Local Government Official Information and Meetings Act 1987
CAS-383978-G2J1P3 
Thank  you  for  contacting  Auckland  Transport  (AT)  on  25  August  2016  requesting  the  following 
information in relation to mass transit options to the airport.  
All  of  the  information  you  have  requested  is  available  in  the  report  from  the  South-western  Multi-
modal Airport  Rapid  Transit  Draft  Indicative  Business  Case  (IBC),  which  can  be  found  at the  link  to 
the AT website (Link 1). AT is currently investigating mass rapid transit options to the airport, with light 
rail  and  bus  being  looked  at  as  options.  Additional  information  about  the  decision  made  by  the  AT 
board to discount heavy rail to the airport can be found in the SMART board report (Link 2). 
Your request has been emphasised in bold as follows: 
1)  Benefit Cost Ratios and analysis for Light Rail to the Airport
These can be found from page 113 of the IBC (Link 1). 
2) Benefit Cost Ratios and analysis for Heavy Rail from Onehunga to the Airport via Mangere
As above 
3) All information and analysis to date on heavy rail from Otahuhu to the Airport via Mangere
The long list options for heavy rail can be found on pages 49-53 of the IBC and the short list options 
for heavy rail can be found on pages 66-71 (Link 1). 
3a) Any initial costs of construction and land acquisition if this option were to proceed 
Cost  estimates  can  be  found  in  Appendix  F  of  the  IBC  entitled  Shortlist  Option  Estimates  at  the 
website link (Link 1). 
3b) Estimated time of construction 
Detail about timing can be found on page 118 of the IBC (Link 1). The timing was based on a guiding 
assumption in order to calculate the costings of the project and is being worked through as part of the 
Auckland  Transport  Alignment  Project  which  will  confirm  the  timing  of  investment  in  mass  rapid 
transit. Please see Link 3 for more information on ATAP. 
3c) Suggestive operation patterns and frequencies servicing this line 
Information about operation patterns and frequencies is included in the assumptions list for the long 
list option identification and evaluation on page 49 of the IBC (Link 1). 
3d) Why was this option dismissed out of hand early on rather than given full analysis like 
options 1 and 2 despite having a better benefit cost ratio as suggested here: 

aucklandtransport.govt.nz 




https://voakl.files.wordpress.com/2016/02/airport-rail-study-6b.jpg and 
https://voakl.files.wordpress.com/2016/02/airport-rail-study-6a.jpg 

The option was not dismissed but assessed against same criteria as other corridors and came fourth. 
The top three corridors were progressed further.  
Top 3 corridors: 
1.
Northern and southern loop
2.
Northern corridor
3.
Southern corridor
Please see sections 4.4.7 on page 40; 5.3.3. on page 51; 5.6.4 on page 65; 5.11 on page 73 of Link 4. 
LINKS 
Link  1.  South-western  Multi-modal  Airport  Rapid  Transit  (SMART)  Draft  Indicative  Business  Case 
Report 
https://at.govt.nz/media/1927342/draft-smart-indicative-business-case.pdf 
Link 2. SMART board report 27 June 2016 
https://at.govt.nz/media/1866351/item-11-6-smart-preferred-way-forward-final.pdf 
Link 3. Auckland Transport Alignment Project (ATAP) update, Foundation Report and Interim Report 
i.
http://www.transport.govt.nz/land/auckland/atap/
ii.
http://www.transport.govt.nz/assets/Uploads/Land/Documents/Auckland-Transport-Alignment-
Project-Foundation-Report.pdf

iii.
http://www.transport.govt.nz/assets/Uploads/Land/Documents/Auckland-Transport-Alignment-
Project-Interim-Report.pdf

iv.
http://transport.govt.nz/assets/Uploads/Land/Documents/ATAP-Recommended-Strategic-
Approach.pdf
Link 4. South-Western Airport Multi-Modal Corridor Project Scoping Report 
https://at.govt.nz/media/1971230/south-western-airport-multi-modal-corridor-project-scoping-report-
final-draft.pdf 

We trust the above information has addressed the matters raised however, should you believe that 
we have not responded appropriately to your request, you have the right in accordance with section 
27(3) of the LGOIMA to make a complaint to the Office of the Ombudsman to seek an investigation 
and review in regard to this matter.
Yours faithfully 
Peter Clark 
Chief Strategy Officer