Cost of footpath repair work in Mangere Bridge
Jason Rowe made this Official Information request to Auckland Transport
This request has an unknown status. We're waiting for Jason Rowe to read a recent response and update the status.
From: Jason Rowe
Dear Auckland Transport,
I would like a detailed breakdown and total cost of the footpath repair work conducted outside 4 Muir Ave, Mangere Bridge, on or about the date of the 24th January 2025, under Snap Send Solve ID 5735144.
Yours faithfully,
Jason Rowe
From: AT Official Information (AT)
Auckland Transport
Kia ora Jason,
Auckland Transport (AT) acknowledges receipt of your request for official
information dated 24 January 2025 for detailed breakdown and total cost of
footpath repair work conducted outside 4 Muir Avenue, Mangere Bridge, on
or about the 24^th January 2025.
We hope to respond to your request as soon as possible, but no later than
25 February 2025, which is 20 working days after the day your request was
received. This takes into account Auckland Anniversary, 27 January 2025
and Waitangi Day, 6 February 2025, which are not included as working days.
Your case is being managed by Anna, who is one of our LGOIMA Business
Partners. If you have any further queries, you can contact the team on
(09) 355 3553 during business hours, quoting Local Government Official
Information request number CAS-1047508-B0Z8R1.
Ngā mihi,
Ane | Customer Care Coordinator
Customer and Network Performance
Auckland Transport
20 Viaduct Harbour Avenue, Auckland 1010
[1]www.at.govt.nz
[2]image
show quoted sections
Things to do with this request
- Add an annotation (to help the requester or others)
- Download a zip file of all correspondence