This is an HTML version of an attachment to the Official Information request 'Cost versus savings of bus changes'.
Route performance
Route 2
Nov 18 ‐ Jan 19

Route
Direction
Timetable 
Cancelled 
Avg. variance  Max. Variance  Trips >5 mins  Avg variance (  Max variance  Trips >5 mins  Avg Travel 
Avg. 
Avg travel 
Trips
Trips
(mins) at 
(mins) at 
late at Origin mins) at 
( mins ) at 
late at 
Time
Scheduled 
Time variance 
Origin
Origin
Destination
Destination
Destination
Travel Time
to schedule
2
0
6734
88
1.4
                 
39.5
               
499
2.5
47.4
1811
54.3
53.1
1.2
2
1
6618
86
1.8
                 
48.9
               
627
1.2
54.8
1138
54.1
54.5
‐0.4
Direction:
0= to Karori
1= from Karori