
 
 
MAPS 
 
Map 1.   
Manawatu District and Palmerston North City Boundary Alteration 
 
Map 2. 
Manawatu District and Palmerston North City Boundary Alteration – Longburn 
 
Map 3. 

Manawatu District and Palmerston North City Boundary Alteration – Bunnythorpe and 
surrounds 
 
Map 4.  
Manawatu  District  and  Palmerston  North  City  Boundary  Alteration  –  Northern 
Ashhurst. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


-  9  - 
 
DM 743453 


- 10 - 
DM 743453 


-  11  - 
 


-  12  - 
 
 
 

 
 
ATTACHMENT B 
 
Provisions from Clause 67 of Schedule 3 to the Local Government Act 2002 which apply to this 
Reorganisation Scheme  
 
The  following  provisions  apply  to  each  reorganisation  scheme  unless  amended  or  declared  not  to 
apply by a reorganisation scheme: 
 
(a) 
the  local  authority  that  assumes,  under  the  scheme,  jurisdiction  over  an  area  formerly 
comprising  or  forming  part  of  a  separate  district  or  region,  or  that  takes  over  the 
responsibilities of a local authority, has, and may exercise, and is responsible for: 
 
(i) 
all  the  powers,  duties,  acts  of  authority,  and  responsibilities  that  were  previously 
exercised  by  the  former  local  authority,  or  that  would  have  been  exercised  by  it  if  it 
had remained in existence or in control of that area: 
(ii) 
all  the  liabilities,  obligations,  engagements,  and  contracts  that  were  previously  the 
responsibility of the former local authority, or that would have been its responsibility if 
it had remained in existence or in control of that area: 
(iii) 
all  the  actions,  suits,  and  proceedings  pending  by  or  against  the  former  local 
authority, or that would have been its responsibility if it has remained in existence or 
in control of that area: 
 
(b) 
the  responsibilities,  duties,  and  powers  of  the  chairperson  and  the  chief  executive  of  the 
former  local  authority  must  be  exercised  by  the  chairperson  and  chief  executive  of  its 
successor: 
 
(c) 
Does not apply 
 
(d) 
a  local  authority  that  assumes  jurisdiction  over  an  area  that  was  formerly  part  of  a  separate 
district or region has, subject to all existing encumbrances, vested in it all the land situated in 
that area that was vested in the local authority that formerly had jurisdiction over that area: 
 
(e) 
Is amended in its application to the Draft Reorganisation Scheme 
 
(f) 
all rates or levies and other money payable in respect of an abolished local authority, or of an 
area of land included in the district or region of another local authority, are due and payable to 
the new local authority: 
 
(g) 
Does not apply 
 
(h) 
the rights or interests of creditors of a district or region must not be affected: 
 
(i) 
the  valuation  rolls,  electoral  rolls,  and  rate  records  in  force  in  the  district  or  region  of  an 
abolished local authority, or in relation to any part of the district or region of a local authority 
included  in  the  district  or  region  of  another  local  authority,  continue  in  force  in  the  district  or 
region of the new controlling local authority until those rolls or records are made by that local 
authority, and, until that time, the Local Government (Rating) Act 2002 applies: 
 
(j) 
except in the circumstances specified in clauses 1, 2, 3, or 4, if part of a district or region is 
excluded from that district or region and included in another district or region, the members of 
the  local  authority  of  the  first-mentioned  district  or  region  continue  to  be  members  of  the 
district or region as if that part had not been excluded from the district or region:  
 
(k) 
if an area is included in the district of another territorial authority, the civil defence emergency 
management  group  plan  for  the  district  in  which  the  area  is  included  applies  to  the  area  so 
included and is the only operative local civil defence plan to apply in that area 
 
(l) 
Does not apply 
 
 
 
DM 743453