Weak concrete or over sized aggregate rubble foundations

Rachael Harris made this Official Information request to Toka Tū Ake – Natural Hazards Commission

Response to this request is long overdue. By law Toka Tū Ake – Natural Hazards Commission should have responded by now (details and exceptions). The requester can complain to the Ombudsman.

From: Rachael Harris

Dear Earthquake Commission,

Please provide all documents relating to repair strategies for repairing weak concrete or over sized aggregate concrete 'rubble' perimeter foundations.

Yours faithfully,

Rachael Harris

Link to this

From: Ministerial Services Team


Attachment image001.jpg
8K Download

Attachment 759 Request for Information Rachael Harris.pdf
303K Download View as HTML


Dear Ms Harris

 

Please find attached EQC’s response to your request for information.

 

Yours sincerely

 

Bradley Martin | Advisor | Government Relations, Communications &
Stakeholders 

Earthquake Commission | Kômihana Rûwhenua

[1]www.eqc.govt.nz

 

[2]cid:image001.jpg@01D189A0.F72206B0

 

 

 

 

************************************************************************************************************************************************************************
This email message (along with any attachments) is intended only for the
addressee(s) named above.  The information contained in this email is
confidential to the New Zealand Earthquake Commission (EQC) and must not
be used, reproduced or passed on without consent.  If you have received
this email in error, informing EQC by return email or by calling (04)978
6400 should ensure the error is not repeated. 
Please delete this email if you are not the intended addressee.
************************************************************************************************************************************************************************

References

Visible links
1. http://www.eqc.govt.nz/

hide quoted sections

Link to this

Mark Hanna left an annotation ()

A response to this request was due 8 working days ago. This delay is entirely unacceptable, and you'd be entitled to complain to the Ombudsman on that basis.

Link to this

From: Rachael Harris

Dear Ministerial Services Team,

Your response is both incorrect and inadequate. MBIE Guidance does not apply to Rubble Foundations, and that has been confirmed by MBIE on multiple emails from Dennis Monastra, Senioro Advisor of Compliance Solutions.
Please provide a proper response to my query.

Yours sincerely,

Rachael Harris

Link to this

Things to do with this request

Anyone:
Toka Tū Ake – Natural Hazards Commission only: