Auckland Harbour Bridge
High Winds Closure Plan
19/05/2023
Summary

This pack summarises the closure plan for:

AHB Restriction Stage 3 (Reduce Lanes), and

AHB Restriction Stage 4 (Full Closure). Note, can be achieved by:

Short Term <45min – Close at base of AHB, stack traffic on mwy
1982

Long Term >45min – Close at outer cordons, detour all traffic
Act 
Short Term Stage 4

If the DE assess Stage 4 is only required for a short period, or if conditions 
deteriorate rapidly, the DE will make the call for the 4x Stage 3 TMA units to 
drop their outrigger to instantly close AHB.
Resources

This plan requires:

Stage 3 – 4x TMAs (also for Full Closure Short Term)
Information 

Stage 4 – 10x TMAs, 2x Light Vehicles
Command & Communication

The WK ASM Duty Engineer (DE) controls the response

All Site Leads & DE to be on ASM Radio Channel “AHB”

Site Leads to develop implementation plan with their team
Official 

DE will check all leads are ready in standby locations using call signs

DE will issue instruction to deploy Stage 3 or 4 via broadcast to all units
the 

Site Leads to confirm closure installed back to DE
Safety & Welfare

CMJ crew to circulate around cordons on south side of AHB to cover 
under 
breaks. Crews north of AHB to utilise Elephant House.
Transition from Stage 3 to 4

In the event Stage 3 is deployed and conditions deteriorate requiring Stage 
4 to be implemented,

Police or TIM Units will close Curran and Fanshawe Onramps, 
Northbound Throttle to remain until last vehicle before to replacing 
Released 
units at Curran and Fanshawe

Police or TIM Unit may close Onewa onramp, Southbound Throttle will 
remain until U-turn established before closing Onewa onramp


Auckland Harbour Bridge
High Winds Closure Plan
Reference Page

Stages 1 and 2 are implemented by ATOC based on recent actual winds

Stages 3 and 4 are implemented by ASM at the DEs discretion based on 
actual winds, forecast winds, wind type, traffic conditions and advice from 1982
MetService.

Table below summarises gust threshold limits (km/hr). 
Gust Wind Thresholds
Act 
Restriction Stage
Action Required
(from Resolve’s international best practice workstream)
Perpendicular
Oblique
1 (Reduce Speed)
Speed Restrictions 
Commence
55
70
2 (Detour WVV)
Wind Vulnerable Vehicles 
Detoured
65
80
3 (Reduce Lanes)
Alternate Lanes Closed
75
90
4 (Full Closure)
AHB Ful y Closed
90
105
Information 
Stage 3 Position Summary
Position
Call Sign
Resources
Lead Name
Phone
SH1 NBD AHB Mainline
Northbound Throttle
2x TMAs
SH1 SBD AHB Mainline
Southbound Throttle
2x TMAs
Official 
Stage 4 Position Summary
the 
Position
Call Sign
Resources
Lead Name
Phone
ransition
SH1 NBD Mainline
Northbound Main
2x TMAs
o 4 T
SH16 WBD Link From Port
Port
1x TMA
 3 t
under 
age
SH16 EBD Link From West
Gundry
1x TMA
St
SH1 Wellington St Onramp
Wel ington
1x IR Truck
SH1 Fanshawe St Onramp
Fanshawe
1x TMA
1x IR Truck
SH1 Curran St Onramp
Curran
1x TMA
Released 
SH1 SBD Mainline
Southbound Main
3x TMAs
SH1 SBD Onewa Rd 
Onramp
Onewa
1x TMA




Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 3 (Reduce Lanes) W Call Sign: Northbound 
Throttle
Road to Close:
SH1 Northbound Mainline
1982
Resources: 2x TMAs
Notes: • Below for Westerly 
winds, for Easterly 
Act 
winds close alternate 
Standby Location:
lanes
Under Vic Park 
Flyover
Information 
Official 
Deployment Location: Mainline Under 1st AHB Gantry
the 
under 
Released 




Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 3 (Reduce Lanes) W Call Sign: Southbound 
Throttle
Road to Close:
SH1 Southbound Mainline
1982
Resources: 2x TMAs
Notes: • Below for Westerly 
winds, for Easterly 
Act 
winds close alternate 
Standby Location:
lanes
Southbound Weigh 
Pad
Information 
Official 
Deployment Location: Mainline Under 1st AHB Gantry
the 
under 
Released 




Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 4 (Full Closure)
Call Sign: Northbound 
Main
Road to Close:
SH1 Northbound Mainline
1982
Resources: 2x TMAs
Notes: • Deploy Outriggers & 
Road Closed Bollards
Act 
Standby Location: Shoulder Prior to Gillies Onramp
Information 
Official 
Deployment Location: Mainline @ SH16 Westbound Link
the 
under 
Released 






Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 4 (Full Closure)
Call Sign: Port
Road to Close:
SH16 Westbound Link to SH1 Northbound
1982
Resources: 1x TMA
Notes: • Deploy Outriggers & 
Road Closed Bollards
Act 
Standby Location: Shoulder Under Upper Queen St
Information 
Official 
Deployment Location: Mwy Link @ SH16 Mainline Diverge
the 
under 
Released 





Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 4 (Full Closure)
Call Sign: Gundry
Road to Close:
SH16 Eastbound Link to SH1 Northbound
1982
Resources: 1x TMA
Notes: • Deploy Outriggers & 
Road Closed Bollards
Act 
• Call/Radio to ATOC to 
Standby Location: Gundry St Ramp
open Gundry St Gate
Information 
Official 
Deployment Location: Mwy Link @ Nelson Offramp Diverge
the 
under 
Released 




Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 4 (Full Closure)
Call Sign: Wellington
Road to Close:
SH1 Wellington St Northbound Onramp1982
Resources: 1x IR Truck
Notes: • Cone off left and right 
turn lanes
Act 
• Deploy Road Closed 
Standby Location: CMJ Yard
Bollards
Information 
Official 
Deployment Location: Onramp @ Commencement
the 
under 
Released 




Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 4 (Full Closure)
Call Sign: Fanshawe
Road to Close:
SH1 Fanshawe St Northbound Onramp1982
Resources: 1x TMA
Notes: • Cone dedicated left turn, 
right turn and straight 
1x IR Truck
Act 
lanes on approaches
Standby Location: Fanshawe or 
• Deploy Road Closed 
Beaumont St
Bollards/Signs
Information 
Official 
Deployment Location: Onramp @ Westhaven Dr
the 
under 
Released 




Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 4 (Full Closure)
Call Sign: Curran
Road to Close:
SH1 Curran St Northbound Onramp
1982
Resources: 1x TMA
Notes: • Deploy Outriggers & 
Road Closed Bollards
Act 
• Cone off approach 
Standby Location: Sarsfield St
lanes and close 
onramp gate
Information 
Official 
Deployment Location: Onramp @ Westhaven Dr
the 
under 
Released 




Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 4 (Full Closure)
Call Sign: Southbound 
Main
Road to Close:
SH1 Southbound Mainline
1982
Resources: 3x TMAs
Notes: • Reduce SH1 to single 
left lane before 
Act 
Elephant House
Standby Location: Akoranga Bus 
• Deploy outriggers, road 
Onramp
closed bollards and 
cones to U-turn traffic 
through centre median
• Commence U-turns 
Information 
only after approval from 
DE after last 
northbound vehicles 
have passed
Official 
Deployment Location: Mainline @ Elephant House
the 
under 
Released 




Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 4 (Full Closure)
Call Sign: Onewa
Road to Close:
SH1 Onewa Southbound Onramp
1982
Resources: 1x TMA
Notes: • Deploy Outriggers & 
Road Closed Bollards
Act 
Standby Location: Sylvan Ave
Information 
Official 
Deployment Location: Onramp @ NB/SB Diverge
the 
under 
Released 

Document Outline