Auckland Harbour Bridge
High Winds Closure Plan
19/05/2023
Summary
•
This pack summarises the closure plan for:
•
AHB Restriction Stage 3 (Reduce Lanes), and
•
AHB Restriction Stage 4 (Full Closure). Note, can be achieved by:
•
Short Term <45min – Close at base of AHB, stack traffic on mwy
1982
•
Long Term >45min – Close at outer cordons, detour all traffic
Act
Short Term Stage 4
•
If the DE assess Stage 4 is only required for a short period, or if conditions
deteriorate rapidly, the DE will make the call for the 4x Stage 3 TMA units to
drop their outrigger to instantly close AHB.
Resources
•
This plan requires:
•
Stage 3 – 4x TMAs (also for Full Closure Short Term)
Information
•
Stage 4 – 10x TMAs, 2x Light Vehicles
Command & Communication
•
The WK ASM Duty Engineer (DE) controls the response
•
All Site Leads & DE to be on ASM Radio Channel “AHB”
•
Site Leads to develop implementation plan with their team
Official
•
DE will check all leads are ready in standby locations using call signs
•
DE will issue instruction to deploy Stage 3 or 4 via broadcast to all units
the
•
Site Leads to confirm closure installed back to DE
Safety & Welfare
•
CMJ crew to circulate around cordons on south side of AHB to cover
under
breaks. Crews north of AHB to utilise Elephant House.
Transition from Stage 3 to 4
•
In the event Stage 3 is deployed and conditions deteriorate requiring Stage
4 to be implemented,
•
Police or TIM Units will close Curran and Fanshawe Onramps,
Northbound Throttle to remain until last vehicle before to replacing
Released
units at Curran and Fanshawe
•
Police or TIM Unit may close Onewa onramp, Southbound Throttle will
remain until U-turn established before closing Onewa onramp
Auckland Harbour Bridge
High Winds Closure Plan
Reference Page
•
Stages 1 and 2 are implemented by ATOC based on recent actual winds
•
Stages 3 and 4 are implemented by ASM at the DEs discretion based on
actual winds, forecast winds, wind type, traffic conditions and advice from 1982
MetService.
•
Table below summarises gust threshold limits (km/hr).
Gust Wind Thresholds
Act
Restriction Stage
Action Required
(from Resolve’s international best practice workstream)
Perpendicular
Oblique
1 (Reduce Speed)
Speed Restrictions
Commence
55
70
2 (Detour WVV)
Wind Vulnerable Vehicles
Detoured
65
80
3 (Reduce Lanes)
Alternate Lanes Closed
75
90
4 (Full Closure)
AHB Ful y Closed
90
105
Information
Stage 3 Position Summary
Position
Call Sign
Resources
Lead Name
Phone
SH1 NBD AHB Mainline
Northbound Throttle
2x TMAs
SH1 SBD AHB Mainline
Southbound Throttle
2x TMAs
Official
Stage 4 Position Summary
the
Position
Call Sign
Resources
Lead Name
Phone
ransition
SH1 NBD Mainline
Northbound Main
2x TMAs
o 4 T
SH16 WBD Link From Port
Port
1x TMA
3 t
under
age
SH16 EBD Link From West
Gundry
1x TMA
St
SH1 Wellington St Onramp
Wel ington
1x IR Truck
SH1 Fanshawe St Onramp
Fanshawe
1x TMA
1x IR Truck
SH1 Curran St Onramp
Curran
1x TMA
Released
SH1 SBD Mainline
Southbound Main
3x TMAs
SH1 SBD Onewa Rd
Onramp
Onewa
1x TMA
Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 3 (Reduce Lanes) W Call Sign: Northbound
Throttle
Road to Close:
SH1 Northbound Mainline
1982
Resources: 2x TMAs
Notes: • Below for Westerly
winds, for Easterly
Act
winds close alternate
Standby Location:
lanes
Under Vic Park
Flyover
Information
Official
Deployment Location: Mainline Under 1st AHB Gantry
the
under
Released
Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 3 (Reduce Lanes) W Call Sign: Southbound
