Centre Place Building Consents

Thomas Holmes made this Official Information request to Hamilton City Council

Response to this request is long overdue. By law Hamilton City Council should have responded by now (details and exceptions). The requester can complain to the Ombudsman.

From: Thomas Holmes

Dear Hamilton City Council,

I am writing to request information relating to the Centre Place complex located in the Hamilton CBD.

For clarity, I am referring to both the side of the complex located north of Ward Street, the side of the complex south of Ward Street (formerly Downtown Plaza), and any other buildings that have been incorporated into the Centre Place complex such as the former P&M Plaza building.

Specifically, for the time period of 2000 to present, please provide a copy of the following:
- All building consents; and
- All plans (e.g. floor plans, architectural plans) that accompany any building consents; and
- All fire report documents that accompany each building consent.
- All code of compliance documents that accompany each building consent.

I understand that the total file size of these documents will be quite large. I am happy to provide a USB drive if you let me know the total file size.

Thank you for your help with this request.

Yours faithfully,

Thomas Holmes

Link to this

From: Thomas Holmes

Dear Hamilton City Council,

I am writing to follow up on this LGOIMA request as the response should be due by 3 July.

Yours faithfully,

Thomas Holmes

Link to this

Things to do with this request

Anyone:
Hamilton City Council only: