This is an HTML version of an attachment to the Official Information request 'Updates on Airport to Botany Rapid Transit given to Howick Local Board, what options where considered by AT and partners'.





Airport-Botany
20 Connect
Southern Local Boards
17 September 2018




Southwest Gateway Programme
Auckland Transport, NZTA, Auckland Airport
• Airport to Botany rapid 
transit
• 20 Connect state highway 
improvements
• Auckland Airport precinct 
improvements



A2B - Problems to 
A2B Aims
20Connect - Problems to 
20 Connect Aims
address
address  
Costly, complicated 
Provide more equitable access to jobs, 
Inadequate transport 
Improve transport reliability 
and unreliable 
education and social opportunities
capacity and connections to 
and resilience
journeys
and within Airport area 
precinct hinders growth 
Poor east west 
Provide easy, affordable, fast, reliable and  
Limited access and choices 
Boost economic 
travel choices
resilient  public transport options and 
to move people and goods
performance of the airport 
through this - promote urban regeneration 
and surrounding area  
and economic opportunities
Safety perceptions
Improve perception of safety and security
Safety perceptions 
Improve safety around use 
around use of public transport and active 
of public transport and 
modes (walking / cycling)
active modes 
Environmental /
Reduce transport effects, enhance 
Environmental / 
Reduce transport effects 
cultural effects
environment
cultural effects
and enhance environment 




Airport to Botany

Airport to Puhinui 

Via SH20B direct – Direct and 
effective, but environmental and 
cultural risks

Via SH20A and Mangere – Less 
direct and has potential effects

Puhinui through Manukau 

Via  Manukau but skip station  

Via Manukau and station 

Manukau to Botany 

Te Irirangi Drive – utilises existing 
median








Mode
Airport to Botany
• Street level corridors that can be bus rapid transit, advanced bus, or 
light rail
• All have 24/7 dedicated lanes
• Almost no traffic delay, priority through intersections
• Special ‘rapid transit’ vehicles: long, high capacity, well equipped
• Very similar corridor width, station locations, priority systems




20 Connect  
Walking and cycling
State highway upgrades
New state highway Connections
Local road improvements
Integration with light rail




Upcoming engagement
• Ongoing engagement with Mana Whenua
• Further group and individual meetings / briefings
• Local board update (Sep / Oct)

Howick: Tuesday 18 September, 5pm

Otara-Papatoetoe: Tuesday 25 September, 11.30am

Manurewa: Thursday 27 September, 5.30

Mangere Otahuhu: TBD
• Engagement with SH20B neighbours before early 
works (Sep / Oct)
• Public engagement (Oct/ Nov)



Business Case Timeline
We are here 
Next steps 
Problem Def 
Workshop
Sep’18
Oct’18
Nov’18
Dec’18
Jan’19 – Mid’19
Reconfirm 
Strategic Case
Develop and Assess Options
Option Assessment 
Workshop
Informal 
Discussion
Preferred indicative 
option identified
Progress Detailed 
Design Business Case; 
i.e. developing the 
Business Case 
indicative preferred 
Development
option into more detail 
to inform a Notice of 
Requirement / route 
Final Business 
protection process
Case





Kia ora mai