Response to this request is long overdue. By law Wellington Regional Council should have responded by now (details and exceptions). The requester can complain to the Ombudsman.

From: Hugh Davenport

Dear Wellington Regional Council,

I saw a response from Metlink on a post at https://www.facebook.com/groups/10369437... that mentioned that the bus contractors are required to have a minimum capacity of 75 passengers. I guess this is a request in addition to my other request https://fyi.org.nz/request/9841-informat....

How many buses have had that minimum capacity met by actual passengers since July 2018? Ie, how many buses have actually had 75 passengers on it at a single time.

If there are other routes with other contractual minimums, I would like to know how many of those have ever had those capacities reached by actual passengers.

If those minimums have never been reached, I would like to know what Metlink are doing about the breach of contractual obligations from the bus operators?

Yours faithfully,

Hugh Davenport

Link to this

From: Sam Horsefield
Wellington Regional Council

Dear Hugh,

 

This further information that you have requested has been added to your
other OIA, found at
[1]https://fyi.org.nz/request/9841-informat....

 

This means that the new due date for this OIA is the 12^th of April 2019.

 

Yours sincerely,

Sam Horsefield

 

Sam Horsefield | Information Services Administrator

GREATER WELLINGTON REGIONAL COUNCIL
Te Pane Matua Taiao

15 Walter Street, Te Aro, Wellington 6011 | PO Box 11646, Manners St,
Wellington 6142

 

 

 

ATTENTION: This correspondence is confidential and intended for the named
recipient(s) only. If you are not the named recipient and receive this
correspondence in error, you must not copy, distribute or take any action
in reliance on it and you should delete it from your system and notify the
sender immediately. Unless otherwise stated, any views or opinions
expressed are solely those of the author, and do not represent those of
the organisation.

References

Visible links
1. https://fyi.org.nz/request/9841-informat...

Link to this

Hugh Davenport left an annotation ()

This has been extended to 31 May 2019 under section 14(1)(a) of the LGOIMA.

Link to this

From: Hugh Davenport

Dear Wellington Regional Council,

While this was discussed during a meeting with Greg Pollock today, I would still like this information to ensure that there is adequate capacity on the Metlink network.

Please note that this request was an addition to https://fyi.org.nz/request/9841-informat..., which I have since "withdrawn" from the FYI system. Both that and all the additions in this thread (https://fyi.org.nz/request/9863-informat...) should be treated as the complete request. Replies should be made to this request.

Yours faithfully,

Hugh Davenport