Ross Hill Tunnel (NAL Tunnel No.7) Tunnel upgrade design reports

Andrew Jones made this Official Information request to KiwiRail

This request has an unknown status. We're waiting for Andrew Jones to read a recent response and update the status.

From: Andrew Jones

Dear KiwiRail,

We have been engaged by our client who is concerned that the recent track upgrades to the Ross Hill Tunnel (No.7) northern portal on the North Auckland Line, which as she states included lowering of the track, has increased erosion on her land adjacent to the northern portal.

We would like to review the design report regarding the upgrade to the Ross Hill Tunnel (No.7), to determine the extent of earthworks, and also what measures were taken in order to prevent erosion of the site.

Yours faithfully,

Andrew Jones

Link to this

From: Dave Allard
KiwiRail


Attachment T7 Detailed Design Report.pdf
10.0M Download View as HTML


Good afternoon

Please find the attached.
Any questions, please get in touch.

This information has been released under the OIA. You have the right to seek an investigation and review by the Ombudsman of this decision. Information about how to make a complaint is available at www.ombudsman.parliament.nz or freephone 0800 802 602.

Kind regards

Dave

Dave Allard  | Senior Government Relations Advisor
DDI: 027 201 8182
Level 4, Wellington Railway Station, Bunny Street, Wellington 6011 | PO Box 593, Wellington 6140, New Zealand

www.kiwirail.co.nz

-----Original Message-----
From: Andrew Jones <[FOI #21458 email]>
Sent: Monday, 19 December 2022 3:44 pm
To: KiwiRail <[email address]>
Subject: Official Information request - Ross Hill Tunnel (NAL Tunnel No.7) Tunnel upgrade design reports

CAUTION EXTERNAL EMAIL: Do not click links or open attachments unless you know the content is safe.

Dear KiwiRail,

We have been engaged by our client who is concerned that the recent track upgrades to the Ross Hill Tunnel (No.7) northern portal on the North Auckland Line, which as she states included lowering of the track, has increased erosion on her land adjacent to the northern portal.

We would like to review the design report regarding the upgrade to the Ross Hill Tunnel (No.7), to determine the extent of earthworks, and also what measures were taken in order to prevent erosion of the site.

Yours faithfully,

Andrew Jones

-------------------------------------------------------------------

This is an Official Information request made via the FYI website.

Please use this email address for all replies to this request:
[FOI #21458 email]

Is [KiwiRail request email] the wrong address for Official Information requests to KiwiRail? If so, please contact us using this form:
https://fyi.org.nz/change_request/new?bo...

Disclaimer: This message and any reply that you make will be published on the internet. Our privacy and copyright policies:
https://fyi.org.nz/help/officers

If you find this service useful as an Official Information officer, please ask your web manager to link to us from your organisation's OIA or LGOIMA page.

-------------------------------------------------------------------

hide quoted sections

Link to this

We don't know whether the most recent response to this request contains information or not – if you are Andrew Jones please sign in and let everyone know.

Things to do with this request

Anyone:
KiwiRail only: