All project reports relating to any funding received by HPANZ

William Stewart made this Official Information request to Energy Efficiency and Conservation Authority

The request was successful.

From: William Stewart

Dear Energy Efficiency and Conservation Authority,

Can you please supply all copies of all project reports (specifically the Project reports mentioned in your Funding Agreements, for Low Emission Transport funding received by Holiday Parks Association New Zealand. This should include the operational data for the first 12 months of the project, and the project close-out interview.

Specifically, this should include the following projects:

30x Chargers - Supercharging Holiday Parks - Round 6

and

50x 22kW AC chargers, costing $440,000, as part of this project -
https://www.eeca.govt.nz/insights/case-s...

If these projects are the same, please include an explanation as to how the scope has expanded or changed.

Yours faithfully,

William Stewart

Link to this

From: Official Information Act Requests
Energy Efficiency and Conservation Authority


Attachment image001.png
5K Download

Attachment image002.jpg
11K Download


Kia ora William

 

I acknowledge receipt of your official information request dated Friday 10
February 2023. You have requested the following information:  

 

Can you please supply all copies of all project reports (specifically the
Project reports mentioned in your Funding Agreements, for Low Emission
Transport funding received by Holiday Parks Association New Zealand. This
should include the operational data for the first 12 months of the
project, and the project close-out interview.

 

Specifically, this should include the following projects:

 

30x Chargers - Supercharging Holiday Parks - Round 6

 

and

 

50x 22kW AC chargers, costing $440,000, as part of this project -
[1]https://www.eeca.govt.nz/insights/case-s...

 

If these projects are the same, please include an explanation as to how
the scope has expanded or changed.

 

We received your request on Friday 10 February 2023. We will endeavour to
respond to your request as soon as possible and in any event no later than
Friday 10 March 2023, being 20 working days after the day your request was
received. If we are unable to respond to your request by then, we will
notify you of an extension of that timeframe.  EECA will come back to you
as soon as possible if we need to rescope the request. Please note, the 20
working day statutory deadline will restart from the date after the
request is clarified.

 

I will be handling your request. If you have any queries, please feel free
to contact me via [2][email address] . If any additional factors come to
light which are relevant to your request, please do not hesitate to
contact us so that these can be taken into account.

 

Ngā mihi   

 

Olivia De Gregorio  

Graduate Advisor 

Policy and Engagement 

 

 

  

Level 8   ∙ 44 The Terrace  ∙  Wellington 6011  ∙  PO Box 388  ∙
 Wellington 6140 

[3]www.eeca.govt.nz 

  

 

 

Caution: If you have received this message in error please notify the
sender immediately and then delete this message along with any
attachments.  Please treat the contents of this message as private and
confidential. 

 

P Please consider the environment before printing this email 

 

 

References

Visible links
1. https://www.eeca.govt.nz/insights/case-s...
2. mailto:[email address]
3. http://www.eeca.govt.nz/

Link to this

From: Official Information Act Requests
Energy Efficiency and Conservation Authority


Attachment image001.png
5K Download

Attachment image002.jpg
11K Download

Attachment Item 21 Reporting Tourism Holdings Milestone 7 REDACTED.pdf
1.3M Download View as HTML

Attachment Item 4 Report Summary Tourism Holdings Update of project for all milestones 15 October 18.pdf
304K Download View as HTML

Attachment Item 5 180930 EECA Project Report Milestone 4.pdf
439K Download View as HTML

Attachment Item 9 Reporting THL Project Report Milestone 8.pdf
309K Download View as HTML

Attachment Item 10 Reporting THL Project Report Milestone 9.pdf
375K Download View as HTML

Attachment Item 11 Reporting THL Project Report Milestone 8.pdf
194K Download View as HTML

Attachment Item 13 Reporting THL Project Report Milestone 9 Version 2.pdf
266K Download View as HTML

Attachment Item 15 Project Report THL Progress Summary 16 January 2019 Milestone 3 part claim.pdf
260K Download View as HTML

Attachment Item 17 Reporting Tourism Holdings Milestone 3 7 project report progress summary.pdf
355K Download View as HTML

Attachment Item 18 Reporting Tourism Holdings Project Milestones 3 5 7.pdf
294K Download View as HTML

Attachment Item 19 Reporting Tourism Holdings Final Project Progress Summary All Milestones.pdf
337K Download View as HTML

Attachment Item 22 Project Report Progress Summary Tourism Holdings 14 2 19.pdf
312K Download View as HTML

Attachment Item 23 Project Report THL Progress Summary 16 January 2019 Milestone 3 part claim.pdf
237K Download View as HTML

Attachment Item 24 LEVCF project exit interview THL 04.10.19.pdf
116K Download View as HTML

Attachment Item 16 Reporting Tourism Holdings Milestone 3 7 Project Report Progress Summary.pdf
385K Download View as HTML

Attachment FINAL Letter to the Requester.pdf
258K Download View as HTML

Attachment Item 7 Project Tourism Holdings Completion of Milestone 4 REDACTED.pdf
3.5M Download View as HTML

Attachment Item 25 Reporting Tourism Holdings Final Project Progress Summary All Milestones version 2.pdf
231K Download View as HTML

Attachment Item 8 Report Tourism Holdings Milestone 6 Complete REDACTED.pdf
4.8M Download View as HTML

Attachment Item 6 Project Tourism Holdings Completion of Milestone 4.pdf
299K Download View as HTML

Attachment Item 1 180630 EECA Project Report REDACTED.pdf
1.5M Download View as HTML

Attachment Item 2 180930 EECA Project Report Milestone 2 24.2.23 REDACTED.pdf
2.0M Download View as HTML

Attachment Item 3 Report Tourism Holdings Completion of Milestone 2 REDACTED.pdf
2.2M Download View as HTML

Attachment Item 12 Report Tourism Holdings Milestone 6 Complete version 2 REDACTED.pdf
3.7M Download View as HTML

Attachment Item 14 Reporting Milestone 3 REDACTED.pdf
3.3M Download View as HTML

Attachment Item 20 Reporting Tourism Holdings Project Report Milestone 7 version 2 REDACTED.pdf
2.2M Download View as HTML


Kia ora William

 

Please see attached EECA’s response to your OIA request of 10 February
2023. Please let us know if you have any issues viewing the documents
(there should be 26 total).

 

Ngā mihi

 

Olivia De Gregorio  

Graduate Advisor 

Policy and Engagement 

 

 

  

Level 8   ∙ 44 The Terrace  ∙  Wellington 6011  ∙  PO Box 388  ∙
 Wellington 6140 

[1]www.eeca.govt.nz 

  

 

 

Caution: If you have received this message in error please notify the
sender immediately and then delete this message along with any
attachments.  Please treat the contents of this message as private and
confidential. 

 

P Please consider the environment before printing this email 

 

 