Throttle
Road to Close:
SH1 Southbound Mainline
1982
Resources: 2x TMAs
Notes: • Below for Westerly
winds, for Easterly
Act
winds close alternate
Standby Location:
lanes
Southbound Weigh
Pad
Information
Official
Deployment Location: Mainline Under 1st AHB Gantry
the
under
Released
Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 4 (Full Closure)
Call Sign: Northbound
Main
Road to Close:
SH1 Northbound Mainline
1982
Resources: 2x TMAs
Notes: • Deploy Outriggers &
Road Closed Bollards
Act
Standby Location: Shoulder Prior to Gillies Onramp
Information
Official
Deployment Location: Mainline @ SH16 Westbound Link
the
under
Released
Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 4 (Full Closure)
Call Sign: Port
Road to Close:
SH16 Westbound Link to SH1 Northbound
1982
Resources: 1x TMA
Notes: • Deploy Outriggers &
Road Closed Bollards
Act
Standby Location: Shoulder Under Upper Queen St
Information
Official
Deployment Location: Mwy Link @ SH16 Mainline Diverge
the
under
Released
Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 4 (Full Closure)
Call Sign: Gundry
Road to Close:
SH16 Eastbound Link to SH1 Northbound
1982
Resources: 1x TMA
Notes: • Deploy Outriggers &
Road Closed Bollards
Act
• Call/Radio to ATOC to
Standby Location: Gundry St Ramp
open Gundry St Gate
Information
Official
Deployment Location: Mwy Link @ Nelson Offramp Diverge
the
under
Released
Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 4 (Full Closure)
Call Sign: Wellington
Road to Close:
SH1 Wellington St Northbound Onramp1982
Resources: 1x IR Truck
Notes: • Cone off left and right
turn lanes
Act
• Deploy Road Closed
Standby Location: CMJ Yard
Bollards
Information
Official
Deployment Location: Onramp @ Commencement
the
under
Released
Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 4 (Full Closure)
Call Sign: Fanshawe
Road to Close:
SH1 Fanshawe St Northbound Onramp1982
Resources: 1x TMA
Notes: • Cone dedicated left turn,
right turn and straight
1x IR Truck
Act
lanes on approaches
Standby Location: Fanshawe or
• Deploy Road Closed
Beaumont St
Bollards/Signs
Information
Official
Deployment Location: Onramp @ Westhaven Dr
the
under
Released
Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 4 (Full Closure)
Call Sign: Curran
Road to Close:
SH1 Curran St Northbound Onramp
1982
Resources: 1x TMA
Notes: • Deploy Outriggers &
Road Closed Bollards
Act
• Cone off approach
Standby Location: Sarsfield St
lanes and close
onramp gate
Information
Official
Deployment Location: Onramp @ Westhaven Dr
the
under
Released
Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 4 (Full Closure)
Call Sign: Southbound
Main
Road to Close:
SH1 Southbound Mainline
1982
Resources: 3x TMAs
Notes: • Reduce SH1 to single
left lane before
Act
Elephant House
Standby Location: Akoranga Bus
• Deploy outriggers, road
Onramp
closed bollards and
cones to U-turn traffic
through centre median
• Commence U-turns
Information
only after approval from
DE after last
northbound vehicles
have passed
Official
Deployment Location: Mainline @ Elephant House
the
under
Released
Auckland Harbour Bridge
High Winds Closure Plan
Restriction Stage: 4 (Full Closure)
Call Sign: Onewa
Road to Close:
SH1 Onewa Southbound Onramp
1982
Resources: 1x TMA
Notes: • Deploy Outriggers &
Road Closed Bollards
Act
Standby Location: Sylvan Ave
Information
Official
Deployment Location: Onramp @ NB/SB Diverge
the
under
Released