This is an HTML version of an attachment to the Official Information request 'Geotechnical investigation information for Arras Tunnel project'.


Date 25/02/2013 
UND-MEMO-02-010 
Email: 
s 9(2)(a)
To 
s 9(2)(a)
s 9(2)(a)
From 
CC 
s 9(2)(a)
THE  ACT 
Date 
25/02/2013 
Subject 
Detailed Design Geotechnical Parameter Selection – Revision 
R E C O M M E N D E D   D E T A I L E D   D E S I G N   P A R A M E T E R S  
We have completed a review of geotechnical material strength parameters, and recommend 
minor changes to previous recommendations. The recommended material parameters are 
presented in table 1 below.  
The revised parameters will be carried through to the next revision of the geotechnical interpretive 
report following a review of the stiffness parameters that is currently underway. 
Table 1: Recommended Design Parameters 
Geological Units 
Holocene 
Completely 
Design Parameters 
Pleistocene  Residual 
Fill 
Alluvium 
Organic 
Weathered 
Layers 
Alluvium 
Soil 
East 
West 
Greywacke 
INFORMATION 
Unit 
kN/m3 
19 
18 
18 
16.5 
18 
18 
19.5 
Weight 
Mid1)
32 
32 
28 
35 
34 
36 
Friction 
° 
Angle 
Lower2)
28 
30 
28 
26 
32 
32 
35 
RELEASED UNDER
Mid1)



10 
10 
15 
Cohesion  (KPa)  Lower2)






10 
Poisson’s 
 - 
0.3 
0.3 
0.3 
0.35 
0.3 

0.3 
Ratio 
Notes: 
1) Based on laboratory testing, analysis of CPT data and SPT-N value plots
2) Based on analysis of CPT data and SPT-N value plots
OFFICIAL 
 Memorial Park Alliance / Memorandum / 25.02.13 


B A C K G R O U N D  
Initial design parameters were used in the concept TCE design package. These parameters were 
based on the site investigation data available at the time including limited laboratory testing.  
Since the TCE design submission further site investigation, laboratory testing and construction works 
have been completed. This has provided a more extensive understanding of the geotechnical 
materials and their parameters.  As such, it is appropriate to revise the initial parameters and 
conduct a more intensive analysis of the site investigation data received up to February 2013. 
D E S I G N   P A R A M E T E R   D I S C U S S I O N
A design parameter workshop was held to establish revised detailed design parameters.  Within this 
workshop, the analysis of the site investigation data was presented then compared to site 
observations and local project knowledge. 
THE  ACT 
Design parameters are determined from a combination of: 

Analysis of CPT data

Plotting of SPT-N values

Laboratory testing

Local geotechnical knowledge and project experience

Site observations of materials during initial construction and site investigation
Where available, laboratory testing has been given heavier weighting in the assessment than less 
direct interpolation from the CPT and N value analysis. 
Annotated graphical outputs of the CPT and SPT-N value analysis and relevant laboratory testing 
results are enclosed in the Appendix. 
Analysis of the stiffness parameters is underway. 
A P P E N D I C I E S  
INFORMATION 
UND West Alluvium CPT Geological Layers 
UND West Alluvium CPT Material Behaviour 
UND East Alluvium CPT Geological Layers 
UND East Alluvium CPT Material Behaviour 
UND Rock CPT Geological Layers 
RELEASED UNDER
UND Rock CPT Material Behaviour 
Borehole SPT N Values 
Borehole Materials SPT N Values 
Laboratory Testing to 14.02.2013 
OFFICIAL