AVA RAIL BRIDGE WORKS – 24 February to June 2025 
 
 
Dear neighbour, 
We’re writing to let you know that KiwiRail wil  soon be carrying out 
essential upgrade work on Ava Rail Bridge. 
The work involves:  
-  removing and replacing sleepers on the north-bound track 
-  removing and replacing rail and fastenings, across the bridge 
and on the bridge approaches, on both north-bound and 
south-bound tracks 
-  replacing the corrosion protection coating for the steel bridge 
beams 
-  installing emergency access to the structure. 
KiwiRail workers and specialist rail-mounted equipment, including 
cranes and excavators, wil  be used to complete the works. Trains 
will mostly continue as normal.   
If you have questions about the works email 
[email address] 
 
Ava Bridge Walkway closing from 24 February 2025 
In order to undertake the works, the walkway which is attached to 
the railway sleepers needs to be removed. The walkway dates back 
to the 1920s and cannot be replaced in its current form. Current 
design also means it is also too close to the tracks and does not 
provide enough separation between people and trains.   
We are mindful that this is well used by locals and Hutt City Council 
is considering options for access in the future.  
The closest alternative pedestrian access across Hutt River is about 
1km away at the Waione Street bridge to the south or Ewan Bridge 
to the North.   
 
 